Publication number
CN108340051A
CN108340051A CN201710046379.3A CN201710046379A CN108340051A CN 108340051 A CN108340051 A CN 108340051A CN 201710046379 A CN201710046379 A CN 201710046379A CN 108340051 A CN108340051 A CN 108340051A
Authority
CN
China
Prior art keywords
welding
argon
er90s
weld
wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710046379.3A
Other languages
Chinese (zh)
Inventor
秦龙
赵克龙
方美琴
徐子华
徐兴川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DAQIN ELECTRIC CO Ltd
Original Assignee
JIANGSU DAQIN ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DAQIN ELECTRIC CO Ltd filed Critical JIANGSU DAQIN ELECTRIC CO Ltd
Priority to CN201710046379.3A priority Critical patent/CN108340051A/en
Publication of CN108340051A publication Critical patent/CN108340051A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/0026Arc welding or cutting specially adapted for particular articles or work
    • B23K9/0052Welding of pipe panels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/02Seam welding; Backing means; Inserts
    • B23K9/028Seam welding; Backing means; Inserts for curved planar seams
    • B23K9/0282Seam welding; Backing means; Inserts for curved planar seams for welding tube sections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment

Abstract

The invention discloses a kind of assembled welding process of P92 heat resisting steel; in welding when heavy wall P92 pipe butt welds; back side argon filling is carried out using ER90S G welding wires; argon arc weld connection technology; filling and the welding between capping layer, road, using the mixed gas arc welding welding procedure of ER90S G welding wires, argon+carbon dioxide composition.The welding procedure of the present invention both ensure that welding quality, meanwhile in middle big thickness piping butt welding, the scarfing cinder work between filled layer, road also becomes easy, and it can continuously weld, welding point largely reduces, meanwhile, when avoiding welding electrode arc welding, the accumulative waste of bare terminal, and lead to the generation of weld porosity and crackle because of the welding rod long-time scene storage moisture absorption, welding efficiency is greatly improved, welding cost is reduced.

Description

The assembled welding process of P92 heat resisting steel
Technical field
The present invention relates to a kind of welding procedure, main application is in the middle thickness that ultra supercritical coal-fired unit material is P92 steel In the big pipe butt welding of wall, has and be related to a kind of assembled welding process of P92 heat resisting steel.
Background technology
P92 steel is widely used in due to its good corrosion resistance and very high creep rupture strength at high temperatures In the gigawatt unit of numerous domestic.As a kind of new type steel playing significant role in extra-supercritical unit, P92 steel Welding procedure also necessarily become and need the project of primary study.
Currently, in fired power generating unit project, middle heavy wall P92 pipe butt welds are all made of the progress of ER90S-G welding wires when welding Back side argon filling, argon arc welding back cover;E9015-G welding electrode arc welding fills the welding procedure with capping.This assembled welding process, it is main If the heat source using argon arc welding is concentrated, protecting effect is good, and quality is easy to get guarantee to carry out the back cover of weld seam, recycles behaviour Make more conveniently stick electrode arc welding come the welding that is filled between capping layer, road.But this welding method is used to have There is the following insufficient:
(1)Welding rod has to pass through 350 DEG C of drying before weldering, and constant temperature is stored in on-demand in heat-preservation cylinder after 1-2 hours, and make It must be dried again with more than four hours, repeatedly drying number generally must not exceed secondary, to increase power consumption, wave Take welding material;
(2)Bare terminal can not use the waste for causing wlding;
(3)Scarfing cinder is more difficult between welding electrode arc welding filled layer, road, inefficiency;
(4)It needs frequently to replace welding rod in welding process, increases welding point quantity, influence U.S. of welding quality and appearance of weld It sees;
(5)Same weldment, because welding rod deposition efficiency is relatively low, it is desirable that welder's stream time is relatively long, increases welder Labor intensity, meanwhile, extend the build date of product, expend a large amount of human and material resources and electric power resource.
Invention content
Technical problem to be solved by the invention is to provide a kind of solution fired power generating unit, material is that the middle heavy wall of P92 steel is big The weld defect that pipe is likely to occur in butt welding, and construction cost is reduced, welding quality and welding efficiency etc. are improved, satisfaction is set The assembled welding process of the P92 heat resisting steel of the working condition of standby normal operation.
In order to solve the above technical problems, the present invention provides a kind of assembled welding process of P92 heat resisting steel, the heavy wall in welding When P92 pipe butt welds, using ER90S-G welding wires carry out back side argon filling, argon arc weld connection technology, filling with capping layer, Welding between road, using the mixed gas arc welding welding procedure of ER90S-G welding wires, argon+carbon dioxide composition, it is characterised in that Include the following steps:
1)(P92 steel alloys content belongs to high-alloy steel 10% or more, although should for the preheating of 200 DEG C -250 DEG C of the progress before weldering C, S, P content are relatively low in the alloy composition of steel, but there are still certain cold crack tendencies, and therefore, P92 steel must be taken when welding Preheating step.But from the point of view of joint quality, preheating temperature is excessively high, then grain boundary carbide can be caused to precipitate and formed iron within a fitting Ferritic, it is very unfavorable to toughness, and after carbide precipitation+formation ferritic structure is formed, it is necessary to carry out modifier treatment ability Effectively solved.It was verified that carrying out 200 DEG C -250 DEG C of preheating before weldering, temperature control is at 150 DEG C -200 between layer, road DEG C, you can it effectively prevent the generation of welding cold cracking);
2)The back cover that weld seam is carried out using argon arc welding welds (displacement of back side argon filling), and quality is easy to get guarantee;
3) 85% argon gas, 15% carbon dioxide is recycled to form gaseous mixture as welding protection gas (experiments have shown that carbon dioxide In 15%-20%, " hydrogen " stomata can substantially eliminate content) welding methods of+ER90S-G solid core welding wires is filled and capping The welding of layer;
4)Postwelding is air-cooled to 80 DEG C -100 DEG C (this temperature is the martensite transformation temperature of such steel), and keeps the temperature 1-2 hours, waits for The crystalline phase tissue of P92 steel be completely reformed into after martensite carry out in time 750 DEG C -760 DEG C (in this temperature range, P92 steel welding The post weld heat treatment of connector could obtain the impact toughness of good comprehensive performance, especially weld seam) postwelding disappears and should be heat-treated Process.
Further, small thermal weld stress is taken in welding process as possible, (P92 steel exists the thin layer welding of multilayer multiple tracks There is obvious timeliness to be inclined within the scope of 500 DEG C -650 DEG C, in ag(e)ing process, the alloying elements such as Cr, W, Mo and Fe, Mn, Si Intermetallic compound Laves phases are formed, impact flexibility can be caused to deteriorate;Meanwhile the excellent base material performance of supply of material state is welded The high temperature circulation connect, base material heat affected area performance must be deteriorated obviously, and degradation by with the increase of thermal weld stress and Aggravation.Therefore in the welding process it should be specifically noted that the control of thermal weld stress).
Compared with prior art, beneficial effects of the present invention are:
1)Gas protection wire is not required to drying and heat preservation, saves electric energy;
2)Gas shielded welds compared with former stick electrode arc welding, without bare terminal residue discard electrode, saves wlding resource, keeps away Exempt to waste, reduces cost;
3)Gas shielded welds no too many welding slag, and welder's scarfing cinder is light, and spatter is less, is conducive to the next procedure that circulates;
4)Gas shielded weldering welding point quantity significantly reduces, and appearance of weld is beautiful;
5)Working efficiency is the 200% of stick electrode arc welding, that is to say, that the pipe clamp of a diameter 1000mm-1200mm, welding rod Arc welding needs -2.5 days 2 days could weld completion, using this welding procedure, can be soldered within general 1 day.Not only mitigate welder's Labor intensity, and the manufacturing cycle of production is greatly shortened, the cost of effectively save welding production;
6)Because gas shielded arc welding can work continuously, reduces the necessary drying of welding rod and receive number, and because weld interval It is shorter, the time of heat preservation welding and the input of Transport Machinery equipment is greatly reduced, reduces the auxiliary of electric energy and mechanical equipment.
Specific implementation mode
Embodiment 1:
A kind of assembled welding process of P92 heat resisting steel, in welding when heavy wall P92 pipe butt welds, using ER90S-G welding wires into Row back side argon filling, argon arc weld connection technology, filling and the welding between capping layer, road, using ER90S-G welding wires, argon+dioxy The mixed gas arc welding welding procedure for changing carbon composition, includes the following steps:
1)(P92 steel alloys content belongs to high-alloy steel 10% or more, although should for the preheating of 200 DEG C -250 DEG C of the progress before weldering C, S, P content are relatively low in the alloy composition of steel, but there are still certain cold crack tendencies, and therefore, P92 steel must be taken when welding Preheating step.But from the point of view of joint quality, preheating temperature is excessively high, then grain boundary carbide can be caused to precipitate and formed iron within a fitting Ferritic, it is very unfavorable to toughness, and after carbide precipitation+formation ferritic structure is formed, it is necessary to carry out modifier treatment ability Effectively solved.It was verified that carrying out 200 DEG C -250 DEG C of preheating before weldering, temperature control is at 150 DEG C -200 between layer, road DEG C, you can it effectively prevent the generation of welding cold cracking);
2)The back cover that weld seam is carried out using argon arc welding welds (displacement of back side argon filling), and quality is easy to get guarantee;
3) 85% argon gas, 15% carbon dioxide is recycled to form gaseous mixture as welding protection gas (experiments have shown that carbon dioxide In 15%-20%, " hydrogen " stomata can substantially eliminate content) welding methods of+ER90S-G solid core welding wires is filled and capping The welding of layer;
4)Postwelding is air-cooled to 80 DEG C -100 DEG C (this temperature is the martensite transformation temperature of such steel), and keeps the temperature 1-2 hours, waits for The crystalline phase tissue of P92 steel be completely reformed into after martensite carry out in time 750 DEG C -760 DEG C (in this temperature range, P92 steel welding The post weld heat treatment of connector could obtain the impact toughness of good comprehensive performance, especially weld seam) postwelding disappears and should be heat-treated Process.
In conclusion the welding procedure of the present invention both ensure that welding quality, meanwhile, in middle big thickness piping butt welding, Scarfing cinder work between filled layer, road also becomes easy, and can continuously weld, and welding point largely reduces, meanwhile, it avoids When welding electrode arc welding, the accumulative waste of bare terminal, and cause because of the welding rod long-time scene storage moisture absorption weld porosity with The generation of crackle greatly improves welding efficiency, reduces welding cost.
The foregoing is merely the better embodiment of the present invention, protection scope of the present invention is not with the above embodiment Limit, as long as those of ordinary skill in the art should all be included in power according to equivalent modification or variation made by disclosed content Protection domain described in sharp claim.

Claims (2)

1. a kind of assembled welding process of P92 heat resisting steel, in welding when heavy wall P92 pipe butt welds, using ER90S-G welding wires Back side argon filling, argon arc weld connection technology, filling and the welding between capping layer, road are carried out, using ER90S-G welding wires, argon+two The mixed gas arc welding welding procedure of carbonoxide composition, it is characterised in that include the following steps:
1)200 DEG C -250 DEG C of preheating is carried out before weldering;
2)The back cover that weld seam is carried out using argon arc welding is welded;
3) weldering of 85% argon gas, 15% carbon dioxide composition gaseous mixture as welding protection gas+ER90S-G solid core welding wires is recycled Method is connect to be filled the welding with capping layer;
4)Postwelding is air-cooled to 80 DEG C -100 DEG C, and keeps the temperature 1-2 hours, after the crystalline phase tissue of P92 steel is completely reformed into martensite 750 DEG C of -760 DEG C of postweldings of progress, which disappear, in time answers process of thermal treatment method.
2. according to a kind of assembled welding process of P92 heat resisting steel shown in claim 1, it is characterised in that:In welding process to the greatest extent Amount takes small thermal weld stress, the thin layer welding of multilayer multiple tracks.
CN201710046379.3A 2017-01-22 2017-01-22 The assembled welding process of P92 heat resisting steel Pending CN108340051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710046379.3A CN108340051A (en) 2017-01-22 2017-01-22 The assembled welding process of P92 heat resisting steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710046379.3A CN108340051A (en) 2017-01-22 2017-01-22 The assembled welding process of P92 heat resisting steel

Publications (1)

Publication Number Publication Date
CN108340051A true CN108340051A (en) 2018-07-31

Family

ID=62974506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710046379.3A Pending CN108340051A (en) 2017-01-22 2017-01-22 The assembled welding process of P92 heat resisting steel

Country Status (1)

Country Link
CN (1) CN108340051A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317787A (en) * 2018-11-14 2019-02-12 中国能源建设集团安徽电力建设第工程有限公司 A kind of steel conduit all positon narrow gap TIG automatic welding process
CN109865955A (en) * 2019-03-05 2019-06-11 哈尔滨锅炉厂有限责任公司 The welding method that G115 large-diameter pipe hand tungsten argon arc welding and welding electrode arc welding combine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101112739A (en) * 2007-08-31 2008-01-30 北京工业大学 P92 steel all position welding gas-protection flux-cored wire
CN101259562A (en) * 2008-03-20 2008-09-10 浙江盛达铁塔有限公司 Welding technique for rolled steel
CN105420638A (en) * 2015-11-20 2016-03-23 钢铁研究总院 Heat-resisting alloy for 700-DEG C ultra-supercritical boiler water-cooling wall and tubing manufacturing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101112739A (en) * 2007-08-31 2008-01-30 北京工业大学 P92 steel all position welding gas-protection flux-cored wire
CN101259562A (en) * 2008-03-20 2008-09-10 浙江盛达铁塔有限公司 Welding technique for rolled steel
CN105420638A (en) * 2015-11-20 2016-03-23 钢铁研究总院 Heat-resisting alloy for 700-DEG C ultra-supercritical boiler water-cooling wall and tubing manufacturing method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国电力建设企业协会: "《中国电力建设工法汇编 2009年 上册》", 31 October 2009 *
梅强等: "SA335_P91钢管CO_2气体保护焊焊接工艺的研究", 《化工之友》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317787A (en) * 2018-11-14 2019-02-12 中国能源建设集团安徽电力建设第工程有限公司 A kind of steel conduit all positon narrow gap TIG automatic welding process
CN109865955A (en) * 2019-03-05 2019-06-11 哈尔滨锅炉厂有限责任公司 The welding method that G115 large-diameter pipe hand tungsten argon arc welding and welding electrode arc welding combine
CN109865955B (en) * 2019-03-05 2021-11-16 哈尔滨锅炉厂有限责任公司 Welding method combining manual tungsten electrode argon arc welding and shielded metal arc welding for G115 large-diameter pipe

Similar Documents

Publication Publication Date Title
CN104759743B (en) A kind of nickel-based alloy pipe argon arc welding process
CN103521886B (en) For the welding method of stainless steel single face welding and double face shaping
CN103433603B (en) The grade of P690QL1 high strength steel mates buried arc welding method by force
CN111266709B (en) Welding method for improving ultralow-temperature toughness of 304LN austenitic stainless steel submerged-arc welding joint
CN106425104A (en) One-sided welding double-sided molding welding method for titanium steel composite pipe
CN110076430B (en) Gas shielded welding method for 1000MPa steel plate with thickness of more than or equal to 40mm
CN104708170A (en) Q460C steel welding process
CN111283308B (en) All-position shielded metal arc welding process for ultralow-temperature 304LN austenitic stainless steel medium plate
CN112171109A (en) Full-automatic submerged-arc welding solid-core welding wire for nickel-saving high-manganese low-temperature steel
CN111230264A (en) Welding method of MIG welding of 304L austenitic stainless steel
CN109623199B (en) Consumable electrode gas shielded welding metal powder core flux-cored wire for ultralow-temperature high-manganese steel
CN104070270A (en) Solder wire submerged-arc welding process for steel resisting atmospheric corrosion in coastal region
CN101229605A (en) Argon-arc welding for austenitic stainless steel using water cooling welding method
CN112894198A (en) Self-protection flux-cored wire for ultralow-temperature high-manganese steel
CN108907504B (en) Metal powder cored flux-cored wire suitable for ultralow-temperature high-manganese steel and welding method
CN101633085B (en) Stainless steel welding wire and technology for welding same
WO2023273159A1 (en) Co2 gas shielded welding wire for ultra-low temperature high manganese steel and preparation method
CN108340051A (en) The assembled welding process of P92 heat resisting steel
CN106378579B (en) A kind of transmission angle steel tower column foot corrosion damage method for reinforcing
CN109926751B (en) 314 heat-resistant stainless steel metal core welding wire
CN104690447A (en) Self-shielded flux-cored wire for 0Cr13 ferrite stainless steel, and preparation method of self-shielded flux-cored wire
CN110576274A (en) Metal material, process and product for welding high-temperature high-pressure stainless steel pipeline
CN108340052A (en) The assembled welding process of P91 heat resisting steel
CN110293287A (en) A kind of welding procedure of superhigh intensity precipitation-hardening stainless steel
CN104002014A (en) Shielded metal arc welding technology for steel used for resisting to atmospheric corrosion in coastal region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180731