CN108388617A - The data processing method and device of Distribution power network GIS platform - Google Patents
The data processing method and device of Distribution power network GIS platform Download PDFInfo
- Publication number
- CN108388617A CN108388617A CN201810136983.XA CN201810136983A CN108388617A CN 108388617 A CN108388617 A CN 108388617A CN 201810136983 A CN201810136983 A CN 201810136983A CN 108388617 A CN108388617 A CN 108388617A
- Authority
- CN
- China
- Prior art keywords
- power network
- change operation
- change
- network line
- gis platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The present invention relates to a kind of data processing method, device, computer equipment and the storage medium of Distribution power network GIS platform, this method includes:The data processing method of Distribution power network GIS platform, including:It obtains user and operates the generated change operation requests to power network line in GIS platform;Obtain the lock condition of power network line;When lock condition meets the requirement of change operation, locks power network line and corresponding change operation is carried out to power network line according to change operation requests.The line anomalies of this method caused GIS platform when can avoid multiple electronic transfer sheets to the progress of the same power network line and edlin.
Description
Technical field
The present invention relates to electric power network technique fields, more particularly to a kind of data processing method of Distribution power network GIS platform, dress
It sets, computer equipment and storage medium.
Background technology
GIS-Geographic Information System (Geographic Information System, abbreviation GIS) is to provide storage, show
Show, analyze the system platform of geographical data function.GIS platform is used in electric power network technique field, i.e. electric power GIS, and electric power is looked forward to
The core business such as power equipment, substation, transmission and distribution networks, power consumer and the electric load of industry and production and management connect shape
At the integrated information system of the production management of power informatization.It is south electric network " 6+1 " system one that distribution electronization, which transfers business,
The business of a core is mainly core traditional production system, power network GIS platform, marketing system, data resource using equipment
The production business of platform etc. integrates to form a set of integrated managing power network resources flow, the wherein content of resource management just
It is power equipment management, including the contents such as distribution net equipment functional location information, distribution net equipment account management.
Electronization transfers function:Data maintenance personnel transfer related data according to electronization, use Distribution power network GIS
Power network modeling function safeguards electric network model, power network topology in platform C/S clients, and the functional location information changed is pushed
To production system, production system amended record underlying assets information is managed for related procedure in production management system, holds
Row, can check the related data of generation and be summarized to related data, then be summarized by data resource platform, extensively
It broadcasts, forms closed loop management of the electronic data in each system.
And it is likely to occur multiple electronic transfer sheets in Distribution power network GIS platform, simultaneously edlin is carried out to the same power network line
The case where, this this may result in the line anomalies of GIS platform.
Invention content
Based on this, it is necessary to be led into edlin to the same power network line for multiple electronization transfer sheets in GIS platform
In the GIS platform of cause the problem of line anomalies, a kind of data processing method of Distribution power network GIS platform, device, computer are provided and set
Standby and storage medium.
A kind of data processing method of Distribution power network GIS platform, including:
It obtains user and operates the generated change operation requests to power network line in GIS platform;
Obtain the lock condition of the power network line;
When the lock condition meets the requirement of change operation, locks the power network line and operated according to the change
Request carries out corresponding change operation to the power network line.
In another embodiment, the power network line is locked and according to the change operation requests to the power network line
The step of carrying out corresponding change operation, including:
According to change operation and the corresponding situation of lock operation, corresponding lock operation is carried out to the power network line;
Corresponding change is carried out according to the change operation requests to the power network line to operate;
Release the locking to the power network line.
In another embodiment, the method further includes:The correspondence of change operation and lock condition is pre-established,
And the correspondence of change operation and lock operation.
In another embodiment, when the lock condition is unsatisfactory for the requirement of change operation, the change is operated
Request, which is added, executes queue.
In another embodiment, lock operation includes the locking of exclusive locking drawn game portion;
The change operation includes whole change operation, attribute changes operation and is associated with change operation;
The correspondence of the change operation and lock condition, including:It is not that whole change, which operates corresponding lock condition,
Integral locking, it is non-integral locking and non-local locks with respect, operation associated corresponding lock that attribute changes, which operate corresponding lock condition,
Condition of pledging love is non-integral locking or non-local locks with respect;
The correspondence of change operation and lock operation, including:Whole change operation and corresponding, the attribute changes of exclusive locking
Operation is corresponding with local locks with respect.
A kind of data processing equipment of Distribution power network GIS platform, including:Acquisition request module, lock condition acquisition module and
Change module;
The acquisition request module operates the generated change to power network line for obtaining user in GIS platform
Operation requests;
The lock condition acquisition module, the lock condition for obtaining the power network line;
The change module, for when the lock condition meets the requirement that change operates, locking the power network line
And corresponding change operation is carried out to the power network line according to the change operation requests.
In another embodiment, the change module, including locking module, change operation module and unlocked state;
The locking module, for according to change operation and the corresponding situation of lock operation, being carried out to the power network line
Corresponding lock operation;
The change operation module, for carrying out corresponding change to the power network line according to the change operation requests
Operation;
The unlocked state, for releasing the locking to the power network line.
In another embodiment, described device further includes:The correspondence of change operation and lock condition is pre-established,
And the correspondence of change operation and lock operation.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, which is characterized in that the processor is realized when executing described program at the data of above-mentioned Distribution power network GIS platform
The step of reason method.
A kind of storage medium, is stored thereon with computer program, which is characterized in that real when the program is executed by processor
The step of data processing method of existing above-mentioned Distribution power network GIS platform.
Data processing method, device, computer equipment and the storage medium of above-mentioned Distribution power network GIS platform, when the lock
When condition of pledging love meets the requirement of change operation, corresponding change behaviour is carried out to the power network line according to the change operation requests
Make, the circuit of caused GIS platform when to avoid multiple electronic transfer sheets from carrying out the same power network line and edlin
It is abnormal.
Description of the drawings
Fig. 1 is the flow chart of the data processing method of the Distribution power network GIS platform of one embodiment;
Fig. 2 is the flow chart of the data processing method of the Distribution power network GIS platform of another embodiment;
Fig. 3 is the structure diagram of the data processing equipment of the Distribution power network GIS platform of one embodiment.
Specific implementation mode
Fig. 1 is the flow chart of the data processing method of the Distribution power network GIS platform of one embodiment.As shown in Figure 1, this method
Include the following steps:
S102 obtains user and operates the generated change operation requests to power network line in GIS platform.
Wherein, user refers to data maintenance personnel.Data maintenance personnel transfer related data according to electronization, use power grid
Power network modeling function safeguards electric network model, power network topology, and the function digit confidence that will be changed in the C/S clients of GIS platform
Breath pushes to production system, and production system amended record underlying assets information carries out pipe in production management system for related procedure
Reason executes, and can be checked to the related data of generation and be summarized to related data, then converged by data resource platform
Always, it broadcasts, forms closed loop management of the electronic data in each system.
User operates the change operation requests generated to power network line in GIS platform.For example, an electronic transfer sheet
It is required that being to move device left, user operates in GIS platform according to the requirement of electronic transfer sheet, generates change behaviour
It asks, that is, it is related with the operation in GIS platform to change operation requests.
S104 obtains the lock condition of power network line.
The lock condition of power network line includes the locking of exclusive locking drawn game portion.Wherein, exclusive locking refers to that power network line is whole
Body is locked, can not carry out any modification to the circuit.The circuit active accommodation function of local locks with respect power network line is locked, only
It can carry out passive association change.It is not isolated in the line construction of power grid, between each circuit, to current line branch
Carry out the operations such as newly-built switch, newly-built conducting wire, if current line branch and other lines branch there are incidence relation, when
The aforesaid operations of preceding lines branch, it will lead to the raw association change of current line branch.Therefore, association change refers to following pass
Connection other lines branch change and to current line branch carry out change.It, can not when power network line local locks with respect
It is actively modified according to user's operation, can only carry out passively being associated with change.
S106 locks power network line and according to change operation requests pair when lock condition meets the requirement of change operation
Power network line carries out corresponding change operation.
In the present embodiment, the lock condition requirement of each change operation is pre-set.For example, when needing to carry out such as to line
The affiliated feeder line change of road branch, the source station of feeder line is changed, circuit is transferred, modification that is newly-built or deleting the globalities such as branch
When, it is desirable that power network line is not by integral locking.When lock condition meets the requirement of change operation, locking power network line and basis
Change operation requests are modified processing to power network line.That is, when lock condition is unsatisfactory for the requirement of change operation, it can not be to electricity
Cable road is modified operation.When lock condition meets the requirement of change operation, conducts the locking operations, can keep away to power network line
When exempting from current work order and handling power network line, occur parallel to the power network line and edlin.
The data processing method of above-mentioned Distribution power network GIS platform, when lock condition meets the requirement of change operation, locking
Power network line simultaneously carries out corresponding change operation according to change operation requests to power network line, to avoid multiple electronic transfer sheets
The line anomalies of caused GIS platform when to the progress of the same power network line and edlin.
In another embodiment, when lock condition is unsatisfactory for the requirement of change operation requests, change request is added
Execute queue.
It executes queue and uses first in, first out mechanism, when lock condition is unsatisfactory for the requirement of change operation requests, by change
The sequencing for the time that operation requests generate is added and executes queue.When corresponding power network line unlocks, successively from team
Change operation requests are taken out in row, are handled.
Fig. 2 is the flow chart of the data processing method of the Distribution power network GIS platform of another embodiment, as shown in Fig. 2, the party
Method includes:
S202 pre-establishes the correspondence of change operation and lock condition, and pair of change operation and lock operation
It should be related to.
Lock operation includes the locking of exclusive locking drawn game portion.
Change operation includes whole change operation, attribute changes operation and is associated with change operation.
Specifically, the correspondence of change operation and lock condition, including:It is not that whole change operation, which requires lock condition,
Integral locking, it is non-integral locking and non-local locks with respect that attribute changes operation, which requires lock condition, and operation associated requirement locks feelings
Condition is non-integral locking or non-local locks with respect.
The correspondence of change operation and lock operation, including:Whole change operation and corresponding, the attribute changes of exclusive locking
Operation is corresponding with local locks with respect.
Specifically, the affiliated feeder line that whole change operation includes lines branch is changed, the source station of feeder line is changed, circuit
It transfers, newly-built or deletion branch.
Attribute changes operate:" line name " of lines branch, " maintenance department ", " operation number ", " whether specially
The determinant attributes such as line " change.
Association change refers to the change for following associated other lines branch and the change carried out to current line branch.
It is not isolated in the line construction of power grid, between each circuit, such as newly-built switch is carried out to current line branch, creates and leads
The operations such as line, if there are incidence relations for current line branch and other lines branch, the aforesaid operations of current line branch will
It can lead to the raw association change of current line branch.
S204 obtains user and operates the generated change operation requests to power network line in GIS platform.
Wherein, user refers to data maintenance personnel.Data maintenance personnel transfer related data according to electronization, use power grid
Power network modeling function safeguards electric network model, power network topology, and the function digit confidence that will be changed in the C/S clients of GIS platform
Breath pushes to production system, and production system amended record underlying assets information carries out pipe in production management system for related procedure
Reason executes, and can be checked to the related data of generation and be summarized to related data, then converged by data resource platform
Always, it broadcasts, forms closed loop management of the electronic data in each system.
User operates the change operation requests generated to power network line in GIS platform.For example, an electronic transfer sheet
It is required that being to move device left, user operates in GIS platform according to the requirement of electronic transfer sheet, generates change behaviour
It asks, that is, it is related with the operation in GIS platform to change operation requests.
S206 obtains the lock condition of power network line.
The lock condition of power network line includes the locking of exclusive locking drawn game portion.Wherein, exclusive locking refers to that power network line is whole
Body is locked, can not carry out any modification to the circuit.The circuit active accommodation function of local locks with respect power network line is locked, only
It can carry out passive association change.It is not isolated in the line construction of power grid, between each circuit, to current line branch
Carry out the operations such as newly-built switch, newly-built conducting wire, if current line branch and other lines branch there are incidence relation, when
The aforesaid operations of preceding lines branch, it will lead to the raw association change of current line branch.Therefore, association change refers to following pass
Connection other lines branch change and to current line branch carry out change.It, can not when power network line local locks with respect
It is actively modified according to user's operation, can only carry out passively being associated with change.
S208, when lock condition meets the requirement of change operation, according to the corresponding situation of more changed handling and lock operation,
Corresponding lock operation is carried out to the power network line.
When lock condition meets the requirement of change operation, conducts the locking operations to power network line, current work can be avoided
When single pair power network line is handled, occur parallel to the power network line and edlin.
S210 carries out corresponding change to power network line according to change request and operates.
S212 releases the locking to power network line.
After being modified operation to power network line, the locking to power network line is released so that other electronics transfer work order
Power network line is handled.Specifically, after unlocking, change operation requests are taken out in queue from executing, are handled.
The data processing method of above-mentioned Distribution power network GIS platform, by distinguishing actively change, determinant attribute changes and passive
Change can effectively reduce the case where lines branch locks, and increase the degree of parallelism of worksheet, reduce " lock is single " situation and go out
It is existing.
Fig. 3 is the data processing equipment of the Distribution power network GIS platform of one embodiment, including:Acquisition request module 302, lock
Condition of pledging love acquisition module 304 and change module 306.
Acquisition request module 302 operates the generated change behaviour to power network line for obtaining user in GIS platform
It asks.
Lock condition acquisition module 304, the lock condition for obtaining power network line.
Module 306 is changed, for when lock condition meets the requirement that change operates, locking power network line and according to change
Operation requests carry out corresponding change operation to power network line.
Specifically, module, including locking module, change operation module and unlocked state are changed;
Locking module, for according to change operation and the corresponding situation of lock operation, being corresponded to the power network line
Lock operation.
Operation module is changed, is operated for carrying out corresponding change to power network line according to change operation requests.
Unlocked state, for releasing the locking to power network line.
In yet another embodiment, the data processing equipment of Distribution power network GIS platform further includes preprocessing module, for pre-
First establish the correspondence of change operation and lock condition, and the correspondence of change operation and lock operation.
Specifically, lock operation includes the locking of exclusive locking drawn game portion;
Change operation includes whole change operation, attribute changes operation and is associated with change operation;
The correspondence of change operation and lock condition, including:It is not whole that whole change, which operates corresponding lock condition,
Locking, it is non-integral locking and non-local locks with respect, operation associated corresponding locking feelings that attribute changes, which operate corresponding lock condition,
Condition is non-integral locking or non-local locks with respect;
The correspondence of change operation and lock operation, including:Whole change operation and corresponding, the attribute changes of exclusive locking
Operation is corresponding with local locks with respect.
In a further embodiment, the data processing equipment of Distribution power network GIS platform further includes executing queue processing module,
For when lock condition being unsatisfactory for the requirement that change operates, change operation requests being added and execute queue.
The data processing equipment of above-mentioned Distribution power network GIS platform, by distinguishing actively change, determinant attribute changes and passive
Change can effectively reduce the case where lines branch locks, and increase the degree of parallelism of worksheet, reduce " lock is single " situation and go out
It is existing.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory simultaneously
The computer program that can be run on a processor, processor realize the Distribution power network GIS platform of the various embodiments described above when executing program
Data processing method the step of.
In one embodiment, a kind of storage medium is provided, computer program is stored thereon with, which is held by processor
When row, the step of realizing the data processing method of Distribution power network GIS platform of the various embodiments described above.
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield is all considered to be the range of this specification record.
Only several embodiments of the present invention are expressed for above example, the description thereof is more specific and detailed, but can not
Therefore it is construed as limiting the scope of the patent.It should be pointed out that for those of ordinary skill in the art,
Under the premise of not departing from present inventive concept, various modifications and improvements can be made, these are all within the scope of protection of the present invention.
Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of data processing method of Distribution power network GIS platform, including:
It obtains user and operates the generated change operation requests to power network line in GIS platform;
Obtain the lock condition of the power network line;
When the lock condition meets the requirement of change operation, the power network line is locked and according to the change operation requests
Corresponding change operation is carried out to the power network line.
2. the data processing method of Distribution power network GIS platform according to claim 1, which is characterized in that lock the power grid
Circuit simultaneously carries out the step of corresponding change operates according to the change operation requests to the power network line, including:
According to change operation and the corresponding situation of lock operation, corresponding lock operation is carried out to the power network line;
Corresponding change is carried out according to the change operation requests to the power network line to operate;
Release the locking to the power network line.
3. the data processing method of Distribution power network GIS platform according to claim 1, which is characterized in that
The method further includes:The correspondence of change operation and lock condition is pre-established, and change operation is grasped with locking
The correspondence of work.
4. the data processing method of Distribution power network GIS platform according to claim 1, which is characterized in that
When the lock condition is unsatisfactory for the requirement of change operation, the change operation requests are added and execute queue.
5. the data processing method of Distribution power network GIS platform according to claim 3, which is characterized in that lock operation includes
The locking of exclusive locking drawn game portion;
The change operation includes whole change operation, attribute changes operation and is associated with change operation;
The correspondence of the change operation and lock condition, including:It is not whole that whole change, which operates corresponding lock condition,
Locking, it is non-integral locking and non-local locks with respect, operation associated corresponding locking feelings that attribute changes, which operate corresponding lock condition,
Condition is non-integral locking or non-local locks with respect;
The correspondence of change operation and lock operation, including:Whole change operation is corresponding with exclusive locking, attribute changes operation
It is corresponding with local locks with respect.
6. a kind of data processing equipment of Distribution power network GIS platform, including:Acquisition request module, lock condition acquisition module and more
Change module;
The acquisition request module operates the generated change operation to power network line for obtaining user in GIS platform
Request;
The lock condition acquisition module, the lock condition for obtaining the power network line;
The change module, for when the lock condition meets the requirement that change operates, locking the power network line and root
Corresponding change operation is carried out to the power network line according to the change operation requests.
7. the data processing equipment of Distribution power network GIS platform according to claim 6, which is characterized in that
The change module, including locking module, change operation module and unlocked state;
The locking module, for according to change operation and the corresponding situation of lock operation, being corresponded to the power network line
Lock operation;
The change operation module is grasped for carrying out corresponding change to the power network line according to the change operation requests
Make;
The unlocked state, for releasing the locking to the power network line.
8. the data processing equipment of Distribution power network GIS platform according to claim 6, which is characterized in that described device is also wrapped
It includes:Preprocessing module, the correspondence for pre-establishing change operation and lock condition, and change operation and lock operation
Correspondence.
9. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor
Calculation machine program, which is characterized in that the processor realizes distribution described in any one of claim 1 to 5 when executing described program
The step of data processing method of net GIS platform.
10. a kind of storage medium, is stored thereon with computer program, which is characterized in that when the program is executed by processor, realize
The step of data processing method of Distribution power network GIS platform described in any one of claim 1 to 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810136983.XA CN108388617B (en) | 2018-02-09 | 2018-02-09 | The data processing method and device of Distribution power network GIS platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810136983.XA CN108388617B (en) | 2018-02-09 | 2018-02-09 | The data processing method and device of Distribution power network GIS platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108388617A true CN108388617A (en) | 2018-08-10 |
CN108388617B CN108388617B (en) | 2019-03-15 |
Family
ID=63075738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810136983.XA Active CN108388617B (en) | 2018-02-09 | 2018-02-09 | The data processing method and device of Distribution power network GIS platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108388617B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110113018A1 (en) * | 2008-02-05 | 2011-05-12 | International Business Machines Corporation | Method and system for merging disparate virtual universes entities |
CN102375727A (en) * | 2010-08-16 | 2012-03-14 | 北京国科恒通电气自动化科技有限公司 | Graphical maintenance method of hierarchical relation of circuits |
US20130226890A1 (en) * | 2012-02-29 | 2013-08-29 | Red Hat Inc. | Supporting transactions in distributed environments using a local copy of remote transaction data and optimistic locking |
CN103440546A (en) * | 2013-08-02 | 2013-12-11 | 广东电网公司电力科学研究院 | Method for automatically maintaining topological relation of power grid |
CN103632312A (en) * | 2013-12-06 | 2014-03-12 | 广东电网公司电力科学研究院 | Power grid resource module building method based on GIS (geographic information system) |
CN104239589A (en) * | 2013-06-20 | 2014-12-24 | 国家电网公司 | Method for implementing intelligent analysis system of distribution network business expansions |
CN105760429A (en) * | 2016-01-29 | 2016-07-13 | 厦门亿力吉奥信息科技有限公司 | Power grid equipment data check method and system thereof |
CN105976124A (en) * | 2016-05-18 | 2016-09-28 | 国网山东省电力公司经济技术研究院 | GIS-based power grid planning project full-process closed-loop control method and system |
-
2018
- 2018-02-09 CN CN201810136983.XA patent/CN108388617B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110113018A1 (en) * | 2008-02-05 | 2011-05-12 | International Business Machines Corporation | Method and system for merging disparate virtual universes entities |
CN102375727A (en) * | 2010-08-16 | 2012-03-14 | 北京国科恒通电气自动化科技有限公司 | Graphical maintenance method of hierarchical relation of circuits |
US20130226890A1 (en) * | 2012-02-29 | 2013-08-29 | Red Hat Inc. | Supporting transactions in distributed environments using a local copy of remote transaction data and optimistic locking |
CN104239589A (en) * | 2013-06-20 | 2014-12-24 | 国家电网公司 | Method for implementing intelligent analysis system of distribution network business expansions |
CN103440546A (en) * | 2013-08-02 | 2013-12-11 | 广东电网公司电力科学研究院 | Method for automatically maintaining topological relation of power grid |
CN103632312A (en) * | 2013-12-06 | 2014-03-12 | 广东电网公司电力科学研究院 | Power grid resource module building method based on GIS (geographic information system) |
CN105760429A (en) * | 2016-01-29 | 2016-07-13 | 厦门亿力吉奥信息科技有限公司 | Power grid equipment data check method and system thereof |
CN105976124A (en) * | 2016-05-18 | 2016-09-28 | 国网山东省电力公司经济技术研究院 | GIS-based power grid planning project full-process closed-loop control method and system |
Also Published As
Publication number | Publication date |
---|---|
CN108388617B (en) | 2019-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhou et al. | A dynamic programming algorithm for leveraging probabilistic detection of energy theft in smart home | |
Ebrahimian et al. | State estimation distributed processing [for power systems] | |
Torres et al. | Expansion planning for smart transmission grids using AC model and shunt compensation | |
Soltan et al. | A learning-based method for generating synthetic power grids | |
Zhao et al. | Fully decentralised multi‐area dynamic economic dispatch for large‐scale power systems via cutting plane consensus | |
CN105406459B (en) | Utilize the method for the optimal load flow estimated based on uniformity distributed treatment in power network | |
Xing et al. | Distributed algorithm for dynamic economic power dispatch with energy storage in smart grids | |
CN108536723B (en) | Distribution power network GIS electric wire figure multiplexing list cooperates with drafting method and device | |
CN103500237A (en) | Automatic image forming method for power distribution network based on logic layout | |
Mehrtash et al. | Security‐constrained transmission expansion planning using linear sensitivity factors | |
Hosseini et al. | Distributed control of electric vehicle fleets considering grid congestion and battery degradation | |
CN107609654A (en) | Management method, managing device and the terminal device of taiwan area | |
Nolan et al. | Compositional models for power systems | |
Ghezelbash et al. | A cyber‐secure model to decentralized co‐expansion planning of gas and electricity networks | |
Zhou et al. | Robustness analysis of power system dynamic process and repair strategy | |
CN109360265A (en) | A kind of method and device that the three-dimensional model structure tree for nuclear power station administration generates | |
CN108388617B (en) | The data processing method and device of Distribution power network GIS platform | |
CN103607048B (en) | An electric power network device fault diagnosis method and a system | |
Bao et al. | A substation-oriented approach to optimal phasor measurement units placement | |
CN115936365B (en) | Regional power spot market clearing method and device with multi-terminal direct-current tie line power optimization | |
CN104732449A (en) | Method for establishing operation mode model of information system | |
CN112258149B (en) | Method, device, equipment and storage medium for determining line rotatable power supply rate | |
CN113722728A (en) | Intelligent government affair information management method based on block chain | |
CN105119741A (en) | Cloud network reliability measuring method | |
CN108491435A (en) | Electric system data on stock exchange method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |