CN108396099A - A kind of method of Rapid-Repair converter lining - Google Patents

A kind of method of Rapid-Repair converter lining Download PDF

Info

Publication number
CN108396099A
CN108396099A CN201810355899.7A CN201810355899A CN108396099A CN 108396099 A CN108396099 A CN 108396099A CN 201810355899 A CN201810355899 A CN 201810355899A CN 108396099 A CN108396099 A CN 108396099A
Authority
CN
China
Prior art keywords
converter
refractory brick
pig
lining
10min
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810355899.7A
Other languages
Chinese (zh)
Inventor
吴杰
崔猛
刘寒冰
曹震
钟国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Iron and Steel Group Co Ltd
Original Assignee
Tianjin Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Iron and Steel Group Co Ltd filed Critical Tianjin Iron and Steel Group Co Ltd
Priority to CN201810355899.7A priority Critical patent/CN108396099A/en
Publication of CN108396099A publication Critical patent/CN108396099A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/44Refractory linings
    • C21C5/441Equipment used for making or repairing linings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The present invention relates to a kind of methods of Rapid-Repair converter lining, include the following steps:1), patching material prepares:Prepare pig and refractory brick;2), after the completion of converter tapping, part clinker is poured out;3), refractory brick is packed into steel bucket, converter face is put by steel bucket, makes the 80% of refractory brick covering converter lining eroded section;4), shaking converter makes refractory brick be laid on the large face of converter being etched;5) pig, is added on the upper layer of refractory brick;6), shaking converter keeps pig tiling uniform, ensures that converter lining is etched part and is completely covered;7) after, refractory brick and pig are filled in converter attack sites, the static 10min of furnace body makes refractory brick sintering adhesive bonding on converter lining using the high temperature furnace slag in converter, after 10min can grate steel-making, repair complete.Adaptation to local conditions of the present invention, gathers materials on the spot, and solves the problems, such as that the large face of converter repairing time is longer;Filling time foreshortens to 10min from original 70min.Have many advantages, such as simple, convenient and refuse reclamation, economizes on resources, reduces cost, environmental protection.

Description

A kind of method of Rapid-Repair converter lining
Technical field
The invention belongs to converters to repair technical field, more particularly to a kind of method of Rapid-Repair converter lining.
Background technology
Can all occur the problem of liner erosion, especially stove in convertor steelmaking process and use as a servant the later stage, converter is close to master control room one Wing furnace serves as a contrast (big face) and corrodes serious, and the type of furnace is caused to deform, poor and there are problems that security risk so as to cause metallurgical effect, because This each factory is all made of the stabilization for the technical maintenance type of furnace for repairing big face.Currently, big face repairing uses material for oil-sand, resistant to corrosion stove Number can reach 10-15 stoves, but there is repairing time length (about 70min), the problem for causing converter operating rate low.
It is studied for large face of converter repairing time longer problem, using the existing material in our factory, has invented one The novel fettling method of kind solves the problems, such as that the large face of converter repairing time is longer.
Invention content
The present invention provides a kind of simple, convenient, easy side to solve technical problem present in known technology The method that method solves the problems, such as large face of converter repairing time longer Rapid-Repair converter lining.
The present invention is adopted the technical scheme that solve technical problem present in known technology:
A kind of method of Rapid-Repair converter lining, it is characterised in that:Include the following steps:
1) patching material prepares:Prepare pig and refractory brick;
2), after the completion of converter tapping, part clinker is poured out;
3), refractory brick is packed into steel bucket, converter face is put by steel bucket, refractory brick is made to cover converter lining eroded section 80%;
4), shaking converter makes refractory brick be laid on the large face of converter being etched;
5) pig, is added on the upper layer of refractory brick;
6), shaking converter keeps pig tiling uniform, ensures that converter lining is etched part and is completely covered;
7) after, refractory brick and pig are filled in converter attack sites, the static 10min of furnace body utilizes the high temperature in converter Clinker makes refractory brick sintering adhesive bonding on converter lining, after 10min can grate steel-making, repair complete.
The invention has the advantages and positive effects that:Adaptation to local conditions of the present invention is gathered materials on the spot discarded refractory brick and life Iron block carries out fettling use, solves the problems, such as that the large face of converter repairing time is longer;Filling time foreshortens to from original 70min 10min.Resistant to corrosion stove number uses oil-sand fettling effect suitable with original;The present invention also has simple, convenient and waste sharp again With, economize on resources, reduce cost, environmental protection the advantages that.
Specific implementation mode
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and it is described in detail It is as follows:
A kind of method of Rapid-Repair converter lining, includes the following steps:
1) patching material prepares:Prepare pig and refractory brick;
2), after the completion of converter tapping, part clinker is poured out;
3), refractory brick is packed into steel bucket, converter face is put by steel bucket, refractory brick is made to cover converter lining eroded section 80%;
4), shaking converter makes refractory brick be laid on the large face of converter being etched;
5) pig, is added on the upper layer of refractory brick;
6), shaking converter keeps pig tiling uniform, ensures that converter lining is etched part and is completely covered;
7) after, refractory brick and pig are filled in converter attack sites, the static 10min of furnace body utilizes the high temperature in converter Clinker makes refractory brick sintering adhesive bonding on converter lining, after 10min can grate steel-making, repair complete.
Adaptation to local conditions of the present invention gathers materials on the spot discarded refractory brick and pig carrying out fettling use, it is big to solve converter Repair time longer problem in face;Filling time foreshortens to 10min from original 70min.Resistant to corrosion stove number with mended originally with oil-sand Stove effect is suitable;The present invention also have simple, convenient and refuse reclamation, economize on resources, reduce cost, environmental protection etc. it is excellent Point.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form, Every any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to In the range of technical solution of the present invention.

Claims (1)

1. a kind of method of Rapid-Repair converter lining, it is characterised in that:Include the following steps:
1), patching material prepares:Prepare pig and refractory brick;
2), after the completion of converter tapping, part clinker is poured out;
3), refractory brick is packed into steel bucket, converter face is put by steel bucket, makes refractory brick covering converter lining eroded section 80%;
4), shaking converter makes refractory brick be laid on the large face of converter being etched;
5) pig, is added on the upper layer of refractory brick;
6), shaking converter keeps pig tiling uniform, ensures that converter lining is etched part and is completely covered;
7) after, refractory brick and pig are filled in converter attack sites, the static 10min of furnace body, using the high temperature furnace slag in converter, Make refractory brick sintering adhesive bonding on converter lining, after 10min can grate steel-making, repair complete.
CN201810355899.7A 2018-04-19 2018-04-19 A kind of method of Rapid-Repair converter lining Pending CN108396099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810355899.7A CN108396099A (en) 2018-04-19 2018-04-19 A kind of method of Rapid-Repair converter lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810355899.7A CN108396099A (en) 2018-04-19 2018-04-19 A kind of method of Rapid-Repair converter lining

Publications (1)

Publication Number Publication Date
CN108396099A true CN108396099A (en) 2018-08-14

Family

ID=63100115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810355899.7A Pending CN108396099A (en) 2018-04-19 2018-04-19 A kind of method of Rapid-Repair converter lining

Country Status (1)

Country Link
CN (1) CN108396099A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109055655A (en) * 2018-10-10 2018-12-21 安溪起星晟汇机械科技有限公司 A kind of different layer material-saving repair apparatus of the knick point of mammoth conveter furnace lining
CN112877494A (en) * 2021-01-13 2021-06-01 广东韶钢松山股份有限公司 Furnace protection method of converter
CN114107596A (en) * 2020-08-26 2022-03-01 山西建龙实业有限公司 Method for padding and supplementing iron adding surface of converter by using pig iron blocks

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104673966A (en) * 2015-01-22 2015-06-03 河北钢铁股份有限公司承德分公司 Method for rapidly maintaining converter lining
CN106566909A (en) * 2016-10-20 2017-04-19 唐山新宝泰钢铁有限公司 Pig iron fettling process for converter

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104673966A (en) * 2015-01-22 2015-06-03 河北钢铁股份有限公司承德分公司 Method for rapidly maintaining converter lining
CN106566909A (en) * 2016-10-20 2017-04-19 唐山新宝泰钢铁有限公司 Pig iron fettling process for converter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109055655A (en) * 2018-10-10 2018-12-21 安溪起星晟汇机械科技有限公司 A kind of different layer material-saving repair apparatus of the knick point of mammoth conveter furnace lining
CN114107596A (en) * 2020-08-26 2022-03-01 山西建龙实业有限公司 Method for padding and supplementing iron adding surface of converter by using pig iron blocks
CN112877494A (en) * 2021-01-13 2021-06-01 广东韶钢松山股份有限公司 Furnace protection method of converter

Similar Documents

Publication Publication Date Title
CN108396099A (en) A kind of method of Rapid-Repair converter lining
CN108660282A (en) A kind of converter deslagging face furnace lining Rapid Maintenance Method
CN103952515B (en) A kind of iron red mud is used as the recycling method of steelmaking slag agent
CN104673966A (en) Method for rapidly maintaining converter lining
CN103397138B (en) Patching method for furnace lining of revolving furnace steel tapping hole part
CN108728603A (en) A kind of method of quick fettling
CN109136458A (en) A kind of quick-acting fettling methods of converter
CN102888486A (en) Converter slag iron furnace protecting technology
CN104894327A (en) Converter slag surface furnace lining fettling method
CN103449828A (en) Repairing mass based on used magnesia carbon refractory and preparation method of repairing mass
CN103602780A (en) Replacing method of converter tap hole
CN105925752A (en) Method for repairing converter lining through pig iron and slag
CN110042196A (en) A kind of resistance to material furnace retaining method of coverter pig sizing
CN102978345B (en) Low-chrome refractory material RH refining furnace and building method thereof
CN101921887B (en) Maintenance method of blast furnace liner
CN112225541B (en) Electric furnace gunning material and gunning furnace protection method
CN106995866A (en) A kind of low-cost high-efficiency converter fettling technique
CN105036775A (en) Torpedo ladle slag line zone repair material
CN106977187A (en) Mineral hot furnace, cast with multi-functional moldable and preparation method thereof
CN103819205B (en) A kind of induction furnace fast repairing furnace charge and fettling method
CN102134165B (en) Furnace lining of ferrovanadium smelting furnace and preparation method thereof
CN207395489U (en) A kind of reviver melting furnace slag-discharging device
CN101125365A (en) Steel ladle integrated masonry method
CN210796513U (en) Blast furnace foundation gas leakage plugging structure
CN208872112U (en) A kind of mineral hot furnace dirt-excluding groove new construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814