CN108367797A - The bulk freighter of ultra-shallow draft depth - Google Patents

The bulk freighter of ultra-shallow draft depth Download PDF

Info

Publication number
CN108367797A
CN108367797A CN201680070388.XA CN201680070388A CN108367797A CN 108367797 A CN108367797 A CN 108367797A CN 201680070388 A CN201680070388 A CN 201680070388A CN 108367797 A CN108367797 A CN 108367797A
Authority
CN
China
Prior art keywords
bulk
ssd
ultra
buoyant device
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201680070388.XA
Other languages
Chinese (zh)
Inventor
M·卢奇多
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cross Sea Holding Co Ltd
Original Assignee
Cross Sea Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2015905023A external-priority patent/AU2015905023A0/en
Application filed by Cross Sea Holding Co Ltd filed Critical Cross Sea Holding Co Ltd
Publication of CN108367797A publication Critical patent/CN108367797A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/04Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods solid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/02Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
    • B63B43/10Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving buoyancy
    • B63B43/14Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving buoyancy using outboard floating members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B11/00Interior subdivision of hulls
    • B63B11/02Arrangement of bulkheads, e.g. defining cargo spaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/22Arrangement of ship-based loading or unloading equipment for cargo or passengers of conveyers, e.g. of endless-belt or screw-type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/56Bulkheads; Bulkhead reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

A kind of bulk freighter of ultra-shallow draft depth (SSD BC) (10) includes hull (12), sponson (16) is attached at two opposite topsides of the hull (12) to provide additional buoyancy, to reduce the SSD BC (10) deadweight tonnage draft.It is additionally provided with loose unpacked material (5) handling system (30a), which can come out cargo transfer to the SSD BC (10) or from the SSD BC (10) transhipment.The loose unpacked material handling system (30a) is arranged as the material that transhipment is unloaded from the cargo hold (14) bottom.The loose unpacked material handling system (34) includes the conveyer being arranged on a sponson (16), which rises to the material unloaded from the cargo hold (14) delivery the open deck (31) of the SSD BC (10).

Description

The bulk freighter of ultra-shallow draft depth
Technical field
A kind of bulk freighter of ultra-shallow draft depth of this disclosure (super shallow draft bulk carrier)(“SSD-BC”)。
Background technology
The bulk goods such as ore, construction material and agricultural product are usually transported by marine ship such as bulk freighter.Use bulk goods The many restrictions factor of the such cargo of Ship Transportation includes but is not limited to that the deadweight tonnage (DWT) of bulk freighter, deadweight tonnage are eaten The berth allocation problem of water depth (draft) and loading and discharging ports.It is essential that the draft of deadweight tonnage must not exceed correlation Maximum permissible draft depth as defined in the port office of loading and discharging ports.When the available draft amount depth of loading ports and port of discharge not Meanwhile to make it possible the direct transport between loading ports and port of discharge, miscellaneous solution may be taken Scheme.It is possible, firstly, to which the loading capacity of bulk freighter is limited in DWT hereinafter, to ensure that the draft of ship is adapted to absorb water The most shallow harbour of depth.In this case, profit obtained by bulk goods exporter is restricted, because transport cargo Gross tonnage is less than the DWT of ship.Second of solution is to arrange ship berthing and/or sail out of the schedule at harbour to utilize tide Condition.However, this may limit the handling capacity at harbour, and require anchorage regardless to berth and wait for take turns to their loading or unloadings Opportunity.This also leads to additional cost, to reduce the profit of bulk goods exporter.
The above problem is also present in a kind of situation, i.e. two terminal port depth having the same, but ship needs are worn Cross the shallower navigation channel of draft between two harbours.
To provide the background of the above problem, the Port Hedland (Port Hedland) of Western Australia, the port are please referred to Mouth is for going abroad iron ore from Australia's transport.The iron ore quantity exported every year from Port Hedland is taken up an official post more than the world What other harbour.
The regulation of the ship passage guide (vessel movement guidelines) of Port Hedland business office is for total Most 330 meters of length (LOA), the ship of 60 meters of the beam (beam).It is more than 330 meters of ship in Harbour master's total length at discretion Oceangoing ship may obtain the license steered a ship through navigation channel, and under certain tidal conditions and weather condition, these ships may be only It is limited to berth daytime and navigate by water.
Some berths of Port Hedland allow bulk ship loading cargo to DWT, this causes maximum draft to be 19 meters.So And the main channel between the berth and open waters only allows most 14 meters of drafts.Economically, it will preferably dissipate Freighter is loaded into the deadweight tonnage for providing maximum allowable draft.And in the example of Port Hedland, to realize one 19 meters The ship of draft can leave berth and pass through main channel, and the departure from port opportunity of ship will arrange according to high tide.Though So this DWT for allowing maximum possible, but this leads to arrival of ship and sails out of the time delay at harbour.This is added significantly in turn Transportation cost, therefore profit is caused to seriously affect.
In the case where keeping draft this ability is solved the problems, such as by building the bulk freighter of wider hull extremely It is few that the beam is limited by main channel.Port Hedland business office can take the circumstances into consideration that the beam is allowed to be more than that 60 meters of ship passes through main boat Road.However, this generally depends on the situation of daytime and tide.Accordingly, there exist high risk, the beam is much larger than 60 meters of (examples Such as 80 meters or wider) ship can pass through delay for a long time and just enter berth or sail out of berth, or it is certain need to avoid it is such Ship is navigated by water in main channel simultaneously.
For a long time, people's physical experience to it is necessary to need increase bulk freighter DWT, without change bulk freighter drinking water The range of the ship passage guide specification of depth or the beam extremely beyond Port Hedland business office.Although increasing dissipating by Port Hedland The aggregate tonnage of cargo can bring significant commercial interest, and bulk goods exporter possesses a large amount of financial resources and talent's money Source, but this problem was at least never resolved at nearest 30 years.
The above-mentioned application that SSD-BC disclosed herein is not intended to limit to the citation of background technology.Specifically, this The embodiment of SSD-BC disclosed in text can be used for other harbours, to facilitate the transport of bulk goods.
Invention content
In one aspect, disclosed herein is a kind of bulk freighters (SSD-BC) of ultra-shallow draft depth comprising:
Hull, the hull have the cargo hold for accommodating bulk goods;With
At least one buoyant device, the buoyant device are attached on each topside of the hull, each buoyant device Be configured to reduce the SSD-BC deadweight tonnage (DWT) draft.
So that it takes up a position, for example, can make one in the case of no buoyant device common draft be 19 meters The draft of the coastal cape type ship (Cape Size vessel) for carrying cargo be reduced to 13.3 meters or so.
In one embodiment, the buoyant device includes the steel construction for being attached to the hull.In an embodiment In, the buoyant device extends between each vertical line of the hull.
In one embodiment, the buoyant device includes substantially continuous outer surface, and the outer surface is along institute The each topside for stating hull extends.
In one embodiment, buoyant device near the end of bow be taper, with along from stern to ship Reduce the transverse width towards the hull in first direction.
In one embodiment, the sternmost end of buoyant device is taper, with from bow to stern The transverse width towards the hull is reduced on direction.
In one embodiment, the buoyant device is made of steel.
In one embodiment, the buoyant device is permanently attached on the hull.
In one embodiment, the bulk freighter of the ultra-shallow draft depth includes bulk goods handling system, described to dissipate Dress cargo movement system is located at least one of port side and starboard side of the SSD-BC, and the bulk goods carries system System is arranged in except deck on place and one or more ships and transports bulk goods between place.
In one embodiment, the bulk freighter of the ultra-shallow draft depth includes bulk goods handling system, can From the bottom discharge bulk goods of the cargo hold.
In one embodiment, the bulk carrier of the ultra-shallow draft depth includes bulk goods handling system, energy Enough by least one buoyant device come loading/unloading goods.
In one embodiment, the bulk freighter of the ultra-shallow draft depth includes bulk goods handling system, can From the bottom of the cargo hold and by least one buoyant device come loading/unloading goods.
In second aspect, there is provided herein a kind of method of bulk freighter that building ultra-shallow draft depth, the method packets It includes:
Each topside along Ship body is attached at least one buoyant device.
In one embodiment, the method includes:Determination needs reduced draft in DWT;And design is extremely Few two buoyant devices, when the buoyant device is connected to the SSD-BC, the buoyant device can provide institute in DWT Need reduced draft.
In the third aspect, there is provided herein a kind of bulk freighters (SSD-BC) of ultra-shallow draft depth, including:
Hull, the hull have the cargo hold for accommodating bulk goods;With
At least one buoyant device, the buoyant device are attached on each topside of the hull, each buoyant device Be configured to reduce the SSD-BC deadweight tonnage (DWT) draft;And bulk goods handling system, it is described to dissipate Bulk goods can be transported from the bottom of the cargo hold by filling cargo movement system, and be turned by least one buoyant device Transport bulk goods.
In one embodiment, it is deep in the drinking water of deadweight tonnage to be configured to reduce the SSD-BC for each buoyant device Degree.
In fourth aspect, there is provided herein a kind of bulk freighters (SSD-BC) of ultra-shallow draft depth, including:
Hull, the hull have the cargo hold for accommodating bulk goods;With
Bulk goods handling system, the bulk goods handling system can transport bulk cargo from the bottom of the cargo hold Object.
In one embodiment, the bulk goods handling system includes the first conveyer, the first conveyer cloth It is set to and the material from tank top is transported by a buoyant device in the buoyant device.
In one embodiment, the bulk goods handling system includes ship loading machine/unloader, the ship dress Carrier aircraft/unloader is supported on the open deck of the SSD-BC, and is arranged to cross the open deck.
In one embodiment, the ship loading machine/unloader can rotate or pivot 360 °.
In one embodiment, the bulk goods handling system further includes deck conveyer, the deck conveyer It is arranged along open deck and transports material to the ship loading machine/unloader.
In one embodiment, the bulk goods handling system further includes connection conveyer, the connection conveyer It is arranged to material being transported to the deck conveyer from first conveyer.
In one embodiment, the bulk goods handling system further includes one be supported on the open deck Or multiple cranes.
In one embodiment, the buoyant device is arranged to receive and discharge ballasting material.
Description of the drawings
Although any other form may fall into the bulk freighter of the ultra-shallow draft depth described in invention content and build and be somebody's turn to do In the range of the method for the bulk freighter of ultra-shallow draft depth, it will be referred to now only by the mode of embodiment herein below attached Figure description specific embodiment, in attached drawing:
Fig. 1 is the side view of an embodiment of the bulk freighter (SSD-BC) of disclosed ultra-shallow draft depth;
Fig. 2 is the plan view of SSD-BC shown in FIG. 1;
Fig. 3 is the sectional view of Fig. 1 and SSD-BC shown in Fig. 2;
Fig. 4 a are the vertical views of the second embodiment of the bulk freighter (SSD-BC) of disclosed ultra-shallow draft depth;
Fig. 4 b are the vertical views of the tank top (tank top) of SSD-BC shown in Fig. 4 a;
Fig. 4 c are the side views of SSD-BC shown in Fig. 4 a;
Fig. 4 d are the sectional views of SSD-BC shown in Fig. 4 a;
Fig. 4 e are the enlarged drawings of the parts SSD-BC shown in Fig. 4 a, it is shown that material unloads a part for subsystems;
Fig. 5 a are the vertical views of the third embodiment of disclosed SSD-BC;
Fig. 5 b are the side views of SSD-BC shown in attached drawing 5a;
Fig. 6 shows that a kind of SSD-BC of disclosed embodiment is directly loaded up cargo by conveyer;With
Fig. 7 shows that bulk goods is being transported to coastal cape type ship (cape size by a kind of SSD-BC of disclosed embodiment Vessel process).
Specific implementation mode
Fig. 1-3 shows the first embodiment of disclosed SSD-BC 10.SSD-BC 10 includes hull 12, the hull 12 are configured as receiving bulk goods, such as, but not limited to:Iron ore, coal, other mineral exploited;Agricultural product;Building wood Material etc..In this embodiment, the hull 12 has nine individual cargo hold 14a-14i (hereafter referred to collectively as " cargo hold 14 "). Although disclosed herein is nine individual cargo holds 14, it will be appreciated that, the embodiment of SSD-BC 10 may include any number The cargo hold of amount, including only there are one cargo hold the case where.SSD-BC 10 is further equipped with buoyant device 16a and 16b (hereafter referred to collectively as " buoyant device 16 "), each buoyant device is attached to the opposite side of the hull 12.Particularly, the buoyant device 16a (such as passing through welding) is attached along the port side (port side) of hull 12, and buoyant device 16b is along the starboard of hull 12 Side (starboard side) is attached.In this specific embodiment, each buoyant device 16 is sponson (sponson) form.The buoyant device 16 for reducing the deadweight tonnage (DWT) of SSD-BC 10 draft.
As a non-limiting embodiment, the SSD-BC 10 in present embodiment may include that buoyancy dress has been transformed Set 16 coastal cape type ship.For coastal cape type ship, hull 12 is integral part, may be possessed always for example, DWT is 185000 tons About 292 meters of length (LOA), about 45 meters of the beam, 19 meters of draft.Buoyant device 16 is configured such that DWT is The draft of 185000 tons of SSD-BC 10 can be 14m or so or lower, such as 14m-12m.Buoyant device/the side of a ship Side protruding portion 16 can be designed as providing draft to the SSD-BC, to adapt to shallower loading ports and port discharge Mouthful.
Therefore, SSD-BC10 embodiments of the invention can solve over more than 30 years from Port Hedland outlet iron ore presence Many operational issues.Using the embodiment of SSD-BC 10, bulk freighter is substantially carried out and has been freighted on schedule with deadweight tonnage (clock loading) and navigation.It need not be lined up and wait for suitable tidal conditions, or optionally allow bulk ship loading low In the cargo of its DWT.
The SSD-BC 10 is observed in more detail, it may be noted that in this particular embodiment, respectively on a left side Topside and the single continuous buoyant device 16 (that is, sponson) of starboard side setting.Each buoyant device 16 is from close to bow 20 front end 18 extends close to stern 24, opposite rear end 22.In this embodiment, each buoyant device 16 is close It is become narrow gradually when front end 18 and rear end 22.The direction to narrow makes the width of the buoyant device 16 subtract towards the hull 12 It is small.
Can with note from FIG. 3 that, buoyant device 16 setting so that the SSD-BC 10 the beam be more than be not provided with it is floating The same money SSD-BC 10 of power apparatus 16.If without buoyant device 16, the beam of SSD-BC10 is B1.The buoyant device 16a It is respectively provided with respective transverse width or the beam Ba and Bb with 16b.In general, the width of each buoyant device 16 is identical, make Obtain width Ba=Bb.Under any circumstance, the entire beam B=B1+Ba+Bb of SSD-BC 10.With without buoyant device 16 Compared with money SSD-BC, the increased percentage of beam institute of the SSD-BC is:(Ba+Bb) ÷ B1 × 100%.
In one example, B1 can be the magnitude of about 40m, and Ba and Bb can be respectively 10m or so.Therefore, The increased percentage of the beam is caused to be 40 × 100%=50% of (10+10) ÷ due to addition buoyant device 16.
Therefore, in this example, equipped with the SSD-BC that buoyant device 16, DWT are 185000 tons and the beam is 60 meters 10 drafts with 14m.Correspondingly, the SSD-BC 10 of this embodiment is by the normal fortune in Port Hedland business office Within row parameter, it can berth without obtaining indult and the harbour and then pass through main channel.
In order to help to load and loading/unloading goods, SSD-BC 10 are provided with bulk goods movement system 30.In the implementation In mode, the movement system 30 is arranged in port side and starboard side.However, in other embodiments, it can be only in side The system 30 is set.The movement system 30 is arranged as except deck the place of (off-board) (for example, being located at harbour Storage stockyard or solid bulk container) and one or more ship on transport between place (in this case, being cargo hold 14) and dissipate Loading object.The movement system 30 includes mobile hopper 32 and associated track 34.The setting of the track 34 in port side and On every side of starboard side.Bulk goods can be transmitted to SSD-BC by the bulk loader (not shown) at hatch door (port) The hopper 32 of 10 nearest sides.The hopper 32 may then pass through its track 34 to load cargo to specific cargo hold 14.Root According to the SSD-BC 10 port side or starboard side close to berth come determine in the operation process of handling goods use which Hopper 32.In the case where the movement system 30 only includes single hopper 32 and associated track 34, then need institute The corresponding side of SSD-BC 10 is stated close to berth to facilitate handling operation.
The manufacturing method of the SSD-BC 10 includes being attached institute along every side of existing bulk freighter such as coastal cape type ship State buoyant device/sponson 16.This method is the corresponding buoyant device 16 of design on one side, to be provided in DWT The required draft range of decrease.This can be easier by using Archimedes principle (Archimedes principle) It decides on ground.Once the buoyant device 16 has designed completion, they can be built by steel or other metals, and for example It is permanently attached on the existing hull of reequiped bulk freighter by welding.The bulk goods movement system 30 is also mounted at On the open deck 31 of the SSD-BC 10.
Buoyant device/the sponson 16 can manufacture partly or wholly elsewhere, and then lead to The arbitrary combination of following any of which or two or more modes is crossed to be attached on the side of hull 12:Welding;Bolt Connection;And riveting.When prefabricated elsewhere, the buoyant device/sponson 16 can be made multiple segments or Part, these segments or part are then subsequently attached on the both sides of the hull 12.The segment or part of separation can flow each other Body is isolated.Optionally, the buoyant device/sponson 16 can manufacture in original place directly on the side of hull 12.No matter floating The building method of power apparatus/sponson 16 is how, the buoyant device/sponson 16 can also be arranged as carry and Discharge ballasting, such as, but not limited to water.In this way it is possible to adjust the pressure of the buoyant device/sponson 16 Cabin object, to provide best draft according to the DWT of the SSD-BC 10.
In the particular implementation of the SSD-BC 10, the sponson 16 is configured to have:With hull 12 The coplanar substrate 36 in bottom 40;Vertical sidewall 38;With inclined upper wall 40.The wall 40 is located at the open deck 31 of hull 12 Lower section.However, sponson 16 may use other constructions, including but not limited to:Each wall in construction is in difference Horizontal plane or different inclination angles.For example, substrate 36 can the mode as shown in dotted line 36' in Fig. 3 tilt.
SSD-BC 10 is built by using existing bulk freighter in the above described manner, it is such existing bulk freighter also to have There is provided or generate the benefit of new markets.In view of this, this kind of bulk freighter is not fully used largely at present.It is true On, many bulk freighters are sold off with steel scrap price.
Attached drawing 4a-4e depicts the second embodiment of disclosed SSD-BC, is noted as SSD-BC 10a.It is described All features of SSD-BC 10a are identical as the SSD-BC 10, or have same or analogous structure or function, they are marked Note is identical accompanying drawing number, but adds suffix " a ".It is readily apparent that the SSD-BC 10a from being described below Second embodiment improved on the basis of first embodiment, and with not only being brought to the operator of SSD-BC It significant commercial interest and economic value and is provided to the manufacturer of bulk goods and the supplier of port infrastructure notable Commercial interest and economic value many characteristics.
The SSD-BC 10a be similar to SSD-BC 10, but the difference is that, with after upgrading bulk goods carry system The 30a that unites replaces bulk goods handling system 30 so that is possibly realized from tank top loading/unloading goods.In fact, described dissipate Dress cargo movement system 30a provides voluntarily loading/discharge capacity for SSD-BC.
As the first embodiment of the SSD-BC 10, the SSD-BC 10a include hull 12, are located at hull 12 Port side and starboard side buoyant device/sponson 16a and 16b and multiple cargo holds 14.However, the SSD-BC 10a includes bulk goods handling system 30a, provides significant extensive use, and greatly extends SSD-BC 10a's Using the numerous markets not previously existed to developing.
The bulk goods handling system 30a includes that multiple interrelated and Collaboration material carries subsystem.This A little system includes:Unload subsystems 56;First conveyer 58 is used to that open deck will to be transported to from the material of cargo hold 14 31;With ship loading machine/unloader 60 (for convenience, hereinafter referred to as " ship loading machine 60 ").
The subsystems 56 that unload include:One or more conveyers, but in this embodiment, unload the packet of subsystems 56 Include three pool conveyer 62a, 62b and 62c extended below cargo hold 14 (hereinafter known as " conveyer 62 ");Positioned at conveying The cross conveyor 64 of 62 one end of machine;Hopper 66a, 66b and 66c (hereafter referred to collectively as " hopper 66 ");Additional hopper 68 and discharging Chute 70a, 70b and 70c (hereafter referred to collectively as " chute 70 ").
The operation of the uninstalling system 56 is the bottom unloading bulk material from cargo hold 14 and sends it to conveyer 58. Discharging chute 70a, 70b and 70c are formed in the bottom wall of each cargo hold 14.Pool conveyer 62a, 62b and 62c are arranged in them In hull 12 below respective discharging chute 70a, 70b and 70c.The conveyer 62 operates the material so that being discharged from chute 70 It is transported along towards the direction of hopper 66.The material delivered by the conveyer 62 is admitted to the respective of lower section operation conveyer 64 Hopper 66 in.Therefore, the conveyer 62 will be transported to from the material that cargo hold 14 is discharged in corresponding hopper 66, and described Material is then transported to by hopper 66 on conveyer 64, and conveyer 64 continues material transmission to additional hopper 68.
The hopper 68 transports material on conveyer 58.Conveyer 58 is located in sponson 16a, and along inclination Path rise to open deck 31.Conveyer 58 is located in sponson 16a, using otherwise no-good nothing Space is imitated, therefore and is not take up valuable cargo space.It is further noted that in this embodiment, the sponson 16 have the configuration slightly different with first embodiment.Particularly, the sponson 16 in present embodiment has upper table Face 40, the upper surface 40 are located in horizontal plane and are flushed with open deck 31 or coplanar.
Hopper 72 in the operation to the open deck 31 being located near the cargo hold 14i of bow of the conveyer 58.If Connection conveyer 74 is set to receive the material being discharged from hopper 72 and be fed to additional hopper 76.Deck conveyer 78 along Open deck 31 runs to neighbouring cargo hold 14a from 76 lower section of hopper and leans on aftermost position.
The ship loading machine 60 is associated with deck conveyer 78 so that its can (a) conveyed by deck by receiving The material and the position that is discharged to except the SSD-BC10a that machine 78 supplies carry out unloading materials;Or it will (b) be conveyed by deck The material that machine 78 supplies is loaded into selected cargo hold 14.For this purpose, the ship loading machine 60 is mounted on open deck 31 On track, allow the length of its open deck 31 across cargo hold 14a and 14i.
The ship loading machine 60 has tensile arm or cantilever 80, can be operable to extend over such as Fig. 4 a Shown in SSD-BC 10a topside (side) so as to unloading materials;Or it inwardly extends so that material to be loaded into cargo hold 14. The ship loading machine 60 further includes the upender (tripper) for transmitting material between conveyer 78 and cantilever 80.Separately Outside or alternatively, the ship loading machine 60, which could be formed with, can rotate or pivot 360 ° of cantilever 80.It is appreciated that It is that, when the cantilever 80 can be rotated by 360 °, the end of the cantilever 80 can be positioned at the side top of ship to unload Loading material, or the overthe openings of cargo hold 14 are located in so that material to be loaded on ship.
It, can be by hopper 72 that third party's loading machine arrives material transmission or additional in a possible loading process In hopper 76, and the ship loading machine 60 is then transmitted to by conveyer 78, wherein cantilever 80 is oriented to turn material It is transported in a cargo hold 14.If material is initially loaded into hopper 72 by third party's loading machine, then conveyer 74 It is operable to material being transported to hopper 76 from hopper 72, material is then supplied to conveyer 78 by hopper 76.
In a possible uninstall process, chute 70 is opened to allow the material in cargo hold 14 to fall on unloading subsystem On the conveyer 62 of system 56.Material is transmitted to chute 66 by conveyer 62, is supplied on conveyer 64, is transported to chute 68, It is supplied to cargo hold to be transported on deck conveyer 58, be transported to and is poured in chute 72, carried and poured by conveyer 74 Chute 76 is simultaneously provided on conveyer 78.Now, ship loading machine 60 is positioned, so that cantilever 80 extend out to the SSD-BC Except the topside of 10a, and operate material to be discharged on harbour or being directly unloaded to the land near the SSD-BC10a to berth On.
It will be appreciated by one of skill in the art that or otherwise understanding:It is transferred to loose unpacked material generally for by loose unpacked material It is transported on cargo ship or from bulk carrier, the harbour or open jetty (jetty) of berthing can be provided with similar to dress The loading machine of carrier aircraft 60.Therefore, the loading machine at harbour or open jetty is used to bulk goods being transferred to the loose unpacked material fortune stayed It is transported on defeated ship or from the bulk carrier.Mooring wharf or open jetty no longer need to possess such loading machine come from The SSD-BC 10a unloading materials.
It is a kind of construction include conveyer 58 buoyant device/sponson 16a method be first by conveyer 58 directly It connects and constructs and be fixed on the topside of hull 12, and sponson 16a is then fixed to 12 same topside of hull and position Above conveyer 58.The sponson 16a can be previously fabricated for individual structure or multiple tops except deck Structure (superstructure), and be subsequently fixed on hull 12.Alternatively, the sponson 16a can be It is directly manufactured on hull 12.
Attached drawing 5a and it is attached Figure 5b shows that the another embodiments of disclosed SSD-BC 10b, wherein using and aforementioned implementation Mode identical reference numeral indicates identical feature.The SSD-BC 10b and the SSD-BC 10a are substantially the same, But increase multiple mobilecranes 82.The mobilecrane 82 is installed in orbit, and the track is along positioned at institute The open deck 31 stated on the topside opposite with the ship loading machine 60 of hull 12 extends.Rail for the crane 82 Road extends to the cargo hold 14i near bow from the cargo hold 14a near stern.Each crane 82 is provided with grab bucket/scraper bowl 84.Institute Stating crane 82 can be from the stockyard of barge or other adjacent positions to the SSD-BC 10b loaded materials.
The SSD-BC 10a and materials conveying system 30a of 10b embodiments can be with up to per hour 10,000 tons Speed load and unload material.Therefore, with 185,000 ton of lifting capacity SSD-BC can in 18.5 hours loading or unloading it is complete At, and the handling method of the prior art takes about 15 days.This saves a large amount of time, and therefore in ship chartering and cost of berthing Aspect also saves huge cost.
Since the embodiment of SSD-BC 10a and 10b are provided with the materials conveying system 30a including loading machine 60, so They are not limited to the transporting bulk material between the harbour, open jetty or harbour with loading unloading infrastructure.When with When SSD-BC 10a of full and down, the relatively shallow draft of 10b are combined, this provides unique ability, illustrates it below In unrestricted example.
DWT is the draft that 185000 tons of coastal cape type bulk freighter needs about 19 meters, this include below keel between Gap.However, the draft at the most of outlet harbours in the whole world is 14 meters or less.The embodiment of the SSD-BC is with daily 24 Hour, seven days a week based on, to including carry DWT be 400000 tons super large ore carrier (Valemax) interior any size ship Oceangoing ship has opened the harbour that draft is limited all over the world.(embodiment of first description of SSD-BC 10 is naturally also such as This.)
The ship for the 185000 tons of DWT that berth is avoided to need to desilt and dredge to existing port facilities.This is not only A large amount of cost is saved, and avoids numerous unfavorable environmental issues and Legislation problems.Naturally, the of SSD-BC 10 The embodiment of one description also brings this benefit.
The bulk goods handling system 30a provided is provided, avoids and is set between loading harbour and destination port Set the relevant cost of material transfer infrastructure.In addition, bulk goods handling system 30a enables the embodiment of SSD-BC Directly from seashore conveyor load cargo.Since the material of exploitation can be transferred directly to the SSD- by long belt conveyor On BC, this makes numerous mines (for example, logistics cost is higher to lead to economically non-remunerative mine) become lucrative.It is local Road or railway, crane and other bulk handling equipments need not be built, stockyard need not be also stored.Attached drawing 6 is shown Such a example.The attached drawing shows the SSD- that the neighbouring boat fender (dolphin) 86 nearby constructed positioned at coastline 88 berths BC 10a.Conveyer 90 will likely be loaded directly into from the mining material except dozens of kilometres in hopper 76.Then may be used To use loose unpacked material handling system 30a that the material of exploitation is loaded into cargo hold 14.It should be understood that in this feelings Common harbour materials conveying system and infrastructure need not be built under condition come support by the material of exploitation from mine load to The SSD-BC10a.Certainly, material transfer operation shown in fig. 6 can also be executed by SSD-BC 10b.
The bulk goods handling system 30a allows cargo from conveyor load on the bank and being assigned to all cabins 14, and cargo can also be unloaded to any foreign-going ship or port of discharge.Fig. 7 shows the transfer operation in open waters The middle example using SSD-BC 10b, will be on material transfer to coastal cape type ocean-going vessel 92.This operation may for example be used in this The situation of sample:The draft of loading ports is too shallow and can not receive coastal cape type ocean-going vessel 92, but port of discharge possesses foot really Enough drafts.Here, the SSD-BC 10b are used for from loading ports loaded material, then by material transfer to the sea Cape type ocean-going vessel 92.Certainly, material transfer operation shown in Fig. 7 can also be executed by SSD-BC 10a.SSD-BC 10b can also Enough material is transshiped from barge using multiple cranes 82.For example, a kind of application scenarios can be, the mining in bulk of mining production Material is loaded to the inland river barge of about 2000 tons of maximum capacity.The barge can be navigated by water near the SSD-BC10b of mooring, And the cargo on its barge is transferred in cargo hold 14 using crane 82.Described in making from more loose unpacked materials of transferring by lighter After SSD-BC10b full and downs, the SSD-BC10b can then be travelled to destination port or port of discharge.
As previously mentioned, SSD-BC 10,10a and 10b very shallow draft can realize round-the-clock material load and Unloading, without living in seclusion to wait advantageous tidal conditions.
It will recognize from described above, the bulk goods handling system 30a really can be in other cargo/bulk cargos It is used on object ships that transport, without including buoyant device/sponson 16.For example, the bulk goods handling system 30a can To be arranged on the conventional coastal cape type ship of 19 meters of draft, although such ship, which is only limited to be docked in, can accommodate drinking water depth On harbour/open jetty of degree.Therefore, although due to needing 19 meters of draft, such ship having the same will not to stop Pool selection, but ship income still having the same in terms of material handling ability.When transformation coastal cape type ship is to include When stating bulk goods handling system 30a (but not having sponson 16), the conveyer 58 can be fixed to the outside of hull, Or it can be arranged in the inside of hull.In addition, the conveyer 58 can be additionally formed with bending section (bend), to incite somebody to action Material is transported in the equivalent of hopper 76.Alternatively, the additional connection conveyer similar with conveyer 74 can be provided, To receive the material being discharged from the end of conveyer 58 and be transported to hopper 76.It is fixed to the outside of hull in the conveyer 58 In the case of, it can be closed by being fixedly installed to the steel lid of hull.Certainly, equipped with disclosed loose unpacked material handling system The coastal cape type ship of 30a will need to be transformed cargo hold, to enable in material disposing to following conveyer 62.
Although there have been described herein the specific implementation mode of the bulk freighter of draft an ultra shallow and its method of construction, It should be understood that bulk freighter and its building method can be implemented with many other forms.Although for example, SSD-BC 10a and 10b Embodiment be shown as having and unload subsystems 56, it is described to unload the tool of subsystems 56 there are three individual conveyer 66a, 66b And 66c, but to unload subsystems 56 to have include one, any amount of conveyer of two or four or more.Goods Cabin 14 will be configured with the chute 70 of quantity identical as conveyer 66.In addition, the embodiment of the SSD-BC can be set It is equipped with mechanical system, to help material being moved on following conveyer 62 across chute 70.For example, the mechanical system can To include such as auger conveyor or vibrator.
In subsequent claims and specification above-mentioned, in addition to the context due to representation language or necessary imply Except requiring otherwise, word " comprising " and "comprising" or " by ... form " etc. variants be used to indicate the meaning of inclusiveness, It emphasizes the presence of stated feature, but is not precluded within the various implementations of SSD-BC and its building method disclosed herein Presence or addition further feature in mode.
Claims (according to the 19th article of modification of treaty)
1. a kind of bulk freighter (SSD-BC) of ultra-shallow draft depth, including:
Hull, the hull have the cargo hold for accommodating loose unpacked material;With
At least one buoyant device, the buoyant device are attached on each topside of the hull, each buoyant device construction For reduce the SSD-BC deadweight tonnage (DWT) draft;Bulk goods handling system, the bulk goods carry system System can be by least one buoyant device come loading/unloading goods.
2. the bulk freighter of ultra-shallow draft depth according to claim 1, wherein the buoyant device includes substantially continuous Outer surface, the outer surface along the hull each topside extend.
3. the bulk freighter of ultra-shallow draft depth according to claim 1 or 2, wherein buoyant device near bow End is taper, to reduce the transverse width towards the hull along the direction from stern to bow.
4. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-3, wherein buoyant device near Aftermost end is taper, to reduce the transverse width towards the hull along the direction from bow to stern.
5. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-4, wherein be further configured with scattered Cargo movement system is filled, to transport bulk goods between place on the place except deck and one or more ships.
6. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-5, wherein the bulk goods is removed Fortune system can be from the bottom discharge bulk goods of the cargo hold, and is then unloaded by least one buoyant device Bulk goods.
7. the bulk freighter (SSD-BC) of ultra-shallow draft depth according to claim 6, wherein the bulk goods carries system System includes the first conveyer, and first conveyer is arranged to come from by the buoyant device transhipment in the buoyant device The material of the bottom of the cargo hold.
8. the bulk freighter (SSD-BC) of the ultra-shallow draft depth according to any one of claim 5-7, wherein described to dissipate It includes ship loading machine/unloader to fill cargo movement system, and the ship loading machine/unloader is supported on the dew of the SSD-BC On its deck, and it is arranged to cross the open deck.
9. the bulk freighter (SSD-BC) of ultra-shallow draft depth according to claim 8, wherein the ship loading machine/unload Carrier aircraft can rotate or pivot 360 °.
10. the bulk freighter (SSD-BC) of ultra-shallow draft depth according to claim 8 or claim 9, wherein the bulk goods is removed Fortune system further includes deck conveyer, the deck conveyer be arranged along the open deck to the ship loading machine/ Unloader transports material.
11. the bulk freighter (SSD-BC) of ultra-shallow draft depth according to claim 10, wherein the bulk goods is carried System further includes connection conveyer, and the connection conveyer is arranged to material being transported to the deck from first conveyer Conveyer.
12. the bulk freighter (SSD-BC) of the ultra-shallow draft depth according to any one of claim 8-11, wherein described Bulk goods handling system further includes the one or more cranes being supported on the open deck.
13. a kind of method of bulk freighter (SSD-BC) that building ultra-shallow draft depth, the method includes:
It is attached at least one buoyant device along each topside of the hull of ship;With
Being there is provided at least one of buoyant device buoyant device can be by least one buoyant device from described The bulk goods handling system of SSD-BC loading/unloading goods.

Claims (22)

1. a kind of bulk freighter (SSD-BC) of ultra-shallow draft depth, including:
Hull, the hull are provided with the cargo hold for accommodating loose unpacked material;With
At least one buoyant device, the buoyant device are attached on each topside of the hull, each buoyant device construction For reduce the SSD-BC deadweight tonnage (DWT) draft.
2. the bulk freighter of ultra-shallow draft depth according to claim 1, wherein the buoyant device is described including attaching to The steel construction of hull.
3. the bulk freighter of ultra-shallow draft depth according to claim 1 or 2, wherein the buoyant device is in the hull Each vertical line between extend.
4. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-3, wherein the buoyant device packet Substantially continuous outer surface is included, the outer surface extends along each topside of the hull.
5. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-4, wherein buoyant device near The end of nearly bow is taper, to reduce the transverse width towards the hull along the direction from stern to bow.
6. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-5, wherein buoyant device near Aftermost end is taper, to reduce the transverse width towards the hull along the direction from bow to stern.
7. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-6, wherein the buoyant device by Steel is made.
8. the bulk freighter of ultra-shallow draft depth according to any one of claims 1-7, wherein the buoyant device is forever It is fixed on the hull long.
9. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-8, the bulk freighter includes being located at Bulk goods handling system at least one of port side and starboard side of SSD-BC, the bulk goods handling system are used for Bulk goods is transported between place on place and one or more ships except the deck.
10. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-8, the bulk freighter includes can From the bulk goods handling system of the bottom discharge bulk goods of cargo hold.
11. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-8, the bulk freighter includes can By at least one buoyant device come the bulk goods handling system of loading/unloading goods.
12. the bulk freighter of the ultra-shallow draft depth according to any one of claim 1-8, the bulk freighter includes can By at least one buoyant device from the bulk goods handling system of the bottom discharge bulk goods of the cargo hold.
13. a kind of method of bulk freighter that building ultra-shallow draft depth, this method include:
Each topside along coastal cape type ship is attached at least one buoyant device.
14. the method according to claim 11, including:
Determination needs reduced draft in DWT;And
At least two buoyant devices are designed, can be subtracted needed for DWT offers when the buoyant device is attached to the SSD-BC Few draft.
15. a kind of bulk freighter (SSD-BC) of ultra-shallow draft depth, including:
Hull, the hull are provided with the cargo hold for accommodating loose unpacked material;With
At least one buoyant device, the buoyant device are attached on each topside of the hull, each buoyant device construction For reduce the SSD-BC deadweight tonnage (DWT) draft;And bulk goods movement system, bulk goods transhipment System can be by least one buoyant device from the bottom discharge bulk goods of the cargo hold.
16. a kind of bulk freighter (SSD-BC) of ultra-shallow draft depth, including:
Hull, the hull are provided with the cargo hold for accommodating loose unpacked material;With bulk goods handling system, which removes Fortune system can be from the bottom discharge bulk goods of the cargo hold.
17. the bulk freighter (SSD-BC) of the ultra-shallow draft depth according to claim 9-12, any one of 15, wherein The bulk goods handling system includes the first conveyer, and first conveyer is arranged to through one in the buoyant device A buoyant device transports the material from the bottom of the cargo hold.
18. the bulk freighter (SSD-BC) of the ultra-shallow draft depth according to any one of claim 9-12,15-17, In, the bulk goods handling system includes ship loading machine/unloader, and the ship loading machine/unloader is supported on described On the open deck of SSD-BC and it is arranged to cross the open deck.
19. the bulk freighter (SSD-BC) of ultra-shallow draft depth according to claim 18, wherein the ship loading machine/ Unloader can rotate or pivot 360 °.
20. the bulk freighter (SSD-BC) of the ultra-shallow draft depth according to claim 18 or 19, wherein the bulk goods Handling system further includes deck conveyer, and the deck conveyer is arranged along the open deck to the ship loading Machine/unloader transports material.
21. the bulk freighter (SSD-BC) of ultra-shallow draft depth according to claim 20, wherein the bulk goods is carried System further includes connection conveyer, and the connection conveyer is arranged to material being transported to the deck from first conveyer Conveyer.
22. the bulk freighter (SSD-BC) of the ultra-shallow draft depth according to any one of claim 9-12,15-21, In, the bulk goods handling system further includes the one or more cranes being supported on the open deck.
CN201680070388.XA 2015-12-03 2016-11-30 The bulk freighter of ultra-shallow draft depth Pending CN108367797A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AU2015905023 2015-12-03
AU2015905023A AU2015905023A0 (en) 2015-12-03 Super Shallow Draft Bulk Carrier
PCT/AU2016/051180 WO2017091860A1 (en) 2015-12-03 2016-11-30 Super shallow draft bulk carrier

Publications (1)

Publication Number Publication Date
CN108367797A true CN108367797A (en) 2018-08-03

Family

ID=58795946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201680070388.XA Pending CN108367797A (en) 2015-12-03 2016-11-30 The bulk freighter of ultra-shallow draft depth

Country Status (6)

Country Link
JP (1) JP2018535894A (en)
KR (1) KR20180088900A (en)
CN (1) CN108367797A (en)
AU (1) AU2016363678A1 (en)
BR (1) BR112018011167A2 (en)
WO (1) WO2017091860A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112550584A (en) * 2021-01-26 2021-03-26 烟台智汇港科技创新有限公司 Marine transportation equipment for improving freight volume
CN114450235A (en) * 2019-09-27 2022-05-06 乐德科技私人有限公司 Hybrid cargo barge or transport ship

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023250270A1 (en) * 2022-06-22 2023-12-28 Switch Barge Llc Barge systems and methods of use

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572276A (en) * 1969-04-14 1971-03-23 Ole Skaarup Self-loading and unloading vessel
US4622912A (en) * 1984-02-09 1986-11-18 Jim Bleke Draft reduction system for ships
DE19902116A1 (en) * 1999-01-20 2000-07-27 Andreas Hoboy Freighter ship, for transporting bulk goods, has floating conveyor belt suspended beneath keel for unloading goods
CN201753101U (en) * 2010-07-09 2011-03-02 广州船舶及海洋工程设计研究院 Device bringing convenience to lead ships into shallow waterways

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US974104A (en) * 1908-11-07 1910-10-25 Charles D Doxford Discharging apparatus for navigable vessels.
US3198157A (en) * 1963-10-31 1965-08-03 Livas Amilcas Ion Draft reducing device for vessels
US3610192A (en) * 1969-01-31 1971-10-05 Mcmullen Ass John J System of moving laden ships through shallow draft-limited waters
US4072238A (en) * 1976-11-24 1978-02-07 Allis-Chalmers Corporation Self-unloading ship with two tunnel belts and a central reclaimer
JPS58174080A (en) * 1982-04-02 1983-10-13 Nippo Kisen Kk Reducing device for draft of ship
JPS6331890A (en) * 1986-07-24 1988-02-10 Mitsubishi Heavy Ind Ltd Building method for docking work facility utilizing used ship
US5364218A (en) * 1993-06-16 1994-11-15 Skarhar, Inc. Bulk material conveyor unloading system for ships
JP3210305B2 (en) * 1999-10-29 2001-09-17 ビーエムエッチ、マリーン、アクチボラグ Ship deck loading / unloading equipment
TW201134722A (en) * 2010-04-13 2011-10-16 Csbc Corp Taiwan Container vessel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572276A (en) * 1969-04-14 1971-03-23 Ole Skaarup Self-loading and unloading vessel
US4622912A (en) * 1984-02-09 1986-11-18 Jim Bleke Draft reduction system for ships
DE19902116A1 (en) * 1999-01-20 2000-07-27 Andreas Hoboy Freighter ship, for transporting bulk goods, has floating conveyor belt suspended beneath keel for unloading goods
CN201753101U (en) * 2010-07-09 2011-03-02 广州船舶及海洋工程设计研究院 Device bringing convenience to lead ships into shallow waterways

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114450235A (en) * 2019-09-27 2022-05-06 乐德科技私人有限公司 Hybrid cargo barge or transport ship
CN112550584A (en) * 2021-01-26 2021-03-26 烟台智汇港科技创新有限公司 Marine transportation equipment for improving freight volume
CN112550584B (en) * 2021-01-26 2021-08-24 温岭市智营电子科技有限公司 Marine transportation equipment for improving freight volume

Also Published As

Publication number Publication date
WO2017091860A1 (en) 2017-06-08
BR112018011167A2 (en) 2018-11-21
AU2016363678A1 (en) 2018-06-07
JP2018535894A (en) 2018-12-06
KR20180088900A (en) 2018-08-07

Similar Documents

Publication Publication Date Title
CN101085658B (en) Automation container boat, dock and using method of warehouse transportation system composing the automation container boat and dock
CN108367797A (en) The bulk freighter of ultra-shallow draft depth
JP2000505166A (en) Modular caisson for use in port construction, expansion and modernization
CN103204227A (en) Self-unloading bulk cargo transport ship and unloading method thereof
US3938676A (en) Floating unloading installation for lighters
CN104870305B (en) Production is supported and storage vessel
CN203172863U (en) Bulk cargo transport ship with automatic unloading achievable
SE426465B (en) PRELIMINARY VESSELS
JP5173892B2 (en) Ship
US4483655A (en) Vessel loading method
JPH06255799A (en) Equipment for loading individual cargo
CN103010414A (en) Bulk carrier, bulk carrier unloading device and use method of bulk carrier unloading system thereof
JP3383681B2 (en) Method and apparatus for loading and transporting powder cargo
Zamorano Surface ore movement, storage, and recovery systems
Abramowski et al. Preliminary design considerations for a ship to mine polymetallic nodules in the Clarion-Clipperton zone
CN102530195A (en) Ship for unloading cargos from ship bottom, device for unloading cargos from ship bottom, device of bulk cargo carrier for unloading cargos at port and process of bulk cargo carrier for unloading cargos at port
CN201056432Y (en) Floating type vessel removing device
EP1350716B1 (en) Floating facility equipped with cranes
KR101580976B1 (en) Ships for mining submarine mineral
KR20130050594A (en) Floating transshipment facility barge
RU27318U1 (en) PORT TECHNOLOGICAL LOADING COMPLEX FOR LOADING OF BULK CARGOES (OPTIONS)
CN2515171Y (en) Multifunctional port of transhipment
CN204021981U (en) A kind of ore grinding fast-assembling harbour
JPH06127470A (en) Cargo handling equipment utilizing slurry ship
AU2013101068A4 (en) A terminal and a method for loading a ship with bulk material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180803

WD01 Invention patent application deemed withdrawn after publication