Prior art keywords
workbench
piping lane
pedestal
support column
outboard template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810208415.6A
Other languages
Chinese (zh)
Inventor
张进军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Shang Shang Road & Bridge Construction Co., Ltd.
Machinery Co., Ltd. is marched in Changsha
Original Assignee
Machinery Co Ltd Is Marched In Changsha
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Machinery Co Ltd Is Marched In Changsha filed Critical Machinery Co Ltd Is Marched In Changsha
Priority to CN201810208415.6A priority Critical patent/CN108360563A/en
Publication of CN108360563A publication Critical patent/CN108360563A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Abstract

The invention discloses a kind of piping lane outboard template trolleys, including be fixedly linked successively workbench, holder, running gear;Holder includes several pedestals being fixedly linked successively, and the top of each pedestal is fixedly linked with workbench respectively, and the bottom end of each pedestal is fixedly linked with running gear respectively;Each pedestal includes two supporting racks for being symmetrically arranged at workbench two bottom sides in the horizontal, supporting rack includes several longitudinally spaced support columns for being located at workbench bottom, connecting rod is equipped in same supporting rack between the middle part of two adjacent support columns, bracing piece is equipped between the either end of each support column and the middle part of any adjacent connecting rod;The both sides of workbench in the horizontal be respectively equipped with can bindiny mechanism for hanging template, support column is equipped with the template that balance mechanism is hung on for balance on workbench, workbench be equipped with it is several can casting concretes through-hole.It being capable of lifting construction efficiency.The present invention is applied to building engineering field.

Description

A kind of piping lane outboard template trolley
Technical field
The present invention relates to building engineering equipment fields, more particularly to a kind of piping lane outboard template trolley.
Background technology
Piping lane, the i.e. corridor of pipeline are a kind of channels for centralized arrangement pipeline.Usually all it is arranged in the underground in city There are piping lane, the various utilities pipelines such as usual combustion gas, heat supply, plumbing to be all arranged in piping lane together, in order to carry out unified rule It draws, Uniting, unify construction and unification management.The piping lane of underground is usually all poured using armored concrete, in piping lane During pouring, generally requires to form cavity by outboard template and inner side template structure, coagulation is then poured in cavity Soil, existing piping lane outboard template trolley length are fixed, and in the longer straight line piping lane construction of length, construction efficiency is by pipe The limitation of corridor outboard template trolley length, and then the construction period is improved, reduce construction efficiency.
Invention content
It to solve the above-mentioned problems, can be effective the purpose of the present invention is to provide a kind of piping lane outboard template trolley Lifting construction efficiency.
The technical solution adopted in the present invention is:A kind of piping lane outboard template trolley,
Including the workbench, holder, running gear being fixedly linked successively from top to bottom;
The holder includes several pedestals being fixedly linked successively, the top of each pedestal respectively with workbench stationary phase Even, the bottom end of each pedestal is fixedly linked with running gear respectively;
Each pedestal includes two supporting racks for being symmetrically arranged at workbench two bottom sides in the horizontal, support frame as described above packet Several longitudinally spaced support columns for being located at workbench bottom are included, one end of each support column is connected to the bottom of workbench Portion, the other end are connected at the top of running gear, are equipped with connecting rod in same supporting rack between the middle part of two adjacent support columns, Bracing piece is equipped between the either end of each support column and the middle part of any adjacent connecting rod;
The both sides of the workbench in the horizontal be respectively equipped with can bindiny mechanism for hanging template, the support Column is equipped with the template that balance mechanism is hung on for balance on workbench, and the workbench can be poured equipped with several Build the through-hole of concrete.
As a further improvement of the above technical scheme, the running gear includes two substrates corresponding with supporting rack, The support column is fixedly connected on the top of counterpart substrate, and one end of the base plate bottom is equipped with driving wheel, the base plate bottom The other end be equipped with driven wheel, the substrate is equipped with driving motor, and the driving motor is connected with capstan drive.
As a further improvement of the above technical scheme, the base plate bottom is longitudinally spaced is equipped with several support devices.
As a further improvement of the above technical scheme, the support device include pedestal, thread spindle, lifting arm, footstock, Rotating bar;
The footstock is fixedly connected on base plate bottom;
One end of the thread spindle is rotatably connected on pedestal, and the threaded one end of the lifting arm is connected to the another of thread spindle The other end of one end, the lifting arm is fixedly connected on footstock bottom;
The thread spindle is equipped with and is inserted into the rotation hole of rotating bar to drive thread spindle to rotate.
As a further improvement of the above technical scheme, the support device further includes fixed link, and the pedestal is equipped with Rotation slot, the thread spindle are rotatably connected in rotation slot, and the side wall of the rotation slot is equipped with the first mounting hole, the screw thread Axis is equipped with the second mounting hole corresponding with the first mounting hole, and the fixed link is inserted into the second fixation after passing through the first mounting hole Hole.
As a further improvement of the above technical scheme, the both ends of the base plate bottom are respectively equipped with link, the master Driving wheel, driven wheel are rotatably connected on respectively on corresponding link, and stabilizer, the driving electricity are respectively equipped on each link Machine fixation is located on the link of corresponding driving wheel.
As a further improvement of the above technical scheme, the bindiny mechanism includes sliding laterally to be connected on workbench Driver plate, the driver plate bottom is longitudinally spaced to set template equipped with several lifting lugs for hanging, and is set at the top of the driver plate The driving mechanism of driver plate can be driven by having.
As a further improvement of the above technical scheme, several drivings corresponding with lifting lug are additionally provided at the top of the driver plate Block, the driving mechanism include several drive cylinders corresponding with drive block, the output end of the drive cylinder and corresponding driving Block is fixedly linked.
As a further improvement of the above technical scheme, the balance mechanism includes vertically being spaced to be located at each support column The balancing pole of inside, the balancing pole include threaded rod and screw shell, and one end of the screw shell is connected to corresponding support On column, the threaded one end of the threaded rod is connected to the other end of screw shell, and the other end of the threaded rod is equipped with engaging lug For connecting template.
As a further improvement of the above technical scheme, it is covered with grid pedal on the through-hole.
Beneficial effects of the present invention:The present invention forms the holder in trolley by several pedestals so that staff's energy The enough length constructed according to piping lane chooses the pedestal of different number, to change the length of trolley, effectively improves construction Efficiency shortens the construction period, and the wherein supporting rack in pedestal is made of several support columns, by being set between adjacent support column Connecting rod is set, and bracing piece is set between adjacent support column and connecting rod, to promote the bearing capacity of pedestal, is finally carried The service life of stage vehicle.
Description of the drawings
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is front view of the present invention;
Fig. 2 is side view of the present invention;
Fig. 3 is support device structure diagram.
Specific implementation mode
Piping lane outboard template trolley as shown in Figs. 1-3,
Including the workbench 1, holder, running gear being fixedly linked successively from top to bottom;
Holder includes several pedestals being fixedly linked successively, and the top of each pedestal is fixedly linked with workbench 1 respectively, respectively The bottom end of pedestal is fixedly linked with running gear respectively;
Each pedestal includes two supporting racks for being symmetrically arranged at 1 two bottom sides of workbench in the horizontal, and supporting rack includes Several longitudinally spaced support columns 21 for being located at 1 bottom of workbench, one end of each support column is connected to the bottom of workbench 1 Portion, the other end are connected at the top of running gear, are equipped with connecting rod in same supporting rack between the middle part of two adjacent support columns 22, bracing piece 23 is equipped between the either end of each support column and the middle part of any adjacent connecting rod;
The both sides of workbench 1 in the horizontal be respectively equipped with can bindiny mechanism for hanging template, on support column 21 It is hung on the template on workbench 1 for balance equipped with balance mechanism, workbench 1 can pour coagulation equipped with several The through-hole of soil, in construction, workbench 1 and two supporting racks are looped around around piping lane, and staff is poured mixed by through-hole Solidifying soil.
The present embodiment forms the holder in trolley by several pedestals so that staff can construct according to piping lane Length chooses the pedestal of different number, to changing the length of trolley, effectively improves construction efficiency, shortens construction work Phase, the wherein supporting rack in pedestal are made of several, by the way that connecting rod 22 is arranged between adjacent support column, and adjacent Bracing piece 23 is set between support column and connecting rod 22, and to promote the bearing capacity of pedestal, final promotion trolley uses the longevity Life.
Further improved, running gear includes two substrates 31 corresponding with supporting rack, and support column 21 is fixedly connected on The one end at the top of counterpart substrate, 31 bottom of substrate is equipped with driving wheel 32, and the other end of 31 bottom of substrate is equipped with driven wheel 33, base Plate 31 is equipped with driving motor 35, and driving motor 35 is connected with the transmission of driving wheel 32.It is held by 31 groups of two pieces of corresponding substrates Carry support column 21, effectively avoid substrate 31 it is excessive in load-bearing and the case where cause middle part to be broken, while also simplifying structure, Reduce production cost.
Further improved, 31 bottom of substrate is longitudinally spaced to be equipped with several support devices 34, and support device 34 includes bottom Seat 341, thread spindle 342, lifting arm 343, footstock 344 and rotating bar (not shown);
Footstock 344 is fixedly connected on 31 bottom of substrate;
One end of thread spindle 342 is rotatably connected on pedestal 341, and the threaded one end of lifting arm 343 is connected to thread spindle 342 The other end, the other end of lifting arm 343 is fixedly connected on 344 bottom of footstock;
Thread spindle 342, which is equipped with, is inserted into the rotation hole of rotating bar to drive thread spindle 342 to rotate.
Further improved, support device 34 further includes fixed link 345, and pedestal 341 is equipped with rotation slot 3411, thread spindle 342 are rotatably connected in rotation slot 3411, and the side wall of rotation slot 3411 is equipped with the first mounting hole, thread spindle 342 be equipped with Corresponding second mounting hole of first mounting hole, fixed link 345 are inserted into the second mounting hole after passing through the first mounting hole.
Staff rotates rotating bar, and then thread spindle 342 is driven to rotate, since the top of lifting arm 343 is fixedly connected In support plate bottom so that lifting arm 343 is kept fixed in the circumferential, and with lifting arm 343 opposite turn occurs for thread spindle 342 It is dynamic, so that lifting arm 343 rises or falls.When trolley needs to be fixed on a certain position, by support device 34 by platform Vehicle supports on the ground, plays the role of transmitting load.
Further improved, the both ends of 31 bottom of substrate are respectively equipped with link 36, and driving wheel 32, driven wheel 33 turn respectively It is dynamic to be connected on corresponding link 36, stabilizer 37 is respectively equipped on each link, the fixation of driving motor 35 is located at correspondence On the link 36 of driving wheel 32 so that walking mechanism, which can more be stablized, drives trolley movement, while stabilizer 37 can be Walking mechanism further keeps the stability of walking when walking.
Further improved, bindiny mechanism includes sliding laterally the driver plate 11 being connected on workbench 1, driver plate 11 Bottom is longitudinally spaced to set template equipped with several lifting lugs 12 for hanging, and 11 top of driver plate, which is equipped with, can drive driver plate 11 Driving mechanism, 11 top of driver plate are additionally provided with several drive blocks 13 corresponding with lifting lug 12, and driving mechanism includes several and driving 13 corresponding drive cylinder 14 of block, the output end of drive cylinder 14 are fixedly linked with corresponding drive block 13.Drive block 13 and lifting lug 12 correspond the transmission effect for being more conducive to power, and it is to reduce oil consumption that can push driver plate 11 in drive cylinder 14, is saved Construction cost.
Further improved, balance mechanism includes vertically being spaced the balancing pole being located on the inside of each support column, balancing pole Including threaded rod 211 and screw shell 212, one end of screw shell 212 is connected on corresponding support column, and the one of threaded rod 211 End is threaded in the other end of screw shell 212, and the other end of threaded rod 211 is equipped with engaging lug for connecting template.It is logical Overbalance bar carrys out support shuttering, keeps stability of the template after being moved to corresponding position, and then ensure that the construction effect of piping lane Rate realizes the Telescopic of balancing pole so that balancing pole energy wherein by threaded rod 211 and 212 Compositional balance bar of screw shell Enough support the template of various positions.
It is further improved, grid pedal 15 is covered on through-hole, operator station can pour on grid pedal 15 Concrete both can guarantee the safety of staff, also can efficiently carry out pouring work.
Certainly, the invention is not limited in the above embodiment, those skilled in the art are without prejudice to the present invention Equivalent variations or replacement can be also made under the premise of spirit, these equivalent modifications or replacement are all contained in the application claim In limited range.

Claims (10)

1. a kind of piping lane outboard template trolley, it is characterised in that:
Including the workbench, holder, running gear being fixedly linked successively from top to bottom;
The holder includes several pedestals being fixedly linked successively, and the top of each pedestal is fixedly linked with workbench respectively, respectively The bottom end of pedestal is fixedly linked with running gear respectively;
Each pedestal includes two supporting racks for being symmetrically arranged at workbench two bottom sides in the horizontal, if support frame as described above includes The longitudinally spaced support column for being located at workbench bottom is done, one end of each support column is connected to the bottom of workbench, separately One end is connected at the top of running gear, is equipped with connecting rod in same supporting rack between the middle part of two adjacent support columns, each Bracing piece is equipped between the either end of support column and the middle part of any adjacent connecting rod;
The both sides of the workbench in the horizontal be respectively equipped with can bindiny mechanism for hanging template, on the support column Be hung on template on workbench equipped with balance mechanism for balance, the workbench be equipped with it is several can pour it is mixed Coagulate the through-hole of soil.
2. piping lane outboard template trolley according to claim 1, it is characterised in that:The running gear includes two and support The corresponding substrate of frame, the support column are fixedly connected on the top of counterpart substrate, and one end of the base plate bottom is equipped with driving wheel, The other end of the base plate bottom is equipped with driven wheel, and the substrate is equipped with driving motor, and the driving motor is passed with driving wheel It is dynamic to be connected.
3. piping lane outboard template trolley according to claim 2, it is characterised in that:The base plate bottom is longitudinally spaced to be equipped with Several support devices.
4. piping lane outboard template trolley according to claim 3, it is characterised in that:The support device includes pedestal, screw thread Axis, lifting arm, footstock, rotating bar;
The footstock is fixedly connected on base plate bottom;
One end of the thread spindle is rotatably connected on pedestal, and the threaded one end of the lifting arm is connected to the another of thread spindle End, the other end of the lifting arm are fixedly connected on footstock bottom;
The thread spindle is equipped with and is inserted into the rotation hole of rotating bar to drive thread spindle to rotate.
5. piping lane outboard template trolley according to claim 4, it is characterised in that:The support device further includes fixed link, The pedestal is equipped with rotation slot, and the thread spindle is rotatably connected in rotation slot, and the side wall of the rotation slot is equipped with first Mounting hole, the thread spindle are equipped with the second mounting hole corresponding with the first mounting hole, and the fixed link passes through the first mounting hole After be inserted into the second mounting hole.
6. according to any one of claim 2 to the 5 piping lane outboard template trolley, it is characterised in that:The two of the base plate bottom End is respectively equipped with link, and the driving wheel, driven wheel are rotatably connected on respectively on corresponding link, divides on each link Not She You stabilizer, driving motor fixation is located on the link of corresponding driving wheel.
7. according to any one of claim 1 to the 5 piping lane outboard template trolley, it is characterised in that:The bindiny mechanism includes The driver plate being connected on workbench is slid laterally, the driver plate bottom is longitudinally spaced to be equipped with several lifting lugs for hanging If template, the driving mechanism that can drive driver plate is equipped at the top of the driver plate.
8. piping lane outboard template trolley according to claim 7, it is characterised in that:Be additionally provided at the top of the driver plate it is several with The corresponding drive block of lifting lug, the driving mechanism include several drive cylinders corresponding with drive block, the drive cylinder it is defeated Outlet is fixedly linked with corresponding drive block.
9. according to any one of claim 1 to the 5 piping lane outboard template trolley, it is characterised in that:The balance mechanism includes Vertically interval is located at the balancing pole on the inside of each support column, and the balancing pole includes threaded rod and screw shell, the screw thread One end of sleeve is connected on corresponding support column, and the threaded one end of the threaded rod is connected to the other end of screw shell, described The other end of threaded rod is equipped with engaging lug for connecting template.
10. according to any one of claim 1 to the 5 piping lane outboard template trolley, it is characterised in that:It is covered on the through-hole Grid pedal.
CN201810208415.6A 2018-03-14 2018-03-14 A kind of piping lane outboard template trolley Pending CN108360563A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810208415.6A CN108360563A (en) 2018-03-14 2018-03-14 A kind of piping lane outboard template trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810208415.6A CN108360563A (en) 2018-03-14 2018-03-14 A kind of piping lane outboard template trolley

Publications (1)

Publication Number Publication Date
CN108360563A true CN108360563A (en) 2018-08-03

Family

ID=63000287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810208415.6A Pending CN108360563A (en) 2018-03-14 2018-03-14 A kind of piping lane outboard template trolley

Country Status (1)

Country Link
CN (1) CN108360563A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204402504U (en) * 2014-12-17 2015-06-17 张进军 A kind of tunnel steel form lining trolley
US20150211205A1 (en) * 2014-01-29 2015-07-30 Guangzhou Jishi Construction Group Co., Ltd. Construction system for subway station
CN204609906U (en) * 2015-04-28 2015-09-02 金中天集团建设有限公司 A kind of modularization steel form carrier
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN107142957A (en) * 2017-06-10 2017-09-08 李国耀 A kind of city integrated piping lane walking circulation construction system and its method
CN206571502U (en) * 2017-03-08 2017-10-20 中国水利水电第十四工程局有限公司 A kind of constructing tunnel telescoping steel form turns mobile device
CN206800451U (en) * 2017-05-02 2017-12-26 成都锐龙机械制造有限公司 A kind of piping lane top board construction chassis and chassis group
CN208183792U (en) * 2018-03-14 2018-12-04 长沙进军机械有限公司 A kind of piping lane outboard template trolley

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150211205A1 (en) * 2014-01-29 2015-07-30 Guangzhou Jishi Construction Group Co., Ltd. Construction system for subway station
CN204402504U (en) * 2014-12-17 2015-06-17 张进军 A kind of tunnel steel form lining trolley
CN204609906U (en) * 2015-04-28 2015-09-02 金中天集团建设有限公司 A kind of modularization steel form carrier
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN206571502U (en) * 2017-03-08 2017-10-20 中国水利水电第十四工程局有限公司 A kind of constructing tunnel telescoping steel form turns mobile device
CN206800451U (en) * 2017-05-02 2017-12-26 成都锐龙机械制造有限公司 A kind of piping lane top board construction chassis and chassis group
CN107142957A (en) * 2017-06-10 2017-09-08 李国耀 A kind of city integrated piping lane walking circulation construction system and its method
CN208183792U (en) * 2018-03-14 2018-12-04 长沙进军机械有限公司 A kind of piping lane outboard template trolley

Similar Documents

Publication Publication Date Title
CN108277825A (en) A kind of binary channels piping lane trolley tooling
CN201722965U (en) Balancing and guiding device for pneumatic jacking operation of large storage tank dome
CN208183792U (en) A kind of piping lane outboard template trolley
CN202029231U (en) Rubber extracting bar threading machine used for box girder reinforcement cage prestress pore forming
CN206484709U (en) A kind of automatic cement placing installation
CN108360563A (en) A kind of piping lane outboard template trolley
CN208441134U (en) A kind of binary channels piping lane trolley tooling
CN203808853U (en) Drilling rig rack
CN202415017U (en) Mold hanging bracket mechanism of injection molding machine
CN109183843B (en) Prefabricated and assembled integral type concrete comprehensive pipe gallery and construction method
CN108301439A (en) A kind of piping lane inner side template trolley with regulatory function
CN207312611U (en) A kind of Municipal Engineering Construction clip pipeline handling device
CN208184745U (en) A kind of piping lane inner side template trolley
CN208183795U (en) A kind of piping lane inner side template trolley with regulatory function
CN208183793U (en) A kind of piping lane outboard template mounting bracket
CN107539771A (en) A kind of Municipal Engineering Construction clip pipeline handling device
CN210797637U (en) Town road utility tunnel
CN208633551U (en) A kind of end pump line magnetic stability frame of concreting distributing system
CN103341620A (en) Temperature adjusting system of condensate water in cooling pond for casting
CN209353722U (en) A kind of building 3D printing pump truck system
CN207553141U (en) Mould trolley in a kind of piping lane with support device
CN208762870U (en) A kind of easy device that overhauling nacelle bridge floor is current across barrier
CN202591932U (en) Device for replacing trolley wheel
CN210500739U (en) Pipe gallery mold
CN202006361U (en) Core extraction machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Jinjun

Inventor after: Liu Yunfu

Inventor after: Zhou Guangyu

Inventor after: Peng Junji

Inventor before: Zhang Jin Jun

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190930

Address after: 410600 Xia duo Pu community, Xia duo Pu town, Ningxiang, Changsha, Hunan (Xia duo Pu Machinery Industrial Park)

Applicant after: Machinery Co., Ltd. is marched in Changsha

Applicant after: Hunan Shang Shang Road & Bridge Construction Co., Ltd.

Address before: 410600 Xia duo Pu community, Xia duo Pu town, Ningxiang, Changsha, Hunan (Xia duo Pu Machinery Industrial Park)

Applicant before: Machinery Co., Ltd. is marched in Changsha

Applicant before: Zhang Jin Jun