CN108380140A - A kind of high-performance solid material melting system - Google Patents

A kind of high-performance solid material melting system Download PDF

Info

Publication number
CN108380140A
CN108380140A CN201810191137.8A CN201810191137A CN108380140A CN 108380140 A CN108380140 A CN 108380140A CN 201810191137 A CN201810191137 A CN 201810191137A CN 108380140 A CN108380140 A CN 108380140A
Authority
CN
China
Prior art keywords
plate
fixed
pedestal
state
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810191137.8A
Other languages
Chinese (zh)
Other versions
CN108380140B (en
Inventor
赵桂香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU LEMIFUN ELECTRICAL TECHNOLOGY Co.,Ltd.
Original Assignee
赵桂香
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 赵桂香 filed Critical 赵桂香
Priority to CN201810191137.8A priority Critical patent/CN108380140B/en
Publication of CN108380140A publication Critical patent/CN108380140A/en
Application granted granted Critical
Publication of CN108380140B publication Critical patent/CN108380140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J6/00Heat treatments such as Calcining; Fusing ; Pyrolysis

Abstract

The invention discloses a kind of high-performance solid material melting systems, including bottom plate, first side plate, second side plate, third side plate, top plate and side door, described first, two, the top of three side plates is fixedly connected with the top plate, first, two, the bottom end of three side plates is fixedly connected with the bottom plate, it is fixed with the first hot air hose at first side plate, second hot air hose and third hot air hose, it is provided with first heater and the first wind turbine on first hot air hose, it is provided with secondary heating mechanism and the second wind turbine on second hot air hose, it is provided with third heating device and third wind turbine on the third hot air hose.The melting systems of the present invention are efficient and energy saving.

Description

A kind of high-performance solid material melting system
Technical field
The present invention relates to materiel machining fields, and in particular to a kind of high-performance solid material melting system.
Background technology
In the preparation process of some materials, used raw material is sometimes solid, such as used in wax manufacturing Producer's manufacture of paraffin, the material upper level of these solids is that liquid material is packed into storage container, is frozen into solid later Material needs to carry out fusing taking-up to these materials, such as need to original in wax field processed when needing to take out these materials Material wax carries out fusing taking-up, although material can be melted by being put into greenhouse, is put into the amount of the material of greenhouse every time not Together, and the space of greenhouse it is unadjustable when, spacious greenhouse is heated, causes to waste.
Invention content
Goal of the invention:The present invention is directed to overcome the deficiencies of existing technologies, a kind of high-performance solid material melting system is provided.
Technical solution:A kind of solid material melting systems, including bottom plate, the first side plate, the second side plate, third side plate, top The top of plate and side door, first, second and third side plate is fixedly connected with the top plate, the bottom end of the first, second and third side plate with The bottom plate is fixedly connected, and is fixed with the first hot air hose, the second hot air hose and third hot air hose at first side plate, and described It is provided with first heater and the first wind turbine on one hot air hose, secondary heating mechanism and are provided on second hot air hose Two wind turbines are provided with third heating device and third wind turbine on the third hot air hose.
Further, further include the first pedestal, the second pedestal, third pedestal, touch screen and controller, first pedestal It is fixed with the upper surface of the bottom plate, there is sliding slot, second pedestal is fixedly connected with to be nibbled with the sliding slot on the bottom plate The first sliding block closed, the third pedestal are fixedly connected with the second sliding block engaged with the sliding slot, consolidate on first pedestal Surely there is first bearing seat, first bearing is fixed at the first bearing seat, the first bearing is connect with first rotating shaft, described First rotating shaft is connected with the first turntable, and the first gear ring is fixed at the excircle of first turntable, is consolidated on second pedestal Surely there is second bearing seat, second bearing is fixed at the second bearing seat, the second bearing is connect with the second shaft, described Second shaft is connected with the second turntable, and the second gear ring is fixed at the excircle of second turntable, is consolidated on the third pedestal Surely there is 3rd bearing seat, 3rd bearing is fixed at the 3rd bearing seat, the 3rd bearing is connect with third shaft, described Third shaft is connected with third turntable, and third gear ring is fixed at the excircle of the third turntable, is consolidated at first side plate Surely there is driving motor, be fixed on the motor shaft of the driving motor and the first gear ring meshed gears;First side It is fixed with fourth bearing seat and 5th bearing seat on plate, fourth bearing, the 5th bearing are fixed at the fourth bearing seat It is fixed with 5th bearing at seat, second side plate is fixed with first motor seat and the second motor cabinet, at the first motor seat It is fixed with first motor, the second motor, the motor shaft of the first motor and the described 4th are fixed at second motor cabinet It is connected with the first lead screw between bearing, the second lead screw is connected between the motor shaft and the 5th bearing of second motor, First pedestal has logical by first through hole that the first lead screw passes through and the second through-hole passed through by the second lead screw, described first The side wall in hole is not contacted with first lead screw, and the side wall of second through-hole is not contacted with second lead screw, and described second Pedestal has by third through-hole that the first lead screw passes through and being passed through by the second lead screw and being engaged with second lead screw first Threaded hole, the side wall of the third through-hole are not contacted with first lead screw, and the third pedestal has by first lead screw The second threaded hole that is passing through and being engaged with first lead screw and the fourth hole passed through by second lead screw, the described 4th The side wall of through-hole is not contacted with second lead screw;First seat surface has first to insert the side of second pedestal Slot, second seat surface have the second slot to the side of the third pedestal, and second seat surface is to first base There is the first plate of irony, the third seat surface to have the second of irony to insert the side of second pedestal for the side of seat Plate is fixed with the first winding device and the second winding device at the top plate, and first winding device is driven by third motor, First winding device is wound with the first heat-insulating cloth, and the bottom end of first heat-insulating cloth is fixed with the first iron plate of rectangle, and described The first magnet is fixed at one iron plate, second winding device is driven by the 4th motor, and the second winding device is wound with second The bottom end of heat-insulating cloth, second heat-insulating cloth is fixed with the second iron plate of rectangle, and the second magnet is fixed at second iron plate; The touch screen, which can be used in operation, makes the melting systems be in first state, the second state or the third state, and described first In state, first gear ring and the second gear ring do not contact, and second gear ring and third gear ring do not contact, first magnet It is contacted with first plate attraction, second magnet is not contacted with second plate, the driving motor, the first heating Device and the first wind turbine are opened, second and third described heating device and second and third wind turbine are closed;In second state, described One, two gear rings are intermeshed, and second gear ring and third gear ring do not contact, and first magnet does not connect with first plate Touch, second magnet and second plate attract contact, the driving motor, first heater, secondary heating mechanism, First wind turbine and the second wind turbine are opened, and the third heating device and third wind turbine are closed;In the third state, described One, two gear rings are intermeshed, second and third gear ring intermeshing, first magnet is not contacted with first plate, institute It states the second magnet not contact with second plate, the driving motor, first heater, secondary heating mechanism, third add Thermal, the first wind turbine, the second wind turbine and third wind turbine are opened.
Further, in the first state, the length of unwound second heat-insulating cloth is less than 10cm;Second state In, the length of unwound first heat-insulating cloth is less than 10cm;In the third state, the length of unwound first and second heat-insulating cloth Degree is respectively less than 10cm.
Further, first laser transmitter and the second emitting laser, first plate are fixed at the top plate On be fixed with the first optical receiver, be fixed with the second optical receiver on second plate, in the first state, the first light connects The signal of first laser transmitter can be received by receiving device, and in second state, the second optical receiver can receive second The signal of laser emitter;Controller is controlled, when the first optical receiver does not receive first laser transmitting in first state When the second optical receiver does not receive the optical signal of second laser transmitter in the optical signal of device or the second state, make the touch Shield display alarm information.
Further, the width of first heat-insulating cloth is equal to the width of the second heat-insulating cloth, the width of first heat-insulating cloth 4/5ths of degree more than the first side plate width.
Further, there is the bottom plate the first sliding rail, the top plate there is second parallel with first sliding rail to slide Rail, the bottom of the side door are engaged with first sliding rail, and top is engaged with second sliding rail, and the side door can be along One, two sliding rails slide.
Further, in the first state, second laser transmitter and the second optical receiver are closed;Second state In, first laser transmitter and the first optical receiver are closed;In the third state, the first and second laser emitter is closed, the One, two optical receivers are closed.
Advantageous effect:The melting systems of the present invention, according to the material for the need fusing placed number, can will be in system Space is separated, and to be heated to the space for holding material, avoids energy waste.
Description of the drawings
Fig. 1 is melting systems first state schematic diagram;
Fig. 2 is the second status diagram of melting systems;
Fig. 3 is melting systems third state schematic diagram;
Fig. 4 is melting systems schematic top plan view.
Specific implementation mode
Reference numeral:1 bottom plate;1.1 sliding slot;2.1 first side plates;2.2 second side plates;2.3 third side plates, 2.4 side doors;3 Top plate;4.1 first hot air hoses;4.1.1 first heater;4.1.2 the first wind turbine;4.2 second hot air hoses;4.2.1 second adds Thermal;4.2.2 the second wind turbine;4.3 third hot air hoses;4.3.1 third heating device;4.3.2 third wind turbine;5.1 driving electricity Machine;5.2 gear;5.4 first lead screws;5.5 second lead screws;5.6 first motor;5.7 second motors;6 first pedestals;6.1 first 6.2 first rotating shaft of bearing;6.3 first turntables;6.4 first slots;7 second pedestals;7.1 second bearing;7.2 second shafts;7.3 Second turntable;7.4 second slots;7.5 first plates;7.6 first sliding blocks;8 third pedestals;8.1 3rd bearing;8.2 thirds turn Axis;8.3 third turntables;8.5 second plates;8.6 second sliding blocks;9 first winding devices;9.1 first heat-insulating cloths;9.2 first iron Plate;9.3 first magnet;10 second winding devices;10.1 the second heat-insulating cloth;10.2 the second iron plate;10.3 the second magnet;11.1 One laser emitter;11.2 the first optical receiver;12.1 second laser transmitter;12.2 the second optical receiver;13.1 the first tooth Circle;13.2 the second gear ring;13.3 third gear ring;20 have contained the container of material to be melted.
A kind of high-performance solid material melting system, including bottom plate 1, the first side plate 1.1, the second side plate 2.2, third side plate 2.3, the top of top plate 3 and side door 2.4, first, second and third side plate is fixedly connected with the top plate, the first, second and third side plate Bottom end be fixedly connected with the bottom plate, the first hot air hose 4.1,4.2 and of the second hot air hose are fixed at first side plate Third hot air hose 4.3, is provided with first heater 4.1.1 and the first wind turbine 4.1.2 on first hot air hose, and described second It is provided with secondary heating mechanism 4.2.1 and the second wind turbine 4.2.2 on hot air hose, third heating is provided on the third hot air hose Device 4.3.1 and third wind turbine 4.3.2.Further include the first pedestal 6, the second pedestal 7, third pedestal 8, touch screen and controller, The upper surface of first pedestal and the bottom plate is fixed, and there is sliding slot, second pedestal to be fixedly connected on the bottom plate The first sliding block 7.6 engaged with the sliding slot, the third pedestal are fixedly connected with the second sliding block engaged with the sliding slot 8.6, first bearing seat is fixed on first pedestal, and first bearing, the first axle are fixed at the first bearing seat It holds and is connect with first rotating shaft, the first rotating shaft is connected with the first turntable 6.3, and is fixed at the excircle of first turntable One gear ring is fixed with second bearing seat on second pedestal, is fixed with second bearing at the second bearing seat, and described second Bearing is connect with the second shaft, and second shaft is connected with the second turntable 7.3, is fixed at the excircle of second turntable Second gear ring is fixed with 3rd bearing seat on the third pedestal, is fixed with 3rd bearing at the 3rd bearing seat, and described Three bearings are connect with third shaft, and the third shaft is connected with third turntable 8.3, is fixed at the excircle of the third turntable There is third gear ring, driving motor is fixed at first side plate, is fixed on the motor shaft of the driving motor and described One gear ring meshed gears;Fourth bearing seat and 5th bearing seat are fixed on first side plate, at the fourth bearing seat Be fixed with fourth bearing, be fixed with 5th bearing at the 5th bearing seat, second side plate be fixed with first motor seat and Second motor cabinet is fixed with first motor 5.6 at the first motor seat, the second motor is fixed at second motor cabinet 5.7, the first lead screw 5.4, the electricity of second motor are connected between the motor shaft of the first motor and the fourth bearing The second lead screw 5.5 is connected between arbor and the 5th bearing, first pedestal has first passed through by the first lead screw Through-hole and the second through-hole passed through by the second lead screw, the side wall of the first through hole is not contacted with first lead screw 5.4, described The side wall of second through-hole is not contacted with second lead screw 5.5, and second pedestal has to be led to by the third that the first lead screw passes through Hole and the first threaded hole that is being passed through by the second lead screw and being engaged with second lead screw, the side wall of the third through-hole with it is described First lead screw does not contact, and the third pedestal has being passed through by first lead screw and being engaged with first lead screw second Threaded hole and the fourth hole passed through by second lead screw, the side wall of the fourth hole are not contacted with second lead screw; First seat surface has the first slot 6.4 to the side of second pedestal, and second seat surface is to the third base There is the second slot 7.4, second seat surface to have the first plate of irony to the side of first pedestal for the side of seat 7.5, the third seat surface has the side of second pedestal the second plate 8.5 of irony, is fixed at the top plate First winding device 9 and the second winding device 10, first winding device are driven by third motor, the first winding device winding There are the first heat-insulating cloth 9.1, the bottom end of first heat-insulating cloth to be fixed with the first iron plate 9.2 of rectangle, consolidate at first iron plate There are the first magnet 9.3, second winding device 10 to be driven by the 4th motor, the second winding device is wound with the second heat-insulating cloth surely 10.1, the bottom end of second heat-insulating cloth is fixed with the second iron plate 10.2 of rectangle, and the second magnetic is fixed at second iron plate Iron 10.3;The touch screen, which can be used in operation, makes the melting systems be in first state, the second state or the third state, institute It states in first state, first gear ring and the second gear ring do not contact, and second gear ring and third gear ring do not contact, and described The attraction of one magnet and first plate contacts, and second magnet is not contacted with second plate, the driving motor, the One heating device and the first wind turbine are opened, second and third described heating device and second and third wind turbine are closed;In second state, The first and second gear ring intermeshing, second gear ring and third gear ring do not contact, and first magnet is inserted with described first Plate does not contact, and second magnet and second plate attract contact, the driving motor, first heater, second to add Thermal, the first wind turbine and the second wind turbine are opened, and the third heating device and third wind turbine are closed;In the third state, The first and second gear ring intermeshing, second and third gear ring intermeshing, first magnet and first plate are not Contact, second magnet do not contact with second plate, the driving motor, first heater, secondary heating mechanism, Third heating device, the first wind turbine, the second wind turbine and third wind turbine are opened.
In the first state, the height of unwound second heat-insulating cloth is less than 10cm;In second state, do not wind The first heat-insulating cloth height be less than 10cm;In the third state, the height of unwound first and second heat-insulating cloth is respectively less than 10cm.It is fixed with first laser transmitter 11.1 and the second emitting laser 12.1 at the top plate, consolidates on first plate Surely there is the first optical receiver 11.2, be fixed with the second optical receiver 12.2 on second plate, in the first state, first Optical receiver can receive the signal of first laser transmitter, and in second state, the second optical receiver can receive The signal of second laser transmitter;Controller is controlled, when in first state the first optical receiver do not receive optical signal or In second state, when the second optical receiver does not receive optical signal, make the touch screen display alarm information.Described first is heat-insulated The width of cloth 9.1 is equal to the width of the second heat-insulating cloth 10.1, and the width of first heat-insulating cloth is more than the first side plate width 4/5ths.The bottom plate has the first sliding rail, and the top plate has second sliding rail parallel with first sliding rail, described The bottom of side door is engaged with first sliding rail, and top is engaged with second sliding rail, and the side door can be slided along first and second Rail slides.In the first state, second laser transmitter and the second optical receiver are closed;In second state, first swashs Optical transmitting set and the first optical receiver are closed;In the third state, the first and second laser emitter is closed, the first and second light-receiving Device is closed.
As shown in Figs. 1-3, the first lead screw is only engaged with the threaded hole of third pedestal, therefore third pedestal can be driven to move It is dynamic;Second lead screw is only engaged with the second pedestal, therefore the second pedestal can be driven to move.To which the first and second motor can be by the One, the driving of two, three pedestals is at state shown in Fig. 1-3.
The melting systems of the present invention, the container for having contained material to be melted is placed on turntable, there is driving motor driving Rotation, hot air hose blowout warm wind melt material, when only there are one material is carried on turntable, as shown in Figure 1, only the Have warm wind at one turntable, and only the first turntable rotates, and the first heat-insulating cloth by with material space and not no material Space separates;When the first and second turntable all has material, as shown in Fig. 2, the first and second turntable rotates;When first, second and third turn When disk all has material, as shown in figure 3, the first, second and third turntable rotates.To realize the fusing to material and avoid heat The waste of amount.
In the first state, the first optical receiver can receive the signal of first laser transmitter, second shape In state, the second optical receiver can receive the signal of second laser transmitter;Controller is controlled, when in first state One optical receiver does not receive in optical signal or the second state, when the second optical receiver does not receive optical signal, makes the touch Shield display alarm information.The purpose being arranged in this way is mainly:In first state or the second state procedure, between magnet and plate The case where there may be no attraction fixations (since hot air hose blows out warm wind, is blown, magnet and plate in the presence of wind-engaging The case where falling off), if without attracting fixation between magnet and plate, heat-insulating cloth is under the influence of hot air hose blows out warm wind Can disorderly it fly, to the triggering alarm that can shut out the light.Under normal circumstances, as shown in Figure 1, 2, magnet and plate are steadily mutually inhaled Draw, heat-insulating cloth will not shut out the light, and will not alarm.
Although the present invention is illustrated and has been described with regard to preferred embodiment, it is understood by those skilled in the art that Without departing from scope defined by the claims of the present invention, variations and modifications can be carried out to the present invention.

Claims (7)

1. a kind of high-performance solid material melting system, which is characterized in that including bottom plate, the first side plate, the second side plate, third side The top of plate, top plate and side door, first, second and third side plate is fixedly connected with the top plate, the bottom end of the first, second and third side plate It is fixedly connected with the bottom plate, the first hot air hose, the second hot air hose and third hot air hose, institute is fixed at first side plate It states and is provided with first heater and the first wind turbine on the first hot air hose, secondary heating mechanism is provided on second hot air hose With the second wind turbine, third heating device and third wind turbine are provided on the third hot air hose.
2. high-performance solid material melting system according to claim 1, which is characterized in that further include the first pedestal, second The upper surface of pedestal, third pedestal, touch screen and controller, first pedestal and the bottom plate is fixed, and is had on the bottom plate There are sliding slot, second pedestal to be fixedly connected with the first sliding block engaged with the sliding slot, the third pedestal is fixedly connected with The second sliding block engaged with the sliding slot is fixed with first bearing seat on first pedestal, is fixed at the first bearing seat There are first bearing, the first bearing to be connect with first rotating shaft, the first rotating shaft is connected with the first turntable, first turntable Excircle at be fixed with the first gear ring, second bearing seat is fixed on second pedestal, is fixed at the second bearing seat There are second bearing, the second bearing to be connect with the second shaft, second shaft is connected with the second turntable, second turntable Excircle at be fixed with the second gear ring, 3rd bearing seat is fixed on the third pedestal, is fixed at the 3rd bearing seat There are 3rd bearing, the 3rd bearing to be connect with third shaft, the third shaft is connected with third turntable, the third turntable Excircle at be fixed with third gear ring, driving motor is fixed at first side plate, on the motor shaft of the driving motor It is fixed with and the first gear ring meshed gears;Fourth bearing seat and 5th bearing seat, institute are fixed on first side plate It states and is fixed with fourth bearing at fourth bearing seat, 5th bearing is fixed at the 5th bearing seat, second side plate is fixed There are first motor seat and the second motor cabinet, first motor is fixed at the first motor seat, is fixed at second motor cabinet There is the second motor, the first lead screw, second motor are connected between the motor shaft of the first motor and the fourth bearing Motor shaft and the 5th bearing between be connected with the second lead screw, first pedestal has first passed through by the first lead screw Through-hole and the second through-hole passed through by the second lead screw, the side wall of the first through hole are not contacted with first lead screw, and described The side wall of two through-holes is not contacted with second lead screw, second pedestal have the third through-hole that is passed through by the first lead screw and by The first threaded hole that is that second lead screw passes through and being engaged with second lead screw, the side wall of the third through-hole with described first Bar does not contact, and the third pedestal has the second threaded hole that is being passed through by first lead screw and being engaged with first lead screw With the fourth hole passed through by second lead screw, the side wall of the fourth hole is not contacted with second lead screw;Described One seat surface there is the first slot, second seat surface to have to the side of the third pedestal side of second pedestal There are the second slot, second seat surface that there is the first plate of irony, the third pedestal to the side of first pedestal There is the second plate of irony in face of the side of second pedestal, the first winding device and volume Two are fixed at the top plate Winding apparatus, first winding device are driven by third motor, and the first winding device is wound with the first heat-insulating cloth, described first every The bottom end of hot cloth is fixed with the first iron plate of rectangle, and the first magnet, second winding device are fixed at first iron plate It is driven by the 4th motor, the second winding device is wound with the second heat-insulating cloth, and the bottom end of second heat-insulating cloth is fixed with rectangle Second iron plate is fixed with the second magnet at second iron plate;The touch screen, which can be used in operation, to be made at the melting systems In first state, the second state or the third state, the first state, first gear ring and the second gear ring do not contact, institute State the second gear ring and third gear ring do not contact, the attraction of first magnet and first plate contacts, second magnet with Second plate does not contact, and the driving motor, first heater and the first wind turbine are opened, second and third described heating dress It sets and is closed with second and third wind turbine;In second state, first and second gear ring is intermeshed, second gear ring and third Gear ring does not contact, and first magnet is not contacted with first plate, and second magnet and second plate attraction connect It touches, the driving motor, first heater, secondary heating mechanism, the first wind turbine and the second wind turbine are opened, the third heating Device and third wind turbine are closed;In the third state, first and second gear ring is intermeshed, second and third described gear ring is mutual Engagement, first magnet are not contacted with first plate, and second magnet is not contacted with second plate, the drive Dynamic motor, first heater, secondary heating mechanism, third heating device, the first wind turbine, the second wind turbine and third wind turbine are opened It opens.
3. high-performance solid material melting system according to claim 2, which is characterized in that in the first state, do not roll up Around the second heat-insulating cloth height be less than 10cm;In second state, the height of unwound first heat-insulating cloth is less than 10cm; In the third state, the height of unwound first and second heat-insulating cloth is respectively less than 10cm.
4. high-performance solid material melting system according to claim 2, which is characterized in that be fixed with first at the top plate Laser emitter and the second emitting laser, are fixed with the first optical receiver on first plate, solid on second plate Surely there is the second optical receiver, in the first state, the first optical receiver can receive the signal of first laser transmitter, institute It states in the second state, the second optical receiver can receive the signal of second laser transmitter;Controller is controlled, when first When the first optical receiver does not receive that the second optical receiver does not receive optical signal in optical signal or the second state in state, make institute State touch screen display alarm information.
5. high-performance solid material melting system according to claim 2, which is characterized in that the width of first heat-insulating cloth Equal to the width of the second heat-insulating cloth, the width of first heat-insulating cloth is more than 4/5ths of the first side plate width.
6. high-performance solid material melting system according to claim 1, which is characterized in that the bottom plate has first to slide There is second sliding rail parallel with first sliding rail, the bottom of the side door to be engaged with first sliding rail for rail, the top plate, Top is engaged with second sliding rail, and the side door can be slided along the first and second sliding rail.
7. high-performance solid material melting system according to claim 1, which is characterized in that in the first state, second Laser emitter and the second optical receiver are closed;In second state, first laser transmitter and the first optical receiver are closed; In the third state, the first and second laser emitter is closed, and the first and second optical receiver is closed.
CN201810191137.8A 2018-03-08 2018-03-08 High-efficient solid material melting system Active CN108380140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810191137.8A CN108380140B (en) 2018-03-08 2018-03-08 High-efficient solid material melting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810191137.8A CN108380140B (en) 2018-03-08 2018-03-08 High-efficient solid material melting system

Publications (2)

Publication Number Publication Date
CN108380140A true CN108380140A (en) 2018-08-10
CN108380140B CN108380140B (en) 2021-09-24

Family

ID=63067036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810191137.8A Active CN108380140B (en) 2018-03-08 2018-03-08 High-efficient solid material melting system

Country Status (1)

Country Link
CN (1) CN108380140B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111426155A (en) * 2020-04-14 2020-07-17 浙江宝威电气有限公司 Oven for baking by using heat pipe to acquire solar energy and transferring heat of heat pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2237000Y (en) * 1995-10-06 1996-10-09 史中伟 Shrinking machine for hot reaction
DE29715846U1 (en) * 1997-09-04 1997-12-11 Ald Vacuum Techn Gmbh Device for the directional solidification of melts
CN204978187U (en) * 2015-09-30 2016-01-20 许迪 Multi -purpose curtain of car
CN105329554A (en) * 2015-11-10 2016-02-17 高邮市应天水产有限公司 Novel cold storage container
CN205731180U (en) * 2016-06-08 2016-11-30 东莞市天丰电源材料有限公司 A kind of device for melting barreled high-solidification point material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2237000Y (en) * 1995-10-06 1996-10-09 史中伟 Shrinking machine for hot reaction
DE29715846U1 (en) * 1997-09-04 1997-12-11 Ald Vacuum Techn Gmbh Device for the directional solidification of melts
CN204978187U (en) * 2015-09-30 2016-01-20 许迪 Multi -purpose curtain of car
CN105329554A (en) * 2015-11-10 2016-02-17 高邮市应天水产有限公司 Novel cold storage container
CN205731180U (en) * 2016-06-08 2016-11-30 东莞市天丰电源材料有限公司 A kind of device for melting barreled high-solidification point material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111426155A (en) * 2020-04-14 2020-07-17 浙江宝威电气有限公司 Oven for baking by using heat pipe to acquire solar energy and transferring heat of heat pipe

Also Published As

Publication number Publication date
CN108380140B (en) 2021-09-24

Similar Documents

Publication Publication Date Title
CN108380140A (en) A kind of high-performance solid material melting system
CN105032788A (en) Product appearance defect detection equipment
CN107098121A (en) A kind of vibration feeding formula bulk capacitor pin shearing device and its method of work
CN105586645A (en) Multifunctional vacuum spinning device
CN218579186U (en) Non-woven fabrics is coiling mechanism for automation line
CN207158393U (en) A kind of automatic propulsion cardboard device of facing machine
CN213708686U (en) Non-woven fabric melt-blowing device
JPH04507082A (en) Spinning wheel unit for fiberizing inorganic melts by centrifugal force
CN206284979U (en) Food cooking machine
CN206447207U (en) Belt slippage warning system between dedusting
CN205068104U (en) Automatically -cooled security door
CN214353526U (en) Quick drying device for plastic particles
CN213137850U (en) Far infrared hot melting bonding machine for processing fiber filter element
CN209081718U (en) A kind of cooling device for glassware production
CN207068681U (en) A kind of automatic bulk capacitor pin shearing device
CN218660339U (en) High-efficiency heating device for injection molding machine or extruder
CN202201821U (en) Simple device for drawing glass fiber
CN114747914B (en) Reversible temperature-sensing type data display self-integrating control
CN206491303U (en) A kind of fish pellet automatic processing device
CN210851845U (en) Automatic control system for paper pasting glue
CN207334120U (en) A kind of outdoor monitoring equipment easy to remove
CN110038675A (en) A kind of saqima returning charge crushed aggregates device
CN204324590U (en) The automatic line concentrator of a kind of polypropylene fiber silk
CN208825030U (en) A kind of glass disc type optical de-tection means of tape handler
CN212199480U (en) Spinning processing equipment for polyester carpet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210907

Address after: Room 704, building 5, No. 556, Changjiang Road, high tech Zone, Suzhou, Jiangsu 215000

Applicant after: SUZHOU LEMIFUN ELECTRICAL TECHNOLOGY Co.,Ltd.

Address before: 225100 Wanke City, Pingshan Township, Hangjiang District, Yangzhou City, Jiangsu Province, 37 701 buildings

Applicant before: Zhao Guixiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant