CN108408618B - Method for setting ground anchor of tail wheel system of endless rope winch for mine and ground anchor device - Google Patents
Method for setting ground anchor of tail wheel system of endless rope winch for mine and ground anchor device Download PDFInfo
- Publication number
- CN108408618B CN108408618B CN201810445960.7A CN201810445960A CN108408618B CN 108408618 B CN108408618 B CN 108408618B CN 201810445960 A CN201810445960 A CN 201810445960A CN 108408618 B CN108408618 B CN 108408618B
- Authority
- CN
- China
- Prior art keywords
- ground anchor
- anchor device
- steel structure
- structure frame
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a method for setting a ground anchor of a tail wheel system of a mining endless rope winch and a ground anchor device, wherein the ground anchor device is firstly manufactured in an aboveground factory, and a proper ground anchor device is selected to be transported to an underground installation site according to an underground endless rope winch transportation mode; digging and leveling the installation foundation of the ground anchor device at the underground installation site, moving the ground anchor device into the foundation, punching holes in the foundation at the position of the anchoring holes, installing anchor rods in the holes, and anchoring the ground anchor device on the foundation. The underground hydraulic pressure system can be manufactured in an industrial manner on a well, is directly installed on an underground installation site, and is anchored on a bottom plate of a roadway by an anchor rod during installation, so that manpower, material resources and time are saved.
Description
Technical Field
The invention relates to a coal mine underground transportation technology, in particular to an endless rope winch transportation technology.
Background
In the underground coal mine winch transportation mode, there are endless rope winch transportation modes and single rope type and double rope type modes. One end of the single rope endless rope winch is a single drum winch, and the other end is a tail wheel system; the tail wheel system is provided with a balance wheel with a tensioning function, and each head wheel is hung on the balance wheel, so that the balance wheel is required to be tensioned on an infrastructure. For heavy load transportation, a double-rope endless rope winch transportation mode is mostly adopted. One transportation end of the double-rope endless rope winch is a double-drum winch, and the other end is a tail wheel system. The tail wheel system is provided with a large balance wheel with a tensioning function, and the balance wheel is hung on two return wheels, so that the balance wheel is required to be tensioned on an infrastructure. Whether single-rope or double-rope, are independent of the infrastructure, and sometimes mine cars are required to pass over the infrastructure. The infrastructure is therefore able to withstand not only large gravitational loads but also large tensile loads of the wire ropes and is therefore very strong to build. The existing infrastructure is generally formed by pouring a large amount of concrete for a deep foundation pit, so that a large amount of manpower, material resources, time and the like are needed, and the foundation pit can be used only after a certain solidification time is needed, and timely exploitation of a coal seam working face is affected. Because the coal mining site is frequently changed, the facility cannot be reused after being used once, and a new foundation needs to be reconstructed, so that the timely mining of the next coal seam working face is affected, and great waste is caused.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides a novel method for arranging a ground anchor of a tail wheel system of a mining endless rope winch.
A method for setting a ground anchor of a tail wheel system of a mining endless rope winch is characterized by comprising the following steps of:
and 3, digging and leveling an installation foundation of the ground anchor device at an underground installation site, moving the ground anchor device into the foundation, punching holes in the foundation at the positions of the anchor holes, installing anchor rods in the holes, anchoring the ground anchor device on the foundation, and after the anchor rods are installed, requiring a track plane to meet the designed roadway rail surface height.
In order to realize the method, the invention provides a ground anchor device of a mining winch tail wheel system, which is characterized in that the ground anchor device is a steel structure frame with an m-shaped or n-shaped section, and is welded by a top cover plate, a supporting vertical plate and a pressure-bearing foot plate; n-type rib plates are uniformly welded on the inner section of the steel structure frame, vertical rib plates are welded on the outer side of the steel structure frame, anchoring holes are formed in the extending parts of the two sides of the pressure-bearing foot plate, and the steel structure frame can be anchored on the bottom plate of the roadway through anchor bolts; the upper rail is fixed on the top surface of the steel structure frame through a pressing plate and bolts.
When the device is used for a single rope winch tail wheel system, an m-shaped steel structure frame is adopted, and when the device is used for a single rope winch tail wheel system, an n-shaped steel structure frame is adopted.
The invention has the positive effects that:
1. the underground hydraulic pressure system can be manufactured in an industrial manner on a well, is directly installed on an underground installation site, and is anchored on a bottom plate of a roadway by an anchor rod during installation, so that manpower, material resources and time are saved.
2. Along with the transformation of the coal mining site, the coal mining site can be disassembled and moved to a new site, and the coal mining site can be manufactured and reused once, so that the construction cost is saved.
3. The steel structure frame has enough space, and the tail wheel system of the winch can be installed in the space without preventing the mine car from passing on the track above the tail wheel system.
4. Can bear the gravity load of the mine car passing on the upper surface and the tension load of the winch.
Drawings
FIG. 1 is a front view of a first embodiment of the present invention;
fig. 2 is a schematic perspective view of an earth anchor device according to a first embodiment of the present invention;
fig. 3 is a front view of a second embodiment of the present invention;
fig. 4 is a schematic perspective view of an earth anchor device according to a second embodiment of the present invention.
In the figure, a top cover plate, a 2-supporting vertical plate, a 3-pressure-bearing foot plate, a 4-n-type rib plate, a 5-vertical rib plate, a 6-track, 7-bolts, 8-pressing plates, 9-anchor rods, 10-anchor rod holes and 11-foundations are arranged.
Detailed Description
Embodiment one:
as shown in FIG. 1, the method for setting the ground anchor of the tail wheel system of the double-rope mining endless rope winch comprises the following steps:
and 3, digging and leveling an installation foundation 11 of the ground anchor device at an underground installation site, moving the ground anchor device into the foundation 11, punching holes in the foundation at the positions of the anchor holes 10, installing anchor rods 9 in the holes, anchoring the ground anchor device on the foundation 11, and after installation, requiring the plane of the track 6 to meet the designed tunnel rail surface height.
Embodiment two:
as shown in fig. 3, a method for setting a ground anchor of a tail wheel system of a double-rope endless rope winch for a mine is characterized by comprising the following steps:
and 3, digging and leveling an installation foundation 11 of the ground anchor device at an underground installation site, moving the ground anchor device into the foundation 11, punching holes in the foundation at the positions of the anchor holes 10, installing anchor rods 9 in the holes, anchoring the ground anchor device on the foundation 11, and after installation, requiring the plane of the track 6 to meet the designed tunnel rail surface height.
When the device is used, the connecting device 10 is only required to be arranged in the inner space of the steel structure frame, and the endless rope winch tail wheel system is firmly connected through the connecting device 10.
Claims (2)
1. The method for setting the ground anchor of the tail wheel system of the mining endless rope winch is characterized by comprising the following steps of:
step 1, before the tail wheel system of the underground endless rope winch is arranged, firstly, manufacturing a ground anchor device in an underground factory, wherein the ground anchor device is a steel structure frame with an m-type or n-type section and is formed by welding a top cover plate, a supporting vertical plate and a pressure-bearing foot plate; n-type rib plates are uniformly welded on the inner section of the steel structure frame, vertical rib plates are welded on the outer side of the steel structure frame, anchoring holes are formed in the pressure-bearing foot plates, and the upper rail is fixed on the top surface of the steel structure frame through pressing plates and bolts; the width of the ground anchor device is required to be smaller than that of the transportation roadway and larger than the track gauge of the mine car track, and the length of the ground anchor device is required to be convenient for the whole transportation to the underground installation site;
step 2, according to the transportation mode of the underground endless rope winch, a proper ground anchor device is selected to be transported to an underground installation site, an m-type steel structure frame is selected when the underground endless rope winch is used for a double-rope winch tail wheel system, and an n-type steel structure frame is selected when the underground endless rope winch is used for a single-rope winch tail wheel system;
and 3, digging and leveling an installation foundation of the ground anchor device at an underground installation site, moving the ground anchor device into the foundation, punching holes in the foundation at the positions of the anchor holes, installing anchor rods in the holes, anchoring the ground anchor device on the foundation, and after the anchor rods are installed, requiring a track plane to meet the designed roadway rail surface height.
2. The mining endless rope winch tail wheel system ground anchor device for realizing the method of claim 1 is characterized in that the device is a steel structure frame with m-type or n-type section, and the steel structure frame is welded by a top cover plate, a supporting vertical plate and a pressure-bearing foot plate; n-type rib plates are uniformly welded on the inner section of the steel structure frame, vertical rib plates are welded on the outer side of the steel structure frame, anchoring holes are formed in the extending parts of the two sides of the pressure-bearing foot plate, and the steel structure frame is anchored on the bottom plate of the roadway through anchor bolts; the upper rail is fixed on the top surface of the steel structure frame through a pressing plate and bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810445960.7A CN108408618B (en) | 2018-05-10 | 2018-05-10 | Method for setting ground anchor of tail wheel system of endless rope winch for mine and ground anchor device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810445960.7A CN108408618B (en) | 2018-05-10 | 2018-05-10 | Method for setting ground anchor of tail wheel system of endless rope winch for mine and ground anchor device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108408618A CN108408618A (en) | 2018-08-17 |
CN108408618B true CN108408618B (en) | 2023-05-26 |
Family
ID=63138710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810445960.7A Active CN108408618B (en) | 2018-05-10 | 2018-05-10 | Method for setting ground anchor of tail wheel system of endless rope winch for mine and ground anchor device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108408618B (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203222796U (en) * | 2013-05-03 | 2013-10-02 | 安徽恒源煤电股份有限公司 | Endless rope pressing wheel ground anchor fixing device |
CN203922554U (en) * | 2014-07-07 | 2014-11-05 | 安徽恒源煤电股份有限公司 | A kind of endless rope winch tail wheel anchor fitting |
-
2018
- 2018-05-10 CN CN201810445960.7A patent/CN108408618B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108408618A (en) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110670615A (en) | Subway green construction adjustment method based on limited space | |
CN103047478B (en) | In-hole sectioning installation method for penstocks with overlarge diameters | |
KR101283672B1 (en) | Non open cut method using the lifting device | |
CN104532856A (en) | Fabricated lattice unit for foundation pit supporting and installation method | |
CN106930315B (en) | A kind of moving tower crane foundation structure and construction method | |
CN110700332A (en) | Existing building reinforcing pile foundation static load test counterforce device and test method thereof | |
CN108408618B (en) | Method for setting ground anchor of tail wheel system of endless rope winch for mine and ground anchor device | |
CN102926388A (en) | Earth moving device and method for deep foundation pit excavation | |
CN108569634B (en) | Tensioning and fixing method and device for tail wheel system of endless rope winch for mine | |
JP3453553B2 (en) | Continuous construction method of precast concrete column wall members | |
CN207228156U (en) | A kind of underground structure being made of stake and wall | |
CN212404803U (en) | Tunnel inverted arch combined type cableway bridge abutment | |
CN210658043U (en) | Novel leveling device for mounting assembly type pier | |
CN208485530U (en) | Mine endless rope winch tail wheel system ground anchorage | |
CN202882002U (en) | Earth moving device used in deep foundation pit excavation | |
CN215054205U (en) | Collision test wall body of nano energy-absorbing safety protection device | |
CN211200424U (en) | Splicing prefabricated mountain slope supporting structure | |
CN107673252B (en) | Mining underground endless rope traction winch tail wheel anchoring device | |
CN215758299U (en) | Prefabricated assembled steel-mixed cantilever structure system for widening roads | |
CN217462242U (en) | Inflatable plate wall for mine filling | |
CN211392734U (en) | Belt conveyor | |
CN110329925B (en) | Heavy equipment hoisting method for neighboring unsealed building | |
CN215252255U (en) | Pile-beam integrated fully-prefabricated assembled bridge substructure and bridge | |
CN211006761U (en) | Mounting structure of circulating water pipe | |
CN108442950B (en) | In-situ reinforcement method for U-shaped steel bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |