CN108457357A - A kind of current-formed silt soil layer pipeline construction method - Google Patents

A kind of current-formed silt soil layer pipeline construction method Download PDF

Info

Publication number
CN108457357A
CN108457357A CN201810148649.6A CN201810148649A CN108457357A CN 108457357 A CN108457357 A CN 108457357A CN 201810148649 A CN201810148649 A CN 201810148649A CN 108457357 A CN108457357 A CN 108457357A
Authority
CN
China
Prior art keywords
tube coupling
tube
sections
pipeline
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810148649.6A
Other languages
Chinese (zh)
Inventor
王丽梅
袁银书
张振禹
付国刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201810148649.6A priority Critical patent/CN108457357A/en
Publication of CN108457357A publication Critical patent/CN108457357A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Abstract

The invention discloses a kind of current-formed silt soil layer pipeline construction methods, include the following steps:(1) unwrapping wire is measured to each construction location, then installs Center stake at pipe manhole and at pipeline changing caliber;(2) basic channel excavation is carried out, trench bottom surfaces are cleaned out after basic channel excavation, backfill sandstone;(3) pipe centerline and edge positions are made in trench bottom surfaces;(4) according to the pipe centerline and edge positions made, each section of tube coupling of pipe laying is upstream sequentially connected end to end from the downstream of basic groove, increase articulated connection between tube coupling and tube coupling, this method can prevent from causing fracture, cracking etc. to pipeline under larger outer force effect.

Description

A kind of current-formed silt soil layer pipeline construction method
Technical field
The present invention relates to a kind of pipeline construction methods, more particularly to a kind of current-formed silt soil layer pipeline construction method.
Background technology
The construction of the rainfall and sewage pipes of urban road both sides belongs to urban discharging pipeline engineering.Municipal sewerage engineering is city One of important infrastructure, construction quality directly affects the discharge capacity of rain sewage, if processing is bad to be easy to cause road ponding Situations such as, cause prodigious hidden danger to the safety trip of road.Especially in some coastal areas since most of geology is stream The mud of shape is moulded, and range is relatively wide relatively deep, often gives construction and later maintenance to bring prodigious difficulty in the construction process, holds The problems such as easily causing pipe shifted, radius off-set joint, it is therefore necessary to use reliable working measure, ensure that pumping equipment pipeline is being pacified Normal construction and use under the conditions of complete.
A kind of " the support of pipelines on concrete plant's pillars of a house is disclosed application No. is the Chinese patent of CN200920071583.1 Pair of horns is fixedly installed up and down in node structure ", including holder, the corresponding position that the holder both sides are located at concrete plant's pillars of a house Steel, anchoring building bolt is fixed on concrete plant's pillars of a house after which passes through.The structure is the pipeline node on factory building columns, no Suitable for being embedded in the pipeline slot grooving of underground.
Invention content
Simple securely, installation that it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of installation technologies Precision is high, at low cost, closes a kind of water quality reliably current-formed silt soil layer pipeline construction method.
A kind of current-formed silt soil layer pipeline construction method of the present invention, includes the following steps:
(1) unwrapping wire is measured to each construction location, is then installed at pipe manhole and at pipeline changing caliber Center stake;
(2) basic channel excavation is carried out, trench bottom surfaces are cleaned out after basic channel excavation, backfill sandstone;
(3) pipe centerline and edge positions are made in trench bottom surfaces;
(4) it according to the pipe centerline and edge positions made, is upstream sequentially connected end to end from the downstream of basic groove Each section of tube coupling of pipe laying;
The step of wherein installing each section of tube coupling be:(a) tube coupling laying is carried out;(b) it is used respectively at left and right sides of this section of tube coupling Spaced timber is fixed;(c) iron wire banding fixed will be used between two timbers being correspondingly arranged at left and right sides of this section of tube coupling; (d) in this section of tube coupling surrounding layering, segmentation backfill, and expose the pipe end position being connect with hypomere tube coupling;
The step of leading portion tube coupling is connect with back segment tube coupling head and the tail be:(a) by back segment tube coupling and leading portion tube coupling plugged and fixed, so I-steel is installed respectively in the left and right sides of the joint area of two sections of tube couplings of docking afterwards;(b) in the joint area of two sections of tube couplings Between fixed using multiple tracks tension member drawknot along pipeline border, the specific steps are:On the joint area of two sections of tube couplings of docking, edge Each tube coupling border difference uniform intervals bore multiple holes, then vertical using two of U-shaped reinforcing bar in the tube chamber of two sections of tube couplings Section is each passed through a hole being correspondingly arranged on two sections of tube couplings, then two vertical sections of reinforcing bar are exposed two sections of tube coupling outer walls Curved 90 ° are arranged to hook dock two sections of tube couplings with tube coupling outside wall parallel for part, and drawknot is formed to two sections of tube couplings;
(5) whole tube couplings do closed-water test after installing to integrated piping, are not backfilled to pipeline after closed-water test qualification Position is backfilled;
(6) I-steel is upstream extracted successively from downstream.
The method of the present invention mainly for pipeline in current-formed silt soil layer construction, the excavation of pipeline foundation using layering and The method of segmentation carries out, and to prevent the upwaarping deformation of Pipeline Ground, to carry out backfill processing in time;In addition it is to prevent from having constructed The pipeline of completion causes excessive, the radius off-set joint between tube coupling and tube coupling of piping displacement floating under the action of mud stressor layer Situations such as, it takes pipeline both sides setting timber and is fixed, increase articulated connection between tube coupling and tube coupling, this connection cannot be It is rigidly connected to prevent causing fracture, cracking etc. to pipeline under larger outer force effect.
Description of the drawings
Fig. 1 is a kind of construction node schematic diagram of current-formed silt soil layer pipeline construction method of the present invention;
Fig. 2 is the structural schematic diagram that is articulated and connected between tube coupling and tube coupling in structure shown in FIG. 1.
Specific implementation mode
Below in conjunction with the accompanying drawings, the specific implementation mode of the present invention is described in detail.
A kind of current-formed silt soil layer pipeline construction method as shown in the picture, includes the following steps:
(1) unwrapping wire is measured to each construction location, is then installed at pipe manhole and at pipeline changing caliber Fender pile or control stake is preferably arranged in Center stake at pipeline changing caliber.
(2) basic channel excavation is carried out, trench bottom surfaces are cleaned out after basic channel excavation, backfill sandstone;
(3) pipe centerline and edge positions are made in trench bottom surfaces;
(4) it according to the pipe centerline and edge positions made, is upstream sequentially connected end to end from the downstream of basic groove Each section of tube coupling of pipe laying;
The step of wherein installing each section of tube coupling be:(a) tube coupling laying is carried out;(b) it is used respectively at left and right sides of this section of tube coupling Spaced timber 2 is fixed;It (c) will be solid with the binding of iron wire 3 between two timbers being correspondingly arranged at left and right sides of this section of tube coupling It is fixed, prevent pipe shifted.(d) consider that pipe trench basis under the pressure of both sides silt soil, easy tos produce the displacement swelled upwards Situation.Therefore after the completion of every section of tube coupling construction, in this section of tube coupling surrounding layering, segmentation backfill, and expose and connect with hypomere tube coupling Pipe end position 4;
The step of leading portion tube coupling is connect with back segment tube coupling head and the tail be:(a) by back segment tube coupling and leading portion tube coupling plugged and fixed, so I-steel 1 is installed respectively in the left and right sides of the joint area of two sections of tube couplings of docking afterwards;(b) it is to prevent pipe joint in mud It misplaces under the extruding of ground, it is solid using multiple tracks tension member drawknot along pipeline border between the joint area of two sections of tube couplings It is fixed, the specific steps are:In the joint area of two sections of tube couplings of docking, along each tube coupling border, difference uniform intervals bore multiple holes, Then in the tube chamber of two sections of tube couplings one be correspondingly arranged on two sections of tube couplings is each passed through using two vertical sections of U-shaped reinforcing bar 7 A hole, then by two vertical sections of reinforcing bar expose the parts of two sections of tube coupling outer walls to curved 90 ° with tube coupling outside wall parallel be arranged with The two sections of tube couplings 5,6 for hooking docking form drawknot to two sections of tube couplings.
(5) whole tube couplings do closed-water test after installing to integrated piping, are not backfilled to pipeline after closed-water test qualification Position is backfilled;
(6) I-steel is upstream extracted successively from downstream.

Claims (2)

1. a kind of current-formed silt soil layer pipeline construction method, it is characterised in that include the following steps:
(1) unwrapping wire is measured to each construction location, then installs center at pipe manhole and at pipeline changing caliber Stake;
(2) basic channel excavation is carried out, trench bottom surfaces are cleaned out after basic channel excavation, backfill sandstone;
(3) pipe centerline and edge positions are made in trench bottom surfaces;
(4) according to the pipe centerline and edge positions made, installation is upstream sequentially connected end to end from the downstream of basic groove Each section of tube coupling of pipeline;
The step of wherein installing each section of tube coupling be:(a) tube coupling laying is carried out;(b) respectively with interval at left and right sides of this section of tube coupling The timber of setting is fixed;(c) iron wire banding fixed will be used between two timbers being correspondingly arranged at left and right sides of this section of tube coupling;(d) In this section of tube coupling surrounding layering, segmentation backfill, and expose the pipe end position being connect with hypomere tube coupling;
The step of leading portion tube coupling is connect with back segment tube coupling head and the tail be:(a) by back segment tube coupling and leading portion tube coupling plugged and fixed, then exist The left and right sides of the joint area of two sections of tube couplings of docking installs I-steel respectively;(b) between the joint area of two sections of tube couplings It is fixed using multiple tracks tension member drawknot along pipeline border, the specific steps are:In the joint area of two sections of tube couplings of docking, along each pipe It saves border difference uniform intervals and bores multiple holes, then using two vertical sections of U-shaped reinforcing bar point in the tube chamber of two sections of tube couplings The hole that Chuan Guo not be correspondingly arranged on two sections of tube couplings, then two vertical sections of reinforcing bar are exposed to the part of two sections of tube coupling outer walls Curved 90 ° are arranged with tube coupling outside wall parallel to hook dock two sections of tube couplings, drawknot is formed to two sections of tube couplings;
(5) whole tube couplings do closed-water test after installing to integrated piping, and position is not backfilled to pipeline after closed-water test qualification It is backfilled;
(6) I-steel is upstream extracted successively from downstream.
2. current-formed silt soil layer pipeline construction method according to claim 1, it is characterised in that:In pipeline changing caliber Place's setting fender pile or control stake.
CN201810148649.6A 2018-02-13 2018-02-13 A kind of current-formed silt soil layer pipeline construction method Pending CN108457357A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810148649.6A CN108457357A (en) 2018-02-13 2018-02-13 A kind of current-formed silt soil layer pipeline construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810148649.6A CN108457357A (en) 2018-02-13 2018-02-13 A kind of current-formed silt soil layer pipeline construction method

Publications (1)

Publication Number Publication Date
CN108457357A true CN108457357A (en) 2018-08-28

Family

ID=63217493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810148649.6A Pending CN108457357A (en) 2018-02-13 2018-02-13 A kind of current-formed silt soil layer pipeline construction method

Country Status (1)

Country Link
CN (1) CN108457357A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112610798A (en) * 2020-12-01 2021-04-06 姜振波 Method for calculating length of lining pipe joint for repairing and updating water supply and drainage pipeline

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046108A (en) * 2006-03-30 2007-10-03 中船第九设计研究院 Water supply and sewerage pipeline settling construction process
CN203977538U (en) * 2014-08-13 2014-12-03 刘建华 Assembling heavy caliber drain pipe road
CN107630500A (en) * 2017-09-27 2018-01-26 广东景源建设工程有限公司 A kind of water supply and drainage construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046108A (en) * 2006-03-30 2007-10-03 中船第九设计研究院 Water supply and sewerage pipeline settling construction process
CN203977538U (en) * 2014-08-13 2014-12-03 刘建华 Assembling heavy caliber drain pipe road
CN107630500A (en) * 2017-09-27 2018-01-26 广东景源建设工程有限公司 A kind of water supply and drainage construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112610798A (en) * 2020-12-01 2021-04-06 姜振波 Method for calculating length of lining pipe joint for repairing and updating water supply and drainage pipeline
CN112610798B (en) * 2020-12-01 2022-08-05 姜振波 Method for calculating length of lining pipe joint for repairing and updating water supply and drainage pipeline

Similar Documents

Publication Publication Date Title
US9353888B2 (en) Polymer bag grouting method for repairing settlement of underground pipelines
CN110485470B (en) Rectangular working well with pre-arranged jacking pipe door opening and sliding type rear wall in water-rich stratum and construction method of rectangular working well
US9777881B2 (en) Polymer composite grouting method for blocking leaking and sand inrush of underground pipelines
CN101798939B (en) Maintainable tunnel drainage system
CN101684669B (en) Submersed type inspection well construction method
KR101500667B1 (en) steel pipe grouting device and tunnel reinforcement andbarrier grouting method using this
CN108086358B (en) Large-caliber long-distance multi-pipe same-ditch immersed pipe construction method
CN105673935A (en) Method for replacing underground pipeline through cracking and inserting method
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN109736884B (en) Treatment structure for water gushing in underground river close to tunnel and construction method of treatment structure
CN111305355A (en) Seepage-proofing process for ultra-large-diameter concrete rainwater pipeline joint
CN216518138U (en) Vertical drainage system of shaft
CN112253847B (en) Pipeline construction method for sand geological water network area
CN108457357A (en) A kind of current-formed silt soil layer pipeline construction method
CN102864833A (en) Application of finished plastic inspection well in outdoor drainage system
CN206157860U (en) Drainage pipeline
CN209129124U (en) A kind of component articulated connection constructing structure
KR100654632B1 (en) A water turning method of powerless drain pipe and apparatus thereof
CN110485465B (en) Circular working well with water-rich stratum with preset pipe jacking door opening and construction method of circular working well
CN113863268A (en) Construction and debugging process for fabricated sewage treatment station of epidemic prevention emergency project
CN113833524B (en) Double-hole box culvert for treating karst area tunnel water burst and construction method thereof
CN220667568U (en) Waterproof reinforcing structure for pipe-jacking pipe joint
CN114382157B (en) Construction method of concrete gas permeable well
CN211421324U (en) Simple device for communicating on-site corrugated water through and drainage pipe
US20220228357A1 (en) System and method for rehabilitating a host pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180828

RJ01 Rejection of invention patent application after publication