A kind of strong karst foundation pretreatment solution ultra-deep impact holing technical method
Technical field
The present invention relates to ultra-deep nose end pile-formation process technical fields, more particularly to one kind being suitable for strong karsts developing area ground
Pretreatment solves ultra-deep impact holing technical method.
Background technology
Guizhou is all built on karst foundation as karst area, most of buildings, by code requirement, strong karst foundation
It should not be used as building yard, Base foundation design grade is first class, the building main body of second class preferably avoids strong karst foundation, but soil
Ground is valuable, and part building, bridge, urban operating mechanism, which have to build on strong karst foundation, to be built.Due to strong karst foundation solution cavity, molten
Ditch, the development of fluid bowl pole, solution cavity is in pearl development is altered, and Growth Depth is larger, and other machinery can not be implemented, frequently with impact holing side
Method construct, but impact holing method it is this in alter pearl development strong karst foundation on using can glance off, block hammer, fall hammer into shape
Etc. drilling accidents phenomenon, once card hammer, fall hammer will be unable to transfer to drill bit and form useless hole.Impact holing method is this in altering pearl
Using general 40m of maximum hole depth or so on the strong karst foundation of shape development, and the construction time is longer, the pile normal construction time
Or so at least one moon, if there is drilling accident, there is drilling accident warp up to 3-4 months in the construction time of processing time length
The success rate of design requirement can be reached after processing less than 50%, hole depth is more than the basic no one ventured clappers of 50m or more and constructs down, has
There is the location as deep as 60m, 70m depth in a little locations, through repeatedly discussing the arrangement and method for construction that also must do not get well in many ways.
Invention content
The technical problem to be solved by the present invention is to overcome when strong karst foundation ultra-deep impact is at constructing in the prior art
Deflection, card hammer, fall the drilling accidents phenomenons such as hammer, and drilling accident can reach after processing the success rate of design requirement less than
50% defect provides a kind of pretreatment solution technical method of strong karst foundation ultra-deep impact holing.
In order to solve the above technical problem, the present invention provides the following technical solutions:
A kind of strong karst foundation pretreatment solution ultra-deep impact holing technical method, includes the following steps:
1), centered on by stake holes, several injected holes are set, injected hole is constructed to basic engineering depth using 150 type drilling machines
0.8~1.2 m under complete bedrock surface;
2), from injected hole bottom up grout injection, grouting pressure 2-10MPa.
Further, in the square range of ranging from 2 times stake diameters of the consolidation process of injected hole.Preferably, between injected hole
Level, vertical interval be 1.0m, open pore size 130mm, whole hole aperture 90mm.
Further, the injected hole of quadrangle, grouting pressure 2-5MPa, then with 5-10MPa are first perfused when grout injection
Grouting pressure other injected holes are perfused.
Further, the ratio of mud of cement mortar is 1:0.5.
The present invention is directed to the special circumstances of strong karsts developing area ground, right in the square range before constructing centered on stake position
Solution cavity, lapies, fluid bowl carry out pre-pouring grout processing, fully allow in the solution crack of cement mortar injection basement rock, tamp, compacted rock solution crack,
Cement grout solidification solution cavity, lapies, 1 body of weak soil filled in fluid bowl, fill solution cavity, the entire compression for improving the rock mass soil body is strong
Degree ensures that impact hammer head does not shift in relative homogeneous body, topples over, card hammer phenomenon.Ensure major diameter mechanical shock
Pore-creating filling pile construction technology succeeds, and pile quality is guaranteed, duration also big shortening, the stake pretreatment time of 70m depths
General 1 month, the about 1 month pore-forming time after pre-pouring grout processing.After pre-pouring grout handles pile, tested by 100% position core pulling
Card, for the indices qualification rate such as concrete piles quality, pile body verticality, pile bottom sediment up to 100%, this promoting technology Guizhou is strong
Karsts developing area ground impact holing stake technology reaches top standard inside the province, and construction stake is deep up to 70m, as long as pretreated depth is sufficient
Enough deep, construction stake can also continue to excavate deeply.
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described, it should be understood that preferred embodiment described herein is only used
In the description and interpretation present invention, it is not intended to limit the present invention.
Embodiment
Pre-pouring grout hole is centered on stake holes, and pre-pouring grout process range is within the scope of 2 times of stake diameter squares, and pretreatment drilling is pressed
Arranged in squares, horizontal, vertical interval are 1.0m, open pore size 130mm, and whole hole aperture 90mm is first applied using 150 type drilling machines
1.0m under work to the complete bedrock surface of basic engineering depth is 1 using the ratio of mud:0.5 cement mortar is up perfused from bottom, first applies
Work quadrangle, grouting pressure 3MPa are rear to implement quadrangle internal drilling, grouting pressure 8MPa.The stake pre-pouring grout processing time of 50-60m long
15-25 days, 28 days stake pre-pouring grout processing times of most deep 70m long were tested after pre-pouring grout handles pile by 100% position core pulling
Card, the indices qualification rate such as concrete piles quality, pile body verticality, pile bottom sediment is up to 100%, as long as pretreated depth is enough
Deep, construction stake can also continue to excavate deeply.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's