Invention content
The purpose of the present invention is to provide a kind of novel letter box arrangements, for overcoming drawbacks described above in the prior art.
A kind of novel letter box arrangement according to the present invention, including processing rack, the processing rack pass through take-off and landing device
Mounted on holder right end face, holder right end face bottom position, which is installed with, sets seat, described to set a top end surface
It is inside embedded with and sets chamber, the chamber left and right sides end surface symmetric that sets is installed with elastic snap-gauge, the processing rack bottom end face
It is interior to be equipped with installation cavity, be rotatably assorted in the installation cavity and processing cutter hub be installed, be equipped in inner wall on the right side of the installation cavity to
The lock being connect with the processing cutter hub lock fit joins device, is equipped in the processing rack inner wall on the left of the installation cavity
Chamber is slipped, is rotatably assorted in the wall body between the sliding chamber and the installation cavity and left-hand rotation syncranium is installed, the left-hand rotation syncranium
Spline recess is equipped in left end face, being slidably installed in the sliding chamber has trolley shoe, in the trolley shoe right end face
It is installed with the first electricity favourable turn, the first electricity favourable turn right-hand end power cooperation is equipped with to be connect with the spline recess spline fitted
Spline pin, it is described first electricity favourable turn upside the trolley shoe in screw-thread fit be equipped with left and right expand setting the first spiral
Bar, the first screw rod right side expansion end are rotatably assorted with inner wall on the right side of the sliding chamber and connect, first screw rod
Left side expands end and is installed with the first cone pulley, and intermeshing is equipped with the second cone pulley, second cone pulley on the upside of first cone pulley
Top end face is installed with the first Coupling Shaft, and first Coupling Shaft is expanded and is rotatably assorted company with the processing rack inner wall upwards
It connects, is slipped described in the upward jacking of the first Coupling Shaft in the first empty slot on the upside of chamber, second is equipped on the right side of first empty slot
Empty slot, second empty slot are located at right over the installation cavity, and unicom is equipped with lock between second empty slot and the installation cavity
Connect chamber, in the first empty slot described in the first Coupling Shaft top end jacking and end is installed with third cone pulley, described first turn
Spindle is fixedly arranged on through the second electricity favourable turn inner wall, the second electricity favourable turn in the processing rack inner wall, and described first is empty
Slot right-hand end is equipped with is installed with second turn with intermeshing 4th cone pulley of the third cone pulley, the 4th cone pulley right end face
Spindle, second Coupling Shaft be rotatably assorted with the processing rack inner wall connect and right side expand end jacking described in second
End is expanded in empty slot, on the right side of second Coupling Shaft and is installed with the 5th cone pulley, and the 5th cone pulley power cooperation installation is useful
In the latch members of the processing cutter hub lock fit connection, the outside of the first electricity favourable turn, which is additionally provided with support and carries, sets.
Valuably or illustratively, the latch members include the sealed plate being slidably installed in the interlocking chamber,
The sealed board bottom portion expansion section is installed with the sealed head to be connect with the processing cutter hub lock fit, the sealed plate top
End surface screw-internal thread fit is equipped with the second screw rod, and the second screw rod top end is installed with the 6th cone pulley, and described
Six cone pulleys are meshed with the 5th cone pulley.
Further technical solution, the lock connection device includes the folding and unfolding chamber being arranged on the right side of the installation cavity in inner wall,
Being slidably installed in the folding and unfolding chamber has sliding frame, is rotatably assorted in the sliding frame left end face and is equipped with right-hand rotation syncranium,
The sliding frame right end face power cooperation is equipped with pneumatic actuator, and the pneumatic actuator is fixedly arranged on the right side of the folding and unfolding chamber
In inner wall.
Further technical solution, the left-hand rotation syncranium are oppositely arranged with the right-hand rotation syncranium, and the left-hand rotation syncranium with
The adjacent end face of the right-hand rotation syncranium is symmetrical above and below respectively to be installed with lock plush copper, at left and right sides of the processing cutter hub end face be equipped with
The interlocking chamber of the lock mating connection of plush copper.
Further technical solution, the support, which carries, sets including shock dropping composite plate and cooling iron plate, the shock dropping composite plate
It is arranged in the top and bottom of the first electricity favourable turn and is fixedly connected with the first electricity favourable turn, the cooling iron plate setting exists
It is described first electricity favourable turn 1 front-end and back-end and with it is described first electricity favourable turn be fixedly connected, it is described second electricity favourable turn outside
The support is correspondingly provided with to carry and set.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, since processing rack is pacified by take-off and landing device
Mounted in holder right end face, it is equipped with installation cavity in processing rack bottom end face, is rotatably assorted in installation cavity and processing cutter hub is installed,
It is equipped in inner wall on the right side of installation cavity and joins device, the processing rack on the left of installation cavity to the lock being connect with processing cutter hub lock fit
It is equipped with sliding chamber in inner wall, is rotatably assorted in sliding wall body between chamber and installation cavity and left-hand rotation syncranium is installed, left-hand rotation syncranium
Spline recess is equipped in left end face, being slidably installed in sliding chamber has trolley shoe, and the is installed in trolley shoe right end face
One electricity favourable turn, the first electricity favourable turn right-hand end power cooperation are equipped with the spline pin being connect with spline recess spline fitted, the first electricity
Screw-thread fit is equipped with the first screw rod that setting is expanded in left and right in the trolley shoe of favourable turn upside, and end is expanded on the first screw rod right side
End is rotatably assorted with inner wall on the right side of sliding chamber and connect, and end is expanded on the left of the first screw rod and is installed with the first cone pulley, the first cone pulley
Upside intermeshing is equipped with the second cone pulley, and the second cone pulley top end face is installed with the first Coupling Shaft, and the first Coupling Shaft is expanded simultaneously upwards
It is rotatably assorted and connect with processing rack inner wall, the upward jacking of the first Coupling Shaft is slipped in the first empty slot on the upside of chamber, and first is empty
The second empty slot is equipped on the right side of slot, the second empty slot is located at right over installation cavity, and unicom is equipped with interlocking between the second empty slot and installation cavity
Chamber, in first Coupling Shaft top end the first empty slot of jacking and end are installed with third cone pulley, and the first Coupling Shaft is through the second electricity
Favourable turn inner wall, the second electricity favourable turn are fixedly arranged in processing rack inner wall, and the first empty slot right-hand end is equipped with mutual with third cone pulley
4th cone pulley of engagement, the 4th cone pulley right end face are installed with the second Coupling Shaft, and the second Coupling Shaft turns with processing rack inner wall
It is dynamic to be connected and in right side expansion the second empty slot of end jacking, end is expanded on the right side of the second Coupling Shaft and is installed with the 5th cone pulley,
The cooperation of 5th cone pulley power is equipped with the latch members for processing the connection of cutter hub lock fit, and then realizes high efficiency cutting work
Make, meanwhile, it can realize the quickly locking work to processing cutter hub and automatically control dismantlement work, improve the operation of the present apparatus
Stability, and in locking, spline pin is in disengaged position with spline recess, and processing cutter hub can not rotate, and substantially increase this
Device be not used when safety, and disassembling, assembling and replacing process cutter hub when, processing cutter hub will not accidental activation and rotate, protect
The safety of disassembling, assembling and replacing is demonstrate,proved.
Specific implementation mode
With reference to Fig. 1-4, the present invention is described in detail.
Referring to Fig.1-4, a kind of novel letter box arrangement according to an embodiment of the invention, including processing rack 100, it is described
It processes rack and 200 right end face of holder is mounted on by take-off and landing device 300,200 right end face bottom position of the holder is solid
Equipped with setting seat 500, it is described set to be embedded in 500 top end surface of seat set chamber 400, it is described to set 400 left and right sides end of chamber
Face is symmetrically installed with elastic snap-gauge 600, and installation cavity 105, the installation cavity 105 are equipped in 100 bottom end face of processing rack
In be rotatably assorted processing cutter hub 114 be installed, be equipped in 105 right side inner wall of the installation cavity to the processing cutter hub 114
The lock of lock fit connection joins device, and sliding chamber is equipped in 100 inner wall of processing rack in 105 left side of the installation cavity
123, it is rotatably assorted in the wall body between the sliding chamber 123 and the installation cavity 105 and left-hand rotation syncranium 116 is installed, the left side
Turn to be equipped with spline recess 117 in 116 left end face of syncranium, being slidably installed in the sliding chamber 123 has trolley shoe 120, institute
It states and is installed with the first electricity favourable turn 121 in 120 right end face of trolley shoe, the first electricity favourable turn 121 right-hand end power cooperation installation
There are the spline pin 118 being connect with 117 spline fitted of spline recess, the trolley shoe of 121 upside of the first electricity favourable turn
Screw-thread fit is equipped with the first screw rod 122 that setting is expanded in left and right in 120, and end is expanded on first screw rod, 122 right side
It is rotatably assorted and connect with 123 right side inner wall of the sliding chamber, first screw rod, 122 left side expands end and is installed with the first cone
Wheel 124, first cone pulley, 124 upside intermeshing are equipped with the second cone pulley 125, and 125 top end face of the second cone pulley is installed with
First Coupling Shaft 126, first Coupling Shaft 126 are expanded and are rotatably assorted with 100 inner wall of processing rack and connect upwards,
In the first empty slot 132 for slipping 123 upside of chamber described in first Coupling Shaft, 126 upward jacking, first empty slot, 132 right side
Equipped with the second empty slot 137, second empty slot 137 is located at right over the installation cavity 105, second empty slot 137 with it is described
Unicom is equipped with interlocking chamber 102 between installation cavity 105, in the first empty slot 132 described in first Coupling Shaft, 126 top end jacking
And end is installed with third cone pulley 131, first Coupling Shaft 126 turns through the second electricity 127 inner walls of favourable turn, second electricity
Machine 127 is fixedly arranged in 100 inner wall of processing rack, and 132 right-hand end of the first empty slot is equipped with and the third cone pulley 131
Intermeshing 4th cone pulley 133,133 right end face of the 4th cone pulley are installed with the second Coupling Shaft 134, second switching
Axis 134 is rotatably assorted with 100 inner wall of processing rack to be connect and right side is expanded described in the jacking of end in the second empty slot 137,
Second Coupling Shaft, 134 right side expands end and is installed with the 5th cone pulley 135, and 135 power of the 5th cone pulley cooperation is equipped with
For the latch members of processing 114 lock fit of the cutter hub connection, the outside of the first electricity favourable turn 121 is additionally provided with support and carries
Device.
Valuably or illustratively, the latch members include be slidably installed it is sealed in the interlocking chamber 102
Plate 103,103 bottom of the sealed plate expansion section are installed with the sealed head to be connect with processing 114 lock fit of cutter hub
104,103 top end surface screw-internal thread fit of the sealed plate is equipped with the second screw rod 101, second screw rod, 101 top
End is installed with the 6th cone pulley 136, and the 6th cone pulley 136 is meshed with the 5th cone pulley 135, to realize automatically by institute
It states processing cutter hub 114 to lock securely, increases safety in utilization.
Valuably or illustratively, the lock connection device includes the folding and unfolding being arranged in 105 right side inner wall of the installation cavity
Chamber 110, being slidably installed in the folding and unfolding chamber 110 has sliding frame 111, is rotatably assorted in 111 left end face of sliding frame
Right-hand rotation syncranium 112 is installed, the cooperation of 111 right end face power of the sliding frame is equipped with pneumatic actuator 106, described pneumatically to hold
Row device 106 is fixedly arranged in 110 right side inner wall of the folding and unfolding chamber, to realize the locking of the processing cutter hub 114 and solution automatically
Lock.
The left-hand rotation syncranium 116 is oppositely arranged with the right-hand rotation syncranium 112, and the left-hand rotation syncranium 116 and the right-hand rotation
The adjacent end face of syncranium 112 is symmetrical above and below respectively to be installed with lock plush copper 115, and 114 left and right sides end face of processing cutter hub is equipped with
With it is described lock 115 mating connection of plush copper interlocking chamber 113, consequently facilitating to process cutter hub 114 locking and unlock.
Valuably, the support, which carries, sets including shock dropping composite plate 1211 and cooling iron plate 1212, the shock dropping composite plate
1211 are arranged in the top and bottom of the first electricity favourable turn 121 and are fixedly connected with the first electricity favourable turn 121, the cooling
Iron plate 1212 is arranged in the front-end and back-end of the first electricity favourable turn 121 and is fixedly connected with the first electricity favourable turn 121, described
Iron plate 1212 cool down to absorb and distribute the heats that the first electricity favourable turn 121 generates at runtime, the shock dropping composite plate
1211 reducing 121 shaking force that generates at runtime of the first electricity favourable turn to prevent the first electricity favourable turn 121 from existing
The shaking force generated when operation is excessive and the present apparatus is caused to be shaken, and the outside of the second electricity favourable turn 127 is also correspondingly provided with
The support, which carries, sets.
When original state, sealed head 104 is connected with the processing locking of cutter hub 114, and spline pin 118 is in spline recess 117
Disengaged position, and trolley shoe 120 is in 122 left-most position of the first screw rod.
When needing to carry out cutting work to mailbox, starting the second electricity favourable turn 127 makes 102 upward sliding of interlocking chamber to most pushing up
End, sealed head 104 is detached from processing cutter hub 114 and locks, while trolley shoe 120 slides to the right, until the 118 complete jacking of spline pin
In spline recess 117, processing cutter hub 114 can be driven to rotate at this point, starting the first electricity favourable turn 121, to carry out cutting work.
When needing to carry out disassembling, assembling and replacing to processing cutter hub, starting the second electricity favourable turn 127 makes 102 upward sliding one of interlocking chamber
Set a distance does not arrive top, is locked at this point, sealed head 104 is detached from processing cutter hub 114, while trolley shoe 120 slides to the right one
In set a distance and 118 non-jacking spline recess 117 of spline pin, at this point, processing 114 unpowered driving of cutter hub rotation, ensure that and tear open
Dress replaces safety, and then, starting pneumatic actuator 106 makes 115 fully extended interlocking chamber 113 of lock plush copper.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, since processing rack is pacified by take-off and landing device
Mounted in holder right end face, it is equipped with installation cavity in processing rack bottom end face, is rotatably assorted in installation cavity and processing cutter hub is installed,
It is equipped in inner wall on the right side of installation cavity and joins device, the processing rack on the left of installation cavity to the lock being connect with processing cutter hub lock fit
It is equipped with sliding chamber in inner wall, is rotatably assorted in sliding wall body between chamber and installation cavity and left-hand rotation syncranium is installed, left-hand rotation syncranium
Spline recess is equipped in left end face, being slidably installed in sliding chamber has trolley shoe, and the is installed in trolley shoe right end face
One electricity favourable turn, the first electricity favourable turn right-hand end power cooperation are equipped with the spline pin being connect with spline recess spline fitted, the first electricity
Screw-thread fit is equipped with the first screw rod that setting is expanded in left and right in the trolley shoe of favourable turn upside, and end is expanded on the first screw rod right side
End is rotatably assorted with inner wall on the right side of sliding chamber and connect, and end is expanded on the left of the first screw rod and is installed with the first cone pulley, the first cone pulley
Upside intermeshing is equipped with the second cone pulley, and the second cone pulley top end face is installed with the first Coupling Shaft, and the first Coupling Shaft is expanded simultaneously upwards
It is rotatably assorted and connect with processing rack inner wall, the upward jacking of the first Coupling Shaft is slipped in the first empty slot on the upside of chamber, and first is empty
The second empty slot is equipped on the right side of slot, the second empty slot is located at right over installation cavity, and unicom is equipped with interlocking between the second empty slot and installation cavity
Chamber, in first Coupling Shaft top end the first empty slot of jacking and end are installed with third cone pulley, and the first Coupling Shaft is through the second electricity
Favourable turn inner wall, the second electricity favourable turn are fixedly arranged in processing rack inner wall, and the first empty slot right-hand end is equipped with mutual with third cone pulley
4th cone pulley of engagement, the 4th cone pulley right end face are installed with the second Coupling Shaft, and the second Coupling Shaft turns with processing rack inner wall
It is dynamic to be connected and in right side expansion the second empty slot of end jacking, end is expanded on the right side of the second Coupling Shaft and is installed with the 5th cone pulley,
The cooperation of 5th cone pulley power is equipped with the latch members for processing the connection of cutter hub lock fit, and then realizes high efficiency cutting work
Make, meanwhile, it can realize the quickly locking work to processing cutter hub and automatically control dismantlement work, improve the operation of the present apparatus
Stability, and in locking, spline pin is in disengaged position with spline recess, and processing cutter hub can not rotate, and substantially increase this
Device be not used when safety, and disassembling, assembling and replacing process cutter hub when, processing cutter hub will not accidental activation and rotate, protect
The safety of disassembling, assembling and replacing is demonstrate,proved.
Those skilled in the art can define, can in the case of not departing from overall spirit and the design of the present invention
To make the various modifications for above example.It each falls within protection scope of the present invention.The protection scheme of the present invention
It is subject to claims appended hereto.