CN108347851A - Module and the connection structure of pedestal, connection method, method for splitting and the assemble method with installation card - Google Patents

Module and the connection structure of pedestal, connection method, method for splitting and the assemble method with installation card Download PDF

Info

Publication number
CN108347851A
CN108347851A CN201710058222.2A CN201710058222A CN108347851A CN 108347851 A CN108347851 A CN 108347851A CN 201710058222 A CN201710058222 A CN 201710058222A CN 108347851 A CN108347851 A CN 108347851A
Authority
CN
China
Prior art keywords
installation
card
pedestal
pilot trench
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710058222.2A
Other languages
Chinese (zh)
Other versions
CN108347851B (en
Inventor
麻贵峰
王兆丰
马文婷
田雨聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Zhishen Control Technology Co ltd
Guoneng Zhishen Tianjin Control Technology Co ltd
Original Assignee
BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co Ltd filed Critical BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co Ltd
Priority to CN201710058222.2A priority Critical patent/CN108347851B/en
Publication of CN108347851A publication Critical patent/CN108347851A/en
Application granted granted Critical
Publication of CN108347851B publication Critical patent/CN108347851B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/02Arrangements of circuit components or wiring on supporting structure
    • H05K7/12Resilient or clamping means for holding component to structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Connection Of Plates (AREA)

Abstract

A kind of connection structure, connection method, method for splitting and the assemble method with installation card of module and pedestal.Module and the connection structure of pedestal include:Module is provided with the first auxiliary section in module;Pedestal is provided with installation slotted eye on pedestal, has the second auxiliary section on the inner wall of installation slotted eye;And installation card, with the first clamping portion, rear end with hand-held part, middle part has the second clamping portion for front end;Wherein, the insertion end of installation card self installation slot is inserted into installation slotted eye, second clamping portion of installation card and the first clamping portion of the clamping of the second auxiliary section, installation card are stretched out the other end of installation slotted eye and are clamped with the first auxiliary section, to realize together with installation card assembling module and pedestal.This kind of connection structure is easy for assemble or unload, is connected firmly, is cost-effective, and saves installation space.

Description

Module and the connection structure of pedestal, connection method, method for splitting and the group with installation card Dress method
Technical field
This application involves programmable controller equipment and technology, connection structure, the Yi Zhongmo of espespecially a kind of module and pedestal The connection method of block and pedestal, method for splitting and a kind of installation card of a kind of module and pedestal, module and pedestal and assembling Method.
Background technology
In the industrial control systems such as scattered control system (DCS), controller (is equivalent to " mould in the application with fastener Block ") generally by floor installation in cabinet, module requires under the premise of ensureing to be fastenedly connected, to save as possible with pedestal Installation space saves the set-up time, reduces installation cost.
Conventional method is to use threaded fastener link block and pedestal, and there are following deficiencies for this kind of type of attachment:
1, larger installation space is needed
When screw progress module generally being used to be connect with pedestal, four angles are required for reserving the behaviour of the position of screw and tool Make space, the waste of installation space can be caused.
2, dismounting is inconvenient
Threaded fastener connects and dismounting needs to expend more manpower and time, and the accessory needed is more, is easy tearing open Screw gasket etc. is lost during dress, causes unnecessary trouble.
3, easy deformation of getting rusty, easily loosens
The long-term controller and fastener for being used for engineering project, since field condition is severe, there was dampness in the air, and temperature change is big, It is easy to cause threaded fastener to get rusty embrittlement, and is easy to loosen because fastener occurs for vibrations, influence assembly safety and longevity Life is also easy to that the situation of slide fastener occurs when dismounting often.
Invention content
In order to solve the above-mentioned technical problem, this application provides the connection structure of a kind of module and pedestal, installing and dismounting sides Just it, is connected firmly, is cost-effective, and saving installation space.
In order to reach the application purpose, the present invention provides the connection structures of a kind of module and pedestal, including:Module, institute It states and is provided with the first auxiliary section in module;Pedestal is provided with installation slotted eye on the pedestal, has on the inner wall of the installation slotted eye There is the second auxiliary section;And installation card, with the first clamping portion, rear end with hand-held part, middle part has the second clamping portion for front end; Wherein, the insertion end of the installation card from the installation slotted eye is inserted into the installation slotted eye, and described the of the installation card Two clamping portions are clamped with second auxiliary section, the another of the installation slotted eye is stretched out in first clamping portion of the installation card It holds and is simultaneously clamped with first auxiliary section, to realize that the installation card assembles together with the module and the pedestal.
Optionally, one in one group of opposite inner wall of the installation slotted eye is upper has with receiving hole, on another Threaded hole, the matching hole of strip is offered in the middle part of the installation card, and the thread segment of threaded fastener passes through the receiving hole It is mutually threadedly coupled with the threaded hole with after the matching hole, the nut of the threaded fastener is located in the receiving hole, simultaneously It is extruded on the outer end face of the matching hole.
Optionally, the matching hole is kidney slot.
Optionally, first auxiliary section is card hole, and first clamping portion is block tongue, and the block tongue is plugged in the card It is clamped in hole and with the card hole and connects.
Optionally, second auxiliary section is card slot, second clamping portion is grab, and the grab is hooked on the card It is clamped in slot and mutually and connect with the card slot.
Optionally, the card slot includes the assembling pilot trench being arranged along the axis direction of the installation slotted eye and splits sub Slot;When the grab is hooked in the assembling pilot trench, the card hole is mutually clamped with the block tongue;The grab is hooked on described When splitting in pilot trench, the card hole is separated with the block tongue;Wherein, the insertion for splitting pilot trench and being located at the installation slotted eye Between end and the assembling pilot trench.
Optionally, there are two the grab, the assembling pilot trench and the fractionation pilot trench include, and two grabs Positioned at the both sides of the horizontal plate of the installation card, the assembling pilot trench and the fractionation pilot trench are arranged at the installation slotted eye On another group of opposite inner wall.
Optionally, the installation card includes:The horizontal plate, front end have the block tongue, have described match in plate face Close hole;Riser is connected positioned at the top of the horizontal plate and its lower end with the rear end of the horizontal plate, the handgrip part In on the riser;With two grabs, it is arranged in parallel positioned at the both sides of the horizontal plate and with the horizontal plate, and two The rear portion of a grab rod end is connected with the rear end of the horizontal plate.
Optionally, the both sides of the riser has a forwardly convex guide ledges, the insertion end of the installation slotted eye it is outer There is guide groove, when the grab is hooked in the assembling pilot trench, the guide ledges are inserted into the guiding on end face In straight slot;Wherein:When the grab is hooked in the fractionation pilot trench, the guide ledges move outwardly to the guide groove Notch at;When the grab is hooked in the assembling pilot trench, the guide ledges move inwardly into the guide groove At slot bottom.
The present invention also provides the assemble methods of a kind of installation card, module and pedestal, including:The riser of hand-held installation card pushes away The arrival end of dynamic installation card, the horizontal plate, two grab self installation slots that make installation card is inserted into installation slotted eye, and makes grab Gib head is caught in assembling pilot trench or splits in pilot trench.
Optionally, the assemble method of installation card, module and pedestal further includes:It is caught in assembling pilot trench in the gib head of grab or tears open In molecule slot after action, it is packed into threaded fastener into receiving hole and matching hole, so that the thread segment of threaded fastener is located at and holds It receives in hole and matching hole.
The present invention also provides the method for splitting of a kind of module and pedestal, including:The riser of hand-held installation card pushes installation Card, makes the gib head of the grab of installation card deviate from assembling pilot trench and be caught in and split in pilot trench, and module and pedestal are split to realize.
Optionally, the method for splitting of module and pedestal further includes:The riser of hand-held installation card push installation card motion it Before, unscrew fastener.
The present invention also provides the connection methods of a kind of module and pedestal, including:The riser of hand-held installation card pushes installation Card makes the gib head of the grab of installation card deviate to split pilot trench and be caught in assembling pilot trench, while block tongue is caught in card hole.
Optionally, the connection method of module and pedestal further includes:After block tongue is caught in card hole action, it is tight to tighten screw thread Firmware makes the thread segment of threaded fastener be mutually threadedly coupled with threaded hole, the nut of threaded fastener is extruded in the outer of matching hole On end face, to realize together with link block and pedestal.
Compared with prior art, the connection structure of module provided by the invention and pedestal, easy for assemble or unload, connection jail Solid, it is cost-effective, and save installation space.
Other features and advantage will illustrate in the following description, also, partly become from specification It obtains it is clear that being understood by implementing the application.The purpose of the application and other advantages can be by specification, rights Specifically noted structure is realized and is obtained in claim and attached drawing.
Description of the drawings
Attached drawing is used for providing further understanding technical scheme, and a part for constitution instruction, with this The embodiment of application is used to explain the technical solution of the application together, does not constitute the limitation to technical scheme.
Fig. 1 is the structural schematic diagram of the connection structure of the module and pedestal described in the application one embodiment;
Fig. 2 is the perspective diagram of module shown in FIG. 1 and the connection structure of pedestal;
Fig. 3 is that module is connected to pedestal after removing threaded fastener in module shown in FIG. 1 and the connection structure of pedestal Structural schematic diagram when together;
Fig. 4 is the structural schematic diagram of installation card and module matching conjunction state in Fig. 3;
Fig. 5 is the structural schematic diagram of installation card in module and the connection structure of pedestal shown in Fig. 1.
Wherein, the correspondence in Fig. 1 to Fig. 5 between reference numeral and component names is:
1 module, 2 pedestals, 21 installation slotted eyes, 22 receiving holes, 23 threaded holes, 3 installation cards, 31 matching holes, 32 risers, 33 is horizontal Plate, 4 threaded fasteners, 51 card holes, 52 block tongues, 61 card slots, 611 assembling pilot trench, 612 fractionation pilot trench, 62 grabs, 71 guiding are convex Platform, 72 guide grooves.
Specific implementation mode
To make the purpose, technical scheme and advantage of the application be more clearly understood, below in conjunction with attached drawing to the application Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application Feature mutually can arbitrarily combine.
Many details are elaborated in the following description in order to fully understand the application, and still, the application may be used also By using other, different from implementing in a manner of described here, therefore, the protection domain of the application is not by following public tool The limitation of body embodiment.
The connection structure of module provided by the invention and pedestal, as shown in Figure 1 to Figure 3, including:Module 1 is set in module 1 It is equipped with the first auxiliary section;Pedestal 2 is provided with installation slotted eye 21 on pedestal 2, has the second cooperation on the inner wall of installation slotted eye 21 Portion;With installation card 3, with the first clamping portion, rear end with hand-held part, middle part has the second clamping portion for front end;Wherein, as schemed Shown in 2 and Fig. 4, the insertion end of 3 self installation slot 21 of installation card is inserted into installation slotted eye 21, the second clamping portion of installation card 3 The other end of installation slotted eye 21 is stretched out with the first clamping portion of the clamping of the second auxiliary section, installation card 3 and is clamped with the first auxiliary section, To realize that installation card 3 assembles together with module 1 and pedestal 2.
The connection structure of module provided by the invention and pedestal, it is easy for assemble or unload, be connected firmly, be cost-effective, and Also installation space is saved.
Optionally, as shown in Figure 1 to Figure 3, one in one group of opposite inner wall of installation slotted eye 21 is upper has receiving hole 22, there is threaded hole 23, the middle part of installation card 3 offers the matching hole 31 of strip, the screw thread of threaded fastener 4 on another Section is threadedly coupled after passing through receiving hole 22 and matching hole 31 with 23 phase of threaded hole, and the nut of threaded fastener 4 is located at receiving hole 22 It is interior and be extruded on the outer end face of matching hole 31.
Optionally, matching hole 31 is kidney slot, and threaded fastener 4 is screw or bolt.
Optionally, the first auxiliary section is card hole 51, and the first clamping portion is block tongue 52, and block tongue 52 is plugged in card hole 51, simultaneously It is clamped and connects with card hole 51.
Optionally, as shown in Figure 2 and Figure 5, the second auxiliary section is card slot 61, the second clamping portion is grab 62,62 hook of grab It hangs in card slot 61 and is clamped with 61 phase of card slot and connected.
Optionally, card slot 61 includes the assembling pilot trench 611 being arranged along the axis direction of installation slotted eye 21 and fractionation pilot trench 612;When grab 62 is hooked in assembling pilot trench 611, card hole 51 is clamped with 52 phase of block tongue;Grab 62, which is hooked on, splits pilot trench 612 When interior, card hole 51 is separated with block tongue 52;Wherein, insertion end and assembling pilot trench 611 that pilot trench 612 is located at installation slotted eye 21 are split Between.
Wherein, grab 62 has elasticity, and the briar tooth of the gib head of grab 62 is in isosceles triangle or equilateral triangle shape, card Slot 61 is also at isosceles triangle identical with clasp-gear structure or equilateral triangle shape.
Installation card in the present invention is not only saved installation space, is realized simultaneously for completing being fixedly connected for module and pedestal Close installation is arranged, and by the way of elastic grafting, it is easy to disassemble.For more demanding place or to avoid maloperation from leading Installation card is caused to fall, the corresponding position of matching hole is threaded hole on pedestal, and the spiral shell of installation card and pedestal may be implemented Line connects, more firm and durable.
Optionally, it grab 62, assembling pilot trench 611 and splits there are two pilot trench 612 includes, and two grabs 62 are located at peace Be loaded 3 horizontal plate both sides, assembling pilot trench 611 and split pilot trench 612 and be arranged at opposite another group of installation slotted eye 21 On inner wall.
Wherein, the length of kidney slot is not less than the distance between assembling pilot trench 611 and fractionation pilot trench 612.
Optionally, as shown in figure 5, installation card 3 includes:Horizontal plate 33, front end have block tongue 52, have cooperation in plate face Hole 31;Riser 32 is connected positioned at the top of horizontal plate 33 and its lower end with the rear end of horizontal plate 33, and handgrip part is in riser On 32;With two grabs 62, it is arranged in parallel positioned at the both sides of horizontal plate 33 and with horizontal plate 33, and two 62 rod ends of grab Rear portion is connected with the rear end of horizontal plate 33.
Optionally, as shown in figure 3, there are forwardly convex guide ledges 71, installation slotted eye 21 to insert for the both sides of riser 32 Entering has guide groove 72 on the outer end face at end, when grab 62 is hooked in assembling pilot trench 611, guide ledges 71 are inserted into guiding In straight slot 72.
Wherein, when grab 62 is hooked in fractionation pilot trench 612, guide ledges 71 move outwardly to the notch of guide groove 72 Place;When grab 62 is hooked in assembling pilot trench 611, guide ledges 71 move inwardly at the slot bottom of guide groove 72;It is oriented to convex Platform 71 is realized with the cooperation of guide groove 72 and is moved back and forth along guide groove 72, to installation card 3 in fractionation action and Assembly Action phase Mutual handoff procedure play the guiding role.
And when grab 62 is hooked in assembling pilot trench 611, guide ledges 71 move inwardly into the slot bottom of guide groove 72 Place is simultaneously against on slot bottom, and installation card 3 cannot be further continued for inwardly promoting and gib head is also just assembling in pilot trench 611, guide ledges 71 realize with the cooperation of guide groove 72 along the reciprocating movement of guide groove 72, also play position-limiting action to the Assembly Action of installation card 3.
Module provided in an embodiment of the present invention and the connection structure of pedestal have the advantages that:
One, installation space is saved
Since this connection structure is not necessarily to reserve the installation space of threaded fastener in module side, mould may be implemented Block closely connects side by side, saves installation space.
Two, it is dismounted easily
Due to the special fixed form of installation card, it need to only stir and can be achieved with being fastenedly connected and split module and pedestal, save About human cost and time, improve production efficiency.
Three, simplify accessory, reduce cost, improve productivity
The connection structure of the embodiment of the present invention, which simplifies, is fastenedly connected accessory, reduces accessory cost, reduces accessory damage Consumption.
Four, it is connected firmly, durable
By design and selection, ensureing that installation card elasticity is good, be not susceptible to be broken, material will not get rusty deformation, Enhance service life.
The assemble method of installation card provided by the invention, module and pedestal is (not shown):Hand-held installation card 3 is erected Plate 32 pushes installation card 3, and the arrival end of 33, two 62 self installation slots 21 of grab of horizontal plate of installation card 3 is made to be inserted into mounting groove In hole 21, and the gib head of grab 62 is made to be caught in assembling pilot trench 611 or split in pilot trench 612;Optionally, to receiving hole 22 and cooperation It is packed into threaded fastener 4 in hole 31, the thread segment of threaded fastener 4 is made to be located in receiving hole 22 and matching hole 31.
The method for splitting of module provided by the invention and pedestal is (not shown):The riser 32 of hand-held installation card 3 pushes away Dynamic installation card 3 makes the gib head of the grab 62 of installation card 3 deviate from assembling pilot trench 611 and be caught in and split in pilot trench 612, to split mould Block 1 and pedestal 2.
Optionally, before the riser 32 of hand-held installation card 3 pushes installation card 3 to act, unscrew fastener 4, releases Compression of the nut of threaded fastener 4 to installation card 3.
Herein, due to the presence of waist-shaped hole, installation card 3 is not compressed as long as threaded fastener 4 is unscrewed, it is not necessary to make thread segment It is kept completely separate with threaded hole, so that it may enter in fractionation pilot trench and solve to push installation card 3 to make grab abjection assembling pilot trench.In this way, Threaded fastener 4 is lifted down without from pedestal 2 in this process, is more convenient.
The connection method of module provided by the invention and pedestal is (not shown):The riser 32 of hand-held installation card 3 pushes away Dynamic installation card 3 makes the gib head of the grab 62 of installation card 3 deviate to split pilot trench 612 and be caught in assembling pilot trench 611, while block tongue 52 are caught in card hole 51;Optionally, threaded fastener 4 is tightened, the thread segment of threaded fastener 4 is made to connect with 23 phase screw thread of threaded hole Connect, the nut of threaded fastener 4 is extruded on the outer end face of matching hole 31, together with link block 1 and pedestal 2.
Above-mentioned technical proposal, installation card, module and pedestal with the use of when not only save installation space, realize tight side by side Close installation, and by the way of elastic grafting, it is easy to disassemble.For more demanding place or to avoid maloperation from causing to pacify It is loaded and falls, the corresponding position of matching hole is threaded hole on pedestal, and the screw thread that installation card and pedestal may be implemented connects It connects, more firm and durable.
The place that maloperation causes installation part to fall is avoided for more demanding place or requirement, can add stubborn screw or Bolt further fixes connection.In place of less demanding, screw or bolt can not also be twisted, is caught in the gib head of grab 62 It completes to be fixedly connected in assembling pilot trench 611.It can be selected as the case may be.
To sum up, the connection structure of module provided by the invention and pedestal, it is easy for assemble or unload, be connected firmly, be cost-effective, And save installation space.
In the description of the present application, term " installation ", " connected ", " connection ", " fixation " etc. shall be understood in a broad sense, example Such as, " connection " may be fixed connection or may be dismantle connection, or integral connection;It can be directly connected, it can also Indirectly connected through an intermediary.For the ordinary skill in the art, above-mentioned art can be understood as the case may be The concrete meaning of language in this application.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the application It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or reality Example.Moreover, description particular features, structures, materials, or characteristics can in any one or more of the embodiments or examples with Suitable mode combines.
Although the embodiment disclosed by the application is as above, the content only for ease of understanding the application and use Embodiment is not limited to the application.Technical staff in any the application fields, is taken off not departing from the application Under the premise of the spirit and scope of dew, any modification and variation, but the application can be carried out in the form and details of implementation Scope of patent protection, still should be subject to the scope of the claims as defined in the appended claims.

Claims (15)

1. the connection structure of a kind of module and pedestal, which is characterized in that including:
Module (1) is provided with the first auxiliary section on the module (1);
Pedestal (2) is provided with installation slotted eye (21) on the pedestal (2), has second on the inner wall of the installation slotted eye (21) Auxiliary section;With
Installation card (3), with the first clamping portion, rear end with hand-held part, middle part has the second clamping portion for front end;
Wherein, the insertion end of installation card (3) from the installation slotted eye (21) is inserted into the installation slotted eye (21), described Second clamping portion of installation card (3) is clamped with second auxiliary section, first clamping portion of the installation card (3) is stretched Go out the other end of the installation slotted eye (21) and be clamped with first auxiliary section, to realize described in the installation card (3) assembling Module (1) and the pedestal (2) are together.
2. the connection structure of module according to claim 1 and pedestal, which is characterized in that the phase of the installation slotted eye (21) To one group of inner wall in one it is upper with receiving hole (22), on another with threaded hole (23), in the installation card (3) Portion offers the matching hole (31) of strip, and the thread segment of threaded fastener (4) passes through the receiving hole (22) and the cooperation Hole (31) is mutually threadedly coupled with the threaded hole (23) afterwards, and the nut of the threaded fastener (4) is located at the receiving hole (22) It is interior and be extruded on the outer end face of the matching hole (31).
3. the connection structure of module according to claim 2 and pedestal, which is characterized in that the matching hole (31) is kidney-shaped Hole.
4. the connection structure of module according to claim 2 and pedestal, which is characterized in that first auxiliary section is card hole (51), first clamping portion is block tongue (52), the block tongue (52) be plugged in the card hole (51) and with the card hole (51) clamping connection.
5. the connection structure of module according to claim 4 and pedestal, which is characterized in that second auxiliary section is card slot (61), second clamping portion is grab (62), the grab (62) be hooked in the card slot (61) and with the card slot (61) mutually clamping connection.
6. the connection structure of module according to claim 5 and pedestal, which is characterized in that the card slot (61) includes edge The assembling pilot trench (611) and fractionation pilot trench (612) of the axis direction setting of the installation slotted eye (21);The grab (62) hooks When the assembling pilot trench (611) is interior, the card hole (51) is mutually clamped with the block tongue (52);The grab (62) is hooked on institute State split pilot trench (612) it is interior when, the card hole (51) and the block tongue (52) are separated;
Wherein, it is described split pilot trench (612) be located at the installation slotted eye (21) insertion end and the assembling pilot trench (611) it Between.
7. the connection structure of module according to claim 6 and pedestal, which is characterized in that the grab (62), described group Dress pilot trench (611) and there are two the fractionation pilot trench (612) includes, and two grabs (62) are located at the installation card (3) both sides of horizontal plate, the assembling pilot trench (611) and the fractionation pilot trench (612) are arranged at the installation slotted eye (21) on another group of opposite inner wall.
8. the connection structure of module according to claim 7 and pedestal, which is characterized in that the installation card (3) includes:
The horizontal plate (33), front end have the block tongue (52), have the matching hole (31) in plate face;
Riser (32), the top and its lower end for being located at the horizontal plate (33) are connected with the rear end of the horizontal plate (33), institute Handgrip part is stated on the riser (32);With
Two grabs (62) are located at the both sides of the horizontal plate (33) and are arranged in parallel with the horizontal plate (33), and two The rear portion of a grab (62) rod end is connected with the rear end of the horizontal plate (33).
9. the connection structure of module according to claim 8 and pedestal, which is characterized in that the both sides of the riser (32) has There are forwardly convex guide ledges (71), there is guide groove (72) on the outer end face of the insertion end of the installation slotted eye (21), The guide ledges (71) are inserted into the guide groove (72);Wherein:
The grab (62) be hooked on the fractionation pilot trench (612) it is interior when, the guide ledges (71) move outwardly to described lead To at the notch of straight slot (72);
The grab (62) be hooked on the assembling pilot trench (611) it is interior when, the guide ledges (71) move inwardly into described lead To at the slot bottom of straight slot (72).
10. the assemble method of a kind of installation card, module and pedestal, which is characterized in that including:
The riser (32) of hand-held installation card (3) pushes installation card (3), makes the horizontal plate (33) of installation card (3), two grabs (62) The arrival end of self installation slot (21) is inserted into installation slotted eye (21), and the gib head of grab (62) is made to be caught in assembling pilot trench (611) Or it splits in pilot trench (612).
11. the assemble method of installation card according to claim 10, module and pedestal, which is characterized in that further include:
Be caught in assembling pilot trench (611) in the gib head of grab (62) or split in pilot trench (612) after action, to receiving hole (22) and It is packed into threaded fastener (4) in matching hole (31), the thread segment of threaded fastener (4) is made to be located at receiving hole (22) and matching hole (31) in.
12. the connection method of a kind of module and pedestal, which is characterized in that including:
The riser (32) of hand-held installation card (3) pushes installation card (3), and the gib head of the grab (62) of installation card (3) is made to deviate to split Pilot trench (612) and be caught in assembling pilot trench (611), while block tongue (52) is caught in card hole (51).
13. the connection method of module according to claim 12 and pedestal, which is characterized in that further include:
After block tongue (52) is caught in card hole (51) action, threaded fastener (4) is tightened, the thread segment of threaded fastener (4) is made It is mutually threadedly coupled with threaded hole (23), the nut of threaded fastener (4) is extruded on the outer end face of matching hole (31).
14. the method for splitting of a kind of module and pedestal, which is characterized in that including:
The riser (32) of hand-held installation card (3) pushes installation card (3), and the gib head of the grab (62) of installation card (3) is made to deviate from assembling Pilot trench (611) and be caught in and split in pilot trench (612).
15. the method for splitting of module according to claim 14 and pedestal, which is characterized in that further include:
Before the riser (32) of hand-held installation card (3) pushes installation card (3) to act, the fastener that unscrews (4).
CN201710058222.2A 2017-01-23 2017-01-23 Connection structure and connection method of module and base, splitting method and assembling method of mounting card Active CN108347851B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710058222.2A CN108347851B (en) 2017-01-23 2017-01-23 Connection structure and connection method of module and base, splitting method and assembling method of mounting card

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710058222.2A CN108347851B (en) 2017-01-23 2017-01-23 Connection structure and connection method of module and base, splitting method and assembling method of mounting card

Publications (2)

Publication Number Publication Date
CN108347851A true CN108347851A (en) 2018-07-31
CN108347851B CN108347851B (en) 2023-11-03

Family

ID=62962265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710058222.2A Active CN108347851B (en) 2017-01-23 2017-01-23 Connection structure and connection method of module and base, splitting method and assembling method of mounting card

Country Status (1)

Country Link
CN (1) CN108347851B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201709065U (en) * 2009-12-10 2011-01-12 杭州优稳自动化系统有限公司 Electronic module, fixing seat and connecting structure thereof
CN102856802A (en) * 2011-06-29 2013-01-02 西门子公司 Installation component of switch device and switch device of installation component
CN204029639U (en) * 2014-08-20 2014-12-17 加西亚电子电器有限公司 A kind of snap device of low-voltage electrical apparatus and miniature circuit breaker
CN206564747U (en) * 2017-01-23 2017-10-17 北京国电智深控制技术有限公司 The attachment structure of module and base

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201709065U (en) * 2009-12-10 2011-01-12 杭州优稳自动化系统有限公司 Electronic module, fixing seat and connecting structure thereof
CN102856802A (en) * 2011-06-29 2013-01-02 西门子公司 Installation component of switch device and switch device of installation component
CN204029639U (en) * 2014-08-20 2014-12-17 加西亚电子电器有限公司 A kind of snap device of low-voltage electrical apparatus and miniature circuit breaker
CN206564747U (en) * 2017-01-23 2017-10-17 北京国电智深控制技术有限公司 The attachment structure of module and base

Also Published As

Publication number Publication date
CN108347851B (en) 2023-11-03

Similar Documents

Publication Publication Date Title
KR100939322B1 (en) Carring Chanel Hanger for Ceiling Closing
KR101174257B1 (en) A fixing device for grating panel and fixing structure with the same
KR102118997B1 (en) Anchor Structure and Construction Method for Easier Attaching and Detaching
US20210102371A1 (en) Insert for construction slab
CN206564747U (en) The attachment structure of module and base
CN105464265B (en) Crimp cell curtain wall and containment member
CN107091524B (en) Wall-mounted air conditioner with detachable base
CN108347851A (en) Module and the connection structure of pedestal, connection method, method for splitting and the assemble method with installation card
CN216075766U (en) Curtain wall dry hanging structure and building curtain wall
CN205637286U (en) Repeatedly usable's roof keel system
CN216195456U (en) Connecting device for concrete outer wall and steel structure building
CN106948529B (en) Curtain wall keel internal connection type triple connection structure
CN205782673U (en) A kind of light fixture module attachment structure
CN205595750U (en) Cable joint that can fix
KR20190098408A (en) Anchor bolt to be used first for formwork
WO2007075054A1 (en) Hanger for ceiling closing
CN113530038A (en) Building curtain wall for building
CN203008483U (en) Screen tent frame
KR200402360Y1 (en) Hanger
CN209456747U (en) A kind of power panel box pre-installation structure, mounting structure and washing machine
CN212195388U (en) Reel shell and suspension device comprising same
KR20070103528A (en) A prop head frame for form panel frame
CN207706662U (en) The mini-tiller instrument cases that can be rapidly assembled and disassembled
CN108347853A (en) The fixed structure and assemble method of DIN guide rails and module base
CN211414935U (en) Auxiliary tool for assembling vacuumizing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 102200 4th floor, smart grid industrial building, UHVDC test base, State Grid Corporation of China, No.16, Nanzhong Road, Nanshao Town, Changping District, Beijing

Applicant after: Guoneng Zhishen Control Technology Co.,Ltd.

Address before: 102200 4th floor, smart grid industrial building, UHVDC test base, State Grid Corporation of China, No.16, Nanzhong Road, Nanshao Town, Changping District, Beijing

Applicant before: BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 102211 room 7716, building 307, 9 Yingcai North 2nd Street, future science city, Changping District, Beijing

Applicant after: Guoneng Zhishen Control Technology Co.,Ltd.

Address before: 102200 4th floor, smart grid industrial building, UHVDC test base, State Grid Corporation of China, No.16, Nanzhong Road, Nanshao Town, Changping District, Beijing

Applicant before: Guoneng Zhishen Control Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231130

Address after: 102211 room 7716, building 307, 9 Yingcai North 2nd Street, future science city, Changping District, Beijing

Patentee after: Guoneng Zhishen Control Technology Co.,Ltd.

Patentee after: Guoneng Zhishen (Tianjin) Control Technology Co.,Ltd.

Address before: 102211 room 7716, building 307, 9 Yingcai North 2nd Street, future science city, Changping District, Beijing

Patentee before: Guoneng Zhishen Control Technology Co.,Ltd.