CN108363796A - A kind of moving method and device of data - Google Patents

A kind of moving method and device of data Download PDF

Info

Publication number
CN108363796A
CN108363796A CN201810154898.6A CN201810154898A CN108363796A CN 108363796 A CN108363796 A CN 108363796A CN 201810154898 A CN201810154898 A CN 201810154898A CN 108363796 A CN108363796 A CN 108363796A
Authority
CN
China
Prior art keywords
data
attribute information
data attribute
database
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810154898.6A
Other languages
Chinese (zh)
Inventor
廖业斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Net Letter Cloud Suit Mdt Infotech Ltd
Original Assignee
Beijing Net Letter Cloud Suit Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Net Letter Cloud Suit Mdt Infotech Ltd filed Critical Beijing Net Letter Cloud Suit Mdt Infotech Ltd
Priority to CN201810154898.6A priority Critical patent/CN108363796A/en
Publication of CN108363796A publication Critical patent/CN108363796A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/214Database migration support

Abstract

This application discloses a kind of moving method of data and devices, wherein method includes:At least one data attribute information is obtained, includes per data attribute information:Title, the effective time of the establishment moment of data, preset data of the mark of data, the database of preservation data, and access the record of data;Judge at least one data attribute information, if it is not later than the default deadline moment at the time of presence after establishment moment delay effective time, and, the number that data are accessed in effective time is less than the first object data attribute information of preset times;If there are first object data attribute informations at least one data attribute information, access the database corresponding to the title of database in first object data attribute information, and from database, the data corresponding to the mark of data in first object data attribute information are migrated.Pass through the embodiment of the present application, it is possible to reduce the less data being queried in database, to improve the search efficiency of data.

Description

A kind of moving method and device of data
Technical field
This application involves field of database management, more particularly to the moving method and device of a kind of data.
Background technology
In the data that database is preserved, there are some less data being queried, wherein the less number being queried According to can be:Tables of data in database, the information etc. recorded in tables of data.
In general, the less data being queried account for the ratio for having preserved data, up to 90% or more in the database, this When, the less presence for being queried data can reduce the search efficiency of database.
The less data being queried are migrated out from database therefore, it is necessary to a kind of, to improve the inquiry of database Efficiency.
Invention content
Based on this, this application provides a kind of moving method of data, for by the less data being queried from database In migrate out, to improve the search efficiency of database.
Present invention also provides a kind of moving apparatus of data, to ensure the realization and application of the above method in practice.
Technical solution provided by the present application is:
This application provides a kind of moving method of data, this method includes:
Obtain at least one data attribute information, wherein include per data attribute information:The mark of data preserves institute The title of the database of data, the effective time of the establishment moment of the data, the preset data are stated, and described in access The record of data, wherein the record includes:Access the number of the data;
Judge at least one data attribute information, if at the time of presence after establishment moment delay effective time It is not later than the default deadline moment, and, the number that the data are accessed in the effective time is less than the first of preset times Target data attribute information;
If there are the first object data attribute informations at least one data attribute information, described first is accessed Database in target data attribute information corresponding to the title of database, and from the database, by the first object Data in data attribute information corresponding to the mark of data are migrated.
Wherein, the record further includes:At the time of accessing the data every time;
The method further includes:
When detect access at least one data attribute information data corresponding to the mark of data when, update institute State record;
If the first object data attribute information is not present at least one data attribute information, described in judgement extremely In few a data attribute information, if be not later than default deadline at the time of presence after establishment moment delay effective time Moment, and, the number that the data are accessed in the effective time is not less than the second target data attribute information of preset times;
If there are when the second target data attribute information at least one data attribute information, by described second In target data attribute information, at the time of the establishment moment of the data is updated to access the data the latest.
Wherein, it is described from the database, corresponding to the mark of data in the first object data attribute information Data migrated after, further include:
From at least one data attribute information, the first object data attribute information is deleted, after obtaining deletion At least one data attribute information.
Wherein, at least one data attribute information of the acquisition, including:
Every preset time, at least one current data attribute information is obtained.
Wherein, it is described from the database, by the first object data attribute information data mark institute it is right After the data answered are migrated, further include:
The quantity of the first object data attribute information corresponding to the data of migration is currently completed in statistics;
Determine that current migration progress, the current migration progress are:The ratio of first quantity and the second quantity, wherein institute Stating the first quantity is:The current quantity that the first object data attribute information corresponding to the data of migration is completed;Described second Quantity is:The total quantity of the first object data attribute information;
Show the current migration progress.
Disclosed herein as well is a kind of moving apparatus of data, which includes:
Acquiring unit, for obtaining at least one data attribute information, wherein include per data attribute information:Data Mark, preserve the data the title of database, the establishment moment of the data, the preset data it is effective when It is long, and access the record of the data, wherein the record includes:Access the number of the data;
First judging unit, for judging at least one data attribute information, if exist and prolong establishment moment It is not later than the default deadline moment at the time of after slow effective time, and, the number of the data is accessed in the effective time Less than the first object data attribute information of preset times;
Migration units, for there are described in judging at least one data attribute information in the first judging unit One target data attribute information accesses the database corresponding to the title of database in the first object data attribute information, And from the database, the data corresponding to the mark of data in the first object data attribute information are migrated.
Wherein, the record in the acquiring unit further includes:At the time of accessing data every time, described device further includes:
First updating unit detects that the mark institute for accessing data at least one data attribute information is right for working as When the data answered, the record is updated;
Second judgment unit, in judging at least one data attribute information in first judging unit not There are when the first object data attribute information, judge at least one data attribute information, if existing will create It is not later than the default deadline moment at the time of after moment delay effective time, and, the data are accessed in the effective time Number be not less than preset times the second target data attribute information;
Second updating unit, for judging to deposit at least one data attribute information in the second judgment unit In the second target data attribute information, by the second target data attribute information, the establishment moment of the data At the time of being updated to access the data the latest.
Wherein, described device further includes:
Deleting unit, for migration units from the database, will in the first object data attribute information number According to mark corresponding to data migrated after, from least one data attribute information, delete first mesh Mark data attribute information, at least one data attribute information after being deleted.
Wherein, the acquiring unit, is specifically used for:Every preset time, current at least one data attribute letter is obtained Breath.
Wherein, described device further includes:
Statistic unit, for migration units from the database, will in the first object data attribute information number According to mark corresponding to data migrated after, first object data corresponding to the data of migration are currently completed in statistics The quantity of attribute information;
Determination unit, for determining, currently migration progress, the current migration progress are:First quantity and the second quantity Ratio, wherein first quantity is:The current number that the first object data attribute information corresponding to the data of migration is completed Amount;Second quantity is:The total quantity of the first object data attribute information;
Display unit, for showing the current migration progress.
The application's has the beneficial effect that:
In the embodiment of the present application, it from least one data attribute information, judges whether that moment delay will be accessed Default deadline is not later than at the time of after effective time, and, the of access times in effective time not less than preset times One target data attribute information, at this point, the first object data attribute information judged, is to default deadline moment number The term of validity is arrived according to attribute information, also, the accessed number of the data is less than preset times in effective time, therefore, The first object data attribute information be exactly to term of validity and less accessed data, therefore, by database with The corresponding data of mark of data in one target data attribute-bit, are migrated, less accessed in database to reduce Data, to reduce the quantity in database, to improve the search efficiency of data in database.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of flow chart of the moving method embodiment of data in the application;
Fig. 2 is a kind of structural schematic diagram of the moving apparatus embodiment of data in the application.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
With reference to figure 1, a kind of flow chart of the moving method embodiment of data in the application is shown, this method embodiment can To include:
Step 101:Obtain at least one data attribute information, wherein include per data attribute information:The mark of data Know, preserve the title of the database of the data, the effective time of the establishment moment of the data, the preset data, and accesses The record of the data, record include the number for accessing the data.
In the present embodiment, data can be the record in tables of data or tables of data.At least one data attribute is believed Breath, most starts to be configured by administrative staff, also, at least one at least one data attribute information refers to:Management The total quantity of the data attribute information of personnel depaly, without refer to administrative staff configuration data attribute information total quantity in, no Data attribute information less than one.For example, when administrative staff are configured with 1000 data attribute informations, herein at least one It is just 1000.
Wherein, per data attribute information in may include the mark of data, preserve the data database title, should The establishment moment of data, the effective time of the preset data and the record for accessing the data.Wherein, record may include The information such as at the time of access times and every time access, the mark of data can be the title of data, for example, when data are data When table, the mark of the data can be the title of tables of data;When data are the record in tables of data, the marks of the data can be with The specific location being recorded in for this in tables of data.
Certainly, the mark of data can also be other forms in practical applications, and the present embodiment is not to the mark of data Concrete form is construed as limiting, as long as the data can be identified.At this point, being directed to each data, all preserve and the data Mark, at the time of preserving the title of the database of the data, the establishment moment of the data, and access the data between pair It should be related to.At least one data attribute information of configuration can be stored in allocation list,
When administrative staff are according to current practice, after being configured at least one data attribute information, then, in this implementation In example, when server detects that the data at least one data attribute information corresponding to the mark of data are accessed, clothes Business device updates the data in attribute information, the corresponding access data record of the data, for example, the access times of the data are updated, And the information such as at the time of accessing the data every time.In this step, every preset time, current data attribute letter is obtained Breath.
Step 102:Judge at least one data attribute information, if exist after establishment moment is postponed effective time At the time of be not later than the default deadline moment, and, the number that the data are accessed in effective time is less than the of preset times One target data attribute information.
After getting current data attribute information, then, in this step, judges in data attribute information, be It is not later than the default deadline moment at the time of after the no delay effective time there are establishment moment, and, number is accessed in effective time According to number be less than preset times data attribute information, for convenience, the present embodiment will meet the data of conditions above Attribute information is referred to as first object data attribute information.Wherein, it can be current time to preset the deadline moment, can also For a certain moment of other settings, this example is not construed as limiting the concrete form for presetting the deadline moment.
Specifically, judging at least one data attribute information, if there are the first object data for meeting certain condition The process of attribute information may include step A1~step A4:
Step A1:According to preset order, a data attribute information is obtained.
After getting at least one data attribute information, then, in this step, from data attribute information, determine Go out current a data attribute information to be judged.Specifically, in this step, preset order can be:According at least one The sequencing of every data attribute information in data attribute information obtains current a data attribute information to be judged. In addition, preset order can also be:To being indexed per the establishment moment in data attribute information in allocation list, according to index Sequence, obtain every data attribute information successively;It can also be by being arranged one per data attribute information in allocation list A ID obtains every data attribute information successively by the sequencing of ID.Certainly, the present embodiment can also pass through other Mode obtain every data attribute information successively, the present embodiment do not make the mode for specifically obtaining every data attribute information It limits.In this step, the first data attribute information is obtained.
Step A2:Judge whether the data attribute information meets, by establishment moment postpone effective time after at the time of between not It is later than the default deadline moment, and, the number that the data are accessed in effective time is less than preset times, if satisfied, then holding Row step A4.
After getting data attribute information, then, in this step, judge whether the data attribute information meets, it will It is not later than the default deadline moment between at the time of after establishment moment delay effective time, and, the number is accessed in effective time According to number be less than preset times.
If not satisfied, then there may be two kinds of situations, the first situations:When the data are also less than preset deadline It carves, obtains lower a data attribute information at this time, and execute the action of step A2;The second situation:The data have arrived preset The deadline moment, but the number that the data are accessed in effective time is not less than preset times, and then show the data It is not by the data of less access, at this point, it is not necessary to the data are migrated out from database, at this point, executing step A3 Action.
If satisfied, then showing in the data attribute information, the data corresponding to Data Identification arrive the default off period Limit, also, the number that the data are accessed in effective time is less than preset times, and then show that the data are accessed less Data, therefore, it is necessary to migrate out the data from database.At this point, executing the action of step A4.
Step A3:By in the data attribute information, at the time of the establishment moment of data is updated to access the data the latest, and From at least one data attribute information, lower a data attribute information is obtained, and return to step the action of A2.
Due to the number that the data corresponding to the data attribute information are accessed in effective time, not less than default time Number, therefore the data are not to access less data;Although the pot-life of the data has arrived preset deadline at this time Carve, server will not by the Data Migration, but, by the corresponding data attribute information of the data, by the establishment of the data Moment is updated to:In the record for accessing the data, at the time of accessing the data the latest.
Then, according to preset order, after getting lower a data attribute information, then, to the number currently got According to attribute information, executed according to the action of step A2.
Step A4:By current data attribute information, it is determined as first object data attribute information, and obtains next number According to attribute information, the action of A2 is returned to step.
When judging in current data attribute information, when the data corresponding to the mark of data are migrated, In this step, by current data attribute information, it is determined as first object data attribute information, then, obtains lower a data Attribute information returns to step the action of A2.
Step 103:Access first object data attribute information in database title corresponding to database, and from this Data Migration corresponding to mark in database by the data is gone out.
In this step, the database corresponding to the title of the database in the first object data attribute information is accessed, And the Data Migration corresponding to the mark from the database by the data is gone out.Specifically, other databases can be moved to, It can also currently move in other memory spaces, the present embodiment is not construed as limiting target migration address.
It should be noted that in practical applications, when the quantity for the first object data attribute information judged is multiple When, the present embodiment can be directed to each first object data attribute information respectively, which is corresponded to Data migrated, can also the corresponding data of multiple first object data attribute informations be subjected to batch migration.For tool The migration pattern of body, the present embodiment do not limit specifically.
In the present embodiment, by data corresponding to first object data attribute information after being migrated out in database, from In at least one data attribute information, the first object data attribute information is deleted.Also, it every preset time, obtains current At least one data attribute information then executed according to the action of step 102~step 103.
In the present embodiment, when being executed every time according to the action of step 101~step 103, if in current implementation procedure, After determining multiple first object data attribute informations, migrated by the data corresponding to first object data attribute information During, current migration progress, the information such as history migration statistics can be shown by the form of webpage.Specifically, displaying is worked as The process of preceding migration progress may include step B1~step B3:
Step B1:The quantity of the first object data attribute information corresponding to the data of migration is currently completed in statistics.
In this step, the quantity of the first object data attribute information corresponding to the current data for completing migration of statistics, For convenience, the present embodiment believes the current first object data attribute being completed corresponding to the data of migration counted The quantity of breath is referred to as the first quantity.
Step B2:Determine that current migration progress, the current migration progress are:The ratio of first quantity and the second quantity, Wherein, first quantity is:The current quantity that the first object data attribute information corresponding to the data of migration is completed;Institute Stating the second quantity is:The total quantity of the first object data attribute information.
In the present embodiment, the total quantity for the first object attribute information determined is referred to as the second quantity, in determination After going out the first quantity, then, in this step, by the ratio between the first quantity and the second quantity, it is determined as current migration progress.
Step B3:Show the first object data attribute information and the current migration progress.
After determining current migration progress, then, in this step, current migration progress is shown.For example, with webpage The current migration progress of information displaying.
In the embodiment of the present application, it from least one data attribute information, judges whether that moment delay will be accessed Default deadline is not later than at the time of after effective time, and, the of access times in effective time not less than preset times One target data attribute information, at this point, the first object data attribute information judged, is to default deadline moment number The term of validity is arrived according to attribute information, also, the accessed number of the data is less than preset times in effective time, therefore, The first object data attribute information be exactly to term of validity and less accessed data, therefore, by database with The corresponding data of mark of data in one target data attribute-bit, are migrated, less accessed in database to reduce Data, to reduce the quantity in database, to improve the search efficiency of data in database.
With reference to figure 2, show that a kind of structural schematic diagram of the moving apparatus embodiment of data in the application, the device are implemented Example may include:
Acquiring unit 201, for obtaining at least one data attribute information, wherein include per data attribute information:Number According to mark, preserve the data the title of database, the establishment moment of the data, the preset data it is effective when It is long, and access the record of the data, wherein the record includes:Access the number of the data;
First judging unit 202, for judging at least one data attribute information, if exist establishment moment It is not later than the default deadline moment at the time of after delay effective time, and, time of the data is accessed in the effective time First object data attribute information of the number less than preset times;
Migration units 203, for judging that there are institutes at least one data attribute information in the first judging unit First object data attribute information is stated, the data corresponding to the title of database in the first object data attribute information are accessed Library, and from the database, the data corresponding to the mark of data in the first object data attribute information are moved It moves.
Wherein, the record in the acquiring unit further includes:At the time of accessing data every time, described device can also wrap It includes:
First updating unit detects that the mark institute for accessing data at least one data attribute information is right for working as When the data answered, the record for accessing data is updated;
Second judgment unit, in judging at least one data attribute information in first judging unit not There are when the first object data attribute information, judge at least one data attribute information, if existing will create It is not later than the default deadline moment at the time of after moment delay effective time, and, the data are accessed in the effective time Number be not less than preset times the second target data attribute information;
Second updating unit, for judging to deposit at least one data attribute information in the second judgment unit In the second target data attribute information, by the second target data attribute information, the establishment moment of the data At the time of being updated to access the data the latest.
Wherein, described device can also include:
Deleting unit, for migration units from the database, will in the first object data attribute information number According to mark corresponding to data migrated after, from least one data attribute information, delete first mesh Mark data attribute information, at least one data attribute information after being deleted.
Wherein, the acquiring unit, is specifically used for:Every preset time, current at least one data attribute letter is obtained Breath.
Wherein, described device can also include:
Statistic unit, for migration units from the database, will in the first object data attribute information number According to mark corresponding to data migrated after, first object data corresponding to the data of migration are currently completed in statistics The quantity of attribute information;
Determination unit, for determining, currently migration progress, the current migration progress are:First quantity and the second quantity Ratio, wherein first quantity is:The current number that the first object data attribute information corresponding to the data of migration is completed Amount;Second quantity is:The total quantity of the first object data attribute information;
Display unit, for showing the current migration progress.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with it is other The difference of embodiment, just to refer each other for identical similar portion between each embodiment.Herein, such as " first " and The relational terms of " second " or the like are only used to distinguish one entity or operation from another entity or operation, and Without necessarily requiring or implying that between these entities or operation, there are any actual relationship or orders.In the text The word explanations such as "include", "comprise" be comprising meaning rather than exclusive or exhaustive meaning;That is, be " include but Be not limited to " meaning.Deformation, same replacement without departing from the inventive concept of the premise, can also be made, improved etc., these Belong to protection scope of the present invention.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or use the application. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can in other embodiments be realized in the case where not departing from spirit herein or range.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (10)

1. a kind of moving method of data, which is characterized in that the method includes:
Obtain at least one data attribute information, wherein include per data attribute information:The mark of data preserves the number According to database title, the effective time of the establishment moment of the data, the preset data, and access the data Record, wherein the record includes:Access the number of the data;
Judge at least one data attribute information, if not late at the time of presence after establishment moment delay effective time In the default deadline moment, and, the number that the data are accessed in the effective time is less than the first object of preset times Data attribute information;
If accessing the first object there are the first object data attribute information at least one data attribute information Database in data attribute information corresponding to the title of database, and from the database, by the first object data Data in attribute information corresponding to the mark of data are migrated.
2. according to the method described in claim 1, it is characterized in that, the record further includes:Access every time the data when It carves;
The method further includes:
When detect access at least one data attribute information data corresponding to the mark of data when, update the note Record;
If the first object data attribute information is not present at least one data attribute information, at least one described in judgement In data attribute information, if when being not later than default deadline at the time of presence after establishment moment delay effective time It carves, and, the number that the data are accessed in the effective time is not less than the second target data attribute information of preset times;
If there are when the second target data attribute information at least one data attribute information, by second target In data attribute information, at the time of the establishment moment of the data is updated to access the data the latest.
3. according to the method described in claim 2, it is characterized in that, it is described from the database, by the first object number After the data corresponding to mark according to data in attribute information are migrated, further include:
From at least one data attribute information, the first object data attribute information is deleted, after being deleted extremely Few a data attribute information.
4. according to the method described in claim 3, it is characterized in that, at least one data attribute information of the acquisition, including:
Every preset time, at least one current data attribute information is obtained.
5. according to the method described in claim 1, it is characterized in that, it is described from the database, by the first object After data in data attribute information corresponding to the mark of data are migrated, further include:
The quantity of the first object data attribute information corresponding to the data of migration is currently completed in statistics;
Determine that current migration progress, the current migration progress are:The ratio of first quantity and the second quantity, wherein described One quantity is:The current quantity that the first object data attribute information corresponding to the data of migration is completed;Second quantity For:The total quantity of the first object data attribute information;
Show the current migration progress.
6. a kind of moving apparatus of data, which is characterized in that described device includes:
Acquiring unit, for obtaining at least one data attribute information, wherein include per data attribute information:The mark of data Know, preserve the title of the database of the data, the effective time of the establishment moment of the data, the preset data, with And access the record of the data, wherein the record includes:Access the number of the data;
First judging unit, for judging at least one data attribute information, if existing has establishment moment delay It is not later than the default deadline moment at the time of after effect duration, and, the number that the data are accessed in the effective time is less than The first object data attribute information of preset times;
Migration units, for there are first mesh in judging at least one data attribute information in the first judging unit Data attribute information is marked, accesses the database corresponding to the title of database in the first object data attribute information, and from In the database, the data corresponding to the mark of data in the first object data attribute information are migrated.
7. device according to claim 6, which is characterized in that the record in the acquiring unit further includes:It accesses every time At the time of data, described device further includes:
First updating unit detects in access at least one data attribute information for working as corresponding to the mark of data When data, the record is updated;
Second judgment unit, for judging to be not present at least one data attribute information in first judging unit When the first object data attribute information, judge at least one data attribute information, if exist establishment moment It is not later than the default deadline moment at the time of after delay effective time, and, time of the data is accessed in the effective time Second target data attribute information of the number not less than preset times;
Second updating unit, for judging that there are institutes at least one data attribute information in the second judgment unit When stating the second target data attribute information, by the second target data attribute information, the establishment moment of the data updates At the time of to access the data the latest.
8. device according to claim 7, which is characterized in that described device further includes:
Deleting unit, for migration units from the database, by data in the first object data attribute information After the corresponding data of mark are migrated, from least one data attribute information, the first object number is deleted According to attribute information, at least one data attribute information after being deleted.
9. device according to claim 8, which is characterized in that the acquiring unit is specifically used for:Every preset time, Obtain at least one current data attribute information.
10. device according to claim 6, which is characterized in that described device further includes:
Statistic unit, for migration units from the database, by data in the first object data attribute information After the corresponding data of mark are migrated, the first object data attribute corresponding to the data of migration is currently completed in statistics The quantity of information;
Determination unit, for determining, currently migration progress, the current migration progress are:The ratio of first quantity and the second quantity Value, wherein first quantity is:The current number that the first object data attribute information corresponding to the data of migration is completed Amount;Second quantity is:The total quantity of the first object data attribute information;
Display unit, for showing the current migration progress.
CN201810154898.6A 2018-02-23 2018-02-23 A kind of moving method and device of data Pending CN108363796A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810154898.6A CN108363796A (en) 2018-02-23 2018-02-23 A kind of moving method and device of data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810154898.6A CN108363796A (en) 2018-02-23 2018-02-23 A kind of moving method and device of data

Publications (1)

Publication Number Publication Date
CN108363796A true CN108363796A (en) 2018-08-03

Family

ID=63002299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810154898.6A Pending CN108363796A (en) 2018-02-23 2018-02-23 A kind of moving method and device of data

Country Status (1)

Country Link
CN (1) CN108363796A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109324959A (en) * 2018-08-13 2019-02-12 中国平安人寿保险股份有限公司 A kind of method, server and the computer readable storage medium of automatic transfer data
CN110895520A (en) * 2018-09-12 2020-03-20 华为技术有限公司 File migration method, related device and equipment
CN112363801A (en) * 2020-11-10 2021-02-12 海光信息技术股份有限公司 Virtual machine migration method, processing method, system, device, chip and medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120117030A1 (en) * 2010-11-09 2012-05-10 Ayako Sakuma Database migration management apparatus and method thereof
CN104035925A (en) * 2013-03-04 2014-09-10 深圳市腾讯计算机系统有限公司 Data storage method and device and storage system
CN105138587A (en) * 2015-07-31 2015-12-09 小米科技有限责任公司 Data access method, apparatus and system
CN105335102A (en) * 2015-10-10 2016-02-17 浪潮(北京)电子信息产业有限公司 Buffer data processing method and device
CN105373369A (en) * 2014-08-25 2016-03-02 北京皮尔布莱尼软件有限公司 Asynchronous caching method, server and system
CN107294756A (en) * 2016-04-13 2017-10-24 中兴通讯股份有限公司 Business changes method and device automatically

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120117030A1 (en) * 2010-11-09 2012-05-10 Ayako Sakuma Database migration management apparatus and method thereof
CN104035925A (en) * 2013-03-04 2014-09-10 深圳市腾讯计算机系统有限公司 Data storage method and device and storage system
CN105373369A (en) * 2014-08-25 2016-03-02 北京皮尔布莱尼软件有限公司 Asynchronous caching method, server and system
CN105138587A (en) * 2015-07-31 2015-12-09 小米科技有限责任公司 Data access method, apparatus and system
CN105335102A (en) * 2015-10-10 2016-02-17 浪潮(北京)电子信息产业有限公司 Buffer data processing method and device
CN107294756A (en) * 2016-04-13 2017-10-24 中兴通讯股份有限公司 Business changes method and device automatically

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109324959A (en) * 2018-08-13 2019-02-12 中国平安人寿保险股份有限公司 A kind of method, server and the computer readable storage medium of automatic transfer data
CN109324959B (en) * 2018-08-13 2024-02-09 中国平安人寿保险股份有限公司 Method for automatically transferring data, server and computer readable storage medium
CN110895520A (en) * 2018-09-12 2020-03-20 华为技术有限公司 File migration method, related device and equipment
CN110895520B (en) * 2018-09-12 2022-04-22 华为技术有限公司 File migration method, related device and equipment
CN112363801A (en) * 2020-11-10 2021-02-12 海光信息技术股份有限公司 Virtual machine migration method, processing method, system, device, chip and medium
CN112363801B (en) * 2020-11-10 2022-10-21 海光信息技术股份有限公司 Virtual machine migration method, processing method, system, device, chip and medium

Similar Documents

Publication Publication Date Title
CN108363796A (en) A kind of moving method and device of data
CN101216821B (en) Data acquisition system storage management method
CN109828721A (en) Data-erasure method, device, computer equipment and storage medium
CN104794177B (en) A kind of date storage method and device
CN105224255B (en) A kind of storage file management method and device
CN106302843B (en) A kind of IP address library update method and device
CN103425663B (en) Embedded system data base establishment table, deposit record, the method and apparatus for deleting record
CN107832401A (en) Database data access method, system, device and computer-readable recording medium
CN103473298B (en) Data archiving method and device and storage system
CN104182435A (en) System and method for searching information based on data missing mark
CN107370803A (en) The method and terminal of a kind of data syn-chronization
CN107807932A (en) A kind of hierarchical data management method and system based on path enumeration
CN108089926A (en) A kind of method, apparatus, equipment and readable storage medium storing program for executing for obtaining distributed lock
CN108255838A (en) A kind of method and system for establishing the intermediate data warehouse for big data analysis
CN104956341A (en) Data migration method, device and processor
CN111552692A (en) Plus-minus cuckoo filter
CN110134689A (en) Target group's screening technique, system and computer equipment based on main object label variations
CN104184601B (en) The acquisition methods and device of user's online hours
CN104765782A (en) Index sequencing updating method and device
CN107609090A (en) More copy weak consistency maintaining methods in distributed memory system
CN107291878A (en) A kind of data-erasure method and device of distributed storage file system
CN105279166B (en) File management method and system
US20070094257A1 (en) File management
CN105205062B (en) Date storage method, method for reading data and device
CN104537016B (en) A kind of method and device of determining file place subregion

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180803

RJ01 Rejection of invention patent application after publication