CN108331967A - Automatic constant pressure filling system - Google Patents
Automatic constant pressure filling system Download PDFInfo
- Publication number
- CN108331967A CN108331967A CN201810207968.XA CN201810207968A CN108331967A CN 108331967 A CN108331967 A CN 108331967A CN 201810207968 A CN201810207968 A CN 201810207968A CN 108331967 A CN108331967 A CN 108331967A
- Authority
- CN
- China
- Prior art keywords
- slip casting
- valve
- pressure
- filling system
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Jacking pipeline sectional is detected the mud sleeve pressure size of each section, is turned on and off Solenoid ball valve valve by automatic constant pressure filling system proposed by the present invention automatically, and lubricated slurry, which is added to pipeline outer wall, backbreaks in gap, keeps the mud sleeve pressure on periphery balanced.It monitors mud sleeve pressure size in real time, realizes that automatic mend is starched.
Description
Technical field
The present invention relates to the push pipe fields that municipal pipeline is laid with, and in particular to the filling system during jacking construction.
Background technology
Currently, China's urban pipe network is built in progress just like a raging fire, traditional pipe network improving and construction be required for by
Road surface excavates again, not only causes economic waste, has an effect on traffic, pollution environment.Traditional construction method is compared, push bench process is applied
Tool has and need not excavate that ground, floor space is small, traffic impact is small, a rate of advance is fast, the advantages such as environmentally friendly, economic, efficient,
Through having obtained comprehensive promotion and application.
When jacking, by the injected hole reserved on tool pipe or concrete tube coupling, backbreaks to pipeline outer wall and be pressed into gap
A certain amount of lubricated slurry forms an annular mud sleeve in pipeline periphery, and support surrounding soil is stablized, and pipeline outer wall is reduced
Frictional resistance between soil layer, substantially reduces thrust force.The quality that mud sleeve is formed, is directly related to the effect of drag reduction, to
The success or failure of entire pipe-jacking project are influenced indirectly.
Common grouting method is that personnel enter inside pipeline, and slave head tube cheats slip casting successively to jacking, opens head pipe
Slip casting branch pipe valve, remaining slip casting branch pipe valve are in closed state, lubricated slurry are made to enter between head pipe outer wall and soil layer
Backbreak in gap, the slip casting time according to pipeline outer wall backbreak gap size calculate come;After slip casting for a period of time, next group is opened
Slip casting branch pipe valve simultaneously closes head pipe slip casting branch pipe valve;After slip casting for a period of time, cycle opens next group of valve and closing
The step of current valve, closes current valve, completes slip casting process until opening last group of valve close to jacking hole.This
The shortcomings of kind method has heavy workload, and the pressure at slip casting position is uneven, can not form the good mud sleeve of duration.
Invention content
The technical problem to be solved by the present invention is to:The deficiency for overcoming the prior art provides a kind of automatic constant pressure filling system,
So that pipeline outer wall is backbreak, pressure in gap is balanced, and mud sleeve continuity is good.
Automatic constant pressure filling system proposed by the present invention mainly by slurry storing tank, pulp-absorbing pipe, grouting pump, threeway, safety valve, return
Starch the compositions such as pipe, slip casting supervisor, slip casting branch pipe, Electric Appliance Cabinet, computer.Slip casting branch pipe includes pressure sensor, Solenoid ball valve, note
Starch hose, slip casting check valve.
Slip casting process is:Computer sends out signal Electric Appliance Cabinet and receives signal and open head tube valve, starts grouting pump, leads to
Pulp-absorbing pipe is crossed from, by lubricated slurry sucking slip casting supervisor, lubricated slurry is responsible for reach along slip casting and be noted at head pipe in slurry storing tank
Branch pipe is starched, by Solenoid ball valve, slip casting hose, slip casting check valve enters pipeline outer wall and backbreaks in gap;After reaching setting pressure,
Computer sends out signal, opens the next group of slip casting branch pipe Solenoid ball valve valve close to head pipe, and close head pipe electromagnetic ball
Valve valve, lubricated slurry are injected into corresponding pipeline outer wall and are backbreak in gap by next group of slip casting branch pipe;Reach setting pressure
Afterwards, computer sends out signal again, opens next group of slip casting branch pipe Solenoid ball valve valve, and closes current group Solenoid ball valve valve
Door, the above steps are repeated, last group of slip casting branch pipe Solenoid ball valve until closing on jacking hole is opened, and lubricated slurry is injected into pipe
Pipeline outer wall is backbreak in gap, and after reaching setting pressure, computer sends out signal-off current electromagnetic ball valve, and closes grouting pump,
A uniform mud sleeve is just formed in pipeline outer wall backbreaks gap at this time.
Description of the drawings
Fig. 1 is schematic diagram of the present invention.
1. 6. return pipe of slurry storing tank 2. pulp-absorbing pipe, 3. grouting pump, 4. threeway, 5. safety valve, 7. slip casting supervisor, 8. electricity
12. Electric Appliance Cabinet of magnetic ball valve 9. pressure sensor, 10. slip casting hose, 11. slip casting check valve, 13. computer.
Specific implementation mode
Automatic constant pressure filling system proposed by the present invention is mainly by slurry storing tank(1), pulp-absorbing pipe(2), grouting pump(3), threeway
(4), safety valve(5), return pipe(6), slip casting supervisor(7), Solenoid ball valve(8), pressure sensor(9), slip casting hose(10), note
Slurry check valve(11), Electric Appliance Cabinet(12), computer(13)Composition.
Example one:Slip casting process for the first time, computer(13)Send out signal Electric Appliance Cabinet(12)It receives signal and opens head pipe
Valve starts grouting pump(3), pass through pulp-absorbing pipe(2)From slurry storing tank(1)It is middle to be responsible for lubricated slurry sucking slip casting(7)In, lubrication
Mud is responsible for along slip casting(7)Slip casting branch pipe at head pipe is reached, by Solenoid ball valve(8), slip casting hose(10), slip casting it is unidirectional
Valve(11)In gap being backbreak into pipeline outer wall;After reaching setting pressure, computer(13)Signal is sent out, is opened close to head pipe
Next group of slip casting branch pipe Solenoid ball valve(8)Valve, and close head pipe Solenoid ball valve(8)Valve, lubricated slurry pass through next
Group slip casting branch pipe is flowed into corresponding pipeline outer wall and backbreaks in gap;After reaching setting pressure, computer(13)Letter is sent out again
Number, open next group of slip casting branch pipe Solenoid ball valve(8)Valve, and close current group Solenoid ball valve(8)Valve recycles the above step
Suddenly, last group of slip casting branch pipe Solenoid ball valve cheated until closing on jacking(8)It opens, lubricated slurry is injected into pipeline outer wall and backbreaks
In gap, after reaching setting pressure, computer(13)Send out signal-off current electromagnetic ball valve(8)Valve, and close grouting pump
(3), a uniform mud sleeve is just formed in pipeline outer wall backbreaks gap at this time.
During slip casting, slip casting supervisor(7)When interior pressure is more than setting maximum pressure, safety valve(5)It opens, lubricated slurry
Pass through return pipe(6)Flow back into slurry storing tank(1)In.
Example two:When jacking construction, lubricated slurry part leaks into surrounding soil and underground water, partly fills up new formation
Gap of backbreaking;Due to the complexity of geological environment, cause lubricated slurry in the inhomogeneities of each part leakage, the mud of formation
It is unbalanced to cover pressure, cannot effectively play the role of drag reduction, needs constantly to mend slurry.Work as pressure sensor(9)Monitor some
When backbreaking that mud sleeve pressure reduction is to minimum pressure setting value in gap outside injected hole position, feedback signal is sent out automatically and reaches meter
Calculation machine(13), computer(13)By analysis, signal enabling grouting pump is sent out, current group Solenoid ball valve is opened(8)Valve will moisten
Slip slurry adds to pipeline outer wall and backbreaks in gap, keeps the mud sleeve pressure on periphery balanced, constantly.
It should be noted that the above is the exemplary case of the present invention, it is clear that described example is only the present invention one
Certain embodiments, rather than whole examples, for those skilled in the art, in the premise without departing from principle of the present invention
Under, several improvement and amendment can be carried out with various different modes, these are improved and amendment should be regarded as protection scope of the present invention.
Claims (3)
1. automatic constant pressure filling system proposed by the present invention, it is characterised in that:By slurry storing tank, pulp-absorbing pipe, grouting pump, threeway, peace
Full valve, return pipe, slip casting supervisor, slip casting branch pipe, Electric Appliance Cabinet, computer composition;By jacking pipeline sectional, mud is detected automatically
Set pressure is turned on and off Solenoid ball valve valve according to the pressure size of each section, and lubricated slurry is added to pipeline outer wall
It backbreaks in gap, keeps the mud sleeve pressure on periphery balanced.
2. automatic constant pressure filling system as described in claim 1, it is characterised in that:The slip casting branch pipe is provided with pressure biography
Sensor, Solenoid ball valve, slip casting hose, slip casting check valve.
3. automatic constant pressure filling system as described in claim 1, it is characterised in that:Monitor mud sleeve pressure size in real time, it is real
It is now automatic to mend slurry.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810207968.XA CN108331967A (en) | 2018-03-14 | 2018-03-14 | Automatic constant pressure filling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810207968.XA CN108331967A (en) | 2018-03-14 | 2018-03-14 | Automatic constant pressure filling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331967A true CN108331967A (en) | 2018-07-27 |
Family
ID=62930820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810207968.XA Pending CN108331967A (en) | 2018-03-14 | 2018-03-14 | Automatic constant pressure filling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331967A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109538823A (en) * | 2018-11-21 | 2019-03-29 | 中铁四局集团有限公司 | Construction method for double-pipe staggered alternative jacking |
CN109795031A (en) * | 2019-03-21 | 2019-05-24 | 中铁十四局集团第三工程有限公司 | A kind of post stretching precast beam automatic benefit sizing device and its application method |
CN109882115A (en) * | 2019-04-08 | 2019-06-14 | 贵州盘江精煤股份有限公司 | A kind of level pressure grouting device |
CN109899027A (en) * | 2019-04-08 | 2019-06-18 | 贵州盘江精煤股份有限公司 | A kind of gas drilling level pressure grout injection control device |
CN113847059A (en) * | 2021-08-24 | 2021-12-28 | 中国地质大学(武汉) | Intelligent early warning type pipe jacking area pipe joint grout supplementing system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5632575A (en) * | 1994-08-30 | 1997-05-27 | Lorenzen; Frank J. | Method and apparatus for controlled pumping of bentonite around a pipe jacked tunnel |
CN101555799A (en) * | 2009-05-19 | 2009-10-14 | 上海隧道工程股份有限公司 | Automatic grouting control device of push bench and method |
CN103176452A (en) * | 2013-02-05 | 2013-06-26 | 中国矿业大学 | Automatic grouting control method and device |
CN103644369A (en) * | 2013-12-24 | 2014-03-19 | 中铁上海工程局有限公司 | Automatic pressure feeding device and method for lubricating and drag-reduction slurry for push pipes |
CN104176976A (en) * | 2014-08-06 | 2014-12-03 | 上海隧道工程有限公司 | Antifriction slurry for rectangular jacking pipe with large section, preparation method of antifriction slurry and grouting construction method |
-
2018
- 2018-03-14 CN CN201810207968.XA patent/CN108331967A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5632575A (en) * | 1994-08-30 | 1997-05-27 | Lorenzen; Frank J. | Method and apparatus for controlled pumping of bentonite around a pipe jacked tunnel |
CN101555799A (en) * | 2009-05-19 | 2009-10-14 | 上海隧道工程股份有限公司 | Automatic grouting control device of push bench and method |
CN103176452A (en) * | 2013-02-05 | 2013-06-26 | 中国矿业大学 | Automatic grouting control method and device |
CN103644369A (en) * | 2013-12-24 | 2014-03-19 | 中铁上海工程局有限公司 | Automatic pressure feeding device and method for lubricating and drag-reduction slurry for push pipes |
CN104176976A (en) * | 2014-08-06 | 2014-12-03 | 上海隧道工程有限公司 | Antifriction slurry for rectangular jacking pipe with large section, preparation method of antifriction slurry and grouting construction method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109538823A (en) * | 2018-11-21 | 2019-03-29 | 中铁四局集团有限公司 | Construction method for double-pipe staggered alternative jacking |
CN109795031A (en) * | 2019-03-21 | 2019-05-24 | 中铁十四局集团第三工程有限公司 | A kind of post stretching precast beam automatic benefit sizing device and its application method |
CN109795031B (en) * | 2019-03-21 | 2024-05-17 | 中铁十四局集团第三工程有限公司 | Automatic slurry supplementing device for post-tensioning prefabricated beam slab and application method of automatic slurry supplementing device |
CN109882115A (en) * | 2019-04-08 | 2019-06-14 | 贵州盘江精煤股份有限公司 | A kind of level pressure grouting device |
CN109899027A (en) * | 2019-04-08 | 2019-06-18 | 贵州盘江精煤股份有限公司 | A kind of gas drilling level pressure grout injection control device |
CN109882115B (en) * | 2019-04-08 | 2023-11-21 | 贵州盘江精煤股份有限公司 | Constant-pressure grouting device |
CN109899027B (en) * | 2019-04-08 | 2024-01-23 | 贵州盘江精煤股份有限公司 | Constant-pressure grouting control device for gas drilling |
CN113847059A (en) * | 2021-08-24 | 2021-12-28 | 中国地质大学(武汉) | Intelligent early warning type pipe jacking area pipe joint grout supplementing system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108331967A (en) | Automatic constant pressure filling system | |
US20160169435A1 (en) | Polymer composite grouting method for blocking leaking and sand inrush of underground pipelines | |
CN105628335B (en) | Class rectangle shield synchronization slip casting testing equipment | |
CN100510274C (en) | Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method | |
CN103410119B (en) | A kind of seepage inside concrete waterproof of man grouting method | |
CN202140088U (en) | Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously | |
CN105155563A (en) | Reinforcing and treating method for water burst of soft-flow muddy stratum of foundation pit | |
CN105926624A (en) | Non-return type collecting hole grouting device and construction method thereof | |
CN108130901B (en) | The construction method of Karst grouting | |
CN104399740B (en) | A kind of horizontal sealing Rotating fields and its method for contaminated soil remediation | |
CN112878909A (en) | Anti-gushing method for drilling horizontal freezing hole of foundation pit | |
CN105649655A (en) | Device used for grouting reinforcement from interior of shield tunneling machine to peripheral stratum | |
CN105604163B (en) | Grouting construction method outside inside sewage pipeline leak stopping | |
CN104089103B (en) | Glass steel pipe lining method of circulating water pipe lined with glass steel pipe | |
CN107386251A (en) | A kind of block form single hole multi-layer Underground Water monitoring holes pipe method for embedding | |
CN109503016B (en) | Method for using acrylate reinforced slurry with magnetic sensitive thickening effect | |
CN104453924B (en) | A kind of shield machine shield tail grease sealing system | |
CN105544547A (en) | Covering type soil filled and soft soil stratum segmented reinforcing device and method | |
CN107780947A (en) | The deslagging pipe-line system and shield machine of a kind of Super Long Tunnel shield machine | |
CN212202370U (en) | Mechanical reversing mechanism of hydraulic grouting pump | |
CN204551551U (en) | A kind of ground-connecting-wall seam leak detection and grouting for water plugging device | |
CN204266222U (en) | Group hole replacement grouting structure suitable for karst region | |
CN207211153U (en) | A kind of high artesian area concrete structure behind perforate grouting device | |
CN110469136B (en) | Back-covering type regeneration waterproof construction method | |
CN207794115U (en) | A kind of recyclable water sealing structure of foundation pit freezing supporting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180727 |
|
WD01 | Invention patent application deemed withdrawn after publication |