CN108358420A - A kind of sludge briquetting drying equipment - Google Patents

A kind of sludge briquetting drying equipment Download PDF

Info

Publication number
CN108358420A
CN108358420A CN201810086368.2A CN201810086368A CN108358420A CN 108358420 A CN108358420 A CN 108358420A CN 201810086368 A CN201810086368 A CN 201810086368A CN 108358420 A CN108358420 A CN 108358420A
Authority
CN
China
Prior art keywords
bearing seat
gear
shaft
motor
sludge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810086368.2A
Other languages
Chinese (zh)
Other versions
CN108358420B (en
Inventor
沈竹青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinming Renewable Recovery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810086368.2A priority Critical patent/CN108358420B/en
Publication of CN108358420A publication Critical patent/CN108358420A/en
Application granted granted Critical
Publication of CN108358420B publication Critical patent/CN108358420B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B11/00Presses specially adapted for forming shaped articles from material in particulate or plastic state, e.g. briquetting presses, tabletting presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The present invention relates to a kind of briquetting drying equipment more particularly to a kind of sludge briquetting drying equipments.The technical problem to be solved in the present invention is to provide one kind can facilitating extraction sludge, the fireballing sludge briquetting drying equipment of desiccation.In order to solve the above-mentioned technical problem, the present invention provides such a sludge briquetting drying equipments, include strut, web plate, holder, first bearing seat, first motor, first rotating shaft, first gear, second bearing seat, the second motor, screw rod, first nut etc.;It is vertically installed with strut on ground, web plate is equipped at the top of strut, holder is vertically installed at left and right sides of ground, the holder of the left and right sides is located at two side of strut or so, and left side brackets right upper portion is equipped with first bearing seat.Make framework that can carry out briquetting to sludge under the action of first motor, by the cooperation of hollow rack and first gear invention achieves extraction sludge, the fireballing effect of desiccation, the present invention can be facilitated.

Description

A kind of sludge briquetting drying equipment
Technical field
The present invention relates to a kind of briquetting drying equipment more particularly to a kind of sludge briquetting drying equipments.
Background technology
The sludge mixed in sewage is good fertilizer, and the sludge extracted, which is dispersed in field, to play the growth in crops To good effect.Sludge is often installed the collection of sludge by people with bucket at present, then the sludge in bucket is sprinkled upon field, This mode is very inconvenient to the extraction of sludge, and since the sludge that this mode is extracted carries very more water Point, the loading weight of people is increased when sludge is moved to field.
To sum up, extraction sludge can be facilitated by needing to research and develop one kind at present, the fireballing sludge briquetting drying equipment of desiccation, be come gram Extraction sludge is inconvenient in the prior art for clothes, the slow-footed disadvantage of sludge drying.
Invention content
(1)Technical problems to be solved
The present invention extracts sludge inconvenience in the prior art in order to overcome, the slow-footed disadvantage of sludge drying, the invention solves The technical issues of be to provide one kind and can facilitate extraction sludge, the fireballing sludge briquetting drying equipment of desiccation.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a sludge briquetting drying equipments, include strut, net Plate, holder, first bearing seat, first motor, first rotating shaft, first gear, second bearing seat, the second motor, screw rod, the first spiral shell Mother, guide sleeve, hollow rack, guide rod, head rod, pushing block, framework and pressing plate are vertically installed with strut, strut top on ground Portion is equipped with web plate, and holder is vertically installed at left and right sides of ground, and the holder of the left and right sides is located at two side of strut or so, left Side stand right upper portion is equipped with first bearing seat, and left side frame left upper portion is equipped with first motor, first bearing seat and first motor Between be connected with first rotating shaft, first rotating shaft left part is connect with first bearing seat interference, first rotating shaft right part and first motor Output shaft is connected by shaft coupling, and first rotating shaft is equipped with first gear, and left side brackets right upper portion is equipped with second bearing seat, the Two bearing bracket is located above first bearing seat, and right side holder left upper portion is equipped with the second motor, and the second motor is located at first motor Top is connected with screw rod, is interference fitted with second bearing seat on the left of screw rod, the right survey of screw rod between the second motor and second bearing seat It is connect by shaft coupling with the output shaft of the second motor, the first nut is rotary on screw rod, guide sleeve is connected on front side of the first nut, leads It covering inner sliding type and is equipped with hollow rack, engaged with first gear on rear side of hollow rack, hollow rack right wall lower part is provided with a word hole, Movable in hollow rack to be equipped with guide rod, guide rod right side central is connected with head rod, and head rod passes through a word hole, the One connecting rod right end is connected with pushing block, and hollow rack bottom end is connected with framework, and through-hole is provided in the middle part of framework upper wall, and guide rod passes through logical Hole, guide rod bottom end are connected with pressing plate, and pressing plate is movable to be located in framework.
Preferably, further include having blowing device, blowing device includes second bevel gear, the second connecting rod, 3rd bearing Seat, the second shaft, thin plate and third hand tap gear, first rotating shaft left part are equipped with second bevel gear, and holder lower right side is connected with the Two connecting rods, the second connecting rod right end are connected with 3rd bearing seat, in 3rd bearing seat interference be connected with the second shaft, second turn The left and right sides and front and rear sides are respectively connected with thin plate in the middle part of axis, are equipped with third hand tap gear at the top of the second shaft, third hand tap gear with Second bevel gear engages.
Preferably, further include having mounting blocks and cylinder, hollow rack lower right side is connected with mounting blocks, and mounting blocks are located at the Below one gear, cylinder is connected among mounting blocks bottom, cylinder is located at right over pushing block.
Preferably, further include having fourth bearing seat, the 4th gear, 5th bearing seat, third shaft, big belt pulley, sector Gear, small belt pulley and flat belt, ground are embedded with fourth bearing seat, and fourth bearing seat is connect with the interference of strut lower part, strut Top is equipped with the 4th gear, and ground is embedded with 5th bearing seat, 5th bearing seat between fourth bearing seat and the second shaft, Interference is connected with third shaft in 5th bearing seat, and big belt pulley is equipped in the middle part of third shaft, sector is equipped at the top of third shaft Gear, sector gear and the 4th gear coordinate, and the second shaft lower part is equipped with small belt pulley, the spaced winding of small belt pulley and big belt pulley There is flat belt.
Preferably, further include having the second nuts and bolt, the second groove is provided on front side of guide sleeve, it is recessed that hollow rack is located at second In slot, left and right two is equipped with the second nut on front side of guide sleeve, and bolt is rotary in the second nut of the left and right sides.
Operation principle:When user needs to carry out briquetting to sludge using this equipment, sludge is poured on right side holder by user On ground between strut, then user starts the second motor and rotates clockwise, and the second motor drives the first spiral shell by screw rod Mother moves right, and the first nut drives hollow rack to move right by guide sleeve, and hollow rack drives framework to move right, simultaneously Hollow rack by guide rod band dynamic pressure plate move right, when hollow rack driven under the action of the second motor framework and pressing plate to It moves right above sludge, user closes the second motor, your hour hands of user's startup first motor rotate, and first motor passes through first Shaft drives first gear to rotate counterclockwise, and first gear drives framework to move down by hollow rack, while hollow rack It is moved down by guide rod band dynamic pressure plate, when pressing plate is contacted with sludge, pressing plate and framework continue to move downward simultaneously, with framework Move down more and more deeper with pressing plate, pressing plate moves up under the action of sludge, and sludge enters in framework, in framework The sludge of entrance is more and more, and pressing plate drives guide rod to be moved up in hollow rack, and guide rod drives head rod in a word It is moved up in hole, head rod drives pushing block to move up, and when suitable sludge enters in framework, user's control first is electric Machine rotates clockwise, and first motor drives first gear to rotate clockwise by first rotating shaft, and first gear passes through hollow rack Framework is driven to move up, after framework moves up reset, user closes first motor, and then user started for the second motor inverse time Needle rotates, and the second motor drives hollow rack to be moved to the left by the first nut, and the first nut drives hollow rack by guide sleeve It is moved to the left, hollow rack drives framework to be moved to the left, to drive sludge bulking to be moved to the left, when framework and pressing plate drive sludge Block is moved to the left to above web plate, and user closes the second motor, and user drives head rod to move down by pushing block, and first Connecting rod drives guide rod to move down, and guide rod band dynamic pressure plate moves down, to drive the sludge bulking in framework to move down, when Sludge bulking in framework, which moves down, to be fallen on web plate, and user unclamps pushing block, and then the second motor of secondary control is clockwise again by user Rotation drives framework to move right to the top of sludge, then controls the second motor and is stopped, and then user repeatedly will again Sludge is pressed into the step of framework, repeatedly, until sludge briquetting is finished.In this way, briquetting is carried out to sludge by framework, it can To carry out quick briquetting to sludge, web plate can help sludge drying.
Because further including having blowing device, blowing device include second bevel gear, the second connecting rod, 3rd bearing seat, Second shaft, thin plate and third hand tap gear, first rotating shaft left part are equipped with second bevel gear, and holder lower right side is connected with the second company Extension bar, the second connecting rod right end are connected with 3rd bearing seat, in 3rd bearing seat interference be connected with the second shaft, in the second shaft At left and right sides of portion and front and rear sides are respectively connected with thin plate, and third hand tap gear, third hand tap gear and second are equipped at the top of the second shaft Bevel gear engages.When first motor, which rotates, drives first rotating shaft rotation, second bevel gear rotation, second bevel gear is driven to pass through Third hand tap gear drives the rotation of the second shaft, and the second shaft drives thin plate rotation, to carry out pectinid to the sludge bulking on web plate, Accelerate the desiccation speed of sludge.
Because further including having mounting blocks and cylinder, hollow rack lower right side is connected with mounting blocks, and mounting blocks are located at first Below gear, cylinder is connected among mounting blocks bottom, cylinder is located at right over pushing block.When user needs that block-like dirt will be pressed into Mud moves down on web plate, user start cylinder elongation drive pushing block move down, pushing block by head rod drive guide rod to Lower movement, guide rod drive sludge bulking to be moved downward on web plate by pressing plate, then the retracted for clearance of user's control cylinder, then User closes cylinder.So the sludge bulking in framework can be extruded automatically, facilitate user job.
Because further including having fourth bearing seat, the 4th gear, 5th bearing seat, third shaft, big belt pulley, sector Wheel, small belt pulley and flat belt, ground are embedded with fourth bearing seat, and fourth bearing seat is connect with the interference of strut lower part, on strut Portion is equipped with the 4th gear, and ground is embedded with 5th bearing seat, and 5th bearing seat is between fourth bearing seat and the second shaft, and the Interference is connected with third shaft in five bearing blocks, and big belt pulley is equipped in the middle part of third shaft, sector is equipped at the top of third shaft Wheel, sector gear and the 4th gear coordinate, and the second shaft lower part is equipped with small belt pulley, is wound between small belt pulley and big belt pulley Flat belt.When user starts first motor rotation, the second shaft drives small belt pulley rotation, small belt pulley to pass through flat belt band Dynamic big belt pulley rotation, big belt pulley drives sector gear to rotate by third shaft, when sector gear is gone in the 4th gear Engagement, the 4th gear drive strut rotation, and strut drives web plate rotation, to which the sludge bulking realized in framework can fall to web plate Other places, take full advantage of web plate space.
Because further including having the second nuts and bolt, it is provided with the second groove on front side of guide sleeve, hollow rack is located at the second groove Interior, left and right two is equipped with the second nut on front side of guide sleeve, and bolt is rotary in the second nut of the left and right sides.When sludge briquetting is complete Finish, user need to the sludge bulking on web plate thin plate do not stall it is dynamic in more rapidly air-dry, user is by bolt from left and right It is screwed out in second nut of both sides, user takes out hollow rack out of second groove, and user again will be at left and right sides of bolt precession The second nut in, for use next time, at this point, user can start first motor rotation so that thin plate constantly rotates, More rapidly the sludge bulking on web plate is air-dried to realize, is completed when the sludge bulking on web plate air-dries, user closes First motor, thin plate stop operating, and when user needs to carry out briquetting to sludge again, user is by bolt from the of the left and right sides It is screwed out in two nuts, hollow rack is inserted into the second groove by user, and user is again by the second nut at left and right sides of bolt precession It is interior.So can desiccation more easily be carried out to sludge bulking.
(3)Advantageous effect
Pass through under the action of first motor invention achieves extraction sludge, the fireballing effect of desiccation, the present invention can be facilitated The cooperation of hollow rack and first gear makes framework that can carry out briquetting to sludge and make by the cooperation of the first nut and screw rod The sludge of block, which must be pressed into, to be collected on web plate automatically, and thin plate is under first motor effect so that the sludge bulking on web plate can Faster more easily to be air-dried.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing be:The ground 1-, 2- struts, 3- web plates, 4- holders, 5- first bearing seats, 6- first motors, 7- First rotating shaft, 8- first gears, 9- second bearing seats, the second motors of 10-, 11- screw rods, the first nuts of 12-, 13- guide sleeves, 14- Hollow rack, the mono- word holes 15-, 16- guide rods, 17- head rods, 18- pushing blocks, 19- frameworks, 20- through-holes, 21- pressing plates, 22- Blowing device, 221- second bevel gears, the second connecting rods of 222-, 223- 3rd bearing seats, the second shafts of 224-, 225- thin plates, 226- third hand tap gears, 23- mounting blocks, 24- cylinders, 25- fourth bearing seats, the 4th gears of 26-, 27- 5th bearing seats, 28- Third shaft, 29- big belt pulleys, 30- sector gears, 31- small belt pulleys, 32- flat belts, the second grooves of 33-, the second spiral shells of 34- Mother, 35- bolts.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up 2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2 Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn 7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9, 11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling, The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack 14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14 Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework 20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Embodiment 2
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up 2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2 Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn 7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9, 11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling, The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack 14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14 Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework 20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Further include having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, third axis Bearing 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221, branch 4 lower right side of frame is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223,3rd bearing Interference is connected with the second shaft 224 in seat 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with thin plate 225,224 top of the second shaft is equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.
Embodiment 3
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up 2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2 Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn 7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9, 11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling, The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack 14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14 Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework 20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Further include having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, third axis Bearing 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221, branch 4 lower right side of frame is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223,3rd bearing Interference is connected with the second shaft 224 in seat 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with thin plate 225,224 top of the second shaft is equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.
Further include having mounting blocks 23 and cylinder 24,14 lower right side of hollow rack is connected with mounting blocks 23, mounting blocks 23 In 8 lower section of first gear, it is connected with cylinder 24 among 23 bottom of mounting blocks, cylinder 24 is located at right over pushing block 18.
Embodiment 4
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up 2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2 Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn 7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9, 11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling, The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack 14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14 Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework 20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Further include having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, third axis Bearing 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221, branch 4 lower right side of frame is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223,3rd bearing Interference is connected with the second shaft 224 in seat 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with thin plate 225,224 top of the second shaft is equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.
Further include having mounting blocks 23 and cylinder 24,14 lower right side of hollow rack is connected with mounting blocks 23, mounting blocks 23 In 8 lower section of first gear, it is connected with cylinder 24 among 23 bottom of mounting blocks, cylinder 24 is located at right over pushing block 18.
Further include having fourth bearing seat 25, the 4th gear 26,5th bearing seat 27, third shaft 28, big belt pulley 29, fan Shape gear 30, small belt pulley 31 and flat belt 32, ground 1 are embedded with fourth bearing seat 25, fourth bearing seat 25 and 2 lower part of strut Interference connects, and 2 top of strut is equipped with the 4th gear 26, and ground 1 is embedded with 5th bearing seat 27, and 5th bearing seat 27 is located at the 4th Between bearing block 25 and the second shaft 224, in 5th bearing seat 27 interference be connected with third shaft 28,28 middle part of third shaft is set There are big belt pulley 29,28 top of third shaft to be equipped with sector gear 30, sector gear 30 and the 4th gear 26 coordinate, the second shaft 224 lower parts are equipped with small belt pulley 31, and flat belt 32 is wound between small belt pulley 31 and big belt pulley 29.
Further include having the second nut 34 and bolt 35, the front side of guide sleeve 13 is provided with the second groove 33, and hollow rack 14 is located at the In two grooves 33,13 front side left and right two of guide sleeve is equipped with the second nut 34, and bolt is rotary in the second nut 34 of the left and right sides 35。
Operation principle:When user needs to carry out briquetting to sludge using this equipment, sludge is poured on right side holder 4 by user On ground 1 between strut 2, then user starts the second motor 10 and rotates clockwise, and the second motor 10 passes through 11 band of screw rod Dynamic first nut 12 moves right, and the first nut 12 drives hollow rack 14 to move right by guide sleeve 13,14 band of hollow rack Dynamic framework 19 moves right, while hollow rack 14 is moved right by guide rod 16 with dynamic pressure plate 21, when hollow rack 14 is the Framework 19 and pressing plate 21 is driven to move right to above sludge under the action of two motors 10, user closes the second motor 10, user You rotate hour hands startup first motor 6, and first motor 6 drives first gear 8 to rotate counterclockwise by first rotating shaft 7, the first tooth Wheel 8 drives framework 19 to move down by hollow rack 14, at the same hollow rack 14 by guide rod 16 with dynamic pressure plate 21 to moving down Dynamic, when pressing plate 21 is contacted with sludge, pressing plate 21 and framework 19 continue to move downward simultaneously, as framework 19 and pressing plate 21 are to moving down More and more deeplyer dynamic, pressing plate 21 moves up under the action of sludge, and sludge enters in framework 19, with what is entered in framework 19 Sludge is more and more, and pressing plate 21 drives guide rod 16 to be moved up in hollow rack 14, and guide rod 16 drives head rod 17 to exist It is moved up in one word hole 15, head rod 17 drives pushing block 18 to move up, and when suitable sludge enters in framework 19, uses Family control first motor 6 rotates clockwise, and first motor 6 drives first gear 8 to rotate clockwise by first rotating shaft 7, and first Gear 8 drives framework 19 to move up by hollow rack 14, and after framework 19 moves up reset, user closes first motor 6, Then user starts the second motor 10 and rotates counterclockwise, and the second motor 10 drives hollow rack 14 to moving to left by the first nut 12 Dynamic, the first nut 12 drives hollow rack 14 to be moved to the left by guide sleeve 13, and hollow rack 14 drives framework 19 to be moved to the left, from And sludge bulking is driven to be moved to the left, when framework 19 and pressing plate 21 drive sludge bulking to be moved to the left to 3 top of web plate, user closes the Two motors 10, user drive head rod 17 to move down by pushing block 18, and head rod 17 drives guide rod 16 to moving down Dynamic, guide rod 16 is moved down with dynamic pressure plate 21, to drive the sludge bulking in framework 19 to move down, the sludge in framework 19 Block, which moves down, to be fallen on web plate 3, and user unclamps pushing block 18, and then the second motor of secondary control 10 rotates clockwise drive to user again Framework 19 moves right to the top of sludge, then controls the second motor 10 and is stopped, and then user is repeated again by sludge The step of being pressed into framework 19, repeatedly, until sludge briquetting is finished.In this way, briquetting is carried out to sludge by framework 19, it can To carry out quick briquetting to sludge, web plate 3 can help sludge drying.
Because further including having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, Three bearing blocks 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221,4 lower right side of holder is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223, the Interference is connected with the second shaft 224 in three bearing blocks 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with Thin plate 225,224 top of the second shaft are equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.When When the rotation of first motor 6 drives first rotating shaft 7 to rotate, second bevel gear 221 is driven to rotate, second bevel gear 221 passes through third Bevel gear 226 drives the rotation of the second shaft 224, the second shaft 224 that thin plate 225 is driven to rotate, to the sludge bulking on web plate 3 Pectinid is carried out, the desiccation speed of sludge is accelerated.
Because further including having mounting blocks 23 and cylinder 24,14 lower right side of hollow rack is connected with mounting blocks 23, mounting blocks 23 are located at 8 lower section of first gear, are connected with cylinder 24 among 23 bottom of mounting blocks, cylinder 24 is located at right over pushing block 18.When with Family needs will be pressed into block-like sludge and move down on web plate 3, and user starts the elongation of cylinder 24 and pushing block 18 is driven to move down, pushing block 18 drive guide rod 16 to move down by head rod 17, and guide rod 16 drives sludge bulking to be moved downward to web plate by pressing plate 21 On 3, the then retracted for clearance of user's control cylinder 24, then user close cylinder 24.It so can be automatically by framework 19 Interior sludge bulking extrudes, and facilitates user job.
Because further including having fourth bearing seat 25, the 4th gear 26,5th bearing seat 27, third shaft 28, big belt pulley 29, sector gear 30, small belt pulley 31 and flat belt 32, ground 1 are embedded with fourth bearing seat 25, fourth bearing seat 25 and strut 2 lower part interference connections, 2 top of strut are equipped with the 4th gear 26, and ground 1 is embedded with 5th bearing seat 27,5th bearing seat 27 Between fourth bearing seat 25 and the second shaft 224, in 5th bearing seat 27 interference be connected with third shaft 28, third shaft 28 Middle part is equipped with big belt pulley 29, and 28 top of third shaft is equipped with sector gear 30, and sector gear 30 and the 4th gear 26 coordinate, the Two shafts, 224 lower part is equipped with small belt pulley 31, and flat belt 32 is wound between small belt pulley 31 and big belt pulley 29.When user starts When first motor 6 rotates, the second shaft 224 drives small belt pulley 31 to rotate, and small belt pulley 31 drives great Pi by flat belt 32 Belt wheel 29 rotates, and big belt pulley 29 drives sector gear 30 to rotate by third shaft 28, when sector gear 30 is gone in the 4th Gear 26 engages, and the 4th gear 26 drives strut 2 to rotate, and strut 2 drives web plate 3 to rotate, to realize the sludge in framework 19 Block can fall to the other places of web plate 3, take full advantage of 3 space of web plate.
Because further including having the second nut 34 and bolt 35,13 front side of guide sleeve is provided with the second groove 33, hollow rack 14 In in the second groove 33,13 front side left and right two of guide sleeve is equipped with the second nut 34, is rotary in the second nut 34 of the left and right sides Bolt 35.When sludge briquetting finishes, user need to the sludge bulking on web plate 3 thin plate 225 do not stall it is dynamic in more quickly Ground air-dries, and user screws out bolt 35 out of the left and right sides the second nut 34, and user is by hollow rack 14 from the second groove 33 It inside takes out, user is again by the second nut 34 at left and right sides of 35 precession of bolt, for use next time, at this point, user can open Dynamic first motor 6 rotates so that thin plate 225 constantly rotates, to realize more rapidly to the sludge bulking on web plate 3 into Sector-style is dry, is completed when the sludge bulking on web plate 3 air-dries, and user closes first motor 6, and thin plate 225 stops operating, when user needs When carrying out briquetting to sludge again, user screws out bolt 35 out of the left and right sides the second nut 34, and user is by hollow rack 14 are inserted into the second groove 33, and user again will be in the second nut 34 at left and right sides of 35 precession of bolt.It so can be more square Just to sludge bulking carry out desiccation.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. a kind of sludge briquetting drying equipment, which is characterized in that include strut(2), web plate(3), holder(4), first bearing Seat(5), first motor(6), first rotating shaft(7), first gear(8), second bearing seat(9), the second motor(10), screw rod (11), the first nut(12), guide sleeve(13), hollow rack(14), guide rod(16), head rod(17), pushing block(18), framework (19)And pressing plate(21), ground(1)On be vertically installed with strut(2), strut(2)Top is equipped with web plate(3), ground(1)Left and right Both sides are vertically installed with holder(4), the holder of the left and right sides(4)It is located at strut(2)Two sides of left and right, left side brackets(4) Right upper portion is equipped with first bearing seat(5), left side frame left upper portion is equipped with first motor(6), first bearing seat(5)With the first electricity Machine(6)Between be connected with first rotating shaft(7), first rotating shaft(7)Left part and first bearing seat(5)Interference connects, first rotating shaft(7) Right part and first motor(6)Output shaft connected by shaft coupling, first rotating shaft(7)It is equipped with first gear(8), left side brackets (4)Right upper portion is equipped with second bearing seat(9), second bearing seat(9)Positioned at first bearing seat(5)Top, right side holder(4)It is left Upper lateral part is equipped with the second motor(10), the second motor(10)Positioned at first motor(6)Top, the second motor(10)With second bearing Seat(9)Between be connected with screw rod(11), screw rod(11)Left side and second bearing seat(9)Interference fit, screw rod(11)Right survey and the Two motors(10)Output shaft connected by shaft coupling, screw rod(11)On be rotary with the first nut(12), the first nut(12)Front side It is connected with guide sleeve(13), guide sleeve(13)Inner sliding type is equipped with hollow rack(14), hollow rack(14)Rear side and first gear(8) Engagement, hollow rack(14)Right wall lower part is provided with a word hole(15), hollow rack(14)It is interior movable equipped with guide rod(16), guide rod (16)Right side central is connected with head rod(17), head rod(17)Across a word hole(15), head rod(17) Right end is connected with pushing block(18), hollow rack(14)Bottom end is connected with framework(19), framework(19)It is provided with through-hole in the middle part of upper wall (20), guide rod(16)Across through-hole(20), guide rod(16)Bottom end is connected with pressing plate(21), pressing plate(21)It is movable to be located at framework (19)It is interior.
2. a kind of sludge briquetting drying equipment according to claim 1, which is characterized in that further include having blowing device (22), blowing device(22)It include second bevel gear(221), the second connecting rod(222), 3rd bearing seat(223), second turn Axis(224), thin plate(225)And third hand tap gear(226), first rotating shaft(7)Left part is equipped with second bevel gear(221), holder(4) Lower right side is connected with the second connecting rod(222), the second connecting rod(222)Right end is connected with 3rd bearing seat(223), third axis Bearing(223)Interior interference is connected with the second shaft(224), the second shaft(224)It is all connected with front and rear sides at left and right sides of middle part There is thin plate(225), the second shaft(224)Top is equipped with third hand tap gear(226), third hand tap gear(226)With second bevel gear (221)Engagement.
3. a kind of sludge briquetting drying equipment according to claim 2, which is characterized in that further include having mounting blocks(23)With Cylinder(24), hollow rack(14)Lower right side is connected with mounting blocks(23), mounting blocks(23)Positioned at first gear(8)Lower section, Mounting blocks(23)Cylinder is connected among bottom(24), cylinder(24)Positioned at pushing block(18)Surface.
4. a kind of sludge briquetting drying equipment according to claim 3, which is characterized in that further include having fourth bearing seat (25), the 4th gear(26), 5th bearing seat(27), third shaft(28), big belt pulley(29), sector gear(30), cuticle Belt wheel(31)And flat belt(32), ground(1)It is embedded with fourth bearing seat(25), fourth bearing seat(25)With strut(2)Lower part Interference connects, strut(2)Top is equipped with the 4th gear(26), ground(1)It is embedded with 5th bearing seat(27), 5th bearing seat (27)Positioned at fourth bearing seat(25)With the second shaft(224)Between, 5th bearing seat(27)Interior interference is connected with third shaft (28), third shaft(28)Middle part is equipped with big belt pulley(29), third shaft(28)Top is equipped with sector gear(30), sector Wheel(30)With the 4th gear(26)Cooperation, the second shaft(224)Lower part is equipped with small belt pulley(31), small belt pulley(31)With great Pi Belt wheel(29)Between be wound with flat belt(32).
5. a kind of sludge briquetting drying equipment according to claim 4, which is characterized in that further include having the second nut(34) And bolt(35), guide sleeve(13)Front side is provided with the second groove(33), hollow rack(14)Positioned at the second groove(33)It is interior, guide sleeve (13)Front side or so two is equipped with the second nut(34), the second nut of the left and right sides(34)Inside it is rotary with bolt(35).
CN201810086368.2A 2018-01-30 2018-01-30 Sludge briquetting drying equipment Active CN108358420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810086368.2A CN108358420B (en) 2018-01-30 2018-01-30 Sludge briquetting drying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810086368.2A CN108358420B (en) 2018-01-30 2018-01-30 Sludge briquetting drying equipment

Publications (2)

Publication Number Publication Date
CN108358420A true CN108358420A (en) 2018-08-03
CN108358420B CN108358420B (en) 2021-02-26

Family

ID=63007500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810086368.2A Active CN108358420B (en) 2018-01-30 2018-01-30 Sludge briquetting drying equipment

Country Status (1)

Country Link
CN (1) CN108358420B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109333767A (en) * 2018-09-06 2019-02-15 谭沛卿 A kind of recycling sludge sludge briquetting apparatus

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089210A (en) * 1992-03-21 1994-07-13 武冈县蜂窝煤机制造厂 Horizontal hydraulic briquette forming machine
CN105645720A (en) * 2016-02-29 2016-06-08 普利资环境科技(苏州)有限公司 Extruder for belt type drying of sludge
CN205856291U (en) * 2016-07-20 2017-01-04 田苗 A kind of high-efficiency environment friendly mud drying forming equipment
CN106890503A (en) * 2017-04-21 2017-06-27 林安益 A kind of sludge dewatering treatment equipment
CN206416552U (en) * 2016-12-05 2017-08-18 江西新裕隆汽车零部件有限公司 A kind of new press
DE102016107061A1 (en) * 2016-04-15 2017-10-19 Christian Wenner Device and a method for the treatment of sewage sludge
CN107619166A (en) * 2017-10-17 2018-01-23 安徽新瑞环保设备有限公司 A kind of high-effective sludge dehydration device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089210A (en) * 1992-03-21 1994-07-13 武冈县蜂窝煤机制造厂 Horizontal hydraulic briquette forming machine
CN105645720A (en) * 2016-02-29 2016-06-08 普利资环境科技(苏州)有限公司 Extruder for belt type drying of sludge
DE102016107061A1 (en) * 2016-04-15 2017-10-19 Christian Wenner Device and a method for the treatment of sewage sludge
CN205856291U (en) * 2016-07-20 2017-01-04 田苗 A kind of high-efficiency environment friendly mud drying forming equipment
CN206416552U (en) * 2016-12-05 2017-08-18 江西新裕隆汽车零部件有限公司 A kind of new press
CN106890503A (en) * 2017-04-21 2017-06-27 林安益 A kind of sludge dewatering treatment equipment
CN107619166A (en) * 2017-10-17 2018-01-23 安徽新瑞环保设备有限公司 A kind of high-effective sludge dehydration device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109333767A (en) * 2018-09-06 2019-02-15 谭沛卿 A kind of recycling sludge sludge briquetting apparatus

Also Published As

Publication number Publication date
CN108358420B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN110867286B (en) Conveniently fix device for binding of pencil of electronic controller pencil
CN109431024A (en) A kind of market umbrella water removal device
CN104939775B (en) Burnisher
CN108358420A (en) A kind of sludge briquetting drying equipment
CN207106014U (en) Painting canvas straightening device
CN209030153U (en) Convenient for clean solar panel
CN108826908B (en) Umbrella dewatering device is folded to rotation type based on centrifugal force separation
CN207592332U (en) A kind of rubber tyre cleaning drying device
CN213173036U (en) Intelligent clothes hanger
CN207820573U (en) The one red medlar-picking machine of seed pod leaf separate type
CN208407731U (en) A kind of oblique balance mechanism
CN219943875U (en) Chinese-medicinal material belt cleaning device
CN107524228B (en) A kind of decontamination plant
CN207590446U (en) Manual simplified clothes-horse
CN217324600U (en) Centrifugal high-efficiency dehydrator for textile industry
CN219781521U (en) Tobacco drying system device of air source heat pump
CN205529562U (en) Hand formula hydroextractor
CN205784361U (en) A kind of apparatus for airing herbal medicine
CN220170587U (en) Sampling device for water and soil conservation monitoring
CN208009972U (en) A kind of one man operation's Intelligent sewage sucking machine
CN204435001U (en) A kind of pedal type spin-drying machine
CN213121262U (en) Activated sludge sampling device for production sewage treatment
CN212505371U (en) Humidification equipment for making clothes
CN219934520U (en) Drying equipment for clothing processing
CN217204826U (en) Extensible furred ceiling connection structure

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210114

Address after: 225700 Guangxiao village, Daguang Town, Xinghua City, Taizhou City, Jiangsu Province

Applicant after: JIANGSU JINMING RENEWABLE RECOVERY Co.,Ltd.

Address before: 210038 no.18-g638, Yinchun Road, science and technology R & D base, Maigaoqiao Pioneer Park, Qixia District, Nanjing City, Jiangsu Province

Applicant before: Shen Zhuqing

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant