CN108362953A - The full-automatic testing platform and method of transformer - Google Patents

The full-automatic testing platform and method of transformer Download PDF

Info

Publication number
CN108362953A
CN108362953A CN201810485846.7A CN201810485846A CN108362953A CN 108362953 A CN108362953 A CN 108362953A CN 201810485846 A CN201810485846 A CN 201810485846A CN 108362953 A CN108362953 A CN 108362953A
Authority
CN
China
Prior art keywords
transformer
phases
ratio
test
voltage winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810485846.7A
Other languages
Chinese (zh)
Inventor
贡维
戴金富
朱小燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu High Electric Power Equipment Co Ltd
Original Assignee
Jiangsu High Electric Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu High Electric Power Equipment Co Ltd filed Critical Jiangsu High Electric Power Equipment Co Ltd
Priority to CN201810485846.7A priority Critical patent/CN108362953A/en
Publication of CN108362953A publication Critical patent/CN108362953A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/20Measuring number of turns; Measuring transformation ratio or coupling factor of windings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/62Testing of transformers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses the full-automatic testing platforms and method of a kind of transformer,The RS232 serial ports of computer comes to communicate connection with the first connector via the one 232/485 converter,The RS485 serial ports of the PLC is connected with the second connector,Second connector is also connected with third connector,The third connector is connected with transformer electrical parameter comprehensive tester,The third connector is also connected with the 4th connector,4th connector is also connected with the 5th connector,5th connector is also connected with 485 interfaces of the 3rd 232/485 converter,232 interfaces of the 3rd 232/485 converter are connected with the RS232 interface of straight resistance instrument,And the function that the test parameter in the prior art that can be arranged and the test that imposes a condition are avoided by method is not often very complete,Since the restriction of performance cannot be satisfied the defect of the interactive performance in terms of stronger test.

Description

The full-automatic testing platform and method of transformer
Technical field
The present invention relates to transformer testing technical field, the full-automatic testing platform and method of specially a kind of transformer.
Background technology
Site test device for transformer is a kind of device being very suitable for live accurate measuring transformer, can be existing Field accurately measures oil using the built-in power of the equipment for transformer and invades the various types transformation such as formula, dry type, special transformer The pattern and load loss of device, can first and second voltage value of arbitrary input transformer when use.
But be also general some transformer testing instruments now for transformer, such tester has portable The advantages of, but it is insufficient in terms of flexibility, the function that can be arranged is due to transformer testing instrument inside chip (often monolithic Machine and small-capacity memory) performance it is very limited, therefore the test parameter that can be arranged and the function for the test that imposes a condition It is often very incomplete, in addition also due to the restriction of performance cannot be satisfied the interactive performance in terms of stronger test.
Invention content
It is an object of the invention to provide the full-automatic testing platforms and method of a kind of transformer, include the electricity with RS232 serial ports Brain, the frequency converter with RS485 serial ports, the PLC with RS485 serial ports, the transformer electrical parameter synthesis with RS485 serial ports are surveyed Try instrument, the no-load voltage ratio group tester with RS232 serial ports, the straight resistance instrument with RS232 serial ports, the RS232 strings of the computer Mouth comes to communicate connection with the first connector via the one 232/485 converter, and first connector is the same as frequency converter RS485 serial ports is connected, and first connector is also connected with the second connector, and the RS485 serial ports of the PLC is the same as the Two connectors are connected, and second connector is also connected with third connector, the same transformer of third connector Electrical parameter comprehensive tester is connected, and the third connector is also connected with the 4th connector, the 4th connector Also it is connected with 485 interfaces of the 2nd 232/485 converter, 232 interfaces of the 2nd 232/485 converter are tested with no-load voltage ratio group The RS232 interface of instrument is connected, and the 4th connector is also connected with the 5th connector, and the 5th connector is also same 485 interfaces of the 3rd 232/485 converter are connected, and 232 interfaces of the 3rd 232/485 converter connect with the RS232 of straight resistance instrument Mouth is connected, and background control module, the information database of transformer, for transformer are provided in the computer and carries out transformation The information database of when joint group alias test, for transformer carry out the information database of winding resistance test, for becoming The information database of depressor no-load loss test, is used for inducting-voltage proof at the information database of for transformer load loss test The information database of test, the information database that test is risen for the information database of industrial frequency withstand voltage test, for temperature, it is described Foreground control module is provided in PLC.And the test parameter in the prior art that can be arranged is avoided by method and is set The function of fixed condition test is not often very complete, cannot be satisfied interactive performance in terms of stronger test due to the restriction of performance Defect.
A kind of full-automatic testing platform of transformer and method in order to overcome the deficiencies in the prior art, the present invention provides Solution, it is specific as follows:
A kind of full-automatic testing platform of transformer includes the computer with RS232 serial ports, the frequency conversion with RS485 serial ports Device, the PLC with RS485 serial ports, the transformer electrical parameter comprehensive tester with RS485 serial ports, the change with RS232 serial ports Straight resistance instrument than group tester, with RS232 serial ports, the RS232 serial ports of the computer is via the one 232/485 converter To communicate connection with the first connector, first connector is connected with the RS485 serial ports of frequency converter, and described first Connector is also connected with the second connector, and the RS485 serial ports of the PLC is connected with the second connector, and described second Connector is also connected with third connector, and the third connector is connected with transformer electrical parameter comprehensive tester, institute The third connector stated also is connected with the 4th connector, and the 4th connector is also the same as the 485 of the 2nd 232/485 converter Interface is connected, and 232 interfaces of the 2nd 232/485 converter are connected with the RS232 interface of no-load voltage ratio group tester, described 4th connector is also connected with the 5th connector, and the 5th connector is also the same as 485 interfaces of the 3rd 232/485 converter It is connected, 232 interfaces of the 3rd 232/485 converter are connected with the RS232 interface of straight resistance instrument, are provided in the computer Background control module, the information database of transformer, for transformer carry out the Information Number of transformation when connection set number test According to the information data that library, for transformer carry out the information database of winding resistance test, for transformer no-load loss is tested Library, for transformer load loss test information database, for inducting-voltage proof test information database, for power frequency it is resistance to It presses the information database of test, rise the information database of test for temperature, foreground control module is provided in the PLC.
The method of the full-automatic testing platform of the transformer is that steps are as follows:
Step 1:Start computer first, runs background control module, be put into human-computer interaction circle of background control module Face, on the human-computer interaction interface with needed for typing transformer parameter to be tested input frame, into transformer into Row transformation when connection set number test select button, into transformer carry out winding resistance test select button, into Enter the select button that transformer noload losses is tested, into the select button tested transformer load loss, into sense It answers the select button of voltage-withstand test, rise the select button tested into the select button tested inducting-voltage proof and into temperature;
Step 2:The transformer parameter information on transformer outer wall nameplate tested as needed, passes through human-computer interaction circle Face needs the input frame of transformer parameter to be tested the transformer parameter data input for typing;
Step 3:After typing, the save button on human-computer interaction interface is clicked, such background control module is just the transformation Device parameter information is stored in as a record in the information database of transformer;
Step 4:When needing to carry out transformation when connection set number test to transformer, specially:First no-load voltage ratio group is surveyed Examination instrument is connected with the transformer, then clicks to enter the select button that transformation when connection set number test is carried out to transformer Into to transformer carry out transformation when connection set number test interactive interface, this to transformer carry out transformation be when coupled On the interactive interface of group alias test, carried on the interactive interface for carrying out transformation when connection set number test to transformer It is alternative be manually entered, memory read and program control test as Three models, if selection be program control test mould Formula is put into the interactive interface of program control test, on the interactive interface of the program control test, by inputting with no-load voltage ratio group tester The factory number for the transformer being connected, the ambient humidity of transformer position, the environment temperature of transformer position, change The tapping point of star-like connection or triangle connection type, transformer that depressor uses carries out parameter setting, and then clicking should The button for starting test on the interactive interface of program control test, the change that just the same no-load voltage ratio group tester is connected The factory number of depressor, the ambient humidity of transformer position, the environment temperature of transformer position, transformer use Star-like connection or triangle connection type, transformer the information of tapping point be sent in PLC, PLC then just starts foreground Control module includes the factory number of transformer, the ambient humidity of transformer position, transformer position to send Environment temperature, transformer use star-like connection or triangle connection type, transformer tapping point test instruction arrive In no-load voltage ratio group tester, no-load voltage ratio group tester is allowed to be tested according to the information of the tapping point of transformer with this, most The ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, change ratio, the transformer of the AC phases of transformer are obtained afterwards The ratio errors of AC phases, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, and the AB phases of transformer Become ratio, the ratio error of AB phases of transformer, the ratio error of the AC phases for becoming ratio, transformer of the AC phases of transformer, The change ratio of the BC phases of transformer, the ratio error of the BC phases of transformer, time point at this time send back computer in real time, then Background control module is in real time the information of the tapping point of transformer, the AB phases for becoming ratio, transformer of the AB phases of transformer Ratio error, the ratio error of the AC phases for becoming ratio, transformer of the AC phases of transformer, the change ratio of the BC phases of transformer, change The ratio errors of the BC phases of depressor, time point at this time, transformer factory number corresponding to transformer information database In tap sum, tap spacing, the nominal transformation ratio of record be shown on the interactive interface of program control test in real time, while going back handle The AC of the information of the tapping point of the transformer, the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, transformer The ratio error of the AC phases for becoming ratio, transformer of phase, the no-load voltage ratio of the BC phases for becoming ratio, transformer of the BC phases of transformer are missed Difference, time point at this time, transformer factory number corresponding to transformer information database in record tap sum, Tap spacing, nominal transformation ratio are stored in the information that for transformer carries out transformation when connection set number test in the form of recording In database;
If the pattern of selection being manually entered, is put into the interactive interface being manually entered, in the friendship being manually entered On mutual interface, by inputting the factory number for the transformer being connected with no-load voltage ratio group tester, the ring of transformer position The star-like connection or triangle connection type, transformer that border humidity, the environment temperature of transformer position, transformer use Tapping point carry out the pre- typing of parameter, then artificial mode manipulates tapping point of the no-load voltage ratio group tester according to transformer Information is tested, and the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, the AC of transformer are finally obtained The ratio error of the AC phases for becoming ratio, transformer of phase, the no-load voltage ratio of the BC phases for becoming ratio, transformer of the BC phases of transformer are missed Difference, and the change ratio of the AB phases of transformer, the ratio error of AB phases of transformer, the change ratio of the AC phases of transformer, transformation The ratio error of the AC phases of device, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point record at this time Enter to the interactive interface being manually entered, then clicks the button for preservation, background control module is in real time point of transformer The information of contact, the AB phases of transformer become ratio, the ratio error of AB phases of transformer, the AC phases of transformer change ratio, The ratio error of the AC phases of transformer, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time at this time Point, transformer factory number corresponding to transformer information database in the tap sum of record, tap spacing, specified No-load voltage ratio is shown in real time on the interactive interface being manually entered, while also the information of the tapping point of the transformer, transformer The ratio error of the AB phases for becoming ratio, transformer of AB phases, the no-load voltage ratio of the AC phases for becoming ratio, transformer of the AC phases of transformer are missed The factory number for becoming ratio, the ratio error of BC phases of transformer, time point at this time, transformer of difference, the BC phases of transformer Tap sum, tap spacing, the nominal transformation ratio of record in the information database of corresponding transformer are deposited in the form of recording It stores up in the information database that for transformer carries out transformation when connection set number test;
If what is selected is the pattern of memory access, it is put into the interactive interface of memory access, in the friendship of the memory access On mutual interface, by inputting the factory number for the transformer being connected with no-load voltage ratio group tester, the ring of transformer position The star-like connection or triangle connection type, transformer that border humidity, the environment temperature of transformer position, transformer use Tapping point carry out parameter setting, then start no-load voltage ratio group tester and surveyed according to the information of the tapping point of transformer Examination, finally obtain the AB phases of transformer become ratio, the ratio error of AB phases of transformer, the AC phases of transformer change ratio, The ratio error of the ratio error of the AC phases of transformer, the BC phases for becoming ratio, transformer of the BC phases of transformer, and transformer AB phases become ratio, the ratio error of AB phases of transformer, the AC phases for becoming ratio, transformer of the AC phases of transformer no-load voltage ratio Error, the ratio error of the BC phases of the change ratio of the BC phases of transformer, transformer, time point at this time are stored in the survey of no-load voltage ratio group In the memory for trying instrument, once clicked for the button of memory access on the interactive interface in memory access, then backstage is controlled Molding block sends PLC read memory instruction in real time, and the foreground control module in PLC is just being stored in no-load voltage ratio group tester Memory in transformer AB phases become ratio, the ratio error of AB phases of transformer, the AC phases of transformer change ratio, become The ratio error of the AC phases of depressor, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point at this time It is sent to computer, the AB that becomes ratio, transformer of the background control module the information of the tapping point of transformer, the AB phases of transformer Ratio error, the no-load voltage ratio of the BC phases of transformer of the ratio error of phase, the AC phases for becoming ratio, transformer of the AC phases of transformer Value, the ratio error of BC phases of transformer, time point at this time, transformer factory number corresponding to transformer Information Number It is shown in real time on the interactive interface of memory reading according to the tap sum of the record in library, tap spacing, nominal transformation ratio, simultaneously Also the information of the tapping point of the transformer, the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, transformer AC phases become ratio, the ratio error of AC phases of transformer, the BC phases for becoming ratio, transformer of the BC phases of transformer no-load voltage ratio Error, time point at this time, transformer factory number corresponding to transformer information database in record tap it is total Number, tap spacing, nominal transformation ratio are stored in for transformer in the form of recording and carry out transformation when connection set number test In information database;
Step 5:When needing to carry out winding resistance test to transformer, specially:First straight resistance instrument is connected with the transformer It connects, then clicks to enter and the select button of winding resistance test is carried out into transformer progress winding resistance test to transformer Interactive interface, this to transformer carry out winding resistance test interactive interface on, this to transformer carry out winding resistance With Three models as alternative manual test, memory reading and program control test on the interactive interface of test, if What is selected is the pattern of program control test, is put into the interactive interface of program control test, on the interactive interface of the program control test, passes through Input is the same as the factory number of transformer, the ambient humidity of transformer position, transformer position that directly resistance instrument is connected Environment temperature, the coil temperature of transformer, transformer tapping point carry out parameter setting, then click the program control test The button for starting test on interactive interface, the factory number for the transformer that just the same straight resistance instrument is connected, change The tap of the ambient humidity of depressor position, the environment temperature of transformer position, the coil temperature of transformer, transformer The information of point is sent in PLC, and PLC includes then the transformation being connected with straight resistance instrument to send with regard to startup foreground control module The factory number of device, the ambient humidity of transformer position, the environment temperature of transformer position, the coil temperature of transformer Degree, transformer tapping point information test instruction to straight resistance instrument in, allow straight resistance instrument according to the tapping point of transformer with this Information tested, finally obtain the line resistances of the AB phases of transformer high-voltage winding, the AC phases of transformer high-voltage winding The line resistance of the BC phases of line resistance, transformer high-voltage winding, alternate poor, transformer low voltage winding the ab of transformer high-voltage winding Line resistance, the transformer of the bc phases of the line resistance of phase, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding are low Press winding alternate difference, and the line resistance of the AC phases of the line resistance of the AB phases of transformer high-voltage winding, transformer high-voltage winding, The line of the line resistance of the BC phases of transformer high-voltage winding, alternate poor, transformer low voltage winding the ab phases of transformer high-voltage winding The line resistance of the ac phases of resistance, transformer low voltage winding, the line resistance of the bc phases of transformer low voltage winding, transformer low voltage winding Alternate poor, at this time time point send back computer in real time, then background control module is in real time transformer high-voltage winding The line resistances of AB phases, the line resistance of BC phases of the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding, transformation The line resistance of alternate poor, transformer low voltage winding the ab phases of device high-voltage winding, the ac phases of transformer low voltage winding line resistance, The line resistance of the bc phases of transformer low voltage winding, the manufacture at alternate poor, at this time the time point, transformer of transformer low voltage winding Tap sum, tap spacing, the nominal transformation ratio of record in the information database of the corresponding transformer of number are shown in real time On the interactive interface of program control test, while also the information of the tapping point of the transformer, the AB phases of transformer high-voltage winding The line resistance of the AC phases of line resistance, transformer high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage around The line resistance of alternate poor, transformer low voltage winding the ab phases of group, line resistance, the transformer of the ac phases of transformer low voltage winding are low Press the line resistance of bc phases, alternate poor, at this time the time point of transformer low voltage winding, the factory number of transformer of winding right Tap sum, tap spacing, the nominal transformation ratio of record in the information database for the transformer answered are stored in the form of recording For transformer carries out in the information database of winding resistance test;
If what is selected is the pattern of manual test, it is put into the interactive interface of manual test, in the friendship of the manual test On mutual interface, by inputting the factory number for the transformer being connected with straight resistance instrument, the ambient humidity of transformer position, becoming The environment temperature of depressor position, the coil temperature of transformer, transformer tapping point carry out the pre- typing of parameter, then people The mode of work manipulates straight resistance instrument and is tested according to the information of the tapping point of transformer, finally obtains transformer high-voltage winding Line resistance, the transformer of the BC phases of the line resistance of AB phases, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding the ab phases of high-voltage winding, the line resistance of the ac phases of transformer low voltage winding, change The line resistance of the bc phases of depressor low pressure winding, alternate poor, at this time the time point of transformer low voltage winding are entered into manual test Interactive interface, then click for preservation button, background control module in real time the information of the tapping point of transformer, become The BC phases of the line resistance of the AB phases of depressor high-voltage winding, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding Line resistance, the line resistance of alternate poor, transformer low voltage winding ab phases of transformer high-voltage winding, transformer low voltage winding Alternate poor, at this time the time of the line resistance of ac phases, the line resistance of the bc phases of transformer low voltage winding, transformer low voltage winding Point, transformer factory number corresponding to transformer information database in the tap sum of record, tap spacing, specified No-load voltage ratio is shown on the interactive interface of manual test in real time, at the same also the line resistance of the AB phases of the transformer high-voltage winding, The phase of the line resistance of the AC phases of transformer high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding Between the line resistances of poor, transformer low voltage winding ab phases, transformer low voltage winding ac phases line resistance, transformer low voltage winding The line resistance of bc phases, alternate poor, at this time the time point of transformer low voltage winding, transformer factory number corresponding to change Tap sum, tap spacing, the nominal transformation ratio of record in the information database of depressor are stored in the form of recording for becoming Depressor carries out in the information database of winding resistance test;
If what is selected is the pattern of memory access, it is put into the interactive interface of memory access, in the friendship of the memory access On mutual interface, by inputting the factory number for the transformer being connected with straight resistance instrument, the ambient humidity of transformer position, becoming The environment temperature of depressor position, the coil temperature of transformer, transformer tapping point carry out parameter setting, then start No-load voltage ratio group tester is tested according to the information of the tapping point of transformer, finally obtains the AB phases of transformer high-voltage winding Line resistance, the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding BC phases line resistance, transformer high-voltage Line resistance, the transformer of the line resistance of alternate poor, transformer low voltage winding the ab phases of winding, the ac phases of transformer low voltage winding The line resistance of the bc phases of low pressure winding, the alternate difference of transformer low voltage winding, and the line of the AB phases of transformer high-voltage winding electricity Resistance, the line resistance of BC phases of the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding ab phases, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage around The line resistance of bc phases of group, alternate poor, at this time the time point of transformer low voltage winding are stored in the interior of no-load voltage ratio group tester In depositing, once clicked for the button of memory access on the interactive interface in memory access, then background control module is real When PLC sent read memory instruction, the foreground control module in PLC is just the transformer being stored in the memory of straight resistance instrument The line of the BC phases of the line resistance of the AB phases of high-voltage winding, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding the ab phases of resistance, transformer high-voltage winding, the ac phases of transformer low voltage winding Line resistance, the line resistance of bc phases of transformer low voltage winding, alternate poor, at this time the time point of transformer low voltage winding send To computer, line resistance, transformer of the background control module the information of the tapping point of transformer, the AB phases of transformer high-voltage winding The alternate poor, change of the line resistance of the AC phases of high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding The bc phases of the line resistance of the ab phases of depressor low pressure winding, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding Line resistance, alternate poor, at this time the time point of transformer low voltage winding, transformer corresponding to the factory number of transformer Tap sum, tap spacing, the nominal transformation ratio of record in information database are shown in the interactive interface of memory reading in real time On, while also the information of the tapping point of the transformer, the line resistance of the AB phases of transformer high-voltage winding, transformer high-voltage winding The line resistances of AC phases, the line resistance of BC phases of transformer high-voltage winding, transformer high-voltage winding alternate poor, transformer low voltage The line resistance of the bc phases of the line resistance of the ab phases of winding, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding, The information data of transformer corresponding to alternate poor, at this time the time point of transformer low voltage winding, the factory number of transformer Tap sum, tap spacing, the nominal transformation ratio of record in library are stored in for transformer in the form of recording and carry out winding electricity In the information database for hindering test;
Step 6:When need to transformer noload losses i.e. no-load current percentage is tested when, transformer electrical parameter Comprehensive tester is connected with transformer, and the pressure regulator being connected with frequency converter is also connected with transformer, then clicks Enter the interactive interface tested transformer noload losses into the select button tested transformer noload losses, click starts The button of test, background control module are just sent to test instruction in PLC, and foreground control module just manipulates transformer electricity ginseng Number synthesis tester test the i.e. no-load current percentage of transformer noload losses, then the no-load current measured Percentage and no-load loss, time at this time are sent in computer, and then background control module is no-load current percentage and sky Load-loss, time showing at this time are on the interactive interface tested transformer noload losses, and no-load current percentage And no-load loss, time at this time are stored in the form of recording in the information database of for transformer no-load loss test;
Step 7:When needing to test transformer load loss, clicks to enter and transformer load loss tested Select button enters the interactive interface tested transformer load loss, clicks the button for starting test, background control module is just Test instruction is sent in PLC, foreground control module just manipulates transformer electrical parameter comprehensive tester and carries out to transformer Load loss is tested, and then the load loss measured, time at this time is sent in computer, then background control module Time showing load loss, at this time on the interactive interface tested transformer load loss, and load loss, this When time be stored in the form of recording for transformer load loss test information database in;
Step 8:When needing to carry out inducting-voltage proof test, the select button entrance pair tested inducting-voltage proof is clicked to enter The interactive interface of inducting-voltage proof test, clicks the button for starting test, and test instruction is just sent to PLC by background control module In, foreground control module just manipulates transformer electrical parameter comprehensive tester and test inducting-voltage proof, then survey The result information of the inducting-voltage proof obtained, time at this time are sent in computer, then knot of the background control module inducting-voltage proof Fruit information, time showing at this time on the interactive interface tested inducting-voltage proof, and the result information of inducting-voltage proof, this When time be stored in the form of recording in the information database tested for inducting-voltage proof;
Step 9:When needing to carry out industrial frequency withstand voltage test, the select button entrance pair tested industrial frequency withstand voltage is clicked to enter The interactive interface of industrial frequency withstand voltage test, clicks the button for starting test, and test instruction is just sent to PLC by background control module In, foreground control module just manipulates transformer electrical parameter comprehensive tester and test industrial frequency withstand voltage, then survey The result information of the industrial frequency withstand voltage obtained, time at this time are sent in computer, then knot of the background control module industrial frequency withstand voltage Fruit information, time showing at this time on the interactive interface tested industrial frequency withstand voltage, and the result information of industrial frequency withstand voltage, this When time be stored in the form of recording in the information database tested for industrial frequency withstand voltage;
Step 10:When needing progress temperature liter test, clicks to enter and survey is risen into temperature to the select button of temperature liter test The interactive interface of examination clicks the button for starting test, and background control module is just sent to test instruction in PLC, foreground control Molding block just manipulates transformer electrical parameter comprehensive tester and test temperature liter, and then the result of the Wen Sheng measured is believed Breath, time at this time are sent in computer, then background control module the result information of Wen Sheng, time showing at this time right Temperature rises on the interactive interface of test, and the result information of Wen Sheng, time at this time are stored in the form of recording for temperature In the information database for rising test.
Transformer parameter on the transformer outer wall nameplate includes product type, rated capacity, high tension voltage, low pressure Voltage, internal connection, group label, high-tension current, low-tension current, winding material, tap sum, divides impedance voltage percentage Connect spacing, the number of phases, date of manufacture, nominal transformation ratio, the class of insulation, factory number, manufacturer and product type.
The product type includes dry-type transformer and oil-immersed transformer.
Using said program of the present invention, the computer with RS232 serial ports, the frequency converter with RS485 serial ports,
PLC with RS485 serial ports, the transformer electrical parameter comprehensive tester with RS485 serial ports are gone here and there with RS232 No-load voltage ratio group tester, the straight resistance instrument with RS232 serial ports of mouth, the RS232 serial ports of the computer is via the 1st Converter to communicate connection with the first connector, and first connector is connected with the RS485 serial ports of frequency converter, described The first connector be also connected with the second connector, the RS485 serial ports of the PLC is connected with the second connector, described The second connector be also connected with third connector, the third connector with transformer electrical parameter comprehensive tester be connected It connects, the third connector is also connected with the 4th connector, and the 4th connector is also the same as the 2nd 232/485 converter 485 interfaces be connected, 232 interfaces of the 2nd 232/485 converter are connected with the RS232 interface of no-load voltage ratio group tester, 4th connector is also connected with the 5th connector, and the 5th connector is also the same as the 3rd 232/485 converter 485 interfaces are connected, and 232 interfaces of the 3rd 232/485 converter are connected with the RS232 interface of straight resistance instrument, the computer In be provided with background control module, the information database of transformer, for transformer carry out transformation when connection set number test Information database, for transformer carry out winding resistance test information database, for transformer no-load loss test Information database, the information database of for transformer load loss test, the information database for inducting-voltage proof test, use The information database tested is risen in the information database of industrial frequency withstand voltage test, for temperature, foreground control is provided in the PLC Module.Effectively realizes interaction and meet the requirement of performance.
Description of the drawings
Fig. 1 is the theory structure schematic diagram of the full-automatic testing platform of the transformer of the present invention.
Specific implementation mode
Invention content is described further with reference to the accompanying drawings and examples:
Shown in referring to Fig.1, the full-automatic testing platform of transformer includes computer with RS232 serial ports, is gone here and there with RS485 The frequency converter of mouth, the transformer electrical parameter comprehensive tester with RS485 serial ports, carries RS232 at the PLC with RS485 serial ports The no-load voltage ratio group tester of serial ports, the straight resistance instrument with RS232 serial ports, the RS232 serial ports of the computer is via the 1st 485 converters to communicate connection with the first connector, and first connector is connected with the RS485 serial ports of frequency converter, First connector is also connected with the second connector, and the RS485 serial ports of the PLC is connected with the second connector, Second connector is also connected with third connector, and the third connector is the same as transformer electrical parameter comprehensive tester It is connected, the third connector is also connected with the 4th connector, and the 4th connector is also the same as the 2nd 232/485 turn 485 interfaces of parallel operation are connected, and 232 interfaces of the 2nd 232/485 converter are connected with the RS232 interface of no-load voltage ratio group tester It connects, the 4th connector is also connected with the 5th connector, and the 5th connector is also the same as the 3rd 232/485 converter 485 interfaces be connected, 232 interfaces of the 3rd 232/485 converter are connected with the RS232 interface of straight resistance instrument, the electricity It is provided with background control module, the information database of transformer, for transformer in brain and carries out transformation when connection set number survey The information database of examination, for transformer carry out the information database of winding resistance test, the test of for transformer no-load loss Information database, for transformer load loss test information database, for inducting-voltage proof test information database, The information database of test is risen for the information database of industrial frequency withstand voltage test, for temperature, and foreground control is provided in the PLC Molding block.
The method of the full-automatic testing platform of the transformer is that steps are as follows:
Step 1:Start computer first, runs background control module, be put into human-computer interaction circle of background control module Face, on the human-computer interaction interface with needed for typing transformer parameter to be tested input frame, into transformer into Row transformation when connection set number test select button, into transformer carry out winding resistance test select button, into Enter the select button that transformer noload losses is tested, into the select button tested transformer load loss, into sense It answers the select button of voltage-withstand test, rise the select button tested into the select button tested inducting-voltage proof and into temperature;
Step 2:The transformer parameter information on transformer outer wall nameplate tested as needed, passes through human-computer interaction circle Face needs the input frame of transformer parameter to be tested the transformer parameter data input, the transformer outer wall for typing Transformer parameter on nameplate includes product type, rated capacity, high tension voltage, low voltage, impedance voltage percentage, inside It is connection, group label, high-tension current, low-tension current, winding material, tap sum, tap spacing, the number of phases, the date of manufacture, specified No-load voltage ratio, the class of insulation, factory number, manufacturer and product type, the product type include dry-type transformer and oil Immersion transformer;
Step 3:After typing, the save button on human-computer interaction interface is clicked, such background control module is just the transformation Device parameter information is stored in as a record in the information database of transformer;
Step 4:When needing to carry out transformation when connection set number test to transformer, specially:First no-load voltage ratio group is surveyed Examination instrument is connected with the transformer, then clicks to enter the select button that transformation when connection set number test is carried out to transformer Into to transformer carry out transformation when connection set number test interactive interface, this to transformer carry out transformation be when coupled On the interactive interface of group alias test, carried on the interactive interface for carrying out transformation when connection set number test to transformer It is alternative be manually entered, memory read and program control test as Three models, if selection be program control test mould Formula is put into the interactive interface of program control test, on the interactive interface of the program control test, by inputting with no-load voltage ratio group tester The factory number for the transformer being connected, the ambient humidity of transformer position, the environment temperature of transformer position, change The tapping point of star-like connection or triangle connection type, transformer that depressor uses carries out parameter setting, and then clicking should The button for starting test on the interactive interface of program control test, the change that just the same no-load voltage ratio group tester is connected The factory number of depressor, the ambient humidity of transformer position, the environment temperature of transformer position, transformer use Star-like connection or triangle connection type, transformer the information of tapping point be sent in PLC, PLC then just starts foreground Control module includes the factory number of transformer, the ambient humidity of transformer position, transformer position to send Environment temperature, transformer use star-like connection or triangle connection type, transformer tapping point test instruction arrive In no-load voltage ratio group tester, no-load voltage ratio group tester is allowed to be tested according to the information of the tapping point of transformer with this, most The ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, change ratio, the transformer of the AC phases of transformer are obtained afterwards The ratio errors of AC phases, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, and the AB phases of transformer Become ratio, the ratio error of AB phases of transformer, the ratio error of the AC phases for becoming ratio, transformer of the AC phases of transformer, The change ratio of the BC phases of transformer, the ratio error of the BC phases of transformer, time point at this time send back computer in real time, then Background control module is in real time the information of the tapping point of transformer, the AB phases for becoming ratio, transformer of the AB phases of transformer Ratio error, the ratio error of the AC phases for becoming ratio, transformer of the AC phases of transformer, the change ratio of the BC phases of transformer, change The ratio errors of the BC phases of depressor, time point at this time, transformer factory number corresponding to transformer information database In tap sum, tap spacing, the nominal transformation ratio of record be shown on the interactive interface of program control test in real time, while going back handle The AC of the information of the tapping point of the transformer, the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, transformer The ratio error of the AC phases for becoming ratio, transformer of phase, the no-load voltage ratio of the BC phases for becoming ratio, transformer of the BC phases of transformer are missed Difference, time point at this time, transformer factory number corresponding to transformer information database in record tap sum, Tap spacing, nominal transformation ratio are stored in the information that for transformer carries out transformation when connection set number test in the form of recording In database;
If the pattern of selection being manually entered, is put into the interactive interface being manually entered, in the friendship being manually entered On mutual interface, by inputting the factory number for the transformer being connected with no-load voltage ratio group tester, the ring of transformer position The star-like connection or triangle connection type, transformer that border humidity, the environment temperature of transformer position, transformer use Tapping point carry out the pre- typing of parameter, then artificial mode manipulates tapping point of the no-load voltage ratio group tester according to transformer Information is tested, and the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, the AC of transformer are finally obtained The ratio error of the AC phases for becoming ratio, transformer of phase, the no-load voltage ratio of the BC phases for becoming ratio, transformer of the BC phases of transformer are missed Difference, and the change ratio of the AB phases of transformer, the ratio error of AB phases of transformer, the change ratio of the AC phases of transformer, transformation The ratio error of the AC phases of device, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point record at this time Enter to the interactive interface being manually entered, then clicks the button for preservation, background control module is in real time point of transformer The information of contact, the AB phases of transformer become ratio, the ratio error of AB phases of transformer, the AC phases of transformer change ratio, The ratio error of the AC phases of transformer, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time at this time Point, transformer factory number corresponding to transformer information database in the tap sum of record, tap spacing, specified No-load voltage ratio is shown in real time on the interactive interface being manually entered, while also the information of the tapping point of the transformer, transformer The ratio error of the AB phases for becoming ratio, transformer of AB phases, the no-load voltage ratio of the AC phases for becoming ratio, transformer of the AC phases of transformer are missed The factory number for becoming ratio, the ratio error of BC phases of transformer, time point at this time, transformer of difference, the BC phases of transformer Tap sum, tap spacing, the nominal transformation ratio of record in the information database of corresponding transformer are deposited in the form of recording It stores up in the information database that for transformer carries out transformation when connection set number test;
If what is selected is the pattern of memory access, it is put into the interactive interface of memory access, in the friendship of the memory access On mutual interface, by inputting the factory number for the transformer being connected with no-load voltage ratio group tester, the ring of transformer position The star-like connection or triangle connection type, transformer that border humidity, the environment temperature of transformer position, transformer use Tapping point carry out parameter setting, then start no-load voltage ratio group tester and surveyed according to the information of the tapping point of transformer Examination, finally obtain the AB phases of transformer become ratio, the ratio error of AB phases of transformer, the AC phases of transformer change ratio, The ratio error of the ratio error of the AC phases of transformer, the BC phases for becoming ratio, transformer of the BC phases of transformer, and transformer AB phases become ratio, the ratio error of AB phases of transformer, the AC phases for becoming ratio, transformer of the AC phases of transformer no-load voltage ratio Error, the ratio error of the BC phases of the change ratio of the BC phases of transformer, transformer, time point at this time are stored in the survey of no-load voltage ratio group In the memory for trying instrument, once clicked for the button of memory access on the interactive interface in memory access, then backstage is controlled Molding block sends PLC read memory instruction in real time, and the foreground control module in PLC is just being stored in no-load voltage ratio group tester Memory in transformer AB phases become ratio, the ratio error of AB phases of transformer, the AC phases of transformer change ratio, become The ratio error of the AC phases of depressor, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point at this time It is sent to computer, the AB that becomes ratio, transformer of the background control module the information of the tapping point of transformer, the AB phases of transformer Ratio error, the no-load voltage ratio of the BC phases of transformer of the ratio error of phase, the AC phases for becoming ratio, transformer of the AC phases of transformer Value, the ratio error of BC phases of transformer, time point at this time, transformer factory number corresponding to transformer Information Number It is shown in real time on the interactive interface of memory reading according to the tap sum of the record in library, tap spacing, nominal transformation ratio, simultaneously Also the information of the tapping point of the transformer, the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, transformer AC phases become ratio, the ratio error of AC phases of transformer, the BC phases for becoming ratio, transformer of the BC phases of transformer no-load voltage ratio Error, time point at this time, transformer factory number corresponding to transformer information database in record tap it is total Number, tap spacing, nominal transformation ratio are stored in for transformer in the form of recording and carry out transformation when connection set number test In information database;
Step 5:When needing to carry out winding resistance test to transformer, specially:First straight resistance instrument is connected with the transformer It connects, then clicks to enter and the select button of winding resistance test is carried out into transformer progress winding resistance test to transformer Interactive interface, this to transformer carry out winding resistance test interactive interface on, this to transformer carry out winding resistance With Three models as alternative manual test, memory reading and program control test on the interactive interface of test, if What is selected is the pattern of program control test, is put into the interactive interface of program control test, on the interactive interface of the program control test, passes through Input is the same as the factory number of transformer, the ambient humidity of transformer position, transformer position that directly resistance instrument is connected Environment temperature, the coil temperature of transformer, transformer tapping point carry out parameter setting, then click the program control test The button for starting test on interactive interface, the factory number for the transformer that just the same straight resistance instrument is connected, change The tap of the ambient humidity of depressor position, the environment temperature of transformer position, the coil temperature of transformer, transformer The information of point is sent in PLC, and PLC includes then the transformation being connected with straight resistance instrument to send with regard to startup foreground control module The factory number of device, the ambient humidity of transformer position, the environment temperature of transformer position, the coil temperature of transformer Degree, transformer tapping point information test instruction to straight resistance instrument in, allow straight resistance instrument according to the tapping point of transformer with this Information tested, finally obtain the line resistances of the AB phases of transformer high-voltage winding, the AC phases of transformer high-voltage winding The line resistance of the BC phases of line resistance, transformer high-voltage winding, alternate poor, transformer low voltage winding the ab of transformer high-voltage winding Line resistance, the transformer of the bc phases of the line resistance of phase, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding are low Press winding alternate difference, and the line resistance of the AC phases of the line resistance of the AB phases of transformer high-voltage winding, transformer high-voltage winding, The line of the line resistance of the BC phases of transformer high-voltage winding, alternate poor, transformer low voltage winding the ab phases of transformer high-voltage winding The line resistance of the ac phases of resistance, transformer low voltage winding, the line resistance of the bc phases of transformer low voltage winding, transformer low voltage winding Alternate poor, at this time time point send back computer in real time, then background control module is in real time transformer high-voltage winding The line resistances of AB phases, the line resistance of BC phases of the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding, transformation The line resistance of alternate poor, transformer low voltage winding the ab phases of device high-voltage winding, the ac phases of transformer low voltage winding line resistance, The line resistance of the bc phases of transformer low voltage winding, the manufacture at alternate poor, at this time the time point, transformer of transformer low voltage winding Tap sum, tap spacing, the nominal transformation ratio of record in the information database of the corresponding transformer of number are shown in real time On the interactive interface of program control test, while also the information of the tapping point of the transformer, the AB phases of transformer high-voltage winding The line resistance of the AC phases of line resistance, transformer high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage around The line resistance of alternate poor, transformer low voltage winding the ab phases of group, line resistance, the transformer of the ac phases of transformer low voltage winding are low Press the line resistance of bc phases, alternate poor, at this time the time point of transformer low voltage winding, the factory number of transformer of winding right Tap sum, tap spacing, the nominal transformation ratio of record in the information database for the transformer answered are stored in the form of recording For transformer carries out in the information database of winding resistance test;
If what is selected is the pattern of manual test, it is put into the interactive interface of manual test, in the friendship of the manual test On mutual interface, by inputting the factory number for the transformer being connected with straight resistance instrument, the ambient humidity of transformer position, becoming The environment temperature of depressor position, the coil temperature of transformer, transformer tapping point carry out the pre- typing of parameter, then people The mode of work manipulates straight resistance instrument and is tested according to the information of the tapping point of transformer, finally obtains transformer high-voltage winding Line resistance, the transformer of the BC phases of the line resistance of AB phases, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding the ab phases of high-voltage winding, the line resistance of the ac phases of transformer low voltage winding, change The line resistance of the bc phases of depressor low pressure winding, alternate poor, at this time the time point of transformer low voltage winding are entered into manual test Interactive interface, then click for preservation button, background control module in real time the information of the tapping point of transformer, become The BC phases of the line resistance of the AB phases of depressor high-voltage winding, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding Line resistance, the line resistance of alternate poor, transformer low voltage winding ab phases of transformer high-voltage winding, transformer low voltage winding Alternate poor, at this time the time of the line resistance of ac phases, the line resistance of the bc phases of transformer low voltage winding, transformer low voltage winding Point, transformer factory number corresponding to transformer information database in the tap sum of record, tap spacing, specified No-load voltage ratio is shown on the interactive interface of manual test in real time, at the same also the line resistance of the AB phases of the transformer high-voltage winding, The phase of the line resistance of the AC phases of transformer high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding Between the line resistances of poor, transformer low voltage winding ab phases, transformer low voltage winding ac phases line resistance, transformer low voltage winding The line resistance of bc phases, alternate poor, at this time the time point of transformer low voltage winding, transformer factory number corresponding to change Tap sum, tap spacing, the nominal transformation ratio of record in the information database of depressor are stored in the form of recording for becoming Depressor carries out in the information database of winding resistance test;
If what is selected is the pattern of memory access, it is put into the interactive interface of memory access, in the friendship of the memory access On mutual interface, by inputting the factory number for the transformer being connected with straight resistance instrument, the ambient humidity of transformer position, becoming The environment temperature of depressor position, the coil temperature of transformer, transformer tapping point carry out parameter setting, then start No-load voltage ratio group tester is tested according to the information of the tapping point of transformer, finally obtains the AB phases of transformer high-voltage winding Line resistance, the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding BC phases line resistance, transformer high-voltage Line resistance, the transformer of the line resistance of alternate poor, transformer low voltage winding the ab phases of winding, the ac phases of transformer low voltage winding The line resistance of the bc phases of low pressure winding, the alternate difference of transformer low voltage winding, and the line of the AB phases of transformer high-voltage winding electricity Resistance, the line resistance of BC phases of the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding ab phases, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage around The line resistance of bc phases of group, alternate poor, at this time the time point of transformer low voltage winding are stored in the interior of no-load voltage ratio group tester In depositing, once clicked for the button of memory access on the interactive interface in memory access, then background control module is real When PLC sent read memory instruction, the foreground control module in PLC is just the transformer being stored in the memory of straight resistance instrument The line of the BC phases of the line resistance of the AB phases of high-voltage winding, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding the ab phases of resistance, transformer high-voltage winding, the ac phases of transformer low voltage winding Line resistance, the line resistance of bc phases of transformer low voltage winding, alternate poor, at this time the time point of transformer low voltage winding send To computer, line resistance, transformer of the background control module the information of the tapping point of transformer, the AB phases of transformer high-voltage winding The alternate poor, change of the line resistance of the AC phases of high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding The bc phases of the line resistance of the ab phases of depressor low pressure winding, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding Line resistance, alternate poor, at this time the time point of transformer low voltage winding, transformer corresponding to the factory number of transformer Tap sum, tap spacing, the nominal transformation ratio of record in information database are shown in the interactive interface of memory reading in real time On, while also the information of the tapping point of the transformer, the line resistance of the AB phases of transformer high-voltage winding, transformer high-voltage winding The line resistances of AC phases, the line resistance of BC phases of transformer high-voltage winding, transformer high-voltage winding alternate poor, transformer low voltage The line resistance of the bc phases of the line resistance of the ab phases of winding, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding, The information data of transformer corresponding to alternate poor, at this time the time point of transformer low voltage winding, the factory number of transformer Tap sum, tap spacing, the nominal transformation ratio of record in library are stored in for transformer in the form of recording and carry out winding electricity In the information database for hindering test;
Step 6:When need to transformer noload losses i.e. no-load current percentage is tested when, transformer electrical parameter Comprehensive tester is connected with transformer, and the pressure regulator being connected with frequency converter is also connected with transformer, then clicks Enter the interactive interface tested transformer noload losses into the select button tested transformer noload losses, click starts The button of test, background control module are just sent to test instruction in PLC, and foreground control module just manipulates transformer electricity ginseng Number synthesis tester test the i.e. no-load current percentage of transformer noload losses, then the no-load current measured Percentage and no-load loss, time at this time are sent in computer, and then background control module is no-load current percentage and sky Load-loss, time showing at this time are on the interactive interface tested transformer noload losses, and no-load current percentage And no-load loss, time at this time are stored in the form of recording in the information database of for transformer no-load loss test;
Step 7:When needing to test transformer load loss, clicks to enter and transformer load loss tested Select button enters the interactive interface tested transformer load loss, clicks the button for starting test, background control module is just Test instruction is sent in PLC, foreground control module just manipulates transformer electrical parameter comprehensive tester and carries out to transformer Load loss is tested, and then the load loss measured, time at this time is sent in computer, then background control module Time showing load loss, at this time on the interactive interface tested transformer load loss, and load loss, this When time be stored in the form of recording for transformer load loss test information database in;
Step 8:When needing to carry out inducting-voltage proof test, the select button entrance pair tested inducting-voltage proof is clicked to enter The interactive interface of inducting-voltage proof test, clicks the button for starting test, and test instruction is just sent to PLC by background control module In, foreground control module just manipulates transformer electrical parameter comprehensive tester and test inducting-voltage proof, then survey The result information of the inducting-voltage proof obtained, time at this time are sent in computer, then knot of the background control module inducting-voltage proof Fruit information, time showing at this time on the interactive interface tested inducting-voltage proof, and the result information of inducting-voltage proof, this When time be stored in the form of recording in the information database tested for inducting-voltage proof;
Step 9:When needing to carry out industrial frequency withstand voltage test, the select button entrance pair tested industrial frequency withstand voltage is clicked to enter The interactive interface of industrial frequency withstand voltage test, clicks the button for starting test, and test instruction is just sent to PLC by background control module In, foreground control module just manipulates transformer electrical parameter comprehensive tester and test industrial frequency withstand voltage, then survey The result information of the industrial frequency withstand voltage obtained, time at this time are sent in computer, then knot of the background control module industrial frequency withstand voltage Fruit information, time showing at this time on the interactive interface tested industrial frequency withstand voltage, and the result information of industrial frequency withstand voltage, this When time be stored in the form of recording in the information database tested for industrial frequency withstand voltage;
Step 10:When needing progress temperature liter test, clicks to enter and survey is risen into temperature to the select button of temperature liter test The interactive interface of examination clicks the button for starting test, and background control module is just sent to test instruction in PLC, foreground control Molding block just manipulates transformer electrical parameter comprehensive tester and test temperature liter, and then the result of the Wen Sheng measured is believed Breath, time at this time are sent in computer, then background control module the result information of Wen Sheng, time showing at this time right Temperature rises on the interactive interface of test, and the result information of Wen Sheng, time at this time are stored in the form of recording for temperature In the information database for rising test.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as be without departing from technical solution of the present invention content, according to the technical essence of the invention, Within the spirit and principles in the present invention, to any simple modification, equivalent replacement and improvement etc. made by above example, still Belong within the protection domain of technical solution of the present invention.

Claims (4)

1. a kind of full-automatic testing platform of transformer, which is characterized in that include computer with RS232 serial ports, gone here and there with RS485 The frequency converter of mouth, the transformer electrical parameter comprehensive tester with RS485 serial ports, carries RS232 at the PLC with RS485 serial ports The no-load voltage ratio group tester of serial ports, the straight resistance instrument with RS232 serial ports, the RS232 serial ports of the computer is via the 1st 485 converters to communicate connection with the first connector, and first connector is connected with the RS485 serial ports of frequency converter, First connector is also connected with the second connector, and the RS485 serial ports of the PLC is connected with the second connector, Second connector is also connected with third connector, and the third connector is the same as transformer electrical parameter comprehensive tester It is connected, the third connector is also connected with the 4th connector, and the 4th connector is also the same as the 2nd 232/485 turn 485 interfaces of parallel operation are connected, and 232 interfaces of the 2nd 232/485 converter are connected with the RS232 interface of no-load voltage ratio group tester It connects, the 4th connector is also connected with the 5th connector, and the 5th connector is also the same as the 3rd 232/485 converter 485 interfaces be connected, 232 interfaces of the 3rd 232/485 converter are connected with the RS232 interface of straight resistance instrument, the electricity It is provided with background control module, the information database of transformer, for transformer in brain and carries out transformation when connection set number survey The information database of examination, for transformer carry out the information database of winding resistance test, the test of for transformer no-load loss Information database, for transformer load loss test information database, for inducting-voltage proof test information database, The information database of test is risen for the information database of industrial frequency withstand voltage test, for temperature, and foreground control is provided in the PLC Molding block.
2. a kind of method of the full-automatic testing platform of transformer according to claim 1, it is characterised in that:Such as including step Under:
Step 1:Start computer first, runs background control module, be put into the human-computer interaction interface of background control module, institute It carried on the human-computer interaction interface stated and needs the input frame of transformer parameter to be tested for typing, carry out transformation into transformer When joint group alias test select button, into transformer carry out winding resistance test select button, into become Depressor no-load loss test select button, into the select button tested transformer load loss, into inducting-voltage proof The select button of test rises the select button tested into the select button tested inducting-voltage proof and into temperature;
Step 2:The transformer parameter information on transformer outer wall nameplate tested as needed, passes through the human-computer interaction interface Need the input frame of transformer parameter to be tested the transformer parameter data input for typing;
Step 3:After typing, the save button on human-computer interaction interface is clicked, such background control module just joins the transformer Number information is stored in as a record in the information database of transformer;
Step 4:When needing to carry out transformation when connection set number test to transformer, specially:First no-load voltage ratio group tester It is connected with the transformer, then clicks to enter the select button entrance for carrying out transformation when connection set number test to transformer The interactive interface that transformation when connection set number test is carried out to transformer carries out transformation when connection set at this to transformer Number test interactive interface on, this to transformer carry out transformation when connection set number test interactive interface on for Selection be manually entered, memory read and program control test as Three models, if selection be program control test pattern, just Into the interactive interface of program control test, on the interactive interface of the program control test, it is connected with no-load voltage ratio group tester by input The factory number of the transformer connect, the ambient humidity of transformer position, the environment temperature of transformer position, transformer The star-like connection of use or triangle connection type, transformer tapping point carry out parameter setting, it is program-controlled then to click this The button for starting test on the interactive interface of test, the transformer that just the same no-load voltage ratio group tester is connected Factory number, the ambient humidity of transformer position, the environment temperature of transformer position, transformer use star The information of tapping point of connection or triangle connection type, transformer is sent in PLC, and PLC then just starts foreground control Module come send include the factory number of transformer, the ambient humidity of transformer position, transformer position ring Star-like connection that border temperature, transformer use or triangle connection type, transformer tapping point test instruction to no-load voltage ratio In group tester, the no-load voltage ratio group tester is allowed to be tested according to the information of the tapping point of transformer with this, finally To the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, the AC of the change ratio of the AC phases of transformer, transformer The ratio error of the ratio error of phase, the BC phases for becoming ratio, transformer of the BC phases of transformer, and the change of the AB phases transformer Ratio error, the transformation of the ratio error of the AB phases of ratio, transformer, the AC phases for becoming ratio, transformer of the AC phases of transformer The change ratio of the BC phases of device, the ratio error of the BC phases of transformer, time point at this time send back computer in real time, then backstage Control module is in real time the information of the tapping point of transformer, the no-load voltage ratio of the AB phases for becoming ratio, transformer of the AB phases of transformer Change ratio, the transformer of error, the ratio error of the AC phases for becoming ratio, transformer of the AC phases of transformer, the BC phases of transformer The ratio errors of BC phases, time point at this time, transformer factory number corresponding to transformer information database in Tap sum, tap spacing, the nominal transformation ratio of record are shown on the interactive interface of program control test in real time, while also the change The information of the tapping point of depressor, the AB phases of transformer become ratio, the ratio error of AB phases of transformer, the AC phases of transformer Become ratio, the ratio error of AC phases of transformer, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, this When time point, transformer factory number corresponding to transformer information database in record tap sum, tap Spacing, nominal transformation ratio are stored in the information data that for transformer carries out transformation when connection set number test in the form of recording In library;
If the pattern of selection being manually entered, is put into the interactive interface being manually entered, in interaction circle being manually entered On face, by inputting the factory number for the transformer being connected with no-load voltage ratio group tester, the environmental wet of transformer position Point of star-like connection or triangle connection type, transformer that degree, the environment temperature of transformer position, transformer use Contact carries out the pre- typing of parameter, and then artificial mode manipulates information of the no-load voltage ratio group tester according to the tapping point of transformer It is tested, finally obtains the ratio errors of the AB phases for becoming ratio, transformer of the AB phases of transformer, the AC phases of transformer Become the ratio error of the AC phases of ratio, transformer, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, and The ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, the AC of the change ratio of the AC phases of transformer, transformer The ratio error of phase, the ratio error of the BC phases of the change ratio of the BC phases of transformer, transformer, time point at this time are entered into people Then the interactive interface of work input clicks the button for preservation, background control module is in real time the tapping point of transformer Change ratio, the transformer of information, the ratio error of the AB phases for becoming ratio, transformer of the AB phases of transformer, the AC phases of transformer The ratio errors of AC phases, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point at this time, become Tap sum, tap spacing, the nominal transformation ratio of record in the information database of transformer corresponding to the factory number of depressor It is shown in real time on the interactive interface being manually entered, while also the information of the tapping point of the transformer, the AB phases of transformer Become ratio, the ratio error of AB phases of transformer, the ratio error of the AC phases for becoming ratio, transformer of the AC phases of transformer, The ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point at this time, the factory number institute of transformer are right Tap sum, tap spacing, the nominal transformation ratio of record in the information database for the transformer answered are stored in the form of recording For transformer carries out in the information database of transformation when connection set number test;
If what is selected is the pattern of memory access, it is put into the interactive interface of memory access, in interaction circle of the memory access On face, by inputting the factory number for the transformer being connected with no-load voltage ratio group tester, the environmental wet of transformer position Point of star-like connection or triangle connection type, transformer that degree, the environment temperature of transformer position, transformer use Contact carries out parameter setting, then starts no-load voltage ratio group tester and is tested according to the information of the tapping point of transformer, Finally obtain the change ratio of the AB phases of transformer, the ratio error of AB phases of transformer, the change ratio of the AC phases of transformer, transformation The ratio error of the ratio error of the AC phases of device, the BC phases for becoming ratio, transformer of the BC phases of transformer, and the AB of transformer The ratio error of the AB phases for becoming ratio, transformer of phase, the no-load voltage ratio of the AC phases for becoming ratio, transformer of the AC phases of transformer are missed Difference, the ratio error of the BC phases of the change ratio of the BC phases of transformer, transformer, time point at this time are stored in the test of no-load voltage ratio group In the memory of instrument, once clicked for the button of memory access on the interactive interface in memory access, then Background control Module sends PLC read memory instruction in real time, and the foreground control module in PLC is just being stored in no-load voltage ratio group tester The change ratio of the AB phases of transformer in memory, the ratio error of AB phases of transformer, the change ratio of the AC phases of transformer, transformation The ratio error of the AC phases of device, the ratio error of the BC phases for becoming ratio, transformer of the BC phases of transformer, time point hair at this time Computer is given, background control module is the information of the tapping point of transformer, the AB phases for becoming ratio, transformer of the AB phases of transformer Ratio error, the AC phases of transformer become ratio, the ratio error of AC phases of transformer, the BC phases of transformer change ratio, The ratio errors of the BC phases of transformer, time point at this time, transformer factory number corresponding to transformer information data Tap sum, tap spacing, the nominal transformation ratio of record in library are shown in real time on the interactive interface of memory reading, simultaneously also The information of the tapping point of the transformer, the ratio errors of the AB phases for becoming ratio, transformer of the AB phases of transformer, transformer The ratio error of the AC phases for becoming ratio, transformer of AC phases, the no-load voltage ratio of the BC phases for becoming ratio, transformer of the BC phases of transformer are missed Difference, time point at this time, transformer factory number corresponding to transformer information database in record tap sum, Tap spacing, nominal transformation ratio are stored in the information that for transformer carries out transformation when connection set number test in the form of recording In database;
Step 5:When needing to carry out winding resistance test to transformer, specially:First straight resistance instrument is connected with the transformer, so The friendship for entering to the select button of transformer progress winding resistance test and carrying out winding resistance test to transformer is clicked to enter afterwards Mutual interface, this to transformer carry out winding resistance test interactive interface on, this to transformer carry out winding resistance test Interactive interface on alternative manual test, memory read and program control test as Three models, if selection Be program control test pattern, be put into the interactive interface of program control test, on the interactive interface of the program control test, pass through input The factory number of transformer that is connected with straight resistance instrument, the ambient humidity of transformer position, transformer position ring Border temperature, the coil temperature of transformer, transformer tapping point carry out parameter setting, then click the interaction of the program control test The button for starting test on interface, factory number, the transformer of the transformer that just the same straight resistance instrument is connected The tapping point of the ambient humidity of position, the environment temperature of transformer position, the coil temperature of transformer, transformer Information is sent in PLC, and PLC includes then the transformer being connected with straight resistance instrument to send with regard to startup foreground control module Factory number, the ambient humidity of transformer position, the environment temperature of transformer position, transformer coil temperature, In the test instruction of the information of the tapping point of transformer to straight resistance instrument, allow straight resistance instrument according to the letter of the tapping point of transformer with this Breath is tested, finally obtain the line resistances of the AB phases of transformer high-voltage winding, the AC phases of transformer high-voltage winding line electricity Resistance, the line resistance of BC phases of transformer high-voltage winding, transformer high-voltage winding alternate poor, transformer low voltage winding ab phases The line resistance of the ac phases of line resistance, transformer low voltage winding, the line resistance of the bc phases of transformer low voltage winding, transformer low voltage around The alternate difference of group, and the line resistance the AC phases of the line resistance of the AB phases of transformer high-voltage winding, transformer high-voltage winding, transformation The line resistance of the BC phases of device high-voltage winding, alternate poor, transformer low voltage winding the ab phases of transformer high-voltage winding line resistance, The phase of the line resistance of the ac phases of transformer low voltage winding, the line resistance of the bc phases of transformer low voltage winding, transformer low voltage winding Between time point poor, at this time send back computer in real time, then background control module is in real time the AB of transformer high-voltage winding Line resistance, the transformer of the BC phases of the line resistance of phase, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding are high Press the line resistance of alternate poor, transformer low voltage winding the ab phases of winding, the line resistance of the ac phases of transformer low voltage winding, transformation The line resistance of the bc phases of device low pressure winding, alternate poor, at this time the time point of transformer low voltage winding, transformer factory number Tap sum, tap spacing, the nominal transformation ratio of record in the information database of corresponding transformer are shown in journey in real time On the interactive interface for controlling test, while also the line electricity of the information of the tapping point of the transformer, the AB phases of transformer high-voltage winding Resistance, the line resistance of BC phases of the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding ab phases, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage around Group the line resistance of bc phases, alternate poor, at this time the time point of transformer low voltage winding, transformer factory number corresponding to Tap sum, tap spacing, the nominal transformation ratio of record in the information database of transformer are stored in the form of recording and are used for Transformer carries out in the information database of winding resistance test;
If what is selected is the pattern of manual test, it is put into the interactive interface of manual test, in interaction circle of the manual test On face, by inputting the factory number of transformer, the ambient humidity of transformer position, the transformer that are connected with straight resistance instrument The environment temperature of position, the coil temperature of transformer, transformer tapping point carry out the pre- typing of parameter, it is then artificial Mode manipulates straight resistance instrument and is tested according to the information of the tapping point of transformer, finally obtains the AB phases of transformer high-voltage winding Line resistance, the line resistance of AC phases of transformer high-voltage winding, transformer high-voltage winding BC phases line resistance, transformer high-voltage Line resistance, the transformer of the line resistance of alternate poor, transformer low voltage winding the ab phases of winding, the ac phases of transformer low voltage winding The line resistance of the bc phases of low pressure winding, the alternate poor, time point at this time of transformer low voltage winding are entered into the friendship of manual test Then the button for preservation, the background control module information the tapping point of transformer, transformer in real time are clicked in mutual interface The line of the BC phases of the line resistance of the AB phases of high-voltage winding, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding The line resistance of alternate poor, transformer low voltage winding the ab phases of resistance, transformer high-voltage winding, the ac phases of transformer low voltage winding Line resistance, the line resistance of bc phases of transformer low voltage winding, transformer low voltage winding alternate poor, at this time time point, become Tap sum, tap spacing, the nominal transformation ratio of record in the information database of transformer corresponding to the factory number of depressor It is shown on the interactive interface of manual test in real time, while the line resistance also the AB phases of the transformer high-voltage winding, transformation The line resistance of the AC phases of device high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding it is alternate it is poor, The bc of the line resistance of the ab phases of transformer low voltage winding, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding The line resistance of phase, alternate poor, at this time the time point of transformer low voltage winding, transformer factory number corresponding to transformer Information database in tap sum, tap spacing, the nominal transformation ratio of record for transformer is stored in the form of recording In the information database for carrying out winding resistance test;
If what is selected is the pattern of memory access, it is put into the interactive interface of memory access, in interaction circle of the memory access On face, by inputting the factory number of transformer, the ambient humidity of transformer position, the transformer that are connected with straight resistance instrument The environment temperature of position, the coil temperature of transformer, transformer tapping point carry out parameter setting, then start no-load voltage ratio Group tester is tested according to the information of the tapping point of transformer, finally obtains the line of the AB phases of transformer high-voltage winding The line resistance of the AC phases of resistance, transformer high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding The line resistances of alternate poor, transformer low voltage winding ab phases, transformer low voltage winding ac phases line resistance, transformer low voltage The line resistance of the bc phases of winding, the alternate difference of transformer low voltage winding, and the line resistance of the AB phases of transformer high-voltage winding, change The line resistance of the AC phases of depressor high-voltage winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding it is alternate Difference, the line resistances of the ac phases of the line resistance of ab phases of transformer low voltage winding, transformer low voltage winding, transformer low voltage winding The line resistance of bc phases, alternate poor, at this time the time point of transformer low voltage winding are stored in the memory of no-load voltage ratio group tester, Once clicked for the button of memory access on the interactive interface in memory access, then background control module is right in real time PLC, which is sent, reads memory instruction, the foreground control module in PLC just the transformer high-voltage being stored in the memory of straight resistance instrument around The line resistance of the BC phases of the line resistance of the AB phases of group, the line resistance of the AC phases of transformer high-voltage winding, transformer high-voltage winding becomes The line electricity of the line resistance of alternate poor, transformer low voltage winding the ab phases of depressor high-voltage winding, the ac phases of transformer low voltage winding Resistance, the line resistance of bc phases of transformer low voltage winding, alternate poor, at this time the time point of transformer low voltage winding are sent to electricity Brain, line resistance, transformer high-voltage of the background control module the information of the tapping point of transformer, the AB phases of transformer high-voltage winding The alternate poor, transformer of the line resistance of the AC phases of winding, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding The line of the bc phases of the line resistance of the ab phases of low pressure winding, the line resistance of the ac phases of transformer low voltage winding, transformer low voltage winding Resistance, alternate poor, at this time the time point of transformer low voltage winding, transformer factory number corresponding to transformer information Tap sum, tap spacing, the nominal transformation ratio of record in database are shown in real time on the interactive interface of memory reading, together When also the information of the tapping point of the transformer, the AC of the line resistance of the AB phases of transformer high-voltage winding, transformer high-voltage winding Alternate poor, the transformer low voltage winding of the line resistance of phase, the line resistance of the BC phases of transformer high-voltage winding, transformer high-voltage winding The line resistances of ab phases, the line resistance of bc phases of the line resistance of ac phases of transformer low voltage winding, transformer low voltage winding, transformation In the information database of transformer corresponding to alternate poor, at this time the time point of device low pressure winding, the factory number of transformer Tap sum, tap spacing, the nominal transformation ratio of record be stored in for transformer in the form of recording and carry out winding resistance survey In the information database of examination;
Step 6:When need to transformer noload losses i.e. no-load current percentage is tested when, transformer electrical parameter integrate Tester simultaneous transformer is connected, and the pressure regulator being connected with frequency converter is also connected with transformer, then clicks to enter The interactive interface tested transformer noload losses is entered to the select button of transformer noload losses test, click starts to test Button, background control module just test instruction be sent in PLC, it is comprehensive that foreground control module just manipulates transformer electrical parameter It closes tester test the i.e. no-load current percentage of transformer noload losses, then the no-load current percentage measured Number and no-load loss, time at this time are sent in computer, and then background control module is no-load current percentage and unloaded damage Consumption, time showing at this time are on the interactive interface tested transformer noload losses, and no-load current percentage and sky Load-loss, time at this time are stored in the form of recording in the information database of for transformer no-load loss test;
Step 7:When needing to test transformer load loss, the selection tested transformer load loss is clicked to enter Button enters the interactive interface tested transformer load loss, clicks the button for starting test, background control module is just survey Examination instruction is sent in PLC, and foreground control module just manipulates transformer electrical parameter comprehensive tester and carries out to transformer load Loss is tested, and then the load loss measured, time at this time are sent in computer, and then background control module is negative Load-loss, time showing at this time are on the interactive interface tested transformer load loss, and load loss, at this time Time is stored in the form of recording in the information database of for transformer load loss test;
Step 8:When needing to carry out inducting-voltage proof test, clicks to enter and the select button that inducting-voltage proof is tested is entered to induction The interactive interface of voltage-withstand test clicks the button for starting test, and background control module is just sent to test instruction in PLC, Foreground control module just manipulates transformer electrical parameter comprehensive tester and test inducting-voltage proof, then the sense measured Answer the result information of pressure resistance, time to be at this time sent in computer, then background control module the result information of inducting-voltage proof, Time showing at this time on the interactive interface tested inducting-voltage proof, and the result information of inducting-voltage proof, at this time when Between be stored in the form of record in the information database tested for inducting-voltage proof;
Step 9:When needing to carry out industrial frequency withstand voltage test, clicks to enter and the select button that industrial frequency withstand voltage is tested is entered to power frequency The interactive interface of voltage-withstand test clicks the button for starting test, and background control module is just sent to test instruction in PLC, Foreground control module just manipulates transformer electrical parameter comprehensive tester and test industrial frequency withstand voltage, then the work measured The result information of frequency pressure resistance, time at this time are sent in computer, then background control module the result information of industrial frequency withstand voltage, Time showing at this time on the interactive interface tested industrial frequency withstand voltage, and the result information of industrial frequency withstand voltage, at this time when Between be stored in the form of record in the information database tested for industrial frequency withstand voltage;
Step 10:When needs, which carry out temperature, rises test, clicks to enter and the warm select button for rising test is entered to temperature liter test Interactive interface clicks the button for starting test, and background control module is just sent to test instruction in PLC, and foreground controls mould Block just manipulate transformer electrical parameter comprehensive tester carry out to temperature liter test, then the result information of the Wen Sheng measured, Time at this time is sent in computer, then background control module the result information of Wen Sheng, time showing at this time to temperature On the interactive interface for rising test, and the result information of Wen Sheng, time at this time are stored in the form of recording for Wen Sheng In the information database of test.
3. a kind of full-automatic testing platform of transformer according to claim 2, it is characterised in that:The transformer outer wall Transformer parameter on nameplate includes product type, rated capacity, high tension voltage, low voltage, impedance voltage percentage, inside It is connection, group label, high-tension current, low-tension current, winding material, tap sum, tap spacing, the number of phases, the date of manufacture, specified No-load voltage ratio, the class of insulation, factory number, manufacturer and product type.
4. a kind of full-automatic testing platform of transformer according to claim 2, it is characterised in that:The product type packet Include dry-type transformer and oil-immersed transformer.
CN201810485846.7A 2018-05-21 2018-05-21 The full-automatic testing platform and method of transformer Pending CN108362953A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810485846.7A CN108362953A (en) 2018-05-21 2018-05-21 The full-automatic testing platform and method of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810485846.7A CN108362953A (en) 2018-05-21 2018-05-21 The full-automatic testing platform and method of transformer

Publications (1)

Publication Number Publication Date
CN108362953A true CN108362953A (en) 2018-08-03

Family

ID=63012121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810485846.7A Pending CN108362953A (en) 2018-05-21 2018-05-21 The full-automatic testing platform and method of transformer

Country Status (1)

Country Link
CN (1) CN108362953A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109507500A (en) * 2018-11-08 2019-03-22 国家电网有限公司 A kind of dedicated computing device for electrical test
CN114217178A (en) * 2021-11-04 2022-03-22 深圳市海浦蒙特科技有限公司 Method and system for voltage withstand test of frequency converter and computer readable storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109507500A (en) * 2018-11-08 2019-03-22 国家电网有限公司 A kind of dedicated computing device for electrical test
CN114217178A (en) * 2021-11-04 2022-03-22 深圳市海浦蒙特科技有限公司 Method and system for voltage withstand test of frequency converter and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN103376378B (en) The calibrating installation of discharge and recharge power supply, charge/discharge testing device, discharge and recharge pilot system and the calibration steps of discharge and recharge power supply
CN101950011A (en) Electricity transformer verification connection analog system and connection judging method thereof
CN108362953A (en) The full-automatic testing platform and method of transformer
CN108267674A (en) System is tested in a kind of comprehensive automation
CN106771632A (en) Multi-channel DC resistance meter
CN108279396A (en) Anti- DC component current transformer error tester and its test method
CN106443567A (en) Real-load test system for electric energy meters
CN107576906A (en) A kind of portable relay checking platform and its application method
CN106546940A (en) A kind of field testing procedure of optical voltage transformer
CN109358235A (en) Transformer directly hinders measuring device and system
CN111721988B (en) Measuring device electricity quantity compensation measuring and calculating instrument and method
CN201584076U (en) Simulator for mutual inductor
CN107219492B (en) Medium voltage network electrical energy measurement high pressure integration semi-physical simulation device
CN208383998U (en) The full-automatic testing platform of transformer
KR102191783B1 (en) Portable Current Transformer Ratio Tester
CN101556929A (en) Method for measuring thickness of grid oxide layer
CN106291329A (en) A kind of have the automatic test system detecting and joining the distant function of a terminal three
CN203133266U (en) Digital testing and evaluation platform used for optical-fiber-type current transformer
CN207881773U (en) Full power primary Ioops coolant flow measurement complexes
CN106771633A (en) Hand-held instrument for measuring DC resistance
CN112379252B (en) Primary and secondary fusion pole switch test system
CN106546936B (en) Virtual detection system and detection method for detecting energy efficiency monitoring equipment
CN211123024U (en) PCB branch current detection device and PCB detection system
CN209280806U (en) Transformer directly hinders measuring device and system
CN211123230U (en) Portable automatic debugging system for calibrator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination