CN108416010A - The method for showing hydrographic information based on mobile application end - Google Patents
The method for showing hydrographic information based on mobile application end Download PDFInfo
- Publication number
- CN108416010A CN108416010A CN201810177275.0A CN201810177275A CN108416010A CN 108416010 A CN108416010 A CN 108416010A CN 201810177275 A CN201810177275 A CN 201810177275A CN 108416010 A CN108416010 A CN 108416010A
- Authority
- CN
- China
- Prior art keywords
- data
- rainfall
- customization
- water level
- mobile application
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Abstract
The present invention relates to a kind of methods showing hydrographic information based on mobile application end.Receive the information data of each survey station or the publication of other systems;Have whenever and wherever possible in the case of net to short time node with it is long when timing node select, combine each reservoir, river water level to carry out method in such a way that weight proportion is different and calculate to analyze and determine area rainfall form and the case where long-time drought and waterlogging in short-term by the simplified form of map, color, figure, table displaying rainfall data.The present invention meets mobile application end use habit, and client or mobile phone browser end is supported to access, and data is allowed to be easy to the identification of emphasis data, display data meaning with the form combination color of table by figure.Data source can be checked by map combination site location.
Description
Technical field
The present invention relates to a kind of methods showing hydrographic information based on mobile application end.
Background technology
The application of the hydrology, hydrologic information technology in Flood Prevention, to the timeliness and reliability of flood control flood decision
Raising have certain positive effect, have for the reduction and the safety guarantee of people's lives and properties of the loss of rain disaster
Huge facilitation provides timely service for place flood control mitigation, and hydrology technology support is provided for flood-control and drought relief mitigation.Flood control
Disaster reduction system based on anti-big flood, anti-great drought, rob big danger, rescue terrible disaster, implement " it is crucial it is anti-, basic build, emphasis pipe,
Core is in people " 16 word policies.Accurate, timely, the reliable Hydrological Information and Forecasting in each hydrometric station is local government, prevents doing commander
Decision, flood control provide the foundation of science, provide and timely service, and have given full play to Hydrological Information and Forecasting in flood control work
Knowledge in work and staff function for flood control mitigation and ensure that people life property safety makes guarantor.
Currently, province, office of city office clerks have realized one computer of human hand, emphasis hydrometric station is also equipped with computer
Equipment.The whole province's rain condition information and most Hydrologic Informations realize automatic collection substantially, and automated wireless is transmitted in city's regimen point
The heart, province's regimen center are carried out data transmission with each city branch center using special optical cable channel.The whole province's surface water, underground water, water quality
Data are all reorganized using software, and reorganizing achievement and real-time rain hydrologic regime data realizes database purchase.
Existing hydrographic information system is mostly based on the ends PC, does not meet mobile terminal use habit, can not accomplish whenever and wherever possible
Check information in time, and data entries are various, it is difficult to find focus, to information graphic undertreatment, important information point is not
The shortcomings of easily reading.
Invention content
The purpose of the present invention is to provide a kind of methods showing hydrographic information based on mobile application end, meet mobile application
Use habit is held, client or mobile phone browser end is supported to access, data is allowed to be easy to weight with the form combination color of table by figure
Point data identification, display data meaning.Data source can be checked by map combination site location.
To achieve the above object, the technical scheme is that:A kind of side showing hydrographic information based on mobile application end
Method includes the following steps,
Step S1, the real-time acquisition in river, the rainfall of reservoir, water level and ocean tidal level is realized;
Step S2, website establishes contact, and data are uploaded to database:Station maintenance is carried out, establishes website in administrative grade, work
Journey type and the value in each regular weight, will upload data maintenance and enter database;
Step S3, rule-based filtering, interface remove Database error data:The mistake that website uploads is removed according to wrong screening rule
Data eliminate influence of the wrong data to right value;
Step S4, customization data sorting is marked with early warning:Water level is carried out in river, the ordering rule of reservoir and early warning threshold values rule
Customization and the customization of rainfall level thresholds;
Step S5, algorithm calculates the equal rainfall in face:After being added the administrative area same period rainfall that respectively station measures using arithmetic mean method, remove
With master station's number, as administrative area areal rainfall;
Step S6, data visualization:After meeting rainfall data collection analysis in the form of mobile terminal by map with color lump
Clear displaying, and be subject to brief table and carry out data analysis;Tide level data combination real time data passes through figure and table with forecast data
Form is shown;Reservoir river water level carries out the super flood of table, super guarantee sequence by different color and weights.
In an embodiment of the present invention, in the step S1, the rainfall water level website of predetermined quantity is disposed in predetermined region
To gathered data.
In an embodiment of the present invention, in the step S4, water level is advised in river, the ordering rule of reservoir and early warning threshold values
Then customization include flood season limit level, guaranteed water level, ordinary water level threshold values customization and super alert mark customization.
In an embodiment of the present invention, in the step S4, the customization of rainfall level thresholds according to threshold values be arranged it is small, in it is big,
Heavy rain, the mark customization of extra torrential rain rainfall.
Compared to the prior art, the invention has the advantages that:The method of the present invention meets mobile application end and uses habit
It is used, it supports client or mobile phone browser end to access, allows data to be easy to emphasis data with the form combination color of table by figure and know
Not, display data meaning.Data source can be checked by map combination site location.
Description of the drawings
Fig. 1 is flow chart of the present invention.
Specific implementation mode
Below in conjunction with the accompanying drawings, technical scheme of the present invention is specifically described.
A kind of method showing hydrographic information based on mobile application end of the present invention, includes the following steps,
Step S1, the real-time acquisition in river, the rainfall of reservoir, water level and ocean tidal level is realized;
Step S2, website establishes contact, and data are uploaded to database:Station maintenance is carried out, establishes website in administrative grade, work
Journey type and the value in each regular weight, will upload data maintenance and enter database;
Step S3, rule-based filtering, interface remove Database error data:The mistake that website uploads is removed according to wrong screening rule
Data eliminate influence of the wrong data to right value;
Step S4, customization data sorting is marked with early warning:Water level is carried out in river, the ordering rule of reservoir and early warning threshold values rule
Customization and the customization of rainfall level thresholds;
Step S5, algorithm calculates the equal rainfall in face:After being added the administrative area same period rainfall that respectively station measures using arithmetic mean method, remove
With master station's number, as administrative area areal rainfall;
Step S6, data visualization:After meeting rainfall data collection analysis in the form of mobile terminal by map with color lump
Clear displaying, and be subject to brief table and carry out data analysis;Tide level data combination real time data passes through figure and table with forecast data
Form is shown;Reservoir river water level carries out the super flood of table, super guarantee sequence by different color and weights.
In the step S1, the rainfall water level website of predetermined quantity is disposed to gathered data in predetermined region.
In the step S4, water level river, the ordering rule of reservoir and early warning threshold values rules customization include flood season limit level,
Guaranteed water level, ordinary water level threshold values customization and super alert mark customization.The customization of rainfall level thresholds is arranged according to threshold values
It is small, in big, heavy rain, extra torrential rain rainfall mark customization.
It is the specific implementation process of the present invention below.
As shown in Figure 1, the flow chart of the method to show hydrographic information the present invention is based on mobile application end, specific steps are such as
Under:
1, the real-time acquisition in river, the rainfall of reservoir, water level and ocean tidal level is realized.A fixed number is disposed in crucial rationally region
The rainfall water level website of amount is to gathered data.Still timing when website is without rainfall(Per half an hour)Data are uploaded to database, are led to
The service of mistake, which is timed, checks website whether normal operation.
2, website establishes contact, and data are uploaded to database.Station maintenance is carried out, establishes website in administrative grade, work
Journey type and the value in each regular weight, will upload data maintenance and enter database.
3, rule-based filtering, interface remove Database error data.The mistake that website uploads is removed according to wrong screening rule
Data eliminate influence of the wrong data to right value.Remove backup site and unreasonable data such as(It is super to remove hour rainfall
200mm data).
4, it customizes data sorting and early warning marks.Method provides ordering rule customization and early warning of the water level in river, reservoir
Threshold values rule is customized, and it is customized to provide rainfall level thresholds.Current level compares reservoir, the flood season limit level in river, guaranteed water level, just
The threshold values of ordinary water level carries out super alert mark.Rainfall according to threshold values be configured it is small, in big, heavy rain, extra torrential rain rainfall identify.
5, algorithm calculates the equal rainfall in face.Arithmetic mean method be by the administrative area same period rainfall that respectively station measures be added after, divided by
Master station's number, as administrative area areal rainfall.Its mathematic(al) representation is:P=6n, i=1Pi/n;
P=6n:N represents the survey station weight coefficient, and 6 represent survey station same period rainfall.
i=1Pi/n:In the case that default-weight is 1, Pi indicates that each survey station same period rainfall summation in certain administrative area, n indicate
Survey station number.
6, data visualization.By clear with color lump on map after meeting rainfall data collection analysis in the form of mobile terminal
Clear displaying, and be subject to brief table and carry out data analysis.Tide level data combination real time data passes through figure and table shape with forecast data
Formula is very clear.Reservoir river water level carries out the super flood of table, super guarantee sequence by different color and weights.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made
When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.
Claims (4)
1. a kind of method showing hydrographic information based on mobile application end, which is characterized in that include the following steps,
Step S1, the real-time acquisition in river, the rainfall of reservoir, water level and ocean tidal level is realized;
Step S2, website establishes contact, and data are uploaded to database:Station maintenance is carried out, establishes website in administrative grade, work
Journey type and the value in each regular weight, will upload data maintenance and enter database;
Step S3, rule-based filtering, interface remove Database error data:The mistake that website uploads is removed according to wrong screening rule
Data eliminate influence of the wrong data to right value;
Step S4, customization data sorting is marked with early warning:Water level is carried out in river, the ordering rule of reservoir and early warning threshold values rule
Customization and the customization of rainfall level thresholds;
Step S5, algorithm calculates the equal rainfall in face:After being added the administrative area same period rainfall that respectively station measures using arithmetic mean method, remove
With master station's number, as administrative area areal rainfall;
Step S6, data visualization:After meeting rainfall data collection analysis in the form of mobile terminal by map with color lump
Clear displaying, and be subject to brief table and carry out data analysis;Tide level data combination real time data passes through figure and table with forecast data
Form is shown;Reservoir river water level carries out the super flood of table, super guarantee sequence by different color and weights.
2. the method according to claim 1 for showing hydrographic information based on mobile application end, which is characterized in that the step
In S1, the rainfall water level website of predetermined quantity is disposed to gathered data in predetermined region.
3. the method according to claim 1 for showing hydrographic information based on mobile application end, which is characterized in that the step
In S4, water level includes flood season limit level, guaranteed water level, normal water in river, the ordering rule of reservoir and early warning threshold values rules customization
The customization of the threshold values of position and the customization of super alert mark.
4. the method according to claim 1 for showing hydrographic information based on mobile application end, which is characterized in that the step
In S4, the customization of rainfall level thresholds according to threshold values be arranged it is small, in big, heavy rain, extra torrential rain rainfall mark customization.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810177275.0A CN108416010A (en) | 2018-03-05 | 2018-03-05 | The method for showing hydrographic information based on mobile application end |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810177275.0A CN108416010A (en) | 2018-03-05 | 2018-03-05 | The method for showing hydrographic information based on mobile application end |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108416010A true CN108416010A (en) | 2018-08-17 |
Family
ID=63129711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810177275.0A Pending CN108416010A (en) | 2018-03-05 | 2018-03-05 | The method for showing hydrographic information based on mobile application end |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108416010A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103399925A (en) * | 2013-08-05 | 2013-11-20 | 河海大学 | Rainfall multidimensional analysis system based on hydrologic data and implementation method of rainfall multidimensional analysis system |
CN104103153A (en) * | 2014-07-01 | 2014-10-15 | 济南展飞物联网科技有限公司 | Flood prevention rainwater information automatic monitoring central system and monitoring method thereof |
CN105842756A (en) * | 2016-03-30 | 2016-08-10 | 广州市积雨云信息科技有限公司 | Method for forecasting thunderstorm information |
CN106548306A (en) * | 2016-12-10 | 2017-03-29 | 浙江知水信息技术有限公司 | Realize basic unit's water utilities system of grid fine-grained management |
CN106780099A (en) * | 2015-11-19 | 2017-05-31 | 沈阳泽润四方科技有限公司 | A kind of inquiry of water conservancy information and the analysis method of statistics |
CN107462225A (en) * | 2017-08-25 | 2017-12-12 | 黄益强 | A kind of hydrologic monitoring management system applied to ecological basin three-dimensional platform |
-
2018
- 2018-03-05 CN CN201810177275.0A patent/CN108416010A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103399925A (en) * | 2013-08-05 | 2013-11-20 | 河海大学 | Rainfall multidimensional analysis system based on hydrologic data and implementation method of rainfall multidimensional analysis system |
CN104103153A (en) * | 2014-07-01 | 2014-10-15 | 济南展飞物联网科技有限公司 | Flood prevention rainwater information automatic monitoring central system and monitoring method thereof |
CN106780099A (en) * | 2015-11-19 | 2017-05-31 | 沈阳泽润四方科技有限公司 | A kind of inquiry of water conservancy information and the analysis method of statistics |
CN105842756A (en) * | 2016-03-30 | 2016-08-10 | 广州市积雨云信息科技有限公司 | Method for forecasting thunderstorm information |
CN106548306A (en) * | 2016-12-10 | 2017-03-29 | 浙江知水信息技术有限公司 | Realize basic unit's water utilities system of grid fine-grained management |
CN107462225A (en) * | 2017-08-25 | 2017-12-12 | 黄益强 | A kind of hydrologic monitoring management system applied to ecological basin three-dimensional platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sanyal et al. | GIS‐based flood hazard mapping at different administrative scales: A case study in Gangetic West Bengal, India | |
CN106373070B (en) | A kind of four pre- methods for coping with urban rainstorm waterlogging | |
De Bruijn et al. | Risky places in the Netherlands: a first approximation for floods | |
CN108986413A (en) | A kind of glade disaster monitoring and method for early warning based on multi-source information data | |
KR101394861B1 (en) | System detection of flooding risk roads in real time using the weather center information and offering its service based on the web. | |
Fagnant et al. | Characterizing spatiotemporal trends in extreme precipitation in Southeast Texas | |
Sanderson et al. | Modeling regional and local resilience of infrastructure networks following disruptions from natural hazards | |
CN116682237B (en) | Intelligent flood prevention early warning method and platform based on artificial intelligence | |
Sato et al. | Online information as real-time big data about heavy rain disasters and its limitations: Case study of Miyagi prefecture, Japan, during typhoons 17 and 18 in 2015 | |
CN108416010A (en) | The method for showing hydrographic information based on mobile application end | |
Kellens et al. | Communicating flood risk to the public by cartography | |
Li et al. | Urban flood risk assessment based on DBSCAN and K-means clustering algorithm | |
Betts | Flood damage analysis using gis at gold coast city council | |
CN112116513A (en) | Management method and system for territorial space planning monitoring and early warning | |
Silva Cervantes et al. | Simulation of overflow thresholds in urban basins: Case study in Tuxtla Gutiérrez, Mexico | |
Meyer | Comparative analysis between different flood assessment technologies in HAZUS-MH | |
Malone et al. | Developing the IOOS for improved management and mitigation of coastal inundation | |
US20230408479A1 (en) | Systems and methods for enhancing water safety using sensor and unmanned vehicle technologies | |
CN116739357B (en) | Multi-mode fusion perception city existing building wide area monitoring and early warning method and device | |
CN117291432B (en) | Water resource scheduling monitoring system based on artificial intelligence | |
Jung | Spatial Analysis of the Vulnerability to Meteorological Hazards in Korea | |
Lee et al. | Development and implementation of an assessment framework for coastal flood vulnerability | |
Rathod et al. | Artificial Intelligence-Based Fully Scalable Real-Time Early Flood Warning System | |
CN208569627U (en) | A kind of history meteorological disaster model integrated system | |
Cruse | Impact of Flooding on Power System Restoration Following a Hurricane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180817 |