CN108443107A CN201810150206.0A CN201810150206A CN108443107A CN 108443107 A CN108443107 A CN 108443107A CN 201810150206 A CN201810150206 A CN 201810150206A CN 108443107 A CN108443107 A CN 108443107A
Authority
CN
China
Prior art keywords
left end
plenum chamber
right end
outer framework
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810150206.0A
Other languages
Chinese (zh)
Inventor
王炯锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810150206.0A priority Critical patent/CN108443107A/en
Publication of CN108443107A publication Critical patent/CN108443107A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B35/00Piston pumps specially adapted for elastic fluids and characterised by the driving means to their working members, or by combination with, or adaptation to, specific driving engines or motors, not otherwise provided for
    • F04B35/04Piston pumps specially adapted for elastic fluids and characterised by the driving means to their working members, or by combination with, or adaptation to, specific driving engines or motors, not otherwise provided for the means being electric
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B39/00Component parts, details, or accessories, of pumps or pumping systems specially adapted for elastic fluids, not otherwise provided for in, or of interest apart from, groups F04B25/00 - F04B37/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B39/00Component parts, details, or accessories, of pumps or pumping systems specially adapted for elastic fluids, not otherwise provided for in, or of interest apart from, groups F04B25/00 - F04B37/00
    • F04B39/16Filtration; Moisture separation

Abstract

The invention discloses a kind of efficient extraction natural-gas energy-saving equipment,Its structure includes natural gas draw-out device,Console,Operation button,Pedestal,Thermovent,Extension tube attached,Plenum chamber,Assist plenum chamber,Display screen,Detection pipe,It is mutually welded with base top console bottom,Console front end is clearance fit with operation button rear end,Pan frontward end is connected with thermovent rear end using card slot,Operation button is vertical connection with console front end,Operation button inside is electrically connected with display screen inside,It is integrated with auxiliary plenum chamber bottom at the top of plenum chamber,A kind of efficient extraction natural-gas energy-saving equipment of the present invention,Structure is equipped with natural gas draw-out device,Device generation persistently attacks,Make acquisition stablize to carry out,And the installation of sealing plate,Acquisition can be blocked in time,Natural gas density is excessive inside anti-locking apparatus,Improve safety guarantee,Reduce risk.

Description

A kind of efficient extraction natural-gas energy-saving equipment
Technical field
The present invention is a kind of efficient extraction natural-gas energy-saving equipment, belongs to extraction natural gas facility field.
Background technology
Natural gas refers to a naturally occurring tangential gas in nature, including in atmospheric thermodynamics, hydrosphere and lithosphere it is various from The gas (including casing-head gas, reservoir gas, gas of mud volcano, coal bed gas and biology generate gas etc.) that right process is formed, and people are long-term Since general " natural gas " definition, be from the narrow sense of energy point of view define, refer to the hydrocarbon naturally contained in stratum The mixture of class and non-hydrocarbon gases is often referred to casing-head gas and reservoir gas in petroleum geology, forms based on hydro carbons, And contain non-hydrocarbon gas.
But existing Gas Exploitation storage is relatively simple, and when use can not close pipeline in time, and natural gas is easily made to exceed standard Amount, makes device internal residual natural gas, is easily damaged to device, and there are security risks.
Invention content
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of efficient extraction natural-gas energy-saving equipment, with It is relatively simple to solve existing Gas Exploitation storage, when use can not close pipeline in time, so that natural gas is exceeded standard volume, make dress Internal residual natural gas is set, easily device is damaged, and there are problems that security risk.
To achieve the goals above, the present invention is to realize by the following technical solutions:A kind of efficient extraction natural gas Energy-saving equipment, structure include natural gas draw-out device, console, operation button, pedestal, thermovent, extension tube attached, plenum chamber, Plenum chamber, display screen, detection pipe, the console bottom is assisted mutually to be welded with base top, the console front end and operation Button rear end is clearance fit, and the pan frontward end is connected with thermovent rear end using card slot, the operation button and control Platform front end processed is vertical connection, and the operation button inside, to be electrically connected, at the top of the plenum chamber and is assisted with display screen inside Plenum chamber bottom is integrated, and the plenum chamber left end is mutually welded with extension tube attached right end, and the extension tube attached is left with plenum chamber End is vertical connection, and the display screen rear end is that card slot is connect with console upper end, and the plenum chamber bottom is logical with base top It crosses screw to be fixedly connected, the console left end fits with plenum chamber right end, and the display screen right end is extracted with natural gas and filled It sets left end to be connected, mutually be welded with detection bottom of the tube at the top of the natural gas draw-out device;The natural gas draw-out device is by moving Power apparatus structure, switching device structure, buffering gas collecting apparatus, filter apparatus configuration, outer framework composition, the powerplant configuration Right end is connected with right end inside outer framework, and the switching device structure left end fits with filter apparatus configuration bottom, described Buffering gas collecting apparatus left end is mutually welded with left end inside outer framework, solid with outer framework inner tip at the top of the filter apparatus configuration Fixed connection, the outer framework top are mutually welded with detection bottom of the tube, and the outer framework left end fits with console right end.
Further, the powerplant configuration is by L fixed blocks, T-type connecting plate, connector bar, driven wheel, the first combination Gear, belt, the second built-up gear, motor gear, motor, turntable, steel cable, small fixed block, spring, sliding block, sliding slot, piston connect Bar, piston composition.
Further, L fixed blocks rear end is fixedly connected with outer framework Internal back end bronze drum screw, the L fixed blocks Bottom is integrated with sliding slot left end, and the sliding block left end is connect with sliding slot right end using card slot, and the slider top is left Side is connected with L fixed block right ends bottom by spring, and the T-type connecting plate bottom is to be flexibly connected with turntable middle-end, the T It is connected by groove with connector bar bottom at the top of type connecting plate, passes through connecting rod at the top of the driven wheel middle-end and connector bar It is connected, the driven wheel upper right side is meshed with the first built-up gear lower-left end, the first built-up gear inner ring and second Built-up gear inner ring is connected by belt, is connected by connecting rod with motor gear bottom at the top of the motor, the motor Right end is fixedly connected with right end inside outer framework, and the motor gear rear end uses Helical gear Transmission with the second built-up gear bottom Connection, the slider bottom are connected at the top of piston rod by positioning pin, and the piston rod bottom is with top land Mechanical connection, the slider top right end are connected at the top of small fixed block by steel cable, the turntable outer wall and steel cable outer wall It fits.
Further, the switching device structure by fixed frame, battery, control box, connecting line, towed electromagnet, lead Draw telescopic rod, link block, sealing plate composition.
Further, the fixed frame right end is mutually welded with right end inside outer framework, in the battery left end and fixed frame Portion's left end is fixed by screws, and is connected by connecting line with anode at the top of the control box, the battery cathode It is to be electrically connected with towed electromagnet top left, the control box bottom passes through connecting line with right end at the top of towed electromagnet It is connected, the towed electromagnet left end is integrated with traction telescopic rod right end, the sealing plate right end and traction Telescopic rod left end is fixedly connected by link block.
Further, the buffering gas collecting apparatus by preliminary plenum chamber, pressure dial plate, table connecting rod, sensor block, connecting tube, Valve forms.
Further, the preliminary plenum chamber left end bottom is connected with connecting tube right end, the preliminary plenum chamber left end Be fixedly connected with left end inside outer framework, the connecting tube middle-end and valve bottom are to be threadedly coupled, the sensor block left end and Pressure gauge pan bottom is connected by table connecting rod, and the table connecting rod right end connects with preliminary plenum chamber left end, the preliminary collection Gas tank middle-end is fixedly connected with outer framework left end.
Further, the filter apparatus configuration by fixed link, hinge, chamber door, filter layer, Quincunx screw, Rose Box, go out Tracheae, air inlet pipe composition.
Further, it is connected by fixed link with outer framework inner tip at the top of the Rose Box, outside the filter layer Wall, using mutually binding, mutually welds at the top of the escape pipe with Rose Box bottom with Rose Box inside, the chamber door top and outline border Frame left end is connected by hinge, and the chamber door bottom is connected with Rose Box left end by Quincunx screw, the Quincunx screw Middle-end connects with chamber door bottom, is connected with Rose Box right end at the top of the air inlet pipe, the escape pipe and outer framework bottom It connects.
Further, the piston base fits with air inlet pipe right end.
Further, the sealing plate left end connects with escape pipe lower end.
Advantageous effect
A kind of efficient extraction natural-gas energy-saving equipment of the present invention, structure are equipped with natural gas draw-out device, device are placed In suitable position, pedestal is made to be adjacent to ground, collection tube is connect with air inlet pipe, and be passed through acquisition zone, by operation button and shown Display screen controls motor and control box, and control box makes battery form closed circuit with towed electromagnet after being powered, and keeps traction flexible Bar pulls sealing plate toward retraction, and then by link block, and air inlet pipe is made integrally to penetrate through, and motor drives motor gear rotation at this time, And then the second built-up gear drives the rotation of the first built-up gear by belt, driven wheel drives connector bar rotation, and then makes T-type Connecting plate pumps together with turntable, since L fixed blocks and small fixed block are fixed, so steel cable pulls on sliding block gram It takes spring and is close to sliding slot and pump, and then so that piston is close to air inlet pipe movement by piston rod, and then generate and continue Suction sucks natural gas, enters Rose Box, and preliminary plenum chamber is entered by escape pipe after by filter layer, if needing more Filter layer is changed, then is unscrewed Quincunx screw, turns left and pulls chamber door, can be observed inside preliminary plenum chamber by pressure dial plate Connecting tube is connect by gas flow using outer connecting pipe with plenum chamber, and natural gas can be sent out by loosening valve, and device, which generates, to be continued It attacks, so that acquisition is stablized and carry out, and the installation of sealing plate, acquisition, anti-locking apparatus inside natural gas density mistake can be blocked in time Greatly, safety guarantee is improved, risk is reduced.
Description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of efficient extraction natural-gas energy-saving equipment of the present invention;
Fig. 2 is the sectional view of natural gas draw-out device of the present invention;
Fig. 3 is the activity diagram of switching device structure of the present invention;
Fig. 4 is the activity diagram of filter apparatus configuration of the present invention.
In figure:Natural gas draw-out device -1, console -2, operation button -3, pedestal -4, thermovent -5, extension tube attached -6, collection Gas tank -7, auxiliary plenum chamber -8, display screen -9, detection pipe -10, powerplant configuration -101, switching device structure -102, buffering Gas collecting apparatus -103, filter apparatus configuration -104, outer framework -105, L fixed blocks -1011, T-type connecting plate -1012, small connection Bar -1013, driven wheel -1014, the first built-up gear -1015, belt -1016, the second built-up gear -1017, motor gear - 1018, motor -1019, turntable -10110, steel cable -10111, small fixed block -10112, spring -10113, sliding block -10114, cunning Slot -10115, piston rod -10116, piston -10117, fixed frame -1021, battery -1022, control box -1023, connecting line - 1024, towed electromagnet -1025, traction telescopic rod -1026, link block -1027, sealing plate -1028, preliminary plenum chamber - 1031, pressure dial plate -1032, table connecting rod -1033, sensor block -1034, connecting tube -1035, valve -1036, fixed link -1041, Hinge -1042, chamber door -1043, filter layer -1044, Quincunx screw -1045, Rose Box -1046, escape pipe -1047, air inlet pipe - 1048。
Specific implementation mode
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to Specific implementation mode, the present invention is further explained.
- Fig. 4 is please referred to Fig.1, the present invention provides a kind of efficient extraction natural-gas energy-saving equipment and technology scheme:Its structure includes Natural gas draw-out device 1, console 2, operation button 3, pedestal 4, thermovent 5, extension tube attached 6, plenum chamber 7, auxiliary plenum chamber 8, Display screen 9, detection pipe 10,2 bottom of the console are mutually welded with 4 top of pedestal, 2 front end of the console and operation button 3 Rear end is clearance fit, and 4 front end of the pedestal is connected with 5 rear end of thermovent using card slot, the operation button 3 and control 2 front end of platform is vertical connection, the inside of the operation button 3 with 9 inside of display screen to be electrically connected, at the top of the plenum chamber 7 with it is auxiliary 8 bottom of plenum chamber is helped to be integrated, 7 left end of the plenum chamber is mutually welded with 6 right end of extension tube attached, the extension tube attached 6 and collection 7 left end of gas tank is vertical connection, and 9 rear end of the display screen and 2 upper end of console are that card slot is connect, 7 bottom of the plenum chamber and 4 top of pedestal is fixed by screws, and 2 left end of the console fits with 7 right end of plenum chamber, 9 right end of the display screen It is connected with 1 left end of natural gas draw-out device, 1 top of the natural gas draw-out device is mutually welded with 10 bottom of detection pipe;It is described Natural gas draw-out device 1 is by powerplant configuration 101, switching device structure 102, buffering gas collecting apparatus 103, filter apparatus configuration 104, outer framework 105 forms, and 101 right end of the powerplant configuration is connected with 105 inside right end of outer framework, the switch dress It sets 102 left end of structure to fit with 104 bottom of filter apparatus configuration, in 103 left end of buffering gas collecting apparatus and outer framework 105 Portion's left end mutually welds, and 104 top of the filter apparatus configuration is fixedly connected with 105 inner tip of outer framework, the outer framework 105 Top is mutually welded with 10 bottom of detection pipe, and 105 left end of the outer framework fits with 2 right end of console, the power plant knot Structure 101 is by L fixed blocks 1011, T-type connecting plate 1012, connector bar 1013, driven wheel 1014, the first built-up gear 1015, skin Band 1016, the second built-up gear 1017, motor gear 1018, motor 1019, turntable 10110, steel cable 10111, small fixed block 10112, spring 10113, sliding block 10114, sliding slot 10115, piston rod 10116, piston 10117 form, the L fixed blocks 1011 rear ends are fixedly connected with 105 Internal back end bronze drum screw of outer framework, and 1011 bottom of L fixed blocks is left with sliding slot 10115 End is integrated, and 10114 left end of the sliding block is connect with 10115 right end of sliding slot using card slot, 10114 top of the sliding block Left side is connected with 1011 right end bottom of L fixed blocks by spring 10113,1012 bottom of T-type connecting plate and turntable 10110 Middle-end is flexible connection, and 1012 top of the T-type connecting plate is connected with 1013 bottom of connector bar by groove, described driven It takes turns 1014 middle-ends with 1013 top of connector bar to be connected by connecting rod, 1014 upper right side of the driven wheel and the first built-up gear 1015 lower-lefts end are meshed, and 1015 inner ring of the first built-up gear passes through 1016 phase of belt with 1017 inner ring of the second built-up gear Connection, 1019 top of the motor are connected with 1018 bottom of motor gear by connecting rod, 1019 right end of the motor and outline border 105 inside right end of frame is fixedly connected, and 1018 rear end of the motor gear is passed with 1017 bottom of the second built-up gear using helical gear Dynamic connection, 10114 bottom of the sliding block are connected with 10116 top of piston rod by positioning pin, the piston rod 10116 Bottom is mechanical connection with 10117 top of piston, and 10114 top right end of the sliding block passes through steel with 10112 top of small fixed block Rope 10111 is connected, and 10110 outer wall of the turntable fits with 10111 outer wall of steel cable, and the switching device structure 102 is by solid Determine frame 1021, battery 1022, control box 1023, connecting line 1024, towed electromagnet 1025, traction telescopic rod 1026, connection Block 1027, sealing plate 1028 form, and 1021 right end of the fixed frame is mutually welded with 105 inside right end of outer framework, the battery 1022 left ends are fixed by screws with 1021 inside left end of fixed frame, 1023 top of the control box and 1022 anode of battery It is connected by connecting line 1024,1022 cathode of the battery is to be electrically connected with 1025 top left of towed electromagnet, described 1023 bottom of control box is connected with 1025 top right end of towed electromagnet by connecting line 1024, the towed electromagnet 1025 left ends are integrated with traction 1026 right end of telescopic rod, and 1028 right end of the sealing plate and traction telescopic rod 1026 are left End is fixedly connected by link block 1027, and the buffering gas collecting apparatus 103 is by preliminary plenum chamber 1031, pressure dial plate 1032, table Connecting rod 1033, sensor block 1034, connecting tube 1035, valve 1036 form, 1031 left end bottom of the preliminary plenum chamber with connect 1035 right end of pipe is connected, and 1031 left end of preliminary plenum chamber is fixedly connected with 105 inside left end of outer framework, the connecting tube 1035 middle-ends are to be threadedly coupled with 1036 bottom of valve, and 1034 left end of the sensor block is connected with 1032 bottom of pressure dial plate by table Bar 1033 is connected, and 1033 right end of table connecting rod connects with 1031 left end of preliminary plenum chamber, the preliminary plenum chamber 1031 Middle-end is fixedly connected with 105 left end of outer framework, and the filter apparatus configuration 104 is by fixed link 1041, hinge 1042, chamber door 1043, filter layer 1044, Quincunx screw 1045, Rose Box 1046, escape pipe 1047, air inlet pipe 1048 form, the Rose Box 1046 tops are connected with 105 inner tip of outer framework by fixed link 1041,1044 outer wall of the filter layer and Rose Box Using mutually binding, 1047 top of the escape pipe is mutually welded with 1046 bottom of Rose Box for 1046 inside, 1043 top of the chamber door It is connected by hinge 1042 with 105 left end of outer framework, 1043 bottom of the chamber door passes through plum blossom spiral shell with 1046 left end of Rose Box Silk 1045 is connected, and 1045 middle-end of the Quincunx screw connects with 1043 bottom of chamber door, 1048 top of the air inlet pipe and mistake 1046 right end of filter box is connected, and the escape pipe 1047 connects with 105 bottom of outer framework, 10117 bottom of the piston with into 1048 right end of tracheae fits, and 1028 left end of the sealing plate connects with 1047 lower end of escape pipe.
Spring 10113 described in this patent uses spring steel material, spring steel to refer to manufacturing all kinds of springs and other bullets The special metals steel of property element, can be divided into common alloy spring steel and specific alloy spring steel by performance requirement, use condition.
In progress in use, placing the device in suitable position, pedestal 4 is set to be adjacent to ground, by collection tube and air inlet pipe 1048 connections, and it is passed through acquisition zone, motor 1019 and control box 1023, control box are controlled by operation button 3 and display screen 9 So that battery 1022 is formed closed circuit with towed electromagnet 1025 after 1023 energizations, makes the past retraction of traction telescopic rod 1026, into And sealing plate 1028 is pulled by link block 1027, so that air inlet pipe 1048 is integrally penetrated through, motor 1019 drives motor gear at this time 1018 rotations, and then the second built-up gear 1017 drives the first built-up gear 1015 to rotate by belt 1016, driven wheel 1014 It drives connector bar 1013 to rotate, and then T-type connecting plate 1012 is made to pump together with turntable 10110, due to L fixed blocks 1011 is fixed with small fixed block 10112, so steel cable 10111 pulls on sliding block 10114 and spring 10113 is overcome to be close to sliding slot 10115 pump, and then so that piston 10117 is close to air inlet pipe 1048 by piston rod 10116 and move, and then generate Continue suction, natural gas is sucked, Rose Box 1046 is entered, is entered just by escape pipe 1047 after by filter layer 1044 Step plenum chamber 1031 unscrews Quincunx screw 1045 if needing to change filter layer 1044, turns left and pulls chamber door 1043, can To observe 1031 interior gas amount of preliminary plenum chamber by pressure dial plate 1032, using outer connecting pipe by connecting tube 1035 and gas collection Case 7 connects, and natural gas can be sent out by loosening valve 1036.
It is relatively simple that the present invention solves existing Gas Exploitation storage, and when use can not close pipeline in time, easily make natural gas Beyond standard volume, makes device internal residual natural gas, easily device is damaged, and there are problems that security risk, the present invention By being combined with each other for above-mentioned component, structure is equipped with natural gas draw-out device, places the device in suitable position, pedestal is made to paste Collection tube connect with air inlet pipe, and is passed through acquisition zone by tightly face, and motor and control are controlled by operation button and display screen Box, control box make battery form closed circuit with towed electromagnet after being powered, make traction telescopic rod toward retraction, and then pass through company It connects block and pulls sealing plate, air inlet pipe is made integrally to penetrate through, motor drives motor gear rotation at this time, and then the second built-up gear passes through Belt drives the rotation of the first built-up gear, and driven wheel drives connector bar rotation, and then makes T-type connecting plate together with past above and below turntable Multiple movement, since L fixed blocks and small fixed block are fixed, so steel cable pulls on sliding block, to overcome spring to be close to sliding slot or more past Multiple movement, and then so that piston is close to air inlet pipe movement by piston rod, and then generate and continue suction, natural gas is sucked, into Enter to Rose Box, preliminary plenum chamber is entered by escape pipe after by filter layer, if needing to change filter layer, by Quincunx screw It unscrews, turns left and pull chamber door, preliminary plenum chamber interior gas amount can be observed by pressure dial plate, it will using outer connecting pipe Connecting tube is connect with plenum chamber, and natural gas can be sent out by loosening valve, and device generation persistently attacks, and so that acquisition is stablized and is carried out, And the installation of sealing plate, acquisition can be blocked in time, and anti-locking apparatus inside natural gas density is excessive, improves safety guarantee, reduces Risk.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from the present invention spirit or In the case of essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that including all changes that come within the meaning and range of equivalency of the claims in the present invention It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (9)

1. a kind of efficient extraction natural-gas energy-saving equipment, structure includes natural gas draw-out device (1), console (2), operates and press Key (3), pedestal (4), thermovent (5), extension tube attached (6), plenum chamber (7), auxiliary plenum chamber (8), display screen (9), detection pipe (10), it is mutually welded at the top of console (2) bottom and pedestal (4), console (2) front end and operation button (3) rear end For clearance fit, pedestal (4) front end is connected with thermovent (5) rear end using card slot, the operation button (3) and control Platform (2) front end processed is vertical connection, and the operation button (3) is internal internal to be electrically connected with display screen (9), the plenum chamber (7) top is integrated with auxiliary plenum chamber (8) bottom, it is characterised in that:
Plenum chamber (7) left end is mutually welded with extension tube attached (6) right end, and the extension tube attached (6) is vertical with plenum chamber (7) left end Connection, display screen (9) rear end are that card slot is connect with console (2) upper end, and plenum chamber (7) bottom is pushed up with pedestal (4) Portion is fixed by screws, and console (2) left end fits with plenum chamber (7) right end, display screen (9) right end with Natural gas draw-out device (1) left end is connected, and is mutually welded with detection pipe (10) bottom at the top of the natural gas draw-out device (1);
The natural gas draw-out device (1) is by powerplant configuration (101), switching device structure (102), buffering gas collecting apparatus (103), filter apparatus configuration (104), outer framework (105) composition, powerplant configuration (101) right end and outer framework (105) internal right end is connected, and switching device structure (102) left end fits with filter apparatus configuration (104) bottom, institute It states buffering gas collecting apparatus (103) left end mutually to weld with the internal left end of outer framework (105), at the top of the filter apparatus configuration (104) It is fixedly connected with outer framework (105) inner tip, is mutually welded with detection pipe (10) bottom at the top of the outer framework (105), it is described Outer framework (105) left end fits with console (2) right end.
2. a kind of efficient extraction natural-gas energy-saving equipment according to claim 1, it is characterised in that:The power plant knot Structure (101) is by L fixed blocks (1011), T-type connecting plate (1012), connector bar (1013), driven wheel (1014), the first combination tooth Take turns (1015), belt (1016), the second built-up gear (1017), motor gear (1018), motor (1019), turntable (10110), Steel cable (10111), small fixed block (10112), spring (10113), sliding block (10114), sliding slot (10115), piston rod (10116), piston (10117) forms.
3. a kind of efficient extraction natural-gas energy-saving equipment according to claim 2 or 1, it is characterised in that:The L fixed blocks (1011) rear end is fixedly connected with outer framework (105) Internal back end bronze drum screw, L fixed blocks (1011) bottom and sliding slot (10115) left end is integrated, and sliding block (10114) left end is connect with sliding slot (10115) right end using card slot, described Sliding block (10114) top left side is connected with L fixed blocks (1011) right end bottom by spring (10113), the T-type connecting plate (1012) bottom is to be flexibly connected with turntable (10110) middle-end, T-type connecting plate (1012) top and connector bar (1013) Bottom is connected by groove, and driven wheel (1014) middle-end is connected at the top of connector bar (1013) by connecting rod, institute It states driven wheel (1014) upper right side to be meshed with the first built-up gear (1015) lower-left end, in first built-up gear (1015) Ring is connected with the second built-up gear (1017) inner ring by belt (1016), motor (1019) top and motor gear (1018) bottom is connected by connecting rod, and motor (1019) right end is fixedly connected with the internal right end of outer framework (105), described Motor gear (1018) rear end is connect with the second built-up gear (1017) bottom using Helical gear Transmission, the sliding block (10114) Bottom is connected at the top of piston rod (10116) by positioning pin, piston rod (10116) bottom and piston (10117) top is mechanical connection, passes through steel cable at the top of sliding block (10114) the top right end and small fixed block (10112) (10111) it is connected, turntable (10110) outer wall fits with steel cable (10111) outer wall.
4. a kind of efficient extraction natural-gas energy-saving equipment according to claim 1, it is characterised in that:The switching device knot Structure (102) is by fixed frame (1021), battery (1022), control box (1023), connecting line (1024), towed electromagnet (1025), traction telescopic rod (1026), link block (1027), sealing plate (1028) composition.
5. a kind of efficient extraction natural-gas energy-saving equipment according to claim 4 or 1, it is characterised in that:The fixed frame (1021) right end is mutually welded with the internal right end of outer framework (105), and battery (1022) left end is internal left with fixed frame (1021) End is fixed by screws, and is connected by connecting line (1024) with battery (1022) anode at the top of the control box (1023) It connects, battery (1022) cathode is to be electrically connected with towed electromagnet (1025) top left, control box (1023) bottom Portion is connected with right end at the top of towed electromagnet (1025) by connecting line (1024), and the towed electromagnet (1025) is left End is integrated with traction telescopic rod (1026) right end, and sealing plate (1028) right end is left with traction telescopic rod (1026) End is fixedly connected by link block (1027).
6. a kind of efficient extraction natural-gas energy-saving equipment according to claim 1, it is characterised in that:The buffering gas collection dress (103) are set by preliminary plenum chamber (1031), pressure dial plate (1032), table connecting rod (1033), sensor block (1034), connecting tube (1035), valve (1036) forms.
7. a kind of efficient extraction natural-gas energy-saving equipment according to claim 6 or 1, it is characterised in that:The preliminary collection Gas tank (1031) left end bottom is connected with connecting tube (1035) right end, preliminary plenum chamber (1031) left end and outer framework (105) internal left end is fixedly connected, and connecting tube (1035) middle-end is to be threadedly coupled with valve (1036) bottom, the induction Block (1034) left end is connected with pressure dial plate (1032) bottom by table connecting rod (1033), table connecting rod (1033) right end with Preliminary plenum chamber (1031) left end connects, and preliminary plenum chamber (1031) middle-end is fixedly connected with outer framework (105) left end.
8. a kind of efficient extraction natural-gas energy-saving equipment according to claim 1, it is characterised in that:The filter device knot Structure (104) is by fixed link (1041), hinge (1042), chamber door (1043), filter layer (1044), Quincunx screw (1045), filtering Case (1046), escape pipe (1047), air inlet pipe (1048) composition.
9. a kind of efficient extraction natural-gas energy-saving equipment according to claim 8 or 1, it is characterised in that:The Rose Box (1046) top be connected by fixed link (1041) with outer framework (105) inner tip, filter layer (1044) outer wall and Using mutually binding inside Rose Box (1046), mutually welded with Rose Box (1046) bottom at the top of the escape pipe (1047), it is described It is connected by hinge (1042) with outer framework (105) left end at the top of chamber door (1043), chamber door (1043) bottom and filtering Case (1046) left end is connected by Quincunx screw (1045), Quincunx screw (1045) middle-end and chamber door (1043) bottom phase Perforation, air inlet pipe (1048) top are connected with Rose Box (1046) right end, the escape pipe (1047) and outer framework (105) bottom connects.
CN201810150206.0A 2018-02-13 2018-02-13 A kind of efficient extraction natural-gas energy-saving equipment Pending CN108443107A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810150206.0A CN108443107A (en) 2018-02-13 2018-02-13 A kind of efficient extraction natural-gas energy-saving equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810150206.0A CN108443107A (en) 2018-02-13 2018-02-13 A kind of efficient extraction natural-gas energy-saving equipment

Publications (1)

Publication Number Publication Date
CN108443107A true CN108443107A (en) 2018-08-24

Family

ID=63192350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810150206.0A Pending CN108443107A (en) 2018-02-13 2018-02-13 A kind of efficient extraction natural-gas energy-saving equipment

Country Status (1)

Country Link
CN (1) CN108443107A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681132A (en) * 2018-12-24 2019-04-26 郑州新领豫智能科技有限公司 A kind of energy-saving and environment-friendly extraction gas plant

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203099335U (en) * 2013-02-06 2013-07-31 李连清 Multi-level reciprocating natural-gas suction compression equipment
CN103807138A (en) * 2014-02-11 2014-05-21 单月伟 Reciprocating piston type sucking pump
CN204610181U (en) * 2015-04-07 2015-09-02 北京杰源压缩机制造有限公司 High rotating speed symmetrical balance natural gas reciprocating compressor
CN104912776A (en) * 2014-03-14 2015-09-16 宁波百瑞天然气高压压缩机有限公司 Anti-explosion electric natural gas compressor
CN105909494A (en) * 2015-02-20 2016-08-31 株式会社神户制钢所 Reciprocating compressor, compression section unit, and maintenance method of reciprocating compressor
CN205654513U (en) * 2016-05-27 2016-10-19 蚌埠移山压缩机制造有限公司 Natural gas compressor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203099335U (en) * 2013-02-06 2013-07-31 李连清 Multi-level reciprocating natural-gas suction compression equipment
CN103807138A (en) * 2014-02-11 2014-05-21 单月伟 Reciprocating piston type sucking pump
CN104912776A (en) * 2014-03-14 2015-09-16 宁波百瑞天然气高压压缩机有限公司 Anti-explosion electric natural gas compressor
CN105909494A (en) * 2015-02-20 2016-08-31 株式会社神户制钢所 Reciprocating compressor, compression section unit, and maintenance method of reciprocating compressor
CN204610181U (en) * 2015-04-07 2015-09-02 北京杰源压缩机制造有限公司 High rotating speed symmetrical balance natural gas reciprocating compressor
CN205654513U (en) * 2016-05-27 2016-10-19 蚌埠移山压缩机制造有限公司 Natural gas compressor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681132A (en) * 2018-12-24 2019-04-26 郑州新领豫智能科技有限公司 A kind of energy-saving and environment-friendly extraction gas plant
CN109681132B (en) * 2018-12-24 2020-09-04 四川丰度能源技术开发有限公司 Energy-concerving and environment-protective natural gas extraction device

Similar Documents

Publication Publication Date Title
CN108443107A (en) A kind of efficient extraction natural-gas energy-saving equipment
CN207403407U (en) Financial accounting special note flattens and storing unit
CN206128214U (en) Manual formula auto -feed type drain cleaner
CN107876129A (en) Disposed waste recycling equipment is used in a kind of solar cell panel assembly production
CN106742931A (en) A kind of dustbin with Automatic-dumping rubbish function
CN211777574U (en) Colliery gas drainage sampling hole plugging device
CN209670956U (en) A kind of grease well acidizing acid filling pipe
CN204920925U (en) Accurate eccentric water filling tool of oil -field flooding well
CN111627587B (en) A automatic recovery plant of protecting against radiation for uranium ore
CN216950331U (en) Low-pressure gas well pressure boost mining device
CN205472504U (en) Novel switch board system
CN108636975A (en) A kind of paper product production debris removal equipment
CN203965181U (en) A kind of manual shaftless spiral sampling device
CN209426189U (en) A kind of polypropylene filter bag hemming device
CN207522582U (en) A kind of adaptive ground emergency management and rescue auxiliary robot
CN202560182U (en) Gas and sand anchor for oilfield well
CN105527129A (en) Manual depth setting water sample collecting device
CN203547675U (en) High-efficiency oil pumping device
CN206816288U (en) A kind of supporting association hydraulic support for coal face
CN208885254U (en) A kind of multi-functional oil recovery device
CN208999122U (en) A kind of wheat field root system acquisition device
CN209525161U (en) A kind of mining geology rock sample processing unit (plant)
CN204252978U (en) A kind of oil gas field negative pressure quarrying apparatus
CN113309411B (en) Novel intelligent management key equipment
CN216277828U (en) A drainage pressure reduction means for coal bed gas exploration well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824

RJ01 Rejection of invention patent application after publication