CN108358420A - A kind of sludge briquetting drying equipment - Google Patents
A kind of sludge briquetting drying equipment Download PDFInfo
- Publication number
- CN108358420A CN108358420A CN201810086368.2A CN201810086368A CN108358420A CN 108358420 A CN108358420 A CN 108358420A CN 201810086368 A CN201810086368 A CN 201810086368A CN 108358420 A CN108358420 A CN 108358420A
- Authority
- CN
- China
- Prior art keywords
- bearing seat
- gear
- shaft
- motor
- sludge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000010802 sludge Substances 0.000 title claims abstract description 98
- 238000001035 drying Methods 0.000 title claims abstract description 24
- 238000007664 blowing Methods 0.000 claims description 15
- 230000008878 coupling Effects 0.000 claims description 12
- 238000010168 coupling process Methods 0.000 claims description 12
- 238000005859 coupling reaction Methods 0.000 claims description 12
- 230000005611 electricity Effects 0.000 claims 1
- 238000000605 extraction Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 239000003337 fertilizer Substances 0.000 description 1
- 230000001095 motoneuron effect Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F11/00—Treatment of sludge; Devices therefor
- C02F11/12—Treatment of sludge; Devices therefor by de-watering, drying or thickening
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B11/00—Presses specially adapted for forming shaped articles from material in particulate or plastic state, e.g. briquetting presses, tabletting presses
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B15/00—Details of, or accessories for, presses; Auxiliary measures in connection with pressing
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Treatment Of Sludge (AREA)
Abstract
The present invention relates to a kind of briquetting drying equipment more particularly to a kind of sludge briquetting drying equipments.The technical problem to be solved in the present invention is to provide one kind can facilitating extraction sludge, the fireballing sludge briquetting drying equipment of desiccation.In order to solve the above-mentioned technical problem, the present invention provides such a sludge briquetting drying equipments, include strut, web plate, holder, first bearing seat, first motor, first rotating shaft, first gear, second bearing seat, the second motor, screw rod, first nut etc.;It is vertically installed with strut on ground, web plate is equipped at the top of strut, holder is vertically installed at left and right sides of ground, the holder of the left and right sides is located at two side of strut or so, and left side brackets right upper portion is equipped with first bearing seat.Make framework that can carry out briquetting to sludge under the action of first motor, by the cooperation of hollow rack and first gear invention achieves extraction sludge, the fireballing effect of desiccation, the present invention can be facilitated.
Description
Technical field
The present invention relates to a kind of briquetting drying equipment more particularly to a kind of sludge briquetting drying equipments.
Background technology
The sludge mixed in sewage is good fertilizer, and the sludge extracted, which is dispersed in field, to play the growth in crops
To good effect.Sludge is often installed the collection of sludge by people with bucket at present, then the sludge in bucket is sprinkled upon field,
This mode is very inconvenient to the extraction of sludge, and since the sludge that this mode is extracted carries very more water
Point, the loading weight of people is increased when sludge is moved to field.
To sum up, extraction sludge can be facilitated by needing to research and develop one kind at present, the fireballing sludge briquetting drying equipment of desiccation, be come gram
Extraction sludge is inconvenient in the prior art for clothes, the slow-footed disadvantage of sludge drying.
Invention content
(1)Technical problems to be solved
The present invention extracts sludge inconvenience in the prior art in order to overcome, the slow-footed disadvantage of sludge drying, the invention solves
The technical issues of be to provide one kind and can facilitate extraction sludge, the fireballing sludge briquetting drying equipment of desiccation.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a sludge briquetting drying equipments, include strut, net
Plate, holder, first bearing seat, first motor, first rotating shaft, first gear, second bearing seat, the second motor, screw rod, the first spiral shell
Mother, guide sleeve, hollow rack, guide rod, head rod, pushing block, framework and pressing plate are vertically installed with strut, strut top on ground
Portion is equipped with web plate, and holder is vertically installed at left and right sides of ground, and the holder of the left and right sides is located at two side of strut or so, left
Side stand right upper portion is equipped with first bearing seat, and left side frame left upper portion is equipped with first motor, first bearing seat and first motor
Between be connected with first rotating shaft, first rotating shaft left part is connect with first bearing seat interference, first rotating shaft right part and first motor
Output shaft is connected by shaft coupling, and first rotating shaft is equipped with first gear, and left side brackets right upper portion is equipped with second bearing seat, the
Two bearing bracket is located above first bearing seat, and right side holder left upper portion is equipped with the second motor, and the second motor is located at first motor
Top is connected with screw rod, is interference fitted with second bearing seat on the left of screw rod, the right survey of screw rod between the second motor and second bearing seat
It is connect by shaft coupling with the output shaft of the second motor, the first nut is rotary on screw rod, guide sleeve is connected on front side of the first nut, leads
It covering inner sliding type and is equipped with hollow rack, engaged with first gear on rear side of hollow rack, hollow rack right wall lower part is provided with a word hole,
Movable in hollow rack to be equipped with guide rod, guide rod right side central is connected with head rod, and head rod passes through a word hole, the
One connecting rod right end is connected with pushing block, and hollow rack bottom end is connected with framework, and through-hole is provided in the middle part of framework upper wall, and guide rod passes through logical
Hole, guide rod bottom end are connected with pressing plate, and pressing plate is movable to be located in framework.
Preferably, further include having blowing device, blowing device includes second bevel gear, the second connecting rod, 3rd bearing
Seat, the second shaft, thin plate and third hand tap gear, first rotating shaft left part are equipped with second bevel gear, and holder lower right side is connected with the
Two connecting rods, the second connecting rod right end are connected with 3rd bearing seat, in 3rd bearing seat interference be connected with the second shaft, second turn
The left and right sides and front and rear sides are respectively connected with thin plate in the middle part of axis, are equipped with third hand tap gear at the top of the second shaft, third hand tap gear with
Second bevel gear engages.
Preferably, further include having mounting blocks and cylinder, hollow rack lower right side is connected with mounting blocks, and mounting blocks are located at the
Below one gear, cylinder is connected among mounting blocks bottom, cylinder is located at right over pushing block.
Preferably, further include having fourth bearing seat, the 4th gear, 5th bearing seat, third shaft, big belt pulley, sector
Gear, small belt pulley and flat belt, ground are embedded with fourth bearing seat, and fourth bearing seat is connect with the interference of strut lower part, strut
Top is equipped with the 4th gear, and ground is embedded with 5th bearing seat, 5th bearing seat between fourth bearing seat and the second shaft,
Interference is connected with third shaft in 5th bearing seat, and big belt pulley is equipped in the middle part of third shaft, sector is equipped at the top of third shaft
Gear, sector gear and the 4th gear coordinate, and the second shaft lower part is equipped with small belt pulley, the spaced winding of small belt pulley and big belt pulley
There is flat belt.
Preferably, further include having the second nuts and bolt, the second groove is provided on front side of guide sleeve, it is recessed that hollow rack is located at second
In slot, left and right two is equipped with the second nut on front side of guide sleeve, and bolt is rotary in the second nut of the left and right sides.
Operation principle:When user needs to carry out briquetting to sludge using this equipment, sludge is poured on right side holder by user
On ground between strut, then user starts the second motor and rotates clockwise, and the second motor drives the first spiral shell by screw rod
Mother moves right, and the first nut drives hollow rack to move right by guide sleeve, and hollow rack drives framework to move right, simultaneously
Hollow rack by guide rod band dynamic pressure plate move right, when hollow rack driven under the action of the second motor framework and pressing plate to
It moves right above sludge, user closes the second motor, your hour hands of user's startup first motor rotate, and first motor passes through first
Shaft drives first gear to rotate counterclockwise, and first gear drives framework to move down by hollow rack, while hollow rack
It is moved down by guide rod band dynamic pressure plate, when pressing plate is contacted with sludge, pressing plate and framework continue to move downward simultaneously, with framework
Move down more and more deeper with pressing plate, pressing plate moves up under the action of sludge, and sludge enters in framework, in framework
The sludge of entrance is more and more, and pressing plate drives guide rod to be moved up in hollow rack, and guide rod drives head rod in a word
It is moved up in hole, head rod drives pushing block to move up, and when suitable sludge enters in framework, user's control first is electric
Machine rotates clockwise, and first motor drives first gear to rotate clockwise by first rotating shaft, and first gear passes through hollow rack
Framework is driven to move up, after framework moves up reset, user closes first motor, and then user started for the second motor inverse time
Needle rotates, and the second motor drives hollow rack to be moved to the left by the first nut, and the first nut drives hollow rack by guide sleeve
It is moved to the left, hollow rack drives framework to be moved to the left, to drive sludge bulking to be moved to the left, when framework and pressing plate drive sludge
Block is moved to the left to above web plate, and user closes the second motor, and user drives head rod to move down by pushing block, and first
Connecting rod drives guide rod to move down, and guide rod band dynamic pressure plate moves down, to drive the sludge bulking in framework to move down, when
Sludge bulking in framework, which moves down, to be fallen on web plate, and user unclamps pushing block, and then the second motor of secondary control is clockwise again by user
Rotation drives framework to move right to the top of sludge, then controls the second motor and is stopped, and then user repeatedly will again
Sludge is pressed into the step of framework, repeatedly, until sludge briquetting is finished.In this way, briquetting is carried out to sludge by framework, it can
To carry out quick briquetting to sludge, web plate can help sludge drying.
Because further including having blowing device, blowing device include second bevel gear, the second connecting rod, 3rd bearing seat,
Second shaft, thin plate and third hand tap gear, first rotating shaft left part are equipped with second bevel gear, and holder lower right side is connected with the second company
Extension bar, the second connecting rod right end are connected with 3rd bearing seat, in 3rd bearing seat interference be connected with the second shaft, in the second shaft
At left and right sides of portion and front and rear sides are respectively connected with thin plate, and third hand tap gear, third hand tap gear and second are equipped at the top of the second shaft
Bevel gear engages.When first motor, which rotates, drives first rotating shaft rotation, second bevel gear rotation, second bevel gear is driven to pass through
Third hand tap gear drives the rotation of the second shaft, and the second shaft drives thin plate rotation, to carry out pectinid to the sludge bulking on web plate,
Accelerate the desiccation speed of sludge.
Because further including having mounting blocks and cylinder, hollow rack lower right side is connected with mounting blocks, and mounting blocks are located at first
Below gear, cylinder is connected among mounting blocks bottom, cylinder is located at right over pushing block.When user needs that block-like dirt will be pressed into
Mud moves down on web plate, user start cylinder elongation drive pushing block move down, pushing block by head rod drive guide rod to
Lower movement, guide rod drive sludge bulking to be moved downward on web plate by pressing plate, then the retracted for clearance of user's control cylinder, then
User closes cylinder.So the sludge bulking in framework can be extruded automatically, facilitate user job.
Because further including having fourth bearing seat, the 4th gear, 5th bearing seat, third shaft, big belt pulley, sector
Wheel, small belt pulley and flat belt, ground are embedded with fourth bearing seat, and fourth bearing seat is connect with the interference of strut lower part, on strut
Portion is equipped with the 4th gear, and ground is embedded with 5th bearing seat, and 5th bearing seat is between fourth bearing seat and the second shaft, and the
Interference is connected with third shaft in five bearing blocks, and big belt pulley is equipped in the middle part of third shaft, sector is equipped at the top of third shaft
Wheel, sector gear and the 4th gear coordinate, and the second shaft lower part is equipped with small belt pulley, is wound between small belt pulley and big belt pulley
Flat belt.When user starts first motor rotation, the second shaft drives small belt pulley rotation, small belt pulley to pass through flat belt band
Dynamic big belt pulley rotation, big belt pulley drives sector gear to rotate by third shaft, when sector gear is gone in the 4th gear
Engagement, the 4th gear drive strut rotation, and strut drives web plate rotation, to which the sludge bulking realized in framework can fall to web plate
Other places, take full advantage of web plate space.
Because further including having the second nuts and bolt, it is provided with the second groove on front side of guide sleeve, hollow rack is located at the second groove
Interior, left and right two is equipped with the second nut on front side of guide sleeve, and bolt is rotary in the second nut of the left and right sides.When sludge briquetting is complete
Finish, user need to the sludge bulking on web plate thin plate do not stall it is dynamic in more rapidly air-dry, user is by bolt from left and right
It is screwed out in second nut of both sides, user takes out hollow rack out of second groove, and user again will be at left and right sides of bolt precession
The second nut in, for use next time, at this point, user can start first motor rotation so that thin plate constantly rotates,
More rapidly the sludge bulking on web plate is air-dried to realize, is completed when the sludge bulking on web plate air-dries, user closes
First motor, thin plate stop operating, and when user needs to carry out briquetting to sludge again, user is by bolt from the of the left and right sides
It is screwed out in two nuts, hollow rack is inserted into the second groove by user, and user is again by the second nut at left and right sides of bolt precession
It is interior.So can desiccation more easily be carried out to sludge bulking.
(3)Advantageous effect
Pass through under the action of first motor invention achieves extraction sludge, the fireballing effect of desiccation, the present invention can be facilitated
The cooperation of hollow rack and first gear makes framework that can carry out briquetting to sludge and make by the cooperation of the first nut and screw rod
The sludge of block, which must be pressed into, to be collected on web plate automatically, and thin plate is under first motor effect so that the sludge bulking on web plate can
Faster more easily to be air-dried.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing be:The ground 1-, 2- struts, 3- web plates, 4- holders, 5- first bearing seats, 6- first motors, 7-
First rotating shaft, 8- first gears, 9- second bearing seats, the second motors of 10-, 11- screw rods, the first nuts of 12-, 13- guide sleeves, 14-
Hollow rack, the mono- word holes 15-, 16- guide rods, 17- head rods, 18- pushing blocks, 19- frameworks, 20- through-holes, 21- pressing plates, 22-
Blowing device, 221- second bevel gears, the second connecting rods of 222-, 223- 3rd bearing seats, the second shafts of 224-, 225- thin plates,
226- third hand tap gears, 23- mounting blocks, 24- cylinders, 25- fourth bearing seats, the 4th gears of 26-, 27- 5th bearing seats, 28-
Third shaft, 29- big belt pulleys, 30- sector gears, 31- small belt pulleys, 32- flat belts, the second grooves of 33-, the second spiral shells of 34-
Mother, 35- bolts.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first
Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky
Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up
2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2
Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle
First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn
7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right
Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the
Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9,
11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling,
The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack
14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14
Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the
One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework
20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Embodiment 2
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first
Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky
Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up
2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2
Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle
First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn
7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right
Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the
Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9,
11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling,
The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack
14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14
Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the
One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework
20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Further include having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, third axis
Bearing 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221, branch
4 lower right side of frame is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223,3rd bearing
Interference is connected with the second shaft 224 in seat 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with thin plate
225,224 top of the second shaft is equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.
Embodiment 3
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first
Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky
Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up
2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2
Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle
First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn
7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right
Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the
Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9,
11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling,
The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack
14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14
Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the
One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework
20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Further include having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, third axis
Bearing 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221, branch
4 lower right side of frame is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223,3rd bearing
Interference is connected with the second shaft 224 in seat 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with thin plate
225,224 top of the second shaft is equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.
Further include having mounting blocks 23 and cylinder 24,14 lower right side of hollow rack is connected with mounting blocks 23, mounting blocks 23
In 8 lower section of first gear, it is connected with cylinder 24 among 23 bottom of mounting blocks, cylinder 24 is located at right over pushing block 18.
Embodiment 4
A kind of sludge briquetting drying equipment includes as shown in Figs. 1-5 strut 2, web plate 3, holder 4, first bearing seat 5, first
Motor 6, first rotating shaft 7, first gear 8, second bearing seat 9, the second motor 10, screw rod 11, the first nut 12, guide sleeve 13, sky
Heart rack 14, guide rod 16, head rod 17, pushing block 18, framework 19 and pressing plate 21 are vertically installed with strut 2 on ground 1, prop up
2 top of bar is equipped with web plate 3, and 1 left and right sides of ground is vertically installed with holder 4, and the holder 4 of the left and right sides is located at strut 2
Two sides of left and right, 4 right upper portion of left side brackets are equipped with first bearing seat 5, and left side frame left upper portion is equipped with first motor 6, first axle
First rotating shaft 7 is connected between bearing 5 and first motor 6,7 left part of first rotating shaft is connect with 5 interference of first bearing seat, first turn
7 right part of axis is connect with the output shaft of first motor 6 by shaft coupling, and first rotating shaft 7 is equipped with first gear 8, and left side brackets 4 are right
Upper lateral part is equipped with second bearing seat 9, and second bearing seat 9 is located at the top of first bearing seat 5, and holder 4 left upper portion in right side is equipped with the
Two motors 10, the second motor 10 are located at 6 top of first motor, screw rod 11 are connected between the second motor 10 and second bearing seat 9,
11 left side of screw rod is interference fitted with second bearing seat 9, and the right survey of screw rod 11 is connect with the output shaft of the second motor 10 by shaft coupling,
The first nut 12 is rotary on screw rod 11,12 front side of the first nut is connected with guide sleeve 13, and 13 inner sliding type of guide sleeve is equipped with hollow rack
14, the rear side of hollow rack 14 is engaged with first gear 8, and 14 right wall lower part of hollow rack is provided with a word hole 15, in hollow rack 14
Movable to be equipped with guide rod 16,16 right side central of guide rod is connected with head rod 17, and head rod 17 passes through a word hole 15, the
One connecting rod, 17 right end is connected with pushing block 18, and 14 bottom end of hollow rack is connected with framework 19, through-hole is provided in the middle part of 19 upper wall of framework
20, guide rod 16 passes through through-hole 20,16 bottom end of guide rod to be connected with pressing plate 21, and pressing plate 21 is movable to be located in framework 19.
Further include having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222, third axis
Bearing 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear 221, branch
4 lower right side of frame is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223,3rd bearing
Interference is connected with the second shaft 224 in seat 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with thin plate
225,224 top of the second shaft is equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.
Further include having mounting blocks 23 and cylinder 24,14 lower right side of hollow rack is connected with mounting blocks 23, mounting blocks 23
In 8 lower section of first gear, it is connected with cylinder 24 among 23 bottom of mounting blocks, cylinder 24 is located at right over pushing block 18.
Further include having fourth bearing seat 25, the 4th gear 26,5th bearing seat 27, third shaft 28, big belt pulley 29, fan
Shape gear 30, small belt pulley 31 and flat belt 32, ground 1 are embedded with fourth bearing seat 25, fourth bearing seat 25 and 2 lower part of strut
Interference connects, and 2 top of strut is equipped with the 4th gear 26, and ground 1 is embedded with 5th bearing seat 27, and 5th bearing seat 27 is located at the 4th
Between bearing block 25 and the second shaft 224, in 5th bearing seat 27 interference be connected with third shaft 28,28 middle part of third shaft is set
There are big belt pulley 29,28 top of third shaft to be equipped with sector gear 30, sector gear 30 and the 4th gear 26 coordinate, the second shaft
224 lower parts are equipped with small belt pulley 31, and flat belt 32 is wound between small belt pulley 31 and big belt pulley 29.
Further include having the second nut 34 and bolt 35, the front side of guide sleeve 13 is provided with the second groove 33, and hollow rack 14 is located at the
In two grooves 33,13 front side left and right two of guide sleeve is equipped with the second nut 34, and bolt is rotary in the second nut 34 of the left and right sides
35。
Operation principle:When user needs to carry out briquetting to sludge using this equipment, sludge is poured on right side holder 4 by user
On ground 1 between strut 2, then user starts the second motor 10 and rotates clockwise, and the second motor 10 passes through 11 band of screw rod
Dynamic first nut 12 moves right, and the first nut 12 drives hollow rack 14 to move right by guide sleeve 13,14 band of hollow rack
Dynamic framework 19 moves right, while hollow rack 14 is moved right by guide rod 16 with dynamic pressure plate 21, when hollow rack 14 is the
Framework 19 and pressing plate 21 is driven to move right to above sludge under the action of two motors 10, user closes the second motor 10, user
You rotate hour hands startup first motor 6, and first motor 6 drives first gear 8 to rotate counterclockwise by first rotating shaft 7, the first tooth
Wheel 8 drives framework 19 to move down by hollow rack 14, at the same hollow rack 14 by guide rod 16 with dynamic pressure plate 21 to moving down
Dynamic, when pressing plate 21 is contacted with sludge, pressing plate 21 and framework 19 continue to move downward simultaneously, as framework 19 and pressing plate 21 are to moving down
More and more deeplyer dynamic, pressing plate 21 moves up under the action of sludge, and sludge enters in framework 19, with what is entered in framework 19
Sludge is more and more, and pressing plate 21 drives guide rod 16 to be moved up in hollow rack 14, and guide rod 16 drives head rod 17 to exist
It is moved up in one word hole 15, head rod 17 drives pushing block 18 to move up, and when suitable sludge enters in framework 19, uses
Family control first motor 6 rotates clockwise, and first motor 6 drives first gear 8 to rotate clockwise by first rotating shaft 7, and first
Gear 8 drives framework 19 to move up by hollow rack 14, and after framework 19 moves up reset, user closes first motor 6,
Then user starts the second motor 10 and rotates counterclockwise, and the second motor 10 drives hollow rack 14 to moving to left by the first nut 12
Dynamic, the first nut 12 drives hollow rack 14 to be moved to the left by guide sleeve 13, and hollow rack 14 drives framework 19 to be moved to the left, from
And sludge bulking is driven to be moved to the left, when framework 19 and pressing plate 21 drive sludge bulking to be moved to the left to 3 top of web plate, user closes the
Two motors 10, user drive head rod 17 to move down by pushing block 18, and head rod 17 drives guide rod 16 to moving down
Dynamic, guide rod 16 is moved down with dynamic pressure plate 21, to drive the sludge bulking in framework 19 to move down, the sludge in framework 19
Block, which moves down, to be fallen on web plate 3, and user unclamps pushing block 18, and then the second motor of secondary control 10 rotates clockwise drive to user again
Framework 19 moves right to the top of sludge, then controls the second motor 10 and is stopped, and then user is repeated again by sludge
The step of being pressed into framework 19, repeatedly, until sludge briquetting is finished.In this way, briquetting is carried out to sludge by framework 19, it can
To carry out quick briquetting to sludge, web plate 3 can help sludge drying.
Because further including having blowing device 22, blowing device 22 includes second bevel gear 221, the second connecting rod 222,
Three bearing blocks 223, the second shaft 224, thin plate 225 and third hand tap gear 226,7 left part of first rotating shaft are equipped with second bevel gear
221,4 lower right side of holder is connected with the second connecting rod 222, and 222 right end of the second connecting rod is connected with 3rd bearing seat 223, the
Interference is connected with the second shaft 224 in three bearing blocks 223, and the 224 middle part left and right sides of the second shaft and front and rear sides are respectively connected with
Thin plate 225,224 top of the second shaft are equipped with third hand tap gear 226, and third hand tap gear 226 is engaged with second bevel gear 221.When
When the rotation of first motor 6 drives first rotating shaft 7 to rotate, second bevel gear 221 is driven to rotate, second bevel gear 221 passes through third
Bevel gear 226 drives the rotation of the second shaft 224, the second shaft 224 that thin plate 225 is driven to rotate, to the sludge bulking on web plate 3
Pectinid is carried out, the desiccation speed of sludge is accelerated.
Because further including having mounting blocks 23 and cylinder 24,14 lower right side of hollow rack is connected with mounting blocks 23, mounting blocks
23 are located at 8 lower section of first gear, are connected with cylinder 24 among 23 bottom of mounting blocks, cylinder 24 is located at right over pushing block 18.When with
Family needs will be pressed into block-like sludge and move down on web plate 3, and user starts the elongation of cylinder 24 and pushing block 18 is driven to move down, pushing block
18 drive guide rod 16 to move down by head rod 17, and guide rod 16 drives sludge bulking to be moved downward to web plate by pressing plate 21
On 3, the then retracted for clearance of user's control cylinder 24, then user close cylinder 24.It so can be automatically by framework 19
Interior sludge bulking extrudes, and facilitates user job.
Because further including having fourth bearing seat 25, the 4th gear 26,5th bearing seat 27, third shaft 28, big belt pulley
29, sector gear 30, small belt pulley 31 and flat belt 32, ground 1 are embedded with fourth bearing seat 25, fourth bearing seat 25 and strut
2 lower part interference connections, 2 top of strut are equipped with the 4th gear 26, and ground 1 is embedded with 5th bearing seat 27,5th bearing seat 27
Between fourth bearing seat 25 and the second shaft 224, in 5th bearing seat 27 interference be connected with third shaft 28, third shaft 28
Middle part is equipped with big belt pulley 29, and 28 top of third shaft is equipped with sector gear 30, and sector gear 30 and the 4th gear 26 coordinate, the
Two shafts, 224 lower part is equipped with small belt pulley 31, and flat belt 32 is wound between small belt pulley 31 and big belt pulley 29.When user starts
When first motor 6 rotates, the second shaft 224 drives small belt pulley 31 to rotate, and small belt pulley 31 drives great Pi by flat belt 32
Belt wheel 29 rotates, and big belt pulley 29 drives sector gear 30 to rotate by third shaft 28, when sector gear 30 is gone in the 4th
Gear 26 engages, and the 4th gear 26 drives strut 2 to rotate, and strut 2 drives web plate 3 to rotate, to realize the sludge in framework 19
Block can fall to the other places of web plate 3, take full advantage of 3 space of web plate.
Because further including having the second nut 34 and bolt 35,13 front side of guide sleeve is provided with the second groove 33, hollow rack 14
In in the second groove 33,13 front side left and right two of guide sleeve is equipped with the second nut 34, is rotary in the second nut 34 of the left and right sides
Bolt 35.When sludge briquetting finishes, user need to the sludge bulking on web plate 3 thin plate 225 do not stall it is dynamic in more quickly
Ground air-dries, and user screws out bolt 35 out of the left and right sides the second nut 34, and user is by hollow rack 14 from the second groove 33
It inside takes out, user is again by the second nut 34 at left and right sides of 35 precession of bolt, for use next time, at this point, user can open
Dynamic first motor 6 rotates so that thin plate 225 constantly rotates, to realize more rapidly to the sludge bulking on web plate 3 into
Sector-style is dry, is completed when the sludge bulking on web plate 3 air-dries, and user closes first motor 6, and thin plate 225 stops operating, when user needs
When carrying out briquetting to sludge again, user screws out bolt 35 out of the left and right sides the second nut 34, and user is by hollow rack
14 are inserted into the second groove 33, and user again will be in the second nut 34 at left and right sides of 35 precession of bolt.It so can be more square
Just to sludge bulking carry out desiccation.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (5)
1. a kind of sludge briquetting drying equipment, which is characterized in that include strut(2), web plate(3), holder(4), first bearing
Seat(5), first motor(6), first rotating shaft(7), first gear(8), second bearing seat(9), the second motor(10), screw rod
(11), the first nut(12), guide sleeve(13), hollow rack(14), guide rod(16), head rod(17), pushing block(18), framework
(19)And pressing plate(21), ground(1)On be vertically installed with strut(2), strut(2)Top is equipped with web plate(3), ground(1)Left and right
Both sides are vertically installed with holder(4), the holder of the left and right sides(4)It is located at strut(2)Two sides of left and right, left side brackets(4)
Right upper portion is equipped with first bearing seat(5), left side frame left upper portion is equipped with first motor(6), first bearing seat(5)With the first electricity
Machine(6)Between be connected with first rotating shaft(7), first rotating shaft(7)Left part and first bearing seat(5)Interference connects, first rotating shaft(7)
Right part and first motor(6)Output shaft connected by shaft coupling, first rotating shaft(7)It is equipped with first gear(8), left side brackets
(4)Right upper portion is equipped with second bearing seat(9), second bearing seat(9)Positioned at first bearing seat(5)Top, right side holder(4)It is left
Upper lateral part is equipped with the second motor(10), the second motor(10)Positioned at first motor(6)Top, the second motor(10)With second bearing
Seat(9)Between be connected with screw rod(11), screw rod(11)Left side and second bearing seat(9)Interference fit, screw rod(11)Right survey and the
Two motors(10)Output shaft connected by shaft coupling, screw rod(11)On be rotary with the first nut(12), the first nut(12)Front side
It is connected with guide sleeve(13), guide sleeve(13)Inner sliding type is equipped with hollow rack(14), hollow rack(14)Rear side and first gear(8)
Engagement, hollow rack(14)Right wall lower part is provided with a word hole(15), hollow rack(14)It is interior movable equipped with guide rod(16), guide rod
(16)Right side central is connected with head rod(17), head rod(17)Across a word hole(15), head rod(17)
Right end is connected with pushing block(18), hollow rack(14)Bottom end is connected with framework(19), framework(19)It is provided with through-hole in the middle part of upper wall
(20), guide rod(16)Across through-hole(20), guide rod(16)Bottom end is connected with pressing plate(21), pressing plate(21)It is movable to be located at framework
(19)It is interior.
2. a kind of sludge briquetting drying equipment according to claim 1, which is characterized in that further include having blowing device
(22), blowing device(22)It include second bevel gear(221), the second connecting rod(222), 3rd bearing seat(223), second turn
Axis(224), thin plate(225)And third hand tap gear(226), first rotating shaft(7)Left part is equipped with second bevel gear(221), holder(4)
Lower right side is connected with the second connecting rod(222), the second connecting rod(222)Right end is connected with 3rd bearing seat(223), third axis
Bearing(223)Interior interference is connected with the second shaft(224), the second shaft(224)It is all connected with front and rear sides at left and right sides of middle part
There is thin plate(225), the second shaft(224)Top is equipped with third hand tap gear(226), third hand tap gear(226)With second bevel gear
(221)Engagement.
3. a kind of sludge briquetting drying equipment according to claim 2, which is characterized in that further include having mounting blocks(23)With
Cylinder(24), hollow rack(14)Lower right side is connected with mounting blocks(23), mounting blocks(23)Positioned at first gear(8)Lower section,
Mounting blocks(23)Cylinder is connected among bottom(24), cylinder(24)Positioned at pushing block(18)Surface.
4. a kind of sludge briquetting drying equipment according to claim 3, which is characterized in that further include having fourth bearing seat
(25), the 4th gear(26), 5th bearing seat(27), third shaft(28), big belt pulley(29), sector gear(30), cuticle
Belt wheel(31)And flat belt(32), ground(1)It is embedded with fourth bearing seat(25), fourth bearing seat(25)With strut(2)Lower part
Interference connects, strut(2)Top is equipped with the 4th gear(26), ground(1)It is embedded with 5th bearing seat(27), 5th bearing seat
(27)Positioned at fourth bearing seat(25)With the second shaft(224)Between, 5th bearing seat(27)Interior interference is connected with third shaft
(28), third shaft(28)Middle part is equipped with big belt pulley(29), third shaft(28)Top is equipped with sector gear(30), sector
Wheel(30)With the 4th gear(26)Cooperation, the second shaft(224)Lower part is equipped with small belt pulley(31), small belt pulley(31)With great Pi
Belt wheel(29)Between be wound with flat belt(32).
5. a kind of sludge briquetting drying equipment according to claim 4, which is characterized in that further include having the second nut(34)
And bolt(35), guide sleeve(13)Front side is provided with the second groove(33), hollow rack(14)Positioned at the second groove(33)It is interior, guide sleeve
(13)Front side or so two is equipped with the second nut(34), the second nut of the left and right sides(34)Inside it is rotary with bolt(35).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810086368.2A CN108358420B (en) | 2018-01-30 | 2018-01-30 | Sludge briquetting drying equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810086368.2A CN108358420B (en) | 2018-01-30 | 2018-01-30 | Sludge briquetting drying equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108358420A true CN108358420A (en) | 2018-08-03 |
CN108358420B CN108358420B (en) | 2021-02-26 |
Family
ID=63007500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810086368.2A Active CN108358420B (en) | 2018-01-30 | 2018-01-30 | Sludge briquetting drying equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108358420B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109333767A (en) * | 2018-09-06 | 2019-02-15 | 谭沛卿 | A kind of recycling sludge sludge briquetting apparatus |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1089210A (en) * | 1992-03-21 | 1994-07-13 | 武冈县蜂窝煤机制造厂 | Horizontal hydraulic briquette forming machine |
CN105645720A (en) * | 2016-02-29 | 2016-06-08 | 普利资环境科技(苏州)有限公司 | Extruder for belt type drying of sludge |
CN205856291U (en) * | 2016-07-20 | 2017-01-04 | 田苗 | A kind of high-efficiency environment friendly mud drying forming equipment |
CN106890503A (en) * | 2017-04-21 | 2017-06-27 | 林安益 | A kind of sludge dewatering treatment equipment |
CN206416552U (en) * | 2016-12-05 | 2017-08-18 | 江西新裕隆汽车零部件有限公司 | A kind of new press |
DE102016107061A1 (en) * | 2016-04-15 | 2017-10-19 | Christian Wenner | Device and a method for the treatment of sewage sludge |
CN107619166A (en) * | 2017-10-17 | 2018-01-23 | 安徽新瑞环保设备有限公司 | A kind of high-effective sludge dehydration device |
-
2018
- 2018-01-30 CN CN201810086368.2A patent/CN108358420B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1089210A (en) * | 1992-03-21 | 1994-07-13 | 武冈县蜂窝煤机制造厂 | Horizontal hydraulic briquette forming machine |
CN105645720A (en) * | 2016-02-29 | 2016-06-08 | 普利资环境科技(苏州)有限公司 | Extruder for belt type drying of sludge |
DE102016107061A1 (en) * | 2016-04-15 | 2017-10-19 | Christian Wenner | Device and a method for the treatment of sewage sludge |
CN205856291U (en) * | 2016-07-20 | 2017-01-04 | 田苗 | A kind of high-efficiency environment friendly mud drying forming equipment |
CN206416552U (en) * | 2016-12-05 | 2017-08-18 | 江西新裕隆汽车零部件有限公司 | A kind of new press |
CN106890503A (en) * | 2017-04-21 | 2017-06-27 | 林安益 | A kind of sludge dewatering treatment equipment |
CN107619166A (en) * | 2017-10-17 | 2018-01-23 | 安徽新瑞环保设备有限公司 | A kind of high-effective sludge dehydration device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109333767A (en) * | 2018-09-06 | 2019-02-15 | 谭沛卿 | A kind of recycling sludge sludge briquetting apparatus |
Also Published As
Publication number | Publication date |
---|---|
CN108358420B (en) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110867286B (en) | Conveniently fix device for binding of pencil of electronic controller pencil | |
CN109431024A (en) | A kind of market umbrella water removal device | |
CN104939775B (en) | Burnisher | |
CN108358420A (en) | A kind of sludge briquetting drying equipment | |
CN207106014U (en) | Painting canvas straightening device | |
CN209030153U (en) | Convenient for clean solar panel | |
CN108826908B (en) | Umbrella dewatering device is folded to rotation type based on centrifugal force separation | |
CN207592332U (en) | A kind of rubber tyre cleaning drying device | |
CN213173036U (en) | Intelligent clothes hanger | |
CN207820573U (en) | The one red medlar-picking machine of seed pod leaf separate type | |
CN208407731U (en) | A kind of oblique balance mechanism | |
CN219943875U (en) | Chinese-medicinal material belt cleaning device | |
CN107524228B (en) | A kind of decontamination plant | |
CN207590446U (en) | Manual simplified clothes-horse | |
CN217324600U (en) | Centrifugal high-efficiency dehydrator for textile industry | |
CN219781521U (en) | Tobacco drying system device of air source heat pump | |
CN205529562U (en) | Hand formula hydroextractor | |
CN205784361U (en) | A kind of apparatus for airing herbal medicine | |
CN220170587U (en) | Sampling device for water and soil conservation monitoring | |
CN208009972U (en) | A kind of one man operation's Intelligent sewage sucking machine | |
CN204435001U (en) | A kind of pedal type spin-drying machine | |
CN213121262U (en) | Activated sludge sampling device for production sewage treatment | |
CN212505371U (en) | Humidification equipment for making clothes | |
CN219934520U (en) | Drying equipment for clothing processing | |
CN217204826U (en) | Extensible furred ceiling connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210114 Address after: 225700 Guangxiao village, Daguang Town, Xinghua City, Taizhou City, Jiangsu Province Applicant after: JIANGSU JINMING RENEWABLE RECOVERY Co.,Ltd. Address before: 210038 no.18-g638, Yinchun Road, science and technology R & D base, Maigaoqiao Pioneer Park, Qixia District, Nanjing City, Jiangsu Province Applicant before: Shen Zhuqing |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |