CN108377582A - Delete method, network element and the system in user plane tunnel - Google Patents
Delete method, network element and the system in user plane tunnel Download PDFInfo
- Publication number
- CN108377582A CN108377582A CN201610963406.9A CN201610963406A CN108377582A CN 108377582 A CN108377582 A CN 108377582A CN 201610963406 A CN201610963406 A CN 201610963406A CN 108377582 A CN108377582 A CN 108377582A
- Authority
- CN
- China
- Prior art keywords
- network element
- user plane
- plane network
- target
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/30—Connection release
- H04W76/32—Release of transport tunnels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/30—Connection release
- H04W76/34—Selective release of ongoing connections
Abstract
An embodiment of the present invention provides a kind of method, network element and the systems in deletion user plane tunnel, are related to field of communication technology.The method is applied in communication system, and communication system includes control plane network element and user plane network element, has at least one user plane tunnel between control plane network element and user plane network element, the method includes:Control plane network element determines the target user face tunnel for existing at least one user plane tunnel and meeting preset condition;Control plane network element sends solicited message to user plane network element, which is used to indicate user plane network element delete target user plane tunnel;User plane network element is according to request message, delete target user plane tunnel.In the scheme of the embodiment of the present invention, for the scene that control plane and user plane detach, the technical solution for deleting the user plane tunnel between control plane network element and user plane network element is provided so that user plane tunnel can be deleted when that need not use, to save resource.
Description
Technical field
The present invention relates to fields of communication technology, more particularly to delete method, network element and the system in user plane tunnel.
Background technology
Control plane and user plane separation (Control and User Plane Separation, CUPS) are core net nets
One development trend of network framework.Control plane (Control Plane, CP) and user plane are executed by different functional entitys respectively
The function of (User Plane, UP) can make control plane and user plane use different software or hardware resource respectively, according to
Demand is deployed to different positions, realizes higher flexibility.
By taking the core net of forth generation (4th Generation, 4G) system as an example, third generation partner program (the
3rd Generation Partnership Project, 3GPP) propose gateway (Serving Gateway, SGW) and
Packet data gateway (Packet Data Network Gateway, PDN-GW or PGW) is divided into control plane functional entity
With user plane functions entity, and the interface between control plane functional entity and user plane functions entity is increased.Wherein, will
SGW is divided into the user plane (serving of control plane (serving gateway control plane) network element and SGW of SGW
Gateway user plane) network element, PGW is divided into control plane (PDN gateway control plane) network element of PGW
With user plane (PDN gateway user plane) network element of PGW.Wherein, the control plane network element of SGW and user plane network element can
To be respectively depicted as SGW-C and SGW-U, the control plane network element and user plane network element of PGW can be respectively depicted as PGW-C and PGW-
U.SGW-C and PGW-C can be deployed on same physical equipment, close the gateway that the SGW-C set and PGW-C is properly termed as unification
Control plane network element, such as SGW/PGW-C can be described as;SGW-U and PGW-U can also be deployed on same physical equipment,
It closes the SGW-U set and PGW-U and is properly termed as the gateway customer veil member of unification, such as SGW/PGW-C can be described as.It is above-mentioned
SGW-C, PGW-C, SGW/PGW-C belong to control plane network element, and SGW-U, PGW-U, SGW/PGW-U belong to user plane network element.Control
Being established between veil member and user plane network element has control plane tunnel (control plane tunnel) and user plane tunnel (user
Plane tunnel), control plane tunnel is mainly used for transmission control plane signaling, and user plane tunnel is mainly used for transmitting user plane number
According to.
Currently, in control plane and the scene of user plane separation, the user plane tunnel between control plane network element and user plane network element
Road also retains always in the case where no data transmits, and results in waste of resources.
Invention content
An embodiment of the present invention provides a kind of method, network element and the systems in deletion user plane tunnel, with to avoid existing side
In case the problem of the wasting of resources.
On the one hand, an embodiment of the present invention provides a kind of method in deletion user plane tunnel, it is applied in communication system, it should
Communication system includes control plane network element and user plane network element, has at least one user between control plane network element and user plane network element
Face tunnel.This method includes:Control plane network element determines that there is the target for meeting preset condition at least one user plane tunnel uses
Family face tunnel;Control plane network element sends solicited message to user plane network element, and solicited message is used to indicate user plane network element and deletes mesh
Mark user plane tunnel;User plane network element is according to solicited message, delete target user plane tunnel.
In scheme provided in an embodiment of the present invention, determine there is symbol at least one user plane tunnel by control plane network element
The target user face tunnel of preset condition is closed, and user plane network element is asked to delete the target user face tunnel, hence for control
The scene in face and user plane separation, provides the technical side for deleting the user plane tunnel between control plane network element and user plane network element
Case so that user plane tunnel is deleted when that need not use, to avoid user plane tunnel long-term existence, to save resource.
Optionally, for varigrained user plane tunnel, preset condition can be different.Wherein, user plane tunnel institute is right
The granularity answered can be terminal granularity, session granularity, carrying granularity or equipment granularity.
In a possible design, user plane tunnel counterpart terminal granularity.In above-mentioned at least one user plane tunnel
Each user plane tunnel is used for transmission and the relevant data of terminal.Target user face tunnel is used for transmission and target terminal
Relevant data.Preset condition includes one of following situation:(1) it needs to delete with the relevant whole sessions of target terminal;(2) it controls
What is cached in veil member processed has reached the largest buffered amount distributed for target terminal with the relevant data of target terminal;(3) it controls
What is cached in veil member processed is all sent to user plane network element with the relevant data of target terminal;(4) control plane network element receives
The instruction of legal interception system, which, which is used to indicate, no longer needs to monitor and the relevant data of target terminal.
In another possible design, user plane tunnel respective session granularity.In above-mentioned at least one user plane tunnel
Each user plane tunnel be used for transmission and the relevant data of session.Target user face tunnel is used for transmission and target meeting
Talk about relevant data.Preset condition includes one of following situation:(1) target session needs to delete;(2) target session includes being used for
At least one session of transmission and the relevant data of target terminal, and cached in control plane network element relevant with target terminal
Data have reached the largest buffered amount distributed for target terminal;(3) target session is relevant with target terminal including being used for transmission
At least one session of data, and what is cached in control plane network element is all sent to user plane with the relevant data of target terminal
Network element;(4) target session includes at least one session being used for transmission with the relevant data of target terminal, and control plane network element is received
To the instruction of legal interception system, which, which is used to indicate, no longer needs to monitor and the relevant data of target terminal.
In another possible design, user plane tunnel corresponds to carrying granularity.In above-mentioned at least one user plane tunnel
Each user plane tunnel be used for transmission and the relevant data of carrying.Target user face tunnel is used for transmission to be held with target
Carry relevant data.Preset condition includes one of following situation:(1) target carrying is to be used for transmission and the relevant number of target session
According at least one carrying, and target session needs to delete;(2) target carrying is to be used for transmission and the relevant data of target terminal
At least one carrying, and cached in control plane network element with the relevant data of target terminal have reached for target terminal distribute
Largest buffered amount;(3) target carrying is to be used for transmission and at least one of the relevant data of target terminal carrying, and control plane
What is cached in network element is all sent to user plane network element with the relevant data of target terminal;(4) target carrying is to be used for transmission
It is carried at least one of the relevant data of target terminal, and control plane network element receives the instruction of legal interception system, the instruction
It is used to indicate and no longer needs to monitor and the relevant data of target terminal.
In another possible design, user plane tunnel corresponds to equipment granularity.Above-mentioned at least one user plane tunnel packet
A user plane tunnel is included, target user face tunnel is this user plane tunnel.Target user face tunnel is used for transmission and controls
The relevant data of all terminals of veil member and user plane network element common service processed.Preset condition includes one of following situation:(1)
It needs to delete by whole sessions of this user plane tunnel transmission;(2) having been cached in control plane network element with all terminals
In each relevant data of terminal have reached the largest buffered amount for each terminal distribution;(3) it is cached in control plane network element
It is all sent to user plane network element with the relevant data of each terminal in all terminals;(4) control plane network element receives legal prison
The instruction of system is listened, which, which is used to indicate, no longer needs to monitor and the relevant data of any terminal in all terminals.
The embodiment of the present invention is for the different grain size and session deletion, data buffer storage, data corresponding to user plane tunnel
4 different application scenarios of forwarding and Lawful Interception etc. each provide corresponding preset condition, and realization is in different application scene
It is lower to delete user plane tunnel on demand.The deletion in user plane tunnel can be not exclusively by the business between terminal and the network element of data network
State determines, can also be decided whether to delete user plane tunnel according to actual data transfer demands, when determining a certain user plane tunnel
The user plane tunnel can be deleted when not having data to need transmission on road, to discharge the occupied resource in user plane tunnel, is reached
To the purpose for saving resource.
In another possible design, for data buffer storage scene, largest buffered amount can also correspond to user plane tunnel point
Match.Correspondingly, preset condition can be:By target user face tunnel the data of control plane network element have been transmitted to from user plane network element
It is reached for the largest buffered amount of target user face tunnel distributing.In this case, the granularity corresponding to user plane tunnel can be
Equipment granularity, terminal granularity, session granularity or carrying granularity.
It, can also be to control veil after user plane network element delete target user plane tunnel in a possible design
Member sends response message, which is used to indicate the delete target user plane tunnel that succeeded.Correspondingly, control plane network element from
User plane network element receives response message.By the above-mentioned means, control plane network element is able to confirm that whether target user face tunnel has become
Work(is deleted.
In a possible design, before or after control plane network element sends solicited message to user plane network element, also
It can determine and need to create new user plane tunnel, and request to create is sent to user plane network element, which is used to indicate
User plane network element creates new user plane tunnel.Correspondingly, user plane network element can create new user plane tunnel according to request to create
Road.The embodiment of the present invention additionally provides the technical solution for creating the user plane tunnel between control plane network element and user plane network element,
So that creating user plane tunnel when there is demand.
On the other hand, the embodiment of the present invention provides a kind of control plane network element, which, which has, realizes the above method
The function of control plane network element behavior in example.The function can also be executed corresponding by hardware realization by hardware
Software realization.The hardware or software include one or more modules corresponding with above-mentioned function.
In a possible design, the structure of control plane network element includes processor and communication interface, the processor
It is configured as that control plane network element is supported to execute corresponding function in the above method.The communication interface is for supporting control plane network element
With the communication between user plane network element or other equipment.Further, control plane network element can also include memory, the storage
Device preserves the necessary program instruction of control plane network element and data for being coupled with processor.
Another aspect, the embodiment of the present invention provide a kind of user plane network element, which, which has, realizes the above method
The function of user plane network element behavior in example.The function can also be executed corresponding by hardware realization by hardware
Software realization.The hardware or software include one or more modules corresponding with above-mentioned function.
In a possible design, the structure of user plane network element includes processor and communication interface, the processor
It is configured as that user plane network element is supported to execute corresponding function in the above method.The communication interface is for supporting user plane network element
With the communication between control plane network element or other equipment.Further, user plane network element can also include memory, the storage
Device preserves the necessary program instruction of user plane network element and data for being coupled with processor.
In another aspect, the embodiment of the present invention provides a kind of communication system, which includes the control plane described in above-mentioned aspect
Network element and user plane network element.
In another aspect, the embodiment of the present invention provides a kind of computer storage media, it is above-mentioned for control plane for being stored as
Computer software instructions used in network element, it includes for executing the program designed by above-mentioned aspect.
In another aspect, the embodiment of the present invention provides a kind of computer storage media, it is above-mentioned for user plane for being stored as
Computer software instructions used in network element, it includes for executing the program designed by above-mentioned aspect.
Compared to the prior art, in the scheme of the embodiment of the present invention, at least one user plane is determined by control plane network element
There is the target user face tunnel for meeting preset condition in tunnel, and user plane network element asked to delete the target user face tunnel,
Hence for the scene that control plane and user plane detach, the user plane deleted between control plane network element and user plane network element is provided
The technical solution in tunnel so that user plane tunnel is deleted when that need not use, to avoid user plane tunnel long-term existence, thus
Save resource.
Description of the drawings
Figure 1A is a kind of schematic diagram of possible application scenarios provided in an embodiment of the present invention;
Figure 1B is a kind of schematic diagram of possible network architecture provided in an embodiment of the present invention;
Fig. 2 is a kind of communication scheme of method for deleting user plane tunnel provided in an embodiment of the present invention;
Fig. 3 is the communication scheme of another method for deleting user plane tunnel provided in an embodiment of the present invention;
Fig. 4 is the communication scheme of the method in another deletion user plane tunnel provided in an embodiment of the present invention;
Fig. 5 is the communication scheme of the method in another deletion user plane tunnel provided in an embodiment of the present invention;
Fig. 6 is the communication scheme of the method in another deletion user plane tunnel provided in an embodiment of the present invention;
Fig. 7 A are a kind of schematic block diagrams of control plane network element provided in an embodiment of the present invention;
Fig. 7 B are a kind of structural schematic diagrams of control plane network element provided in an embodiment of the present invention;
Fig. 8 A are a kind of schematic block diagrams of user plane network element provided in an embodiment of the present invention;
Fig. 8 B are a kind of structural schematic diagrams of user plane network element provided in an embodiment of the present invention.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical solution in the embodiment of the present invention is described.
The network architecture and business scenario of description of the embodiment of the present invention are to clearly illustrate implementation of the present invention
The technical solution of example, does not constitute the restriction to technical solution provided in an embodiment of the present invention, those of ordinary skill in the art can
Know, with the appearance of the differentiation and new business scene of the network architecture, technical solution provided in an embodiment of the present invention is for similar
Technical problem, it is equally applicable.
Combine Figure 1A and Figure 1B to some applicable possible application scenarios of the embodiment of the present invention and network rack first below
Structure is introduced.
Figure 1A shows a kind of application scenarios that the embodiment of the present invention may be applicable in.As shown in Figure 1A, terminal passes through wireless
Access net and core net access carrier Internet protocol (Internet Protocol, IP) business network, such as multimedia
System (IP Multimedia System, IMS) network, packet switch stream business (Packet Switched Streaming
Service, simple PSS) network etc..The technical solution that the present invention describes can be adapted for long term evolution (Long Term
Evolution, LTE) system or other use various wireless access technologys wireless communication system, for example, by using CDMA
(Code Division Multiple Access, CDMA), frequency division multiple access (Frequency Division Multiple
Access, FDMA), time division multiple acess (Time Division Multiple Access, TDMA), orthogonal frequency division multiple access
(Orthogonal Frequency Division Multiple Access, OFDMA), single-carrier frequency division multiple access (Single
Carrier Frequency Division Multiple Access, SC-FDMA) etc. access technologies system.In addition, may be used also
To be suitable for the subsequent evolution system of LTE system, such as NGN system, i.e. the 5th generation (5th Generation, 5G) system
System etc..For clarity, it is only illustrated by taking LTE system as an example here.In LTE system, the general land of evolution wirelessly connects
(Evolved Universal Terrestrial Radio Access Network, E-UTRAN) is networked as wireless access
Net, evolution block core net (Evolved Packet Core, EPC) are used as core net.Terminal is accessed by E-UTRAN and EPC
IMS network.
Based on above application scene, Figure 1B shows a kind of possible network architecture provided in an embodiment of the present invention.Such as figure
Shown in 1B, which includes:Control plane network element 110 and user plane network element 120.
Control plane network element 110 is for realizing the network equipment of control plane function.For example, control plane function includes wireless money
The management in source, the foundation of wireless connection, service quality (Quality of Service, QoS) guarantee of business etc..User's veil
Member 120 is the network equipment for realizing user plane functions.User plane functions include mainly sending and receiving business datum.
One control plane network element 110 can control one or more user plane network element 120, a user plane veil member
120 can also be controlled by one or more control plane network element 110.Have between control plane network element 110 and user plane network element 120
At least one user plane tunnel (user plane tunnel).User plane tunnel is used for transmission user face data namely business number
According to.In addition, also having at least one control plane tunnel (control between control plane network element 110 and user plane network element 120
plane tunnel).Control plane tunnel is used for transmission control plane signaling.
Optionally, control plane network element 110 and user plane network element 120 are the equipment in the core net of communication system.Such as Figure 1B
Shown, which further includes:Access network equipment 130 and terminal 140.
Access network equipment 130 can be base station (Base Station, BS), and the base station is that one kind being deployed in wireless access
Providing the device of wireless communication function for terminal in net.The base station may include various forms of macro base stations, micro-base station,
Relay station, access point etc..In the system using different wireless access technologys, the title for having the equipment of base station functions can
It can will be different, such as in LTE system, the node B (evolved NodeB, eNB or eNodeB) of referred to as evolution, in 3G
In communication system, referred to as node B (Node B) etc..It is above-mentioned to be provided wirelessly for terminal in the embodiment of the present invention for convenience of description
The device of communication function is referred to as access network equipment.
Terminal 140 may include various handheld devices with wireless communication function, mobile unit, wearable device, meter
It calculates equipment or is connected to other processing equipments of radio modem and various forms of user equipment (User
Equipment, UE), mobile station (Mobile Station, MS), terminal device (terminal device) etc..For convenience
Description, apparatus mentioned above are referred to as terminal.
It is communicated by certain technology of eating dishes without rice or wine between access network equipment 130 and terminal 140, such as honeycomb skill can be passed through
Art communicates.In addition, can also pass through skill of eating dishes without rice or wine between access network equipment 130 and control plane network element 110 and user plane network element 120
Art realization communicates, and can also be communicated by technology realization of eating dishes without rice or wine between terminal 140 and control plane network element 110.User plane
The also accessible data network (Data Network) of network element 120, such as public data network (Public Data Network,
PDN)。
In the embodiment of the present invention, noun " network " and " system " are often used alternatingly, but those skilled in the art can manage
Solve its meaning.In the embodiment of the present invention, control plane network element 110 and user plane network element 120 can be there are many possible ways of realization.
For example, in LTE system, control plane network element 110 can be:SGW-C, PGW-C, flow detection function (Traffic
Detection Function, TDF) entity control plane network element, SGW/PGW-C;User plane network element 120 can be:SGW-U、
User plane network element, the SGW/PGW-U of PGW-U, TDF entity, wherein the control plane network element and user plane network element of TDF entities can be with
It is respectively depicted as TDF-C and TDF-U.In another example in next generation network, control plane network element 110 can be next generation network
The control plane network element of (Next Generation, NG), user plane network element 120 can be the user plane network elements of next generation network,
In, the control plane network element and user plane network element of next generation network can be respectively depicted as NG-CP and NG-UP.It should be noted that
When the scheme of the embodiment of the present invention be applied to 5G systems or the future may appear other systems when, control plane network element, user plane
The title of network element, access network equipment, terminal etc. may change, but this has no effect on the implementation of the embodiment of the present invention.
Currently, in control plane and the scene of user plane separation, the user plane tunnel between control plane network element and user plane network element
Road also retains always in the case where no data transmits, and results in waste of resources.In view of this, an embodiment of the present invention provides one kind
The method for deleting user plane tunnel, and the control plane network element based on this method, user plane network element and system, this method are applied to
In communication system, communication system includes control plane network element and user plane network element, is had between control plane network element and user plane network element
At least one user plane tunnel.Technical solution provided in an embodiment of the present invention, core concept are that setting deletes user for triggering
The preset condition in face tunnel deletes the user plane tunnel when a certain user plane tunnel meets the preset condition.
It is further detailed to the embodiment of the present invention below by the general character being related to based on invention described above embodiment aspect
It describes in detail bright.
Fig. 2 is a kind of communication scheme of method for deleting user plane tunnel provided in an embodiment of the present invention.This method can
To include such as lower part.
In 201 parts, control plane network element determines that there is the target for meeting preset condition at least one user plane tunnel uses
Family face tunnel.
Specifically, having at least one user plane tunnel between control plane network element and user plane network element.For user plane tunnel
The quantity of different grain size corresponding to road, the user plane tunnel between control plane network element and user plane network element can be different.For example,
When user plane tunnel corresponds to equipment granularity, there is a user plane tunnel between control plane network element and user plane network element.Example again
Such as, when user plane tunnel counterpart terminal granularity, there is at least one user plane tunnel between control plane network element and user plane network element
Road, each user plane tunnel in at least one user plane tunnel are used for transmission and the relevant data of terminal.Example again
Such as, when user plane tunnel respective session granularity, there is at least one user plane tunnel between control plane network element and user plane network element
Road, each user plane tunnel in at least one user plane tunnel are used for transmission and the relevant data of session.Example again
Such as, when user plane tunnel corresponds to carrying granularity, there is at least one user plane tunnel between control plane network element and user plane network element
Road, each user plane tunnel in at least one user plane tunnel is used for transmission and the relevant data of carrying.
Below to above involved session (session), carrying (bearer), preset condition, target user face tunnel
Make exemplary introduction in road etc..
Session can refer within a unbroken specific operation time, the communication interaction between two equipment.At one
Ession for telecommunication, all messages transmitted between two equipment belong to the session.In embodiments of the present invention, session refers to end
The communication interaction of business datum is used for transmission between network element in end and data network.It can pass through with the relevant data of terminal
At least one session transmissions.
Carrying can refer to a data access of transmitting wireless service data.Involved by embodiments of the present invention
Carrying is referred to as radio bearer, refers to the data that business datum is used for transmission between the network element in terminal and data network
Access.Can be by least one session transmissions with the relevant data of terminal, it can be by extremely with the relevant data of session
Few carrying transmission.
Preset condition can refer to preset for determining whether user plane tunnel needs the decision condition deleted.Not
In same application scenarios, preset condition is different.In addition, being directed to varigrained user plane tunnel, preset condition is also
It is different.Detailed description in relation to preset condition see below.
Target user face tunnel can be the arbitrary one or more user plane tunnel in above-mentioned at least one user plane tunnel
Road.
In 202 parts, control plane network element sends solicited message to user plane network element, and solicited message is used to indicate user's veil
First delete target user plane tunnel.
Correspondingly, user plane network element receives solicited message from control plane network element.
In one example, it can be carried in solicited message at least one of following:It is used to indicate and deletes user plane tunnel
Indicate information, the mark in target user face tunnel, the corresponding message forward rule in target user face tunnel or target user face tunnel
The corresponding message matching rule in road.
In a kind of possible embodiment, the mark in target user face tunnel is carried in solicited message, to notify to use
Family veil member needs the target user face tunnel deleted.For example, the granularity corresponding to user plane tunnel is terminal granularity, session
When granularity or carrying granularity, since a plurality of user plane tunnel can be established between control plane network element and user plane network element, ask
It asks in information in addition to carrying above-mentioned instruction information, it is also necessary to the target user face tunnel for needing to delete is identified in solicited message
Road.In another example when the granularity corresponding to the user plane tunnel is equipment granularity, due between control plane network element and user plane network element
An only user plane tunnel, therefore above-mentioned instruction information is only carried in solicited message, it may not be necessary in solicited message
Carry the mark in this user plane tunnel.
In a kind of possible embodiment, tunnel corresponding message forwarding rule in target user face are carried in solicited message
Then and/or message matching rule, to which user plane network element can corresponding message forwarding rule in delete target user plane tunnel accordingly
Then and/or message matching rule and other contextual informations.
In 203 parts, user plane network element is according to solicited message, delete target user plane tunnel.
Specifically, user plane network element can determine the target user face tunnel for needing to delete after receiving solicited message
Then the target user face tunnel is deleted in road.For example, user plane network element delete target user plane tunnel can be in the following manner
It realizes:Discharge the occupied resource in target user face tunnel, corresponding contextual information in delete target user plane tunnel, etc..
In one example, user plane network element can be sent after delete target user plane tunnel to control plane network element
Response message, the response message are used to indicate the delete target user plane tunnel that succeeded.Correspondingly, control plane network element is from user plane
Network element receives after response message, you can confirms that target user face tunnel has been deleted.
It should be noted that by the agency of above, in addition to having at least one between control plane network element and user plane network element
Except user plane tunnel, there can also be at least one control plane tunnel.It can lead between control plane network element and user plane network element
Cross control plane tunnel transmitting-receiving solicited message and response message.
In scheme provided in an embodiment of the present invention, determine there is symbol at least one user plane tunnel by control plane network element
The target user face tunnel of preset condition is closed, and user plane network element is asked to delete the target user face tunnel, hence for control
The scene in face and user plane separation, provides the technical side for deleting the user plane tunnel between control plane network element and user plane network element
Case so that user plane tunnel can be deleted when that need not use, to avoid user plane tunnel long-term existence, to save money
Source.
In the following, for the different grain size corresponding to user plane tunnel, to the preset condition involved by the embodiment of the present invention into
Row further illustrates.
1, user plane tunnel counterpart terminal granularity
When user plane tunnel counterpart terminal granularity, have between control plane network element and user plane network element at least one use
Each user plane tunnel in the tunnel of family face is used for transmission and the relevant data of terminal.Target user face tunnel is for passing
The defeated and relevant data of target terminal, target terminal is in all terminals of control plane network element and user plane network element common service
Any one terminal.Preset condition may include one of following situation:
(a) it needs to delete with the relevant whole sessions of target terminal.
In which case, user plane tunnel can be deleted in scene is deleted in session.
Quantity with the relevant session of target terminal can be one, can also be multiple.These are related to target terminal
Session be used for transmission and the relevant data of target terminal.For example, including with the relevant data of target terminal:Target terminal is to number
The downlink business number sent to target terminal according to the uplink business data that the network element in network is sent, the network element in data network
According to.When user plane tunnel counterpart terminal granularity, it is assumed that target terminal correspond to target user face tunnel, then with target terminal phase
The data of whole sessions of pass are transmitted on the tunnel of target user face.It needs to delete when with the relevant whole sessions of target terminal
When, illustrate not need, by target user face tunnel transmission, to trigger delete target at this time with the relevant data of target terminal
User plane tunnel.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.Wherein, user plane tunnel 1 be used for transmission with 1 relevant data of terminal,
User plane tunnel 2 is used for transmission to be used for transmission and 3 relevant data of terminal with 2 relevant data of terminal, user plane tunnel 3.With
For terminal 1, it is assumed that being established between the network element in terminal 1 and data network has 2 sessions, when this 2 sessions all need to delete
Except when, control plane network element, which determines, deletes terminal 1 corresponding user plane tunnel 1, and control plane network element sends to user plane network element and carries
User plane tunnel 1 is deleted after having the solicited message of the mark in user plane tunnel 1, user plane network element to receive the solicited message.
In addition, the reason of needing to delete with the relevant whole sessions of target terminal may include one of following situation:Target
The service disconnection between network element in terminal and data network;Target terminal attachment removal flow;It is sent out in target terminal attachment flow
Existing target terminal leads to the context for still having activation in control plane network element due to attachment removal unreasonable before;Tracing section updating
Or target terminal update position is rejected in Routing Area Update flow, etc..
(b) what is cached in control plane network element has reached the maximum distributed for target terminal with the relevant data of target terminal
Buffer memory.
In which case, user plane tunnel can be deleted in data buffer storage scene.
Specifically, when target terminal is in Idle state, user plane network element is receiving and the relevant data of target terminal
It, will be with by target user face tunnel after (such as the network element in data network sent to target terminal downlink service data)
The relevant data forwarding of target terminal gives control plane network element, these data are cached by control plane network element.Subsequently, when target terminal from
When Idle state is restored to connected state, caching and the relevant data of target terminal are sent to user plane network element by control plane network element,
These data are sent from user plane network element to target terminal.
The largest buffered amount of promising each terminal distribution is configured in control plane network element.The corresponding largest buffered amount of each terminal
It can be distributed by control plane network element, can also be distributed by other equipment and notify to give control plane network element.For example, working as control plane network element
For SGW-C when, the corresponding largest buffered amount of each terminal can be by mobility management entity (Mobility Management
Entity, MME) it distributes and notifies to SGW-C.Largest buffered amount for target terminal distribution, which refers to control plane network element, to be cached
The maximum quantity with the relevant data of target terminal.Largest buffered amount for the distribution of each different terminals can be identical, also may be used
With difference, the embodiment of the present invention is not construed as limiting this.Optionally, largest buffered amount is down buffer storage suggested quantity (downlink
buffering suggested count).By taking target terminal as an example, when having been cached in control plane network element and target terminal phase
When the data of pass have reached the largest buffered amount distributed for target terminal, control plane network element can not continue storage and target terminal
Relevant data, at this time user plane network element can will be given with the relevant data forwarding of target terminal without going through target user face tunnel
Control plane network element is cached, and target user face tunnel can be deleted.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.Wherein, user plane tunnel 1 be used for transmission with 1 relevant data of terminal,
User plane tunnel 2 is used for transmission to be used for transmission and 3 relevant data of terminal with 2 relevant data of terminal, user plane tunnel 3.With
For terminal 1, it is assumed that the largest buffered amount for being the distribution of terminal 1 is a.When terminal 1 is in Idle state, user plane network element is receiving
To with after 1 relevant data of terminal, control plane network element will be given with 1 relevant data forwarding of terminal by user plane tunnel 1, by
Control plane network element caches these data.Reach largest buffered amount a with 1 relevant data of terminal when having been cached in control plane network element
When, control plane network element, which determines, deletes 1 corresponding user plane tunnel 1 of terminal, and control plane network element is carried to the transmission of user plane network element
The solicited message of the mark in user plane tunnel 1, user plane network element delete user plane tunnel 1 after receiving the solicited message.
Illustratively, for the situation in the deletion user plane tunnel in data buffer storage scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(c) what is cached in control plane network element is all sent to user plane network element with the relevant data of target terminal.
In which case, user plane tunnel can be deleted in data forwarding scene.
By the agency of above, when target terminal is in Idle state, user plane network element is receiving and target terminal phase
After the data of pass, control plane network element will be given with the relevant data forwarding of target terminal by target user face tunnel, by controlling
Veil member caches these data.Subsequently, when target terminal restores from Idle state to connected state, control plane network element by caching with
The relevant data of target terminal are sent to user plane network element, these data are sent from user plane network element to target terminal.
By taking target terminal as an example, it is all sent to use with the relevant data of target terminal when being cached in control plane network element
When the veil member of family, do not needed through target user face tunnel transmission with the relevant data of target terminal in control plane network element,
Target user face tunnel can be deleted at this time.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.Wherein, user plane tunnel 1 be used for transmission with 1 relevant data of terminal,
User plane tunnel 2 is used for transmission to be used for transmission and 3 relevant data of terminal with 2 relevant data of terminal, user plane tunnel 3.With
For terminal 1, when terminal 1 is restored from Idle state to connected state, control plane network element is by user plane tunnel 1 by caching and end
It holds 1 relevant data to be sent to user plane network element, these data is sent from user plane network element to terminal 1.When in control plane network element
When being all sent to user plane network element with 1 relevant data of terminal of caching, control plane network element determine that deletion terminal 1 is corresponding
User plane tunnel 1, control plane network element send the solicited message for the mark for carrying user plane tunnel 1, user to user plane network element
Veil member deletes user plane tunnel 1 after receiving the solicited message.
Illustratively, for the situation in the deletion user plane tunnel in data forwarding scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(d) control plane network element receives the instruction of legal interception system, which, which is used to indicate, no longer needs monitoring and target
The relevant data of terminal.
In which case, user plane tunnel can be deleted in Lawful Interception scene.
In Lawful Interception scene, if legal interception system needs to monitor and the relevant data of target terminal, user plane
Network element receive with after the relevant data of target terminal, will be with the relevant data of target terminal by target user face tunnel
It is sent to control plane network element, by control plane network element by these data forwardings to legal interception system.User plane network element is sent to control
The data of veil member processed can be the data copy that user plane network element generates, and can also include other data type informations.Control
The data that veil member is transmitted to legal interception system can be that control plane network element carries out treated data or other information.
If legal interception system no longer need to monitor with the relevant data of target terminal, legal interception system can be to
Control plane network element sends Lawful Interception and deactivates message, which deactivates message and be used to indicate deactivation and target terminal
Relevant Lawful Interception function, subsequent user veil member need not will be sent to control plane network element again with the relevant data of target terminal
It is transmitted to legal interception system, target user face tunnel can be deleted at this time.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.Wherein, user plane tunnel 1 be used for transmission with 1 relevant data of terminal,
User plane tunnel 2 is used for transmission to be used for transmission and 3 relevant data of terminal with 2 relevant data of terminal, user plane tunnel 3.With
For terminal 1, after legal interception system activation is with 1 relevant Lawful Interception function of terminal, user plane network element passes through user
Face tunnel 1 will be sent to control plane network element with 1 relevant data of terminal, these data forwardings are given to legal prison by control plane network element
Listen system.Control plane network element receive legal interception system transmission be used to indicate deactivation and the relevant legal prison of terminal 1
After the Lawful Interception of auditory function deactivates message, determine and delete 1 corresponding user plane tunnel 1 of terminal, control plane network element to
Family veil member sends the solicited message for the mark for carrying user plane tunnel 1, and user plane network element receives after the solicited message
Delete user plane tunnel 1.
Illustratively, for the situation in the deletion user plane tunnel in Lawful Interception scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, the control plane network element being either related to be PGW-C and user plane network element be PGW-U or
The control plane network element being related to is SGW/PGW-C and user plane network element is SGW/PGW-U, or the control plane network element being related to is NG-
CP and user plane network element are NG-UP.
It should be added that when user plane tunnel counterpart terminal granularity, a terminal can correspond to a user
Face tunnel, in this case, target terminal corresponding target user face tunnel are a user plane tunnel;Alternatively, one
Terminal can also correspond at least two user plane tunnels, and in this case, target terminal corresponding target user face tunnel can
To include at least two user plane tunnels.
2, user plane tunnel respective session granularity
When user plane tunnel respective session granularity, have between control plane network element and user plane network element at least one use
Each user plane tunnel in the tunnel of family face is used for transmission and the relevant data of session.Target user face tunnel is for passing
The defeated and relevant data of target session.Preset condition may include one of following situation:
(a) target session needs to delete.
In which case, user plane tunnel can be deleted in scene is deleted in session.
When user plane tunnel respective session granularity, it is assumed that target session correspond to target user face tunnel, then with target
The relevant data of session are transmitted on the tunnel of target user face.When target session need delete when, illustrate not with target meeting
Relevant data are talked about to need, by target user face tunnel transmission, to trigger delete target user plane tunnel at this time.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.Wherein, user plane tunnel 1 be used for transmission with 1 relevant data of session,
User plane tunnel 2 is used for transmission to be used for transmission and 3 relevant data of session with 2 relevant data of session, user plane tunnel 3.With
For session 1, when session 1 needs to delete, control plane network element, which determines, deletes 1 corresponding user plane tunnel 1 of session, controls veil
Member sends the solicited message for the mark for carrying user plane tunnel 1 to user plane network element, and user plane network element receives request letter
User plane tunnel 1 is deleted after breath.
In addition, target session may include one of following situation the reason of needing to delete:In target terminal and data network
Network element between service disconnection;Target terminal attachment removal flow;Find target terminal due to it in target terminal attachment flow
Preceding unreasonable attachment removal leads to the context for still having activation in control plane network element;Tracing section updating or Routing Area Update flow
Middle target terminal update position is rejected, and flow is deleted in the session that target terminal or network are initiated, etc..Wherein, target session is
Session between target terminal and the network element of data network.
(b) target session includes at least one session being used for transmission with the relevant data of target terminal, and controls veil
What is cached in member has reached the largest buffered amount distributed for target terminal with the relevant data of target terminal.
In which case, user plane tunnel can be deleted in data buffer storage scene.
Specifically, when target terminal is in Idle state, user plane network element is receiving and the relevant data of target terminal
It, will be with by target user face tunnel after (such as the network element in data network sent to target terminal downlink service data)
The relevant data forwarding of target terminal gives control plane network element, these data are cached by control plane network element.Subsequently, when target terminal from
When Idle state is restored to connected state, caching and the relevant data of target terminal are sent to user plane network element by control plane network element,
These data are sent from user plane network element to target terminal.
The largest buffered amount of promising each terminal distribution is configured in control plane network element.The corresponding largest buffered amount of each terminal
It can be distributed by control plane network element, can also be distributed by other equipment and notify to give control plane network element.For example, working as control plane network element
For SGW-C when, the corresponding largest buffered amount of each terminal can be distributed by MME and be notified to SGW-C.For target terminal distribution
Largest buffered amount refers to the maximum quantity with the relevant data of target terminal that control plane network element can cache.It is each different whole
The largest buffered amount of end distribution may be the same or different, and the embodiment of the present invention is not construed as limiting this.Optionally, maximum slow
Storage is down buffer storage suggested quantity (downlink buffering suggested count).By taking target terminal as an example, when
Cached in control plane network element when having reached the largest buffered amount distributed for target terminal with the relevant data of target terminal, control
Veil member processed can not continue storage and the relevant data of target terminal, and user plane network element can be without going through target user face at this time
Tunnel will be cached with the relevant data forwarding of target terminal to control plane network element, and target user face tunnel can be deleted.
In an example it is assumed that having 5 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2, user plane tunnel 3, user plane tunnel 4 and user plane tunnel 5.Wherein, user plane tunnel 1 is used
In transmission with 1 relevant data of session, user plane tunnel 2 be used for transmission with 2 relevant data of session, user plane tunnel 3 is used for
Transmission and 3 relevant data of session, user plane tunnel 4 is used for transmission to be used to pass with 4 relevant data of session, user plane tunnel 5
Defeated and 5 relevant data of session.Assuming that session 1, session 2 and session 3 are used for transmission and 1 relevant data of terminal, session 4 and meeting
Words 5 are used for transmission and 2 relevant data of terminal.By taking terminal 1 as an example, it is assumed that the largest buffered amount for being the distribution of terminal 1 is a.Work as end
When end 1 is in Idle state, user plane network element is being received with after 1 relevant data of terminal, passes through user plane tunnel 1,2 and 3
In one or more user plane tunnel will give control plane network element with 1 relevant data forwarding of terminal, cached by control plane network element
These data.When cached in control plane network element reach largest buffered amount a with 1 relevant data of terminal when, control plane network element
It determines and deletes 1 corresponding user plane tunnel 1,2 and 3 of terminal, control plane network element carries user plane tunnel to the transmission of user plane network element
The solicited message of the mark in road 1,2 and 3, user plane network element delete user plane tunnel 1,2 and 3 after receiving the solicited message.
Illustratively, for the situation in the deletion user plane tunnel in data buffer storage scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(c) target session includes at least one session being used for transmission with the relevant data of target terminal, and controls veil
What is cached in member is all sent to user plane network element with the relevant data of target terminal.
In which case, user plane tunnel can be deleted in data forwarding scene.
By the agency of above, when target terminal is in Idle state, user plane network element is receiving and target terminal phase
After the data of pass, control plane network element will be given with the relevant data forwarding of target terminal by target user face tunnel, by controlling
Veil member caches these data.Subsequently, when target terminal restores from Idle state to connected state, control plane network element by caching with
The relevant data of target terminal are sent to user plane network element, these data are sent from user plane network element to target terminal.
By taking target terminal as an example, it is all sent to use with the relevant data of target terminal when being cached in control plane network element
When the veil member of family, do not needed through target user face tunnel transmission with the relevant data of target terminal in control plane network element,
Target user face tunnel can be deleted at this time.
In an example it is assumed that having 5 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2, user plane tunnel 3, user plane tunnel 4 and user plane tunnel 5.Wherein, user plane tunnel 1 is used
In transmission with 1 relevant data of session, user plane tunnel 2 be used for transmission with 2 relevant data of session, user plane tunnel 3 is used for
Transmission and 3 relevant data of session, user plane tunnel 4 is used for transmission to be used to pass with 4 relevant data of session, user plane tunnel 5
Defeated and 5 relevant data of session.Assuming that session 1, session 2 and session 3 are used for transmission and 1 relevant data of terminal, session 4 and meeting
Words 5 are used for transmission and 2 relevant data of terminal.By taking terminal 1 as an example, when terminal 1 is restored from Idle state to connected state, control plane
Network element is sent caching and 1 relevant data of terminal by one or more user plane tunnel in user plane tunnel 1,2 and 3
User plane network element is given, these data are sent from user plane network element to terminal 1.It is related to terminal 1 when being cached in control plane network element
Data when being all sent to user plane network element, control plane network element, which determines, deletes 1 corresponding user plane tunnel 1,2 and 3 of terminal,
Control plane network element sends the solicited message for the mark for carrying user plane tunnel 1,2 and 3 to user plane network element, and user plane network element connects
It receives the solicited message and deletes user plane tunnel 1,2 and 3 later.
Illustratively, for the situation in the deletion user plane tunnel in data forwarding scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(d) target session includes at least one session being used for transmission with the relevant data of target terminal, and controls veil
Member receives the instruction of legal interception system, which, which is used to indicate, no longer needs to monitor and the relevant data of target terminal.
In which case, user plane tunnel can be deleted in Lawful Interception scene.
In Lawful Interception scene, if legal interception system needs to monitor and the relevant data of target terminal, user plane
Network element receive with after the relevant data of target terminal, will be with the relevant data of target terminal by target user face tunnel
It is sent to control plane network element, by control plane network element by these data forwardings to legal interception system.User plane network element is sent to control
The data of veil member processed can be the data copy that user plane network element generates, and can also include other data type informations.Control
The data that veil member is transmitted to legal interception system can be that control plane network element carries out treated data or other information.
If legal interception system no longer need to monitor with the relevant data of target terminal, legal interception system can be to
Control plane network element sends Lawful Interception and deactivates message, which deactivates message and be used to indicate deactivation and target terminal
Relevant Lawful Interception function, subsequent user veil member need not will be sent to control plane network element again with the relevant data of target terminal
It is transmitted to legal interception system, target user face tunnel can be deleted at this time.
In an example it is assumed that having 5 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2, user plane tunnel 3, user plane tunnel 4 and user plane tunnel 5.Wherein, user plane tunnel 1 is used
In transmission with 1 relevant data of session, user plane tunnel 2 be used for transmission with 2 relevant data of session, user plane tunnel 3 is used for
Transmission and 3 relevant data of session, user plane tunnel 4 is used for transmission to be used to pass with 4 relevant data of session, user plane tunnel 5
Defeated and 5 relevant data of session.Assuming that session 1, session 2 and session 3 are used for transmission and 1 relevant data of terminal, session 4 and meeting
Words 5 are used for transmission and 2 relevant data of terminal.By taking terminal 1 as an example, when legal interception system activation is relevant legal with terminal 1
After monitor function, user plane network element will be with terminal 1 by one or more user plane tunnel in user plane tunnel 1,2 and 3
Relevant data are sent to control plane network element, by control plane network element by these data forwardings to legal interception system.Control veil
Member is in the Lawful Interception for being used to indicate deactivation and 1 relevant Lawful Interception function of terminal for receiving legal interception system transmission
It after deactivating message, determines and deletes 1 corresponding user plane tunnel 1,2 and 3 of terminal, control plane network element is sent to user plane network element
The solicited message of the mark in user plane tunnel 1,2 and 3 is carried, user plane network element deletes user after receiving the solicited message
Face tunnel 1,2 and 3.
Illustratively, for the situation in the deletion user plane tunnel in Lawful Interception scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, the control plane network element being either related to be PGW-C and user plane network element be PGW-U or
The control plane network element being related to is SGW/PGW-C and user plane network element is SGW/PGW-U, or the control plane network element being related to is NG-
CP and user plane network element are NG-UP.
3, user plane tunnel corresponds to carrying granularity
When user plane tunnel correspond to carrying granularity when, have between control plane network element and user plane network element at least one use
Each user plane tunnel in the tunnel of family face is used for transmission and the relevant data of carrying.Target user face tunnel is for passing
It is defeated to carry relevant data with target.Preset condition includes one of following situation:
(a) target carrying is at least one carrying being used for transmission with the relevant data of target session, and target session needs
It deletes.
In which case, user plane tunnel can be deleted in scene is deleted in session.
When target session needs to delete, illustrate not need through target user face with the relevant data of target session
Tunnel transmission triggers delete target user plane tunnel at this time.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.Wherein, user plane tunnel 1 is used for transmission and carries 1 relevant data,
User plane tunnel 2 is used for transmission to be used for transmission and 3 relevant data of carrying with 2 relevant data of carrying, user plane tunnel 3.It is false
It is used for transmission and 2 relevant data of session with 1 relevant data of session, carrying 3 if carrying 1 and carrying 2 are used for transmission.With session
For 1, when session 1 needs to delete, control plane network element, which determines, deletes 1 corresponding user plane tunnel 1 and 2 of session, controls veil
Member sends the solicited message for the mark for carrying user plane tunnel 1 and 2 to user plane network element, and user plane network element receives the request
User plane tunnel 1 and 2 is deleted after information.
In addition, target session may include one of following situation the reason of needing to delete:In target terminal and data network
Network element between service disconnection;Target terminal attachment removal flow;Find target terminal due to unreasonable before in attachment flow
Attachment removal lead to the context for still having activation in control plane network element;Target is whole in tracing section updating or Routing Area Update flow
End update position is rejected, and flow is deleted in the session that target terminal or network are initiated, etc..Wherein, target session is target terminal
Session between the network element of data network.
(b) target carrying is to be used for transmission and at least one of the relevant data of target terminal carrying, and control plane network element
In cached have reached the largest buffered amount distributed for target terminal with the relevant data of target terminal.
In which case, user plane tunnel can be deleted in data buffer storage scene.
When target terminal is in Idle state, user plane network element receive with the relevant data of target terminal (such as count
The downlink service data sent to target terminal according to the network element in network) after, it will be with target end by target user face tunnel
It holds relevant data forwarding to give control plane network element, these data is cached by control plane network element.Subsequently, when target terminal is from Idle state
When restoring to connected state, caching and the relevant data of target terminal are sent to user plane network element by control plane network element, by user
Veil member sends these data to target terminal.
The largest buffered amount of promising each terminal distribution is configured in control plane network element.The corresponding largest buffered amount of each terminal
It can be distributed by control plane network element, can also be distributed by other equipment and notify to give control plane network element.For example, working as control plane network element
For SGW-C when, the corresponding largest buffered amount of each terminal can be distributed by MME and be notified to SGW-C.For target terminal distribution
Largest buffered amount refers to the maximum quantity with the relevant data of target terminal that control plane network element can cache.It is each different whole
The largest buffered amount of end distribution may be the same or different, and the embodiment of the present invention is not construed as limiting this.Optionally, maximum slow
Storage is down buffer storage suggested quantity (downlink buffering suggested count).By taking target terminal as an example, when
Cached in control plane network element when having reached the largest buffered amount distributed for target terminal with the relevant data of target terminal, control
Veil member processed can not continue storage and the relevant data of target terminal, and user plane network element can be without going through target user face at this time
Tunnel will be cached with the relevant data forwarding of target terminal to control plane network element, and target user face tunnel can be deleted.
In an example it is assumed that having 5 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2, user plane tunnel 3, user plane tunnel 4 and user plane tunnel 5.Wherein, user plane tunnel 1 is used
In transmission and 1 relevant data of carrying, user plane tunnel 2 is used for transmission and carries 2 relevant data, and user plane tunnel 3 is used for
Transmission and 3 relevant data of carrying, user plane tunnel 4 are used for transmission and carry 4 relevant data, and user plane tunnel 5 is for passing
Defeated and 5 relevant data of carrying.It 4 and is held with 1 relevant data of terminal, carrying assuming that carrying 1, carrying 2 and carrying 3 are used for transmission
5 are carried to be used for transmission and 2 relevant data of terminal.By taking terminal 1 as an example, it is assumed that the largest buffered amount for being the distribution of terminal 1 is a.Work as end
When end 1 is in Idle state, user plane network element is being received with after 1 relevant data of terminal, passes through user plane tunnel 1,2 and 3
In one or more user plane tunnel will give control plane network element with 1 relevant data forwarding of terminal, cached by control plane network element
These data.When cached in control plane network element reach largest buffered amount a with 1 relevant data of terminal when, control plane network element
It determines and deletes 1 corresponding user plane tunnel 1,2 and 3 of terminal, control plane network element carries user plane tunnel to the transmission of user plane network element
The solicited message of the mark in road 1,2 and 3, user plane network element delete user plane tunnel 1,2 and 3 after receiving the solicited message.
Illustratively, for the situation in the deletion user plane tunnel in data buffer storage scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(c) target carrying is to be used for transmission and at least one of the relevant data of target terminal carrying, and control plane network element
Middle caching is all sent to user plane network element with the relevant data of target terminal.
In which case, user plane tunnel can be deleted in data forwarding scene.
By the agency of above, when target terminal is in Idle state, user plane network element is receiving and target terminal phase
After the data of pass, control plane network element will be given with the relevant data forwarding of target terminal by target user face tunnel, by controlling
Veil member caches these data.Subsequently, when target terminal restores from Idle state to connected state, control plane network element by caching with
The relevant data of target terminal are sent to user plane network element, these data are sent from user plane network element to target terminal.
By taking target terminal as an example, it is all sent to use with the relevant data of target terminal when being cached in control plane network element
When the veil member of family, do not needed through target user face tunnel transmission with the relevant data of target terminal in control plane network element,
Target user face tunnel can be deleted at this time.
In an example it is assumed that having 5 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2, user plane tunnel 3, user plane tunnel 4 and user plane tunnel 5.Wherein, user plane tunnel 1 is used
In transmission and 1 relevant data of carrying, user plane tunnel 2 is used for transmission and carries 2 relevant data, and user plane tunnel 3 is used for
Transmission and 3 relevant data of carrying, user plane tunnel 4 are used for transmission and carry 4 relevant data, and user plane tunnel 5 is for passing
Defeated and 5 relevant data of carrying.It 4 and is held with 1 relevant data of terminal, carrying assuming that carrying 1, carrying 2 and carrying 3 are used for transmission
5 are carried to be used for transmission and 2 relevant data of terminal.By taking terminal 1 as an example, when terminal 1 is restored from Idle state to connected state, control plane
Network element is sent caching and 1 relevant data of terminal by one or more user plane tunnel in user plane tunnel 1,2 and 3
User plane network element is given, these data are sent from user plane network element to terminal 1.It is related to terminal 1 when being cached in control plane network element
Data when being all sent to user plane network element, control plane network element, which determines, deletes 1 corresponding user plane tunnel 1,2 and 3 of terminal,
Control plane network element sends the solicited message for the mark for carrying user plane tunnel 1,2 and 3 to user plane network element, and user plane network element connects
It receives the solicited message and deletes user plane tunnel 1,2 and 3 later.
Illustratively, for the situation in the deletion user plane tunnel in data forwarding scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(d) target carrying is to be used for transmission and at least one of the relevant data of target terminal carrying, and control plane network element
The instruction of legal interception system is received, which, which is used to indicate, no longer needs to monitor and the relevant data of target terminal.
In which case, user plane tunnel can be deleted in Lawful Interception scene.
In Lawful Interception scene, if legal interception system needs to monitor and the relevant data of target terminal, user plane
Network element receive with after the relevant data of target terminal, will be with the relevant data of target terminal by target user face tunnel
It is sent to control plane network element, by control plane network element by these data forwardings to legal interception system.User plane network element is sent to control
The data of veil member processed can be the data copy that user plane network element generates, and can also include other data type informations.Control
The data that veil member is transmitted to legal interception system can be that control plane network element carries out treated data or other information.
If legal interception system no longer need to monitor with the relevant data of target terminal, legal interception system can be to
Control plane network element sends Lawful Interception and deactivates message, which deactivates message and be used to indicate deactivation and target terminal
Relevant Lawful Interception function, subsequent user veil member need not will be sent to control plane network element again with the relevant data of target terminal
It is transmitted to legal interception system, target user face tunnel can be deleted at this time.
In an example it is assumed that having 5 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2, user plane tunnel 3, user plane tunnel 4 and user plane tunnel 5.Wherein, user plane tunnel 1 is used
In transmission and 1 relevant data of carrying, user plane tunnel 2 is used for transmission and carries 2 relevant data, and user plane tunnel 3 is used for
Transmission and 3 relevant data of carrying, user plane tunnel 4 are used for transmission and carry 4 relevant data, and user plane tunnel 5 is for passing
Defeated and 5 relevant data of carrying.It 4 and is held with 1 relevant data of terminal, carrying assuming that carrying 1, carrying 2 and carrying 3 are used for transmission
5 are carried to be used for transmission and 2 relevant data of terminal.By taking terminal 1 as an example, when legal interception system activation is relevant legal with terminal 1
After monitor function, user plane network element will be with terminal 1 by one or more user plane tunnel in user plane tunnel 1,2 and 3
Relevant data are sent to control plane network element, by control plane network element by these data forwardings to legal interception system.Control veil
Member is in the Lawful Interception for being used to indicate deactivation and 1 relevant Lawful Interception function of terminal for receiving legal interception system transmission
It after deactivating message, determines and deletes 1 corresponding user plane tunnel 1,2 and 3 of terminal, control plane network element is sent to user plane network element
The solicited message of the mark in user plane tunnel 1,2 and 3 is carried, user plane network element deletes user after receiving the solicited message
Face tunnel 1,2 and 3.
Illustratively, for the situation in the deletion user plane tunnel in Lawful Interception scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, the control plane network element being either related to be PGW-C and user plane network element be PGW-U or
The control plane network element being related to is SGW/PGW-C and user plane network element is SGW/PGW-U, or the control plane network element being related to is NG-
CP and user plane network element are NG-UP.
4, user plane tunnel corresponds to equipment granularity
When user plane tunnel corresponds to equipment granularity, have between control plane network element and user plane network element at least one use
Family face tunnel includes a user plane tunnel, and target user face tunnel is this user plane tunnel.Target user face tunnel
It is used for transmission the relevant data of all terminals with control plane network element and user plane network element common service.Preset condition may include
One of following situation:
(a) it needs to delete by whole sessions of user plane tunnel transmission.
In which case, user plane tunnel can be deleted in scene is deleted in session.
Due to only having a user plane tunnel, each terminal and data network between control plane network element and user plane network element
All sessions between the network element of network are transmitted on this user plane tunnel.If only partial session needs to delete,
This user plane tunnel cannot be deleted, for transmitting other not deleted relevant data of session.When whole sessions
When needing to delete, illustrate to need to transmit on this user plane tunnel without session, this user is deleted in triggering at this time
Face tunnel.
In an example it is assumed that only having a user plane tunnel, control plane between control plane network element and user plane network element
There are 3 sessions in total, respectively between network element and all terminals and the network element of data network of user plane network element common service
Session 1, session 2 and session 3.All pass through this user plane tunnel transmission with this 3 relevant data of session.When this 3
When session all needs to delete, control plane network element, which determines, deletes this user plane tunnel, and control plane network element is to user plane network element
Solicited message is sent, user plane network element deletes this user plane tunnel after receiving the solicited message.
(b) what is cached in control plane network element has reached with the relevant data of each terminal in all terminals as each end
Hold the largest buffered amount of distribution.
In which case, user plane tunnel can be deleted in data buffer storage scene.
For any terminal (by taking target terminal as an example) of control plane network element and user plane network element common service, when target end
End in Idle state when, user plane network element receive with the relevant data of target terminal (such as the network element in data network to
The downlink service data that target terminal is sent) after, it will be related to target terminal by above-mentioned have user plane tunnel
Data forwarding give control plane network element, these data are cached by control plane network element.Subsequently, when target terminal from Idle state restore to
When connected state, caching and the relevant data of target terminal are sent to user by control plane network element by this user plane tunnel
Veil member, these data are sent from user plane network element to target terminal.
The largest buffered amount of promising each terminal distribution is configured in control plane network element.The corresponding largest buffered amount of each terminal
It can be distributed by control plane network element, can also be distributed by other equipment and notify to give control plane network element.For example, working as control plane network element
For SGW-C when, the corresponding largest buffered amount of each terminal can be distributed by MME and be notified to SGW-C.For target terminal distribution
Largest buffered amount refers to the maximum quantity with the relevant data of target terminal that control plane network element can cache.It is each different whole
The largest buffered amount of end distribution may be the same or different, and the embodiment of the present invention is not construed as limiting this.Optionally, maximum slow
Storage is down buffer storage suggested quantity (downlink buffering suggested count).By taking target terminal as an example, when
Cached in control plane network element when having reached the largest buffered amount distributed for target terminal with the relevant data of target terminal, control
Veil member processed can not continue storage and the relevant data of target terminal.Due to only having between control plane network element and user plane network element
One user plane tunnel, therefore pass through this user plane tunnel transmission with the relevant data of each terminal.If only portion
The data that point terminal has cached in control plane network element have reached corresponding largest buffered amount, then this user plane tunnel
It cannot be deleted, for transmitting and other relevant data of terminal for being also not up to largest buffered amount.When all terminals are being controlled
When the data cached in veil member processed have reached corresponding largest buffered amount, this user plane tunnel is deleted in triggering
Road.
In an example it is assumed that only having a user plane tunnel, control plane between control plane network element and user plane network element
All terminals of network element and user plane network element common service include terminal 1, terminal 2 and terminal 3.It is assumed to be each terminal distribution
Largest buffered amount is a, and largest buffered amount a is had reached with the relevant data of each terminal when having been cached in control plane network element
When, control plane network element, which determines, deletes this user plane tunnel, and control plane network element sends solicited message, user to user plane network element
Veil member deletes this user plane tunnel after receiving the solicited message.
Illustratively, for the situation in the deletion user plane tunnel in data buffer storage scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(c) what is cached in control plane network element is all sent to user plane with the relevant data of each terminal in all terminals
Network element.
In which case, user plane tunnel can be deleted in data forwarding scene.
By the agency of above, when target terminal is in Idle state, user plane network element is receiving and target terminal phase
After the data of pass, control veil will be given with the relevant data forwarding of target terminal by above-mentioned have user plane tunnel
Member caches these data by control plane network element.Subsequently, when target terminal restores from Idle state to connected state, control plane network element
Caching and the relevant data of target terminal are sent to user plane network element by this user plane tunnel, by user plane network element
These data are sent to target terminal.
It is relevant with each terminal due to only having a user plane tunnel between control plane network element and user plane network element
Data pass through this user plane tunnel transmission.If the data that only part terminal caches in control plane network element are whole
It is sent to user plane network element, then this user plane tunnel cannot be deleted, and be cached in control plane network element for transmission
Data be not sent to the relevant data of other terminals of user plane network element all also.When all terminals are delayed in control plane network element
When the data deposited all have been sent to user plane network element, this user plane tunnel is deleted in triggering.
In an example it is assumed that only having a user plane tunnel, control plane between control plane network element and user plane network element
All terminals of network element and user plane network element common service include terminal 1, terminal 2 and terminal 3.When what is cached in control plane network element
When being all sent to user plane network element with the relevant data of each terminal, control plane network element, which determines, deletes this user plane tunnel
Road, control plane network element send solicited message to user plane network element, and user plane network element deletes this after receiving the solicited message
User plane tunnel.
Illustratively, for the situation in the deletion user plane tunnel in data forwarding scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, or the control plane network element being related to is SGW/PGW-C and user plane network element is SGW/
PGW-U, or the control plane network element that is related to is NG-CP and user plane network element is NG-UP.
(d) control plane network element receives the instruction of legal interception system, the instruction be used to indicate no longer need monitor with it is above-mentioned
The relevant data of any terminal in all terminals.
In which case, user plane tunnel can be deleted in Lawful Interception scene.
In Lawful Interception scene, if legal interception system needs monitoring related (by taking target terminal as an example) to any terminal
Data, then user plane network element receiving with after the relevant data of target terminal, pass through above-mentioned have a target use
Family face tunnel will be sent to control plane network element with the relevant data of target terminal, by control plane network element by these data forwardings to conjunction
Method monitoring system.The data that user plane network element is sent to control plane network element can be the data copy that user plane network element generates, also
May include other data type informations.The data that control plane network element is transmitted to legal interception system can be control plane network element into
Row treated data or other information.
If legal interception system no longer need to monitor with the relevant data of target terminal, legal interception system can be to
Control plane network element sends Lawful Interception and deactivates message, which deactivates message and be used to indicate deactivation and target terminal
Relevant Lawful Interception function, subsequent user veil member need not will be sent to control plane network element again with the relevant data of target terminal
It is transmitted to legal interception system.Due to only having a user plane tunnel between control plane network element and user plane network element, if legal
There is still a need for monitorings and the relevant data of at least one terminal, then this user plane tunnel to be deleted for monitoring system, with
It is used for transmission and the relevant data of these terminals.When legal interception system no longer needs to monitor and the relevant data of any terminal
When, this user plane tunnel is deleted in triggering.
In an example it is assumed that only having a user plane tunnel, control plane between control plane network element and user plane network element
All terminals of network element and user plane network element common service include terminal 1, terminal 2 and terminal 3.When legal interception system no longer needs
When monitoring data relevant with any terminal, control plane network element determine delete this user plane tunnel, control plane network element to
User plane network element sends solicited message, and user plane network element deletes this user plane tunnel after receiving the solicited message.
Illustratively, for the situation in the deletion user plane tunnel in Lawful Interception scene, the control plane network element being related to is
SGW-C and user plane network element are SGW-U, the control plane network element being either related to be PGW-C and user plane network element be PGW-U or
The control plane network element being related to is SGW/PGW-C and user plane network element is SGW/PGW-U, or the control plane network element being related to is NG-
CP and user plane network element are NG-UP.
Above in relation to the different grain size corresponding to user plane tunnel, explanation is described to preset condition.Also, respectively
From 4 different application scenarios such as session deletion, data buffer storage, data forwarding and Lawful Interception, it is situated between to preset condition
Continue explanation.For data buffer storage scene, above only by taking the distribution of largest buffered amount counterpart terminal as an example.In other possible embodiment party
In formula, largest buffered amount can also correspond to user plane tunnel distributing.That is, configuring promising each user plane tunnel in control plane network element
The largest buffered amount of distribution.The corresponding largest buffered amount in each user plane tunnel can be distributed by control plane network element, can also be by
Other equipment distributes and notifies to give control plane network element.For example, when control plane network element is SGW-C, each user plane tunnel corresponds to
Largest buffered amount can be distributed and be notified to SGW-C by MME.Largest buffered amount for target user face tunnel distributing is to accuse
The maximum quantity for the data received from user plane network element by target user face tunnel that veil member processed can cache.Work as user plane
It when tunnel is a plurality of, may be the same or different for the largest buffered amount of each different user face tunnel distributing, the present invention is real
Example is applied to be not construed as limiting this.In this case, preset condition is:It is transmitted to from user plane network element by target user face tunnel
The data of control plane network element have reached as the largest buffered amount of target user face tunnel distributing.When what is cached in control plane network element
By the data of target user face tunnel transmission have reached for the largest buffered amount of target user face tunnel distributing when, control veil
Member can not continue the data that storage is received by target user face tunnel, and user plane network element can be used without going through target at this time
Family face tunnel forwards the data to control plane network element and is cached, and target user face tunnel can be deleted.
In an example it is assumed that having 3 user plane tunnels between control plane network element and user plane network element, respectively use
Family face tunnel 1, user plane tunnel 2 and user plane tunnel 3.The largest buffered amount for being assumed to be each user plane tunnel distributing is a,
By taking user plane tunnel 1 as an example, when the data for being transmitted to control plane network element from user plane network element by user plane tunnel 1 have reached most
When big buffer memory a, control plane network element, which determines, deletes user plane tunnel 1, and control plane network element carries useful to the transmission of user plane network element
The solicited message of the mark in family face tunnel 1, user plane network element delete user plane tunnel 1 after receiving the solicited message.
In addition, in the case where largest buffered amount corresponds to user plane tunnel distributing, the granularity corresponding to user plane tunnel can
To be that equipment granularity, terminal granularity, session granularity or carrying granularity, the embodiment of the present invention are not construed as limiting this.
In the alternative embodiment provided based on embodiment illustrated in fig. 2, as shown in figure 3, control plane network element is to user
Before or after veil member sends solicited message, namely before or after 202 part, the method can also include as follows
Part:
In 204 parts, the determination of control plane network element needs to create new user plane tunnel.
Specifically, control plane network element can detect that determination needs to create new user plane tunnel when meeting establishment condition
Road.For corresponding to user plane tunnel different grain size and different application scenarios, above-mentioned establishment condition can be different.It is right below
Explanation is introduced in establishment condition.
1, user plane tunnel counterpart terminal granularity
When user plane tunnel counterpart terminal granularity, each user plane tunnel is used for transmission and a relevant number of terminal
According to.The new user plane tunnel that request creates is used for transmission and the relevant data of service terminal.Service terminal is control plane network element
With a terminal of user plane network element common service, and user plane corresponding with this terminal tunnel is not temporarily created.Establishment condition
It may include one of following situation:(a) it needs to create with the relevant session of service terminal;(b) service terminal restores from Idle state
To connected state, control plane network element needs will have been cached is sent to user plane network element with the relevant data of service terminal, by user
Veil member sends these data to service terminal;(c) service terminal is converted to Idle state from connected state, and control plane network element needs
It receives and caches and the relevant data of service terminal from user plane network element;(d) control plane network element receives legal interception system
Instruction needs to monitor and the relevant data of service terminal.
2, user plane tunnel respective session granularity
When user plane tunnel respective session granularity, each user plane tunnel is used for transmission and a relevant number of session
According to.Request create new user plane tunnel be used for transmission with the relevant data of new session, new session refers to not creating temporarily
Session.Establishment condition may include one of following situation:(a) new session needs to create;(b) new session includes for passing
Defeated at least one session with the relevant data of service terminal, and service terminal restores from Idle state to connected state, controls veil
Member needs to have cached to be sent to user plane network element with the relevant data of service terminal, is sent out these data by user plane network element
Give service terminal;(c) new session includes at least one session being used for transmission with the relevant data of service terminal, and is serviced
Terminal is converted to Idle state from connected state, and control plane network element needs are received from user plane network element and cached relevant with service terminal
Data;(d) new session includes at least one session being used for transmission with the relevant data of service terminal, and control plane network element connects
The instruction for receiving legal interception system needs to monitor and the relevant data of service terminal.
For above-mentioned (b), (c), (d) situation, service terminal is the one of control plane network element and user plane network element common service
A terminal.
3, user plane tunnel corresponds to carrying granularity
When user plane tunnel corresponds to carrying granularity, each user plane tunnel is used for transmission and a relevant number of carrying
According to.Request create new user plane tunnel be used for transmission with the relevant data of new carrying, new carrying refers to not creating temporarily
Carrying.Establishment condition may include one of following situation:(a) new carrying includes being used for transmission and the relevant number of new session
According at least one carrying, and new session needs to create, and new session refers to the session not created temporarily;(b) new carrying packet
At least one carrying being used for transmission with the relevant data of service terminal is included, and service terminal restores from Idle state to connected state,
Control plane network element needs will cache and be sent to user plane network element with the relevant data of service terminal, by user plane network element by this
A little data are sent to service terminal;(c) new carrying includes being used for transmission to hold at least one of the relevant data of service terminal
It carries, and service terminal is converted to Idle state from connected state, control plane network element needs receive from user plane network element and cache and service
The relevant data of terminal;(d) new carrying includes at least one carrying being used for transmission with the relevant data of service terminal, and is controlled
The instruction that veil member processed receives legal interception system needs to monitor and the relevant data of service terminal.
For above-mentioned (b), (c), (d) situation, service terminal is the one of control plane network element and user plane network element common service
A terminal.
4, user plane tunnel corresponds to equipment granularity
When user plane tunnel corresponds to equipment granularity, due between control plane network element and user plane network element only have one with
Family face tunnel, so the new user plane tunnel that request creates is this user plane tunnel.It uses in this user plane tunnel
In the relevant data of all terminals of transmission and control plane network element and user plane network element common service.Establishment condition may include as
One of lower situation:(a) it needs to create by the session of this user plane tunnel transmission, which can be above-mentioned all terminals
In any terminal need the session that creates;(b) any terminal in above-mentioned all terminals is restored from Idle state to connected state, control
Veil member needs processed will have been cached is sent to user plane network element with the relevant data of the terminal, is counted these by user plane network element
According to being sent to the terminal;(c) any terminal in above-mentioned all terminals is converted to Idle state from connected state, and control plane network element needs
It receives and caches and the relevant data of the terminal from user plane network element;(d) control plane network element receives the finger of legal interception system
Show and needs to monitor and the relevant data of any terminal in above-mentioned all terminals.
In 205 parts, control plane network element sends request to create to user plane network element, and request to create is used to indicate user's veil
Member creates new user plane tunnel.
Correspondingly, user plane network element receives request to create from control plane network element.
In one example, it can be carried in request to create at least one of following:It is used to indicate and creates user plane tunnel
Indicate information, the identifying of new user plane tunnel, the corresponding message forward rule in new user plane tunnel or new user plane tunnel
The corresponding message matching rule in road.
In a kind of possible embodiment, the mark in the new user plane tunnel that request creates is carried in request to create
Know, with the new user plane tunnel for notifying user plane network element to need to create.For example, the granularity corresponding to user plane tunnel is eventually
When telomere degree, session granularity or carrying granularity, since a plurality of user plane can be established between control plane network element and user plane network element
Tunnel, therefore in request to create in addition to carrying above-mentioned instruction information, it is also necessary to identify what request created in request to create
New user plane tunnel.In another example when the granularity corresponding to the user plane tunnel is equipment granularity, due to control plane network element and use
Only have a user plane tunnel between the veil member of family, therefore only carry above-mentioned instruction information in request to create, it may not be necessary to
The mark in this user plane tunnel is carried in request to create.
In a kind of possible embodiment, it is corresponding that the new user plane tunnel that request creates is carried in solicited message
Message forward rule and/or message matching rule, to which user plane network element can configure the new user plane tunnel of establishment accordingly
Corresponding message forward rule and/or message matching rule and other contextual informations.
In 206 parts, user plane network element creates new user plane tunnel according to request to create.
Specifically, user plane network element can determine the new user plane tunnel for needing to create after receiving request to create
Then road creates the new user plane tunnel.For example, user plane network element create new user plane tunnel can be in the following manner
It realizes:It is the new corresponding contextual information of user plane tunnel configuration, etc. for new user plane tunnel distributing resource.
In one example, user plane network element can be sent after creating new user plane tunnel to control plane network element
Response is created, establishment response, which is used to indicate, has successfully created new user plane tunnel.Correspondingly, control plane network element is from user plane
Network element receives after establishment response, you can confirms that new user plane tunnel has created.
It is rung in addition, request to create can be received and dispatched between control plane network element and user plane network element by control plane tunnel and created
It answers.
From the foregoing, it can be understood that the embodiment of the present invention additionally provides the user plane created between control plane network element and user plane network element
The technical solution in tunnel so that user plane tunnel can be created when there is demand.
Below shown in Fig. 2 and Fig. 3 on the basis of method, in conjunction with Fig. 4~Fig. 6, to the scheme of the embodiment of the present invention do into
One step explanation.Wherein, it in method shown in Fig. 4~Fig. 6, with the same or analogous content of method shown in Fig. 2 or Fig. 3, can refer to
Detailed description in Fig. 2 or Fig. 3, does not repeat subsequently.
Fig. 4 is the communication scheme of another method for deleting user plane tunnel provided in an embodiment of the present invention.In Fig. 4,
With user plane tunnel counterpart terminal granularity, illustrated so that application scenarios are data buffer storage scene as an example.This method may include
Such as lower part.
In 401 parts, when target terminal is in Idle state, user plane network element is used by target corresponding with target terminal
Family face tunnel is sent and the relevant data of target terminal to control plane network element.
In 402 parts, control plane network element caching and the relevant data of target terminal.
In 403 parts, control plane network element determines whether what is cached has reached with the relevant data of target terminal as target
The largest buffered amount of terminal distribution.
In 404 parts, if cached that the maximum distributed for target terminal is had reached with the relevant data of target terminal is slow
Storage, then control plane network element send solicited message to user plane network element, solicited message is used to indicate user plane network element delete target
User plane tunnel carries the mark in target user face tunnel in the solicited message.
In 405 parts, user plane network element is according to solicited message, delete target user plane tunnel.
In 406 parts, user plane network element sends response message to control plane network element.
In 407 parts, when target terminal restores from Idle state to connected state, control plane network element, which determines, to be needed to create newly
User plane tunnel, the new user plane tunnel to the transmission of user plane network element for having cached and the relevant data of target terminal.
In 408 parts, control plane network element sends request to create to user plane network element, and request to create is used to indicate user's veil
Member creates new user plane tunnel.
In 409 parts, user plane network element creates new user plane tunnel according to request to create.
In 410 parts, user plane network element sends to control plane network element and creates response.
Later, control plane network element can send cached and target by the new user plane tunnel to user plane network element
The relevant data of terminal.
In 411 parts, control plane network element sends session termination request to user plane network element, and session termination request is used to indicate
User plane network element is deleted and the relevant session of target terminal.
In 412 parts, user plane network element is deleted and the relevant session of target terminal, and deletes and the relevant use of target terminal
Family face tunnel.
In 413 parts, user plane network element sends session termination response to control plane network element.
Fig. 5 is the communication scheme of the method in another deletion user plane tunnel provided in an embodiment of the present invention.In Fig. 5,
With user plane tunnel counterpart terminal granularity, illustrated so that application scenarios are data forwarding scene as an example.This method may include
Such as lower part.
In 501 parts, when target terminal restores from Idle state to connected state, control plane network element by with target terminal pair
The target user face tunnel answered to user plane network element send cached with the relevant data of target terminal.
In 502 parts, control plane network element determines whether what is cached is all sent to use with the relevant data of target terminal
Family veil member.
In 503 parts, if control plane network element caching is all sent to user's veil with the relevant data of target terminal
Member, then control plane network element to user plane network element send solicited message, solicited message be used to indicate user plane network element delete target use
Family face tunnel carries the mark in target user face tunnel in the solicited message.
In 504 parts, user plane network element is according to solicited message, delete target user plane tunnel.
In 505 parts, user plane network element sends response message to control plane network element.
In 506 parts, when target terminal is converted to Idle state from connected state, control plane network element, which determines, to be needed to create newly
User plane tunnel, which is used to receive from user plane network element and the relevant data of target terminal, in order to incite somebody to action
With the relevant data buffer storage of target terminal in control plane network element.
In 507 parts, control plane network element sends request to create to user plane network element, and request to create is used to indicate user's veil
Member creates new user plane tunnel.
In 508 parts, user plane network element creates new user plane tunnel according to request to create.
In 509 parts, user plane network element sends to control plane network element and creates response.
Later, user plane network element can be related to target terminal to the transmission of control plane network element by the new user plane tunnel
Data, control plane network element receives and caches and the relevant data of target terminal.
In 510 parts, control plane network element sends session termination request to user plane network element, and session termination request is used to indicate
User plane network element is deleted and the relevant session of target terminal.
In 511 parts, user plane network element is deleted and the relevant session of target terminal, and deletes and the relevant use of target terminal
Family face tunnel.
In 512 parts, user plane network element sends session termination response to control plane network element.
Fig. 6 is the communication scheme of another method for deleting user plane tunnel provided in an embodiment of the present invention.In Fig. 6,
With user plane tunnel counterpart terminal granularity, illustrated so that application scenarios are Lawful Interception scene as an example.This method may include
Such as lower part.
In 601 parts, in the case where the corresponding Lawful Interception function of target terminal is active, user plane network element
It is sent and the relevant data of target terminal to control plane network element by target user corresponding with target terminal face tunnel.
In 602 parts, control plane network element forwards and the relevant data of target terminal to legal interception system.
In 603 parts, control plane network element receives Lawful Interception from legal interception system and deactivates message, which goes
Activate message is used to indicate deactivation and the relevant Lawful Interception function of target terminal.
In 604 parts, control plane network element sends solicited message to user plane network element, and solicited message is used to indicate user's veil
First delete target user plane tunnel carries the mark in target user face tunnel in the solicited message.
In 605 parts, user plane network element is according to solicited message, delete target user plane tunnel.
In 606 parts, user plane network element sends response message to control plane network element.
In 607 parts, control plane network element receives Lawful Interception activate message, Lawful Interception activation from legal interception system
Message is used to indicate activation and the relevant Lawful Interception function of target terminal.
In 608 parts, control plane network element sends request to create to user plane network element, and request to create is used to indicate user's veil
Member creates new user plane tunnel, which is used to receive and the relevant number of target terminal from user plane network element
According to.
In 609 parts, user plane network element creates new user plane tunnel according to request to create.
In 610 parts, user plane network element sends to control plane network element and creates response.
Later, user plane network element can be related to target terminal to the transmission of control plane network element by the new user plane tunnel
Data, control plane network element receive simultaneously to legal interception system forwarding with the relevant data of target terminal.
In 611 parts, control plane network element sends session termination request to user plane network element, and session termination request is used to indicate
User plane network element is deleted and the relevant session of target terminal.
In 612 parts, user plane network element is deleted and the relevant session of target terminal, and deletes and the relevant use of target terminal
Family face tunnel.
In 613 parts, user plane network element sends session termination response to control plane network element.
The above-mentioned angle mainly interacted from control plane network element and user plane network element to scheme provided in an embodiment of the present invention into
Introduction is gone.It is understood that control plane network element, user plane network element are in order to realize above-mentioned function, it is each it comprises executing
The corresponding hardware configuration of function and/or software module.In conjunction with disclosed in this invention embodiment describe each exemplary unit
And algorithm steps, the embodiment of the present invention can be realized with the combining form of hardware or hardware and computer software.Some function
It executes in a manner of hardware or computer software driving hardware actually, depend on the specific application of technical solution and designs about
Beam condition.Those skilled in the art can realize described function to each specific application using different methods,
But this realization is it is not considered that exceed the range of the technical solution of the embodiment of the present invention.
The embodiment of the present invention can carry out functional unit according to above method example to control plane network element or user plane network element
Division two or more functions can also be integrated for example, can correspond to each function divides each functional unit
In a processing unit.The form that hardware had both may be used in above-mentioned integrated unit is realized, software function list can also be used
The form of member is realized.It should be noted that being schematical, only a kind of logic to the division of unit in the embodiment of the present invention
Function divides, formula that in actual implementation, there may be another division manner.
Using integrated unit, Fig. 7 A show the one of control plane network element involved in above-described embodiment
The possible structural schematic diagram of kind.Control plane network element 700 includes:Processing unit 702 and communication unit 703.Processing unit 702 is used for
Control management is carried out to the action of control plane network element, for example, processing unit 702 is for supporting control plane network element to execute in Fig. 2
Process 201 and 202, the process 204 and 205 in Fig. 3, the process 402~404,407,408 and 411 in Fig. 4, the process in Fig. 5
Process 602~604,607,608 and 611 in 501~503,506,507 and 510, Fig. 6, and/or for described herein
Other processes of technology.Communication unit 703 is used to support the communication of control plane network element and user plane network element or other network entities.
Control plane network element 700 can also include storage unit 701, the program code for storing control plane network element 700 and data.
Wherein, processing unit 702 can be processor or controller, such as can be central processing unit (Central
Processing Unit, CPU), general processor, digital signal processor (Digital Signal Processor, DSP),
Application-specific integrated circuit (Application-Specific Integrated Circuit, ASIC), field programmable gate array
It is (Field Programmable Gate Array, FPGA) or other programmable logic device, transistor logic, hard
Part component or its arbitrary combination.It may be implemented or executes illustratively patrols in conjunction with various described in the disclosure of invention
Collect box, module and circuit.The processor can also be to realize the combination of computing function, such as include one or more micro- places
Manage device combination, the combination etc. of DSP and microprocessor.Communication unit 703 can be communication interface, transceiver, transmission circuit etc.,
Wherein, communication interface is to be referred to as, and may include connecing between one or more interfaces, such as control plane network element and user plane network element
Mouthful.Storage unit 701 can be memory.
When processing unit 702 is processor, communication unit 703 is communication interface, when storage unit 701 is memory, this
Control plane network element involved by inventive embodiments can be control plane network element shown in Fig. 7 B.
Shown in Fig. 7 B, which includes:Processor 712, communication interface 713, memory 711.It is optional
, control plane network element 710 can also include bus 714.Wherein, communication interface 713, processor 712 and memory 711 can be with
It is connected with each other by bus 714;Bus 714 can be Peripheral Component Interconnect standard (Peripheral Component
Interconnect, abbreviation PCI) bus or expanding the industrial standard structure (Extended Industry Standard
Architecture, abbreviation EISA) bus etc..The bus 714 can be divided into address bus, data/address bus, controlling bus etc..
For ease of indicating, only indicated with a thick line in Fig. 7 B, it is not intended that an only bus or a type of bus.
Control plane network element shown in above-mentioned Fig. 7 A or Fig. 7 B can be SGW-C, PGW-C, TDF-C, SGW/PGW-C or NG-
CP。
Using integrated unit, Fig. 8 A show the one of user plane network element involved in above-described embodiment
The possible structural schematic diagram of kind.User plane network element 800 includes:Processing unit 802 and communication unit 803.Processing unit 802 is used for
Control management is carried out to the action of user plane network element, for example, processing unit 802 is for supporting user plane network element to execute in Fig. 2
Process 203, the process 206 in Fig. 3, the process 401,405,406,409,410,412 and 413 in Fig. 4, the process in Fig. 5
504, the process 601,605,606,609,610,612 and 613 in 505,508,509,511 and 512, Fig. 6, and/or for this
Other processes of technology described in text.Communication unit 803 is for supporting user plane network element and control plane network element or other networks
The communication of entity.User plane network element 800 can also include storage unit 801, the program code for storing user plane network element 800
And data.
Wherein, processing unit 802 can be processor or controller, such as can be CPU, general processor, DSP,
ASIC, FPGA either other programmable logic device, transistor logic, hardware component or its arbitrary combination.It can be with
It realizes or executes and combine various illustrative logic blocks, module and circuit described in the disclosure of invention.The processing
Device can also be to realize the combination of computing function, such as combined comprising one or more microprocessors, the group of DSP and microprocessor
Close etc..Communication unit 803 can be communication interface, transceiver, transmission circuit etc., wherein communication interface is to be referred to as, and can be wrapped
Include the interface between one or more interfaces, such as user plane network element and control plane network element.Storage unit 801 can be storage
Device.
When processing unit 802 is processor, communication unit 803 is communication interface, when storage unit 801 is memory, this
User plane network element involved by inventive embodiments can be user plane network element shown in Fig. 8 B.
Shown in Fig. 8 B, which includes:Processor 812, communication interface 813, memory 811.It is optional
, user plane network element 810 can also include bus 814.Wherein, communication interface 813, processor 812 and memory 811 can be with
It is connected with each other by bus 814;Bus 814 can be pci bus or eisa bus etc..The bus 814 can be divided into address
Bus, data/address bus, controlling bus etc..For ease of indicating, only indicated with a thick line in Fig. 8 B, it is not intended that only one
Bus or a type of bus.
User plane network element shown in above-mentioned Fig. 8 A or Fig. 8 B can be SGW-U, PGW-U, TDF-U, SGW/PGW-U or NG-
UP。
The step of method in conjunction with described in disclosure of the embodiment of the present invention or algorithm, can be come real in a manner of hardware
It is existing, can also be that the mode of software instruction is executed by processor to realize.Software instruction can be made of corresponding software module,
Software module can be stored on random access memory (Random Access Memory, RAM), flash memory, read-only memory
(Read Only Memory, ROM), Erasable Programmable Read Only Memory EPROM (Erasable Programmable ROM,
EPROM), Electrically Erasable Programmable Read-Only Memory (Electrically EPROM, EEPROM), register, hard disk, movement are hard
In the storage medium of disk, CD-ROM (CD-ROM) or any other form well known in the art.A kind of illustrative storage
Medium couples are to processor, to enable a processor to from the read information, and can be written and believe to the storage medium
Breath.Certainly, storage medium can also be the component part of processor.Pocessor and storage media can be located in ASIC.In addition,
The ASIC can be located in control plane network element or user plane network element.Certainly, pocessor and storage media can also be used as discrete sets
Part is present in control plane network element or user plane network element.
Those skilled in the art it will be appreciated that in said one or multiple examples, retouched by the embodiment of the present invention
The function of stating can be realized with hardware, software, firmware or their arbitrary combination.It when implemented in software, can be by this
A little functions storages in computer-readable medium or as on computer-readable medium one or more instructions or code into
Row transmission.Computer-readable medium includes computer storage media and communication media, and wherein communication media includes convenient for from one
Any medium of computer program is transmitted to another place in place.Storage medium, which can be general or specialized computer, to be deposited
Any usable medium taken.
Above-described specific implementation mode carries out the purpose, technical solution and advantageous effect of the embodiment of the present invention
It is further described, it should be understood that the foregoing is merely the specific implementation modes of the embodiment of the present invention, and does not have to
In limit the embodiment of the present invention protection domain, it is all on the basis of the technical solution of the embodiment of the present invention, done it is any
Modification, equivalent replacement, improvement etc. should all be included within the protection domain of the embodiment of the present invention.
Claims (29)
1. a kind of method for deleting user plane tunnel, is applied in communication system, the communication system include control plane network element and
User plane network element has at least one user plane tunnel, the method between the control plane network element and the user plane network element
Including:
The control plane network element determines the target user face tunnel for existing at least one user plane tunnel and meeting preset condition
Road;
The control plane network element sends solicited message to the user plane network element, and the solicited message is used to indicate the user plane
Network element deletes target user face tunnel.
2. according to the method described in claim 1, it is characterized in that, each user at least one user plane tunnel
Face tunnel be used for transmission with the relevant data of terminal, target user face tunnel is used for transmission relevant with target terminal
Data, the preset condition include one of following situation:
It needs to delete with the relevant whole sessions of the target terminal;
Being had reached with the relevant data of the target terminal for having been cached in the control plane network element distributes for the target terminal
Largest buffered amount;
What is cached in the control plane network element has all been sent to the user plane network element with the relevant data of the target terminal;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the mesh
Mark the relevant data of terminal.
3. according to the method described in claim 1, it is characterized in that, each user at least one user plane tunnel
Face tunnel be used for transmission with the relevant data of session, target user face tunnel is used for transmission relevant with target session
Data, the preset condition include one of following situation:
The target session needs to delete;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has all been sent to the user plane network element with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
Member receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the relevant number of the target terminal
According to.
4. according to the method described in claim 1, it is characterized in that, each user at least one user plane tunnel
Face tunnel is used for transmission carries relevant data with one, and target user face tunnel is used for transmission relevant with target carrying
Data, the preset condition include one of following situation:
The target carrying is at least one carrying being used for transmission with the relevant data of target session, and the target session needs
It deletes;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
In cached have reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
Middle caching has all been sent to the user plane network element with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
The instruction of legal interception system is received, the instruction, which is used to indicate, no longer to need to monitor and the relevant data of the target terminal.
5. according to the method described in claim 1, it is characterized in that, at least one user plane tunnel includes a user plane
Tunnel, target user face tunnel be a user plane tunnel, target user face tunnel be used for transmission with it is described
The relevant data of all terminals of control plane network element and the user plane network element common service, the preset condition include following feelings
One of shape:
It needs to delete by whole sessions of a user plane tunnel transmission;
Cached in the control plane network element with each relevant data of terminal have reached in all terminals is described
The largest buffered amount of each terminal distribution;
All being sent to each relevant data of terminal in all terminals for being cached in the control plane network element is described
User plane network element;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the institute
There are the relevant data of any terminal in terminal.
6. according to the method described in claim 1, it is characterized in that, the preset condition is:Pass through target user face tunnel
The data that road is transmitted to the control plane network element from the user plane network element have reached as target user face tunnel distributing
Largest buffered amount.
7. method according to any one of claims 1 to 6, which is characterized in that the control plane network element is to the user plane
Before or after network element sends solicited message, the method further includes:
The control plane network element determination needs to create new user plane tunnel;
The control plane network element sends request to create to the user plane network element, and the request to create is used to indicate the user plane
Network element creates the new user plane tunnel.
8. a kind of method for deleting user plane tunnel, is applied in communication system, the communication system include control plane network element and
User plane network element has at least one user plane tunnel, the method between the control plane network element and the user plane network element
Including:
The user plane network element receives solicited message from the control plane network element, and the solicited message is used to indicate the user plane
Network element deletes the target user face tunnel for meeting preset condition at least one user plane tunnel;
The user plane network element deletes target user face tunnel according to the solicited message.
9. according to the method described in claim 8, it is characterized in that, each user at least one user plane tunnel
Face tunnel be used for transmission with the relevant data of terminal, target user face tunnel is used for transmission relevant with target terminal
Data, the preset condition include one of following situation:
It needs to delete with the relevant whole sessions of the target terminal;
Being had reached with the relevant data of the target terminal for having been cached in the control plane network element distributes for the target terminal
Largest buffered amount;
What is cached in the control plane network element has all been sent to the user plane network element with the relevant data of the target terminal;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the mesh
Mark the relevant data of terminal.
10. according to the method described in claim 8, it is characterized in that, each at least one user plane tunnel is used
Family face tunnel be used for transmission with the relevant data of session, target user face tunnel is used for transmission related to target session
Data, the preset condition includes one of following situation:
The target session needs to delete;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has all been sent to the user plane network element with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
Member receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the relevant number of the target terminal
According to.
11. according to the method described in claim 8, it is characterized in that, each at least one user plane tunnel is used
Family face tunnel is used for transmission carries relevant data with one, and target user face tunnel is used for transmission related to target carrying
Data, the preset condition includes one of following situation:
The target carrying is at least one carrying being used for transmission with the relevant data of target session, and the target session needs
It deletes;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
In cached have reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
Middle caching has all been sent to the user plane network element with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
The instruction of legal interception system is received, the instruction, which is used to indicate, no longer to need to monitor and the relevant data of the target terminal.
12. according to the method described in claim 8, it is characterized in that, at least one user plane tunnel includes a user
Face tunnel, target user face tunnel are a user plane tunnel, and target user face tunnel is used for transmission and institute
The relevant data of all terminals of control plane network element and the user plane network element common service are stated, the preset condition includes as follows
One of situation:
It needs to delete by whole sessions of a user plane tunnel transmission;
Cached in the control plane network element with each relevant data of terminal have reached in all terminals is described
The largest buffered amount of each terminal distribution;
All being sent to each relevant data of terminal in all terminals for being cached in the control plane network element is described
User plane network element;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the institute
There are the relevant data of any terminal in terminal.
13. according to the method described in claim 8, it is characterized in that, the preset condition is:Pass through target user face tunnel
The data that road is transmitted to the control plane network element from the user plane network element have reached as target user face tunnel distributing
Largest buffered amount.
14. according to claim 8 to 13 any one of them method, which is characterized in that the user plane network element is from the control
Before or after veil member receives solicited message, the method further includes:
The user plane network element receives request to create from the control plane network element, and the request to create is used to indicate the user plane
Network element creates new user plane tunnel;
The user plane network element creates the new user plane tunnel according to the request to create.
15. a kind of control plane network element is applied in communication system, the communication system includes the control plane network element and user plane
Network element has at least one user plane tunnel, the control plane network element between the control plane network element and the user plane network element
Including:Processing unit and communication unit;
The processing unit is used to determine the target user face for existing at least one user plane tunnel and meeting preset condition
Tunnel;And for sending solicited message to the user plane network element by the communication unit, the solicited message is for referring to
Show that the user plane network element deletes target user face tunnel.
16. control plane network element according to claim 15, which is characterized in that every at least one user plane tunnel
One user plane tunnel is used for transmission to be used for transmission and target end with the relevant data of terminal, target user face tunnel
It includes one of following situation to hold relevant data, the preset condition:
It needs to delete with the relevant whole sessions of the target terminal;
Being had reached with the relevant data of the target terminal for having been cached in the control plane network element distributes for the target terminal
Largest buffered amount;
What is cached in the control plane network element has all been sent to the user plane network element with the relevant data of the target terminal;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the mesh
Mark the relevant data of terminal.
17. control plane network element according to claim 15, which is characterized in that every at least one user plane tunnel
One user plane tunnel be used for transmission with the relevant data of session, target user face tunnel is used for transmission and target meeting
Relevant data are talked about, the preset condition includes one of following situation:
The target session needs to delete;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has all been sent to the user plane network element with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
Member receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the relevant number of the target terminal
According to.
18. control plane network element according to claim 15, which is characterized in that every at least one user plane tunnel
One user plane tunnel is used for transmission carries relevant data with one, and target user face tunnel is used for transmission to be held with target
Relevant data are carried, the preset condition includes one of following situation:
The target carrying is at least one carrying being used for transmission with the relevant data of target session, and the target session needs
It deletes;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
In cached have reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
Middle caching has all been sent to the user plane network element with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
The instruction of legal interception system is received, the instruction, which is used to indicate, no longer to need to monitor and the relevant data of the target terminal.
19. control plane network element according to claim 15, which is characterized in that at least one user plane tunnel includes one
User plane tunnel, target user face tunnel are a user plane tunnel, and target user face tunnel is for passing
The defeated relevant data of all terminals with the control plane network element and the user plane network element common service, the preset condition packet
Include one of following situation:
It needs to delete by whole sessions of the user plane tunnel transmission;
Cached in the control plane network element with each relevant data of terminal have reached in all terminals is described
The largest buffered amount of each terminal distribution;
All being sent to each relevant data of terminal in all terminals for being cached in the control plane network element is described
User plane network element;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the institute
There are the relevant data of any terminal in terminal.
20. control plane network element according to claim 15, which is characterized in that the preset condition is:Pass through the target
The data that user plane tunnel is transmitted to the control plane network element from the user plane network element have reached as target user face tunnel
The largest buffered amount of road distribution.
21. according to claim 15 to 20 any one of them control plane network element, which is characterized in that the processing unit is additionally operable to
Before or after sending solicited message to the user plane network element by the communication unit, determination needs to create new use
Family face tunnel;And for sending request to create to the user plane network element by the communication unit, the request to create is used
The new user plane tunnel is created in the instruction user plane network element.
22. a kind of user plane network element is applied in communication system, the communication system includes control plane network element and the user plane
Network element has at least one user plane tunnel, the user plane network element between the control plane network element and the user plane network element
Including:Processing unit and communication unit;
The processing unit is used to receive solicited message, the solicited message from the control plane network element by the communication unit
It is used to indicate the user plane network element and deletes the target user face tunnel for meeting preset condition at least one user plane tunnel
Road;And for according to the solicited message, deleting target user face tunnel.
23. user plane network element according to claim 22, which is characterized in that every at least one user plane tunnel
One user plane tunnel is used for transmission to be used for transmission and target end with the relevant data of terminal, target user face tunnel
It includes one of following situation to hold relevant data, the preset condition:
It needs to delete with the relevant whole sessions of the target terminal;
Being had reached with the relevant data of the target terminal for having been cached in the control plane network element distributes for the target terminal
Largest buffered amount;
What is cached in the control plane network element has all been sent to the user plane network element with the relevant data of the target terminal;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the mesh
Mark the relevant data of terminal.
24. user plane network element according to claim 22, which is characterized in that every at least one user plane tunnel
One user plane tunnel be used for transmission with the relevant data of session, target user face tunnel is used for transmission and target meeting
Relevant data are talked about, the preset condition includes one of following situation:
The target session needs to delete;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
What is cached in member has all been sent to the user plane network element with the relevant data of the target terminal;
The target session includes at least one session being used for transmission with the relevant data of target terminal, and the control veil
Member receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the relevant number of the target terminal
According to.
25. user plane network element according to claim 22, which is characterized in that every at least one user plane tunnel
One user plane tunnel is used for transmission carries relevant data with one, and target user face tunnel is used for transmission to be held with target
Relevant data are carried, the preset condition includes one of following situation:
The target carrying is at least one carrying being used for transmission with the relevant data of target session, and the target session needs
It deletes;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
In cached have reached the largest buffered amount distributed for the target terminal with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
Middle caching has all been sent to the user plane network element with the relevant data of the target terminal;
Target carrying is at least one carrying being used for transmission with the relevant data of target terminal, and the control plane network element
The instruction of legal interception system is received, the instruction, which is used to indicate, no longer to need to monitor and the relevant data of the target terminal.
26. user plane network element according to claim 22, which is characterized in that at least one user plane tunnel includes one
User plane tunnel, target user face tunnel are a user plane tunnel, and target user face tunnel is for passing
The defeated relevant data of all terminals with the control plane network element and the user plane network element common service, the preset condition packet
Include one of following situation:
It needs to delete by whole sessions of the user plane tunnel transmission;
Cached in the control plane network element with each relevant data of terminal have reached in all terminals is described
The largest buffered amount of each terminal distribution;
All being sent to each relevant data of terminal in all terminals for being cached in the control plane network element is described
User plane network element;
The control plane network element receives the instruction of legal interception system, and the instruction, which is used to indicate, no longer to need to monitor and the institute
There are the relevant data of any terminal in terminal.
27. user plane network element according to claim 22, which is characterized in that the preset condition is:Pass through the target
The data that user plane tunnel is transmitted to the control plane network element from the user plane network element have reached as target user face tunnel
The largest buffered amount of road distribution.
28. according to claim 22 to 27 any one of them user plane network element, which is characterized in that the processing unit is additionally operable to
By the communication unit from the control plane network element receive solicited message before or after, by the communication unit from
The control plane network element receives request to create, and the request to create is used to indicate the user plane network element and creates new user plane tunnel
Road;And for according to the request to create, creating the new user plane tunnel.
29. a kind of communication system, which is characterized in that the communication system includes:Such as claim 15 to 21 any one of them
Control plane network element and such as claim 22 to 28 any one of them user plane network element.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110221115.3A CN113056038B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
CN201610963406.9A CN108377582B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
PCT/CN2017/108260 WO2018082517A1 (en) | 2016-11-04 | 2017-10-30 | Method, network element and system for deleting user plane tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610963406.9A CN108377582B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110221115.3A Division CN113056038B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108377582A true CN108377582A (en) | 2018-08-07 |
CN108377582B CN108377582B (en) | 2021-02-23 |
Family
ID=62075575
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110221115.3A Active CN113056038B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
CN201610963406.9A Active CN108377582B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110221115.3A Active CN113056038B (en) | 2016-11-04 | 2016-11-04 | Method, network element and system for deleting user plane tunnel |
Country Status (2)
Country | Link |
---|---|
CN (2) | CN113056038B (en) |
WO (1) | WO2018082517A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111031080A (en) * | 2018-10-09 | 2020-04-17 | 华为技术有限公司 | Message transmission method and device |
WO2020119791A1 (en) * | 2018-12-14 | 2020-06-18 | 华为技术有限公司 | Method and device for releasing network segment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101009907A (en) * | 2006-01-24 | 2007-08-01 | 华为技术有限公司 | Establishment and release method of the tunnel in the evolution network framework and its device |
CN101039507A (en) * | 2006-03-14 | 2007-09-19 | 华为技术有限公司 | Method and apparatus for establishing and releasing tunnel in evolution network framework |
CN101583118A (en) * | 2008-07-01 | 2009-11-18 | 中兴通讯股份有限公司 | Isr deactivation method and mobility management unit |
WO2011094954A1 (en) * | 2010-02-08 | 2011-08-11 | 上海贝尔股份有限公司 | Method and device for transmitting data in machine to machine communication system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101090358B (en) * | 2006-06-15 | 2011-02-02 | 华为技术有限公司 | Method for recovering user data transmission |
CN102685921B (en) * | 2011-03-11 | 2017-04-26 | 中兴通讯股份有限公司 | Dual-channel communication method and system |
EP3085038A1 (en) * | 2013-12-20 | 2016-10-26 | Nokia Solutions And Networks Management International GmbH | Sgc and pgc and sgu and pgu allocation procedure |
CN106161289A (en) * | 2015-03-23 | 2016-11-23 | 中兴通讯股份有限公司 | A kind of based on the processing method and the system that control message in the gateway of SDN |
-
2016
- 2016-11-04 CN CN202110221115.3A patent/CN113056038B/en active Active
- 2016-11-04 CN CN201610963406.9A patent/CN108377582B/en active Active
-
2017
- 2017-10-30 WO PCT/CN2017/108260 patent/WO2018082517A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101009907A (en) * | 2006-01-24 | 2007-08-01 | 华为技术有限公司 | Establishment and release method of the tunnel in the evolution network framework and its device |
CN101039507A (en) * | 2006-03-14 | 2007-09-19 | 华为技术有限公司 | Method and apparatus for establishing and releasing tunnel in evolution network framework |
CN101583118A (en) * | 2008-07-01 | 2009-11-18 | 中兴通讯股份有限公司 | Isr deactivation method and mobility management unit |
WO2011094954A1 (en) * | 2010-02-08 | 2011-08-11 | 上海贝尔股份有限公司 | Method and device for transmitting data in machine to machine communication system |
Non-Patent Citations (2)
Title |
---|
3GPP: "Architecture enhancements for control and user plane separation of EPC nodes", 《3GPP TS 23.214 V1.0.0》 * |
HUAWEI, HISILICON, CISCO SYSTEMS, INC.: "Sx Session Management Procedure Update", 《SA WG2 MEETING #116BIS,S2-164989》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111031080A (en) * | 2018-10-09 | 2020-04-17 | 华为技术有限公司 | Message transmission method and device |
CN111031080B (en) * | 2018-10-09 | 2021-06-29 | 华为技术有限公司 | Message transmission method and device |
US11765686B2 (en) | 2018-10-09 | 2023-09-19 | Huawei Technologies Co., Ltd. | Packet transmission method and apparatus for communicating between terminals of a same 5G LAN group |
WO2020119791A1 (en) * | 2018-12-14 | 2020-06-18 | 华为技术有限公司 | Method and device for releasing network segment |
CN111328123A (en) * | 2018-12-14 | 2020-06-23 | 华为技术有限公司 | Method and device for releasing network segment |
CN111328123B (en) * | 2018-12-14 | 2022-06-24 | 华为技术有限公司 | Method and device for releasing network segment |
Also Published As
Publication number | Publication date |
---|---|
WO2018082517A1 (en) | 2018-05-11 |
CN113056038A (en) | 2021-06-29 |
CN113056038B (en) | 2023-05-16 |
CN108377582B (en) | 2021-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11140601B2 (en) | Reducing delay of a UE access to a network | |
US8837395B2 (en) | Method and entity for conveying data units | |
US9060308B2 (en) | Avoiding network address translation in a mobile data network | |
US9014023B2 (en) | Mobile network services in a mobile data network | |
CN109429364A (en) | The method and apparatus for establishing session | |
US8830864B2 (en) | Maintenance of high-speed channels by inserting channel maintenance data in a mobile data network to avoid channel type switching | |
TWI634801B (en) | Data transmission method and device | |
US20190327635A1 (en) | Data transmission method and apparatus | |
US8913556B2 (en) | Reducing packet loss in a mobile data network with data breakout at the edge | |
CN107534608A (en) | Method and apparatus for processing data stream within a wireless communication network | |
CN109104746A (en) | A kind of communication means and device | |
US20170048833A1 (en) | Method for transmitting downlink data, mobility management network element, access network device, and serving gateway | |
CN108924882A (en) | Method and apparatus about data transfer state control | |
US11109265B2 (en) | Method and apparatus for transmitting control message in software defined network-based mobile communication system | |
CN108377582A (en) | Delete method, network element and the system in user plane tunnel | |
US9019843B2 (en) | Utilizing stored data to reduce packet data loss in a mobile data network with data breakout at the edge | |
CN102056136B (en) | Tunnel updating method and system in communication system supporting local IP access | |
US8914021B2 (en) | Using the maintenance channel in a mobile data network to provide subscriber data when a cache miss occurs | |
US20180035324A1 (en) | System, Method and Apparatus for Processing Packet Data Service | |
US20180248707A1 (en) | Core-Network Control of Local Break-Out for a Distributed Cloud | |
US11516696B2 (en) | Method, devices and system for a hybrid bearer service | |
CN105792286A (en) | Traffic control method and apparatus | |
CN109155923A (en) | It is used for transmission the methods, devices and systems of message | |
CN107645724A (en) | A kind of method and device of data transfer | |
CN110313195A (en) | Communication means and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |