CN108341434A - The integrating water route harden structure and preparation method of water treatment plant - Google Patents

The integrating water route harden structure and preparation method of water treatment plant Download PDF

Info

Publication number
CN108341434A
CN108341434A CN201710054914.XA CN201710054914A CN108341434A CN 108341434 A CN108341434 A CN 108341434A CN 201710054914 A CN201710054914 A CN 201710054914A CN 108341434 A CN108341434 A CN 108341434A
Authority
CN
China
Prior art keywords
tube body
semicanal
water route
treatment plant
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710054914.XA
Other languages
Chinese (zh)
Inventor
熊超北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710054914.XA priority Critical patent/CN108341434A/en
Publication of CN108341434A publication Critical patent/CN108341434A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to the integrating water route harden structures and preparation method of a kind of water treatment plant, it is coated on so that an outer cladding is body formed outside at least one tube body, the external periphery of the outer cladding is additionally provided at least one extension tube attached, the tube body connects rank with the corresponding extension tube attached and communicates, the pipeline can so be fully sealed, make the situation that leak or infiltration does not occur, it is ensured that the safety of drinking water and cleaning, the disqualification rate of processing procedure can be reduced again simultaneously, and have both assembling quickly with the progress benefit that does not take up space.

Description

The integrating water route harden structure and preparation method of water treatment plant
Technical field
The present invention relates to the integrating water route harden structures and preparation method of a kind of water treatment plant, and espespecially leak-stopping can be fully sealed in one kind for this Integrating water route harden structure and preparation method, can so prevent pipeline in the integrating water route plate from leak pollution occurs, it is ensured that drinking water Safety, while the disqualification rate of processing procedure can be reduced again, and have both assembling quickly with the progress benefit that does not take up space.
Background technology
Since the mankind are constant for the pollution of environment, the safety of related drinking water also faces great threat, because This more and more payes attention to the idea of healthy water, and for a long time, most basic and economic way is exactly to utilize filtering dress It sets and carrys out filtering water, to ensure the safety of drinking water and clean, and the filtering of general filter device, filtered with 3 to 5 mostly After bottle carries out multi-filtering, the impurity in water removal and harmful substance, and the connection between these filtering flasks could fully be gone then must It is mutually connected with a plurality of connecting tube, the pipe-connecting mode of this connecting tube, not only consumption takes up space, and installs also cumbersome.
It is the derivative for the integrating water route plate for having various filter device, person as shown in Figure 1 to Figure 3, as typical knot thus Structure, greatest feature are that the connecting line between multiple water-filtering bottles 10 is all concentrated on the top of the water-filtering bottle 10, related Technology can consider the cases such as publication No. CN 102743916A in light of actual conditions, such structure has the advantages that assembling is quick and convenient, while It does not take up space;In addition to this, but can quickly volume production and cost is also low, but but there are some problems to deposit in actual use and production , because of the structure of the integrating water route plate 1, mainly by a upper plate body 11 and a lower body 12 to being combined into, the wherein upper plate It is equipped with the upper half pipeline 111 of plural item in body 11, the lower half pipeline 121 of plural item, the upper tube half also are provided in the lower body 12 Road 111 and the lower half pipeline 121 are pairing configuration, and after the upper plate body 11 and 12 pairing of lower body, then via high frequency, The bonding of hot melt or sticker etc. keeps the upper half pipeline 111 and the lower half pipeline 121 closely sealed at a complete pipeline, however each pipe Road will accomplish completely closely sealed, it is necessary to which, there are one premise, the exactly upper plate body 11 of full wafer and lower body 12 must be maintained at smooth Under the conditions of, it can just accomplish completely closely sealed requirement, only during plastic molding, be most difficult to control is exactly that molded product holds very much It is also easy to produce the problem of part is shunk, when especially area, volume are bigger, disqualification rate often remains high, such situation It then be easy to cause the upper plate body 11 and bonds non-uniform problem with the lower body 12, cause the not closely sealed situation of pipeline to occur, therefore As long as there is a small place leak or infiltration situation occur in whole pipeline, will make filtered water be contaminated again, and allow Filter device performs practically no function.
Invention content
The drainage of the present invention is completed finally after inventor is after research improvement many times in view of the missing of the formula of habit The integrating water route harden structure and preparation method of device, i.e. the main inventive purpose of this case tie up to and provide a kind of leak-stopping that is fully sealed The integrating water route harden structure of water treatment plant, so makes the pipeline after sealing, makes the situation that leak or infiltration does not occur, to ensure Drinking water after filter is not contaminated.
Another goal of the invention of this case ties up to and provides a kind of integrating water route plate preparation method for the water treatment plant being fully sealed, Such preparation method makes the pipeline after sealing that the situation of leak or infiltration will not occur, to ensure filtered drinking water not by dirt Dye.
To reach the goal of the invention of above-mentioned this case, the integrating water route harden structure of water treatment plant of the invention, including at least one Tube body and an outer cladding body, the outer cladding body coat the tube body, wherein:
The tube body, including one first semicanal and one second semicanal, which is equipped with one first pipeline space, this second Semicanal is equipped with one second pipeline space, first semicanal and second semicanal to being combined into the tube body, the first pipeline space with The second pipeline space is combined to form a pipeline, which is equipped at least two take over through-holes, which communicates with the pipeline;
The outer cladding body, forming covered form the tube body and seal outside the tube body.
The avris of the first above-mentioned semicanal, is equipped with one first holding section, and the avris of second semicanal is equipped with one second engaging Portion, first holding section card corresponding with second holding section tie fitting.
The external periphery of above-mentioned outer cladding also sets at least one extension tube attached, and a water pipe is then equipped in the extension tube attached, should Water pipe connects rank with the take over through-hole of the tube body and communicates.
Above-mentioned tube body is an elongate tube or a bending tube body.
The integrating water route plate of the present invention, internal includes at least one tube body, and the piping distribution of the tube body is three axial directions Solid distribution.
The integrating water route plate of the present invention, internal includes at least one tube body, and the piping distribution of the tube body is two axial directions Same plane is distributed.
Above-mentioned tube body has further extended outward at least one extension tube attached, which is equipped with a take over through-hole, this takes over logical Hole is communicated with the pipeline in the tube body.
The integrating water route plate preparation method of the water treatment plant of the present invention, includes the following steps:
(a) the first semicanal, each self-forming of the second semicanal;
(b) the first semicanal and the second semicanal form a tube body, the first pipeline space and second semicanal of first semicanal The second pipeline space be combined to form a pipeline;
(c) overmolded, be that at least one tube body after combining is put into a molding tool, covering material inject this at In pattern tool, the covering material is made to be coated on outside the tube body, and form an outer cladding body, and through a molding activity duration Afterwards, it opens the molding die and takes out an integrating water route board finished product.
In above-mentioned overmolded step, the wherein length of the molding activity duration, according to the covering material filled in Depending on different and molding volume size.
In conclusion the integrating water route harden structure and preparation method of the water treatment plant of the present invention, can be fully sealed pipe in structure Road, so the contamination of leak or infiltration will not occur, to ensure safety and the cleaning of drinking water, while the integrating water route plate Structure, and the disqualification rate of processing procedure can be reduced, and have both assembling quickly with the progress benefit that does not take up space.
Description of the drawings
Fig. 1 is the embodiment schematic diagram of its integrating water route plate of existing water treatment plant.
Fig. 2 is the upper plate body schematic diagram of its integrating water route plate of existing water treatment plant.
Fig. 3 is the lower body schematic diagram of its integrating water route plate of existing water treatment plant.
Fig. 4 is the perspective exploded view of its tube body of the invention.
Fig. 5 is the stereoscopic schematic diagram of its tube body of the invention.
Fig. 6 is the section cross-sectional schematic of its tube body of the invention.
Fig. 7 is the stereoscopic schematic diagram of the present invention.
Fig. 8 is the diagrammatic cross-section of its structure of the invention.
Fig. 9 is the embodiment of the present invention stereoscopic schematic diagram.
Figure 10 is another embodiment (one) stereoscopic schematic diagram of its tube body of the invention.
Figure 11 is another embodiment (two) stereoscopic schematic diagram of its tube body of the invention.
Figure 12 is the step flow diagram of its preparation method of the invention.
Figure 13 is the molding diagrammatic cross-section of its molding die of the invention.
Reference sign:(existing) 1 integrating water route plate;10 water-filtering bottles;11 upper plate bodies;111 upper half pipelines;12 lower plates Body;121 lower half pipelines;(present invention) 2 tube body;21 first semicanals;210 first pipeline spaces;211 first holding sections;212 first Access mouth;213 first retaining elements;214 first fix fin;22 second semicanals;220 second pipeline spaces;221 second engagings Portion;222 alternate path mouths;223 second retaining elements;224 second fix fin;3 outer cladding bodies;31 extension tube attacheds;32 water service pipes Road;4 filtering flasks;5 auxiliary equipments;6 preparation methods;61 steps;62 steps;63 steps;64 steps;7 molding dies;71 upper molds;Under 72 Mould;721 injection cast gates;711 exhaust passages;A1 card slots;A2 pillars;A3, A5 locating slot;A4, A6 positioning column;B take over through-holes;C Pipeline;D extension tube attacheds.
Specific implementation mode
It please refers to shown in Fig. 4 to Fig. 8, the integrating water route harden structure of water treatment plant of the invention, including at least one tube body 2 And an outer cladding body 3, the outer cladding body 3 coat the tube body 2, wherein:
The tube body 2, including one first semicanal 21 and one second semicanal 22, which is equipped with one first pipeline space 210, which is equipped with one second pipeline space 220, and first semicanal 21 is with second semicanal 22 to being combined into the pipe Body 2 makes the first pipeline space 210 be combined to form a pipeline C with the second pipeline space 220, which connects equipped at least two Pipe through-hole B, the take over through-hole B are communicated with pipeline C;
The outer cladding body 3, forming covered forms the tube body 2 and seals outside the tube body 2, outside the outer cladding body 3 Periphery is additionally provided at least one extension tube attached 31, and a water pipe 32, and the take over through-hole of the tube body 2 are then equipped in the extension tube attached 31 B also connects rank with the water pipe 32 of the corresponding extension tube attached 31 and communicates.
The first above-mentioned semicanal 21, avris are equipped with one first holding section 211, and the avris of second semicanal 22 is equipped with one the Two holding sections 221, first holding section 211 card corresponding with second holding section 221 tie fitting.
Above-mentioned tube body 2, wherein first semicanal 21 are equipped at least one first access mouth 212, which is equipped with An at least alternate path mouth 222, the first access mouth 212 are combined into a take over through-hole B (as schemed with 222 pairs of the alternate path mouth 4, shown in Fig. 5);Take over through-hole B can also be directly arranged on first semicanal 21 (as shown in Figure 10), or be directly arranged in this On second semicanal 22 (figure does not disclose).
It please referring to shown in Fig. 4, Fig. 6, the first above-mentioned holding section 211 is equipped with a card slot A1 and at least a positioning groove A3, A5, Second holding section 221 is equipped with a pillar A2 and at least positioning column A4, A6, first holding section 211 and second holding section 221 correspond to engaging, and locating slot A3, A5 fittings corresponding with the positioning column A4, A6 form positioning, rely on first holding section 211 With the snap-in structure of second holding section 221, make the outer cladding body 3 when coating the tube body 2, covering material does not penetrate into In the pipeline C of the tube body 2, and influenced the circulation of drainage.
Above-mentioned the first semicanal 21 and second semicanal 22, the avris of wherein first semicanal 21 are additionally provided at least one first Retaining element 213, the avris of second semicanal 22 are additionally provided at least one second retaining element 223, first retaining element 213 with Second retaining element, the 223 pairing card knot.
The first above-mentioned semicanal 21, outer peripheral edge is additionally provided at least one first fixation fin 214, to increase the outer cladding body The combination of the 3 forming covereds tube body 2 is fixed.
The second above-mentioned semicanal 22, outer peripheral edge is additionally provided at least one second fixation fin 224, to increase the outer cladding body The combination of the 3 forming covereds tube body 2 is fixed.
Above-mentioned tube body 2, shape can be an elongate tube (as shown in Fig. 5, Figure 10), can also be a bending tube body (as shown in figure 11).
The integrating water route plate of the present invention, internal includes at least one tube body 2, and the piping of the tube body 2 is distributed, and can be three Axial three-dimensional distribution can also be two axial same plane distributions.
As shown in figure 11, tube body 2 of the invention, has further extended outward at least one extension tube attached D, and extension tube attached D is equipped with one Take over through-hole B, the take over through-hole B are communicated with the pipeline C in the tube body 2.
Above-mentioned outer cladding body 3 is coated on the thickness outside the tube body 2 depending on moulded and use demand, i.e., The outer cladding body 3 is in addition to being coated on outside the tube body 2, except being sealed to the tube body 2, can also coordinate the outer of entire filter device Type makees the collocation of space kenel, such as the outer cover as the filter device;In addition, in order to which material cost can be saved, the outer cladding Body 3 can also make profiling cladding according to the outer shape of the respectively tube body 2, to reduce the dosage of covering material.
Above-mentioned outer cladding body 3, material is plastic cement, rubber or the synthetic material of plastic cement and rubber are constituted.
It please refers to shown in Fig. 9, is the embodiment of the integrating water route plate of the water treatment plant of the present invention, the integrating water route harden structure Filtering flask 4 and the auxiliary equipment 5 (such as force (forcing) pump, water storage pressure barrel, reverse osmosis membrane peripheral device) of filter device can be provided Connection, allows all disengaging water routes to concentrate on the integrating water route plate, and pipe can be fully sealed in the integrating water route plate in structure Road, so the contamination of leak or infiltration will not occur, to ensure safety and the cleaning of drinking water, while the integrating water route plate Structure can reduce disqualification rate when manufacture, and progress benefit that is quick with assembling, not taking up space.
It please refers to Fig.1 shown in 2, the integrating water route plate preparation method 6 of water treatment plant of the invention includes the following steps:
(a) the first semicanal, each self-forming (step 61) of the second semicanal, please be simultaneously shown in compares figure 4), wherein this first half Pipe 21 and each self-forming of 22 system of the second semicanal;
(b) the first semicanal and the second semicanal form 2 (step 62) of a tube body, please simultaneously compares figure 5, shown in Fig. 6, this first The second holding section 221 card knot fitting of first holding section 211 of semicanal 21 and second semicanal 22, by first semicanal 21 and is somebody's turn to do For second semicanal 22 to being combined into a tube body 2, which is combined to form a pipeline with the second pipeline space 220 C;
(c) overmolded (step 63), please simultaneously compares figure 8, shown in Figure 13, when operations for forming, the upper mold of molding die 7 71 and lower die 72 open, then at least one tube body 2 after combination is put into the molding die 7, then shut the upper mold 71 and Lower die 72, covering material since one injection cast gate 721 inject in the molding die 7, so that the covering material is coated on the tube body 2 Outside, and an outer cladding body 3 is formed, and after a molding activity duration, it is integrated finally to open the molding die 7 taking-up one Water route board finished product (step 64).
Above-mentioned step 63, the wherein length of the molding activity duration, according to the covering material filled in difference and Depending on the volume size of molding.
Above-mentioned step 63, the wherein molding die 7 also include an exhaust passage 711.
In conclusion the integrating water route harden structure and preparation method of the water treatment plant of the present invention, can be fully sealed pipe in structure Road, so the contamination of leak or infiltration will not occur, to ensure safety and the cleaning of drinking water, while the integrating water route plate Structure, and the disqualification rate of processing procedure can be reduced, and have both assembling quickly with the progress benefit that does not take up space;Therefore, energy of the present invention It effectively solves habit formula and deposits missing, and the technological means used in the present invention, and be background technology institute nothing, so the present invention has specially The novelty of profit and creative condition.
Specific embodiment proposed in holding within the present invention only illustrates technology contents of the invention to facilitate, rather than The present invention is narrowly limited to above-described embodiment, the case where the spirit without departing from the present invention is with following claims Under, made by many variations implement, still fall within the scope of the present invention.

Claims (10)

1. a kind of integrating water route harden structure of water treatment plant, it is characterised in that:Including at least one tube body and an outer cladding body, it should Outer cladding body coats the tube body, wherein:
The tube body, including one first semicanal and one second semicanal, which is equipped with one first pipeline space, second semicanal Equipped with one second pipeline space, first semicanal with second semicanal to being combined into the tube body, the first pipeline space with this Two pipeline spaces are combined to form a pipeline, which is equipped at least two take over through-holes, which communicates with the pipeline;
The outer cladding body, forming covered form the tube body and seal outside the tube body.
2. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The avris of first semicanal Equipped with one first holding section, the avris of second semicanal is equipped with one second holding section, first holding section and second holding section Corresponding card knot fitting.
3. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The external periphery of the outer cladding It is additionally provided at least one extension tube attached, a water pipe is equipped in the extension tube attached, which connects rank with the take over through-hole and communicate.
4. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The tube body is one elongated Pipe.
5. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The tube body is a bending pipe Body.
6. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The integrating water route intralamellar part The piping distribution of at least one tube body be three axial three-dimensional distributions.
7. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The integrating water route intralamellar part Including the piping distribution of at least one tube body be two axial same planes distributions.
8. the integrating water route harden structure of water treatment plant according to claim 1, it is characterised in that:The tube body further extends outward There is at least one extension tube attached, which is equipped with a take over through-hole, which communicates with the pipeline of the tube body.
9. a kind of integrating water route plate preparation method of water treatment plant, which is characterized in that include the following steps:
(a) the first semicanal, each self-forming of the second semicanal;
(b) the first semicanal and the second semicanal form a tube body, and the of the first pipeline space of first semicanal and second semicanal Two pipeline spaces are combined to form a pipeline;
(c) overmolded, it is that at least one tube body after combining is put into a molding tool, covering material injects the shaping mould In tool, the covering material is made to be coated on outside the tube body, and forms an outer cladding body, and after a molding activity duration, It opens the molding die and takes out an integrating water route board finished product.
10. the integrating water route plate preparation method of water treatment plant according to claim 9, it is characterised in that:The overmolded step In the molding activity duration length, depending on the volume size of the difference for the covering material filled in and molding.
CN201710054914.XA 2017-01-24 2017-01-24 The integrating water route harden structure and preparation method of water treatment plant Pending CN108341434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710054914.XA CN108341434A (en) 2017-01-24 2017-01-24 The integrating water route harden structure and preparation method of water treatment plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710054914.XA CN108341434A (en) 2017-01-24 2017-01-24 The integrating water route harden structure and preparation method of water treatment plant

Publications (1)

Publication Number Publication Date
CN108341434A true CN108341434A (en) 2018-07-31

Family

ID=62961960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710054914.XA Pending CN108341434A (en) 2017-01-24 2017-01-24 The integrating water route harden structure and preparation method of water treatment plant

Country Status (1)

Country Link
CN (1) CN108341434A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104944608A (en) * 2014-12-03 2015-09-30 佛山市云米电器科技有限公司 Water purifying equipment, integrated waterway module thereof and production method of integrated waterway module
CN205061623U (en) * 2015-09-09 2016-03-02 厦门建霖工业有限公司 Integrated waterway structure of RO water purifier
CN105864459A (en) * 2016-05-09 2016-08-17 南京福碧源环境技术有限公司 Liquid treatment control valve device with integrated flow channel and control method of liquid treatment control valve device
CN205662356U (en) * 2016-06-12 2016-10-26 佛山市云米电器科技有限公司 Antibacterial integrated water route
CN206553212U (en) * 2017-01-24 2017-10-13 熊超北 The hardened structure of integrating water route of water treatment plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104944608A (en) * 2014-12-03 2015-09-30 佛山市云米电器科技有限公司 Water purifying equipment, integrated waterway module thereof and production method of integrated waterway module
CN205061623U (en) * 2015-09-09 2016-03-02 厦门建霖工业有限公司 Integrated waterway structure of RO water purifier
CN105864459A (en) * 2016-05-09 2016-08-17 南京福碧源环境技术有限公司 Liquid treatment control valve device with integrated flow channel and control method of liquid treatment control valve device
CN205662356U (en) * 2016-06-12 2016-10-26 佛山市云米电器科技有限公司 Antibacterial integrated water route
CN206553212U (en) * 2017-01-24 2017-10-13 熊超北 The hardened structure of integrating water route of water treatment plant

Similar Documents

Publication Publication Date Title
WO2016086866A1 (en) Water purification equipment and integrated water path module thereof
WO2016086865A1 (en) Water purification equipment, integrated water path module thereof and manufacturing method for integrated water path module
CN104985757A (en) Stacking mold
CN104136188A (en) Gate valve and method of manufacturing gate valve
CN211763152U (en) Injection molding mold
CN101932417A (en) Composite products and methods of making same
CN101495021B (en) Dishwasher manifold assembly and associated method
CN108341434A (en) The integrating water route harden structure and preparation method of water treatment plant
CN204312917U (en) Water pipe adapter
CN101850216B (en) Calking appliance and manufacturing method for fluid processor
CN108916380A (en) One kind inlaying tube sealing device and its processing technology
CN204417224U (en) Water purifying plant and integrating water route module thereof
CN103302873B (en) Method for manufacturing composite material rim
CN204869480U (en) Stromatolite mould
CN208004736U (en) Easy processing hot and cold water does not ooze the casting mold group of bathroom faucet main body mutually
CN206553212U (en) The hardened structure of integrating water route of water treatment plant
KR101444743B1 (en) A molding device for T-type pipe connector formation
CN205767090U (en) A kind of auto parts machinery quick cooling and shaping device
CN105565501B (en) A kind of assembly type constructed wetland device
CN203886257U (en) Water-distributing and gas-distributing system
CN208115305U (en) Modular water treatment plant integrating water route plate
CN208914490U (en) A kind of O-shaped rubber ring injection molding
CN208670045U (en) One kind inlaying tube sealing device
CN206596469U (en) A kind of accurate drip irrigation appliance of greenhouse solanaceous vegetables organic production
CN204054558U (en) A kind of point water block cooling device connecing angle mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180731

WD01 Invention patent application deemed withdrawn after publication