CN108457280B - 在高寒地区利用旋流器堆筑尾矿库人造干滩的新方法 - Google Patents
在高寒地区利用旋流器堆筑尾矿库人造干滩的新方法 Download PDFInfo
- Publication number
- CN108457280B CN108457280B CN201810187377.0A CN201810187377A CN108457280B CN 108457280 B CN108457280 B CN 108457280B CN 201810187377 A CN201810187377 A CN 201810187377A CN 108457280 B CN108457280 B CN 108457280B
- Authority
- CN
- China
- Prior art keywords
- tailing
- dam
- blocking
- dry beach
- pond
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 230000000903 blocking effect Effects 0.000 claims abstract description 129
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 15
- 238000011835 investigation Methods 0.000 claims abstract description 5
- 230000008569 process Effects 0.000 claims abstract description 4
- 238000007599 discharging Methods 0.000 claims description 22
- 230000008014 freezing Effects 0.000 claims description 8
- 238000007710 freezing Methods 0.000 claims description 8
- 239000002002 slurry Substances 0.000 claims description 6
- 238000005065 mining Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000004927 clay Substances 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 239000002245 particle Substances 0.000 claims description 3
- 239000002699 waste material Substances 0.000 claims description 3
- JTJMJGYZQZDUJJ-UHFFFAOYSA-N phencyclidine Chemical class C1CCCCN1C1(C=2C=CC=CC=2)CCCCC1 JTJMJGYZQZDUJJ-UHFFFAOYSA-N 0.000 claims 2
- 239000002689 soil Substances 0.000 description 11
- 238000010276 construction Methods 0.000 description 5
- 230000009471 action Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000005855 radiation Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 230000008093 supporting effect Effects 0.000 description 2
- 238000010257 thawing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007850 degeneration Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000001932 seasonal effect Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/18—Making embankments, e.g. dikes, dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/35—Foundations formed in frozen ground, e.g. in permafrost soil
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Cyclones (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810187377.0A CN108457280B (zh) | 2018-03-07 | 2018-03-07 | 在高寒地区利用旋流器堆筑尾矿库人造干滩的新方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810187377.0A CN108457280B (zh) | 2018-03-07 | 2018-03-07 | 在高寒地区利用旋流器堆筑尾矿库人造干滩的新方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108457280A CN108457280A (zh) | 2018-08-28 |
CN108457280B true CN108457280B (zh) | 2020-01-17 |
Family
ID=63217334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810187377.0A Active CN108457280B (zh) | 2018-03-07 | 2018-03-07 | 在高寒地区利用旋流器堆筑尾矿库人造干滩的新方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108457280B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2748474C1 (ru) * | 2020-05-12 | 2021-05-26 | Акционерное общество "Всероссийский научно-исследовательский институт гидротехники имени Б.Е. Веденеева" | Способ возведения намывного сооружения |
CN113152386B (zh) * | 2021-02-04 | 2023-03-21 | 南昌工学院 | 湿法堆存尾矿库缆式起重机分级筑坝系统 |
CN113152485A (zh) * | 2021-02-04 | 2021-07-23 | 南昌工学院 | 高浓度尾矿库静压自流分级筑坝系统与实施方法 |
RU2769435C1 (ru) * | 2021-10-11 | 2022-03-31 | Акционерное общество "Всероссийский научно-исследовательский институт гидротехники имени Б.Е. Веденеева" | Способ возведения намывного сооружения |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2186902C1 (ru) * | 2000-12-09 | 2002-08-10 | Акционерная компания "АЛРОСА" (Закрытое акционерное общество) | Способ возведения намывной техногенной залежи |
CN101353885B (zh) * | 2008-09-02 | 2010-04-21 | 金堆城钼业股份有限公司 | 一种尾矿库的填筑方法 |
RU2009140799A (ru) * | 2009-11-03 | 2011-05-10 | Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт | Способ возведения намывной ограждающей дамбы |
CN103015437A (zh) * | 2012-12-12 | 2013-04-03 | 瓮福(集团)有限责任公司 | 一种堆筑尾矿库副坝的方法 |
CN106284205A (zh) * | 2016-08-30 | 2017-01-04 | 北京矿冶研究总院 | 一种模袋边梗的尾砂水力冲填筑坝的方法 |
-
2018
- 2018-03-07 CN CN201810187377.0A patent/CN108457280B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2186902C1 (ru) * | 2000-12-09 | 2002-08-10 | Акционерная компания "АЛРОСА" (Закрытое акционерное общество) | Способ возведения намывной техногенной залежи |
CN101353885B (zh) * | 2008-09-02 | 2010-04-21 | 金堆城钼业股份有限公司 | 一种尾矿库的填筑方法 |
RU2009140799A (ru) * | 2009-11-03 | 2011-05-10 | Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт | Способ возведения намывной ограждающей дамбы |
CN103015437A (zh) * | 2012-12-12 | 2013-04-03 | 瓮福(集团)有限责任公司 | 一种堆筑尾矿库副坝的方法 |
CN106284205A (zh) * | 2016-08-30 | 2017-01-04 | 北京矿冶研究总院 | 一种模袋边梗的尾砂水力冲填筑坝的方法 |
Non-Patent Citations (1)
Title |
---|
西藏高原尾矿库设计问题探讨;沈楼燕 等;《中国矿山工程》;20080430;第37卷(第2期);第14-16页 * |
Also Published As
Publication number | Publication date |
---|---|
CN108457280A (zh) | 2018-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108457280B (zh) | 在高寒地区利用旋流器堆筑尾矿库人造干滩的新方法 | |
CN105350498B (zh) | 一种节水的尾矿排放方法 | |
CN103397645B (zh) | 一种干堆与湿排相结合的尾矿堆排方法 | |
CN103953008B (zh) | 一种适用于尾矿库的改进型混合坝 | |
CN103541762B (zh) | 一种高海拔严寒富水隧道永临结合的防冻排水方法 | |
CN104480949B (zh) | 基于强排渗上游式的尾矿库两级坝结构及其应用 | |
CN108797652B (zh) | 一种磷石膏库调节回水方法 | |
CN102875059A (zh) | 用于严寒环境防渗层的改性沥青混凝土及其施工方法 | |
CN108360467B (zh) | 一种在高寒地区堆筑尾矿库人造干滩的新工艺 | |
CN103628488B (zh) | 一种尾矿坝子坝的筑坝方法 | |
CN1232130A (zh) | 一种尾矿坝及灰渣坝的双坝安全堆筑法 | |
CN112482313B (zh) | 一种尾矿中线法筑坝长距离高浓度尾矿排放工艺 | |
CN104846779A (zh) | 一种堆筑不透水尾矿库坝体的方法 | |
CN206928250U (zh) | 峡谷区高坝水电工程渣场沟水导流系统 | |
CN114457895B (zh) | 一种高寒修复矿区的集排水系统 | |
CN203685289U (zh) | 一种高海拔严寒富水隧道永临结合的防冻排水结构 | |
CN1099083A (zh) | 一种建设尾矿堆筑坝的双坝上游法 | |
CN102261082B (zh) | 高水位地区渣场铺膜防渗的方法和铺膜渣场及其使用方法 | |
CN105297670A (zh) | 修万里长渠调水与根治塔克拉马干沙漠的方法 | |
CN205296060U (zh) | 一套新构造型式的水利建筑物 | |
CN220166845U (zh) | 一种陡峭区域多级竖井串联跌落式消能结构 | |
CN114855761B (zh) | 一种湿式尾矿库闭库复垦结构及其施工方法 | |
CN207143629U (zh) | 一种路基护岸结构 | |
Journeaux et al. | Tailings impoundment at Québec Cartier Mining | |
Pan et al. | Comparative Study on Layout Scheme of High Head Diversion Power Station----Taking the Yamu River-I Hydropower Station as an Example |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666 Co-patentee after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee after: MAANSHAN Mine Research Institute Co.,Ltd. Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666 Co-patentee before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |