CN108390373A - A kind of closed loop network turn power supply aid decision-making system - Google Patents

A kind of closed loop network turn power supply aid decision-making system Download PDF

Info

Publication number
CN108390373A
CN108390373A CN201810172413.6A CN201810172413A CN108390373A CN 108390373 A CN108390373 A CN 108390373A CN 201810172413 A CN201810172413 A CN 201810172413A CN 108390373 A CN108390373 A CN 108390373A
Authority
CN
China
Prior art keywords
data
power
power grid
module
flow calculation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810172413.6A
Other languages
Chinese (zh)
Other versions
CN108390373B (en
Inventor
杨金东
李文
陶晔
黄继盛
李周龙
肖齐
李荣明
罗淑进
张海涛
王家华
向春勇
李文娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd filed Critical Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201810172413.6A priority Critical patent/CN108390373B/en
Publication of CN108390373A publication Critical patent/CN108390373A/en
Application granted granted Critical
Publication of CN108390373B publication Critical patent/CN108390373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The application provides a kind of closed loop network turn power supply aid decision-making system, including server and several clients;Server includes Data Analysis Services module, power grid real-time model generation module, net structure configuration module, power grid off-line model structure module, database module and Load flow calculation module.The Load flow calculation module is used to carry out Load flow calculation to the whole network, or carries out the Load flow calculation in each region respectively to partial electric grid, is aggregated into the whole network, obtains power flowcontrol condition and the suggestion of cyclization or the suggestion of tide optimization of cyclization.Call the real-time flow data of power grid to carry out Load flow calculation, can actual response power grid operating condition, improve the accuracy of Load flow calculation.The whole network and partial electric grid layering, partial electric grid are subjected to subregion, Load flow calculation is carried out by way of layering, subregion, calculating is made more to refine, as a result more precisely, phenomena such as avoiding mistuning, accidentally controlling helps to improve reliability and safety that closed loop network turns power supply.

Description

A kind of closed loop network turn power supply aid decision-making system
Technical field
The present invention relates to technical field of power systems more particularly to a kind of closed loop network to turn power supply aid decision-making system.
Background technology
Power distribution network is by overhead transmission line, cable, shaft tower, distribution transformer, disconnecting switch, reactive power compensator and some are attached Belong to the compositions such as facility, the network of important distribution electric energy effect is played in power network.Cyclization, which turns power supply, is opened by being closed contact It closes, the two or more pieces distribution line of same voltage class is converted to the operation of cyclic wire connection from radial wiring, can be subtracted The amount when power failure that few interruption maintenance is brought, improves the effective means of power supply reliability.
In Loop Closing Operation, it is necessary to assure cyclization point both sides phase is identical, and voltage difference, phase angle should meet regulation.It should be true It protects in cyclization network, power flow changing is no more than the limitation of the stabilization of power grids, place capacity etc., therefore in Loop Closing Operation, answers The variation for considering trend when cyclization, to provide rationally reliable cyclization suggestion.Power flow changing can be according to the fortune side of upper level network Situation and network parameter participate in low-pressure side bus pressure difference, original flow situations and operating experience of cyclization etc. to estimate.At present Closed loop network turns in power supply process, and work about electric power personnel are often according to power flowcontrol, electric power in the ring in automated system The data such as control, spatial load forecasting of dispatching from the factory carry out Load flow calculation, and combine the judgement of experience progress cyclization.However, it is calculated For data greatly mostly from the historical data of automated system, checkout result cannot really reflect current electric grid operating condition, error It is larger, and there are some undesirable data.In addition it is also higher manually to calculate error rate.Once cyclization error is likely to result in power failure And the problems such as electric utility damage.
Based on above it is found that current closed loop network, which turns calculation of tidal current in power supply, cannot really reflect current electric grid Operating condition, cyclization turn power supply accuracy cannot meet the needs of management and running, exist accidentally arrange the method for operation, mistuning, The accidentally hidden danger such as control, reduce power distribution network reliability of operation and safety.
Invention content
This application provides a kind of closed loop networks to turn power supply aid decision-making system, turns to supply to solve existing closed loop network Electric accuracy is unable to meet demand, there are mistuning, accidentally arranges the hidden danger such as the method for operation, reduces asking for power distribution network operational reliability Topic.
A kind of closed loop network turn power supply aid decision-making system, including server and several clients;
The server includes Data Analysis Services module, power grid real-time model generation module, net structure configuration module, Power grid off-line model builds module, database module and Load flow calculation module;
The Data Analysis Services module for obtaining grid equipment parameter, and optimizes the device parameter and builds Mould forms online Dynamic model bank, and the real-time calling electric network swim data from Automation System of Power Network, is integrally formed Power grid Real-time Power Flow data;
The power grid real-time model generation module, for calling the power grid Real-time Power Flow data, by itself and the network It constructs configuration module data and generates power grid real-time model;
The net structure configuration module turns power supply calculation model for passing through visualization electrical network assembly formation cyclization;
The power grid off-line model builds module, the parameter for calling the online Dynamic model bank, structure power grid from Line model;
The Load flow calculation module carries out Load flow calculation, or to part for calling the power grid real-time model to the whole network Power grid carries out the Load flow calculation in each region respectively, is aggregated into the whole network, and condition and the cyclization of closed loop power flow control are obtained Suggestion or obtain the suggestion of tide optimization;And the power grid off-line model is called, Load flow calculation is carried out to the whole network, or play a game Portion's power grid carries out the Load flow calculation in each region respectively, is aggregated into the whole network, and the suggestion of looped network planning is obtained;
Database module, for storing the online dynamic model data, the power grid Real-time Power Flow data, the power grid The result of real-time model data, the power grid off-line model data and the Load flow calculation.
Optionally, the database module includes database management module, for being carried out to the data in the database Management;
The database management module includes historical data database management module and real time database management module;
The historical data database management module, for carrying out storage management to historical load, history power plant manufacture information;
The real time database management module, for flow data, the metering automation to current scheduling automated system The load data of system, the plant information of small power station's system carry out storage management.
Optionally, the system also includes interface display modules, for the result of the Load flow calculation to be used report, figure Show or the mode of its synthesis is shown.
Optionally, the system also includes data check modules, are checked for the result to the Load flow calculation.
Optionally, the system also includes remote access module, the remote access for realizing client to server.
Optionally, the electric network swim data include SCADA formatted datas;The grid equipment parameter include PSASP, BPA formatted datas.
A kind of closed loop network turn power supply aid decision-making method, including:
According to cyclization computations, grid equipment parameter is obtained, and modeling is optimized to the device parameter and is formed in Line Dynamic model bank;The real-time calling electric network swim data from Automation System of Power Network, are integrally formed power grid Real-time Power Flow Data;
The power grid Real-time Power Flow data are called, itself and net structure configuration module data are generated into power grid real-time model;
The power grid real-time model is called, Load flow calculation is carried out to the whole network, or carry out respectively in each region to partial electric grid Load flow calculation, be aggregated into the whole network, obtain closed loop power flow control condition and cyclization suggestion;
When the suggestion of cyclization is that cannot carry out cyclization, the power grid real-time model is called again, and trend is carried out to the whole network It calculates, or carries out the Load flow calculation in each region respectively to partial electric grid, be aggregated into the whole network, obtain building for tide optimization View;
When cannot still meet the condition of closed loop power flow control after the suggestion of the tide optimization deviates reality, or optimization, The parameter of the online Dynamic model bank is called, power grid off-line model is built;The power grid off-line model is called, the whole network is carried out Load flow calculation, or carry out the Load flow calculation in each region respectively to partial electric grid, it is aggregated into the whole network, obtains looped network planning Suggestion;
By online dynamic model data, the power grid Real-time Power Flow data, the power grid real-time model data, described Power grid off-line model data and the result of the Load flow calculation are stored in database module, access and use for client.
Optionally, the method further includes being checked to the result of the Load flow calculation.
Optionally, the access with use of the client include the mode of remote access.
Technical solution provided by the present application includes following advantageous effects:
This application provides a kind of closed loop networks to turn power supply aid decision-making system, calls the real-time flow data of power grid simultaneously After being integrated to it, power grid real-time model is formed in conjunction with net structure configuration data, and then carry out Load flow calculation, obtain cyclization Power flowcontrol condition, the suggestion of cyclization or the suggestion of tide optimization, the data of real-time calling can really react the fortune of power grid Market condition improves the accuracy of Load flow calculation.Modeling is optimized to grid equipment parameter, establish power grid off-line model into Row Load flow calculation obtains the suggestion of looped network planning, integration is optimized to the data of calling, improves the accuracy of data, The efficiency for being conducive to improve the accuracy and calculating of the offline Load flow calculation of powernet, the mistuning for avoiding cyclization, accidentally control etc. Problem.In addition by the whole network and partial electric grid layering, partial electric grid carry out subregion, respectively expansion layering, subregion Load flow calculation, needle To a certain looped network section, can meet closed loop power flow adjust and cyclization after equipment nonoverload and meet the whole network trend and be no more than Equipment service ability, makes Load flow calculation more refine, and improves the accuracy of calculating, helps to improve closed loop network Turn reliability and the safety of power supply.
Description of the drawings
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor, Other drawings may also be obtained based on these drawings.
Fig. 1 is the schematic diagram that a kind of closed loop network provided by the embodiments of the present application turns power supply aid decision-making system;
Fig. 2 is the flow chart that a kind of closed loop network provided by the embodiments of the present application turns power supply aid decision-making method.
Specific implementation mode
The drawings herein are incorporated into the specification and forms part of this specification, and shows the implementation for meeting the application Example, and the principle together with specification for explaining the application.
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, without having to pay creative labor, other drawings may also be obtained based on these drawings.
Attached drawing 1 is please referred to, the figure shows a kind of closed loop network turn power supply aid decision-making systems provided in this embodiment Schematic diagram.
The application provides a kind of closed loop network turn power supply aid decision-making system, including server and several clients. Server is connect with client communication.Server, which is used to be instructed according to cyclization, carries out closed loop power flow calculating, and client can send out number It is investigated that the instructions such as inquiry, calculating, modification, can also access to server by way of remote access.
To ensure the function of program and Data expansion upgrading, using B/S structures, server is adjusted with being arranged in, and each county's tune exists Client is installed on microcomputer.Ground each county's tune of reconciliation shares a sets of data, and the cyclization for carrying out the whole network or each regional network turns power supply calculation.
In the present embodiment, the data communication between client and server provides TCP/IP network communications association by server View, terminal can obtain data by webservice soap1.1 standard access servers.Client can also pass through http1.1 Standard, which accesses to server, downloads the structural map of the formats such as spg, xml, generates cyclization and turns to make required for power supply Load flow calculation Electric network model.
The client that the embodiment of the present application uses is WebService communication standard clients, using Web (HTTP) mode, The request with response external system is received, to realize the function of far call.A large amount of Load flow calculations need to be carried out in server, greatly In the case that amount user accesses computing resource jointly, client can form Load flow calculation service role, carry out calculating task registration And queuing, server meet situation according to the service condition of its computing resource and calculating task, client are arranged to carry out trend It calculates.The phenomenon that computing resource competition can effectively be reduced, shorten the stand-by period of client, improve the response of system, puts down Weigh computational load.In addition, client can carry out version checking when Web starts automatically, if inconsistent with server version, Automatic client plug-in of downloading is updated, and ensures the unification of version to the full extent, in version function upgrading or increased feelings Under condition, new function can be also obtained in the shortest time.
Server includes Data Analysis Services module, power grid real-time model generation module, net structure configuration module, power grid Off-line model builds module, database module and Load flow calculation module.
The Data Analysis Services module for obtaining grid equipment parameter, and optimizes modeling to device parameter and is formed Online Dynamic model bank, and the real-time calling electric network swim data from Automation System of Power Network are integrally formed power grid reality When flow data.
The Data Analysis Services module from scheduling system locality county's electric network composition, transformer, generating set, circuit and The device parameter of the grid equipments parameter such as reactive power compensator, acquisition is QS files, is formed by parameter identification and state estimation High-quality network parameter, and power distribution network depth optimization modeling is carried out, form unified online Dynamic model bank.Data analysis module is also For the real-time calling electric network swim data from dispatch automated system, including active and reactive, electric current, voltage, breaker, every Off status is left, data are carried out on ground tune server and are integrally formed unified the whole network Real-time Power Flow data.
Power grid real-time model generation module, for calling power grid Real-time Power Flow data, by itself and net structure configuration module Data generate power grid real-time model.
An input terminal part for the power grid real-time model generation module is connect with data analysis module, another part and network Construct configuration module connection.The output end of power grid real-time model generation module is connect with the input terminal of Load flow calculation module.
Net structure configuration module turns power supply calculation model for passing through visualization electrical network assembly formation cyclization.
Net structure configuration determines the linking relationship between various components in power grid, and Load flow calculation is formed by linking relationship In chain matrice so that original static network is become cyclization by opening or closing corresponding breaker in configuration figure Customized network.Since there are busbar, circuit, breaker, power supply, load, compensation device, transformer etc. are multiple to be set in a network Slave component, physical characteristic differ, and the physical characteristic of various components in power grid can be arranged in net structure configuration.By the way that network is arranged Component property in configuration defines its matrix element in Load flow calculation, forms network configuration figure and is individually calculated it, And it is equivalent to carry out data.Compared with traditional tidal current computing method matrix construction is larger, network configuration can carry out automatically it is equivalent, Simplify the structure of net structure.
Visualization construction has been carried out to network condition by network configuration figure, can have been suited with real network height, if Network has change, it is only necessary to change cyclization figure, have higher real-time and accuracy.Whether net structure configuration is simultaneously Energy cyclization provides Rule of judgment, if not meeting cyclization condition, is carried out by adjusting network connection relation and power supply load excellent Change.In addition, network configuration figure can read the real time data of power grid by unique index (key assignments), can be obtained in Load flow calculation To current Load flow calculation quantity of state initial value, calculating iterations can be reduced, avoid making trend meter due to the unreasonable of Initial value choice Calculate the local minimum that model is absorbed in mistake.Simulation operations can also be carried out, result of calculation can directly be reacted to be convenient in figure Analysis.
Power grid off-line model builds module, and the parameter for calling online Dynamic model bank builds power grid off-line model.Electricity The input terminal of net off-line model structure module is connect with Data Analysis Services module, and output end is connect with Load flow calculation module, will Off-line simulation calculating is carried out in the power grid off-line model input Load flow calculation module of structure.
Load flow calculation module carries out Load flow calculation, or distinguish partial electric grid for calling power grid real-time model to the whole network Carry out the Load flow calculation in each region, be aggregated into the whole network, obtain closed loop power flow control condition and cyclization suggestion or Obtain the suggestion of tide optimization;And power grid off-line model is called, Load flow calculation is carried out to the whole network, or opened respectively partial electric grid The Load flow calculation in each region is opened up, is aggregated into the whole network, the suggestion of looped network planning is obtained.
The suggestion of cyclization include under current trend can cyclization, be unable to the suggestion etc. that cyclization then carries out tide optimization.Work as conjunction The suggestion of ring is when cannot carry out cyclization, and Load flow calculation module calls power grid real-time model again, and Load flow calculation is carried out to the whole network, Or carry out Load flow calculation in each region respectively to partial electric grid, it is aggregated into the whole network, obtains the suggestion of tide optimization.Tide Flow-optimized suggestion includes active power adjustment position and adjustment amount, i.e. power plant's output adjustment amount, load adjustment amount;Idle adjustment position And adjustment amount, i.e. load tap changer adjustment amount, reactive power compensator adjustment amount etc..
When cannot still meet the condition of closed loop power flow control after the suggestion of tide optimization deviates reality, or optimization, call Power grid off-line model carries out Load flow calculation to the whole network, or carries out the Load flow calculation in each region, Jiang Qihui respectively to partial electric grid Always to the suggestion in the whole network, obtaining looped network planning.Looped network planning suggestion include:The replacement of mutual inductor, main transformer circuit on looped network Etc. equipment whether need technological transformation replace etc..
Load flow calculation module is made of the computing unit of more installation LINUX systems in the present embodiment, receives cyclization calculating Tidal current analysis calculating is carried out after order or data-triggered, and result of calculation is returned after calculating.Using Load flow calculation module into When row Load flow calculation, the layering of the whole network and partial electric grid, such as prefecture-level power grid, County Power Grid are carried out, power grids at different levels are carried out Subregion carries out the Load flow calculation in each region respectively.Subregion is mainly the standard for considering big the cyclization assessment and operation in power distribution network True property, layering mainly consider the convenience of the small cyclization or grid switching operation in power distribution network under the region.
In the present embodiment, to each counties and districts' power grid carry out subregion, carry out Load flow calculation during, because each counties and districts' power grid with City-level power grid connects (city-level power grid is similar) with other counties and districts' power grids, is calculated to simplify, external connection power grid can be carried out etc. Effect only focuses on contact interface power exchange capacity, such as active power, reactive power.Each counties and districts' power grid is carried out respectively in each region Load flow calculation, be aggregated into the whole network, for a certain looped network section, after both having met closed loop power flow condition and cyclization, N-1 equipment is not Overload, and the whole network trend can be met and be no more than equipment service ability.Compared with common Load flow calculation module, using layering, divide Area is calculated, and Load flow calculation is made more to refine, convenient for work about electric power personnel targetedly involutive ring result of calculation into Row is checked, while effectively raising the accuracy of Load flow calculation, helps to improve the reliability of power supply.
It should be noted that further including having permission to access setup module in server, after carrying out Sub-region and hierarchical, to client User accesses and provides and limit, and to ensure the safety of user information, while client being avoided to misunderstand other regions due to error Cyclization calculate information, lead to the adjusting and control of mistake, cause have a power failure, damage electric utility the problems such as.The user of client Delineation of power also is carried out to the user of Sub-region and hierarchical in rights management classification, is connect with remote switching operation service system for system It is reserved to do permission.
Database module, for storing online dynamic model data, power grid Real-time Power Flow data, power grid real-time model number According to, the result of power grid off-line model data and Load flow calculation.
The result of Load flow calculation includes the condition and suggestion of closed loop power flow control, the suggestion of tide optimization and looped network planning Suggestion, fed back and shown in client.Simultaneously during entire Load flow calculation, the parameter and data of acquisition generate Online dynamic model data, power grid Real-time Power Flow data, power grid real-time model data, power grid off-line model data and trend meter Result data is calculated, is stored in database module, access and use in order to client to data and calculation of tidal current. Each hierarchical system shares a database, it can be achieved that electric network model off-line data, real-time running data, equipment component supplemental characteristic It is shared.
After server obtains the instruction of cyclization, grid equipment parameter is obtained by Data Analysis Services module, and to equipment Parameter optimizes modeling and forms online Dynamic model bank, the real-time calling electric network swim data from Automation System of Power Network, will It is integrally formed power grid Real-time Power Flow data.Power grid real-time model generation module calls power grid Real-time Power Flow data, by itself and net Network constructs configuration module data and generates power grid real-time model.Load flow calculation module calls the power grid real-time model, carries out the whole network Load flow calculation, or or carry out Load flow calculation in each region respectively to partial electric grid, be aggregated into the whole network, obtain cyclization tide The condition of flow control and the suggestion of cyclization.When the suggestion of cyclization be cannot carry out cyclization when, again call power grid real-time model into Row Load flow calculation obtains the suggestion of tide optimization.It cannot still meet cyclization after the suggestion of tide optimization deviates reality, or optimization When the condition of power flowcontrol, the parameter of online Dynamic model bank is called, builds power grid off-line model, Load flow calculation module calls electricity Net off-line model carries out Load flow calculation, obtains the suggestion of looped network planning.And in the whole process, the parameter and data of acquisition are raw At model data, the result etc. of Load flow calculation is stored in database module.
Optionally, database module includes database management module, for being managed to the data in database.
Database management module includes historical data database management module and real time database management module.
The historical data database management module, for carrying out storage management to historical load, history power plant manufacture information.
The real time database management module, for the flow data to current scheduling automated system, metering automation system The load data of system, the plant information of small power station's system carry out storage management.Database management module can store data It is shown, i.e., is deposited in historical data database management module and real time database management module with management, including push client The data such as historical load, the small power station's system plant information of storage can be shown to client push, convenient for staff to electricity The real-time understanding and assurance of network operation situation, help to improve the safety of cyclization.
Optionally, which further includes interface display module, for by the result of Load flow calculation using report, diagram or its Comprehensive mode is shown.Analysis result is shown from different levels such as time, space, event, purposes, using report, diagram With comprehensive mode, orderliness is more clear, convenient for checking for staff.
Optionally, which further includes data check module, is checked for the result to Load flow calculation.It can be by trend The result of calculating is input in unified anti-error expert database, the power generation in device parameter, small electric system in calling model Plan, historical data etc. check calculation of tidal current, to determine whether disclosure satisfy that cyclization condition, carry out cyclization behaviour Make.The accuracy for improving Load flow calculation, the problems such as avoiding causing power failure and electric utility to damage due to maloperation, mistuning control.
Optionally, which further includes remote access module, the remote access for realizing client to server.It is in Client at county level can carry out the access of ground level server by way of remote access, can call device parameter and Real-time Power Flow Data realize the Load flow calculation of corresponding region, can reflect the regional power grid operating condition in real time, improve regional power grid Load flow calculation Accuracy.
Optionally, electric network swim data include SCADA formatted datas.Grid equipment parameter includes PSASP, BPA format number According to.Online data directly invokes automation SCADA formatted datas, and off-line data supports the formats such as PSASP, BPA.
Fig. 2 shows a kind of closed loop network turn power supply aid decision-making method flow chart provided by the embodiments of the present application, ginsengs See Fig. 2, this method comprises the following steps:
S101:According to cyclization computations, grid equipment parameter is obtained, and modeling is optimized to device parameter and is formed in Line Dynamic model bank;The real-time calling electric network swim data from Automation System of Power Network, are integrally formed power grid Real-time Power Flow Data.
S102:Power grid Real-time Power Flow data are called, itself and net structure configuration module data are generated into power grid real-time model.
S103:Power grid real-time model is called, Load flow calculation is carried out to the whole network, or carry out respectively in each region to partial electric grid Load flow calculation, be aggregated into the whole network, obtain closed loop power flow control condition and cyclization suggestion.
S104:When the suggestion of cyclization is that cannot carry out cyclization, power grid real-time model is called again, and trend is carried out to the whole network It calculates, or carries out the Load flow calculation in each region respectively to partial electric grid, be aggregated into the whole network, obtain building for tide optimization View.
S105:When cannot still meet the condition of closed loop power flow control after the suggestion of tide optimization deviates reality, or optimization, Online Dynamic model bank parameter is called, power grid off-line model is built.Power grid off-line model is called, Load flow calculation is carried out to the whole network, Or carry out Load flow calculation in each region respectively to partial electric grid, it is aggregated into the whole network, obtains the suggestion of looped network planning.
S106:By online dynamic model data, power grid Real-time Power Flow data, power grid real-time model data, the offline mould of power grid Type data and the result of Load flow calculation are stored in database module, access and use for client.
Optionally, this method further includes being checked to the result of Load flow calculation.
Optionally, the access with use of client include the mode of remote access.
This application provides a kind of closed loop networks to turn power supply aid decision-making system, calls the real-time flow data of power grid simultaneously After being integrated to it, power grid real-time model is formed in conjunction with net structure configuration data, and then carry out Load flow calculation, real-time calling Data can really react the operating condition of power grid, improve the accuracy of Load flow calculation.Grid equipment parameter is carried out simultaneously Optimization Modeling establishes power grid off-line model and carries out Load flow calculation, integration is optimized to the data of calling, improves number According to accuracy.The efficiency for being conducive to improve accuracy and calculating that electric network swim calculates avoids the mistuning of cyclization, accidentally controls The problems such as.In addition by the whole network and partial electric grid layering, partial electric grid carry out subregion, expansion layering, subregion Load flow calculation, for A certain looped network section, can meet closed loop power flow adjust and cyclization after equipment nonoverload and meet the whole network trend be no more than set Standby service ability, makes Load flow calculation more refine, and improve the accuracy of calculating, helps to improve closed loop network and turns The reliability of power supply and safety.In addition each level shares a sets of data, realizes electric network model off-line data, real time execution number It is shared according to, device network supplemental characteristic.
It should be noted that such as " the terms "include", "comprise" or its any other variant are intended to nonexcludability Include but also include not bright so that article or equipment including a series of elements include not only those elements The other element really listed, or further include for elements inherent to such a process, method, article, or device.Do not having In the case of more limitations, the element that is limited by sentence "including a ...", it is not excluded that including the element process, There is also other identical elements in method, article or equipment.
The above is only the specific implementation mode of the application, is made skilled artisans appreciate that or realizing this Shen Please.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can in other embodiments be realized in the case where not departing from spirit herein or range.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.
It should be understood that the application is not limited to the content for being described above and being shown in the accompanying drawings, and can To carry out various modifications and change without departing from the scope.Scope of the present application is only limited by the accompanying claims.

Claims (9)

1. a kind of closed loop network turns power supply aid decision-making system, which is characterized in that including server and several clients;
The server includes Data Analysis Services module, power grid real-time model generation module, net structure configuration module, power grid Off-line model builds module, database module and Load flow calculation module;
The Data Analysis Services module optimizes modeling shape for obtaining grid equipment parameter, and to the device parameter At online Dynamic model bank, and the real-time calling electric network swim data from Automation System of Power Network, it is integrally formed power grid Real-time Power Flow data;
The power grid real-time model generation module, for calling the power grid Real-time Power Flow data, by itself and the net structure Configuration module data generate power grid real-time model;
The net structure configuration module turns power supply calculation model for passing through visualization electrical network assembly formation cyclization;
The power grid off-line model builds module, and the parameter for calling the online Dynamic model bank builds the offline mould of power grid Type;
The Load flow calculation module carries out Load flow calculation, or to partial electric grid for calling the power grid real-time model to the whole network Carry out the Load flow calculation in each region respectively, be aggregated into the whole network, obtains the condition of closed loop power flow control and building for cyclization Discuss or obtain the suggestion of tide optimization;And the power grid off-line model is called, Load flow calculation is carried out to the whole network, or to local electricity Net carries out the Load flow calculation in each region respectively, is aggregated into the whole network, and the suggestion of looped network planning is obtained;
Database module, it is real-time for storing the online dynamic model data, the power grid Real-time Power Flow data, the power grid The result of model data, the power grid off-line model data and the Load flow calculation.
2. system according to claim 1, which is characterized in that the database module includes database management module, is used It is managed in the data in the database;
The database management module includes historical data database management module and real time database management module;
The historical data database management module, for carrying out storage management to historical load, history power plant manufacture information;
The real time database management module, for the flow data to current scheduling automated system, metering automation system Load data, small power station's system plant information carry out storage management.
3. system according to claim 1, which is characterized in that the system also includes interface display modules, are used for institute The result for stating Load flow calculation is shown by the way of report, diagram or its synthesis.
4. system according to claim 1, which is characterized in that the system also includes data check modules, for institute The result for stating Load flow calculation is checked.
5. system according to claim 1, which is characterized in that the system also includes remote access module, for realizing Remote access of the client to server.
6. system according to claim 1, which is characterized in that the electric network swim data include SCADA formatted datas;Institute It includes PSASP, BPA formatted data to state grid equipment parameter.
7. a kind of closed loop network turns power supply aid decision-making method, which is characterized in that including:
According to cyclization computations, grid equipment parameter is obtained, and modeling is optimized to the device parameter and forms online move States model library;The real-time calling electric network swim data from Automation System of Power Network are integrally formed power grid Real-time Power Flow data;
The power grid Real-time Power Flow data are called, itself and net structure configuration module data are generated into power grid real-time model;
The power grid real-time model is called, Load flow calculation is carried out to the whole network, or carry out the tide in each region respectively to partial electric grid Stream calculation is aggregated into the whole network, and the suggestion of the condition and cyclization of closed loop power flow control is obtained;
When the suggestion of cyclization is that cannot carry out cyclization, the power grid real-time model is called again, and Load flow calculation is carried out to the whole network, Or carry out Load flow calculation in each region respectively to partial electric grid, it is aggregated into the whole network, obtains the suggestion of tide optimization;
When cannot still meet the condition of closed loop power flow control after the suggestion of the tide optimization deviates reality, or optimization, call The parameter of the online Dynamic model bank builds power grid off-line model;The power grid off-line model is called, trend is carried out to the whole network It calculates, or carries out the Load flow calculation in each region respectively to partial electric grid, be aggregated into the whole network, obtain building for looped network planning View;
By the online dynamic model data, the power grid Real-time Power Flow data, the power grid real-time model data, the power grid Off-line model data and the result of the Load flow calculation are stored in database module, access and use for client.
8. the method according to the description of claim 7 is characterized in that the method further include to the result of the Load flow calculation into Row is checked.
9. the method according to the description of claim 7 is characterized in that accessing and using for the client includes remote access Mode.
CN201810172413.6A 2018-03-01 2018-03-01 Power distribution network closed loop switching power supply auxiliary decision making system Active CN108390373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810172413.6A CN108390373B (en) 2018-03-01 2018-03-01 Power distribution network closed loop switching power supply auxiliary decision making system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810172413.6A CN108390373B (en) 2018-03-01 2018-03-01 Power distribution network closed loop switching power supply auxiliary decision making system

Publications (2)

Publication Number Publication Date
CN108390373A true CN108390373A (en) 2018-08-10
CN108390373B CN108390373B (en) 2020-09-22

Family

ID=63070128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810172413.6A Active CN108390373B (en) 2018-03-01 2018-03-01 Power distribution network closed loop switching power supply auxiliary decision making system

Country Status (1)

Country Link
CN (1) CN108390373B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109840716A (en) * 2019-02-21 2019-06-04 国网山东省电力公司临沂供电公司 A kind of power supply system aid decision-making method and device, system
CN109861212A (en) * 2019-02-21 2019-06-07 国网山东省电力公司临沂供电公司 A kind of power supply system diagnosing, alarming method and device, system
CN111104770A (en) * 2019-12-20 2020-05-05 云南电网有限责任公司信息中心 Method for rapidly calculating power outage area based on single line diagram topological relation
CN111509703A (en) * 2020-04-22 2020-08-07 云南电网有限责任公司电力科学研究院 Power distribution network loop closing and power adjusting operation decision method and system
CN111682534A (en) * 2020-06-17 2020-09-18 广东电网有限责任公司 Method for analyzing batch transfer scheme of feeder lines of power distribution network
CN113746102A (en) * 2021-08-26 2021-12-03 国网山东省电力公司潍坊供电公司 Power grid load flow calculation extension splicing model and method thereof
CN114336634A (en) * 2021-12-31 2022-04-12 广东电网有限责任公司 Load flow calculation method, device and equipment of power grid system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104268328A (en) * 2014-09-21 2015-01-07 国家电网公司 Real-time dada based electromagnetic closed loop conductive operation system
CN105429137A (en) * 2015-12-09 2016-03-23 云南电网有限责任公司红河供电局 Distribution network loop closing power supply switching method
CN107093928A (en) * 2017-03-31 2017-08-25 贵州电网有限责任公司凯里供电局 Power distribution network scheduling aid decision and trouble analysis system
CN107492890A (en) * 2017-10-23 2017-12-19 云南电网有限责任公司临沧供电局 A kind of cyclization turns the computational methods of power supply control parameter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104268328A (en) * 2014-09-21 2015-01-07 国家电网公司 Real-time dada based electromagnetic closed loop conductive operation system
CN105429137A (en) * 2015-12-09 2016-03-23 云南电网有限责任公司红河供电局 Distribution network loop closing power supply switching method
CN107093928A (en) * 2017-03-31 2017-08-25 贵州电网有限责任公司凯里供电局 Power distribution network scheduling aid decision and trouble analysis system
CN107492890A (en) * 2017-10-23 2017-12-19 云南电网有限责任公司临沧供电局 A kind of cyclization turns the computational methods of power supply control parameter

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109840716A (en) * 2019-02-21 2019-06-04 国网山东省电力公司临沂供电公司 A kind of power supply system aid decision-making method and device, system
CN109861212A (en) * 2019-02-21 2019-06-07 国网山东省电力公司临沂供电公司 A kind of power supply system diagnosing, alarming method and device, system
CN111104770A (en) * 2019-12-20 2020-05-05 云南电网有限责任公司信息中心 Method for rapidly calculating power outage area based on single line diagram topological relation
CN111104770B (en) * 2019-12-20 2022-06-21 云南电网有限责任公司信息中心 Method for rapidly calculating power outage area based on single line diagram topological relation
CN111509703A (en) * 2020-04-22 2020-08-07 云南电网有限责任公司电力科学研究院 Power distribution network loop closing and power adjusting operation decision method and system
CN111682534A (en) * 2020-06-17 2020-09-18 广东电网有限责任公司 Method for analyzing batch transfer scheme of feeder lines of power distribution network
CN113746102A (en) * 2021-08-26 2021-12-03 国网山东省电力公司潍坊供电公司 Power grid load flow calculation extension splicing model and method thereof
CN113746102B (en) * 2021-08-26 2023-07-07 国网山东省电力公司潍坊供电公司 Power grid tide calculation expansion splicing model and method thereof
CN114336634A (en) * 2021-12-31 2022-04-12 广东电网有限责任公司 Load flow calculation method, device and equipment of power grid system

Also Published As

Publication number Publication date
CN108390373B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN108390373A (en) A kind of closed loop network turn power supply aid decision-making system
US11378994B2 (en) Systems and methods for grid operating systems in electric power systems
Manbachi et al. Real-time co-simulation platform for smart grid volt-VAR optimization using IEC 61850
Hommelberg et al. Distributed control concepts using multi-agent technology and automatic markets: An indispensable feature of smart power grids
CN103038606B (en) Intelligent core engine
CN102209074B (en) All-digital dynamic simulation system of power system
CN102812334B (en) Utility grid command filter system
US20100292857A1 (en) Electrical network command and control system and method of operation
CN103718566B (en) social infrastructure control system, control method, control device and server
Repo et al. The IDE4L project: Defining, designing, and demonstrating the ideal grid for all
CN102938098A (en) Power grid operation manner expert system
CN104537428B (en) One kind meter and the probabilistic economical operation appraisal procedure of wind power integration
Elizabeth et al. Smart grid technology potentials in Nigeria: An Overview
CN105893714B (en) Based on the detection of automatic voltage control system closed loop and appraisal procedure under Bulk power system simulation system
Kulkarni et al. A review on smart grid architecture and implementation challenges
Parkinson et al. Wind integration in self-regulating electric load distributions
Vadari The future of distribution operations and planning: The electric utility environment is changing
CN116628937A (en) Automatic fusion maintenance method, device, equipment and medium for power grid equipment model
Xu et al. A two-level hierarchical discrete-device control method for power networks with integrated wind farms
Jha et al. Volt/VAR Optimization (VVO) Application on GridAPPS-D Platform
Lukovic et al. Adapting multi-agent systems approach for integration of prosumers in smart grids
JP2024035816A (en) System and method for control of power distribution systems enabling power outage rotation
Antoniadou-Plytaria et al. Specifications of functional requirements
CN117391798A (en) Automatic issuing method, system, equipment and storage medium for substation operation ticket
Pouraltafi-Kheljan Design of a Centralized Microgrid Controller in Compliance with IEEE 2030.7 Standard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant