CN108400854B - Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal - Google Patents

Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal Download PDF

Info

Publication number
CN108400854B
CN108400854B CN201710067272.7A CN201710067272A CN108400854B CN 108400854 B CN108400854 B CN 108400854B CN 201710067272 A CN201710067272 A CN 201710067272A CN 108400854 B CN108400854 B CN 108400854B
Authority
CN
China
Prior art keywords
prb
resource
parameter
prbs
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710067272.7A
Other languages
Chinese (zh)
Other versions
CN108400854A (en
Inventor
苟伟
毕峰
郝鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710067272.7A priority Critical patent/CN108400854B/en
Priority to PCT/CN2017/120313 priority patent/WO2018141190A1/en
Publication of CN108400854A publication Critical patent/CN108400854A/en
Application granted granted Critical
Publication of CN108400854B publication Critical patent/CN108400854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0453Resources in frequency domain, e.g. a carrier in FDMA

Abstract

The invention provides a parameter sending method, a parameter sending device, a resource determining method, a resource determining device, a base station and a terminal; the parameter sending method comprises the following steps: determining a first specified parameter and/or a second specified parameter, wherein the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance; and sending the first specified parameter and/or the second specified parameter to the terminal through first signaling. By the invention, the problem of mismatching between the candidate resource and the transmission bit in the related technology is solved.

Description

Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal
Technical Field
The present invention relates to the field of communications, and in particular, to a parameter sending method, a resource determining method, a parameter sending device, a resource determining device, a base station, and a terminal.
Background
A New generation mobile communication system (New Radio, abbreviated as NR) is being researched, and in the NR system that can be determined at present, there are 3 typical service types in the future. Common services include: enhanced Mobile BroadBand (eMBB), high-reliability and Low-Latency Communications (URLLC), and massive Machine Type Communications (mMTC). These services have different requirements with respect to delay, coverage and reliability. For example, for the eMBB, high peak transmission rate is mainly emphasized, the requirement on delay is not high (low delay is not required), and the reliability is required. For URLLC, low latency, high reliability transmission is emphasized, which is very demanding on latency. For mtc, a large number of terminals are emphasized, the connection density is high, and a larger transmission coverage is required, and there is little requirement for delay.
In the NR system, a Physical Resource Block (PRB) is still used for Resource allocation. Currently, a PRB Frequency domain includes 12 subcarriers, and the number of Orthogonal Frequency Division Multiplexing (OFDM) symbols included in a time domain is not determined. It is assumed that the number of symbols included in the time domain is the same as the number of OFDM symbols included in a scheduling unit (for example, a slot, which may also be regarded as a scheduling unit).
An Uplink Control Channel (e.g., a Physical Uplink Control Channel (PUCCH)) of a receiving end (e.g., a User Equipment (UE)) may be configured with multiple candidate resources, where the multiple candidate resources configured in the related art are fixed, so that the candidate resources may not be matched with transmission bits when transmission bits change.
In view of the above technical problems in the related art, no effective solution has been proposed at present.
Disclosure of Invention
The embodiment of the invention provides a parameter sending method, a resource determining method, a parameter sending device, a resource determining device, a base station and a terminal, and aims to at least solve the problem of mismatching between candidate resources and transmission bits in the related art.
According to an embodiment of the present invention, there is provided a parameter sending method, including: determining a first specified parameter and/or a second specified parameter, wherein the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance; and sending the first specified parameter and/or the second specified parameter to the terminal through first signaling.
Optionally, the one or more candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
Optionally, when determining the first specified parameter and/or the second specified parameter, the method further comprises: selecting one candidate channel resource from the configured one or more candidate channel resources as a preset candidate channel resource; sending the preset candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
Optionally, after selecting one candidate channel resource from the configured one or more candidate channel resources as the predetermined candidate channel resource, the method further includes: and determining the channel resource for receiving the terminal data according to the preset candidate channel resource and the first specified parameter.
Optionally, the first signaling and/or the second signaling is physical layer signaling.
Optionally, the granularity of the resource amount is at least one of: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
Optionally, the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with the PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
Optionally, the candidate channel resource is used for a physical uplink control channel, PUCCH, or for transmitting uplink control information, UCI; the data is data in a PUCCH channel or UCI.
According to an embodiment of the present invention, a parameter sending method is provided, including: configuring a first parameter for determining channel resources allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs; and sending the first parameter to the terminal.
Optionally, when the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
Optionally, the second parameter comprises at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
Optionally, the starting physical resource block PRB index of the channel resource is determined by one of the following predetermined rules:
Figure BDA0001221121110000031
Figure BDA0001221121110000032
Figure BDA0001221121110000041
wherein PRBnum is used for representing the starting PRB index of the channel resource with the number of num, num is an integer greater than or equal to 0, PRBall is used for representing the maximum index of PRBs in the resource to be allocated, and PRBoffset is used for representing the offset relative to the minimum index of PRBs in the resource to be allocatedQuantity, M is used to indicate the number of portions of channel resources that need to be allocated,
Figure BDA0001221121110000042
in order to get the function of the integer downwards,
Figure BDA0001221121110000043
to round up the function, round () is a rounding function and mod is a remainder operation.
Optionally, after generating the first parameter for determining the channel resources allocated for the terminal, the method further comprises: and determining the PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs.
Optionally, determining the PRBs included in the channel resource according to the starting PRB index and the number of PRBs includes: in the resource to be allocated, taking the PRB corresponding to the starting PRB index as the starting point, and determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index, where N is the number of PRBs.
Optionally, determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index includes: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
Optionally, when the resource to be allocated is a partial subband of the entire system bandwidth, the PRBall is used to indicate a maximum index after renumbering all PRBs in the partial subband.
Optionally, the number of PRBs is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
Optionally, when the base station and the terminal always require that the channel resource includes a fixed PRB, configuring the number of PRBs in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-layer signaling, the PRB number required by the data transmission is reconfigured through the physical layer signaling, wherein the PRB number configured through the high-layer signaling is still adopted after the data transmission.
Optionally, M is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
Optionally, when the base station and the terminal always require to allocate a fixed number of channel resources, configuring M in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through a high-level signaling, reconfiguring the value of M required at this time through a physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
Optionally, in the case of configuring multiple channel resources, the configuration is performed in the order from small to large of the PRBoffset value.
Optionally, sending the first parameter to the terminal includes: and sending the first parameters to the terminal in a broadcasting or appointed mode.
Optionally, the channel resource is used for a physical uplink control channel, PUCCH, or for transmitting uplink control information, UCI.
According to an embodiment of the present invention, there is provided a resource determination method including: receiving a first specified parameter and/or a second specified parameter through first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station; and determining channel resources required by the data transmission of the terminal according to the first specified parameters and/or the second specified parameters.
Optionally, the one or more candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
Optionally, the method further comprises: receiving a predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources configured for the terminal in advance, and the first signaling and the second signaling are different or the same.
Optionally, the first signaling and/or the second signaling is physical layer signaling.
Optionally, the granularity of the resource amount is at least one of: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
Optionally, the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
Optionally, the candidate channel resource is used for a physical uplink control channel, PUCCH, or for transmitting uplink control information, UCI; the data is data in a PUCCH channel or UCI.
According to an embodiment of the present invention, there is provided a resource determination method including: receiving a first parameter, wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the number of PRBs contained in the channel resource is the second parameter; determining the PRB index of the channel resource according to the second parameter and a preset rule; and determining the PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs.
Optionally, when the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
Optionally, the second parameter comprises at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and if the three variables are not included by the second parameter, the values of the variables not included by the second parameter are agreed with the terminal in advance.
Optionally, the predetermined rule comprises at least one of:
Figure BDA0001221121110000071
Figure BDA0001221121110000072
Figure BDA0001221121110000073
wherein PRBnum is used for representing the initial PRB index of the channel resource with the number num, num is an integer which is greater than or equal to 0, PRBall is used for representing the maximum index of PRBs in the resource to be allocated, PRBoffset is used for representing the offset relative to the minimum index of PRBs in the resource to be allocated, M is used for representing the number of parts of the channel resource to be allocated,
Figure BDA0001221121110000074
in order to get the function of the integer downwards,
Figure BDA0001221121110000075
to round up the function, round () is a rounding function and mod is a remainder operation.
Optionally, when the resource to be allocated is a partial subband of the entire system bandwidth, the PRBall is used to indicate a maximum index after renumbering all PRBs in the partial subband.
Optionally, determining the PRBs included in the channel resource according to the starting PRB index and the number of PRBs includes: in the resource to be allocated, taking the PRB corresponding to the starting PRB index as the starting point, and determining N PRBs as the PRBs included in the channel resource in the direction of increasing or decreasing the PRB index, where N is the number of PRBs.
Optionally, determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index includes: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
Optionally, the number of PRBs is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
Optionally, when the base station and the terminal always require that the channel resource includes a fixed PRB, configuring the number of PRBs in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-layer signaling, the PRB number required by the data transmission is reconfigured through the physical layer signaling, wherein the PRB number configured through the high-layer signaling is still adopted after the data transmission.
Optionally, M is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
Optionally, when the base station and the terminal always require to allocate a fixed number of channel resources, configuring M in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through the high-level signaling, reconfiguring the needed M value through the physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission.
Optionally, the method further comprises: the first parameter is received by broadcast or by convention.
Optionally, the channel resource is used for a physical uplink control channel, PUCCH, or for transmitting uplink control information, UCI.
According to an embodiment of the present invention, there is provided a parameter transmission apparatus including: a determining module, configured to determine a first specified parameter and/or a second specified parameter, where the first specified parameter is used to indicate an increased or decreased number of resources based on a predetermined candidate channel resource, or the second specified parameter is used to indicate a number of resources included in channel resources required by data transmission of a terminal; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance; and the sending module is used for sending the first specified parameter and/or the second specified parameter to the terminal through the first signaling.
Optionally, the one or more candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for the last data transmission of the terminal.
Optionally, the apparatus further comprises: the selection module is used for selecting one candidate channel resource from the configured one or more candidate channel resources as a preset candidate channel resource after one or more candidate channel resources are configured for the terminal; the sending module is further used for sending the preset candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
Optionally, the apparatus further comprises: and the determining module is used for determining the channel resources required by the data transmission of the terminal according to the preset candidate channel resources and the first specified parameters after selecting one candidate channel resource from the one or more configured candidate channel resources as the preset candidate channel resource.
According to an embodiment of the present invention, there is provided a parameter transmission apparatus including: a configuration module, configured to configure a first parameter for determining a channel resource allocated for a terminal; wherein the first parameter comprises at least one of the following three variables: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs; and the sending module is used for sending the first parameter to the terminal.
Optionally, the second parameter comprises: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the parts of the channel resource to be allocated is determined.
Optionally, the apparatus further comprises: a first determining module, configured to determine a starting physical resource block, PRB, index of a channel resource by a predetermined rule of one of:
Figure BDA0001221121110000091
Figure BDA0001221121110000092
Figure BDA0001221121110000093
wherein PRBnum is used for representing the initial PRB index of the channel resource with the number num, num is an integer which is greater than or equal to 0, PRBall is used for representing the maximum index of PRBs in the resource to be allocated, PRBoffset is used for representing the offset relative to the minimum index of PRBs in the resource to be allocated, M is used for representing the number of parts of the channel resource to be allocated,
Figure BDA0001221121110000101
in order to get the function of the integer downwards,
Figure BDA0001221121110000102
to round up the function, round () is a rounding function and mod is a remainder operation.
Optionally, the apparatus further comprises: and the second determining module is used for determining the PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs after generating the first parameter for determining the channel resources allocated to the terminal.
Optionally, the second determining module is further configured to determine, in the resource to be allocated, N PRBs as PRBs included in the channel resource in a direction in which the PRB corresponding to the starting PRB index is increased or decreased from the starting point, where N is the number of PRBs.
Optionally, the second determining module is further configured to determine, according to the number of the channel resource, a manner for determining PRBs included in the channel resource, where the manner includes: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
According to an embodiment of the present invention, there is provided a resource determination apparatus including: the receiving module is used for receiving the first specified parameters and/or the second specified parameters through the first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the predetermined candidate channel resources comprise one or more candidate channel resources which are configured by the base station for the terminal in advance; and the determining module is used for determining the channel resources required by the data transmission of the terminal according to the first specified parameters and/or the second specified parameters.
Optionally, the one or more candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
Optionally, the receiving module is further configured to receive the predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources configured for the terminal in advance, and the first signaling and the second signaling are different or the same.
According to an embodiment of the present invention, there is provided a resource determination apparatus including: a receiving module, configured to receive a first parameter, where the first parameter includes at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the number of PRBs contained in the channel resource is the second parameter; a first determining module, configured to determine, according to a second parameter and according to a predetermined rule, a PRB index of a channel resource; and the second determining module is used for determining the PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs.
Optionally, the predetermined rule comprises at least one of:
Figure BDA0001221121110000111
Figure BDA0001221121110000112
Figure BDA0001221121110000113
wherein PRBnum is used for representing the initial PRB index of the channel resource with the number of num, num is an integer greater than or equal to 0, PRBall is used for representing the maximum index of the PRB in the resource to be allocated, PRBoffset is used for representing the offset relative to the minimum index of the PRB in the resource to be allocated, M is used for representing the number of the channel resources to be allocated,
Figure BDA0001221121110000114
in order to round down the function,
Figure BDA0001221121110000115
to round up the function, round () is a rounding function and mod is a remainder operation.
According to an embodiment of the present invention, there is provided a base station including: a processor, configured to determine a first specified parameter and/or a second specified parameter, where the first specified parameter is used to indicate an increased or decreased number of resources based on a predetermined candidate channel resource, or the second specified parameter is used to indicate a number of resources included in channel resources required for data transmission by a terminal; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance; the first signaling is used for sending the first specified parameter and/or the second specified parameter to the terminal; a memory coupled to the processor.
Optionally, the one or more candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
Optionally, the processor is configured to, after configuring one or more candidate channel resources for the terminal, select one candidate channel resource from the configured one or more candidate channel resources as a predetermined candidate channel resource; and sending the predetermined candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
Optionally, the processor is further configured to determine, after selecting one candidate channel resource from the one or more configured candidate channel resources as the predetermined candidate channel resource, a channel resource required for data transmission of the terminal according to the predetermined candidate channel resource and the first specified parameter.
According to an embodiment of the present invention, there is provided a base station including: a processor configured to configure a first parameter for determining channel resources allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs; and for sending the first parameter to the terminal; a memory coupled to the processor.
Optionally, the second parameter comprises: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the parts of the channel resource to be allocated is determined.
Optionally, the processor is configured to determine a starting physical resource block, PRB, index of the channel resource by a predetermined rule of one of:
Figure BDA0001221121110000121
Figure BDA0001221121110000131
Figure BDA0001221121110000132
wherein PRBnum is used for representing the initial PRB index of the channel resource with the number of num, num is an integer greater than or equal to 0, PRBall is used for representing the maximum index of the PRB in the resource to be allocated, PRBoffset is used for representing the offset relative to the minimum index of the PRB in the resource to be allocated, M is used for representing the number of the channel resources to be allocated,
Figure BDA0001221121110000133
in order to get the function of the integer downwards,
Figure BDA0001221121110000134
to round up the function, round () is a rounding function and mod is a remainder operation.
Optionally, the processor is configured to determine, after generating a first parameter for determining a channel resource allocated for the terminal, a PRB included in the channel resource according to a starting PRB index and a PRB number.
Optionally, the processor is further configured to determine, in the resource to be allocated, N PRBs as PRBs included in the channel resource in a direction in which the PRB corresponding to the starting PRB index is increased or decreased from the starting PRB corresponding to the starting PRB index, where N is the number of PRBs.
Optionally, the processor is further configured to determine, according to the number of the channel resource, a manner for determining PRBs included in the channel resource, where the manner includes: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
According to an embodiment of the present invention, there is provided a terminal including: the processor is used for receiving the first specified parameter and/or the second specified parameter through first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station; the channel resource required by the data transmission of the terminal is determined according to the first specified parameter and/or the second specified parameter; a memory coupled to the processor.
Optionally, the one or more candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
Optionally, the processor is further configured to receive a predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources configured for the terminal in advance, and the first signaling and the second signaling are different or the same.
According to an embodiment of the present invention, there is provided a terminal including: a processor configured to receive a first parameter, wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the number of PRBs contained in the channel resource is the second parameter; a PRB index used for determining the channel resource according to a second parameter and a preset rule; the PRB used for determining the channel resource according to the starting PRB index and the number of the PRBs; a memory coupled to the processor.
Optionally, the predetermined rule comprises at least one of:
Figure BDA0001221121110000141
Figure BDA0001221121110000142
Figure BDA0001221121110000143
wherein PRBnum is used for representing the initial PRB index of the channel resource with the number num, num is an integer which is greater than or equal to 0, PRBall is used for representing the maximum index of PRBs in the resource to be allocated, PRBoffset is used for representing the offset relative to the minimum index of PRBs in the resource to be allocated, M is used for representing the number of parts of the channel resource to be allocated,
Figure BDA0001221121110000151
in order to get the function of the integer downwards,
Figure BDA0001221121110000152
to round up the function, round () is a rounding function and mod is a remainder operation.
According to still another embodiment of the present invention, there is also provided a storage medium. The storage medium is configured to store program code for performing the steps of: determining a first specified parameter and/or a second specified parameter, wherein the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance; and sending the first specified parameter and/or the second specified parameter to the terminal through first signaling.
According to still another embodiment of the present invention, there is also provided a storage medium. The storage medium is configured to store program code for performing the steps of: configuring a first parameter for determining channel resources allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs; and sending the first parameter to the terminal.
According to still another embodiment of the present invention, there is also provided a storage medium. The storage medium is configured to store program code for performing the steps of: receiving a first specified parameter and/or a second specified parameter through first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station; and determining channel resources required by the data transmission of the terminal according to the first specified parameters and/or the second specified parameters.
According to still another embodiment of the present invention, there is also provided a storage medium. The storage medium is configured to store program code for performing the steps of: receiving a first parameter, wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the number of PRBs contained in the channel resource is the second parameter; determining the PRB index of the channel resource according to the second parameter and a preset rule; and determining the PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs.
According to the invention, the first specified parameter and/or the second specified parameter are/is sent to the terminal, wherein the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, and the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal, so that the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits are changed, and the adjusted resources can be matched with the transmission bits, therefore, the problem of mismatching between the candidate resources and the transmission bits in the related technology can be solved, and the dynamic allocation of the resources is realized.
According to the invention, the first parameter for determining the channel resource allocated to the terminal is sent to the terminal, so that the terminal can determine the channel resource allocated to the terminal according to the first parameter, dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related technology can be solved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without limiting the invention. In the drawings:
fig. 1 is a first flowchart of a parameter sending method according to an embodiment of the present invention;
fig. 2 is a schematic flowchart of a parameter sending method according to an embodiment of the present invention;
fig. 3 is a block diagram of a hardware structure of a mobile terminal of a resource determination method according to an embodiment of the present invention;
fig. 4 is a first flowchart of a resource determination method according to an embodiment of the present invention;
fig. 5 is a flowchart illustrating a resource determining method according to an embodiment of the present invention;
fig. 6 is a first block diagram of a parameter sending apparatus according to an embodiment of the present invention;
fig. 7 is a block diagram of a parameter sending apparatus according to an embodiment of the present invention;
fig. 8 is a first block diagram illustrating an exemplary configuration of a resource determination apparatus according to an embodiment of the present invention;
fig. 9 is a block diagram of a second structure of a resource determination apparatus according to an embodiment of the present invention;
fig. 10 is a block diagram of a base station according to an embodiment of the present invention;
fig. 11 is a block diagram of a base station according to an embodiment of the present invention;
fig. 12 is a first block diagram of a terminal according to an embodiment of the present invention;
fig. 13 is a block diagram of a second structure of the terminal according to the embodiment of the present invention;
FIG. 14 is a diagram illustrating a resource allocation scenario provided in accordance with a preferred embodiment of the present invention;
fig. 15 is a schematic diagram of sub-band resource allocation provided according to the preferred embodiment 3 of the present invention.
Detailed Description
The invention will be described in detail hereinafter with reference to the accompanying drawings in conjunction with embodiments. It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order.
Example 1
An embodiment of the present invention provides a parameter sending method, and fig. 1 is a first flowchart illustrating the parameter sending method according to the embodiment of the present invention, and as shown in fig. 1, the method includes:
step S102, determining a first specified parameter and/or a second specified parameter, wherein the first specified parameter is used for indicating the number of the increased or decreased resources on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance;
step S104, the first designated parameter and/or the second designated parameter are/is sent to the terminal through the first signaling.
Through the above steps, since the first specified parameter and/or the second specified parameter are/is sent to the terminal, where the first specified parameter is used to indicate the number of resources that are increased or decreased based on the predetermined candidate channel resources, and the second specified parameter is used to indicate the number of resources included in the channel resources required by the terminal for data transmission, so that the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits change, and can implement matching between the adjusted resources and the transmission bits, thereby solving the problem of mismatching between the candidate resources and the transmission bits in the related art, and implementing dynamic allocation of the resources.
It should be noted that, one or more candidate channel resources of the predetermined candidate channel resources may be at least one of the following: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
The fixed number of resources may be a default value or may be set in advance according to actual conditions, but is not limited thereto.
In an embodiment of the present invention, when the step S102 is executed, the method may further include: selecting one candidate channel resource from the configured one or more candidate channel resources as a preset candidate channel resource; sending the preset candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different. That is, the predetermined candidate channel resource may be sent to the terminal by using the same signaling or different signaling as the first specified parameter and/or the second specified parameter.
It should be noted that, after selecting one candidate channel resource from the one or more configured candidate channel resources as the predetermined candidate channel resource, the method may further include: the channel resources for receiving the terminal data are determined from the predetermined candidate channel resources and the first specified parameter.
It should be noted that the first signaling and/or the second signaling are physical layer signaling, and the physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that the granularity of the resource quantity may be at least one of the following: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
It should be noted that the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with PRBs of the predetermined candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are consecutive, the number of PRBs that increase or decrease from the predetermined candidate channel resources is consecutive to the number of PRBs of the predetermined candidate channel resources; under the condition that PRBs contained in the preset candidate channel resources are discrete, PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
It should be noted that, the candidate channel resources are used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI; the data is data in a PUCCH or UCI.
It should be noted that the main body for executing the above steps may be a base station, but is not limited thereto.
Example 2
An embodiment of the present invention provides a parameter sending method, and fig. 2 is a flowchart illustrating a second method for sending parameters according to an embodiment of the present invention, where as shown in fig. 2, the method includes:
step S202, configuring a first parameter for determining channel resources allocated to a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs;
and step S204, sending the first parameter to the terminal.
Through the steps, since the first parameter for determining the channel resource allocated to the terminal is sent to the terminal, the terminal can determine the channel resource allocated to the terminal according to the first parameter, dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related art can also be solved.
It should be noted that, when the first parameter includes the number of PRBs, the second parameter is predetermined with the terminal; and under the condition that the first parameter comprises a second parameter, the number of PRBs is predetermined with the terminal.
It should be noted that the second parameter or the number of PRBs is predetermined with the terminal, and may be expressed as that the second parameter or the number of PRBs is a fixed value, and it is not necessary to transmit the second parameter or the number of PRBs to the terminal.
It should be noted that the second parameter includes at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
It should be noted that the offset with respect to the minimum index of the PRB in the resource to be allocated may be equal to the offset with respect to the PRB boundary of the resource to be allocated, but is not limited thereto.
It should be noted that, the starting physical resource block PRB index of the channel resource may be determined by one of the following predetermined rules:
Figure BDA0001221121110000201
Figure BDA0001221121110000202
Figure BDA0001221121110000203
wherein PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB among resources to be allocated, M for indicating the number of parts of channel resources that need to be allocated,
Figure BDA0001221121110000204
in order to get the function of the integer downwards,
Figure BDA0001221121110000205
to round up the function, round () is a rounding function and mod is a remainder operation.
In an embodiment of the present invention, after the step S202, the method may further include: and determining the PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs. Therefore, the channel resources used by the terminal for transmitting the data can be conveniently obtained, and the data transmitted by the terminal can be better received.
It should be noted that, determining the PRBs included in the channel resource according to the starting PRB index and the number of PRBs may be represented as: in the resource to be allocated, taking the PRB corresponding to the starting PRB index as the starting point, and determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index, where N is the number of PRBs.
It should be noted that, the determination of N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index may be represented as follows, but is not limited to this: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
It should be noted that, when the resource to be allocated is a partial subband of the entire system bandwidth, the PRBallFor indicating the maximum index after renumbering of all PRBs within the partial sub-band.
In one embodiment of the present invention, the number of PRBs may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling. It should be noted that the physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that, when the base station and the terminal always require that the channel resource includes a fixed PRB, the number of PRBs is configured in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through the physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
In one embodiment of the present invention, M may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require to allocate a fixed number of channel resources, M is configured in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through the high-level signaling, reconfiguring the needed M value through the physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission.
Note that, when multiple channel resources are allocated, the PRB-specific resources are allocatedoffsetAre configured in order from small to large. Note that in small PRBsoffsetThe PRB can only be increased when the corresponding resources can no longer be allocated to more terminalsoffsetAllocation continues, but is not limited thereto.
In an embodiment of the present invention, the step S204 may be represented as: and sending the first parameters to the terminal in a broadcasting or appointed mode.
It should be noted that the channel resource may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI, but is not limited thereto.
It should be noted that the main body for executing the above steps may be a base station, but is not limited thereto.
Example 3
The method provided by embodiment 3 of the present application may be executed in a mobile terminal, a computer terminal, or a similar computing device. Taking the example of the method running on the mobile terminal, fig. 3 is a hardware structure block diagram of the mobile terminal of the resource determination method according to the embodiment of the present invention. As shown in fig. 3, the mobile terminal 30 may include one or more (only one shown) processors 302 (the processors 302 may include, but are not limited to, a processing device such as a microprocessor MCU or a programmable logic device FPGA, etc.), a memory 304 for storing data, and a transmitting device 306 for communication functions. It will be understood by those skilled in the art that the structure shown in fig. 3 is only an illustration and is not intended to limit the structure of the electronic device. For example, the mobile terminal 30 may also include more or fewer components than shown in FIG. 3, or have a different configuration than shown in FIG. 3.
The memory 304 may be used to store software programs and modules of application software, such as program instructions/modules corresponding to the resource determination method in the embodiment of the present invention, and the processor 302 executes various functional applications and data processing by executing the software programs and modules stored in the memory 304, so as to implement the above-mentioned method. The memory 304 may include high-speed random access memory, and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 304 may further include memory located remotely from the processor 302, which may be connected to the mobile terminal 30 via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The transmission device 306 is used for receiving or sending data via a network. Specific examples of the network described above may include a wireless network provided by a communication provider of the mobile terminal 30. In one example, the transmission device 306 includes a Network Interface Controller (NIC) that can be connected to other Network devices through a base station to communicate with the internet. In one example, the transmission device 306 can be a Radio Frequency (RF) module, which is used for communicating with the internet in a wireless manner.
In this embodiment, a resource determining method operating in the mobile terminal is provided, and fig. 4 is a first flowchart of the resource determining method according to the embodiment of the present invention, as shown in fig. 4, the method includes:
step S402, receiving a first specified parameter and/or a second specified parameter through a first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station;
step S404, determining the channel resource needed by the terminal data transmission according to the first specified parameter and/or the second specified parameter.
Through the above steps, by receiving a first specified parameter and/or a second specified parameter, where the first specified parameter is used to indicate the number of resources that are increased or decreased based on the predetermined candidate channel resources, and the second specified parameter is used to indicate the number of resources included in the channel resources required by the terminal for data transmission, so that the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits change, and can implement matching between the adjusted resources and the transmission bits, therefore, the problem of mismatching between the candidate resources and the transmission bits in the related art can be solved, and dynamic allocation of the resources is implemented.
It should be noted that, one or more candidate channel resources of the predetermined candidate channel resources may be at least one of the following: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
In an embodiment of the present invention, the method may further include: receiving a predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources configured for the terminal in advance, and the first signaling and the second signaling are different or the same.
It should be noted that the first signaling and/or the second signaling are physical layer signaling. The physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that the granularity of the resource quantity may be at least one of the following: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
It should be noted that the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, the PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with the specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
It should be noted that the candidate channel resources may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI; the data is data in a PUCCH channel or UCI, but is not limited thereto.
It should be noted that, the executing subject of the above steps may be a terminal, such as a mobile terminal, a computer terminal, but is not limited thereto.
Example 4
An embodiment of the present invention further provides a resource determining method applied to the terminal shown in fig. 3, where fig. 5 is a second flowchart of the resource determining method provided in the embodiment of the present invention, and as shown in fig. 5, the method includes:
step S502, receiving a first parameter, wherein the first parameter includes at least one of: a second parameter used for determining the starting physical resource block PRB index of the channel resource distributed for the terminal, wherein the channel resource comprises the number of PRBs; determining the PRB index of the channel resource according to the second parameter and a preset rule;
step S504, determining PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs.
Through the steps, the terminal can determine the channel resource allocated to the terminal according to the first parameter by receiving the first parameter for determining the channel resource allocated to the terminal, so that dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related art can also be solved.
It should be noted that, when the first parameter includes the number of PRBs, the second parameter is predetermined with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
It should be noted that the second parameter includes at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
It should be noted that the offset with respect to the minimum index of the PRB in the resource to be allocated may be equal to the offset with respect to the PRB boundary of the resource to be allocated, but is not limited thereto.
It should be noted that the predetermined rule includes at least one of the following:
Figure BDA0001221121110000251
Figure BDA0001221121110000261
Figure BDA0001221121110000262
wherein PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB among resources to be allocated, M for indicating the number of parts of channel resources that need to be allocated,
Figure BDA0001221121110000263
in order to round down the function,
Figure BDA0001221121110000264
to round up the function, round () is a rounding function and mod is a remainder operation.
In one embodiment of the invention, the PRB is a partial sub-band of the whole system bandwidth when the resource to be allocated is a partial sub-bandallFor indicating the maximum index after renumbering of all PRBs within the partial sub-band.
In one embodiment of the present invention, determining the PRBs contained in the channel resource according to the starting PRB index and the number of PRBs includes: in the resource to be allocated, taking the PRB corresponding to the starting PRB index as the starting point, and determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index, where N is the number of PRBs.
It should be noted that, determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index may be represented as: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
In one embodiment of the present invention, the number of PRBs is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require that the channel resource includes a fixed PRB, the number of PRBs is configured in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through the physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
In one embodiment of the present invention, M may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require to allocate a fixed number of channel resources, M is configured in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through a high-level signaling, reconfiguring the value of M required at this time through a physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
In an embodiment of the present invention, the method may further include: the first parameter is received by broadcast or by convention.
It should be noted that the channel resources may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI, but are not limited thereto.
It should be noted that the executing subject of the above steps may be a terminal, such as a computer terminal, a mobile terminal, etc., but is not limited thereto.
Through the description of the foregoing embodiments, it is clear to those skilled in the art that the method according to the foregoing embodiments may be implemented by software plus a necessary general hardware platform, and certainly may also be implemented by hardware, but the former is a better implementation mode in many cases. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., ROM/RAM, magnetic disk, optical disk) and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, or a network device) to execute the method according to the embodiments of the present invention.
Example 5
An embodiment of the present invention provides a parameter sending apparatus, and fig. 6 is a first structural block diagram of the parameter sending apparatus provided in the embodiment of the present invention, as shown in fig. 6, the apparatus includes:
a determining module 62, configured to determine a first specified parameter and/or a second specified parameter, where the first specified parameter is used to indicate an increased or decreased number of resources based on a predetermined candidate channel resource, or the second specified parameter is used to indicate a number of resources included in channel resources required by terminal data transmission; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance;
a sending module 64, connected to the determining module 62, for sending the first specified parameter and/or the second specified parameter to the terminal through the first signaling.
By the device, the first specified parameter and/or the second specified parameter are/is sent to the terminal, wherein the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, and the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal, so that the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits change, and can realize the matching of the adjusted resources and the transmission bits, thereby solving the problem of mismatching between the candidate resources and the transmission bits in the related technology and realizing the dynamic allocation of the resources.
It should be noted that, one or more candidate channel resources of the predetermined candidate channel resources may be at least one of the following: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for the last data transmission of the terminal.
The fixed number of resources may be a default value or may be set in advance in accordance with actual circumstances, but is not limited thereto.
In an embodiment of the present invention, the apparatus may further include: a selecting module, connected to the sending module 64, for selecting one candidate channel resource from the configured one or more candidate channel resources as a predetermined candidate channel resource; the sending module 64 may be further configured to send the predetermined candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
In an embodiment of the present invention, the apparatus may further include: and the determining module is connected with the selecting module and is used for determining the channel resource for receiving the terminal data according to the preset candidate channel resource and the first specified parameter after selecting one candidate channel resource from the one or more configured candidate channel resources as the preset candidate channel resource.
It should be noted that the first signaling and/or the second signaling are physical layer signaling, and the physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that the granularity of the resource quantity may be at least one of the following: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
It should be noted that the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
It should be noted that, the candidate channel resources are used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI; the data is data in a PUCCH or UCI.
It should be noted that the above-mentioned apparatus may be located in a base station, but is not limited thereto.
It should be noted that, the above modules may be implemented by software or hardware, and for the latter, the following may be implemented, but not limited to: the modules are all positioned in the same processor; alternatively, the modules are located in different processors in any combination.
Example 6
An embodiment of the present invention provides a parameter sending apparatus, and fig. 7 is a block diagram of a structure of the parameter sending apparatus according to the embodiment of the present invention, as shown in fig. 7, the apparatus includes:
a configuration module 72, configured to configure a first parameter for determining a channel resource allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs;
a sending module 74, connected to the configuration module 72, for sending the first parameter to the terminal.
By the device, the first parameter for determining the channel resource allocated to the terminal is sent to the terminal, so that the terminal can determine the channel resource allocated to the terminal according to the first parameter, dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related art can be solved.
It should be noted that, when the first parameter includes the number of PRBs, the second parameter is predetermined with the terminal; and under the condition that the first parameter comprises a second parameter, the number of PRBs is predetermined with the terminal.
It should be noted that the second parameter or the number of PRBs is predetermined with the terminal, and may be expressed as that the second parameter or the number of PRBs is a fixed value, and it is not necessary to transmit the second parameter or the number of PRBs to the terminal.
It should be noted that the second parameter includes at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
It should be noted that the offset with respect to the minimum index of the PRB in the resource to be allocated may be equal to the offset with respect to the PRB boundary of the resource to be allocated, but is not limited thereto.
In an embodiment of the present invention, the apparatus may further include: a first determining module, connected to the configuring module 72, configured to determine a starting physical resource block PRB index of the channel resource according to a predetermined rule selected from:
Figure BDA0001221121110000301
Figure BDA0001221121110000311
Figure BDA0001221121110000312
wherein PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB among resources to be allocated, M for indicating the number of parts of channel resources that need to be allocated,
Figure BDA0001221121110000313
in order to get the function of the integer downwards,
Figure BDA0001221121110000314
to round up the function, round () is a rounding function and mod is a remainder operation.
In an embodiment of the present invention, the apparatus may further include: and a second determining module, connected to the configuring module 72, configured to determine, after generating the first parameter for determining the channel resource allocated to the terminal, the PRB included in the channel resource according to the starting PRB index and the PRB number.
It should be noted that the second determining module may be further configured to determine, in the to-be-allocated resource, N PRBs as PRBs included in the channel resource in a direction in which the PRB corresponding to the starting PRB index is increased or decreased from the starting PRB index, where N is the number of PRBs.
It should be noted that the second determining module may be further configured to determine, according to the number of the channel resource, a manner for determining a PRB included in the channel resource, where the manner includes: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
It should be noted that, determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index may be represented as the following manner, but is not limited to this: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
It should be noted that, when the resource to be allocated is a partial subband of the entire system bandwidth, the PRBallFor indicating the maximum index after renumbering of all PRBs within the partial sub-band.
In one embodiment of the present invention, the number of PRBs may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling. It should be noted that the physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that, when the base station and the terminal always require that the channel resource includes a fixed PRB, the number of PRBs is configured in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through the physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
In one embodiment of the present invention, M may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require to allocate a fixed number of channel resources, M is configured in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through a high-level signaling, reconfiguring the value of M required at this time through a physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
Note that, when multiple channel resources are allocated, the PRB-specific resources are allocatedoffsetAre configured in order from small to large. Note that in small PRBsoffsetThe PRB can only be increased when the corresponding resources can no longer be allocated to more terminalsoffsetAllocation continues, but is not limited thereto.
In an embodiment of the present invention, the sending module 74 is further configured to send the first parameter to the terminal through broadcasting or via a predetermined manner.
It should be noted that the channel resource may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI, but is not limited thereto.
It should be noted that the above-mentioned apparatus may be located in a base station, but is not limited thereto.
It should be noted that, the above modules may be implemented by software or hardware, and for the latter, the following may be implemented, but not limited to: the modules are all positioned in the same processor; alternatively, the modules are respectively located in different processors in any combination.
Example 7
In an embodiment of the present invention, a resource determining apparatus is further provided, and fig. 8 is a first structural block diagram of the resource determining apparatus provided in the embodiment of the present invention, as shown in fig. 8, the apparatus includes:
a receiving module 82, configured to receive the first specified parameter and/or the second specified parameter through the first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station;
a determining module 84, connected to the receiving module 82, for determining channel resources required for data transmission of the terminal according to the first specified parameter and/or the second specified parameter.
By the device, the first specified parameter and/or the second specified parameter are received, wherein the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, and the second specified parameter is used for indicating the number of resources contained in the channel resources required by the terminal data transmission, so that the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits change, and can realize the matching of the adjusted resources and the transmission bits, therefore, the problem of mismatching between the candidate resources and the transmission bits in the related art can be solved, and the dynamic allocation of the resources is realized.
It should be noted that, one or more candidate channel resources of the predetermined candidate channel resources may be at least one of the following: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for the last data transmission of the terminal.
In an embodiment of the present invention, the receiving module 82 may be further configured to receive a predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources configured for the terminal in advance, and the first signaling and the second signaling are different or the same.
It should be noted that the first signaling and/or the second signaling are physical layer signaling. The physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that the granularity of the resource amount may be at least one of the following: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
It should be noted that the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with the PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
It should be noted that the candidate channel resource may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI; the data is data in a PUCCH channel or UCI, but is not limited thereto.
It should be noted that the above-mentioned apparatus may be located in a terminal, such as a mobile terminal, a computer terminal, but is not limited thereto.
It should be noted that, the above modules may be implemented by software or hardware, and for the latter, the following may be implemented, but not limited to: the modules are all positioned in the same processor; alternatively, the modules are respectively located in different processors in any combination.
Example 8
In an embodiment of the present invention, a resource determining apparatus is further provided, and fig. 9 is a block diagram of a structure of the resource determining apparatus provided in the embodiment of the present invention, as shown in fig. 9, the apparatus includes:
a receiving module 92, configured to receive a first parameter, where the first parameter includes at least one of: a second parameter used for determining the starting physical resource block PRB index of the channel resource distributed for the terminal, wherein the channel resource comprises the number of PRBs;
a first determining module 94, connected to the receiving module 92, for determining a PRB index of the channel resource according to a predetermined rule according to the second parameter;
a second determining module 96, connected to the first determining module 94, for determining the PRBs included in the channel resource according to the starting PRB index and the number of the PRBs.
By the device, the terminal can determine the channel resource allocated to the terminal according to the first parameter by receiving the first parameter for determining the channel resource allocated to the terminal, so that dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related art can also be solved.
It should be noted that, when the first parameter includes the number of PRBs, the second parameter is predetermined with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
It should be noted that the second parameter includes at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
It should be noted that, the offset with respect to the minimum index of the PRB in the resource to be allocated may be the same as the offset with respect to the PRB boundary of the resource to be allocated, but is not limited thereto.
It should be noted that the predetermined rule may include at least one of the following:
Figure BDA0001221121110000351
Figure BDA0001221121110000361
Figure BDA0001221121110000362
wherein PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB among resources to be allocated, M for indicating the number of parts of channel resources that need to be allocated,
Figure BDA0001221121110000363
in order to round down the function,
Figure BDA0001221121110000364
to round up the function, round () is a rounding function and mod is a remainder operation.
In one embodiment of the invention, the PRB is a partial subband of the entire system bandwidth when the resource to be allocated is a partial subbandallFor indicating the maximum index after renumbering of all PRBs within the partial sub-band.
In one embodiment of the present invention, determining the PRBs contained in the channel resource according to the starting PRB index and the number of PRBs includes: in the resource to be allocated, taking the PRB corresponding to the starting PRB index as the starting point, and determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index, where N is the number of PRBs.
It should be noted that, determining N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index may be represented as: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
In one embodiment of the invention, the number of PRBs is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require that the channel resource includes a fixed PRB, the number of PRBs is configured in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through the physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
In one embodiment of the present invention, M may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require to allocate a fixed number of channel resources, M is configured in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through a high-level signaling, reconfiguring the value of M required at this time through a physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
In an embodiment of the present invention, the method may further include: the first parameter is received by broadcast or by convention.
It should be noted that the channel resources may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI, but are not limited thereto.
It should be noted that the above-mentioned apparatus may be located in a terminal, such as a computer terminal, a mobile terminal, etc., but is not limited thereto.
It should be noted that, the above modules may be implemented by software or hardware, and for the latter, the following may be implemented, but not limited to: the modules are all positioned in the same processor; alternatively, the modules are respectively located in different processors in any combination.
Example 9
An embodiment of the present invention provides a base station, and fig. 10 is a first structural block diagram of the base station provided in the embodiment of the present invention, as shown in fig. 10, including:
a processor 1002, configured to determine a first specified parameter and/or a second specified parameter, where the first specified parameter is used to indicate an increased or decreased number of resources based on a predetermined candidate channel resource, or the second specified parameter is used to indicate a number of resources included in a channel resource required by terminal data transmission; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance; the first signaling is used for sending the first specified parameter and/or the second specified parameter to the terminal;
the memory 1004 is coupled to the processor 1002.
Through the base station, the first specified parameter and/or the second specified parameter are/is sent to the terminal, wherein the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, and the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal, so that the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits change, and can realize the matching of the adjusted resources and the transmission bits, thereby solving the problem of mismatching between the candidate resources and the transmission bits in the related technology and realizing the dynamic allocation of the resources.
It should be noted that, one or more candidate channel resources of the predetermined candidate channel resources may be at least one of the following: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
The fixed number of resources may be a default value or may be set in advance in accordance with actual circumstances, but is not limited thereto.
In an embodiment of the present invention, the processor 1002 is configured to select one candidate channel resource from the configured one or more candidate channel resources as a predetermined candidate channel resource; and sending the predetermined candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
In an embodiment of the present invention, the processor 1002 may be further configured to determine, after selecting one candidate channel resource from the one or more configured candidate channel resources as the predetermined candidate channel resource, a channel resource for receiving terminal data according to the predetermined candidate channel resource and the first specified parameter.
It should be noted that the first signaling and/or the second signaling are physical layer signaling, and the physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that the granularity of the resource amount may be at least one of the following: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
It should be noted that the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, the PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with the specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
It should be noted that, the candidate channel resources are used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI; the data is data in a PUCCH or UCI.
Example 10
An embodiment of the present invention provides a base station, and fig. 11 is a block diagram of a structure of a base station provided according to an embodiment of the present invention, as shown in fig. 11, including:
a processor 1102 configured to configure a first parameter for determining channel resources allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs; and for sending the first parameter to the terminal;
a memory 1104 is coupled to the processor 1102.
By the base station, the first parameter for determining the channel resource allocated to the terminal is sent to the terminal, so that the terminal can determine the channel resource allocated to the terminal according to the first parameter, dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related art can be solved.
It should be noted that, when the first parameter includes the number of PRBs, the second parameter is predetermined with the terminal; and under the condition that the first parameter comprises a second parameter, the number of PRBs is predetermined with the terminal.
It should be noted that the second parameter or the number of PRBs is predetermined with the terminal, and may be expressed as that the second parameter or the number of PRBs is a fixed value, and it is not necessary to transmit the second parameter or the number of PRBs to the terminal.
It should be noted that the second parameter includes at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and if the three variables are not included by the second parameter, the values of the variables not included by the second parameter are agreed with the terminal in advance.
It should be noted that the offset with respect to the minimum index of the PRB in the resource to be allocated may be equal to the offset with respect to the PRB boundary of the resource to be allocated, but is not limited thereto.
In an embodiment of the present invention, the processor 1102 is configured to determine a starting physical resource block PRB index of a channel resource according to a predetermined rule selected from one of the following:
Figure BDA0001221121110000401
Figure BDA0001221121110000402
Figure BDA0001221121110000403
wherein PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffset is used to indicate the offset with respect to the smallest index of the PRB in the resource to be allocated, M is used to indicate the number of parts of the channel resource that need to be allocated,
Figure BDA0001221121110000411
in order to get the function of the integer downwards,
Figure BDA0001221121110000412
to round up the function, round () is a rounding function and mod is a remainder operation.
In an embodiment of the present invention, the processor 1102 is configured to determine PRBs included in the channel resources according to the starting PRB index and the number of PRBs after generating the first parameter for determining the channel resources allocated for the terminal.
It should be noted that, the processor 1102 may be further configured to determine, in the resource to be allocated, N PRBs as PRBs included in the channel resource in a direction of increasing or decreasing the PRB index from the PRB corresponding to the starting PRB index as a starting point, where N is the number of PRBs.
It should be noted that the processor 1102 may be further configured to determine, according to the number of the channel resource, a manner for determining the PRB included in the channel resource, where the manner includes: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
It should be noted that, the determination of N PRBs as PRBs included in the channel resource in the direction of increasing or decreasing the PRB index may be represented as follows, but is not limited to this: determining a mode for determining PRBs contained in the channel resources according to the numbers of the channel resources, wherein the mode comprises the following steps: determining according to the direction of increasing the PRB index and determining according to the direction of decreasing the PRB index; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
It should be noted that, when the resource to be allocated is a partial subband of the entire system bandwidth, the PRBallFor indicating the maximum index after renumbering of all PRBs within the partial sub-band.
In one embodiment of the present invention, the number of PRBs may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling. It should be noted that the physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that, when the base station and the terminal always require that the channel resource includes a fixed PRB, the number of PRBs is configured in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through the physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
In one embodiment of the present invention, M may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require to allocate a fixed number of channel resources, M is configured in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through a high-level signaling, reconfiguring the value of M required at this time through a physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
Note that, when multiple channel resources are allocated, the PRB-specific resources are allocatedoffsetAre configured in order from small to large. Note that in small PRBsoffsetThe PRB can only be increased when the corresponding resources can no longer be allocated to more terminalsoffsetAllocation continues, but is not limited thereto.
In an embodiment of the present invention, the processor 1102 may be further configured to send the first parameter to the terminal by broadcasting or by a predetermined method.
It should be noted that the channel resource may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI, but is not limited thereto.
Example 11
An embodiment of the present invention provides a terminal, and fig. 12 is a first structural block diagram of the terminal provided in the embodiment of the present invention, as shown in fig. 12, including:
a processor 1202 configured to receive a first specified parameter and/or a second specified parameter through a first signaling; the first specified parameter is used for indicating the number of the resources which are increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station; the channel resource required by the data transmission of the terminal is determined according to the first specified parameter and/or the second specified parameter;
a memory 1204 is coupled to the processor 1202.
Through the terminal, as the first specified parameter and/or the second specified parameter are received, wherein the first specified parameter is used for indicating the number of the resources increased or decreased on the basis of the preset candidate channel resources, and the second specified parameter is used for indicating the number of the resources contained in the channel resources required by the data transmission of the terminal, the terminal can adjust the resources according to the first specified parameter and/or the second specified parameter when the transmission bits are changed, and can realize the matching of the adjusted resources and the transmission bits, the problem of the mismatching between the candidate resources and the transmission bits in the related art can be solved, and the dynamic allocation of the resources is realized.
It should be noted that, one or more candidate channel resources of the predetermined candidate channel resources may be at least one of the following: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission of the terminal.
In an embodiment of the present invention, the processor 1202 may be further configured to receive a predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources configured for the terminal in advance, and the first signaling and the second signaling are different or the same.
It should be noted that the first signaling and/or the second signaling are physical layer signaling. The physical layer signaling may be downlink control information DCI, but is not limited thereto.
It should be noted that the granularity of the resource quantity may be at least one of the following: physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
It should be noted that the increased or decreased number of resources satisfies at least one of the following conditions: when PRBs contained in the predetermined candidate channel resources are continuous, PRBs increased or decreased on the basis of the predetermined candidate channel resources are continuous with PRBs of the predetermined candidate channel resources; when the numbers of the PRBs included in the predetermined candidate channel resource are consecutive, the number of the PRBs that increase or decrease from the predetermined candidate channel resource is consecutive to the number of the PRBs of the predetermined candidate channel resource; under the condition that PRBs contained in the preset candidate channel resources are discrete, PRBs increased or decreased on the basis of the preset candidate channel resources are continuous with specified PRBs in the preset candidate channel resources; when the numbers of PRBs included in the predetermined candidate channel resources are discrete, the numbers of PRBs that increase or decrease from the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
It should be noted that the candidate channel resources may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI; the data is data in a PUCCH channel or UCI, but is not limited thereto.
Example 12
An embodiment of the present invention provides a terminal, and fig. 13 is a block diagram of a structure of the terminal provided according to the embodiment of the present invention, as shown in fig. 13, including:
a processor 1302 configured to receive a first parameter, wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the number of PRBs contained in the channel resource is the second parameter; a PRB index used for determining the channel resource according to a second parameter and a preset rule; the PRB used for determining the channel resource according to the starting PRB index and the number of the PRBs;
the memory 1304 is coupled to the processor 1302.
By the terminal, the terminal can determine the channel resource allocated to the terminal according to the first parameter by receiving the first parameter for determining the channel resource allocated to the terminal, so that dynamic allocation of the resource can be realized, and the problem of mismatching between the candidate resource and the transmission bit in the related art can also be solved.
It should be noted that, when the first parameter includes the number of PRBs, the second parameter is predetermined with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
It should be noted that the second parameter includes at least one of the following three variables: the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
It should be noted that the offset with respect to the minimum index of the PRB in the resource to be allocated may be equal to the offset with respect to the PRB boundary of the resource to be allocated, but is not limited thereto.
Optionally, the predetermined rule includes at least one of:
Figure BDA0001221121110000451
Figure BDA0001221121110000452
Figure BDA0001221121110000453
wherein PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB among resources to be allocated, M for indicating the number of parts of channel resources that need to be allocated,
Figure BDA0001221121110000454
in order to round down the function,
Figure BDA0001221121110000455
to round up the function, round () is a rounding function and mod is a remainder operation.
In one embodiment of the invention, the PRB is a partial sub-band of the whole system bandwidth when the resource to be allocated is a partial sub-bandallFor indicating the maximum index after renumbering of all PRBs within the partial sub-band.
In an embodiment of the present invention, the processor 1302 may be further configured to determine, in the resource to be allocated, N PRBs as PRBs included in the channel resource in a direction of increasing or decreasing the PRB index from the PRB corresponding to the starting PRB index as a starting point, where N is the number of PRBs.
It should be noted that the processor 1302 may be further configured to determine, according to the number of the channel resource, a manner for determining the PRB included in the channel resource, where the manner includes: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, the PRB contained in the channel resource is determined according to the increasing direction of the PRB index, and when the number of the channel resource is an even number, the PRB contained in the channel resource is determined according to the decreasing direction of the PRB index.
In one embodiment of the present invention, the number of PRBs is configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require that the channel resource includes a fixed PRB, the number of PRBs is configured in a predetermined manner; when the base station and the terminal require the PRB contained in the channel resource to change, the number of the PRB is configured through high-level signaling; after the PRB number is configured through the high-layer signaling, the PRB number required by the data transmission is reconfigured through the physical layer signaling, wherein the PRB number configured through the high-layer signaling is still adopted after the data transmission.
In one embodiment of the present invention, M may be configured by at least one of the following signaling: pre-agreed, high-level signaling, physical layer signaling.
It should be noted that, when the base station and the terminal always require to allocate a fixed number of channel resources, M is configured in a predetermined manner; when the number of the resource required to be allocated by the base station and the terminal changes, configuring M through a high-level signaling; after configuring M through a high-level signaling, reconfiguring the value of M required at this time through a physical layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
In an embodiment of the present invention, the processor 1302 further receives the first parameter through broadcasting or a default manner.
It should be noted that the channel resources may be used for a physical uplink control channel PUCCH or for transmitting uplink control information UCI, but are not limited thereto.
Example 13
The embodiment of the invention also provides a storage medium. Alternatively, in the present embodiment, the above-mentioned storage medium may be configured to store program codes for executing the steps of any of the methods in embodiments 1 to 4.
Optionally, in this embodiment, the storage medium may include, but is not limited to: a U-disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic or optical disk, and other various media capable of storing program codes.
Alternatively, in the present embodiment, the processor executes the steps of any of the methods in embodiments 1 to 4 according to program codes already stored in the storage medium.
Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments and optional implementation manners, and this embodiment is not described herein again.
For a better understanding of the embodiments of the present invention, the present invention is further explained below with reference to preferred embodiments.
The technical problems to be solved by the preferred embodiment of the invention are as follows: in the NR system, a preferable PRB resource allocation method is provided, and the method can allocate candidate PUCCH resources for the UE and can also be used for other aspects of PRB resource allocation.
The preferred embodiment of the present invention provides a method for dynamically changing resource allocation, which acts on a sending end, and includes:
1. after the base station configures one or more candidate PUCCH resources for the UE through high-level signaling, the base station can describe the number of the resources increased or decreased based on the previously configured candidate PUCCH resources by introducing parameters, and sends the parameters to the UE. Note that the candidate PUCCH resources configured in the foregoing manner correspond to predetermined candidate channel resources in the foregoing embodiment.
2. Based on 1, the increasing or decreasing the number of resources, when the base station indicates a specifically used PUCCH resource (corresponding to one candidate channel resource selected from one or more configured candidate channel resources in the above embodiment) from the allocated candidate PUCCH resources for the UE, the base station simultaneously or separately transmits the parameter (corresponding to the same or different first signaling and second signaling), indicating the increased or decreased number of resources for the specifically used PUCCH resource.
3. Based on 2, a PUCCH resource specifically used and an increased number of resources are indicated through physical layer signaling. For example using DCI.
4. Based on 1, the number of resources is increased or decreased, and the base station sends the parameter to indicate that the number of resources is increased or decreased in the candidate PUCCH resources allocated to the UE.
5. Based on 1, the granularity of the increased or decreased resource quantity is calculated by PRB, or calculated by the number of OFDM symbols, or calculated by subcarriers, or is described by adopting the granularity of 2 or more.
6. The increased or decreased number of resources, the rule of which is increased or decreased, is agreed in advance based on 1 or 5. Including but not limited to one of the following:
the PRBs increased or decreased for each candidate PUCCH resource remain contiguous with the PRBs to which each candidate PUCCH resource was originally allocated.
When each candidate PUCCH resource is discrete, PRBs are increased or decreased and are respectively continuous on the basis of the original discrete candidate PUCCH resources.
The preferred embodiment of the present invention further provides a method for dynamically changing resource allocation, which acts on a receiving end, and includes:
the UE receives one or more candidate PUCCH resources configured by the high-level signaling of the base station, then receives the PUCCH resources specifically used and indicated for the UE from the candidate PUCCH resources by the base station through the physical layer signaling, and the UE simultaneously or respectively receives the resource quantity increased or decreased based on the previously configured candidate PUCCH resources sent by the base station.
The other weights are the sender inverse process.
The preferred embodiment of the present invention further provides a method and an apparatus for resource allocation and use, which can act on a sending end, and include:
the base station performs resource allocation according to the following parameters and the agreed rule.
Wherein the parameters include:
PRBalldescription of the total PRB number maximum index to be allocated (equivalent to the PRB in the above-described embodiment)all)。
PRBoffsetThe offset amount with respect to the boundary of the total PRB (equivalent to the PRB in the above-described embodiment) is describedoffset)。
M, describing how many resources (corresponding to M in the above embodiment) need to be allocated.
PRBnumStarting PRB index for each resource allocated (corresponding to PRB in the above-described embodiment)num). num is the number of each resource.
Q, the total number of PRBs per resource (corresponding to the number of PRBs included in the channel resource in the above embodiment).
Wherein, the rule of engagement includes:
Figure BDA0001221121110000491
PRBnumafter being calculated, Q PRBs are calculated according to a rule as the PRBs contained in each resource.
2. Based on 1, the PRBallWhen the resource to be allocated is a partial sub-band of the entire system bandwidth, the PRBallThe maximum index after renumbering all PRBs within the partial subband.
3. Based on the number of the bits in 1,q is the number of PRBs contained in each resource according to the PRBsnumAnd the corresponding PRB calculates the PRB contained in each resource towards the direction of increasing or decreasing the index.
4. Based on 1, in the equation
Figure BDA0001221121110000492
The principle of rounding up or rounding down can also be adopted.
5. Based on 1, the base station configures the value of Q and sends the value to UE through high-level signaling or physical layer signaling;
or, when the base station and the UE always require each resource to include a fixed PRB, then the Q value is agreed in advance;
or, when the base station and the UE require that the number of PRBs included in each resource is changed, the Q value is configured through a high layer signaling.
Or, the high-level signaling configures the Q value, but the base station can send the physical-level signaling reconfiguration Q value to be valid at the time, and then the Q value configured by the high-level signaling is still considered to be valid.
6. Based on 1, the Q, the base station and the UE agree on the directionality of the Q, namely when the number num of each resource is an odd number, the Q calculates the PRBs contained in each resource in the direction of increasing the PRB index; when the number num is even, Q calculates PRBs included in each resource in a direction in which the PRB index decreases.
7. Based on 1, the base station configures the value of M and sends the value to UE through high-level signaling or physical layer signaling;
or, when the base station and the UE always require to allocate a fixed number of resources, the value of M is agreed in advance;
or when the number of the resource required by the base station and the UE is changed, the M value is configured through a high-level signaling;
or, the higher layer signaling configures the M value, but the base station can send the physical layer signaling reconfiguration M value to be valid at the time, and then the M value configured by the higher layer signaling is still considered to be valid.
8. Based on 1, when the base station allocates resources for the UE, the base station always preferentially configures PRBoffset from small to large. For example, PRBoffset is increased when the resource allocation corresponding to a certain small PRBoffset cannot be reallocated to more UEs.
9. Based on 1, the base station broadcasts or appoints one or more of the parameters in 1 to the UE, so that the UE knows which PRBs in the system have been allocated.
The embodiment of the invention also provides a resource allocation and use method and a device, which can act on a receiving end and comprise the following steps:
and the UE receives the parameters sent by the base station and obtains the allocated resources according to the use rules of the parameters.
The parameters received by the UE include one or more of the following, and the parameters that are not transmitted need to be agreed or implied in advance:
PRBallthe total PRB number maximum index to be allocated is described.
PRBoffsetThe offset with respect to the boundary of the total PRB is described.
M, describing how many resources need to be allocated.
PRBnumThe starting PRB index of each resource allocated. num is the number of each resource.
Q, total number of PRBs per resource.
Wherein the rule of engagement includes:
Figure BDA0001221121110000511
PRBnumafter being calculated, Q PRBs are calculated according to a rule as the PRBs contained in each resource.
The preferred embodiment of the present invention provides a method for configuring a suitable uplink control symbol position for a UE according to a beam direction of the UE when short uplink control time division multiplexing of different UEs is performed in one transmission unit, so that transmission of the UE and reception of a base station are simpler.
In a preferred embodiment of the present invention, referring to equation 1 below, a sending end and a receiving end agree or a sending end signaling indicates a value of a relevant parameter, and then calculates allocated resources according to an agreed rule. And the values, configuration and usage of the relevant parameters, and the resource allocation use case based on the variant of equation 1. The UE is dynamically informed that the size of each candidate PUCCH resource is a dynamic size that is applicable to the PUCCH load.
Even if the candidate PUCCH resource allocation scheme in the ARI mechanism of the existing LTE is used, a new parameter describing an increased number of PRBs per candidate PUCCH resource or PUCCH resource (from the candidate PUCCH resource) specifically used by the UE based on the candidate PUCCH resource allocation in the existing ARI mechanism needs to be additionally introduced.
Fig. 14 is a schematic diagram of a resource allocation situation provided according to a preferred embodiment of the present invention, and referring to fig. 14 and equation 1, a sending end (which may be a base station, a small cell base station, a remote radio unit, etc., and will be described below by taking a base station as an example) and a receiving end (which may be a UE, a terminal, etc., and will be described below by taking a UE as an example) agree on or send end signaling to indicate a relevant parameter value, and then calculate allocated resources (which may be in the form of a PRB or a cluster, and mainly includes granularity of frequency domain resources, and will be described below by taking a PRB as an example) according to an agreed rule.
The required relevant parameters include:
PRBallobtaining the total PRB number, for example, the total PRB number is 110, the index is 0-109, then PRBallThen 109. All allocated PRBs may be allowed, for example, all PRBs corresponding to the system bandwidth, or the sum of all PRBs corresponding to one or more subbands in the system bandwidth; if the plurality of sub-bands are discrete, the sum of the PRBs of the plurality of discrete sub-bands is used as the total number of PRBs, or resource allocation is independently carried out according to each sub-band, and the PRB corresponding to each sub-band is used as the total number of PRBs.
PRBoffsetThe number of offset PRBs relative to the minimum index PRBs of the total PRBs. For example, the total PRB number is 110, the index is 0-109, and then PRBoffsetIt is how many PRBs are offset from the PRB index 0. Or as an offset from the starting PRB of the PRB index 0.
And M is the number of resources needing to be allocated.
PRBnumStarting PRB index of allocated resource. num is the number of one resource and is from 0 to M-1.
Q is the number of PRBs contained in each resource, according to the PRBsnumThe corresponding PRBs are calculated in a direction of increasing or decreasing (in different cases, increasing or decreasing) the indexes of the corresponding PRBs.
An example is given below to illustrate the use of the above parameters, equation 1 is an example constructed by the above parameters, and based on this equation 1, the corresponding resource allocation can be achieved.
Figure BDA0001221121110000521
In addition, specific applications including improved use of the above-described related parameters or equation 1 will be given in the present invention. The problems to be solved in different applications or improvements are different, and the effects to be achieved are different. Therefore, there are many variables for the specific use of the relevant parameters. Specific uses to solve various problems are listed in detail below.
In equation 1, PRBoffsetIs a starting offset, less than or equal to PRB with PRB index of 0
Figure BDA0001221121110000522
The resulting value of (this is to avoid overlapping of allocated PUCCH resources, if overlapping is allowed or M is small, PRBoffsetThe maximum value is 109). When the total number of PRBs is determined, the required number of copies is determined, and the range of PRBoffset can be obtained.
In the case of the equation 1,
Figure BDA0001221121110000531
the rounding-down is one of the methods, and the rounding-up or rounding-down principle can also be adopted.
The specific use of Q is when PRBnumAfter being calculated, Q PRBs are calculated according to the rule convention sequence as the PRBs contained in each resource.
Preferred embodiment 1, use of equation 1.
It is assumed that the system bandwidth is 20M, corresponding to 110 PRBs, and the index value ranges from 0 to 109, and 4 candidate PUCCH resources are allocated to one UE, where each candidate PUCCH resource includes 2 PRBs and requires 2 consecutive PRBs.
The base station configures the UE to use the whole system bandwidth, so that the total PRBs are 110, the index value range is 0-109, namely the PRball value is 109.
The value of the base station configuration Q is 2, and the Q is sent to the UE through a high-level signaling or a physical layer signaling, or is about to be 2. When the base station and the UE always require each candidate PUCCH resource to contain 2 PRBs, then the Q value may be agreed to be 2 in advance; when the number of PRBs contained in each candidate PUCCH resource required by the base station and the UE changes slowly, the Q value can be configured through high-level signaling. In addition, the following manner may also be adopted, for example, when the Q value is configured for the higher layer signaling, but the Q value needs to be adjusted temporarily, the base station may send the physical layer signaling reconfiguration Q value as being valid again, and then the Q value configured for the higher layer signaling is still considered to be valid. Further, in the preferred embodiment 1, the base station and the UE agree on the directionality of Q, that is, when num is an odd number, Q calculates the PRBs included in each candidate PUCCH in the direction of increasing PRB index, and when num is an even number, Q calculates the PRBs included in each candidate PUCCH in the direction of decreasing PRB index. The directionality of Q may be predetermined, and different directivities of Q will result in different assignments.
The base station configures the value of M to be 4, and sends the value to the UE through a high-layer signaling or a physical layer signaling, or the value is about 4. When the UE always needs 4 candidate PUCCH resources, then the value of M may be agreed to 4 in advance; when the number of the candidate PUCCH resources required by the UE changes slowly, the M value can be configured through high-level signaling. In addition, the following manner may also be adopted, for example, the higher layer signaling configures the M value, but when the adjustment is temporarily needed, the base station may send the physical layer signaling reconfiguration M value to be valid next time, and then still consider that the M value configured by the higher layer signaling is valid.
The base station configures the value of PRBoffset to be 2 and sends the value to the UE through high-level signaling or physical layer signaling. At this time, is less than or equal to
Figure BDA0001221121110000541
The obtained value of (a).
The number corresponding to the M candidate PUCCH resources is denoted num, and the corresponding values are 0,1,2, and 3.
Then substituting the above parameters into equation 1, the starting PRB index of each candidate PUCCH resource can be obtained:
PRBnum=0=2,PRBnum=2=29,PRBnum=1=107,PRBnum=3=80。
further, combining the directionality of Q agreed by the base station and the UE, it may be obtained that the PRB index included in the candidate PUCCH resource with the number num ═ 0 is 2, 3; the PRB index included in the candidate PUCCH resource numbered num ═ 2 is 29, 30; the candidate PUCCH resource numbered num 1 includes a PRB index of 79, 80; the candidate PUCCH resource numbered num 3 includes a PRB index of 106,107.
In the preferred embodiment 1, the candidate PUCCH resources are always allocated from both ends of the system bandwidth. By adopting the method of the preferred embodiment 1, compared with directly notifying the PRB index of each candidate PUCCH resource, the method has the advantage of low overhead, and the number and the position of PRBs included in each candidate PUCCH resource can be flexibly adjusted.
Currently, in the NR, the range of effective bits of the PUCCH is considered to be increased relative to the LTE system, for example, the effective bits carried by the PUCCH channel have a large variation range, and for example, companies propose that the effective bits variation range is as follows: the short PUCCH bits are 1-64 bits, the long PUCCH bits are 1-640 bits, and the change of the bit number is dynamic. If this proposal is adopted by NR, it is difficult to implement purely by multiplexing in order to support such a large effective bit variation range, so a dynamic addition of PUCCH resources would be necessary, how could it be increased? On the basis of the preferred embodiment 1, as long as the base station dynamically configures the value of Q through signaling, it can implement that the PUCCH resource size of the UE is dynamically changed in each scheduling unit, for example, downlink control information DCI of scheduling data is used to carry Q (in this document, parameters using physical layer signaling may all be carried using DCI). For example, the PUCCH of the UE in scheduling unit n needs 2 PRBs, and then the base station configures the Q value in the DCI in scheduling unit n to be 2, and the PUCCH of the UE in the next scheduling unit n needs 10 PRBs, and then the base station configures the Q value in the DCI in scheduling unit n +1 to be 10. In the conventional LTE, the size of each candidate PUCCH resource cannot be dynamically modulated, and the number of effective bits of the PUCCH is basically fixed, so that it is not necessary to adjust the resource size.
Currently, in NR, in the latest discussion, frequency division multiplexing of PUSCH and short PUCCH is supported (short PUCCH is PUCCH transmitted in several symbols before uplink data or at the end of a scheduling unit, and the typical number of symbols is 1 symbol), so as to enable UE to know that PRBs in the system bandwidth are allocated to a candidate PUCCH, when PUSCH of UE is included in these PRBs, the symbol occupied by PUCCH is avoided. In preferred embodiment 1, the base station can gradually increase the PRBoffset value from 0, for example, first allocate a value of PRBoffset equal to 0 to the UE, and if there is still UE that needs to be allocated, continue to use PRBoffset equal to 1, and so on, only the current PRBoffset value is allocated to reuse the next PRBoffset value, so that the base station can broadcast the maximum value in PRBoffset corresponding to the PUCCH allocation resource in the system to the UE, so that the UE will know that PRBs in the system are allocated as PUCCH resources according to equation 1 and related parameters, such as Q and M (Q, M also needs to be broadcast to the UE if it changes slowly).
Obviously, in the preferred embodiment 1, the candidate PUCCH resource allocation method may also be regarded as PRB resource allocation, and may be used for PRB allocation for other purposes. For example, when one UE needs 2 PRBs, different PRB allocation patterns may be implemented by configuring values of relevant parameters, some examples are as follows:
setting M to be 2 and num to be 0, 1; q is 1; PRBoffset ═ 0; the allocated PRB index is: 0,109. This results in discrete PRB resources.
Setting M to be 2 and num to be 0, 1; q is 1; PRBoffset 4; the allocated PRB index is: 4,105. This results in discrete PRB resources.
Setting M to be 1 and num to be 0; q is 2; PRBoffset ═ 0; the allocated PRB index is: 0,1. This results in contiguous PRB resources.
Setting M to be 1 and num to be 0; q is 2; PRBoffset 4; the allocated PRB index is: 4,5. This results in contiguous PRB resources.
In one particular preferred embodiment 1.1,
in the preferred embodiment 1.1, it can be assumed that the base station obtains each candidate PUCCH resource by non-equation 1 (the number of PRBs in each candidate PUCCH resource is 1), for example, in the LTE system, the base station directly notifies the UE of the starting PRB index of each candidate PUCCH resource, for example, through higher layer signaling or physical layer signaling. To support a wide range of dynamic effective bit numbers, an improvement is presented herein. For example, new signaling is introduced, describing that consecutive P PRBs are taken as each PUCCH candidate resource, indexed from the starting PRB. P can be dynamically configured by the base station and sent to the UE, e.g., a DCI bearer. The base station and the UE appoint that P PRBs are sequentially added (in the direction of increasing or decreasing the index) to serve as the PRBs of the current candidate PUCCH resource on the basis of the allocated PRBs of each candidate PUCCH resource. P can be notified directly or implicitly, and in short, P describes the number of PRBs that needs to be additionally increased this time.
Preferred embodiment 2
In order to discretize the PRBs for each candidate PUCCH resource. The total required PRBs are allocated by using equation 1, and then the candidate PUCCH resource to which the obtained PRBs belong is subdivided. The method is divided into two variations.
Preferred embodiment 2.1, when on the basis of equation 1, assuming that each candidate PUCCH resource includes Q1 PRBs, assuming that M1 candidate PUCCH resources are configured, the total number of PRBs required to be allocated is Q1xM 1. Q1xM1 PRBs are then allocated using equation 1 above. At this time, the meaning of the corresponding part of the parameters in equation 1 will change. E.g. M, Q, PRBnumMeaning changes will occur (or it can be understood that the PRB is temporarily allocated according to the original meaning, and finally the candidate PUCCH resource to which the obtained PRB belongs needs to be re-partitioned again). At this time, the three parameters can be regarded as 3 intermediate variable parameters. The meaning of the remaining parameters is unchanged.
For convenience of explanation, the following is exemplified. Assume that 4 candidate PUCCH resources still need to be allocated for the UE, but each resource contains 2 discrete PRBs. The rest of the assumptions are the same as in preferred embodiment 1.
The base station configuration parameter value is Q1, M Q1xM 12 x4 (the values of Q and M always assume that each candidate PUCCH has only one PRB and always requires 8 candidate PUCCH resources, after 8 PRBs are obtained through equation 1, the 8 PRBs are re-divided as the PRB of each candidate PUCCH resource), and the PRB is sent to the UE, and the parameter PRBnum is calculated by using equation 1 in agreement with the UE. Thus, PRBnum ═ 0 ═ 2, PRBnum ═ 2 ═ 15, PRBnum ═ 4 ═ 28, PRBnum ═ 6 ═ 41, PRBnum ═ 1 ═ 107, PRBnum ═ 3 ═ 94, PRBnum ═ 5 ═ 81, and PRBnum ═ 7 ═ 68.
Further, combining Q (final Q requirement, in this case, Q is 2, but not 1 of the middle procedure) PRBnum (which may be only even or odd) with even and odd num corresponding to Q PRBs in each candidate PUCCH resource agreed by the base station and the UE. And finally, obtaining Q PRBs in each candidate PUCCH resource from the candidate PUCCH resources corresponding to the PRBnum obtained by the equation 1. For example, the PRBnum ═ 0 and PRBnum ═ 1 obtained in equation 1 above are one set of candidate PUCCH resources, PRBnum ═ 2 and PRBnum ═ 3 are one set of candidate PUCCH resources, PRBnum ═ 4 and PRBnum ═ 5 are one set of candidate PUCCH resources, and PRBnum ═ 6 and PRBnum ═ 7 are one set of candidate PUCCH resources.
At this time, the 4 candidate PUCCH resources allocated to the UE are: PRB index 2,107; PRB index 15, 94; PRB index 28, 81; PRB indices are 41, 68.
Preferred embodiment 2.2, when on the basis of equation 1, assuming that each candidate PUCCH resource includes Q1 PRBs, assuming that M1 candidate PUCCH resources are configured, the total number of PRBs required to be allocated is Q1xM 1. Q1xM1 PRBs are then allocated using equation 1 above. At this time, the meaning of the corresponding part of the parameters in equation 1 will change. For example, M, Q, PRBnum will change meaning (or it can be understood that PRB is allocated temporarily according to the original meaning, and finally the candidate PUCCH resource to which the obtained PRB belongs needs to be re-partitioned again). In this case, the 3 parameters can be regarded as 3 intermediate variable parameters. The remaining parameters have unchanged meaning.
For convenience of explanation, the following is exemplified. Assume that 4 candidate PUCCH resources still need to be allocated for the UE, but each resource contains 2 discrete PRBs. The rest of the assumptions are the same as in preferred embodiment 1.
The base station configuration parameter value is Q4, M2 (the values of Q and M always assume that each candidate PUCCH has 4 PRBs, and 2 candidate PUCCH resources are always needed, 8 PRBs are obtained through equation 1, then the 8 PRBs are re-divided as the PRBs of each candidate PUCCH resource, and the PRBnum is sent to the UE, and meanwhile, the PRBnum is calculated by using equation 1 in agreement with the UE. Thus, PRBnum ═ 0 ═ 2, and PRBnum ═ 1 ═ 107. At this time, the candidate PUCCH resource corresponding to PRBnum ═ 0 is temporarily 2,3,4, 5. The candidate PUCCH resource corresponding to PRBnum ═ 1 is temporarily 104,105,106,107.
Further, in each candidate PUCCH resource agreed by the base station and the UE, Q (final Q requirement, in this case, Q is 2, but not 4 of the middle procedure) is associated with one PRB including num (in this variation, num of the middle procedure, i.e. 0,1) of even and odd PRBnum (which may be only even or odd). And finally, obtaining Q PRBs in each candidate PUCCH resource from the candidate PUCCH resources corresponding to the PRBnum obtained by the equation 1. For example, it is agreed (the rule may be defined according to actual needs), where the 1 st PRB in the PRBnum ═ 0 and the 1 st last PRB in the PRBnum ═ 1 obtained in the above equation 1 are one set of candidate PUCCH resources, the 2 nd PRB in the PRBnum ═ 0 and the 2 nd last PRB in the PRBnum ═ 1 are one set of candidate PUCCH resources, the 3 rd PRB in the PRBnum ═ 0 and the 3 rd last PRB in the PRBnum ═ 1 are one set of candidate PUCCH resources, and the 4 th PRB in the PRBnum ═ 0 and the 4 th last PRB in the PRBnum ═ 1 are one set of candidate PUCCH resources.
At this time, the 4 candidate PUCCH resources allocated to the UE are: PRB index 2,107; PRB index 3,106; PRB index 4,105; PRB index is 5,104.
Preferred embodiment 3
Fig. 15 is a schematic diagram of sub-band resource allocation according to preferred embodiment 3 of the present invention, and mainly describes a case when the base station allocates resources only to a part of the system bandwidth, for example, a sub-band, or multiple sub-bands, with reference to fig. 15. For example, a 100M system bandwidth, divided into 5 20M subbands, is now allocated resources within one or more subbands.
For the case of allocation for only one subband, the PRBs within the subband may be renumbered, allocated as in preferred embodiments 1 and 2. Or equivalently increasing the parameter value in the preferred embodiments 1 and 2 to a constant value, where the constant value is the minimum PRB index value of the subband where the parameter value is located. At this time, the base station needs to allocate a corresponding sub-band for the UE first, and then perform resource allocation within the sub-band according to the convention by using the preferred embodiments 1 and 2.
If the sub-band allocated to the UE by the base station is a continuous plurality of sub-bands, it can still be regarded as one sub-band for processing.
If the sub-band allocated by the base station for the UE is a plurality of discrete sub-bands, PRBs in the plurality of sub-bands are renumbered and then treated as one sub-band.
Preferred embodiment 4
The preferred embodiment provides a specific method for indicating candidate resources (e.g. PUCCH candidate resources), which is used in a slot (or subframe, etc.) that is used for transmitting downlink data but in which there is a resource for UE to transmit uplink data or control. Generally, there is downlink control information at the beginning of the time slot, and the downlink control information may be used to schedule downlink data in the time slot (note that downlink data in the time slot may also be scheduled by downlink control information in a previous time slot). If multiple candidate resources exist in the time slot as the UE and it needs to be indicated that the candidate resources in the time slot will be used specifically by the UE, the base station can indicate the candidate resources used specifically by the UE in the time slot for the UE by transmitting downlink control information (downlink grant information) corresponding to downlink data of the UE in the time slot. Note that it is emphasized herein that the downlink control information is sent in the time slot, i.e. candidate resources for specific use by the UE in the time slot are indicated in the time slot. In addition, it is emphasized herein that downlink data corresponding to downlink control information carrying candidate resources specifically used by the UE in the time slot is transmitted in the time slot (the downlink control information may be transmitted in a certain previous time slot).
In an uplink timeslot, downlink control information (for uplink data scheduling or for downlink data scheduling across timeslots) may start at the beginning of the uplink timeslot, followed by an uplink data transmission portion and an uplink control region. If the UE needs to use the specific candidate resource to carry data in the time slot, the base station can send a signaling indicating the specific candidate resource for the UE in the downlink control information (i.e. uplink grant information for scheduling uplink data) of the time slot. That is, the UE receives the uplink grant information in the time slot, schedules uplink data, and obtains specific candidate resource information used in the time slot.
This indication can solve the following problem, if the time slot is a time slot mainly for downlink data, at this time, downlink control information is not sent in the time slot for uplink data scheduling. If the specifically used candidate resource is carried by the downlink control information scheduled for the uplink data, the UE will not receive the signaling indicating the specifically used candidate resource in the time slot.
It will be apparent to those skilled in the art that the modules or steps of the present invention described above may be implemented by a general purpose computing device, they may be centralized on a single computing device or distributed across a network of multiple computing devices, and alternatively, they may be implemented by program code executable by a computing device, such that they may be stored in a storage device and executed by a computing device, and in some cases, the steps shown or described may be performed in an order different than that described herein, or they may be separately fabricated into individual integrated circuit modules, or multiple ones of them may be fabricated into a single integrated circuit module. Thus, the present invention is not limited to any specific combination of hardware and software.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (71)

1. A parameter transmission method, comprising:
determining a first specified parameter, or the first specified parameter and a second specified parameter, wherein the first specified parameter is used for indicating the number of resources increased or decreased on the basis of a predetermined candidate channel resource, or the second specified parameter is used for indicating the number of resources contained in the channel resource required by terminal data transmission; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance;
and sending the first designated parameter or the first designated parameter and the second designated parameter to the terminal through a first signaling.
2. The method of claim 1, wherein one or more of the candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission by the terminal.
3. The method of claim 1, wherein in determining the first specified parameter and/or the second specified parameter, the method further comprises:
selecting one candidate channel resource from the one or more configured candidate channel resources as a preset candidate channel resource;
sending the preset candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
4. The method of claim 3, wherein after selecting one candidate channel resource from the one or more configured candidate channel resources as the predetermined candidate channel resource, the method further comprises:
and determining the channel resource for receiving the terminal data according to the preset candidate channel resource and the first specified parameter.
5. The method according to claim 3, wherein the first signaling and/or the second signaling is physical layer signaling.
6. The method according to any one of claims 1 to 5, wherein the resource quantity is granular at least one of:
physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
7. The method of claim 1, wherein the increased or decreased number of resources satisfies at least one of the following conditions:
when PRBs included in the predetermined candidate channel resource are consecutive, PRBs that are increased or decreased on the basis of the predetermined candidate channel resource are consecutive to PRBs of the predetermined candidate channel resource;
when the numbers of PRBs included in the predetermined candidate channel resource are consecutive, the number of PRBs that are increased or decreased from the predetermined candidate channel resource is consecutive to the number of PRBs of the predetermined candidate channel resource;
when the PRBs included in the predetermined candidate channel resource are discrete, the PRBs increased or decreased on the basis of the predetermined candidate channel resource are continuous with the designated PRBs in the predetermined candidate channel resource;
when the numbers of the PRBs included in the predetermined candidate channel resources are discrete, the numbers of the PRBs increased or decreased on the basis of the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
8. The method according to claim 1, wherein the candidate channel resources are for physical uplink control channel, PUCCH, or for transmitting uplink control information, UCI; the data is data in a PUCCH channel or UCI.
9. A parameter transmission method, comprising:
configuring a first parameter for determining channel resources allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs;
sending the first parameter to a terminal;
wherein, under the condition that the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
10. The method of claim 9, wherein the second parameter comprises at least one of the following three variables:
the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated;
and if the three variables are not included by the second parameter, the values of the variables not included by the second parameter are agreed with the terminal in advance.
11. The method according to claim 10, wherein the starting physical resource block, PRB, index of the channel resource is determined by a predetermined rule selected from one of:
Figure FDA0003538714470000031
Figure FDA0003538714470000032
Figure FDA0003538714470000033
wherein the PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB of the resources to be allocated, M for indicating a number of parts of channel resources that need to be allocated,
Figure FDA0003538714470000041
in order to round down the function,
Figure FDA0003538714470000042
to round up the function, round () is a rounding function and mod is a remainder operation.
12. The method of claim 9, wherein after generating the first parameter for determining the channel resources allocated for the terminal, the method further comprises:
and determining the PRBs contained in the channel resources according to the starting PRB index and the PRB number.
13. The method of claim 12, wherein determining the PRBs contained in the channel resources according to the starting PRB index and the number of PRBs comprises:
in the resource to be allocated, taking the PRB corresponding to the starting PRB index as a starting point, and determining N PRBs as PRBs included in the channel resource in a direction of increasing or decreasing the PRB index, where N is the number of PRBs.
14. The method of claim 13, wherein determining N PRBs as the PRBs included in the channel resource in the direction of increasing or decreasing PRB index comprises:
determining a mode for determining PRBs contained in the channel resources according to the number of the channel resources, wherein the mode comprises: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, determining the PRB contained in the channel resource according to the direction of increasing the PRB index, and when the number of the channel resource is an even number, determining the PRB contained in the channel resource according to the direction of decreasing the PRB index.
15. The method of claim 11, wherein the PRB is part of a subband of the entire system bandwidth when the resource to be allocated is the partial subbandallFor indicating the maximum index after renumbering of all PRBs within the partial subband.
16. The method according to claim 9 or 15, wherein the number of PRBs is configured by at least one of the following signaling:
pre-agreed, high-level signaling, physical layer signaling.
17. The method of claim 16,
when the base station and the terminal always require the channel resources to contain fixed PRBs, configuring the number of PRBs by adopting the pre-defined mode;
when the base station and the terminal require the PRB contained in the channel resource to change, configuring the PRB quantity through high-level signaling;
after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
18. The method of claim 15, wherein the M is configured by at least one of the following signaling:
pre-agreed, high-level signaling, physical layer signaling.
19. The method of claim 18, wherein the M is configured in the pre-defined manner when a base station and the terminal always require a fixed number of channel resources to be allocated;
when the number of the resources required to be allocated by the base station and the terminal changes, configuring the M through a high-level signaling;
and after the M is configured through the high-level signaling, reconfiguring the value of the M required at this time through physical-layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission at this time.
20. The method of claim 18, wherein the PRB is configured as multiple channel resourcesoffsetAre configured in order from small to large.
21. The method of claim 18, wherein sending the first parameter to a terminal comprises:
and sending the first parameter to a terminal in a broadcasting or appointed mode.
22. The method of claim 9,
the channel resource is used for a Physical Uplink Control Channel (PUCCH) or is used for transmitting Uplink Control Information (UCI).
23. A method for resource determination, comprising:
receiving a first specified parameter or the first specified parameter and a second specified parameter through a first signaling; the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by the base station;
and determining the channel resources required by the terminal data transmission according to the first specified parameter or the first specified parameter and the second specified parameter.
24. The method of claim 23, wherein one or more of the candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission by the terminal.
25. The method of claim 23, further comprising: receiving the predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources pre-configured for the terminal, and the first signaling and the second signaling are different or the same.
26. The method according to claim 25, wherein said first signaling and/or said second signaling is physical layer signaling.
27. The method according to any one of claims 23 to 26, wherein the resource quantity is granular at least one of:
physical resource block PRB, orthogonal frequency division multiplexing OFDM symbol, subcarrier.
28. The method of claim 23, wherein the increased or decreased number of resources satisfies at least one of the following conditions:
when PRBs included in the predetermined candidate channel resource are consecutive, PRBs that are increased or decreased on the basis of the predetermined candidate channel resource are consecutive to PRBs of the predetermined candidate channel resource;
when the numbers of PRBs included in the predetermined candidate channel resource are consecutive, the number of PRBs that are increased or decreased from the predetermined candidate channel resource is consecutive to the number of PRBs of the predetermined candidate channel resource;
when the PRBs included in the predetermined candidate channel resource are discrete, the PRBs increased or decreased on the basis of the predetermined candidate channel resource are continuous with the designated PRBs in the predetermined candidate channel resource;
when the numbers of the PRBs included in the predetermined candidate channel resources are discrete, the numbers of the PRBs increased or decreased on the basis of the predetermined candidate channel resources are consecutive to the number of the designated PRB in the predetermined candidate channel resources.
29. The method according to claim 23, wherein the candidate channel resources are used for physical uplink control channel, PUCCH, or for transmitting uplink control information, UCI; the data is data in a PUCCH channel or UCI.
30. A method for resource determination, comprising:
receiving a first parameter, wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the channel resource comprises the number of PRBs;
determining the PRB index of the channel resource according to the second parameter and a preset rule;
determining PRBs contained in the channel resources according to the starting PRB index and the number of the PRBs;
wherein, under the condition that the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and if the first parameter comprises the second parameter, the number of PRBs is agreed with the terminal in advance.
31. The method of claim 30, wherein the second parameter comprises at least one of the following three variables:
the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same as the number of the PRB in the resource to be allocated; and for the three variables, if the variable is not included by the second parameter, the value of the variable not included by the second parameter is agreed with the terminal in advance.
32. The method of claim 30, wherein the predetermined rule comprises at least one of:
Figure FDA0003538714470000081
Figure FDA0003538714470000082
Figure FDA0003538714470000083
wherein the PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB of the resources to be allocated, M for indicating a number of parts of channel resources that need to be allocated,
Figure FDA0003538714470000091
in order to get the function of the integer downwards,
Figure FDA0003538714470000092
for rounding up functions, round () is a rounding functionThe number, mod, is the remainder operation.
33. The method of claim 32, wherein the PRB is part of a subband of the entire system bandwidth when the resource to be allocated is the partial subbandallFor indicating the maximum index after renumbering of all PRBs within the partial subband.
34. The method of claim 30, wherein determining the PRBs contained in the channel resources according to the starting PRB index and the number of PRBs comprises:
in the resource to be allocated, taking the PRB corresponding to the starting PRB index as a starting point, and determining N PRBs as PRBs included in the channel resource in a direction of increasing or decreasing the PRB index, where N is the number of PRBs.
35. The method of claim 34, wherein determining N PRBs as the PRBs included in the channel resource in the direction of increasing or decreasing PRB index comprises:
determining a mode for determining PRBs contained in the channel resources according to the number of the channel resources, wherein the mode comprises: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, determining the PRB contained in the channel resource according to the direction of increasing the PRB index, and when the number of the channel resource is an even number, determining the PRB contained in the channel resource according to the direction of decreasing the PRB index.
36. The method according to claim 30 or 32, wherein the number of PRBs is configured by at least one of the following signaling:
pre-appointment, high-level signaling, physical-level signaling.
37. The method of claim 36,
when the base station and the terminal always require that channel resources contain fixed PRBs, configuring the number of the PRBs in the pre-defined mode;
when the base station and the terminal require the PRB contained in the channel resource to change, configuring the number of the PRB through high-level signaling;
after the PRB number is configured through the high-level signaling, the PRB number required by the data transmission is reconfigured through physical-level signaling, wherein the PRB number configured through the high-level signaling is still adopted after the data transmission.
38. The method of claim 32, wherein the M is configured through at least one of the following signaling:
pre-agreed, high-level signaling, physical layer signaling.
39. The method of claim 38, wherein the M is configured in the pre-defined manner when a base station and the terminal always require a fixed number of channel resources to be allocated;
when the number of the resources required to be allocated by the base station and the terminal changes, configuring the M through a high-level signaling;
and after the M is configured through the high-level signaling, reconfiguring the needed M value through physical-layer signaling, wherein the M configured through the high-level signaling is still adopted after the data transmission.
40. The method of claim 30, further comprising:
and receiving the first parameters in a broadcasting or appointed mode.
41. The method of claim 30,
the channel resource is used for a Physical Uplink Control Channel (PUCCH) or is used for transmitting Uplink Control Information (UCI).
42. An apparatus for transmitting parameters, comprising:
a determining module, configured to determine a first specific parameter, or the first specific parameter and a second specific parameter, where the first specific parameter is used to indicate an amount of resources that is increased or decreased based on a predetermined candidate channel resource, or the second specific parameter is used to indicate an amount of resources included in channel resources required by terminal data transmission; the preset candidate channel resources comprise one or more candidate channel resources configured for the terminal in advance;
a sending module, configured to send the first specified parameter, or the first specified parameter and the second specified parameter, to the terminal through a first signaling.
43. The apparatus of claim 42, wherein one or more of the candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission by the terminal.
44. The apparatus of claim 42, further comprising: the selection module is used for selecting one candidate channel resource from the configured one or more candidate channel resources as a preset candidate channel resource after one or more candidate channel resources are configured for the terminal;
the sending module is further configured to send the predetermined candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
45. The apparatus of claim 44, further comprising: a determining module, configured to determine, after selecting one candidate channel resource from the one or more configured candidate channel resources as a predetermined candidate channel resource, a channel resource for receiving the terminal data according to the predetermined candidate channel resource and the first specified parameter.
46. An apparatus for transmitting parameters, comprising:
a configuration module, configured to configure a first parameter for determining a channel resource allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs;
the sending module is used for sending the first parameter to a terminal;
wherein, under the condition that the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
47. The apparatus of claim 46, wherein the second parameter comprises at least one of the following three variables:
the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same.
48. The apparatus of claim 47, further comprising: a first determining module, configured to determine a starting physical resource block, PRB, index of the channel resource according to a predetermined rule that is one of:
Figure FDA0003538714470000121
Figure FDA0003538714470000122
Figure FDA0003538714470000131
wherein the PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB of the resources to be allocated, M for indicating a number of parts of channel resources that need to be allocated,
Figure FDA0003538714470000132
in order to get the function of the integer downwards,
Figure FDA0003538714470000133
to round up the function, round () is a rounding function and mod is a remainder operation.
49. The apparatus of any one of claims 46 to 48, further comprising: and a second determining module, configured to determine, after generating a first parameter for determining a channel resource allocated for the terminal, PRBs included in the channel resource according to the starting PRB index and the number of PRBs.
50. The apparatus of claim 49, wherein the second determining module is further configured to determine N PRBs as the PRBs contained in the channel resource in a direction of increasing or decreasing a PRB index from the PRB corresponding to the starting PRB index as a starting point in the resource to be allocated, where N is the number of PRBs.
51. The apparatus of claim 50, wherein the second determining module is further configured to determine a manner for determining PRBs included in the channel resources according to the number of the channel resources, wherein the manner comprises: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, determining the PRB contained in the channel resource according to the direction of increasing the PRB index, and when the number of the channel resource is an even number, determining the PRB contained in the channel resource according to the direction of decreasing the PRB index.
52. A resource determination apparatus, comprising:
a receiving module, configured to receive a first specified parameter, or the first specified parameter and a second specified parameter, through a first signaling; the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by a base station;
and the determining module is used for determining the channel resources required by the data transmission of the terminal according to the first specified parameter or the first specified parameter and the second specified parameter.
53. The apparatus of claim 52, wherein one or more of the candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission by the terminal.
54. The apparatus of claim 52, wherein the receiving module is further configured to receive the predetermined candidate channel resource through a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources pre-configured for the terminal, and the first signaling and the second signaling are different or the same.
55. A resource determination apparatus, comprising:
a receiving module, configured to receive a first parameter, where the first parameter includes at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the channel resource comprises the number of PRBs;
a first determining module, configured to determine, according to the second parameter and according to a predetermined rule, a PRB index of the channel resource;
a second determining module, configured to determine, according to the starting PRB index and the number of PRBs, a PRB included in the channel resource;
wherein, under the condition that the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
56. The apparatus according to claim 55, wherein the predetermined rules comprise at least one of:
Figure FDA0003538714470000151
Figure FDA0003538714470000152
Figure FDA0003538714470000153
wherein the PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB of the resources to be allocated, M for indicating a number of parts of channel resources that need to be allocated,
Figure FDA0003538714470000154
in order to get the function of the integer downwards,
Figure FDA0003538714470000155
to round up the function, round () is a rounding function and mod is a remainder operation.
57. A base station, comprising:
a processor, configured to determine a first specified parameter, or the first specified parameter and a second specified parameter, where the first specified parameter is used to indicate an increased or decreased number of resources based on a predetermined candidate channel resource, or the second specified parameter is used to indicate a number of resources included in channel resources required for data transmission by a terminal; the preset candidate channel resource comprises one or more candidate channel resources which are configured for the terminal in advance; and is used for sending the first specified parameter, or the first specified parameter and the second specified parameter to the terminal through a first signaling;
a memory coupled with the processor.
58. The base station of claim 57, wherein one or more of the candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission by the terminal.
59. The base station of claim 57, wherein the processor is configured to select one candidate channel resource from the one or more configured candidate channel resources as the predetermined candidate channel resource after configuring one or more candidate channel resources for the terminal; and sending the predetermined candidate channel resource to the terminal through a second signaling; wherein the first signaling and the second signaling are the same or different.
60. The base station of claim 59, wherein the processor is further configured to determine the channel resource for receiving the terminal data according to the predetermined candidate channel resource and the first specified parameter after selecting one candidate channel resource from the one or more configured candidate channel resources as a predetermined candidate channel resource.
61. A base station, comprising:
a processor configured to configure a first parameter for determining channel resources allocated for a terminal; wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of the channel resource, wherein the channel resource comprises the number of PRBs; and is used for sending the first parameter to the terminal;
a memory coupled with the processor;
wherein, under the condition that the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and under the condition that the first parameter comprises the second parameter, the PRB number is pre-agreed with the terminal.
62. The base station of claim 61, wherein the second parameter comprises:
the maximum index of the PRB in the resource to be allocated is offset relative to the minimum index of the PRB in the resource to be allocated, and the number of the channel resources to be allocated is the same.
63. The base station according to claim 61, wherein the processor is configured to determine the starting Physical Resource Block (PRB) index of the channel resource according to a predetermined rule selected from the group consisting of:
Figure FDA0003538714470000171
Figure FDA0003538714470000172
Figure FDA0003538714470000173
wherein the PRBnumStarting PRB index for representing channel resource numbered num, num being an integer greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB of the resources to be allocated, M for indicating a number of parts of channel resources that need to be allocated,
Figure FDA0003538714470000174
in order to get the function of the integer downwards,
Figure FDA0003538714470000175
to round up the function, round () is a rounding function and mod is a remainder operation.
64. The base station according to any of claims 61 to 63, wherein the processor is configured to determine the PRBs that the channel resources contain according to the starting PRB index and the number of PRBs, after generating the first parameter for determining the channel resources allocated for the terminal.
65. The base station according to claim 64, wherein the processor is further configured to determine N PRBs as the PRBs contained in the channel resource in a direction of increasing or decreasing a PRB index from the PRB corresponding to the starting PRB index as a starting point in the resource to be allocated, where N is the number of PRBs.
66. The base station of claim 65, wherein the processor is further configured to determine a manner for determining PRBs contained in the channel resources according to the channel resource numbers, wherein the manner comprises: determining according to the direction of PRB index increase and determining according to the direction of PRB index decrease; when the number of the channel resource is an odd number, determining the PRB contained in the channel resource according to the direction of increasing the PRB index, and when the number of the channel resource is an even number, determining the PRB contained in the channel resource according to the direction of decreasing the PRB index.
67. A terminal, comprising:
the processor is used for receiving the first specified parameter or the first specified parameter and the second specified parameter through the first signaling; the first specified parameter is used for indicating the number of resources increased or decreased on the basis of the preset candidate channel resources, or the second specified parameter is used for indicating the number of resources contained in the channel resources required by the data transmission of the terminal; the preset candidate channel resources comprise one or more candidate channel resources which are pre-configured for the terminal by a base station; and is used for confirming the channel resource that the data transmission of the said terminal station needs according to the said first designated parameter, or said first designated parameter and said second designated parameter;
a memory coupled with the processor.
68. The terminal of claim 67, wherein one or more of the candidate channel resources of the predetermined candidate channel resources are at least one of: the one or more candidate channel resources comprise a fixed resource amount, and the one or more candidate channel resources are one or more candidate channel resources configured for last data transmission by the terminal.
69. The terminal of claim 67, wherein the processor is further configured to receive the predetermined candidate channel resource via a second signaling; the predetermined candidate channel resource is one candidate channel resource selected by the base station from one or more candidate channel resources pre-configured for the terminal, and the first signaling and the second signaling are different or the same.
70. A terminal, comprising:
a processor configured to receive a first parameter, wherein the first parameter comprises at least one of: a second parameter for determining a starting Physical Resource Block (PRB) index of a channel resource allocated to the terminal, wherein the channel resource comprises the number of PRBs; a PRB index used for determining the channel resource according to the second parameter and a preset rule; and determining PRBs contained in the channel resources according to the starting PRB index and the number of PRBs;
a memory coupled with the processor;
wherein, under the condition that the first parameter includes the number of PRBs, the second parameter is pre-agreed with the terminal; and if the first parameter comprises the second parameter, the number of PRBs is agreed with the terminal in advance.
71. The terminal according to claim 70, wherein the predetermined rule comprises at least one of:
Figure FDA0003538714470000191
Figure FDA0003538714470000192
Figure FDA0003538714470000193
wherein the PRBnumStarting PRB index for indicating channel resource numbered num, numInteger greater than or equal to 0, PRBallMaximum index for representing PRB in resource to be allocated, PRBoffsetFor indicating an offset with respect to a minimum index of a PRB of the resources to be allocated, M for indicating a number of parts of channel resources that need to be allocated,
Figure FDA0003538714470000201
in order to get the function of the integer downwards,
Figure FDA0003538714470000202
to round up the function, round () is a rounding function and mod is a remainder operation.
CN201710067272.7A 2017-02-06 2017-02-06 Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal Active CN108400854B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710067272.7A CN108400854B (en) 2017-02-06 2017-02-06 Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal
PCT/CN2017/120313 WO2018141190A1 (en) 2017-02-06 2017-12-29 Parameter transmitting method, resource determining method and device, base station and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710067272.7A CN108400854B (en) 2017-02-06 2017-02-06 Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal

Publications (2)

Publication Number Publication Date
CN108400854A CN108400854A (en) 2018-08-14
CN108400854B true CN108400854B (en) 2022-06-21

Family

ID=63039293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710067272.7A Active CN108400854B (en) 2017-02-06 2017-02-06 Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal

Country Status (2)

Country Link
CN (1) CN108400854B (en)
WO (1) WO2018141190A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013961A (en) * 2009-11-05 2011-04-13 大唐移动通信设备有限公司 Method, system and device for transmitting uplink feedback information
KR20130111329A (en) * 2012-04-01 2013-10-10 엘지전자 주식회사 Method of tranceiving downlink control channel in wireless communication system and appratus thereof
CN103518406A (en) * 2010-12-09 2014-01-15 夏普株式会社 Mobile station device, communication system, communication method and integrated circuit
CN104159309A (en) * 2014-08-13 2014-11-19 大唐移动通信设备有限公司 Resource allocation optimization method and resource allocation optimization device
CN106162888A (en) * 2015-04-10 2016-11-23 夏普株式会社 PUCCH resource collocation method in carrier aggregation and equipment thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2144462A1 (en) * 2008-07-09 2010-01-13 Nokia Siemens Networks OY Reduced resource allocation parameter signalling
CN102076094A (en) * 2009-11-24 2011-05-25 北京三星通信技术研究有限公司 Method and equipment for determining PHICH ( Physical Hybrid ARQ Indicator Channel) resources in band spread system
JP4878651B1 (en) * 2010-09-17 2012-02-15 シャープ株式会社 Mobile station apparatus, communication system, communication method, and integrated circuit
CN103782561B (en) * 2012-08-03 2017-10-24 华为技术有限公司 Control information sending method, method of reseptance and device
CN103716121B (en) * 2012-09-28 2019-03-08 上海诺基亚贝尔股份有限公司 A kind of method and apparatus for determining the Downlink Control Information based on ePDCCH
CN106332286B (en) * 2015-06-30 2022-01-28 中兴通讯股份有限公司 Spectrum resource allocation method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013961A (en) * 2009-11-05 2011-04-13 大唐移动通信设备有限公司 Method, system and device for transmitting uplink feedback information
CN103518406A (en) * 2010-12-09 2014-01-15 夏普株式会社 Mobile station device, communication system, communication method and integrated circuit
KR20130111329A (en) * 2012-04-01 2013-10-10 엘지전자 주식회사 Method of tranceiving downlink control channel in wireless communication system and appratus thereof
CN104159309A (en) * 2014-08-13 2014-11-19 大唐移动通信设备有限公司 Resource allocation optimization method and resource allocation optimization device
CN106162888A (en) * 2015-04-10 2016-11-23 夏普株式会社 PUCCH resource collocation method in carrier aggregation and equipment thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"RP-151931".《3GPP Inbox\jmm》.2015, *
S4-161336 "CR 26.114-0390 rev 1 Compact Concurrent Codec Capabilities SDP Usage for MMCMH CCCEx and Session Initiation (Rel-14)";Qualcomm Incorporated;《3GPP tsg_sa\WG4_CODEC》;20161027;全文 *

Also Published As

Publication number Publication date
CN108400854A (en) 2018-08-14
WO2018141190A1 (en) 2018-08-09

Similar Documents

Publication Publication Date Title
US10382969B2 (en) Resource allocation design for low cost machine-type communication UE
KR101021803B1 (en) Base station equipment, user equipment and communication control method
CN110832931A (en) Method for allocating resources in wireless communication system and apparatus using the same
US9814039B2 (en) Method and apparatus for configuring SRS resource for cooperating cells
EP3349384A1 (en) Resource element (re) allocation for uplink control information (uci) on physical uplink shared channel (pusch)
CN110383920B (en) Base station, terminal and communication method
CN104704766A (en) Control channels for wireless communication
JP6957639B2 (en) Resource allocation signaling
US11632222B2 (en) Telecommunications apparatus and methods
CN108401292B (en) Control information transmission method, control information receiving device, base station and terminal
JP7027440B2 (en) Uplink transmission method, device, terminal device, access network device and system
US20130322493A1 (en) User equipment, radio base station and methods therein for transmitting information of an allocation of a radio resource
CN111436149B (en) Transmission resource selection method and device
CN110383914B (en) Information sending method, device, terminal, access network equipment and system
CN108811090B (en) Resource allocation indication method, device, network side equipment and user equipment
CN108400854B (en) Parameter sending method, resource determining method, parameter sending device, resource determining device, base station and terminal
KR20210084350A (en) Communication devices, communication methods and integrated circuits
WO2019160468A1 (en) Provision of granting of resources to a wireless device
EP3629649B1 (en) Terminal device, network-side device, and communication system
CN108810974B (en) Resource mapping method, network equipment and base station
JP2022068269A (en) Method for uplink transmission, device, terminal device, access network device, and system
CN117858235A (en) Method and base station for processing public PUCCH (physical uplink control channel) resources
WO2019057940A1 (en) Interference and fading mitigation in ofdm systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant