CN108401284A - Poewr control method and user equipment in a kind of communication system - Google Patents

Poewr control method and user equipment in a kind of communication system Download PDF

Info

Publication number
CN108401284A
CN108401284A CN201710089495.3A CN201710089495A CN108401284A CN 108401284 A CN108401284 A CN 108401284A CN 201710089495 A CN201710089495 A CN 201710089495A CN 108401284 A CN108401284 A CN 108401284A
Authority
CN
China
Prior art keywords
business
power
transmission
transmission power
business datum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710089495.3A
Other languages
Chinese (zh)
Inventor
付景兴
喻斌
钱辰
熊琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Samsung Telecom R&D Center
Beijing Samsung Telecommunications Technology Research Co Ltd
Samsung Electronics Co Ltd
Original Assignee
Beijing Samsung Telecommunications Technology Research Co Ltd
Samsung Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Samsung Telecommunications Technology Research Co Ltd, Samsung Electronics Co Ltd filed Critical Beijing Samsung Telecommunications Technology Research Co Ltd
Priority to PCT/KR2018/001588 priority Critical patent/WO2018143778A1/en
Publication of CN108401284A publication Critical patent/CN108401284A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/28TPC being performed according to specific parameters using user profile, e.g. mobile speed, priority or network state, e.g. standby, idle or non transmission
    • H04W52/281TPC being performed according to specific parameters using user profile, e.g. mobile speed, priority or network state, e.g. standby, idle or non transmission taking into account user or data type priority

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

This application discloses the Poewr control methods in a kind of communication system, including:For each service signal of synchronization transmission being allocated on the physical channel of UE, the UE determines its corresponding power distribution priority according to the business importance of each service signal;According to the power distribution priority of each service signal, transmission power is distributed for corresponding signal.Using the application, power distribution can be more reasonably carried out.

Description

Poewr control method and user equipment in a kind of communication system
Technical field
This application involves mobile communication technology fields, specifically, this application involves the biographies of different priorities upstream data Transmission method and user equipment.
Background technology
In (NR, New Radio) system of newly eating dishes without rice or wine, user equipment (UE, User Equipment) may take at one Business cell sends the upstream data of different priorities simultaneously or UE is sent at different service cells (Serving Cell) simultaneously The upstream data of different priorities, such as mobile broadband (eMBB, the Enhanced Mobile of enhancing is sent simultaneously Broadband) and super reliable low time delay communicates (URLLC, Ultra Reliability Low Latency Communication) data, and the priority of URLLC data transmissions is higher than the priority of eMBB data transmissions.
In addition, the time slot of transmission eMBB and the slot length of URLLC may be different, for example, the time slot of transmission eMBB is than passing The time slot of defeated URLLC is long, as shown in Figure 1.
Since a UE will be in same ascending time slot or the lap of different ascending time slots, different serving cells or phase With the different data of priority are sent simultaneously on the different frequency bands of serving cell, and multiple serving cells or same clothes are sent simultaneously The sum of transmission power needed for the different data of business native region priority is likely larger than the maximum transmission power of UE configurations.How to handle excellent The distribution of the transmission power of first grade different business is the problem of research.
Invention content
The purpose of the application aims to solve at least one of above-mentioned technical problem, provides the power control in a kind of communication system Method and user equipment, so that in the case that the business of different priorities coexists, the transmission power of UE is no more than UE configurations Maximum transmission power, UE can preferably be the high preferential distribution power of business of importance, and the business for keeping priority low is abundant Use remaining power.
A kind of Poewr control method in communication system, including:
For each service signal of synchronization transmission being allocated on the physical channel of UE, the UE is according to described each The business importance of a service signal determines its corresponding power distribution priority;
According to the power distribution priority of each service signal, transmission power is distributed for corresponding signal.
Preferably, when the UE is determined described in all parameters to transmission of the power control calculating of each service signal When the time interval of the upstream data of each service signal is greater than or equal to setting thresholding, the work(according to each service signal Rate distribution priority is that corresponding signal distribution transmission power includes:
Calculate the required transmission power of each service signal;
When the sum of described each required transmission power of service signal is less than or equal to the emission maximum of UE configurations When power, each service signal carries out power distribution according to required transmission power;
When the sum of described each required transmission power of service signal is more than the maximum transmission power of UE configurations, According to the power distribution priority sequence from high to low of each service signal, it is sequentially allocated transmission power.
Preferably, when each service signal includes two kinds of different service signals of importance, if deciding whether to pass The time of the first defeated business is more than or waits with second of business transmission intercal before second of business data transmission starts In preset t1 and it is less than preset t2, then is corresponding signal point according to the power distribution priority of each service signal Include with transmission power:
The first described business datum and the required transimission power of second of business datum are calculated separately, when described The sum of the first business datum and the required transimission power of second of business datum are less than or equal to UE configurations When maximum transmission power, power is carried out according to the first described business datum and the required transimission power of second of business datum Distribution;When the sum of the first described business datum and the required transimission power of second of business datum are matched more than the UE When the maximum transmission power set, from high to low according to the power distribution priority of the first described business and second of business Sequence, be sequentially allocated transmission power;
And/or when the power distribution priority of the first business datum is higher than the work(of second of business datum When rate distributes priority, according to whether sending the first described business datum, the transimission power of second of business datum is determined;
Wherein, the first described business is the business of pre-allocated recourses in described two business, and second of business is The business of dynamic dispatching resource, 0≤t1 in described two business<t2.
Preferably, described according to whether sending the transimission power that the first described business datum determines second of business datum Including:
The biography of described the first business datum and second of business datum is calculated separately according to the two ways of setting Defeated power;It, respectively will be according to the first way calculating in described two modes when determining to transmit the first described business The transimission power of the first described business datum and second business datum is as the first described business and second described The transmission power of business;It, will be according to the second way in described two modes when determining not transmitting the first described business Transmission power of the transimission power of second of the business datum calculated as second of business;
Wherein, include according to the transimission power of first way calculating the first business datum:By the UE Maximum transmission power be used for the data transmission of the first business, calculate the transmission power of the first business;According to The transimission power that the first way calculates second of business datum includes:The maximum transmission power of the UE is subtracted Dump power after the transmission power of the first business is used for the data transmission of second of business, calculates described second The transimission power of kind business datum;The transmission that second of business datum is calculated according to the second way includes:By institute The maximum transmission power for stating UE is used for the data transmission of second of business, calculates the transmission work(of second of business datum Rate.
Preferably, when each service signal includes two kinds of different service signals of importance, for described two Business, if decide whether to transmit time of the first business before second of business data transmission starts with second of business Transmission intercal is less than preset t1, if alternatively, deciding whether the time of transmission the first business in second of business Then it is corresponding signal distribution transmitting work(according to the power distribution priority of each service signal after data transmission starts Rate includes:
The first described business datum and the required transimission power of second of business datum are calculated separately, when described The sum of the first business datum and the required transimission power of second of business datum are less than or equal to UE configurations When maximum transmission power, power is carried out according to the first described business datum and the required transimission power of second of business datum Distribution;When the sum of the first described business datum and the required transimission power of second of business datum are matched more than the UE When the maximum transmission power set, from high to low according to the power distribution priority of the first described business and second of business Sequence, be sequentially allocated transmission power;
And/or when the power distribution priority of the first business datum is higher than the work(of second of business datum When rate distributes priority, according to whether sending the first described business datum, the transmission power of second of business datum is determined;
Wherein, the first described business is the business of pre-allocated recourses in described two business, and second of business is The business of dynamic dispatching resource, t1 >=0 in described two business.
Preferably, described according to whether sending the transimission power that the first described business datum determines second of business datum Including:
The biography of described the first business datum and second of business datum is calculated separately according to the two ways of setting Defeated power;It, will be according to the first business number described in first way calculating when determining to transmit the first described business According to transmission power of the transimission power as the first business, be overlapped in the first described business and second of business At the time of transmission, using the transimission power of second of the business datum calculated according to the first way as described second The transmission power of kind business will be according to described at the time of the first described business and second of business not overlapping transmission Transmission power of second of business data transmission power that the second way calculates as second of business;Work as decision When not transmitting the first described business, second of business data transmission power calculated according to the second way is made For the transmission power of second of business;
Alternatively, calculate the transimission power P1 of the first business datum according to the first way, according to described the Two kinds of modes calculate the transimission power P2 of second of business datum;It, will be described when determining to transmit the first described business Transmission powers of the P1 as the first business, the first described business and second of business overlapping transmission when It carves, if the sum of P1 and P2 are less than or equal to the maximum transmission power of the UE, using the P2 as second of business Transmission power does not send second of business if the sum of P1 and P2 are more than the maximum transmission power of the UE, described the A kind of business and second of business not overlapping transmission at the time of, using the P2 as the transmitting work(of second of business Rate;When determining not transmitting the first described business, using the P2 as the transmission power of second of business;
Alternatively, calculate the transimission power P1 of the first business datum according to the first way, according to described the Two kinds of modes calculate the transimission power P2 of second of business datum;It, will be described when determining to transmit the first described business Transmission powers of the P1 as the first business, before the first described business starts transmission and the first described business and Second of business not overlapping transmission at the time of, using the P2 as the transmission power of second of business, described At the time of a kind of business and second of business overlapping transmission, if the sum of P1 and P2 are less than or equal to the emission maximum of the UE Power, then using the P2 as the transmission power of second of business, if the sum of P1 and P2 are more than the emission maximum of the UE Power is not sent described second at the time of the overlapping transmission with the remainder of second of business transmission time slot then Business;When determining not transmitting the first described business, using the P2 as the transmission power of second of business;
Wherein, include according to the transimission power of first way calculating the first business datum:By the UE Maximum transmission power be used for the data transmission of the first business, calculate the transmission power of the first business;According to The transimission power that the first way calculates second of business datum includes:The maximum transmission power of the UE is subtracted Dump power after the transmission power of the first business is used for the data transmission of second of business, calculates described second The transimission power of kind business datum;The transmission that second of business datum is calculated according to the second way includes:By institute The maximum transmission power for stating UE is used for the data transmission of second of business, calculates the transmission work(of second of business datum Rate.
Preferably, when the power distribution priority of the first business datum is higher than the work(of second of business datum It is described according to whether sending the transmission power that the first described business datum determines second of business datum when rate distributes priority Including:
The transimission power P1 that the first business datum is calculated according to the first way, according to second of side Formula calculates the transimission power P2 of second of business datum;When determining to transmit the first described business, it is described the first At the time of business and second of business overlapping transmission, if the sum of P1 and P2 are less than or equal to the emission maximum work(of the UE Rate, then using the P2 as the transmission power of second of business, using the P1 as the transmitting work(of the first business Rate, if the sum of P1 and P2 are more than the maximum transmission power of the UE, using the P2 as the transmitting work(of second of business Rate, the dump power that the maximum transmission power of the UE is subtracted to the P2 are used for the data transmission of the first business, The first described business and second of business not overlapping transmission at the time of, using the P2 as the hair of second of business Penetrate power;When determining not transmitting the first described business, using the P2 as the transmission power of second of business;
Wherein, include according to the transimission power of first way calculating the first business datum:By the UE Maximum transmission power be used for the data transmission of the first business, calculate the transmission power of the first business;According to The transmission that the second way calculates second of business datum includes:By the maximum transmission power of the UE for described The data transmission of second of business calculates the transimission power of second of business datum.
Preferably, when each service signal includes two kinds of different service signals of importance and described two business In the first business power-priority higher than in described two business when second of business, if for dispatching the first described industry The Downlink Control Information DCI of business before second of business data transmission starts and with second of business transmission intercal Transmission time slot more than or equal to the t1 of setting and less than the t2 and the first business that set is than second of business Transmission time slot is short, then is that corresponding signal distributes transmission power packet according to the power distribution priority of each service signal It includes:
The required transmission work(of the first described business datum is calculated according to the power control mode of the first business Rate P1, the dump power after the maximum transmission power of the UE is subtracted setting Pr calculate described second as maximum transmission power The required transimission power P2 of kind business datum;If P1≤the Pr, using the P1 as the first business datum Transmission power, using the P2 as the transmission power of second of business datum;If the P1>Pr, then using the P1 as The transmission power of the first business datum does not send second of business datum;
Alternatively, calculating the required biography of the first described business datum according to the power control mode of the first business The maximum transmission power of the UE is subtracted the dump power after the Pr (i) of setting as maximum transmission power meter by defeated power P 1 Calculate required transimission power P (i) _ 2 of second of business datum;Using the P1 as the hair of the first business datum Penetrate power;If P1≤the Pr (1), the transmission power by the P (1) _ 2 as second of business datum;If described Pr(i-1)<P1≤Pr (i), the then transmission power by P (i) _ 2 as second of business datum;If the P1>Pr (M), then second of business datum is not sent;
Alternatively, calculating the required biography of the first described business datum according to the power control mode of the first business Defeated power P 1 calculates separately the transimission power of second of business datum according to preset two ways;When it is described the first When business datum is transmitted, using the P1 as the transmission power of the first business datum, in the first described business It, will be by using the P1 as the transmission power of the first business datum at the time of with second of business overlapping transmission According in described two modes first way calculate second of business datum transimission power as described second The transmission power of business will be according to described two at the time of the first described business and second of business not overlapping transmission Hair of the transimission power for second of business datum that the second way in kind mode calculates as second of business Penetrate power;
Wherein, the resource of the first described business and second of business is dynamic dispatching, 0≤t1<t2;According to The first way calculates the required transimission power of second of business datum:By the emission maximum work(of the UE Rate subtracts the dump power after the Pr (i) of setting as maximum transmission power, and it is required to calculate second of business datum Transimission power P (i) _ 2, if the P1≤Pr (1), the transmission work(by the P (1) _ 2 as second of business datum Rate;If the Pr (i-1)<P1≤Pr (i), the then transimission power by P (i) _ 2 as second of business datum;If The P1>Pr (M), then by 0 transimission power as second of business datum;Described in second way calculating The required transimission power of second of business datum includes:The maximum transmission power of the UE is used for second of business number According to transmission, the required transimission power of second of business datum is calculated;Work as i<When j, Pr (i)<Pr (j), i, j=1, 2 ..., M, Pr (i)<The maximum transmission power of the UE, M are high-rise configuration or preset positive integer.
Preferably, when each service signal includes two kinds of different service signals of importance and described two business In the first business priority higher than in described two business when the priority of second of business, if for dispatching described first The DCI of kind of business is less than t1 and described before second of business data transmission starts and with second of business transmission intercal The transmission time slot of the first business is shorter than the transmission time slot of second of business, if alternatively, for dispatching the first described industry The DCI of business is after second of business transmission starts and the transmission time slot of the first business is than second of industry The transmission time slot of business is short, then is that corresponding signal distributes transmission power according to the power distribution priority of each service signal Including:
The required transmission work(of the first described business datum is calculated according to the power control mode of the first business Rate P1, the dump power after the maximum transmission power of the UE is subtracted setting Pr calculate described second as maximum transmission power The required transimission power P2 of kind business datum;If P1≤the Pr, using the P1 as the first business datum Transmission power, using the P2 as the transmission power of second of business datum;If the P1>Pr, then using the Pr as The transmission power of the first business datum, using the P2 as the transmission power of second of business datum;
Alternatively, calculating the required biography of the first described business datum according to the power control mode of the first business Defeated power P 1, the dump power after the maximum transmission power of the UE is subtracted setting Pr is as described in maximum transmission power calculating The required transimission power P2 of second of business datum;If P1≤the Pr, using the P1 as the first described business number According to transmission power, using the P2 as the transmission power of second of business datum;If the P1>Pr, then by the P1 As the transmission power of the first business datum, the first described business and second of business overlapping transmission when It carves, does not send second of business datum, at the time of the first described business and second of business not overlapping transmission, Using the P2 as the transmission power of second of business datum;
Alternatively, calculating the required biography of the first described business datum according to the power control mode of the first business Defeated power P 1 calculates separately the required transimission power of second of business datum according to preset two ways;It will be described Transmission powers of the P1 as the first business datum, in the first described business and second of business overlapping transmission Moment will be according to the first side in described two modes using the P1 as the transmission power of the first business datum Transmission power of the transimission power as second of business for second of business datum that formula calculates, it is described the first Business and second of business not overlapping transmission at the time of, the institute that will be calculated according to the second way in described two modes State transmission power of the transimission power of second of business datum as second of business;
Wherein, the resource of the first described business and second of business is dynamic dispatching, 0≤t1<t2;According to The first way calculates the required transimission power of second of business datum:By the emission maximum work(of the UE Rate subtracts the dump power after the Pr (i) of setting as maximum transmission power, and it is required to calculate second of business datum Transimission power P (i) _ 2, if the P1≤Pr (1), the transmission work(by the P (1) _ 2 as second of business datum Rate;If the Pr (i-1)<P1≤Pr (i), the then transimission power by P (i) _ 2 as second of business datum;If The P1>Pr (M), then by 0 transimission power as second of business datum;Described in second way calculating The required transimission power of second of business datum includes:The maximum transmission power of the UE is used for second of business number According to transmission, the required transimission power of second of business datum is calculated;Work as i<When j, Pr (i)<Pr (j), i, j=1, 2 ..., M, Pr (i)<The maximum transmission power of the UE, M are high-rise configuration or preset positive integer.
Preferably, when second of business passes through Physical Uplink Shared Channel PUSCH using orthogonal frequency division multiplex OFDM When transmission, for the overlapping transmission moment of the first described business and second of business, however, it is determined that described second gone out The transmission power A of business is less than the transmission power B of second of business before the overlapping transmission moment, then is being described second After the transmission power at overlapping transmission moment described in kind traffic assignments, the determination of each resource element RE power of the PUSCH is carried Mode includes:
On the basis of the transmission power B, according to the difference of A and B, is reduced in the PUSCH and be used for same ratio The power of the RE of transmission data and the RE for being used for transmission ascending control information UCI, so that the transmission power of second of business For A;
Alternatively, on the basis of the transmission power B, the number of RE in the PUSCH is reduced, for the RE of reservation, work( Rate remains unchanged, so that the transmission power of second of business is A;
Alternatively, according to the modulation system of data and UCI in the PUSCH, the power of each RE is determined;
Alternatively, whether including UCI according to the PUSCH in the overlapping transmission moment, the power of each RE is determined.
Preferably, described determine that the power of each RE includes according to data in the PUSCH and the modulation system of UCI:
If the data and UCI are using the first modulation system set, on the basis of the transmission power B, according to A With the difference of B, the RE for being used for transmission data in the PUSCH is reduced with same ratio and is used for transmission ascending control information UCI RE power so that the transmission power of the PUSCH be A;If the data and UCI use the second modulation system of setting, On the basis of the transmission power B, the number of RE in the PUSCH is reduced, for the RE of reservation, power remains unchanged, with It is A to make the transmission power of the PUSCH;
And/or
Whether comprising UCI determine that the power of each RE includes according to the PUSCH in the overlapping transmission moment:
If what the PUSCH included in all overlapping transmission moment is all data and does not include UCI, described On the basis of transmission power B, according to the difference of A and B, the power for the RE that data are used for transmission in the PUSCH is reduced, so that institute The transmission power for stating PUSCH is A;If the PUSCH includes UCI in any overlapping transmission moment, in the transmitting work( On the basis of rate B, the number for the RE that data are used for transmission in the PUSCH is reduced, for the RE of reservation, power remains unchanged, So that the transmission power of the PUSCH is A, the transmitting work(of the PUSCH after number of the RE for being used for transmission data is 0 When rate is still above A, the power for the RE that UCI is used for transmission in the PUSCH is reduced, so that the transmission power of the PUSCH is A, alternatively, reducing the number for the RE for being used for transmission data in the PUSCH, for the RE of reservation, power remains unchanged, so that institute The transmission power for stating PUSCH is A, alternatively, the transmission power of the first business is reduced, so that at the overlapping transmission moment The sum of transmission power of the first interior business and second of business is less than or equal to the maximum transmission power of the UE;
Alternatively, for any OFDM symbol of the PUSCH in the overlapping transmission moment, if the OFDM symbol includes Be all data and, according to the difference of A and B, reduce the OFDM then on the basis of the transmission power B not comprising UCI The power of the RE of data is used for transmission in symbol, so that the transmission power of the PUSCH is A;If the OFDM symbol includes UCI reduces the number for the RE that data are used for transmission in the OFDM symbol then on the basis of the transmission power B, for protecting The RE stayed, power remain unchanged, so that the transmission power of the PUSCH is A, when the number of the RE for being used for transmission data is When the transmission power of the PUSCH is still above A after 0, the power for the RE that UCI is used for transmission in the OFDM symbol is reduced, with It is A to make the transmission power of the PUSCH, alternatively, the number for the RE for being used for transmission data in the PUSCH is reduced, for retaining RE, power remains unchanged, so that the transmission power of the PUSCH is A, alternatively, reducing the transmitting work(of the first business Rate, so that described in the sum of transmission power of the first business and second of business is less than or equal within the overlapping transmission moment The maximum transmission power of UE;
If alternatively, in all overlapping transmission moment the PUSCH include be all data and do not include UCI, On the basis of the transmission power B, according to the difference of A and B, the power for the RE that data are used for transmission in the PUSCH is reduced, with It is A to make the transmission power of the PUSCH;If the PUSCH includes UCI in any overlapping transmission moment, in the hair It penetrates on the basis of power B, reduces the power for the RE for being used for transmission data in the PUSCH, so that the transmission power of the PUSCH For A, after the power for being used for transmission RE in the PUSCH of data in the PUSCH is 0, the transmission power of the PUSCH is still When being so more than A, continue the power for reducing the RE that UCI is used for transmission in the PUSCH, so that the transmission power of the PUSCH is A, alternatively, reducing the number for the RE for being used for transmission data in the PUSCH, for the RE of reservation, power remains unchanged, so that institute The transmission power for stating PUSCH is A, alternatively, the transmission power of the first business is reduced, so that the first business and second The sum of transmission power of business is less than or equal to the maximum transmission power of the UE;
Alternatively, for any OFDM symbol of the PUSCH in the overlapping transmission moment, if the overlapping transmission moment What the interior OFDM symbol included is all data and does not include UCI, then on the basis of the transmission power B, according to A's and B Difference reduces the power for the RE that data are used for transmission in the OFDM symbol, so that the transmission power of the PUSCH is A;If institute State in the overlapping transmission moment reduces the OFDM comprising UCI in the OFDM symbol then on the basis of the transmission power B It is used for transmission the power of the RE of data in symbol, so that the transmission power of the PUSCH is A, is used for when in the OFDM symbol After the power of the RE of transmission data is 0, when the transmission power of the OFDM symbol is still above A, reduce in the OFDM symbol It is used for transmission the power of the RE of UCI, so that the transmission power of the PUSCH is A, is used for transmission in the PUSCH alternatively, reducing The number of the RE of data, for the RE of reservation, power remains unchanged, so that the transmission power of the PUSCH is A, alternatively, reducing The transmission power of the first business, so that the sum of the first business and the transmission power of second of business are less than or equal to institute State the maximum transmission power of UE;
Preferably, when second of business passes through PUSCH transmission using Single Carrier-Frequency Division multiplexing SC-FDM, for The overlapping transmission moment of the first described business and second of business, however, it is determined that the transmitting work(of second of the business gone out Rate A is less than the transmission power B of second of business before the overlapping transmission moment, then for second of traffic assignments institute After the transmission power for stating the overlapping transmission moment, the method for determination for carrying each resource element RE power of the PUSCH includes:
On the basis of the transmission power B, according to the difference of A and B, is reduced in the PUSCH and be used for same ratio The power of the RE of transmission data and the RE for being used for transmission ascending control information UCI, so that the transmission power of the PUSCH is A;
Alternatively, on the basis of the transmission power B, the partial modulation symbol in the PUSCH is set to 0, then carry out Precoding is converted, so that the transmission power of the PUSCH is A;
Alternatively, according to the modulation system of data and UCI in the PUSCH, the power of each RE is determined;
Alternatively, whether including UCI according to the PUSCH in the overlapping transmission moment, the power of each RE is determined.
Preferably, described determine that the power of each RE includes according to data in the PUSCH and the modulation system of UCI:
If the data and UCI are using the first modulation system set, on the basis of the transmission power B, according to A With the difference of B, the RE for being used for transmission data in the PUSCH is reduced with same ratio and is used for transmission ascending control information UCI RE power so that the transmission power of the PUSCH be A;If the data and UCI use the second modulation system of setting, On the basis of the transmission power B, the partial modulation symbol in the PUSCH is set to 0, then carry out transformation precoding, with It is A to make the transmission power of the PUSCH;
And/or
Whether comprising UCI determine that the power of each RE includes according to the PUSCH in the overlapping transmission moment:
If what the PUSCH included in all overlapping transmission moment is all data and does not include UCI, described On the basis of transmission power B, according to the difference of A and B, the power for the RE that data are used for transmission in the PUSCH is reduced, so that institute The transmission power for stating PUSCH is A;If the PUSCH includes UCI in any overlapping transmission moment, in the transmitting work( On the basis of rate B, data modulation symbol some or all of in the PUSCH is set to 0, then carry out transformation precoding, so that The transmission power of the PUSCH be A, after all data modulation symbols are set to 0 the transmission power of the PUSCH still above When A, the power for the RE that UCI is used for transmission in the PUSCH is reduced, alternatively, by the part UCI modulation symbols in the PUSCH It is set to 0, so that the transmission power of the PUSCH is A, alternatively, the transmission power of the first business is reduced, so that described The sum of transmission power of the first business and second of business is less than or equal to the emission maximum of the UE in the overlapping transmission moment Power;
Alternatively, for any SC-FDM symbols of the PUSCH in the overlapping transmission moment, if the SC-FDM symbols Including be all data and do not include UCI, then on the basis of the transmission power B, according to the difference of A and B, with mutually on year-on-year basis Example reduces the power for being used for transmission the RE of data in the SC-FDM symbols and being used for transmission the RE of ascending control information UCI, with It is A to make the transmission power of the PUSCH;It, will on the basis of the transmission power B if the SC-FDM symbols include UCI Data modulation symbol is set to 0 some or all of in the SC-FDM symbols, then carries out transformation precoding, so that the PUSCH Transmission power be A, when all data modulation symbols are set to the transmission power of the PUSCH after 0 still above A, reduce The power of the RE of UCI is used for transmission in the SC-FDM symbols, alternatively, the part UCI in the SC-FDM symbols is modulated symbol Number it is set to 0, so that the transmission power of the PUSCH is A, alternatively, the transmission power of the first business is reduced, so that in institute State maximum hair of the sum of the transmission power of the first business and second of business less than or equal to the UE in the overlapping transmission moment Penetrate power.
A kind of user equipment in communication system, including:Priority determining unit and power determining unit;
The priority determining unit, the physical channel for being allocated to this user equipment for being transmitted for synchronization Each service signal, its corresponding power distribution priority is determined according to the business importance of each service signal;
The power determining unit is corresponding industry for the power distribution priority according to each service signal Business signal distributes transmission power.
As seen from the above technical solution, for each service signal for being allocated to UE of synchronization transmission, UE is according to each The business importance of a service signal determines its corresponding power distribution priority;Power distribution according to each service signal is excellent First grade distributes transmission power for corresponding signal.Aforesaid way is suitable for the UE transmission different business of at least two priority System, in the case where the different business of priority coexists, UE can be pressed within the maximum transmission power configured no more than UE According to certain priority distribution power, make the preferential distribution power of important business, to preferentially ensure the performance of important service.
Description of the drawings
Fig. 1 is to transmit eMBB to compare figure with the slot length for transmitting URLLC;
Fig. 2 is the flow diagram of Poewr control method in the application;
Fig. 3 is the schematic diagram of the sum of required transmission power of all signals;
Fig. 4 is the flow diagram for distributing transmission power in the application situation one according to priority;
Fig. 5 is the assumed condition schematic diagram of the application situation two;
Fig. 6 is the schematic diagram of power distribution in two method three of the application situation;
Fig. 7 is the schematic diagram of power distribution in two method four of the application situation;
Fig. 8 is the schematic diagram of power distribution in two method five of the application situation;
Fig. 9 is the assumed condition schematic diagram of the application situation three;
Figure 10 is the schematic diagram of power distribution in three method five of the application situation;
Figure 11 is the assumed condition schematic diagram of the application situation four;
Figure 12 is the assumed condition schematic diagram of the application situation five;
Figure 13 is the basic structure schematic diagram of user equipment in the application.
Specific implementation mode
In order to make the purpose, technological means and advantage of the application be more clearly understood, the application is done below in conjunction with attached drawing It is further described.
Present invention assumes that at least there are two types of different upper of business importance in one or more serving cells that UE is configured Row data transmission.
The application provides a kind of Poewr control method configured with different importance business, and Fig. 2 is the basic flow of this method Journey schematic diagram.As shown in Fig. 2, this method includes:
Step 201:For each service signal being allocated on the physical channel of UE transmitted in synchronization, according to each The importance of a business determines its corresponding power distribution priority;
In the prior art, for the signal of different time-gap initial position, the preceding signal A in initial position is according to current Situation carries out power control, even if subsequently having the higher signal B of priority and A simultaneous transmissions, signal A is still with original power Control result carries out data transmission, be not compromised by own priority it is low and reduce power give signal B use.
And in this application, as long as synchronization transmission each signals of UE, all based on power distribution priority into Row power distribution.Specifically, when the time slot initial position difference of unlike signal, although the preceding signal A in time slot initial position It had determined the transmission power of current time slots, but hair is determined in the higher signal B of rear but priority in time slot initial position When penetrating power, it is still desirable to redefine the transmission power of signal A according to current priority.That is, no matter time slot rises Beginning position it is front and back, as long as synchronization transmission each signals of UE, according to power distribution priority carry out power distribution.
Step 202:According to the power distribution priority determined, transmission power is distributed for corresponding signal.
In the signal of the business to different importance, when distributing transmission power according to power distribution priority, it is preferable that UE It is required that different importance business data transmissions in each serving cell or same serving cell of configuration can be calculated separately Transmission power, further according to the sum of all serving cells or the required transmission power of all signal datas of same serving cell and UE Maximum transmission power magnitude relationship, and configured serving cell the case where, determine each serving cell or same clothes The corresponding transmission power of unlike signal data in cell of being engaged in;UE emits corresponding signal according to the transmission power distributed.
The sum of the required transmission power of each signal of UE configurations described below refers to overlapping each other in synchronization The sum of the required transmission power of each signal.For example, as shown in figure 3, physically row shares channel (PUSCH, Physical Uplink Shared Channel) in transmission time, the PUSCH of the PUSCH and serving cell 2 of serving cell 1 partly overlap, Then the sum of power is the sum of the PUSCH of serving cell 1 and the power of both PUSCH of serving cell 2 in the transmission time.
UE is configured with the different business transmission of two or more importance, configures two kinds of importance differences here with UE Business transmission for illustrate, similar method processing may be used more than the case where two kinds of importance different business.Two The different business of kind importance is referred to as the first business and second of business, for example, the first business can be URLLC industry Business, second of business can be eMBB business, and the importance of the first business is higher than second of business, the transmission of the first business Priority is higher than second of business, that is, the power distribution priority of the first business is higher than second of business.Both industry Business may be transmitted in a serving cell different frequency range, both business may also be transmitted in different service cells. Either UE needs to transmit the different channel signal of importance, for example, the Physical Uplink Control Channel of transmitting uplink control information The priority of (PUCCH, Physical Uplink Control Channel) is higher than the PUSCH of transmission data, and includes uplink The priority for controlling the PUSCH transmission of information is higher than the PUSCH transmission for not including ascending control information.
Embodiment one:
Divide several situations that the determination method of signal transmission power in above-mentioned steps 202 is specifically described below.
Situation one:
UE can calculate the power of signal on all serving cell different channels in time, that is to say, that UE knows carry out work( All parameters that rate control calculates (for example, for close-loop power control, have received transimission power order (TPC) and uplink Resource allocation) time interval for transmitting upstream data is arrived more than or equal to a thresholding, then used according to the case where power calculation Following method carries out power control.
When the sum of the required transmission power of different business signal of UE configurations is less than or equal to the emission maximum of UE configurations When power P cmax, each signal emits respectively according to the transmission power of calculating.In this way, the transmission power in UE is configured less than UE Maximum transmission power under conditions of, fully meet the power demand of each signal.
When the sum of the required transmission power of different business signal of UE configurations is more than the maximum transmission power of UE configurations When Pcmax, power is sequentially allocated from high to low according to the power distribution priority of different business signal, then each signal according to The transmission power of distribution emits respectively.In this way, under conditions of the transmission power of UE is more than the maximum transmission power of UE configurations, it is excellent First meet the power demand of the high service signal of priority, detailed process is as described in Figure 4.
Situation two:
UE configures the different business transmission of two kinds of importance, and the resource of the first business is to be pre-configured, and is not that dynamic is adjusted Degree, for example, the resource configured by high-level signaling, or pass through semi-continuous scheduling (SPS, Semi-persistent Scheduling the resource of resource), second of business is dynamic dispatching;Then, UE transmission services data as needed Situation decides whether to transmit the first business.In this situation, decide whether the time for transmitting the first business in second of business Transmission is small with second of business transmission intercal more than or equal to t1 (t1 is more than or equal to 0) with second of business transmission intercal before starting In t2 (t2 is more than t1), as shown in figure 5, within t1 interval times, UE can be emitted according to the transmission power calculated, In interval time less than t2, UE can not re-start power control calculating.For such case, there are following several processing sides Method.
Method one:
The first business datum and the required transimission power of second of business datum are calculated separately, when the first business number When according to the maximum transmission power Pcmax for being less than or equal to UE configurations with the sum of the required transimission power of second of business datum, Power distribution is carried out according to the first business datum and the required transimission power of second of business datum;When the first business number When according to the maximum transmission power Pcmax for being more than UE configurations with the sum of the required transimission power of second of business datum, according to the A kind of sequence of the power distribution priority of business and second of business from high to low, is sequentially allocated transmission power.For example, when the When a kind of power distribution priority of business is higher than second of business, power is preferentially distributed to the transmission of the first business datum Channel, remaining power distribution give the transmission channel of second of business datum, even if the first business is not transmitted, second of industry The transimission power of business data is still remaining power after the transmission channel power distribution of the first business datum is over, because of UE Whether the sufficient time does not transmit the power for recalculating second of business according to the first business.In entire slot transmission mistake The transimission power of Cheng Zhong, the first business datum and second of business datum is constant.
In following method, all assume that the power distribution priority of the first business is higher than second of business, Ke Yigen According to whether the first business datum is sent, the transimission power of second of business datum is determined.Specifically,
Method two:
First step calculates separately the first business datum and second of business datum according to preset two ways Transimission power, wherein first way assumes that the first business datum needs to send, power preferentially then distributed to first The transmission channel of kind business datum, remaining power distribution give the transmission channel of second of business datum;The second way is assumed The first business datum need not be sent, and power distribution be given the transmission channel of second of business datum.Second step, if the A kind of business datum is transmitted, and the transmission of second of business datum is sent using the power that first way calculates;If the A kind of business datum need not be transmitted, and the transmission of second of business datum is sent using the power that the second way calculates.In this way, Power more can be effectively utilized according to the method whether the first business datum sends the power for determining second of business datum. During entire slot transmission, the transimission power of the first business datum and second of business datum is constant.
Method three:
First step calculates separately the transmission work(of the first business datum and second of business datum in two ways Rate, wherein first way assume that the first business datum needs to send, and then power are preferentially distributed to the first business number According to transmission channel, determine the transimission power P1 of the first business datum, remaining power distribution gives second of business datum Transmission channel, determine the transimission power P2 of second of business datum;The second way assumes that the first business datum is not required to It sends, power distribution is given the transmission channel of second of business datum, determine the transimission power P3 of second of business datum.The Two steps, if the first business datum is transmitted, at the time of the first business and second of business overlapping, the first industry Transmitting for data of being engaged in is sent using the power P 1 calculated, and the transmission of second of business datum uses the power that first way calculates P2 is sent;Second of side is used in the transmission of the first business and the nonoverlapping part of second of business, second of business datum The power P 3 that formula calculates is sent, as shown in Figure 6.If the first business datum need not be transmitted, the biography of second of business datum The defeated power P 3 calculated using the second way is sent.In this way, being determined second according to whether the first business datum sends The method of the power of business datum more can effectively utilize power.During entire slot transmission, the first business datum Transimission power is constant, what the transimission power of second of business datum may change.
Method four:
First step, it is assumed that second of business datum need not be sent, and power distribution be given the biography of the first business datum The transimission power P1 of defeated the first business datum of channel calculation, it is assumed that the first business datum need not be sent, power distribution The transimission power P2 of second of business datum is calculated to the transmission channel of second of business datum.Second step, if the first Business datum is transmitted, the first business datum is sent using the power P 1 calculated;In the first business and second of business The part of overlapping, if the sum of P1 and P2 are more than the maximum transmission power of UE, UE only sends the first business datum, does not send the Two kinds of business datums, as shown in fig. 7, if the sum of P1 and P2 are less than or equal to the maximum transmission power of UE, second of business datum Transmission using calculate power P 2 send;In the first business and the nonoverlapping part of second of business, second of business number According to transmission using calculate power P 2 send.If the first business datum need not be transmitted, the biography of second of business datum It is defeated to be sent using the power P 2 calculated.Second business datum is determined in this way, whether being sent according to the first business datum The method of power more can effectively utilize power.During entire slot transmission, the transimission power of the first business datum is not Become, the transmission of second of business datum may partly stop transmitting.
Method five:
First step, it is assumed that second of business datum need not be sent, and power distribution be given the biography of the first business datum The transimission power P1 of defeated the first business datum of channel calculation, it is assumed that the first business datum need not be sent, power distribution The transimission power P2 of second of business datum is calculated to the transmission channel of second of business datum.Second step, if the first Business datum is transmitted, the first business is sent using the power P 1 calculated;The first business start transmission before and first The transmission at kind business and second of business nonoverlapping moment, second of business datum is sent using the power P 2 calculated; At the time of a kind of business and second of business overlapping, if the sum of P1 and P2 are more than the maximum transmission power of UE, UE only sends the A kind of business datum, in the part and second of business transmission time slot remainder of the first business and second of business overlapping Second of business datum is not sent, as shown in Figure 8;If the maximum transmission power of the sum of P1 and P2 less than or equal to UE, second The transmission of business datum is sent using the power P 2 calculated.If the first business datum need not be transmitted, second of business number According to transmission using the second way calculate power P 2 send.In this way, whether sending decision according to the first business datum The method of the power of second of business datum more can effectively utilize power.During entire slot transmission, the first business The transimission power of data is constant, and the transmission of second of business datum may partly stop transmitting.
Situation three:
UE configures the different business transmission of two kinds of importance, and the resource of the first business is to be pre-configured, and is not that dynamic is adjusted Degree, for example, the resource configured by high-level signaling, or pass through semi-continuous scheduling (SPS, Semi-persistent Scheduling the resource of resource), second of business is dynamic dispatching;Then, UE transmission services data as needed Situation decides whether to transmit the first business.In this situation, decide whether the time for transmitting the first business in second of business It is less than t1 (t1 is more than or equal to 0) with second of business transmission intercal before starting transmission or decides whether to transmit the first business Time after second of business starts transmission, as shown in Figure 9.For such case, there are following several processing methods.
Method one:
The first business datum and the required transimission power of second of business datum are calculated separately, when the first business number When according to the maximum transmission power Pcmax for being less than or equal to UE configurations with the sum of the required transimission power of second of business datum, Power distribution is carried out according to the first business datum and the required transimission power of second of business datum;When the first business number When according to the maximum transmission power Pcmax for being more than UE configurations with the sum of the required transimission power of second of business datum, according to the A kind of sequence of the power distribution priority of business and second of business from high to low, is sequentially allocated transmission power.For example, when the When a kind of power distribution priority of business is higher than second of business, power is preferentially distributed to the transmission of the first business datum Channel, remaining power distribution give the transmission channel of second of business datum, even if the first business is not transmitted, second of industry The transimission power of business data is still remaining power after the transmission channel power distribution of the first business datum is over, because of UE Whether the sufficient time does not transmit the power for recalculating second of business according to the first business.In entire slot transmission mistake The transimission power of Cheng Zhong, the first business datum and second of business datum is constant.
In following method, all assume that the power distribution priority of the first business is higher than second of business, Ke Yigen According to whether the first business datum is sent, the transimission power of second of business datum is determined.Specifically,
Method two:
First step calculates separately the first business datum and second of business datum according to preset two ways Transimission power, wherein first way assumes that the first business datum needs to send, power preferentially then distributed to first The transmission channel of kind business datum determines that the transimission power P1 of the first business datum, remaining power distribution give second The transmission channel of business datum determines the transimission power P2 of second of business datum;The second way assumes the first business Data need not be sent, and power distribution is given the transmission channel of second of business datum, determined the biography of second of business datum Defeated power P 3.Second step, if the first business datum is transmitted, when the first business and second of business are overlapped It carves, the transmission of the first business datum is sent using the power P 1 calculated, and the transmission of second of business datum uses the first side The power P 2 that formula calculates is sent;In the first business and second of business nonoverlapping moment, the transmission of second of business datum It is sent using the power P 3 that the second way calculates, as shown in Figure 6.If the first business datum need not be transmitted, second The transmission of business datum is sent using the power P 3 that the second way calculates.In this way, whether being sent according to the first business datum Method to determine the power of second of business datum more can effectively utilize power.During entire slot transmission, first The transimission power of kind of business datum is constant, what the transimission power of second of business datum may change.
Method three:
First step, it is assumed that second of business datum need not be sent, and power distribution be given the biography of the first business datum The transimission power P1 of defeated the first business datum of channel calculation, it is assumed that the first business datum need not be sent, power distribution The transimission power P2 of second of business datum is calculated to the transmission channel of second of business datum.Second step, if the first Business datum is transmitted, the first business is sent using the power P 1 calculated;In the first business and second of business overlapping At the time of, if the maximum transmission power Pcmax, UE of the sum of P1 and P2 more than UE only send the first business datum, do not send Second of business datum, if the sum of P1 and P2 are less than or equal to the maximum transmission power Pcmax of UE, the biography of second of business datum It is defeated to be sent using the power P 2 calculated;In the first business and second of business nonoverlapping moment, second business datum Transmission is sent using the power P 2 calculated, as shown in Figure 7.If the first business datum need not be transmitted, second of business number According to transmission using calculate power P 2 send.In this way, determining second of business according to whether the first business datum sends The method of the power of data more can effectively utilize power.During entire slot transmission, the transmission of the first business datum Power is constant, and the transmission of second of business datum may partly stop transmitting.
Method four:
First step, it is assumed that second of business datum need not be sent, and power distribution be given the biography of the first business datum The transimission power P1 of defeated the first business datum of channel calculation, it is assumed that the first business datum need not be sent, power distribution The transimission power P2 of second of business datum is calculated to the transmission channel of second of business datum.Second step, if the first Business datum is transmitted, the first business is sent using the power P 1 calculated;The first business start transmission before and first The transmission at kind business and second of business nonoverlapping part moment, second of business datum is sent using the power P 2 calculated; At the time of the first business and second of business overlapping, if the sum of P1 and P2 are more than the maximum transmission power of UE, UE is only sent out The first business datum is given, it is remaining in the part and second of business transmission time slot of the first business and second of business overlapping Part does not send second of business datum, as shown in Figure 8;If the sum of P1 and P2 are less than or equal to the maximum transmission power of UE The transmission of Pcmax, second of business datum are sent using the power P 2 that first way calculates.If the first business datum is not It needs to transmit, the transmission of second of business datum is sent using the power P 2 that the second way calculates.In this way, according to the first industry The method whether business data send the power for determining second of business datum more can effectively utilize power.It is passed in entire time slot During defeated, the transimission power of the first business datum is constant, and the transmission of second of business datum may partly stop transmitting.
Method five:
First step, it is assumed that second of business datum need not be sent, and power distribution be given the biography of the first business datum The transimission power P1 of defeated the first business datum of channel calculation, it is assumed that the first business datum need not be sent, power distribution The transimission power P2 of second of business datum is calculated to the transmission channel of second of business datum.Second step, if the first Business datum is transmitted, at the time of the first business and second of business overlapping, if the sum of P1 and P2 are more than UE most Big transmission power Pcmax, UE send second of business datum with power P 2, UE with send the remaining power of second of business (that is, The maximum transmission power Pcmax of UE subtracts P2) the first business datum is sent, as shown in Figure 10;If the sum of P1 and P2 be less than etc. It is sent using the power P 2 calculated in the transmission of the maximum transmission power of UE, second of business datum, the first business datum Transmission is sent using power P 1;In the first business and second of business nonoverlapping moment, the transmission of second of business datum It is sent using the power P 2 of calculating.If the first business datum need not be transmitted, the transmission of second of business datum is using meter The power P 2 of calculation is sent.In this way, whether sending the side for the power for determining second of business datum according to the first business datum Method more can effectively utilize power.During entire slot transmission, the transimission power of the first business datum is constant, second The transimission power of business datum is constant.In the processing of this method, although the priority of the first business is higher than second of business, But since the decision of the first business transmission is after second of business transmission starts, in order to ensure second of business transmission process Middle power is constant, aforesaid way can only be used to handle.
Situation four:
UE configures the different business transmission of two kinds of importance, and two kinds of business are all dynamic dispatchings.The first business datum The priority of transmission is higher than the priority of second of business data transmission, dispatches the UL DCI of the first business data transmission the It is more than or equal between t1 (t1 is more than or equal to 0) and second of business transmission with second of business transmission intercal before two kinds of business transmission Every less than t2 (t2 be more than t1), and than second business transmission time slot of the first business transmission time slot is short, as shown in figure 11, in t1 In interval time, UE can be emitted according to the transmission power calculated, and within the interval time less than t2, UE can not be weighed It is new to carry out power control calculating.For such case, there are following several processing methods.It is assumed that the power distribution of the first business is excellent First grade is higher than second of business.
Method one:
A part of Pr of the maximum transmission power of reserved UE gives the first business data transmission, UE using remaining power as The maximum transmission power of UE calculates the transimission power P2 of second of business datum.If according to the power control meter of the first business The transimission power P1 for calculating the first business datum is less than or equal to Pr, the first business datum is transmitted using power P 1, Second of business datum is transmitted using power P 2.If calculating the first industry according to the power control of the first business The transimission power P1 for data of being engaged in is more than Pr, the first business datum is transmitted using power P 1, second of business datum not into Row transmission.During entire slot transmission, the transimission power of the first business datum and second of business datum is constant.
Method two:
A part of Pr (i) of the maximum transmission power of M UE is reserved to the first business data transmission, UE is by remaining work( Rate Pcmax-Pr (i) calculates transimission power P (i) _ 2 of second of business datum, wherein i, j=as the maximum transmission power of UE 1,2 ..., M, and work as i>When j, Pr (i)>Pr (j), M are greater than 1 positive integer, are configured by high-level signaling or are preset by agreement. That is it is respectively (1) Pr to keep for the power of the first business data transmission, Pr (2) ..., Pr (M) are accordingly calculated The transimission power of second of business datum be respectively P (1) _ 2, P (2) _ 2 ..., P (M) _ 2.If according to the first business The transimission power P1 that power control calculates the first business datum is less than or equal to Pr (1), the first business datum uses work( Rate P1 is transmitted, and second of business datum is transmitted using power P (1) _ 2.If according to the power control of the first business The transimission power P1 that system calculates the first business datum is less than or equal to Pr (i) more than Pr (i-1), the first business datum makes It is transmitted with power P1, second of business datum is transmitted using power P (i) _ 2.If according to the work(of the first business Rate control calculate the first business datum transimission power P1 be more than Pr (M), the first business datum using power P 1 into Row transmission, second of business datum is without transmission.During entire slot transmission, the first business datum and second of industry The transimission power for data of being engaged in is constant.
Method three:
First step calculates separately the transmission work(of the first business datum and second of business datum in two ways Rate, wherein first way are that a part for the maximum transmission power for reserving M UE (is respectively { Pr (1), Pr (2) ..., Pr (M) }, and work as i>When j, Pr (i)>Pr (j)) give the first business data transmission, UE to be sent out remaining power as the maximum of UE Penetrate the transimission power of second of business datum of power calculation, respectively P (1) _ 2, P (2) _ 2 ..., P (M) _ 2, wherein M is greater than Positive integer equal to 1 is configured by high-level signaling or is preset by agreement.The second way assumes that the first business datum need not be sent out It send, power P 2 is distributed to the transmission channel of second of business datum.Second step, if the first business datum is passed It is defeated, in the part that the first business and second of business are overlapped, if calculating the according to the power control of the first business A kind of transimission power P1 of business datum is less than or equal to Pr (1), the first business datum is transmitted using power P 1, second Business datum is transmitted using power P (1) _ 2.If calculating the first business according to the power control of the first business The transimission power P1 of data is less than or equal to Pr (i) and is more than Pr (i-1), the first business datum is transmitted using power P 1, the Two kinds of business datums are transmitted using power P (i) _ 2.If the power control according to the first business calculates the first The transimission power P1 of business datum is more than Pr (M), the first business datum is transmitted using power P 1, second of business datum Without transmission;Second is used in the transmission of the first business and the nonoverlapping part of second of business, second of business datum The power P 2 that kind mode calculates is sent.During entire slot transmission, the transimission power of the first business datum is constant, and second What the transimission power of kind business datum may change.
Situation five:
UE configures the different business transmission of two kinds of importance, and two kinds of business are all dynamic dispatchings.Dispatch the first business The DCI of data transmission be less than with second of business transmission intercal before second business is transmitted t1 (t1 is more than or equal to 0) or Decide whether the time for transmitting the first business after second of business is transmitted, as shown in figure 12.For such case, have with Under several processing methods.It is assumed that the power distribution priority of the first business is higher than second of business.
Method one:
A part of Pr of the maximum transmission power of reserved UE gives the first business data transmission, UE using remaining power as The maximum transmission power of UE calculates the transimission power P2 of second of business datum.If according to the power control meter of the first business The transimission power P1 for calculating the first business datum is less than or equal to Pr, the first business datum is transmitted using power P 1, Second of business datum is transmitted using power P 2.If calculating the first industry according to the power control of the first business The transimission power P1 for data of being engaged in is more than Pr, the first business datum is transmitted using power P r, and second of business datum uses Power P 2 is transmitted.During entire slot transmission, the transimission power of the first business datum and second of business datum It is constant.
Method two:
A part of Pr of the maximum transmission power of reserved UE gives the first business data transmission, UE using remaining power as The maximum transmission power of UE calculates the transimission power P2 of second of business datum.If according to the power control meter of the first business The transimission power P1 for calculating the first business datum is less than or equal to Pr, the first business datum is transmitted using power P 1, Second of business datum is transmitted using power P 2.If calculating the first industry according to the power control of the first business The transimission power P1 for data of being engaged in is more than Pr, the first business datum is transmitted using power P 1, in the first business and second At kind business nonoverlapping moment, second of business datum is transmitted using power P 2, in the first business and second of business At the time of overlapping, second of business datum is without transmission.During entire slot transmission, the first business datum and second The transimission power of kind business datum may change.
Method three:
First step calculates separately the transmission work(of the first business datum and second of business datum in two ways Rate, wherein first way are that a part for the maximum transmission power for reserving M UE (is respectively { Pr (1), Pr (2) ..., Pr (M) }, and work as i>When j, Pr (i)>Pr (j)) give the first business data transmission, UE to be sent out remaining power as the maximum of UE Penetrate the transimission power of second of business datum of power calculation, respectively P (1) _ 2, P (2) _ 2 ..., P (M) _ 2, wherein M is greater than Positive integer equal to 1 is configured by high-level signaling or is preset by agreement.The second way assumes that the first business datum need not be sent out It send, power P 2 is distributed to the transmission channel of second of business datum.Second step, the first business and second of business not The transmission of the part of overlapping, second of business datum is sent using the power P 2 that the second way calculates.If the first business Data are transmitted, in the part that the first business and second of business are overlapped, if according to the power control of the first business The transimission power P1 for calculating the first business datum is less than or equal to Pr (1), the first business datum is carried out using power P 1 Transmission, second of business datum are transmitted using power P 1_2.If the power control according to the first business is calculated The transimission power P1 of the first business datum be less than or equal to Pr (i) be more than Pr (i-1), the first business datum using power P 1 into Row transmission, second of business datum are transmitted using power P (i) _ 2.If calculated according to the power control of the first business Out the transimission power P1 of the first business datum is more than Pr (M), the first business datum is transmitted using power P 1, and second Kind business datum is without transmission;During entire slot transmission, the transimission power of the first business datum is constant, second What the transimission power of business datum may change.
Embodiment two:
For after in embodiment one being second traffic assignments transmission power, for the first business and second business The transmission power at overlapping transmission moment, second of business is likely lower than transmission power before this, may be used the present embodiment provides Several ways reduce overlapping time section in second of business transmission power so that the transmission power of its transmission power and distribution It is identical.
First, it is assumed that second of business is to use orthogonal frequency division multiplexing (OFDM, Orthogonal Frequency Division Multiplexing) pass through Physical Uplink Shared Channel (PUSCH, Physical Uplink Shared Channel it) transmits, following seven kinds of methods, which may be used, reduces transmission power.In which it is assumed that the overlapping transmission moment determined The transmission power of second of business is A, and the transmission power for second of the business determined before this is B.
Method one:
On the basis of transmission power B, according to the difference of A and B, reduces in the overlapping transmission moment and transmit according to same ratio Data and ascending control information (UCI, Uplink Control Information) all resource element (RE, Resource Element power), until PUSCH in the overlapping transmission moment transmission power be A, to ensure the overlapping transmission moment section in General power be less than or equal to UE maximum transmission power.
Method two:
On the basis of transmission power B, the number of transmission data and ascending control information RE in the overlapping transmission moment is reduced, And the transimission power for each retaining RE is constant, to reduce the power of entire OFDM symbol, until PUSCH in the overlapping transmission moment Transmission power be A, to ensure the general power in the overlapping transmission moment be less than or equal to UE maximum transmission power.
Method three:
The method for reducing power in the overlapping transmission moment is determined according to data and the modulation system of ascending control information, if Data and ascending control information are first kind modulation systems (for example, data are quadrature phase shift keying (QPSK, Quadrature Phase Shift) modulation system), power in overlapping time section is reduced using the method for the above method one;If data and uplink Control information is the second class modulation system (for example, data are quadrature amplitude modulation (QAM, Quadrature Amplitude Modulation, such as 16QAM) etc. modulation systems), using the above method two method reduce overlapping time section in power.
Method four:
Still include that UCI modulation symbols determine to reduce overlapping time in overlapping time section according to the entirely data for including The method of power in section reduces overlapping time if include in overlapping time section is entirely data using the method for method one Power in section;If including UCI modulation symbols in overlapping time section, overlapping time section internal strength is reduced using the method for method two Rate, at this point, the number of transmission data RE in overlapping time section is first reduced, until the transmission power of PUSCH in overlapping time section For A, to ensure that the general power in overlapping time section is less than or equal to the maximum transmission power of UE.If transmission in overlapping time section The number of data RE does not all have, and the general power in overlapping time section transmission time is still more than the maximum transmission power of UE, at this point, A kind of method is to continue with the number of the power for reducing the RE for transmitting UCI modulation symbols or reduction transmission data UCI modulation symbols RE Mesh, the power that another method is to maintain the RE of transmission UCI modulation symbols is constant, reduces the power of the first business, so that the A kind of general power of business and second of business in overlapping time section is less than the maximum transmission power of UE, in this case The transmission power of PUSCH is no longer A.Wherein, overlapping time section i.e. continuous all overlapping transmission moment.
Method five:
Still include that UCI symbols determine to reduce overlapping time section in the overlapping transmission moment according to the entirely data for including The unit of the method for interior power, decision is OFDM symbol.Specifically, if an OFDM symbol in the overlapping transmission moment includes Be entirely data, using method one method reduce the overlapping transmission moment in the OFDM symbol power so that the hair of PUSCH It is A to penetrate power;If an OFDM symbol in the overlapping transmission moment includes UCI modulation symbols, dropped using the method for method two The power of the OFDM symbol in the low overlapping transmission moment, at this point, first to reduce the transmission of the OFDM symbol overlapping transmission moment Nei The transmission of the number of data RE, until PUSCH in the overlapping transmission moment transmission power be A, to ensure the OFDM symbol General power is less than or equal to the maximum transmission power of UE.If the number of OFDM symbol transmission data RE is all in the overlapping transmission moment Not, in the overlapping transmission moment transmission power of PUSCH still above A, that is to say, that the general power of the OFDM symbol is still big In the maximum transmission power of UE, at this point, a kind of method is to continue with the work(of the RE for the transmission UCI modulation symbols for reducing the OFDM symbol Rate or the number for reducing transmission data UCI modulation symbols RE, another method are to maintain the transmission UCI modulation of the OFDM symbol The power of the RE of symbol is constant, reduces the power of the first business in the OFDM symbol.
Method six:
Still include that UCI modulation symbols determine to reduce overlapping time in overlapping time section according to the entirely data for including The method of power in section.Specifically, if include in overlapping time section is entirely data, weight is reduced using the method for method one Power in the folded period;If including UCI modulation symbols in overlapping time section, first to reduce and transmit number in overlapping time section According to the power of RE, until the transmission power of PUSCH in overlapping time section is A, to ensure the first business in overlapping time section It is less than or equal to the maximum transmission power of UE with the general power of second of business.If the work(of transmission data RE in overlapping time section After rate is 0, the transmission power of PUSCH is still above A, that is to say, that overlapping time section carves the first interior business and second of business General power be still more than the maximum transmission power of UE, at this point, a kind of method is to continue with the RE for reducing transmission UCI modulation symbols Power or the number for reducing transmission data UCI modulation symbols RE, another method are to maintain the RE's of transmission UCI modulation symbols Power is constant, reduces the power of the first business.
Method seven:
Still include that UCI symbols determine to reduce overlapping time section in the overlapping transmission moment according to the entirely data for including The unit of the method for interior power, decision is OFDM symbol.Specifically, if some OFDM symbol packet in the overlapping transmission moment What is contained is entirely data, and the power of the OFDM symbol in the overlapping transmission moment is reduced using the method for method one;If overlapping passes Some OFDM symbol in the defeated moment includes UCI modulation symbols, first to reduce the biography of the OFDM symbol overlapping transmission moment Nei The power of transmission of data RE, until PUSCH in the overlapping transmission moment transmission power be A, to ensure the total work of the OFDM symbol Rate is less than or equal to the maximum transmission power of UE.If the power of OFDM symbol transmission data RE is 0 in the overlapping transmission moment, weight The transmission power of PUSCH is still above A in folded transmission time, that is to say, that the general power of the OFDM symbol is still more than UE most Big transmission power, at this point, a kind of method is to continue with the power of the RE for the transmission UCI modulation symbols for reducing the OFDM symbol or subtracts The number of few transmission data UCI modulation symbols RE, another method are to maintain the RE of the transmission UCI modulation symbols of the OFDM symbol Power it is constant, reduce the power of the first business of the OFDM symbol.
Here illustratively, may include multiple OFDM symbols in overlapping time section, in four~method of the above method seven, Judge whether there are two types of the decision units comprising UCI symbols:One is make all OFDM symbols in section of entire overlapping time To be whole to determine whether comprising UCI symbols, i.e. method four and method six;Another kind is by each OFDM in overlapping time section Whether symbol judges in single OFDM symbol to include UCI symbols, i.e. method five and method seven as individual.
If assuming, second of business carries out PUSCH transmission using SC-FDM, and following five kinds of methods, which may be used, reduces transmitting Power.
Method one ':
On the basis of transmission power B, according to the difference of A and B, is reduced according to same ratio and transmit number in overlapping time section According to ascending control information (UCI, Uplink Control Information) all resource element (RE, Resource Element power), until PUSCH in the overlapping transmission moment transmission power be A, to ensure in the overlapping transmission moment General power is less than or equal to the maximum transmission power of UE.
Method two ':
On the basis of transmission power B, transmission data and ascending control information modulation symbol number in overlapping time section are reduced, The modulation symbol of partial data and ascending control information is namely set to 0, then carries out transformation precoding (Transform Precoding) namely discrete Fourier variation (DFT) processing, to reduce the power of entire OFDM symbol, until overlapping transmission The transmission power of moment PUSCH is A, to ensure that the general power in overlapping time section is less than or equal to the maximum transmission power of UE. Specifically operating procedure is:Assuming that the data transmitted and ascending control information modulation symbol collection is needed to be combined into { s0,s1,…,sN-1, A portion data and ascending control information modulation symbol are set to 0, for example, { s0,s1,…sM, 0 ..., 0 }, i.e., from sM+1Extremely sN-1It is all set to 0, other modulation symbols are constant, can reduce the power of total SC-FDM symbols in this way, reduce the value of M, have More modulation symbols are set to 0, then the power of SC-FDM symbols is smaller, therefore, reduce the value of M until in overlapping time section General power is less than or equal to the maximum transmission power of UE.
Method three ':
The method for reducing power in overlapping time section is determined according to data and the modulation system of ascending control information, if number It is first kind modulation system (for example, data are quadrature phase shift keying (QPSK, Quadrature according to ascending control information Phase Shift) modulation system), power in overlapping time section is reduced using the method for the above method one ';If data and upper Row control information is the second class modulation system (for example, data are quadrature amplitude modulation (QAM, Quadrature Amplitude Modulation, such as 16QAM) etc. modulation systems), using the above method two ' method reduce overlapping time section in power.
Method four ':
Still include that UCI modulation symbols determine to reduce overlapping time in overlapping time section according to the entirely data for including The method of power in section reduces overlapping time if include in overlapping time section is entirely data using the method for method one ' Power in section;If including UCI modulation symbols in overlapping time section, reduced in overlapping time section using the method for method two ' Power, at this point, overlapping time intersegmental part point or total data modulation symbol are first set to 0, until in overlapping time section PUSCH transmission powers are A, to ensure that the general power in overlapping time section is less than or equal to the maximum transmission power of UE.If weight After all data modulation symbols are set to 0 in the folded period, the power of overlapping time section is still above A, that is to say, that when overlapping Between general power in section be still more than the maximum transmission power of UE, at this point, a kind of method is to continue with reduction transmission UCI modulation symbols RE power, alternatively, part UCI modulation symbols are set to 0, another method is to maintain the RE's of transmission UCI modulation symbols Power is constant, reduces the power of the first business.
Method five ':
Still include that UCI symbols determine to reduce in overlapping time section in overlapping time section according to the entirely data for including The unit of the method for power, decision is SC-FDM symbols.Specifically, if some SC-FDM symbol in the overlapping transmission moment Including be entirely data, using method one ' method reduce the overlapping transmission moment in the SC-FDM symbols power;If weight Some SC-FDM symbol in folded transmission time includes UCI modulation symbols, when reducing overlapping transmission using the method for method two ' The power of the SC-FDM symbols in carving, at this point, first to set the data modulation symbol of the SC-FDM symbols in the overlapping transmission moment Be 0, until PUSCH in the overlapping transmission moment transmission power be A, to ensure that the general power of the SC-FDM symbols is less than or equal to The maximum transmission power of UE.If all data modulation symbols of the SC-FDM symbols are set to 0 in overlapping transmission time section Afterwards, overlapping time section transmission time in PUSCH transmission power still above A, that is to say, that the total work of the SC-FDM symbols Rate is still more than the maximum transmission power of UE, at this point, a kind of method is to continue with the transmission UCI modulation symbols for reducing the SC-FDM symbols Number RE power, alternatively, part UCI modulation symbols are set to 0, another method is to maintain the transmission of the SC-FDM symbols The power of the RE of UCI modulation symbols is constant, reduces the power of the first business of the SC-FDM symbols.
Here illustratively, may include multiple SC-FDM symbols in overlapping time section, in the above method four ' and method In five ', judge whether there are two types of the decision units comprising UCI symbols:One is by entire overlapping time section in all SC- FDM symbols are as a whole to determine whether comprising UCI symbols, i.e. method four ';Another kind is will be each in overlapping time section Whether SC-FDM symbols judge in single SC-FDM symbols to include UCI symbols, i.e. method five ' as individual.
So far, the Poewr control method flow in the application terminates.It, can be for same by the processing of above-mentioned the application Each service signal on the physical channel of moment transmission carries out power distribution according to power distribution priority, can be more effective Reasonably carry out power distribution.The application also provides a kind of user equipment, can be used for implementing above-mentioned Poewr control method.Figure 13 For the basic structure schematic diagram of user equipment in the application.As shown in figure 13, which includes:Priority determining unit and Power determining unit.
Wherein, priority determining unit, the physical channel for being allocated to this user equipment for being transmitted for synchronization On each service signal, its corresponding power distribution priority is determined according to the business importance of each service signal.Power Determination unit distributes transmission power for the power distribution priority according to each service signal for corresponding signal.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent substitution, improvement and etc. done should be included within the scope of protection of the invention god.

Claims (14)

1. the Poewr control method in a kind of communication system, which is characterized in that including:
For each service signal of synchronization transmission being allocated on the physical channel of UE, the UE is according to each industry The business importance of business signal determines its corresponding power distribution priority;
According to the power distribution priority of each service signal, transmission power is distributed for corresponding signal.
2. according to the method described in claim 1, it is characterized in that, when the UE determines the power control of each service signal The time interval for making all parameters to the upstream data for transmitting each service signal that calculate is greater than or equal to setting thresholding When, the power distribution priority according to each service signal is that corresponding signal distribution transmission power includes:
Calculate the required transmission power of each service signal;
When the sum of described each required transmission power of service signal is less than or equal to the maximum transmission power of UE configurations When, each service signal carries out power distribution according to required transmission power;
When the sum of described each required transmission power of service signal is more than the maximum transmission power of UE configurations, according to The sequence of the power distribution priority of each service signal from high to low, is sequentially allocated transmission power.
3. according to the method described in claim 1, it is characterized in that, when each service signal includes two kinds of importance differences Service signal when, if deciding whether to transmit time of the first business before second of business data transmission starts with described Two kinds of business transmission intercals are greater than or equal to preset t1 and are less than preset t2, then according to the power of each service signal Distribution priority is that corresponding signal distribution transmission power includes:
The first described business datum and the required transimission power of second of business datum are calculated separately, when described first Kind the sum of business datum and the required transimission power of second of business datum are less than or equal to the maximum of UE configurations When transmission power, power point is carried out according to the first described business datum and the required transimission power of second of business datum Match;When the sum of the first described business datum and the required transimission power of second of business datum are configured more than the UE Maximum transmission power when, according to the power distribution priority of the first described business and second of business from high to low Sequentially, it is sequentially allocated transmission power;
And/or when the power distribution priority of the first business datum is divided higher than the power of second of business datum When with priority, according to whether sending the first described business datum, the transimission power of second of business datum is determined;
Wherein, the first described business is the business of pre-allocated recourses in described two business, and second of business is described The business of dynamic dispatching resource, 0≤t1 in two kinds of business<t2.
4. according to the method described in claim 3, it is characterized in that, described according to whether the first business datum described in sending is true The transimission power of second of business datum includes calmly:
The transmission work(of described the first business datum and second of business datum is calculated separately according to the two ways of setting Rate;It, respectively will be according to described in the first way calculating in described two modes when determining to transmit the first described business The transimission power of the first business datum and second business datum is as the first described business and second of business Transmission power;When determining not transmitting the first described business, will be calculated according to the second way in described two modes Second of business datum transmission power of the transimission power as second of business;
Wherein, include according to the transimission power of first way calculating the first business datum:Most by the UE Big transmission power is used for the data transmission of the first business, calculates the transmission power of the first business;According to described The transimission power that first way calculates second of business datum includes:The maximum transmission power of the UE is subtracted described Dump power after the transmission power of the first business is used for the data transmission of second of business, calculates second of industry The transimission power for data of being engaged in;The transmission that second of business datum is calculated according to the second way includes:By the UE Maximum transmission power be used for the data transmission of second of business, calculate the transimission power of second of business datum.
5. according to the method described in claim 1, it is characterized in that, when each service signal includes two kinds of importance differences Service signal when, for described two business, if deciding whether the time for transmitting the first business in second of business datum It transmits and is less than preset t1 with second of business transmission intercal before starting, if alternatively, deciding whether the first described in transmission The time of business, the power distribution then according to each service signal was excellent after second of business data transmission starts First grade is that corresponding signal distribution transmission power includes:
The first described business datum and the required transimission power of second of business datum are calculated separately, when described first Kind the sum of business datum and the required transimission power of second of business datum are less than or equal to the maximum of UE configurations When transmission power, power point is carried out according to the first described business datum and the required transimission power of second of business datum Match;When the sum of the first described business datum and the required transimission power of second of business datum are configured more than the UE Maximum transmission power when, according to the power distribution priority of the first described business and second of business from high to low Sequentially, it is sequentially allocated transmission power;
And/or when the power distribution priority of the first business datum is divided higher than the power of second of business datum When with priority, according to whether sending the first described business datum, the transmission power of second of business datum is determined;
Wherein, the first described business is the business of pre-allocated recourses in described two business, and second of business is described The business of dynamic dispatching resource, t1 >=0 in two kinds of business.
6. the method according to claim 3 or 5, which is characterized in that described according to whether sending the first described business number According to determine second of business datum transimission power include:
The transmission work(of described the first business datum and second of business datum is calculated separately according to the two ways of setting Rate;It, will be according to the first business datum described in first way calculating when determining to transmit the first described business Transmission power of the transimission power as the first business, in the first described business and second of business overlapping transmission At the time of, using the transimission power of second of the business datum calculated according to the first way as second of industry The transmission power of business will be according to described second at the time of the first described business and second of business not overlapping transmission Transmission power of second of business data transmission power that kind mode calculates as second of business;When decision does not pass When the first defeated described business, using second of business data transmission power calculated according to the second way as institute State the transmission power of second of business;
Alternatively, the transimission power P1 of the first business datum is calculated according to the first way, according to described second Mode calculates the transimission power P2 of second of business datum;When determining to transmit the first described business, the P1 is made For the transmission power of the first business, at the time of the first described business and second of business overlapping transmission, if The sum of P1 and P2 are less than or equal to the maximum transmission power of the UE, then using the P2 as the transmitting work(of second of business Rate does not send second of business, in the first described industry if the sum of P1 and P2 are more than the maximum transmission power of the UE Business and second of business not overlapping transmission at the time of, using the P2 as the transmission power of second of business;When certainly When determining not transmitting the first described business, using the P2 as the transmission power of second of business;
Alternatively, the transimission power P1 of the first business datum is calculated according to the first way, according to described second Mode calculates the transimission power P2 of second of business datum;When determining to transmit the first described business, the P1 is made For the transmission power of the first business, before the first described business starts transmission and the first described business and described Second of business not overlapping transmission at the time of, using the P2 as the transmission power of second of business, it is described the first At the time of business and second of business overlapping transmission, if the sum of P1 and P2 are less than or equal to the emission maximum work(of the UE Rate, then using the P2 as the transmission power of second of business, if the sum of P1 and P2 are more than the emission maximum work(of the UE Rate, the then at the time of overlapping transmission and the remainder of second of business transmission time slot does not send second of industry Business;When determining not transmitting the first described business, using the P2 as the transmission power of second of business;
Wherein, include according to the transimission power of first way calculating the first business datum:Most by the UE Big transmission power is used for the data transmission of the first business, calculates the transmission power of the first business;According to described The transimission power that first way calculates second of business datum includes:The maximum transmission power of the UE is subtracted described Dump power after the transmission power of the first business is used for the data transmission of second of business, calculates second of industry The transimission power for data of being engaged in;The transmission that second of business datum is calculated according to the second way includes:By the UE Maximum transmission power be used for the data transmission of second of business, calculate the transimission power of second of business datum.
7. according to the method described in claim 5, it is characterized in that, the power distribution priority of the first business datum described in Higher than second of business datum power distribution priority when, it is described according to whether to send the first described business datum true The transmission power of second of business datum includes calmly:
The transimission power P1 that the first business datum is calculated according to the first way, according to the second way meter Calculate the transimission power P2 of second of business datum;When determining to transmit the first described business, in the first described business At the time of with second of business overlapping transmission, if the sum of P1 and P2 are less than or equal to the maximum transmission power of the UE, Using the P2 as the transmission power of second of business, using the P1 as the transmission power of the first business, if The sum of P1 and P2 are more than the maximum transmission power of the UE, then, will using the P2 as the transmission power of second of business The dump power that the maximum transmission power of the UE subtracts the P2 is used for the data transmission of the first business, described the A kind of business and second of business not overlapping transmission at the time of, using the P2 as the transmitting work(of second of business Rate;When determining not transmitting the first described business, using the P2 as the transmission power of second of business;
Wherein, include according to the transimission power of first way calculating the first business datum:Most by the UE Big transmission power is used for the data transmission of the first business, calculates the transmission power of the first business;According to described The transmission that the second way calculates second of business datum includes:The maximum transmission power of the UE is used for described second The data transmission of kind business, calculates the transimission power of second of business datum.
8. according to the method described in claim 1, it is characterized in that, when each service signal includes different two of importance The power-priority of the first business is higher than second of business in described two business in kind service signal and described two business When, if for dispatching the Downlink Control Information DCI of the first business before second of business data transmission starts and It is greater than or equal to the t1 of setting with second of business transmission intercal and less than the t2 of setting and the biography of the first business Defeated time slot is shorter than the transmission time slot of second of business, then is pair according to the power distribution priority of each service signal The signal answered distributes transmission power:
The required transimission power P1 of the first described business datum is calculated according to the power control mode of the first business, Dump power after the maximum transmission power of the UE is subtracted setting Pr calculates second of industry as maximum transmission power The required transimission power P2 of data of being engaged in;If P1≤the Pr, using the P1 as the transmitting of the first business datum Power, using the P2 as the transmission power of second of business datum;If the P1>Pr, then using the P1 as described in The transmission power of the first business datum does not send second of business datum;
Alternatively, calculating the required transmission work(of the first described business datum according to the power control mode of the first business The maximum transmission power of the UE is subtracted the dump power after the Pr (i) of setting and calculates institute as maximum transmission power by rate P1 State required transimission power P (i) _ 2 of second of business datum;Using the P1 as the transmitting work(of the first business datum Rate;If P1≤the Pr (1), the transmission power by the P (1) _ 2 as second of business datum;If Pr (the i- 1)<P1≤Pr (i), the then transmission power by P (i) _ 2 as second of business datum;If the P1>Pr (M), then Second of business datum is not sent;
Alternatively, calculating the required transmission work(of the first described business datum according to the power control mode of the first business Rate P1 calculates separately the transimission power of second of business datum according to preset two ways;When the first described business When data are transmitted, using the P1 as the transmission power of the first business datum, in the first described business and institute It, will be according to institute using the P1 as the transmission power of the first business datum at the time of stating second of business overlapping transmission The transimission power for second of business datum that the first way in two ways calculates is stated as second of business Transmission power will be according to described two sides at the time of the first described business and second of business not overlapping transmission Transmitting work(of the transimission power for second of business datum that the second way in formula calculates as second of business Rate;
Wherein, the resource of the first described business and second of business is dynamic dispatching, 0≤t1<t2;According to described First way calculates the required transimission power of second of business datum:The maximum transmission power of the UE is subtracted It goes the dump power after the Pr (i) of setting as maximum transmission power, calculates the required transmission of second of business datum Power P (i) _ 2, if the P1≤Pr (1), the transimission power by the P (1) _ 2 as second of business datum;If The Pr (i-1)<P1≤Pr (i), the then transimission power by P (i) _ 2 as second of business datum;If the P1 >Pr (M), then by 0 transimission power as second of business datum;It is calculated described second according to the second way The required transimission power of business datum includes:The maximum transmission power of the UE is passed for second of business datum It is defeated, calculate the required transimission power of second of business datum;Work as i<When j, Pr (i)<Pr (j), i, j=1,2 ..., M, Pr(i)<The maximum transmission power of the UE, M are high-rise configuration or preset positive integer.
9. according to the method described in claim 1, it is characterized in that, when each service signal includes different two of importance In kind of service signal and described two business the priority of the first business higher than in described two business second business it is excellent When first grade, if for dispatch the DCI of the first business before second of business data transmission starts and with described second Business transmission intercal is less than t1 and the transmission time slot of the first business is shorter than the transmission time slot of second of business, or Person, if for dispatching the DCI of the first business after second of business transmission starts and the first described business Transmission time slot it is shorter than the transmission time slot of second of business, then according to the power distribution priority of each service signal Distributing transmission power for corresponding signal includes:
The required transimission power P1 of the first described business datum is calculated according to the power control mode of the first business, Dump power after the maximum transmission power of the UE is subtracted setting Pr calculates second of industry as maximum transmission power The required transimission power P2 of data of being engaged in;If P1≤the Pr, using the P1 as the transmitting of the first business datum Power, using the P2 as the transmission power of second of business datum;If the P1>Pr, then using the Pr as described in The transmission power of the first business datum, using the P2 as the transmission power of second of business datum;
Alternatively, calculating the required transmission work(of the first described business datum according to the power control mode of the first business Rate P1, the dump power after the maximum transmission power of the UE is subtracted setting Pr calculate described second as maximum transmission power The required transimission power P2 of kind business datum;If P1≤the Pr, using the P1 as the first business datum Transmission power, using the P2 as the transmission power of second of business datum;If the P1>Pr, then using the P1 as The transmission power of the first business datum, at the time of the first described business and second of business overlapping transmission, Second of business datum is not sent, it, will at the time of the first described business and second of business not overlapping transmission Transmission powers of the P2 as second of business datum;
Alternatively, calculating the required transmission work(of the first described business datum according to the power control mode of the first business Rate P1 calculates separately the required transimission power of second of business datum according to preset two ways;The P1 is made For the transmission power of the first business datum, the first described business and second of business overlapping transmission when It carves, it, will be according to the first way in described two modes using the P1 as the transmission power of the first business datum Transmission power of the transimission power of second of the business datum calculated as second of business, in the first described industry Business and second of business not overlapping transmission at the time of, will according in described two modes the second way calculate described in Transmission power of the transimission power of second of business datum as second of business;
Wherein, the resource of the first described business and second of business is dynamic dispatching, 0≤t1<t2;According to described First way calculates the required transimission power of second of business datum:The maximum transmission power of the UE is subtracted It goes the dump power after the Pr (i) of setting as maximum transmission power, calculates the required transmission of second of business datum Power P (i) _ 2, if the P1≤Pr (1), the transimission power by the P (1) _ 2 as second of business datum;If The Pr (i-1)<P1≤Pr (i), the then transimission power by P (i) _ 2 as second of business datum;If the P1 >Pr (M), then by 0 transimission power as second of business datum;It is calculated described second according to the second way The required transimission power of business datum includes:The maximum transmission power of the UE is passed for second of business datum It is defeated, calculate the required transimission power of second of business datum;Work as i<When j, Pr (i)<Pr (j), i, j=1,2 ..., M, Pr(i)<The maximum transmission power of the UE, M are high-rise configuration or preset positive integer.
10. according to any method in claim 3 to 9, which is characterized in that when second of business uses orthogonal frequency When dividing multiplexing OFDM by Physical Uplink Shared Channel PUSCH transmission, for the first described business and second of business The overlapping transmission moment, however, it is determined that the transmission power A of second of the business gone out is less than described before the overlapping transmission moment The transmission power B of second of business is held then after for the transmission power at overlapping transmission moment described in second of traffic assignments The method of determination for carrying each resource element RE power of the PUSCH includes:
On the basis of the transmission power B, according to the difference of A and B, is reduced in the PUSCH and be used for transmission with same ratio The power of the RE of data and the RE for being used for transmission ascending control information UCI, so that the transmission power of second of business is A;
Alternatively, on the basis of the transmission power B, the number of RE in the PUSCH is reduced, for the RE of reservation, power is protected Hold it is constant so that the transmission power of second of business be A;
Alternatively, according to the modulation system of data and UCI in the PUSCH, the power of each RE is determined;
Alternatively, whether including UCI according to the PUSCH in the overlapping transmission moment, the power of each RE is determined.
11. according to the method described in claim 10, it is characterized in that, the modulation according to data and UCI in the PUSCH Mode determines that the power of each RE includes:
If the data and UCI are using the first modulation system set, on the basis of the transmission power B, according to A and B Difference, the RE that data are used for transmission in the PUSCH is reduced and the RE that is used for transmission ascending control information UCI with same ratio Power so that the transmission power of the PUSCH be A;If the data and UCI are using the second modulation system set, in institute On the basis of stating transmission power B, the number of RE in the PUSCH is reduced, for the RE of reservation, power remains unchanged, so that institute The transmission power for stating PUSCH is A;
And/or
Whether comprising UCI determine that the power of each RE includes according to the PUSCH in the overlapping transmission moment:
If what the PUSCH included in all overlapping transmission moment is all data and does not include UCI, in the transmitting On the basis of power B, according to the difference of A and B, the power for the RE that data are used for transmission in the PUSCH is reduced, so that described The transmission power of PUSCH is A;If the PUSCH includes UCI in any overlapping transmission moment, in the transmission power B On the basis of, the number for the RE that data are used for transmission in the PUSCH is reduced, for the RE of reservation, power remains unchanged, so that The transmission power of the PUSCH is A, and the transmission power of the PUSCH is still after the number of the RE for being used for transmission data is 0 When being so more than A, the power for the RE that UCI is used for transmission in the PUSCH is reduced, so that the transmission power of the PUSCH is A, or Person reduces the number for the RE that data are used for transmission in the PUSCH, and for the RE of reservation, power remains unchanged, so that described The transmission power of PUSCH is A, alternatively, the transmission power of the first business is reduced, so that within the overlapping transmission moment The sum of transmission power of the first business and second of business is less than or equal to the maximum transmission power of the UE;
Alternatively, for any OFDM symbol of the PUSCH in the overlapping transmission moment, if the OFDM symbol includes all It is data and, according to the difference of A and B, reduces the OFDM symbol then on the basis of the transmission power B not comprising UCI In be used for transmission data RE power so that the transmission power of the PUSCH be A;If the OFDM symbol includes UCI, On the basis of the transmission power B, the number for the RE that data are used for transmission in the OFDM symbol is reduced, for reservation RE, power remain unchanged, so that the transmission power of the PUSCH is A, after the number of the RE for being used for transmission data is 0 When the transmission power of the PUSCH is still above A, the power for the RE that UCI is used for transmission in the OFDM symbol is reduced, so that institute The transmission power for stating PUSCH is A, alternatively, reduce the number for the RE for being used for transmission data in the PUSCH, for the RE of reservation, Power remains unchanged, so that the transmission power of the PUSCH is A, alternatively, the transmission power of the first business is reduced, with The sum of transmission power of the first business and second of business within the overlapping transmission moment is set to be less than or equal to the UE's Maximum transmission power;
If alternatively, in all overlapping transmission moment the PUSCH include be all data and do not include UCI, described On the basis of transmission power B, according to the difference of A and B, the power for the RE that data are used for transmission in the PUSCH is reduced, so that institute The transmission power for stating PUSCH is A;If the PUSCH includes UCI in any overlapping transmission moment, in the transmitting work( On the basis of rate B, the power for the RE that data are used for transmission in the PUSCH is reduced, so that the transmission power of the PUSCH is A, After the power for being used for transmission RE in the PUSCH of data in the PUSCH is 0, the transmission power of the PUSCH is still big When A, continue the power for reducing the RE that UCI is used for transmission in the PUSCH, so that the transmission power of the PUSCH is A, or Person reduces the number for the RE that data are used for transmission in the PUSCH, and for the RE of reservation, power remains unchanged, so that described The transmission power of PUSCH is A, alternatively, the transmission power of the first business is reduced, so that the first business and second of industry The sum of transmission power of business is less than or equal to the maximum transmission power of the UE;
Alternatively, for any OFDM symbol of the PUSCH in the overlapping transmission moment, if institute in the overlapping transmission moment That states that OFDM symbol includes is all data and does not include UCI, then on the basis of the transmission power B, according to the difference of A and B Value, reduces the power for the RE that data are used for transmission in the OFDM symbol, so that the transmission power of the PUSCH is A;If described Comprising UCI in the OFDM symbol in the overlapping transmission moment, then on the basis of the transmission power B, the OFDM symbols are reduced The power of the RE of data is used for transmission in number so that the transmission power of the PUSCH is A, when in the OFDM symbol for passing After the power of the RE of transmission of data is 0, when the transmission power of the OFDM symbol is still above A, reduces and used in the OFDM symbol In the power of the RE of transmission UCI number is used for transmission alternatively, reducing in the PUSCH so that the transmission power of the PUSCH is A According to RE number, for the RE of reservation, power remains unchanged so that the transmission power of the PUSCH be A, alternatively, reduce institute The transmission power of the first business is stated, so that the sum of the first business and the transmission power of second of business are less than or equal to described The maximum transmission power of UE.
12. according to any method in claim 3 to 9, which is characterized in that when second of business is carried using single When wave-frequency division multiplexing SC-FDM passes through PUSCH transmission, for the overlapping transmission of the first described business and second of business Moment, however, it is determined that the transmission power A of second of the business gone out is less than second of business before the overlapping transmission moment Transmission power B, then after for the transmission power at overlapping transmission moment described in second of traffic assignments, described in carrying The method of determination of each resource element RE power of PUSCH includes:
On the basis of the transmission power B, according to the difference of A and B, is reduced in the PUSCH and be used for transmission with same ratio The power of the RE of data and the RE for being used for transmission ascending control information UCI, so that the transmission power of the PUSCH is A;
Alternatively, on the basis of the transmission power B, the partial modulation symbol in the PUSCH is set to 0, then converted Precoding, so that the transmission power of the PUSCH is A;
Alternatively, according to the modulation system of data and UCI in the PUSCH, the power of each RE is determined;
Alternatively, whether including UCI according to the PUSCH in the overlapping transmission moment, the power of each RE is determined.
13. according to the method for claim 12, which is characterized in that the modulation according to data and UCI in the PUSCH Mode determines that the power of each RE includes:
If the data and UCI are using the first modulation system set, on the basis of the transmission power B, according to A and B Difference, the RE that data are used for transmission in the PUSCH is reduced and the RE that is used for transmission ascending control information UCI with same ratio Power so that the transmission power of the PUSCH be A;If the data and UCI are using the second modulation system set, in institute On the basis of stating transmission power B, the partial modulation symbol in the PUSCH is set to 0, then carry out transformation precoding, so that institute The transmission power for stating PUSCH is A;
And/or
Whether comprising UCI determine that the power of each RE includes according to the PUSCH in the overlapping transmission moment:
If what the PUSCH included in all overlapping transmission moment is all data and does not include UCI, in the transmitting On the basis of power B, according to the difference of A and B, the power for the RE that data are used for transmission in the PUSCH is reduced, so that described The transmission power of PUSCH is A;If the PUSCH includes UCI in any overlapping transmission moment, in the transmission power B On the basis of, data modulation symbol some or all of in the PUSCH is set to 0, then carry out transformation precoding, so that described The transmission power of PUSCH is A, when all data modulation symbols are set to the transmission power of the PUSCH after 0 still above A, The power for the RE that UCI is used for transmission in the PUSCH is reduced, alternatively, the part UCI modulation symbols in the PUSCH are set to 0, so that the transmission power of the PUSCH is A, alternatively, the transmission power of the first business is reduced, so that in the overlapping The sum of transmission power of the first business and second of business is less than or equal to the maximum transmission power of the UE in transmission time;
Alternatively, for any SC-FDM symbols of the PUSCH in the overlapping transmission moment, if the SC-FDM symbols include Be all data and, according to the difference of A and B, dropped with same ratio then on the basis of the transmission power B not comprising UCI It is used for transmission the RE of data in the low SC-FDM symbols and is used for transmission the power of the RE of ascending control information UCI, so that institute The transmission power for stating PUSCH is A;It, will be described on the basis of the transmission power B if the SC-FDM symbols include UCI Data modulation symbol is set to 0 some or all of in SC-FDM symbols, then carries out transformation precoding, so that the hair of the PUSCH It is A to penetrate power, when all data modulation symbols are set to the transmission power of the PUSCH after 0 still above A, described in reduction The power of the RE of UCI is used for transmission in SC-FDM symbols, alternatively, the part UCI modulation symbols in the SC-FDM symbols are set It is 0, so that the transmission power of the PUSCH is A, alternatively, the transmission power of the first business is reduced, so that described heavy The sum of transmission power of the first business and second of business is less than or equal to the emission maximum work(of the UE in folded transmission time Rate.
14. the user equipment in a kind of communication system, which is characterized in that including:Priority determining unit and power determining unit;
The priority determining unit, it is each on the physical channel of this user equipment for being allocated to of being transmitted for synchronization A service signal determines its corresponding power distribution priority according to the business importance of each service signal;
The power determining unit is believed for the power distribution priority according to each service signal for corresponding business Number distribution transmission power.
CN201710089495.3A 2017-02-06 2017-02-20 Poewr control method and user equipment in a kind of communication system Pending CN108401284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/KR2018/001588 WO2018143778A1 (en) 2017-02-06 2018-02-06 Method and apparatus for controlling power in a wireless communication system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2017100672549 2017-02-06
CN201710067254 2017-02-06

Publications (1)

Publication Number Publication Date
CN108401284A true CN108401284A (en) 2018-08-14

Family

ID=63094194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710089495.3A Pending CN108401284A (en) 2017-02-06 2017-02-20 Poewr control method and user equipment in a kind of communication system

Country Status (1)

Country Link
CN (1) CN108401284A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111385863A (en) * 2018-12-28 2020-07-07 华为技术有限公司 Power control method and device
WO2021008179A1 (en) * 2019-07-15 2021-01-21 中兴通讯股份有限公司 Method and apparatus for determining transmission power, storage medium, and electronic device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102047745A (en) * 2008-05-30 2011-05-04 诺基亚西门子通信公司 Allocating resources within a communication system
CN102415169A (en) * 2009-05-04 2012-04-11 高通股份有限公司 Method and apparatus for uplink power control in a multicarrier wireless communication system
CN104717736A (en) * 2013-12-12 2015-06-17 中国移动通信集团公司 LTE downlink power control method and equipment
WO2015168906A1 (en) * 2014-05-08 2015-11-12 富士通株式会社 Power control method for uplink channel, user equipment and communication system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102047745A (en) * 2008-05-30 2011-05-04 诺基亚西门子通信公司 Allocating resources within a communication system
CN102415169A (en) * 2009-05-04 2012-04-11 高通股份有限公司 Method and apparatus for uplink power control in a multicarrier wireless communication system
CN104717736A (en) * 2013-12-12 2015-06-17 中国移动通信集团公司 LTE downlink power control method and equipment
WO2015168906A1 (en) * 2014-05-08 2015-11-12 富士通株式会社 Power control method for uplink channel, user equipment and communication system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
GUANGDONG OPPO MOBILE TELECOM.: "R1-1700553 "Uplink power control for NR"", 《3GPP TSG_RAN\WG1_RL1》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111385863A (en) * 2018-12-28 2020-07-07 华为技术有限公司 Power control method and device
CN111385863B (en) * 2018-12-28 2021-10-15 华为技术有限公司 Power control method and device
WO2021008179A1 (en) * 2019-07-15 2021-01-21 中兴通讯股份有限公司 Method and apparatus for determining transmission power, storage medium, and electronic device

Similar Documents

Publication Publication Date Title
US9814001B2 (en) Terminal device for controlling uplink signal transmission power, and method therefor
CN102771173B (en) The apparatus and method of transmitting power balance information in multi-carrier systems
TWI469608B (en) Multiplexing pucch information
CN104871471B (en) The method and apparatus for sending ACK/NACK in a wireless communication system
CN102907160B (en) Mobile communication system, base station apparatus, mobile station apparatus and communication means
EP2686977B1 (en) Enhanced power headroom reporting in wireless communication networks
CN103190192B (en) Wireless communication system, radio base station apparatus and mobile terminal apparatus
CN102098086B (en) Data transmission method for uplink and device
JP4531722B2 (en) User device, transmission method, and mobile communication system
CN102474495B (en) In a wireless communication system to sending the method and device that the uplink carrier of uplink control information distributes
CN104601315B (en) Ascending control information method of reseptance and device in multicarrier system
US9723576B2 (en) Method and device for reporting power headroom under carrier aggregation
JP2020505815A (en) A method for transmitting an uplink control channel of a terminal in a wireless communication system and a communication apparatus using the method
CN107682923A (en) The method of power headroom reporting and corresponding user equipment
CN102870480B (en) Base station apparatus, mobile terminal apparatus and communication control method
CN107040358A (en) The method and its device of upward signal are sent and received for NB IoT UE
WO2011013715A1 (en) Mobile station device and communication method
CN104412645A (en) Base station device, mobile station device, wireless communication method, integrated circuit, and wireless communication system
CN105846957A (en) Radio base station apparatus, mobile terminal apparatus, radio communication system and radio communication method
CN104205973A (en) Wireless communication system, wireless base station device, user terminal, and wireless resource allocation method
CN102685870A (en) Base station apparatus
US8787281B2 (en) Base station apparatus and user terminal
CN104685949A (en) Wireless communication system, base station, user equipment, and wireless communication method
CN108737311A (en) The method and user equipment of uplink control information transmission
US8391911B2 (en) Transmit power control method, base station apparatus and user apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814

RJ01 Rejection of invention patent application after publication