CN108356326B - A kind of construction building top plate vertical drilling device - Google Patents

A kind of construction building top plate vertical drilling device Download PDF

Info

Publication number
CN108356326B
CN108356326B CN201810463738.XA CN201810463738A CN108356326B CN 108356326 B CN108356326 B CN 108356326B CN 201810463738 A CN201810463738 A CN 201810463738A CN 108356326 B CN108356326 B CN 108356326B
Authority
CN
China
Prior art keywords
backup pad
seal housing
upper backup
lifting
dirt seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810463738.XA
Other languages
Chinese (zh)
Other versions
CN108356326A (en
Inventor
俞嘉陈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Guofeng Yuanda Residential Industry Co ltd
Original Assignee
Zhejiang College of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang College of Construction filed Critical Zhejiang College of Construction
Priority to CN201810463738.XA priority Critical patent/CN108356326B/en
Publication of CN108356326A publication Critical patent/CN108356326A/en
Application granted granted Critical
Publication of CN108356326B publication Critical patent/CN108356326B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • B25H1/0042Stands
    • B25H1/005Stands attached to a workbench

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)

Abstract

The present invention provides a kind of construction building top plate vertical drilling device, including operation platform, height adjustment mechanism is provided on the operation platform, the twin shaft displacement regulating mechanism for adjusting electric drill position is provided on the height adjustment mechanism, the twin shaft displacement regulating mechanism includes can be in front and back, left and right adjusting position and the main supporting plate that can be locked, upper backup pad is set above the main supporting plate, pass through several connecting column connections between upper backup pad and main supporting plate, lifting spindle is set inside upper backup pad, electric drill is fixed at the top of the lifting spindle;Top opening and liftable dirt seal housing are provided with above the upper backup pad.Electric drill quickly can be positioned and be operated by the present apparatus, dust is unrestrained when guaranteeing that electric drill carries out vertical drilling operation in accurate position, while not will lead to drilling.

Description

A kind of construction building top plate vertical drilling device
Technical field
The invention mainly relates to the auxiliary instrument technical field used that drills when construction, specifically a kind of construction With building top plate vertical drilling device.
Background technique
When construction carries out the operations such as bar planting, need to carry out vertical drilling to building top plate.Traditional drilling side Formula is usually that man-hour manually hand-held electric drill station carries out bore operation on the workbenches such as staircase, when drilling be easy to cause hole location deflection compared with Greatly, inconvenient, and drill after dust spread down it is latter be it is unhealthful after being sucked by operating personnel, second is that being not easily cleaned.Mesh Before, in the prior art, some are directed to the specific device that building top plate drilling uses, and usually install one on a platform A electric drill controls electric drill lifting by height adjusting structure and realizes drilling.But above-mentioned drilling equipment is in actual use still It has the following problems:
1, the adjustment that electric drill position is carried out generally by the entire platform of movement is difficult fine quickly control electric drill alignment Hole location hole to be drilled;2, personnel station operates electric drill in side, although can avoid sucking more dust to a certain degree, drill dust Situation under spilling still is difficult to avoid that.
Summary of the invention
For the deficiency for solving current technology, the present invention combination prior art provides a kind of build and applies from practical application Work building top plate vertical drilling device, quickly can be positioned and be operated to electric drill by the present apparatus, guarantee electric drill Dust is unrestrained when carrying out vertical drilling operation in accurate position, while not will lead to drilling.
To achieve the above object, technical scheme is as follows:
A kind of construction building top plate vertical drilling device, including operation platform are arranged on the operation platform There is height adjustment mechanism, the twin shaft displacement regulating mechanism for adjusting electric drill position, institute are provided on the height adjustment mechanism State twin shaft displacement regulating mechanism include can be in front and rear, left and right adjusting position and the main supporting plate that can be locked, the main supporting plate Upper backup pad is arranged in top, by several connecting column connections between upper backup pad and main supporting plate, sets inside upper backup pad Lifting spindle is set, one section of rack gear is arranged in the lifting spindle lower part, and lifting spindle top passes through upper backup pad and and upper backup pad It is slidably matched, the gear matched with the rack gear of lifting spindle is installed on main supporting plate, gear passes through the drilling hand of side Handle control, is rotated to be gone up and down by rack drives lifting spindle, at the top of the lifting spindle by drilling lever drive gear Fixed electric drill;It is provided with top opening and liftable dirt seal housing above the upper backup pad, the lifting spindle is by dirt seal housing Bottom passes through dirt seal housing and is located at the electric drill of installation inside dirt seal housing, is respectively arranged with an engaging lug in dirt seal housing two sides Portion is correspondingly connected with ear in the upper backup pad upper surface and is provided with guide post, the connection ear be mounted in guide post and Be slidably matched with guide post, be arranged with spring in guide post, the both ends of the spring respectively with engaging lug lower surface and upper branch The contact of fagging upper surface is equipped with locking in each connection ear and links up with, and the locking is linked up with and to connect ear hinged Dirt seal housing is moved to bottom when carrying out the adjustment of electric drill position before drilling by connection, and locking is made to hang over upper backup pad The upper fixation for realizing dirt seal housing, the drill bit of electric drill is extend out to outside dirt seal housing convenient for observation bit location at this time, when adjusting electricity When brill position starts drilling, the locking hook is opened, under spring impetus, dirt seal housing is moved upwards along guide post and held out against To building top plate and crowding around electric drill prevents dust from flowing out.
Dirt seal housing bottom surface positioned at lifting spindle two sides is in the inclined-plane tilted down, is provided with out in dirt seal housing two sides of the bottom Grey mouth, the ash hole are passed down through upper backup pad and extend to upper backup pad lower part, are equipped with removably in ash hole bottommost Stored ash box.
Be plane at the dirt seal housing bottom surface and lifting spindle cooperation, and be provided on dirt seal housing bottom surface prevent dust from The flexible seal ring that dirt seal housing and lifting spindle junction are trickled down.
The connecting column is four, in rectangular layout, and the lifting spindle is arranged at four connecting column centers, lifting master It is contacted with the main supporting plate upper surface when axis falls to lowest part, lifting spindle wherein side is arranged in the drilling handle Between two connecting columns.
The height adjustment mechanism includes the lead screw being mounted on operation platform, and there are two can be opposite for installation on the lead screw The nut seat of movement, assembling fork scissor lift connecting rod on two nut seats, mounting lifting platform at the top of scissor type lifting linking member, in silk The lifting handwheel of thick stick one end setting driving lead screw rotation, the twin shaft displacement regulating mechanism are mounted on the lifting platform.
Twin shaft displacement regulating mechanism includes horizontally slipping component and to slide back and forth component, wherein the component packet that horizontally slips The left and right sliding block for including the left and right sliding rail being fixed on lifting platform and being mounted on the sliding rail of left and right, setting displacement is adjusted on the sliding block of left and right Plate, the component that slides back and forth includes that the front and back sliding rail being mounted on displacement adjustable plate and the front and back being mounted on the sliding rail of front and back are sliding Block, the main supporting plate are fixed on the sliding block of front and back, and controllable magnetic seat, the controllable magnetic seat are provided with below main supporting plate Lower surface is bonded with lifting platform, and when opening controllable magnetic seat switch, controllable magnetic seat, which is adsorbed on lifting platform, consolidates main supporting plate Fixed, when closing controllable magnetic seat, main supporting plate can be move freely in left and right, front-rear direction.
Beneficial effects of the present invention:
1, the present invention carries out the adjustment of short transverse position by the height adjustment mechanism of setting to electric drill, meets different top The drilling demand of plate height, after operation platform is fixed, being displaced regulating mechanism adjustment bit location by twin shaft sets it accurately Immediately below hole location to be drilled, guarantee the quality of drilling;Handle by pressing side makes to control electric drill lifting, side easy to operate Just;By the dirt seal housing of setting, when drilling, crowds around electric drill to confined space, spilling for dust is prevented, convenient for the collection of dust Middle cleaning can avoid operating personnel's sucking dust simultaneously, and when carrying out bore position adjustment, can by adjusting dirt seal housing position, Expose drill bit to dirt seal housing, convenient for the observation of operating personnel.
2, the dust after present invention drilling is concentrated in stored ash box, is cleared up after can removing stored ash box dust, is made With extremely convenient.
3, the present invention uses scissor type lifting structure, easy to operate, reliable and stable, and pair being made up of sliding block and sliding rail The movement of axial displacement regulating mechanism flexibly, the control of Main shoe plate motion state is carried out using controllable magnetic seat, easy to operate, Gu It is fixed firm.
Detailed description of the invention
Attached drawing 1 is general structure schematic diagram of the present invention;
Attached drawing 2 is that twin shaft of the present invention is displaced regulating mechanism and electric drill control structure schematic diagram.
Label shown in attached drawing: 1, operation platform;2, lifting handwheel;3, lead screw;4, nut seat;5, scissor type lifting connects Bar;6, lifting platform;7, main supporting plate;8, drill handle;9, upper backup pad;10, dirt seal housing;11, electric drill;12, ash hole;13, Stored ash box;14, lifting spindle;15, connecting column;16, controllable magnetic seat;17, flexible seal ring;18, guide post;19, engaging lug Portion;20, spring;21, locking hook;22, gear;23, rack gear;24, front and back sliding block;25, front and back sliding rail;26, it is displaced adjustable plate; 27, left and right sliding rail;28, left and right sliding block.
Specific embodiment
With reference to the drawings and specific embodiments, the invention will be further described.It should be understood that these embodiments are merely to illustrate The present invention rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, this field Technical staff can make various changes or modifications the present invention, and such equivalent forms equally fall within range defined herein.
As shown in Fig. 1/2, a kind of construction building top plate vertical drilling device, including operation platform 1, construction are flat It is provided with height adjustment mechanism on platform 1, the twin shaft displacement adjusting machine for adjusting electric drill position is provided on height adjustment mechanism Structure, twin shaft displacement regulating mechanism includes can be on front and rear, left and right adjusting position and the main supporting plate that can be locked 7, main supporting plate 7 Side's setting upper backup pad 9, is connected between upper backup pad 9 and main supporting plate 7 by several connecting columns 15, in upper backup pad 9 Portion be arranged lifting spindle 14,14 lower part of lifting spindle be arranged one section of rack gear 23,14 top of lifting spindle pass through upper backup pad 9 and and Upper backup pad 9 is slidably matched, and the gear 22 matched with the rack gear 23 of lifting spindle 14, gear are equipped on main supporting plate 7 22 are controlled by the drilling handle 8 of side, drive the rotation of gear 22 to drive lifting spindle by rack gear 23 by drilling handle 8 14 liftings, fix electric drill 11 at the top of lifting spindle 14;Top opening and liftable dirt seal housing are provided with above upper backup pad 9 10, lifting spindle 14 passes through dirt seal housing 10 by 10 bottom of dirt seal housing and is located at the electric drill 11 of installation inside dirt seal housing 10, anti- 10 two sides of dirt case are respectively arranged with a connection ear 19, are correspondingly connected with ear 19 in 9 upper surface of upper backup pad and are provided with guiding Column 18, connection ear 19 are mounted in guide post 18 and are slidably matched with guide post 18, and spring 20 is arranged in guide post 18, 20 both ends of spring are contacted with connection 19 lower surface of ear with 9 upper surface of upper backup pad respectively, are installed in each connection ear 19 There is a locking hook 21, locking hook 21 is articulated and connected with ear 19 is connect, and carries out the adjustment of 11 position of electric drill before drilling When, dirt seal housing 10 is moved to bottom, and locking hook 21 is made to hang over the fixation for realizing dirt seal housing 10 on upper backup pad 9, at this time The drill bit of electric drill 11 extend out to outside dirt seal housing 10 convenient for observation bit location, when adjust 11 position of electric drill start drilling when, Locking hook 21 is opened, under 20 impetus of spring, dirt seal housing 10 is moved upwards along guide post 18 to be held out against to building top plate And crowding around electric drill 11 prevents dust from flowing out.
In the present invention, the construction cart or escalator-type structure that can fix position can be used in operation platform 1, in Qi Ding Portion is arranged one for installing the platform of drilling equipment, and setting stands for construction personnel and operates electric drill on operation platform 1 Corresponding position.In the present invention, 1 height and position of operation platform determines, since it is desired that the building ceiling height of drilling is different, because This is mounted with height adjustment mechanism on operation platform 1, for adjusting electric drill 11 in the height direction according to actual use situation Position.Due to 11 position of electric drill adjust when, operation platform 1 be it is fixed, need by twin shaft be displaced regulating mechanism it is accurate The position for adjusting electric drill 11 makes the underface for being located at hole location before bit bore, is by twin shaft displacement regulating mechanism locking later It can.Lifting spindle 14 of the invention is mainly used for installing electric drill 11 while controlling electric drill lifting, and electric drill 11 can pass through any way It is fixed on 14 top of lifting spindle, guarantees drill bit vertically upward.14 lower part of lifting spindle is divided into rectangular configuration, and top is divided into Cylindrical structure, in lower part side, lifting is realized in setting rack gear 23 and the cooperation of gear 22, pulls down drilling handle 8, drill hand Handle 8 is moved by gear 22 with carry-over bar 23, and then is made lifting spindle 14 that electric drill 11 be driven to move upwards and carried out drilling depth Control.Due to that in boring procedure, can trickle down a large amount of dust, therefore the present invention is provided with dirt seal housing 10.Dirt seal housing 10 is one A open-topped thin wall type body structure, dirt seal housing 10 can independent adjusting position, main function be in the height direction to work as When needing to be aligned the position of drill bit before drilling, dirt seal housing 10 is fallen, drill bit is made to be in state shown in Fig. 2, stretches out dirt seal housing 10 Outside, such operating personnel can observe directly the position of drill bit, convenient for the adjustment of bit location, when adjusting drill bit position It sets, and by after twin shaft displacement regulating mechanism locking, the position of drill bit is fixed, and at this time can be risen dirt seal housing 10, in spring 20 Under effect, dirt seal housing 10 holds out against building top plate automatically, and electric drill 11 is enclosed in inside dirt seal housing 10, the dust under boring in this way It falls into dirt seal housing 10, without under trickling down or by with construction personnel.In the present invention, 10 two sides of dirt seal housing use L-type Locking hook 21 carry out the fixations of dirt seal housings 10, locking hook 21 is two settings in 10 two sides of dirt seal housing, construction personnel behaviour When making, stand on operation platform 1, operation one can quickly finish the fixation or release of dirt seal housing 10 on the other hand, and it is easy to adjust, Meet the operating habit of people's routine.
As shown in Fig. 2, in the present invention, 10 bottom surface of dirt seal housing positioned at 14 two sides of lifting spindle is oblique in tilting down Face is provided with ash hole 12 in 10 two sides of the bottom of dirt seal housing, which is passed down through upper backup pad 9 and extends to upper backup pad 9 lower parts are equipped with dismountable stored ash box 13 in 12 bottommost of ash hole, are at 10 bottom surface of dirt seal housing and 14 cooperation of lifting spindle Plane, and being provided on 10 bottom surface of dirt seal housing prevents dust close from the flexibility unrestrained with 14 junction of lifting spindle of dirt seal housing 10 Seal 17.Corresponding rectangular through-hole is processed in 9 two sides of upper backup pad, is passed through for ash hole 12, the dust generated in boring procedure It is fallen in stored ash box 13 by ash hole 12, need to only remove stored ash box 13, periodic cleaning, and pass through the flexible close of setting Seal 17 can prevent dust from flowing out from the gap that lifting spindle 14 and dirt seal housing 10 connect.
As shown in Fig. 2, connecting column 15 of the invention is four, in rectangular layout, the setting of lifting spindle 14 is connected at four It at 15 center of column, is contacted when lifting spindle 14 falls to lowest part with 7 upper surface of main supporting plate, the drilling setting of handle 8 is being gone up and down Main shaft 14 is wherein between two connecting columns 15 of side.Structure strong degree is high, rationally distributed, flat in construction convenient for construction personnel station Drilling handle 8 is operated on platform 1.
As shown in Figure 1, height adjustment mechanism of the invention includes the lead screw 3 being mounted on operation platform 1, pacify on lead screw 3 Dress is there are two the nut seat 4 that can be movable relatively, assembling fork scissor lift connecting rod 5 on two nut seats 4, scissor type lifting linking member 5 The lifting handwheel 2 that driving lead screw 3 rotates is arranged in 3 one end of lead screw in top mounting lifting platform 6, and twin shaft is displaced regulating mechanism installation On lifting platform 6.Scissor type hoistable platform occupies little space, and supporting & stablizing is reliable, can be to electric drill height before construction carries out Position is adjusted, and the drill bit of electric drill is made to be in top plate following few millimetres.
As shown in Fig. 2, twin shaft displacement regulating mechanism of the invention include horizontally slip component and to slide back and forth component, wherein The component that horizontally slips includes the left and right sliding rail 27 being fixed on lifting platform 6 and the left and right sliding block 28 being mounted on left and right sliding rail 27, Setting displacement adjustable plate 26 on left and right sliding block 28, sliding back and forth component includes the front and back sliding rail 25 being mounted on displacement adjustable plate 26 With the front and back sliding block 24 being mounted on front and back sliding rail 25, main supporting plate 7 is fixed on front and back sliding block 24, below main supporting plate 7 It is provided with controllable magnetic seat 16,16 lower surface of controllable magnetic seat is bonded with lifting platform 6, can when opening controllable magnetic seat 16 and switching Control magnet base 16, which is adsorbed on lifting platform 6, keeps main supporting plate 7 fixed, and when closing controllable magnetic seat 16, main supporting plate 7 can be on a left side Right, front-rear direction is move freely.Twin shaft is displaced the two-way by way of sliding rail, sliding block combination of regulating mechanism, adjusts quick Laborsaving, construction personnel need to only close the switch of controllable magnetic seat 16, buttress main supporting plate 7 manually and be adjusted, keep drill bit accurate After being directed at hole site to be drilled, opens magnetic seat switch 16 and fix main supporting plate 7.Entire mechanism flexible operation, operation are steady Fixed and locking is firm, is not in the problem of displacement of main supporting plate 7 influences borehole accuracy in boring procedure.

Claims (6)

1. a kind of construction building top plate vertical drilling device, including operation platform (1), on the operation platform (1) It is provided with height adjustment mechanism, it is characterised in that: the twin shaft for adjusting electric drill position is provided on the height adjustment mechanism It is displaced regulating mechanism, the twin shaft displacement regulating mechanism includes can be in front and rear, left and right adjusting position and the main support that can be locked Plate (7), upper backup pad (9) are arranged in main supporting plate (7) top, by several between upper backup pad (9) and main supporting plate (7) Root connecting column (15) connection, is arranged lifting spindle (14) inside upper backup pad (9), lifting spindle (14) the lower part setting one Section rack gear (23), lifting spindle (14) top passes through upper backup pad (9) and is slidably matched with upper backup pad (9), in main supporting plate (7) gear (22) matched with the rack gear (23) of lifting spindle (14) is installed, gear (22) passes through the drilling hand of side on Handle (8) control, by drilling handle (8) driving gear (22) rotation to pass through rack gear (23) driving lifting spindle (14) lifting, At the top of the lifting spindle (14) fixed electric drill (11);Top opening and liftable are provided with above the upper backup pad (9) Dirt seal housing (10), the lifting spindle (14) by dirt seal housing (10) bottom pass through dirt seal housing (10) and make installation electric drill (11) It is internal positioned at dirt seal housing (10), it is respectively arranged with a connection ear (19) in dirt seal housing (10) two sides, in the upper backup pad (9) upper surface is correspondingly connected with ear (19) and is provided with guide post (18), and the connection ear (19) is mounted on guide post (18) And be slidably matched with guide post (18), be arranged on guide post (18) spring (20), spring (20) both ends respectively and even Lug portion (19) lower surface is contacted with upper backup pad (9) upper surface, and a locking is equipped on each connection ear (19) and is hung Hook (21), the locking hook (21) are articulated and connected with ear (19) are connect, and carry out the adjustment of electric drill (11) position before drilling When, dirt seal housing (10) is moved to bottom, and hang over locking hook (21) and realize consolidating for dirt seal housing (10) on upper backup pad (9) Fixed, the drill bit of electric drill (11) is extend out to outside dirt seal housing (10) convenient for observation bit location at this time, when adjusting electric drill (11) position It sets when starting drilling, opens the locking and link up with (21), under spring (20) impetus, dirt seal housing (10) is along guide post (18) It moves upwards and holds out against to building top plate and crowding around electric drill (11) prevents dust from flowing out.
2. a kind of construction building top plate vertical drilling device as described in claim 1, it is characterised in that: be located at and rise Dirt seal housing (10) bottom surface of drop main shaft (14) two sides is in the inclined-plane tilted down, and dirt seal housing (10) two sides of the bottom are provided with ash discharge Mouth (12), which is passed down through upper backup pad (9) and extends to upper backup pad (9) lower part, at ash hole (12) most bottom Portion is equipped with dismountable stored ash box (13).
3. a kind of construction building top plate vertical drilling device as claimed in claim 2, it is characterised in that: described anti- It is plane at dirt case (10) bottom surface and lifting spindle (14) cooperation, and being provided on dirt seal housing (10) bottom surface prevents dust from anti- The flexible seal ring (17) that dirt case (10) and lifting spindle (14) junction are trickled down.
4. a kind of construction building top plate vertical drilling device as described in claim 1, it is characterised in that: the company Connecing column (15) is four, in rectangular layout, and the lifting spindle (14) is arranged at four connecting column (15) centers, lifting spindle (14) it is contacted when falling to lowest part with the main supporting plate (7) upper surface, the drilling handle (8) is arranged in lifting spindle (14) wherein between two connecting columns (15) of side.
5. a kind of construction building top plate vertical drilling device as described in claim 1, it is characterised in that: the height Degree regulating mechanism includes the lead screw (3) being mounted on operation platform (1), and there are two can be movable relatively for installation on the lead screw (3) Nut seat (4), assembling fork scissor lift connecting rod (5) on two nut seats (4), installation rises at the top of scissor type lifting linking member (5) It drops platform (6), the lifting handwheel (2) of driving lead screw (3) rotation, the twin shaft displacement regulating mechanism peace is set in lead screw (3) one end On the lifting platform (6).
6. a kind of construction building top plate vertical drilling device as claimed in claim 5, it is characterised in that: described double Axial displacement regulating mechanism includes horizontally slipping component and to slide back and forth component, wherein the component that horizontally slips includes being fixed on lifting platform (6) position is arranged on (28) in left and right sliding rail (27) on and the left and right sliding block (28) being mounted on left and right sliding rail (27), left and right sliding block It moves adjustable plate (26), the component that slides back and forth includes the front and back sliding rail (25) being mounted in displacement adjustable plate (26) and is mounted on Front and back sliding block (24) on front and back sliding rail (25), the main supporting plate (7) is fixed on front and back sliding block (24), in main supporting plate (7) lower section is provided with controllable magnetic seat (16), and controllable magnetic seat (16) lower surface is bonded with lifting platform (6), can when opening Controllable magnetic seat (16), which is adsorbed on lifting platform (6), when control magnet base (16) switch keeps main supporting plate (7) fixed, controllable when closing When magnet base (16), main supporting plate (7) can be move freely in left and right, front-rear direction.
CN201810463738.XA 2018-05-15 2018-05-15 A kind of construction building top plate vertical drilling device Active CN108356326B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810463738.XA CN108356326B (en) 2018-05-15 2018-05-15 A kind of construction building top plate vertical drilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810463738.XA CN108356326B (en) 2018-05-15 2018-05-15 A kind of construction building top plate vertical drilling device

Publications (2)

Publication Number Publication Date
CN108356326A CN108356326A (en) 2018-08-03
CN108356326B true CN108356326B (en) 2019-04-30

Family

ID=63012337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810463738.XA Active CN108356326B (en) 2018-05-15 2018-05-15 A kind of construction building top plate vertical drilling device

Country Status (1)

Country Link
CN (1) CN108356326B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108971574A (en) * 2018-08-19 2018-12-11 晨龙飞机(荆门)有限公司 A kind of professional drilling machine of airplane parts processing
CN109352030B (en) * 2018-10-17 2020-09-11 江苏鑫世丰技术产权交易有限公司 Auxiliary punching equipment for suspended ceiling for building
CN110202699B (en) * 2019-06-06 2024-03-22 中建八局第一建设有限公司 Full-automatic floor drilling equipment
CN110369763B (en) * 2019-07-18 2020-07-14 广州城建职业学院 Assembled drilling machine support for building
CN110355406A (en) * 2019-08-14 2019-10-22 东莞美崎智能科技有限公司 One kind is semi-automatic to seek a smallpox drilling device
CN110405253A (en) * 2019-09-03 2019-11-05 中国建筑土木建设有限公司 A kind of vertical bar planting is accurately positioned drilling equipment and its construction method
CN111993607B (en) * 2020-09-10 2022-03-11 安徽雷辰建工集团有限公司 Top beam plate vertical drilling support for building
CN112916910B (en) * 2021-01-28 2022-04-08 中国核动力研究设计院 Device and method for maintaining electric heating element of voltage stabilizer
CN113071008A (en) * 2021-05-05 2021-07-06 江苏省苏中建设集团股份有限公司 Convenient wall body perforating device for construction

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9415750U1 (en) * 1994-09-29 1995-01-26 Wesler Martina Drilling aid device for a drill, in particular a hand drill
JPH10175107A (en) * 1996-12-13 1998-06-30 Sanko Techno Kk Jig for boring drill and boring drill
CN103706832A (en) * 2013-12-09 2014-04-09 淮南矿业(集团)有限责任公司 Novel automatic drilling device
KR101546806B1 (en) * 2015-02-09 2015-08-25 배영달 Auxiliary device for rotary tool
CN205733125U (en) * 2015-07-09 2016-11-30 李仕贤 A kind of roof, hand-operated elevation type indoor drilling equipment
CN105904003A (en) * 2016-06-12 2016-08-31 方彐云 Wall drilling machine
CN205914796U (en) * 2016-08-01 2017-02-01 李芬 Cut fork lift platform's roof puncher
CN207043380U (en) * 2017-07-29 2018-02-27 平湖市阳光建筑工程有限公司 Drilling equipment at the top of concrete structure floor

Also Published As

Publication number Publication date
CN108356326A (en) 2018-08-03

Similar Documents

Publication Publication Date Title
CN108356326B (en) A kind of construction building top plate vertical drilling device
CN204909974U (en) Department of general surgery's operation table of easily operating
CN214602075U (en) Drilling equipment for construction that can store up dirt
CN214989514U (en) Adjustable guide rail bracket
CN209050139U (en) A kind of drilling equipment for small space
CN209883384U (en) Operating table convenient for adjusting position of display
CN208138761U (en) A kind of surveying instrument supporting frame
CN208772538U (en) Mobile beam slab drilling equipment
CN206333626U (en) A kind of seat controlling mechanism
CN211066866U (en) Special drilling equipment of clinical orthopedics
CN206601559U (en) One kind office adjustable rack of projector angles
CN2702100Y (en) Lifting gearing for electric fan
CN220428395U (en) Robot positioning mechanism
CN219666528U (en) Auxiliary bracket of electric hammer
CN220416827U (en) Support device for dustproof display screen remote controller
CN219571475U (en) Multifunctional control table
CN215577338U (en) Model design building assembly for architecture
CN220526080U (en) Multi-axis motion precise vibration isolation physical optical platform
CN220623518U (en) Noise monitoring device convenient to move
CN210677775U (en) Working platform for horizontal lathe
CN109846554A (en) A kind of operating robot long-distance operating device
CN211301970U (en) Body-building apparatus convenient to accomodate
CN219089642U (en) Chassis device, medical control table and surgical robot system
CN218624058U (en) Fixed steel inclined ladder for feeding in powder metallurgy production
CN219206212U (en) Adjustable platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221230

Address after: 230000 Room 203, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Hefei Jiuzhou Longteng scientific and technological achievement transformation Co.,Ltd.

Address before: 311200 intersection of Honghui road and Xuezhi Road, ningwei Town, Xiaoshan District, Hangzhou City, Zhejiang Province

Patentee before: ZHEJIANG College OF CONSTRUCTION

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230307

Address after: 276800 west side of feijiahe village, Rizhao street, Donggang District, Rizhao City, Shandong Province

Patentee after: RIZHAO GUOFENG YUANDA RESIDENTIAL INDUSTRY Co.,Ltd.

Address before: 230000 Room 203, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Hefei Jiuzhou Longteng scientific and technological achievement transformation Co.,Ltd.