CN108442258A - A kind of precast beam place - Google Patents

A kind of precast beam place Download PDF

Info

Publication number
CN108442258A
CN108442258A CN201810532591.5A CN201810532591A CN108442258A CN 108442258 A CN108442258 A CN 108442258A CN 201810532591 A CN201810532591 A CN 201810532591A CN 108442258 A CN108442258 A CN 108442258A
Authority
CN
China
Prior art keywords
bridge
precast beam
precast
pedestal
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810532591.5A
Other languages
Chinese (zh)
Inventor
殷胜光
刘丹娜
杨伟威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communication North Road and Bridge Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communication North Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communication North Road and Bridge Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201810532591.5A priority Critical patent/CN108442258A/en
Publication of CN108442258A publication Critical patent/CN108442258A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

A kind of precast beam place provided by the present application, is related to bridges in highway engineering construction technique field.Precast beam place is arranged in bridge location area Bridgehead by Blastig or bridge tail roadbed, from far from bridge location area to close to bridge location area and the reinforcing bar storage area, predefined region, beam strorage area, the Bridge Erector installing zone that are set gradually along bridge formation direction, further include A-road, gantry crane, reinforcing bar storage area is arranged far from bridge, and A-road passes through reinforcing bar storage area and predefined region along bridge formation direction.Precast beam place is arranged on the end of the bridge or bridge tail roadbed in bridge location area the application, avoid the difficulty of the precast beam Site Selection caused by landform limitation or land status are not inconsistent, requisition arable land and expense of reclaiming are avoided simultaneously, cost is saved, reasonable Arrangement precast beam place, the peace of template tears the factors such as space and beam transporting passage, haulage vehicle passage open when fully considering width of subgrade, precast beam construction, improves working efficiency, casualties risk is reduced, operating expenses is reduced.

Description

A kind of precast beam place
Technical field
This application involves bridges in highway engineering construction technique field more particularly to a kind of precast beam places.
Background technology
With the continuous social and economic development, highway engineering construction also rapidly develops therewith.The top of bridges in highway engineering Structure mostly uses precast beam, and whether up to standard the quality of precast beam construction directly affects entire bridge engineering construction.As precast beam The important component of construction, precast beam place carry the precast beam construction task of entire engineering project, are engineering constructions The most important thing not only restricts project duration, also concerning the overall construction quality of all bridges in highway engineering, so precast beam field The planning construction on ground, should be in the well-organized arrangement of engineering project initial stage.
Currently, there are following several respects about precast beam Site Selection:(1) landform limits, such as alpine terrain, puts down Plot that is smooth and meeting big site requirements is less, and there are drop, transport routes turning radius very littles to select the place in some places It will increase the difficulty of transport and erection;Sometimes for the interim soil of requisition, but there are certain difficulty;(2) land status, such as agro-farming Soil does not allow to be taken over for use;Such as Sandy land, it is not appropriate for being used for precast beam place, or need to do a large amount of previous work It can just meet the requirements;(3) it if land acquisition, needs a large amount of land expropriation cost and later stage to reclaim expense, increases cost.It is right The laying in precast beam place, similarly concerning the construction period, laying disorderly and unsystematic, without planning can equally extend construction period, Sometimes it also can cause casualties accident.
To sum up, the characteristics of engineering project should be fully considered in work progress, external environment influence factor, engineering quantity, meter The factors such as duration are drawn, for the purpose of few land occupation, the flat plot of selection topography, reduction beam body transport difficulty and distance, rationally Precast beam place is laid, project management risk is reduced.
Invention content
This application provides a kind of precast beam places, and big to solve land seizure area, beam body is transported caused by topography problem Defeated difficulty is big, distance is remote, and the problem of causing long construction period etc., increasing project management risk is laid in unreasonable place.
Bridgehead by Blastig or bridge tail roadbed in bridge location area is arranged in a kind of precast beam place, the precast beam place;Including:From Far from the bridge location area to the close bridge location area and the reinforcing bar storage area set gradually along bridge formation direction, predefined region, beam strorage area, Bridge Erector installing zone further includes A-road, gantry crane, wherein the A-road is stored along the bridge formation direction across the reinforcing bar Area, the predefined region;The gantry crane is travelled along gantry rail, and the gantry rail is arranged along the bridge formation direction;The frame Bridge machine installing zone is arranged between the beam strorage area and the bridge location area.
Optionally, the predefined region is equipped with precast pedestal, and precast beam, the precast pedestal packet are placed on the precast pedestal It includes the Extended chemotherapy inside embedded roadbed, place hardened layer and precast beam pedestal in the roadbed upper surface is set, it is described Place hardened layer is arranged at the both ends of the precast pedestal, and upper surface and the upper surface of the closely Extended chemotherapy of its setting are flat Together;The precast beam pedestal is equipped with reserved pulling eye, three sections of settings of the precast beam pedestal point, and intermediate segment length is more than both ends Side segment length, the interlude and side section are connected by the first steel plate with the lumps of wood;Precast beam pedestal upper surface is equipped with Second steel plate, both sides along its length are equipped with channel steel.
Optionally, the beam strorage area is equipped with and deposits beam pedestal, and described deposit places precast beam on beam pedestal, the beam pedestal of depositing is in Rectangular shape is formed by concreting.
Optionally, further include spray system, the spray tube of the spray system is arranged under the flange plate dowel of precast beam, It is arranged using suspension method, nozzle is towards beam body.
Optionally, the A-road is located at the precast beam place along the centre position of bridge formation direction roadbed, described Reinforcing bar storage area, the predefined region are symmetrically distributed in the A-road both sides.
Optionally, the A-road is located at the precast beam place along the position of the bridge formation direction roadbed side, described Reinforcing bar storage area, the predefined region are distributed in the side of the A-road.
Optionally, bridge formation direction described in the upper edge of the precast beam place is equipped with a plurality of gutter.
Technical solution provided by the present application includes following advantageous effects:
Compared with prior art, a kind of precast beam place provided by the present application, includes the steel being sequentially arranged along bridge formation direction Muscle storage area, predefined region, beam strorage area, Bridge Erector installing zone and A-road, gantry crane etc., reinforcing bar storage area is for storing original Material;Predefined region is for making precast beam;Beam strorage area is for storing the precast beam ready for use that completes;Bridge Erector installing zone is used In handling, the installation of the installation of Bridge Erector, and first bridge;A-road passes through for construction equipment, can be arranged pre- Beam making field along the centre position of bridge formation direction roadbed, reinforcing bar storage area, predefined region are symmetrically distributed in the both sides of A-road, also may be used The side position in precast beam place along bridge formation direction roadbed is arranged, reinforcing bar storage area, predefined region are distributed in the one of A-road Side;Gantry crane is for transports such as precast beam, raw material, templates.Predefined region is equipped with precast pedestal for placing precast beam, per type The precast beam of type has corresponding precast pedestal;Beam strorage area, which is equipped with, deposits beam pedestal for storing precast beam ready for use;Further include Spray system is arranged under the flange plate dowel of precast beam, is used for the health of precast beam;Gutter is used to extra water being discharged. Precast beam place is arranged on the end of the bridge or bridge tail roadbed in bridge location area the application, avoids because of landform limitation or land status The difficulty of precast beam Site Selection caused by not being inconsistent, while requisition arable land and expense of reclaiming are avoided, save cost, reasonable cloth Precast beam place is set, the peace of template tears space open when fully considering width of subgrade, precast beam construction and beam transporting passage, haulage vehicle are logical The factors such as row improve working efficiency, reduce casualties risk, reduce operating expenses.
Description of the drawings
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor, Other drawings may also be obtained based on these drawings.
Fig. 1 is a kind of precast beam place floor plan provided by the embodiments of the present application.
Fig. 2 is the cross-sectional view of gantry rail provided by the embodiments of the present application.
Fig. 3 is prefabricated box -beam pedestal provided by the embodiments of the present application cross-section diagram along its length.
Fig. 4 is precast pedestal provided by the embodiments of the present application cross-section diagram in the width direction.
Fig. 5 is box beam storage area structural schematic diagram provided by the embodiments of the present application.
Fig. 6 is T beams storage area structural schematic diagram provided by the embodiments of the present application.
Fig. 7 is the beam prefabricated plot structure schematic diagrames of T provided by the embodiments of the present application.
Reference sign:1, reinforcing bar storage area;2, predefined region;3, beam strorage area;301, beam pedestal is deposited;4, Bridge Erector is installed Area;5, A-road;6, gantry crane;201, Extended chemotherapy;202, place hardened layer;203, precast beam pedestal;204, pulling eye is reserved; 205, the first steel plate;206, the lumps of wood;207, the second steel plate;208, channel steel;7, spray system;8, gutter;9, gantry rail.
Specific implementation mode
Attached drawing 1 is please referred to, the figure shows a kind of precast beam place horizontal layouts provided by the embodiments of the present application.
Bridgehead by Blastig or bridge tail roadbed in bridge location area is arranged in a kind of precast beam place, precast beam place;Including:From separate Bridge location area to close to bridge location area and set gradually along bridge formation direction reinforcing bar storage area 1, predefined region 2, beam strorage area 3, Bridge Erector peace Area 4 is filled, further includes A-road 5, gantry crane 6, wherein A-road 5 passes through reinforcing bar storage area 1, predefined region 2 along bridge formation direction;Gantry It hangs 6 to travel along gantry rail 9, gantry rail 9 is arranged along bridge formation direction;Bridge Erector installing zone 4 is arranged in beam strorage area 3 and bridge location area Between.
In the embodiment of the present application, the Bridgehead by Blastig or bridge tail roadbed in bridge location area is arranged in precast beam place, is mainly examined The factor of several aspects is considered:
(1) Bridgehead by Blastig and bridge tail roadbed can be fully met pre- on the basis of the main line roadbed of bridge location area both sides The storage of beam processed and the requirement of working space.(2) can meet transporting equipment different type and the environment in size and place, Geological conditions reduces volume of earthwork and foundation engineering amount.(3) Economization on land improves the utilization rate of land resource, reduces soil Ground takes over for use and expense of reclaiming, and reduces prefabricated cost.(4) it fully considers communications and transportation factor, is connected with existing highway, with bridge location area Distance recently, the transport of convenient material and tool utmostly shortens transportation range, ensure that transporting precast beams safety and Construction speed.
On the precast beam place, reinforcing bar storage area 1 is disposed furthest from the position in bridge location area, can avoid gantry crane 6 When current in reinforcing bar storage area 1, cause casualties accident.
Predefined region 2 includes a plurality of types of precast beams, in Fig. 1, from separate bridge location in close to bridge location area successively cloth Set the beam prefabricated areas T, prefabricated box -beam area, plate-girder predefined region, three kinds of different patterns in corresponding diagram.For making not in predefined region 2 On the one hand the beam of same type will consider the making convenience of precast beam in predefined region 2, on the other hand also to consider follow-up The exploitativeness of transport.
For storing precast beam, close to bridge location area, setting shortens transportation range, ensures construction speed for beam strorage area 3.
Bridge Erector installing zone 4 is arranged between beam strorage area 3 and bridge location area, facilitates and hangs the transporting precast beams in beam strorage area 3 It is filled to job location.
A-road 5 for transport vehicles travel, during making precast beam, need conveying cement, reinforcing bar, steel plate, Lumps of wood and other items, by transport trolley by goods transportation to designated position.
Gantry crane 6 is used for lifting, the transport etc. of goods and materials in precast beam manufacturing process.Gantry crane 6 is in 9 uplink of gantry rail It sails, wherein the cross-sectional area of gantry rail is as shown in Fig. 2, in figure, superposed protrusion is to be connect with 6 main body of gantry crane Track, gantry rail 9 is formed by concreting, based on compression, to prevent concrete cracking in work progress, can suitably be increased Add reinforced mesh and construction muscle, such as increases by 16 reinforcing bars of φ and 10 stirrups of φ, concrete cracking can be effectively prevent.
Gantry crane 6 generally selects two kinds of specifications, wherein big load-bearing gantry crane generally selects two pairs, small load-bearing gantry crane to select One secondary or two pairs, handling of the big load-bearing gantry crane for precast beam are respectively arranged with lifting rope at the both ends of precast beam, with two secondary big load-bearing Gantry crane realizes the handling of precast beam;Small load-bearing gantry crane is mainly used for the handling of the materials such as reinforcing bar, template, is required according to weighing Select a secondary or two secondary gantry cranes.For example, selecting the secondary handling precast beam of 100t gantry cranes two, two secondary 5t gantry cranes or a pair are selected 10t gantry crane handlings reinforcing bar, template etc..
It should be noted that gantry rail 9 along bridge formation direction there are head fall, the designed lines longitudinal slope of main line is generally 2%, general control is within 1%~1.5%, to meet wanting for operation of the gantry crane 6 during handling, stress etc. It asks, head fall can be by carrying out excavation or embankment construction realization to basic roadbed.
In addition, when be the landform that need to be turned for basic roadbed, precast beam place uses more broken line set-up modes, straightway and The spaced setting of curved section, ensures that turning radius is at least 900m~1000m, at this point, gantry rail 9 is using same setting Mode, in order to meet gantry crane 6 in turning position synchronous walking, the setting change quick-mounting at outboard end gantry leg location of turning It sets, is adjusted by inside and outside speed change, to realize the interior outside synchronous walking of gantry crane 6.
Bridge Erector installing zone 4 is used for the installation of Bridge Erector, and handling, the installation of first bridge.By land-service road, can arrive Up to Bridge Erector installing zone 4, when such as land-service road inconvenience, also A-road 5 can be extended to Bridge Erector installation along beam strorage area 3 Area 4 will fully consider the reasonable Arrangement of each region in the process.
The width of integral subgrade is generally 24m~25m, and the width of setting A-road 5 is 4m, and the beam prefabricated areas T, box beam are pre- Area processed, plate-girder make area and are arranged from the distant to the near along bridge formation direction, and beam strorage area 3 is divided into box beam along bridge formation direction and deposits from the distant to the near Area, T beams storage area, plate-girder storage area are put, each subregion reserves construction and transport space.Gantry crane 6 uses 100t and 5t Two kinds of specifications of gantry crane each two are secondary, in precast beam manufacturing process, are mutually independent of each other, and respectively construct, and improve working efficiency, accelerate Construction speed.
It should be noted that the placement order of precast beam does not limit in predefined region 2 and beam strorage area 3, according to practice of construction Depending on situation.
A kind of precast beam place provided by the embodiments of the present application, include the reinforcing bar storage area 1 being sequentially arranged along bridge formation direction, Predefined region 2, beam strorage area 3, Bridge Erector installing zone 4 and A-road 5, gantry crane 6 etc., reinforcing bar storage area 1 is for storing former material Material;Predefined region 2 is for making precast beam;Beam strorage area 3 is for storing the precast beam ready for use that completes;Bridge Erector installing zone 4 Handling, installation for the installation of Bridge Erector, and first bridge;A-road 5 passes through for construction machinery;Gantry crane 6 is for pre- The transport of materials such as beam processed, reinforcing bar, template.End of the bridge or bridge tail roadbed in bridge location area is arranged in precast beam place by the embodiment of the present application On, the difficulty of the precast beam Site Selection caused by landform limitation or land status are not inconsistent is avoided, while avoiding requisition It ploughs and reclaims expense, saved cost, reasonable Arrangement precast beam place, mould when fully considering width of subgrade, precast beam construction The peace of plate tears the factors such as space and beam transporting passage, haulage vehicle passage open, improves working efficiency, reduces casualties risk, reduces Operating expenses.
Optionally, predefined region 2 is equipped with precast pedestal, and precast beam is placed on precast pedestal, and precast pedestal 209 includes embedded road Extended chemotherapy 201, place hardened layer 202 inside base and precast beam pedestal 203 in roadbed upper surface is set, place hardening Layer 202 is arranged at the both ends of precast pedestal, and upper surface is concordant with the upper surface of Extended chemotherapy 201 of closely its setting;Precast beam Pedestal is equipped with reserved pulling eye 204, and three sections of settings of precast beam pedestal point, intermediate segment length is more than the side segment length at both ends, intermediate Section and side section are connected by the first steel plate 205 and the lumps of wood 206;203 upper surface of precast beam pedestal is equipped with the second steel plate 207, along length The both sides for spending direction are equipped with channel steel 208.
Predefined region 2 is broadly divided into the beam prefabricated areas T, prefabricated box -beam area, plate-girder predefined region, and precast beam is placed on precast pedestal On.The both ends of each precast pedestal are equipped with place hardened layer 202 and Extended chemotherapy 201, and precast beam pedestal 203 is arranged in centre, 203 parts three sections of precast beam pedestal is connected between interlude and two side sections by the first steel plate 205 and the lumps of wood 206, such as Fig. 3 institutes Show, is prefabricated box -beam pedestal section structure along its length.Precast pedestal upper surface is equipped with the second steel plate 207, along its length Both sides be equipped with channel steel 208, be illustrated in figure 4 precast pedestal section structure in the width direction.
Prefabricated box -beam pedestal, plate-girder precast pedestal generally use the cast of C20 concrete to make, and T girder prefabricated pedestals are generally adopted It is poured into a mould and is made with C25 concrete.
Integral subgrade width is 24m, is four rows along width of subgrade direction setting prefabricated box -beam pedestal, T girder prefabricated pedestals, It is set as multiple row according to condition of construction, can both meet the making construction of precast beam in this way, while subsequent transportation construction can be met, is made Place reaches maximum using effective percentage.Plate-girder precast pedestal number carries out rational deployment according to construction operating mode.
Optionally, beam strorage area 3 is equipped with and deposits beam pedestal 301, deposits and places precast beam on beam pedestal 301, deposits beam pedestal 301 in length Cube shape is formed by concreting.
As shown in figure 5, being box beam storage area structure chart, the box beam made is transported to box beam storage area, is placed on and deposits On beam pedestal 301, box beam is stored using double-deck, and plate-girder sets storage using four stackings, and plate-girder location mode is similar with box beam.
As shown in fig. 6, being T beam storage area structure charts, T beams are stored using double-deck, and each T beams of lower layer are equipped with supporting rack, Upper layer T beams are equipped with limiting plate, are shaken to prevent upper layer T beams.
It should be noted that precast pedestal and beam pedestal 301 is deposited based on compression, to prevent concrete in work progress Cracking can suitably increase reinforced mesh and construction muscle, to meet construction requirement.
Optionally, further include spray system 7, the spray tube of spray system 7 is arranged under the flange plate dowel of precast beam, adopts It is arranged with suspension method, nozzle is towards beam body.
Spray system 7 is mainly used for the routine servicing of precast beam, and along precast beam length direction, spray tube suspention is arranged in the wing Under listrium dowel, one nozzle is installed at interval of 2m, nozzle is towards beam body.
Optionally, A-road 5 is located at precast beam place along the centre position of bridge formation direction roadbed, reinforcing bar storage area 1, prefabricated Area 2 is symmetrically distributed in 5 both sides of A-road.
A-road 5 is mainly used for haulage vehicle traveling, as shown in fig. 7, being the beam prefabricated plot structures of T, A-road 5 is arranged pre- Beam making field roadbed centre position, reinforcing bar storage area 1, predefined region 2 are symmetrically distributed in the both sides of A-road 5, pass through fortune in this way When defeated trolley transport material, two side areas can be taken into account, while meeting material supply and demand.
Optionally, A-road 5 is located at precast beam place along the position of bridge formation direction roadbed side, reinforcing bar storage area 1, prefabricated Area 2 is distributed in the side of A-road 5.
The side position in precast beam place roadbed is arranged in A-road 5, in this way in isolation reinforcing bar storage area 1 or predefined region 2 When, it can be achieved that disposable all isolation.
Optionally, precast beam place upper edge bridge formation direction is equipped with a plurality of gutter 8.
In reinforcing bar storage area 1, predefined region 2, it is also dispersed with a plurality of gutter 8 along bridge formation direction, gutter 8 is for excluding Extra water, the outside gradient in 8 both sides of every gutter are arranged in 1%~2%, preferably 1.5%, and extra water is in gravity Under, it is collected to automatically in gutter 8, ensure that the ground in precast beam place is clean.As shown in fig. 7, wherein gutter 8 is positioned at low At position, flow is facilitated to collect, same discharge.
Place is selected in the end of the bridge or bridge tail roadbed in bridge location area by precast beam place provided by the embodiments of the present application, without sign With soil, excavation or embankment are carried out with regard to Bridgehead by Blastig or bridge tail roadbed, meet site requirements, close highway, convenience in transport, rationally It arranges place, reaches raising working efficiency, reduce casualties risk, reduce operating expenses.
It should be noted that the relational terms of such as " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include but also include not having so that article or equipment including a series of elements include not only those elements The other element being expressly recited, or further include for elements inherent to such a process, method, article, or device.Do not having There is the element limited by sentence "including a ..." in the case of more limiting, it is not excluded that in the mistake for including the element There is also other identical elements in journey, method, article or equipment.
The above is only the specific implementation mode of the application, is made skilled artisans appreciate that or realizing this Shen Please.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can in other embodiments be realized in the case where not departing from spirit herein or range.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.
It should be understood that the application is not limited to the content being described above, and its model can not departed from It encloses and carry out various modifications and change.Scope of the present application is only limited by the accompanying claims.

Claims (7)

1. a kind of precast beam place, which is characterized in that the precast beam place is arranged on the roads Bridgehead by Blastig Huo Qiaowei in bridge location area Base;Including:From far from the bridge location area to close to the bridge location area and set gradually along bridge formation direction reinforcing bar storage area (1), Predefined region (2), beam strorage area (3), Bridge Erector installing zone (4) further include A-road (5), gantry crane (6), wherein the A-road (5) the reinforcing bar storage area (1), the predefined region (2) are passed through along the bridge formation direction;The gantry crane (6) is along gantry rail (9) it travels, the gantry rail (9) is arranged along the bridge formation direction;The Bridge Erector installing zone (4) is arranged in the beam strorage area (3) between the bridge location area.
2. a kind of precast beam place according to claim 1, which is characterized in that the predefined region (2) is equipped with precast pedestal, Place precast beam on the precast pedestal, the precast pedestal (209) includes Extended chemotherapy (201) inside embedded roadbed, field Ground hardened layer (202) and precast beam pedestal (203) in the roadbed upper surface is set, the place hardened layer (202) sets It sets at the both ends of the precast pedestal, upper surface is concordant with the upper surface of the Extended chemotherapy (201) of closely its setting;It is described Precast beam pedestal is equipped with reserved pulling eye (204), three sections of settings of the precast beam pedestal point, and intermediate segment length is more than the side at both ends Segment length, the interlude and side section are connected by the first steel plate (205) and the lumps of wood (206);The precast beam pedestal (203) upper surface is equipped with the second steel plate (207), and both sides along its length are equipped with channel steel (208).
3. a kind of precast beam place according to claim 1, which is characterized in that the beam strorage area (3) is equipped with and deposits beam pedestal (301), described deposit places precast beam on beam pedestal (301), and the beam pedestal (301) of depositing is in rectangular shape, is poured by concrete It builds.
4. a kind of precast beam place according to claim 1, which is characterized in that further include spray system (7), the spray The spray tube of system (7) is arranged under the flange plate dowel of precast beam, is arranged using suspension method, and nozzle is towards beam body.
5. a kind of precast beam place according to claim 1, which is characterized in that the A-road (5) is located at described prefabricated Beam place is symmetrically distributed in along the centre position of bridge formation direction roadbed, the reinforcing bar storage area (1), the predefined region (2) A-road (5) both sides.
6. a kind of precast beam place according to claim 1, which is characterized in that the A-road (5) is located at described prefabricated Along the position of the bridge formation direction roadbed side, the reinforcing bar storage area (1), the predefined region (2) are distributed in described in beam place The side of A-road (5).
7. a kind of precast beam place according to claim 1, which is characterized in that build bridge described in the upper edge of the precast beam place Direction is equipped with a plurality of gutter (8).
CN201810532591.5A 2018-05-29 2018-05-29 A kind of precast beam place Pending CN108442258A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810532591.5A CN108442258A (en) 2018-05-29 2018-05-29 A kind of precast beam place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810532591.5A CN108442258A (en) 2018-05-29 2018-05-29 A kind of precast beam place

Publications (1)

Publication Number Publication Date
CN108442258A true CN108442258A (en) 2018-08-24

Family

ID=63205093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810532591.5A Pending CN108442258A (en) 2018-05-29 2018-05-29 A kind of precast beam place

Country Status (1)

Country Link
CN (1) CN108442258A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812082A (en) * 2018-12-28 2019-05-28 广州瀚阳工程咨询有限公司 A kind of bridge subsection precast plant and its precast segment technique
CN110359375A (en) * 2019-08-02 2019-10-22 广州瀚阳工程咨询有限公司 The construction method of precast segment girder precast field under a kind of bridge
CN110512908A (en) * 2019-08-15 2019-11-29 中铁七局集团有限公司 Highway curve roadbed precast beam field construction method
CN111719910A (en) * 2020-05-20 2020-09-29 中国建筑第八工程局有限公司 Retaining wall partition type beam field structure and construction method thereof
CN113001753A (en) * 2021-03-10 2021-06-22 中铁二十局集团第六工程有限公司 Intelligent box girder prefabricating method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943440A (en) * 2012-11-06 2013-02-27 天津二十冶建设有限公司 Method for constructing bridges
CN103924527A (en) * 2014-04-29 2014-07-16 中铁四局集团有限公司 Highway girder fabrication yard arrangement structure which is environmentally friendly, saves resources and integrates frame fabrication and construction method thereof
CN106012858A (en) * 2016-06-30 2016-10-12 中交航局第四工程有限公司 T-beam precast yard arranged on roadbed with longitudinal slope and construction method thereof
CN208563118U (en) * 2018-05-29 2019-03-01 中交路桥北方工程有限公司 A kind of precast beam place

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943440A (en) * 2012-11-06 2013-02-27 天津二十冶建设有限公司 Method for constructing bridges
CN103924527A (en) * 2014-04-29 2014-07-16 中铁四局集团有限公司 Highway girder fabrication yard arrangement structure which is environmentally friendly, saves resources and integrates frame fabrication and construction method thereof
CN106012858A (en) * 2016-06-30 2016-10-12 中交航局第四工程有限公司 T-beam precast yard arranged on roadbed with longitudinal slope and construction method thereof
CN208563118U (en) * 2018-05-29 2019-03-01 中交路桥北方工程有限公司 A kind of precast beam place

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
于亮清: "施工现场桥梁预制场的选择与布置", 山西建筑, no. 08, pages 48 - 49 *
梅克喜;: "变长度简支T梁预制施工技术探析", 安徽建筑, no. 06, pages 149 - 151 *
黄渭泉等: "《泸州长江大桥 施工技术与施工管理》", pages: 170 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812082A (en) * 2018-12-28 2019-05-28 广州瀚阳工程咨询有限公司 A kind of bridge subsection precast plant and its precast segment technique
CN110359375A (en) * 2019-08-02 2019-10-22 广州瀚阳工程咨询有限公司 The construction method of precast segment girder precast field under a kind of bridge
CN110359375B (en) * 2019-08-02 2022-02-08 瀚阳国际工程咨询有限公司 Construction method for in-situ precast segmental beam precast field under bridge
CN110512908A (en) * 2019-08-15 2019-11-29 中铁七局集团有限公司 Highway curve roadbed precast beam field construction method
CN111719910A (en) * 2020-05-20 2020-09-29 中国建筑第八工程局有限公司 Retaining wall partition type beam field structure and construction method thereof
CN111719910B (en) * 2020-05-20 2021-08-10 中国建筑第八工程局有限公司 Retaining wall partition type beam field structure and construction method thereof
CN113001753A (en) * 2021-03-10 2021-06-22 中铁二十局集团第六工程有限公司 Intelligent box girder prefabricating method
CN113001753B (en) * 2021-03-10 2022-04-08 中铁二十局集团第六工程有限公司 Intelligent box girder prefabricating method

Similar Documents

Publication Publication Date Title
CN208563118U (en) A kind of precast beam place
CN108442258A (en) A kind of precast beam place
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN103485288B (en) A kind ofly pass through both wired double-deck jacking culvert construction technology
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN106149576B (en) On removed and construction method of installation across both wired bridge whole groups
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN102943440A (en) Method for constructing bridges
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN105178352B (en) One kind is non-equal across the adjustable T-type girder prefabricated pedestal construction method of different bottom width
CN104727227A (en) Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge
CN110184926A (en) A kind of public affairs rail is built together the overhead pier stud construction method of double-layer integrallyization
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN106284109A (en) On across the most wired bridge main beam method for dismounting
CN106012791B (en) Three across the antinode steel concretes of work beam shear wave three combine T-shaped continuous beam
CN110184928A (en) A kind of pier stud construction method that the public rail using falsework is built together overhead
CN107938520A (en) Using the method for vertical drag-line construction steel reinforced concrete combination beam
CN205576955U (en) Raft foundation's reinforced structure is displaced into to strip footing
CN109518544A (en) A kind of subway precast track plate railway roadbed laying method
CN106193051A (en) Upper-soft lower-hard ground Metro station excavation support system and construction method thereof
CN106638183A (en) Urban rail transit assembly board type high precision rail base cast-in-place construction method
CN108842558A (en) Heavy concrete road surface can be had enough to meet the need
CN108708290A (en) The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit
CN101122115B (en) Construction method for tower crane shift
CN105019357A (en) Method for mounting specially-shaped precast bridge decks on open lattice steel beams of arched bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination