CN108441194A - The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid - Google Patents

The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid Download PDF

Info

Publication number
CN108441194A
CN108441194A CN201810258792.0A CN201810258792A CN108441194A CN 108441194 A CN108441194 A CN 108441194A CN 201810258792 A CN201810258792 A CN 201810258792A CN 108441194 A CN108441194 A CN 108441194A
Authority
CN
China
Prior art keywords
borehole wall
drilling fluid
cleaning method
cleaning
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810258792.0A
Other languages
Chinese (zh)
Inventor
许明标
李中
由福昌
李炎军
孟文波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangtze University
CNOOC China Ltd Zhanjiang Branch
Original Assignee
Yangtze University
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangtze University, CNOOC China Ltd Zhanjiang Branch filed Critical Yangtze University
Priority to CN201810258792.0A priority Critical patent/CN108441194A/en
Publication of CN108441194A publication Critical patent/CN108441194A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/40Spacer compositions, e.g. compositions used to separate well-drilling from cementing masses
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/52Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • E21B37/06Methods or apparatus for cleaning boreholes or wells using chemical means for preventing, limiting or eliminating the deposition of paraffins or like substances

Abstract

The invention belongs to reinforcing oil well technical fields, and in particular to the cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid.The present invention sequentially contacts drilling fluid base fluid, organic solvent, flushing liquor and insulating liquid respectively with the borehole wall, and each component synergistic effect improves the flushing effect to the drilling fluid borehole wall.Embodiment the result shows that, the cleaning method, can make the cleaning efficiency of the borehole wall reach 90% or more using the above scheme.

Description

Before a kind of well cementation of synthetic base drilling fluid before the cleaning method of the borehole wall and the well cementation used Set liquid
Technical field
The invention belongs to reinforcing oil well technical fields, and in particular to a kind of cleaning side of the preceding borehole wall of synthetic base drilling fluid well cementation Method and the Cementing used.
Background technology
During oil exploitation, the compatibility between drilling fluid and cementing slurry is poor, this is just needed in well cementation Before replace into prepad fluid, drilling fluid is isolated, and the borehole wall is cleaned, improve cementing quality.And the cleaning difficulty of the borehole wall is outstanding It is most, this is because oil base drilling fluid and synthetic base drilling fluid can make the borehole wall form one with oil base drilling fluid and synthetic base drilling fluid Layer " oil film ", and due to having very strong cementation between differential pressure action, with the borehole wall, if cannot effectively be cleaned to it, Cementing quality will certainly be influenced, and then influences oil-gas mining.
Both at home and abroad to the cleaning aspect of oil base drilling fluid or synthetic base drilling fluid mud cake, a large amount of research work is done, such as Chinese patent CN201310545773.3 discloses a kind of shale gas exploitation oil base drilling fluid mud cake cleaning solution;Chinese patent CN201610438760.X discloses a kind of microemulsion-type flushing liquor system suitable for oil base drilling fluid;Chinese patent 201510990331.9 disclose a kind of well cementation flushing liquor system suitable for oil base drilling fluid, mainly solve existing oil base drilling well The big problem of liquid mud cake cleaning difficulty, but above-mentioned well cementation flushing liquor system pairing is paid no attention at the mud cake flushing effect of base drilling fluid Think, influences the cementing of hydrogel and the borehole wall of subsequently cementing the well.
Invention content
The cleaning method of the borehole wall before cementing the well the purpose of the present invention is to provide a kind of synthetic base drilling fluid.It is provided by the invention Cleaning method can effectively clean the mud cake of synthetic base drilling fluid, realize the isolation to cement mortar, be effectively improved well cementation water The bonding quality of mud and the borehole wall improves cementing quality.
In order to achieve the above object, the present invention provides the following technical solutions:
The cleaning method of the borehole wall, includes the following steps before cementing the well the present invention provides a kind of synthetic base drilling fluid:
(1) drilling fluid base fluid is injected into oil drilling, previous cleaning is carried out to the borehole wall;During the previous cleaning, drilling well Liquid-based liquid contacts under turbulent condition with the borehole wall, and the time of the contact is 2~7min;
(2) after step (1) previous cleaning, the second cleaning is carried out to the borehole wall using organic solvent;The mistake of second cleaning Cheng Zhong, organic solvent contact under turbulent condition with the borehole wall, and the time of the contact is 5~8min;
(3) after the step (2) second is cleaned, the borehole wall is rinsed using flushing liquor;During the flushing, punching Washing lotion contacts under turbulent condition with the borehole wall, and the time of the contact is 5~10min;
(4) after the step (3) is rinsed, the borehole wall is isolated using insulating liquid;During the isolation, insulating liquid It is contacted with the borehole wall, the time of the contact is 2~5min.
Preferably, the organic solvent includes perfluoro-n-octane or hexamethylene.
Preferably, in terms of mass parts, the flushing liquor includes 100 parts of water and 20~100 parts of irrigations.
Preferably, in terms of mass parts, the insulating liquid includes 100 parts of water, 2~5 portions of interleaving agents and 10~50 parts of isolation punchings Lotion.
Preferably, the irrigation and isolation irrigation include independently perfluoro capryl ammonium chloride iodide and nonionic table Face activating agent.
Preferably, the flushing liquor further includes rinsing heavy weight additive;The insulating liquid further includes isolation heavy weight additive;The flushing Heavy weight additive and isolation heavy weight additive include independently barite and/or Iron Ore Powder.
Preferably, the interleaving agent includes tackifier, crosslinking agent, fluid loss additive and pH value alkaline conditioner;The thickening Agent, crosslinking agent, fluid loss additive and pH value alkaline conditioner mass ratio be (20~30):(4~6):(50~70):(8~12).
Preferably, the tackifier include one or more in xanthans, guar gum, fenugreek gum and carragheen;
The crosslinking agent includes sodium tetraborate;
The fluid loss additive includes cationic starch;
The pH value alkaline conditioner includes sodium hydroxide and sodium carbonate.
Preferably, the cationic starch includes hydroxypropul starch and/or carboxymethyl starch.
The present invention also provides the prepad fluids for cleaning method described in above-mentioned technical proposal, including the drilling well independently dispensed Liquid-based liquid, organic solvent, flushing liquor and insulating liquid.
The cleaning method of the borehole wall, includes the following steps before cementing the well the present invention provides a kind of synthetic base drilling fluid:It adopts first Previous cleaning is carried out to the borehole wall with drilling fluid base fluid;During the previous cleaning, drilling fluid base fluid contacts under turbulent condition with the borehole wall, The time of the contact is 2~7min;After previous cleaning, the present invention carries out the second cleaning using organic solvent to the borehole wall;Described second During cleaning, organic solvent contacts under turbulent condition with the borehole wall, and the time of the contact is 5~8min;Second cleaning Afterwards, then the borehole wall is rinsed using flushing liquor;During the flushing, flushing liquor connects under turbulent condition with the borehole wall It touches, the time of the contact is 5~10min;It completes after rinsing, the borehole wall is isolated using insulating liquid;The mistake of the isolation Cheng Zhong, the time that insulating liquid is contacted with the borehole wall are 2~5min.
The present invention sequentially contacts drilling fluid base fluid, organic solvent, flushing liquor and insulating liquid with the borehole wall, and each component collaboration is made With flushing effect of the raising to the drilling fluid borehole wall.Synthetic drilling fluid is easy that the borehole wall is made to form one layer " oil film ", and since pressure difference is made With with very strong cementation between the borehole wall, it is difficult to clean.The present invention utilizes the mud cake that drilling fluid base fluid adheres to the borehole wall It is washed away, softens mud cake, reduced the bond between mud cake and the borehole wall, be conducive to the infiltration of organic solvent;Organic solvent oozes Mud cake deep is arrived thoroughly, enters between mud cake and the borehole wall, mud cake is removed, destroy the structure of mud cake, further decrease mud The bond of cake and the borehole wall;It rinses remaining mud cake after liquid energy rinses organic solvent to be washed away and cleaned, and emulsifies bonding Synthetic base drilling fluid on the borehole wall further increases the removal rate to drilling fluid, and realizes the borehole wall and casing wettability reversal, makes The borehole wall and casing of oil drilling are changed into water wetting;Flushing liquor and cement mortar finally are separated using insulating liquid, prevents cement mortar It is mutually altered with flushing liquor and flushing effect is caused to be deteriorated, and further enhance the wettability reversal effect of the borehole wall, improve cementing matter of cementing the well Amount.Embodiment the result shows that, the cleaning method using the above scheme reaches 90% or more, cleaning to the cleaning efficiency of the borehole wall Effect is ideal, so that cementing quality is met the requirements, and improve the cementing strength of cementing slurry and the borehole wall, has further reached anti- The purpose only altered on oil gas.
Specific implementation mode
The cleaning method of the borehole wall, includes the following steps before cementing the well the present invention provides a kind of synthetic base drilling fluid:
(1) drilling fluid base fluid is used to carry out previous cleaning to the borehole wall;During the previous cleaning, drilling fluid base fluid is in turbulent condition Lower to be contacted with the borehole wall, the time of the contact is 3~5min;
(2) after step (1) previous cleaning, the second cleaning is carried out to the borehole wall using organic solvent;The mistake of second cleaning Cheng Zhong, organic solvent contact under turbulent condition with the borehole wall, and the time of the contact is 5~8min;
(3) after the step (2) second is cleaned, the borehole wall is rinsed using flushing liquor;During the flushing, punching Washing lotion contacts under turbulent condition with the borehole wall, and the time of the contact is 5~10min;
(4) after the step (3) is rinsed, the borehole wall is isolated using insulating liquid;During the isolation, insulating liquid The time contacted with the borehole wall is 2~5min.
In the present invention, unless otherwise specified, the component involved in the cleaning method is that those skilled in the art are ripe The commercial product known.
The present invention carries out previous cleaning using drilling fluid base fluid to the borehole wall.In the present invention, the previous cleaning is i.e. by the drilling fluid Base fluid is injected into oil drilling, is cleaned to the borehole wall.The present invention is not special to the injection mode of the drilling fluid base fluid It is required that using well known to those skilled in the art.The present invention does not have particular/special requirement to the drilling fluid base fluid, using ability Known to field technique personnel.In the present invention, the drilling fluid base fluid preferably includes synthetic base drilling fluid base fluid.In this hair In bright, the drilling fluid base fluid includes but not limited to makings oil or direct-connected alkane.
In the present invention, when carrying out previous cleaning to the borehole wall using drilling fluid base fluid, the drilling fluid base fluid is under turbulent condition It is contacted with the borehole wall, the time of the contact is 2~7min, further preferably 3~5min.Turbulent condition of the present invention refers to Particle makees irregular movement, mutual blending, the tortuous chaotic flow regime in track in liquid.In the present invention, the drilling fluid The turbulent condition of base fluid is preferably realized by adjusting annular space and returning the rheological parameter of speed and drilling fluid base fluid.The present invention is to the tune The mode of section does not have particular/special requirement, using well known to those skilled in the art.In the present invention, the drilling fluid base fluid Rheological parameter preferably indicates that the apparent viscosity of the drilling fluid base fluid is preferably≤10mPas, further excellent with apparent viscosity It is selected as 1~5mPas.
Fluidised form and time when the present invention contacts the drilling fluid base fluid and the borehole wall carry out above-mentioned restriction, make drilling well liquid-based Liquid effectively washes away the mud cake that the borehole wall adheres to and is softened, and the bond between mud cake and the borehole wall is reduced, and is follow-up organic The infiltration of solvent provides condition.
After the previous cleaning, the present invention carries out the second cleaning using organic solvent to the borehole wall.In the present invention, described second is clear It washes and the organic solvent is injected into oil drilling, the borehole wall is cleaned.Injection of the present invention to the organic solvent Mode does not have particular/special requirement, using well known to those skilled in the art.In the present invention, the organic solvent preferably includes Perfluoro-n-octane or hexamethylene.In the present invention, the rheological parameter of the organic solvent is preferably indicated with apparent viscosity, described to have The apparent viscosity of solvent is preferably≤12mPas, further preferably 2~8mPas.
In the present invention, when carrying out the second cleaning to the borehole wall using organic solvent, the organic solvent is under turbulent condition It is contacted with the borehole wall, the time of the contact is 5~8min, further preferably 4.5~7.5min.In the present invention, described to have The turbulent condition realization method of solvent is consistent with the realization method of drilling fluid base fluid, and details are not described herein.
The fluidised form and time that the present invention contacts organic solvent in second cleaning process with the borehole wall carry out above-mentioned restriction, So that organic solvent is penetrated into mud cake deep, especially penetrate between mud cake and the borehole wall, mud cake is removed, destroys mud cake Structure further decreases bond.
After second cleaning, the present invention is rinsed the borehole wall using flushing liquor.In the present invention, the flushing will The flushing liquor is injected into oil drilling, is rinsed to the borehole wall.The present invention is to the injection mode of the flushing liquor without spy It is different to require, using well known to those skilled in the art.
In the present invention, in terms of mass parts, the flushing liquor preferably includes 100 parts of water and 20~100 parts of irrigations.
On the basis of the mass parts of water in the flushing liquor, irrigation of the present invention is more preferably 30~90 parts, More preferably 35~85 parts.In the present invention, the irrigation preferably includes perfluoro capryl ammonium chloride iodide and nonionic table The mass ratio of face activating agent, the perfluoro capryl ammonium chloride iodide and nonionic surfactant is preferably 5:90~100, into One step is preferably 5:92~97, more preferably 5:95.In the present invention, the nonionic surfactant preferably includes isomery ten Triol polyoxyethylene ether, fatty alcohol polyoxyethylene ether, polyoxyethylene carboxylate and propylene glycol propyl ether.In the present invention, described Isomerous tridecanol polyoxyethylene ether, fatty alcohol polyoxyethylene ether, the mass ratio of polyoxyethylene carboxylate and propylene glycol propyl ether are excellent It is selected as 5:22~27:22~27:35~45;Further preferably 5:23~26:23~5:37~42, more preferably 5:25:25: 40。
On the basis of the mass parts of water in the flushing liquor, flushing liquor of the present invention preferably further includes 0~100 part of flushing Heavy weight additive.In the present invention, the flushing heavy weight additive preferably includes barite and/or Iron Ore Powder, further preferably barite Or Iron Ore Powder.In the present invention, when the flushing heavy weight additive is mixture, quality of the present invention to each component in the mixture Than being not particularly limited.
In the present invention, the rheological parameter of the flushing liquor is preferably indicated with apparent viscosity, and the apparent of the flushing liquor sticks Degree is preferably≤20mPas, further preferably 5~15mPas.
In flushing process, flushing liquor of the present invention contacts under turbulent condition with the borehole wall, and time of the contact is 5~ 10min, further preferably 5.5~9.5min.In the present invention, the turbulent condition realization method and drilling fluid of the flushing liquor The realization method of base fluid is consistent, and details are not described herein.
The fluidised form and time that the present invention contacts the flushing liquor with the borehole wall carry out above-mentioned restriction, make flushing liquor to organic molten Remaining mud cake is washed away and is cleaned after agent is rinsed, and emulsifies remaining drilling fluid base fluid, and drilling fluid base fluid is made to enter punching In washing lotion, wettability reversal is realized to the borehole wall and casing, the borehole wall is made to be changed into water wetting.
After the flushing, the present invention is isolated the borehole wall using insulating liquid.In the present invention, the isolation i.e. will be described Insulating liquid is injected into oil drilling, and the borehole wall is isolated.The present invention does not have special want to the injection mode of the insulating liquid It asks, using well known to those skilled in the art.
In the present invention, in terms of mass parts, the insulating liquid preferably includes 100 parts of water, 2~5 portions of interleaving agents and 10~50 Part isolation irrigation.
On the basis of the mass parts of water in the insulating liquid, interleaving agent of the present invention is preferably 2.5~4.5 parts, into one Preferably 3~4 parts of step.In the present invention, the interleaving agent preferably includes tackifier, crosslinking agent, fluid loss additive and pH value alkalinity Conditioning agent, the tackifier, crosslinking agent, fluid loss additive and pH value alkaline conditioner mass ratio be preferably (20~30):(4~ 6):(50~70):(8~12), further preferably (24~26):5:(55~65):(9~11).
In the present invention, the tackifier preferably include one kind or more in xanthans, guar gum, fenugreek gum and carragheen Kind, further preferably xanthans, guar gum, fenugreek gum or carragheen.In the present invention, the tackifier are the mixed of various ingredients When closing object, the present invention does not have particular/special requirement to the mass ratio of each component in the mixture.
In the present invention, the crosslinking agent preferably includes sodium tetraborate.
In the present invention, the fluid loss additive preferably includes cationic starch, further preferably hydroxypropul starch and/or Carboxymethyl starch.In the present invention, when the fluid loss additive is the mixture of various ingredients, the present invention is to each in the mixture The mass ratio of component does not have particular/special requirement.
In the present invention, the pH value alkaline conditioner preferably includes sodium hydroxide and/or sodium carbonate, further preferably Sodium hydroxide and sodium carbonate.In the present invention, when the pH value alkaline conditioner is the mixture of sodium hydroxide and sodium carbonate, institute It is preferably 20 to state the mass ratio of sodium hydroxide and sodium carbonate in mixture:70~90, further preferably 20:75~85, it is more excellent It is selected as 20:80.
In the present invention, the interleaving agent is preferably included tackifier, crosslinking agent, fluid loss additive and pH value alkaline conditioner It is mixed to get.The present invention does not have particular/special requirement to the mode of the mixing, using well known to those skilled in the art.
On the basis of the mass parts of water in the insulating liquid, isolation irrigation of the present invention is preferably 10~50 parts, into One step is preferably 20~40 parts.In the present invention, the isolation irrigation preferably includes perfluoro capryl ammonium chloride iodide and non- The mass ratio of ionic surface active agent, the perfluoro capryl ammonium chloride iodide and nonionic surfactant is preferably 5:90~ 100, further preferably 5:92~97, more preferably 5:95.In the present invention, the nonionic surfactant preferably includes Isomerous tridecanol polyoxyethylene ether, fatty alcohol polyoxyethylene ether, polyoxyethylene carboxylate and propylene glycol propyl ether;The isomery ten Triol polyoxyethylene ether, fatty alcohol polyoxyethylene ether, polyoxyethylene carboxylate and propylene glycol propyl ether mass ratio be preferably 5: 22~27:22~27:35~45;Further preferably 5:23~26:23~5:37~42, more preferably 5:25:25:40.
In the present invention, the isolation irrigation preferably includes to live in perfluoro capryl ammonium chloride iodide and non-ionic surface Property agent is mixed to get.The present invention does not have particular/special requirement to the mode of the mixing, using well known to those skilled in the art.
On the basis of the mass parts of water in the insulating liquid, insulating liquid of the present invention preferably further includes 0~100 part of isolation Heavy weight additive.In the present invention, the isolation heavy weight additive preferably includes barite and/or Iron Ore Powder, further preferably barite Or Iron Ore Powder.In the present invention, when the isolation heavy weight additive is mixture, quality of the present invention to each component in the mixture Than being not particularly limited.
In the present invention, the rheological parameter of the insulating liquid is preferably indicated with apparent viscosity, and the apparent of the insulating liquid sticks Degree is preferably >=40mPas, further preferably 50~80mPas.
Insulating liquid of the present invention preferably includes said components being mixed to get.The present invention does not have the mode of the mixing Particular/special requirement, using well known to those skilled in the art.
In isolation processes, insulating liquid of the present invention is contacted with the borehole wall, and the time of the contact is 2~5min, further Preferably 2.5~4.5min.
The time when present invention contacts the insulating liquid and the borehole wall carries out above-mentioned restriction, and isolation liquid energy is made to separate flushing liquor And cement mortar, prevent cement mortar from mutually being altered with flushing liquor and flushing effect is caused to be deteriorated, and further enhance the profit realized to the borehole wall Wet inversion effect, and then achieve the purpose that improve cementing quality.
The present invention also provides the Cementings that cleaning method described in above-mentioned technical proposal uses, including independently dispense Drilling fluid base fluid, organic solvent, flushing liquor and insulating liquid.In the present invention, the drilling fluid base fluid, organic solvent, flushing liquor With drilling fluid base fluid, organic solvent, flushing liquor and insulating liquid one are used in cleaning method described in insulating liquid and above-mentioned technical proposal It causes, details are not described herein.
In order to further illustrate the present invention, with reference to embodiment to a kind of synthetic base drilling fluid well cementation provided by the invention The cleaning method of the preceding borehole wall and its Cementing used are described in detail, but they cannot be interpreted as to the present invention The restriction of protection domain.
Embodiment 1:
Unless otherwise specified, the dosage of component as described below refers both to mass parts.
Drilling fluid base fluid is synthetic-based mud used by synthetic base drilling fluid;
Organic solvent is perfluoro-n-octane;
Flushing liquor is 100 parts of water and 20 parts of irrigations;Wherein irrigation is perfluoro capryl ammonium chloride iodide, isomery 13 Alcohol polyoxyethylene ether, fatty alcohol polyoxyethylene ether, polyoxyethylene carboxylate and propylene glycol propyl ether are according to mass ratio 5:5:25: 25:40 compound;
Insulating liquid is 100 parts of water, 2 portions of interleaving agents and 10 parts of isolation irrigations;
Interleaving agent is tackifier, crosslinking agent, fluid loss additive and pH value alkaline conditioner according to mass ratio 25:5:60:10 is multiple With into;Wherein tackifier are xanthans, and crosslinking agent is sodium tetraborate, and fluid loss additive is hydroxypropul starch, and pH value alkalinity is adjusted Agent is sodium hydroxide and sodium carbonate mass ratio is 20:80 mixture.
Isolation irrigation is perfluoro capryl ammonium chloride iodide, isomerous tridecanol polyoxyethylene ether, aliphatic alcohol polyethenoxy Ether, polyoxyethylene carboxylate and propylene glycol propyl ether are according to mass ratio 5:5:25:25:40 compound.
Cleaning method:
Synthetic-based mud, organic solvent, flushing liquor and insulating liquid are sequentially injected into and are pumped into equipment, sequentially uses synthetic-based mud Drilling shaft lining is cleaned with organic solvent, flushing liquor is rinsed drilling shaft lining and insulating liquid is to flushing liquor and cement mortar It is isolated, and assists cleaning drilling shaft lining:The time of contact of above-mentioned each component and the borehole wall is respectively:
Synthetic-based mud is 5min with borehole wall time of contact;
Organic solvent is 8min with borehole wall time of contact;
Flushing liquor is 10min with borehole wall time of contact;
Insulating liquid is 5min with borehole wall time of contact.
The mud cake of synthetic base drilling fluid is handled according to the method described above, can realize and be more than to the cleaning efficiency of the borehole wall 90%, the acoustic amplitude of cementing quality is less than 15%, and cementing quality is excellent.
Embodiment 2:
Cleaning reagent forms and dosage is with embodiment 1, the difference is that:
Organic solvent is hexamethylene;
Flushing liquor is 100 parts of water, 100 parts of irrigations and 100 parts of flushing heavy weight additives;
Flushing heavy weight additive is barite;
Insulating liquid is 100 parts of water, 5 portions of interleaving agents, 50 parts of isolation irrigations and 100 parts of isolation heavy weight additives;
Wherein tackifier are fenugreek gum, and fluid loss additive is hydroxypropul starch;
Isolation heavy weight additive is barite.
It is cleaned according to the cleaning method of embodiment 1, the difference is that:
Synthetic-based mud is 3min with borehole wall time of contact;
Organic solvent is 5min with borehole wall time of contact;
Flushing liquor is 5min with borehole wall time of contact;
Insulating liquid is 2min with borehole wall time of contact.
The mud cake of synthetic base drilling fluid is handled according to the method described above, can realize and be more than to the cleaning efficiency of the borehole wall 91%, the acoustic amplitude of cementing quality is less than 13%, and cementing quality is excellent.
Embodiment 3:
Cleaning reagent with embodiment 1, the difference is that:
Flushing liquor is 100 parts of water, 60 parts of irrigations and 50 parts of flushing heavy weight additives;
Flushing heavy weight additive is Iron Ore Powder.
Insulating liquid is 100 parts of water, 3 portions of interleaving agents, 30 parts of isolation irrigations and 50 parts of isolation heavy weight additives;
Wherein tackifier are guar gum, and fluid loss additive is carboxymethyl starch, and isolation heavy weight additive is Iron Ore Powder.
Cleaning method with embodiment 1, the difference is that:
Synthetic-based mud is 4min with borehole wall time of contact;
Organic solvent is 6min with borehole wall time of contact;
Flushing liquor is 8min with borehole wall time of contact;
Insulating liquid is 4min with borehole wall time of contact.
The mud cake of synthetic base drilling fluid is handled according to the method described above, can realize and be more than to the cleaning efficiency of the borehole wall 95%, the acoustic amplitude of cementing quality is less than 10%, and cementing quality is excellent.
Embodiment 4:
Cleaning reagent is formed with embodiment 1 together, the difference is that:
Organic solvent is hexamethylene;
Flushing liquor is 100 parts of water, 100 parts of irrigations and 20 parts of flushing heavy weight additives;
Flushing heavy weight additive is barite.
The insulating liquid is 100 parts of water, 5 portions of interleaving agents, 10 parts of isolation irrigations, 20 parts of isolation heavy weight additive compositions;
Wherein tackifier are carragheen, and isolation heavy weight additive is barite.
Cleaning method with embodiment 1, the difference is that:
Synthetic-based mud is 5min with borehole wall time of contact;
Organic solvent is 5min with borehole wall time of contact;
Flushing liquor is 5min with borehole wall time of contact;
Insulating liquid is 5min with borehole wall time of contact.
The mud cake of synthetic base drilling fluid is handled according to the method described above, can realize and be more than to the cleaning efficiency of the borehole wall 93%, the acoustic amplitude of cementing quality is less than 12%, and cementing quality is excellent.
Comparative example 1:
Prepad fluid group becomes the flushing liquor in the present invention separately as prepad fluid,
Flushing liquor is 100 parts of water and 20 parts of irrigations;Wherein irrigation is perfluoro capryl ammonium chloride iodide, isomery 13 Alcohol polyoxyethylene ether, fatty alcohol polyoxyethylene ether, polyoxyethylene carboxylate and propylene glycol propyl ether are according to mass ratio 5:5:25: 25:40 compound.
Cleaning method is to be injected into flushing liquor to be pumped into equipment, is cleaned to drilling shaft lining, scavenging period 25min.
The mud cake of synthetic base drilling fluid is handled according to the method described above, cleaning solution efficiency is only 60%, cementing quality Acoustic amplitude is more than 30%, and cementing quality is qualification.
Comparative example 2:
Prepad fluid group becomes water as prepad fluid,
Cleaning method is to inject water into be pumped into equipment, is cleaned to drilling shaft lining, scavenging period 30min.
The mud cake of synthetic base drilling fluid is handled according to the method described above, cleaning solution efficiency is only 20%, cementing quality Acoustic amplitude is more than 70%, and cementing quality is unqualified.
It, can be significantly by above example and comparative example it is found that Cementing using the present invention and cleaning method Cleaning efficiency is improved, and acoustic amplitude can be controlled in relatively low range, cementing quality reaches excellent.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (10)

1. the cleaning method of the borehole wall, includes the following steps before a kind of synthetic base drilling fluid well cementation:
(1) drilling fluid base fluid is used to carry out previous cleaning to the borehole wall;During the previous cleaning, drilling fluid base fluid under turbulent condition with The borehole wall contacts, and the time of the contact is 2~7min;
(2) after step (1) previous cleaning, the second cleaning is carried out to the borehole wall using organic solvent;During second cleaning, Organic solvent contacts under turbulent condition with the borehole wall, and the time of the contact is 5~8min;
(3) after the step (2) second is cleaned, the borehole wall is rinsed using flushing liquor;During the flushing, flushing liquor It is contacted with the borehole wall under turbulent condition, the time of the contact is 5~10min;
(4) after the step (3) is rinsed, the borehole wall is isolated using insulating liquid;During the isolation, insulating liquid and well The time of wall contact is 2~5min.
2. cleaning method as described in claim 1, which is characterized in that the organic solvent includes perfluoro-n-octane or hexamethylene Alkane.
3. cleaning method as described in claim 1, which is characterized in that in terms of mass parts, the flushing liquor include 100 parts of water and 20~100 parts of irrigations.
4. cleaning method as described in claim 1, which is characterized in that in terms of mass parts, the insulating liquid includes 100 parts of water, 2 ~5 portions of interleaving agents and 10~50 parts of isolation irrigations.
5. cleaning method as described in claim 3 or 4, which is characterized in that the irrigation and isolation irrigation independently wrap Include perfluoro capryl ammonium chloride iodide and nonionic surfactant.
6. cleaning method as described in claim 3 or 4, which is characterized in that the flushing liquor further includes rinsing heavy weight additive;It is described Insulating liquid further includes isolation heavy weight additive;
The flushing heavy weight additive and isolation heavy weight additive include independently barite and/or Iron Ore Powder.
7. cleaning method as claimed in claim 4, which is characterized in that the interleaving agent includes tackifier, crosslinking agent, filtrate reducing Agent and pH value alkaline conditioner;The tackifier, crosslinking agent, fluid loss additive and pH value alkaline conditioner mass ratio be (20~ 30):(4~6):(50~70):(8~12).
8. cleaning method as claimed in claim 7, which is characterized in that the tackifier include xanthans, guar gum, fenugreek gum and It is one or more in carragheen;
The crosslinking agent includes sodium tetraborate;
The fluid loss additive includes cationic starch;
The pH value alkaline conditioner includes sodium hydroxide and sodium carbonate.
9. cleaning method as claimed in claim 8, which is characterized in that the cationic starch include hydroxypropul starch and/or Carboxymethyl starch.
10. for the prepad fluid of any one of claim 1~9 cleaning method, including independently dispense drilling fluid base fluid, have Solvent, flushing liquor and insulating liquid.
CN201810258792.0A 2018-03-27 2018-03-27 The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid Pending CN108441194A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810258792.0A CN108441194A (en) 2018-03-27 2018-03-27 The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810258792.0A CN108441194A (en) 2018-03-27 2018-03-27 The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid

Publications (1)

Publication Number Publication Date
CN108441194A true CN108441194A (en) 2018-08-24

Family

ID=63196906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810258792.0A Pending CN108441194A (en) 2018-03-27 2018-03-27 The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid

Country Status (1)

Country Link
CN (1) CN108441194A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109135697A (en) * 2018-09-18 2019-01-04 中国石油集团西部钻探工程有限公司 Ultra high density displacement of reservoir oil insulating liquid resistant to high temperatures and preparation method thereof
CN109652044A (en) * 2019-01-02 2019-04-19 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of compound Cementing system and its purging method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858146A (en) * 2005-12-26 2006-11-08 西南石油学院 Anti-pollution high efficiency isolation liquid and preparing method
WO2010023602A1 (en) * 2008-08-29 2010-03-04 Schlumberger Canada Limited Partially neutralized polyhydroxy acids for well treatments
CN103351856A (en) * 2013-07-25 2013-10-16 中国石油集团川庆钻探工程有限公司 Flushing fluid of relieving damage of low permeable sandstone air layer drilling fluid and preparation method thereof
CN103642476A (en) * 2013-12-17 2014-03-19 长江大学 Shale gas exploitation oil-based drilling fluid well-cementing prepad fluid
CN103756654A (en) * 2014-01-16 2014-04-30 中国石油集团渤海钻探工程有限公司 Salt-resistant high-density isolating liquid and preparation method thereof
CN104152120A (en) * 2014-06-10 2014-11-19 翟常忠 Preparation method of pressure-bearing borehole wall stabilizer for drilling fluid
WO2015088515A1 (en) * 2013-12-11 2015-06-18 Halliburton Energy Services, Inc. Treating a subterranean formation with a composition having multiple curing stages
CN105134110A (en) * 2015-08-20 2015-12-09 中国海洋石油总公司 Method for cleaning high-density drilling fluid mud cakes
US20160145487A1 (en) * 2013-09-11 2016-05-26 Halliburton Energy Services, Inc. Asphaltene-dissolving oil-external emulsion for acidization and methods of using the same

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858146A (en) * 2005-12-26 2006-11-08 西南石油学院 Anti-pollution high efficiency isolation liquid and preparing method
WO2010023602A1 (en) * 2008-08-29 2010-03-04 Schlumberger Canada Limited Partially neutralized polyhydroxy acids for well treatments
CN103351856A (en) * 2013-07-25 2013-10-16 中国石油集团川庆钻探工程有限公司 Flushing fluid of relieving damage of low permeable sandstone air layer drilling fluid and preparation method thereof
US20160145487A1 (en) * 2013-09-11 2016-05-26 Halliburton Energy Services, Inc. Asphaltene-dissolving oil-external emulsion for acidization and methods of using the same
WO2015088515A1 (en) * 2013-12-11 2015-06-18 Halliburton Energy Services, Inc. Treating a subterranean formation with a composition having multiple curing stages
CN103642476A (en) * 2013-12-17 2014-03-19 长江大学 Shale gas exploitation oil-based drilling fluid well-cementing prepad fluid
CN103756654A (en) * 2014-01-16 2014-04-30 中国石油集团渤海钻探工程有限公司 Salt-resistant high-density isolating liquid and preparation method thereof
CN104152120A (en) * 2014-06-10 2014-11-19 翟常忠 Preparation method of pressure-bearing borehole wall stabilizer for drilling fluid
CN105134110A (en) * 2015-08-20 2015-12-09 中国海洋石油总公司 Method for cleaning high-density drilling fluid mud cakes

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁金钊等: "《海上石油开发溢油污染风险分析与防范对策》", 30 April 2016, 海洋出版社 *
肖驰俊等: "水平井筛管完井多段塞完井液技术", 《油田化学》 *
赵永会等: ""DG抗高温隔离液的室内研究"", 《西部探矿工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109135697A (en) * 2018-09-18 2019-01-04 中国石油集团西部钻探工程有限公司 Ultra high density displacement of reservoir oil insulating liquid resistant to high temperatures and preparation method thereof
CN109135697B (en) * 2018-09-18 2020-10-16 中国石油集团西部钻探工程有限公司 High-temperature-resistant ultrahigh-density oil displacement isolation liquid and preparation method thereof
CN109652044A (en) * 2019-01-02 2019-04-19 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of compound Cementing system and its purging method

Similar Documents

Publication Publication Date Title
US3411580A (en) Mud removal method
CN104194759B (en) Oil extraction in oil field stratum neutral de-plugging agent composition and preparation method thereof
RU2369736C2 (en) System of stabilisers and enhancers of functional qualities of aqueous liquids, thickened by viscoelastic surfactants
EP1523606B1 (en) Method for completing injection wells
US6534449B1 (en) Removal of wellbore residues
US6911419B2 (en) High temperature seawater-based cross-linked fracturing fluids and methods
US20030073585A1 (en) Viscous fluid applicable for treating subterranean formations
SA97180598B1 (en) An improved spur treatment method
CN107365574A (en) A kind of viscosity reduction oil displacement agent for common heavy oil reservoir and preparation method thereof
NO331598B1 (en) Drilling and maintenance fluids and methods for removing filter cake deposits
EP1460121B1 (en) Well treating fluids
MX2013005018A (en) Methods for servicing subterranean wells.
CN106634938A (en) Compound type temperature-resisting viscoelastic self-diverting acid as well as preparation method and application thereof
CN102575146A (en) Microemulsion to improve shale gas production by controlling water imbibition
CN108441194A (en) The cleaning method of the borehole wall and the Cementing used before a kind of well cementation of synthetic base drilling fluid
CN105482795B (en) A kind of temporary stifled type workover fluid and its preparation method suitable for fissurity reservoir
CN104927832A (en) Self-diverting acid for acidifying modification of heterogeneous reservoir
CN109652044A (en) A kind of compound Cementing system and its purging method
CA2955042C (en) Reservoir treatment fluid
US11891566B2 (en) Weighted fluid loss control pill for completion and workover operations
CN102399546A (en) Environment-friendly composite blocking remover composition for oil fields
US20190010383A1 (en) Self-degradable diverters for propped fracture acidizing
CA3018528A1 (en) Self-suspending material for diversion applications
CN104673268A (en) Neutral fracturing fluid composition in oil extraction floor layer of oil field and preparation method of neutral fracturing fluid composition
CN113046051A (en) Online solid-liquid flow-splitting acid suitable for sandstone reservoir heterogeneous oil layer and preparation method and application thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824