CN108331810B - A pole tower hoop - Google Patents

A pole tower hoop Download PDF

Info

Publication number
CN108331810B
CN108331810B CN201711480353.6A CN201711480353A CN108331810B CN 108331810 B CN108331810 B CN 108331810B CN 201711480353 A CN201711480353 A CN 201711480353A CN 108331810 B CN108331810 B CN 108331810B
Authority
CN
China
Prior art keywords
bolt
base
section
hole
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711480353.6A
Other languages
Chinese (zh)
Other versions
CN108331810A (en
Inventor
邵孜辉
余成星
王杰
张耀
钟岳
鲁晨浩
詹志文
邹璇
张佳俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Kaihua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Kaihua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Kaihua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201711480353.6A priority Critical patent/CN108331810B/en
Publication of CN108331810A publication Critical patent/CN108331810A/en
Application granted granted Critical
Publication of CN108331810B publication Critical patent/CN108331810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/065Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using screw-thread elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)
  • Connection Of Plates (AREA)

Abstract

The invention discloses a tower hoop, which comprises a first base, a second base, a clasping belt, a fastening bolt and a fastening nut, wherein the first base is provided with a first hole; the first base is provided with a first fixing structure, the second base is provided with a second fixing structure, the holding belt comprises a first fixing section, a ring belt section and a second fixing section, and the first fixing section, the ring belt section and the second fixing section are of an integrally formed structure; the first bolt penetrates through the first hole and an upper through hole in the first fixing section, and the second bolt penetrates through the second hole and an upper through hole in the second fixing section; the fastening bolt passes through the first base and the second base, the second base is provided with a mounting plate, and the mounting plate is provided with a plurality of connecting holes. The invention has the beneficial effects that: the structure is reasonable, various electric power towers can be effectively held and fixed, the connection is firm, the disassembly and the assembly are facilitated, and the size and shape adaptability is good; the anti-loosening structure and the strengthening structure are provided, and the stability of the whole structure is good in the working process.

Description

一种杆塔抱箍A pole tower hoop

技术领域technical field

本发明属于电力施工技术领域,尤其涉及一种杆塔抱箍。The invention belongs to the technical field of electric power construction, and in particular relates to a pole tower hoop.

背景技术Background technique

在电力领域中,电力杆塔上经常会用到抱箍,抱箍是用一种材料抱住或箍住另外一种材料的构件,它属于紧固件。抱箍本身可与需要固定的配件、结构、设备等进行固定,然后抱持电力杆塔上,从而实现安装定位或连接。目前的抱箍,虽然能实现定位、连接等功能,但只能适应单一尺寸的被抱持对象,且对被抱持对象形状的适应性较差。In the field of electric power, hoop is often used on power towers. Hoop is a component that uses one material to hug or hoop another material, which belongs to fasteners. The hoop itself can be fixed with accessories, structures, equipment, etc. that need to be fixed, and then held on the power tower to achieve installation, positioning or connection. Although the current hoop can realize functions such as positioning and connection, it can only adapt to a single-sized object to be held, and has poor adaptability to the shape of the object to be held.

发明内容SUMMARY OF THE INVENTION

本发明的目的是为了克服现有技术中的不足,提供了一种结构合理,能有效对各类电力杆塔进行抱持固定,连接牢靠、利于拆装,尺寸、形状适应性好的杆塔抱箍。The purpose of the present invention is to overcome the deficiencies in the prior art, and to provide a pole and tower hoop with reasonable structure, which can effectively hold and fix various types of power poles and towers, has reliable connection, is convenient for disassembly and assembly, and has good adaptability to size and shape. .

为了实现上述目的,本发明采用以下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:

一种杆塔抱箍,包括A pole tower hoop, comprising

第一基座、第二基座、抱紧带、紧固螺栓及与紧固螺栓螺纹连接的紧固螺母;a first base, a second base, a holding belt, a fastening bolt and a fastening nut threadedly connected with the fastening bolt;

所述第一基座上设有第一固定结构,第一固定结构包括第一螺栓及与第一螺栓螺纹连接的第一螺母,第一基座上设有第一孔,第二基座上设有第二固定结构,第二固定结构包括第二螺栓及与第二螺栓螺纹连接的第二螺母,第二基座上设有第二孔;The first base is provided with a first fixing structure, the first fixing structure includes a first bolt and a first nut threadedly connected with the first bolt, the first base is provided with a first hole, and the second base is provided with a first hole. a second fixing structure is provided, the second fixing structure comprises a second bolt and a second nut threadedly connected with the second bolt, and a second hole is arranged on the second base;

所述抱紧带上设有多个上通孔,抱紧带包括依次连接的第一固定段、环带段及第二固定段,第一固定段、环带段及第二固定段为一体成型结构,第一固定段上的上通孔数目至少为1个,第二固定段上的上通孔数目至少为1个,环带段上的上通孔数目至少为5个;The holding belt is provided with a plurality of upper through holes, and the holding belt includes a first fixing section, an annular belt section and a second fixing section which are connected in sequence, and the first fixing section, the annular belt section and the second fixing section are integrated. Forming structure, the number of upper through holes on the first fixing segment is at least 1, the number of upper through holes on the second fixing segment is at least 1, and the number of upper through holes on the annular band segment is at least 5;

所述第一螺栓穿过第一孔及第一固定段上的一个上通孔,第一螺栓压紧第一基座,第一螺母压紧第一固定段,第二螺栓穿过第二孔及第二固定段上的一个上通孔,第二螺栓压紧第二基座,第二螺母压紧第二固定段;The first bolt passes through the first hole and an upper through hole on the first fixing section, the first bolt presses the first base, the first nut presses the first fixing section, and the second bolt passes through the second hole and an upper through hole on the second fixed section, the second bolt presses the second base, and the second nut presses the second fixed section;

所述紧固螺栓穿过第一基座及第二基座,紧固螺栓压紧第一基座,紧固螺母压紧第二基座,第二基座上设有安装板,安装板上设有若干连接孔。The tightening bolts pass through the first base and the second base, the tightening bolts press the first base, the tightening nuts press the second base, the second base is provided with a mounting plate, and the mounting plate There are several connection holes.

作为优选,所述第一基座上设有第三固定结构,第三固定结构包括第三螺栓及与第三螺栓螺纹连接的第三螺母,第一基座上设有第三孔,第二基座上设有第四固定结构,第四固定结构包括第四螺栓及与第四螺栓螺纹连接的第四螺母,第二基座上设有第四孔,抱紧带上设有多个与上通孔一一对应的下通孔,下通孔处在对应上通孔的正下方,第三螺栓穿过第三孔及第一固定段上的一个下通孔,第三螺栓压紧第一基座,第三螺母压紧第一固定段,第四螺栓穿过第四孔及第二固定段上的一个下上通孔,第四螺栓压紧第二基座,第四螺母压紧第二固定段。Preferably, the first base is provided with a third fixing structure, the third fixing structure includes a third bolt and a third nut threadedly connected with the third bolt, the first base is provided with a third hole, the second The base is provided with a fourth fixing structure, the fourth fixing structure includes a fourth bolt and a fourth nut threadedly connected with the fourth bolt, the second base is provided with a fourth hole, and the holding belt is provided with a plurality of The upper through holes correspond to the lower through holes one-to-one, the lower through holes are located just below the corresponding upper through holes, the third bolt passes through the third hole and a lower through hole on the first fixing section, and the third bolt presses the first through hole. a base, the third nut presses the first fixing section, the fourth bolt passes through the fourth hole and a lower and upper through hole on the second fixing section, the fourth bolt presses the second base, and the fourth nut presses Second fixed segment.

作为优选,所述上通孔轴线水平,所有上通孔轴线均处在同一水平面内,所述下通孔轴线水平,所有下通孔轴线均处在同一水平面内。Preferably, the axes of the upper through holes are horizontal, the axes of all the upper through holes are in the same horizontal plane, the axes of the lower through holes are horizontal, and the axes of all the lower through holes are in the same horizontal plane.

作为优选,所述紧固螺栓通过垫片压紧第一基座,紧固螺母通过垫片压紧第二基座,第一螺母通过垫片压紧第一固定段,第二螺母通过垫片压紧第二固定段。Preferably, the fastening bolt presses the first base through the washer, the tightening nut presses the second base through the washer, the first nut presses the first fixing section through the washer, and the second nut passes through the washer Tighten the second fixing segment.

作为优选,所述第三螺母通过垫片压紧第一固定段,第四螺母通过垫片压紧第二固定段。Preferably, the third nut is pressed against the first fixing section by the washer, and the fourth nut is pressed against the second fixing section by the washer.

作为优选,所述抱紧带由不锈钢或铁或钢或铝制成。Preferably, the holding belt is made of stainless steel or iron or steel or aluminum.

作为优选,所述抱紧带还包括第一覆盖段及第二覆盖段,第一覆盖段、第一固定段、环带段、第二固定段及第二覆盖段依次连接,第一覆盖段、第一固定段、环带段、第二固定段及第二覆盖段为一体成型结构,第一覆盖段接触第一螺栓及第三螺栓,第二覆盖段接触第二螺栓及第四螺栓。Preferably, the clasping belt further includes a first covering segment and a second covering segment, the first covering segment, the first fixing segment, the annular band segment, the second fixing segment and the second covering segment are connected in sequence, and the first covering segment is connected in sequence. The first fixed segment, the annular band segment, the second fixed segment and the second cover segment are integrally formed, the first cover segment contacts the first bolt and the third bolt, and the second cover segment contacts the second bolt and the fourth bolt.

作为优选,在第一螺栓轴向上:第一覆盖段、第一固定段、第一孔及第一螺母依次布置,第一螺栓投影落在第一覆盖段投影范围内;在第二螺栓轴向上:第一覆盖段、第一固定段、第一孔及第二螺母依次布置,第二螺栓投影落在第一覆盖段投影范围内;在第三螺栓轴向上:第一覆盖段、第一固定段、第三孔及第三螺母依次布置,第三螺栓投影落在第一覆盖段投影范围内;在第四螺栓轴向上:第一覆盖段、第一固定段、第四孔及第四螺母依次布置,第四螺栓投影落在第一覆盖段投影范围内。Preferably, in the axial direction of the first bolt: the first covering section, the first fixing section, the first hole and the first nut are arranged in sequence, and the projection of the first bolt falls within the projection range of the first covering section; Up: the first covering section, the first fixing section, the first hole and the second nut are arranged in sequence, and the projection of the second bolt falls within the projection range of the first covering section; in the axial direction of the third bolt: the first covering section, The first fixing section, the third hole and the third nut are arranged in sequence, and the projection of the third bolt falls within the projection range of the first covering section; in the axial direction of the fourth bolt: the first covering section, the first fixing section, the fourth hole and the fourth nut are arranged in sequence, and the projection of the fourth bolt falls within the projection range of the first covering segment.

作为优选,所述第一基座上设有加强板,第二基座上设有加强板。Preferably, the first base is provided with a reinforcing plate, and the second base is provided with a reinforcing plate.

本发明的有益效果是:结构合理,能有效对各类电力杆塔进行抱持固定,连接牢靠、利于拆装,尺寸、形状适应性好;具有防松结构和强化结构,工作过程中整体结构的稳定性好。The beneficial effects of the invention are as follows: the structure is reasonable, it can effectively hold and fix various power poles and towers, the connection is firm, the disassembly and assembly are convenient, and the adaptability of size and shape is good; Good stability.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2是图1中A处的结构示意图;Fig. 2 is the structural representation at A place in Fig. 1;

图3是本发明抱紧带平铺展开后的局部结构示意图。FIG. 3 is a schematic diagram of the partial structure of the gripping belt of the present invention after it is spread out.

图中:第一基座1、第二基座2、抱紧带3、第一固定段3a、环带段3b、第二固定段3c、第一覆盖段3d、第二覆盖段3e、上通孔31、下通孔32、紧固螺栓41、紧固螺母42、第一螺栓51、第一螺母52、第二螺栓61、第二螺母62、安装板7、垫片8。In the figure: the first base 1, the second base 2, the holding belt 3, the first fixing section 3a, the annular belt section 3b, the second fixing section 3c, the first covering section 3d, the second covering section 3e, the upper The through hole 31 , the lower through hole 32 , the fastening bolt 41 , the fastening nut 42 , the first bolt 51 , the first nut 52 , the second bolt 61 , the second nut 62 , the mounting plate 7 , and the washer 8 .

具体实施方式Detailed ways

下面结合附图和具体实施方式对本发明做进一步的描述。The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

如图1至图3中所示,一种杆塔抱箍,包括As shown in Figure 1 to Figure 3, a pole tower hoop, including

第一基座1、第二基座2、抱紧带3、紧固螺栓41及与紧固螺栓螺纹连接的紧固螺母42;The first base 1, the second base 2, the holding belt 3, the tightening bolts 41 and the tightening nuts 42 threadedly connected with the tightening bolts;

所述第一基座上设有第一固定结构,第一固定结构包括第一螺栓51及与第一螺栓螺纹连接的第一螺母52,第一基座上设有第一孔,第二基座上设有第二固定结构,第二固定结构包括第二螺栓61及与第二螺栓螺纹连接的第二螺母62,第二基座上设有第二孔;The first base is provided with a first fixing structure. The first fixing structure includes a first bolt 51 and a first nut 52 threadedly connected with the first bolt. The first base is provided with a first hole, and the second base is provided with a first hole. The seat is provided with a second fixing structure, the second fixing structure includes a second bolt 61 and a second nut 62 threadedly connected with the second bolt, and a second hole is provided on the second base;

所述抱紧带上设有多个上通孔31,抱紧带包括依次连接的第一固定段3a、环带段3b及第二固定段3c,第一固定段、环带段及第二固定段为一体成型结构,第一固定段上的上通孔数目至少为1个,第二固定段上的上通孔数目至少为1个,环带段上的上通孔数目至少为5个;The holding belt is provided with a plurality of upper through holes 31, and the holding belt includes a first fixed section 3a, an annular belt section 3b and a second fixed section 3c which are connected in sequence. The fixed segment is integrally formed, the number of upper through holes on the first fixed segment is at least 1, the number of upper through holes on the second fixed segment is at least 1, and the number of upper through holes on the annular band segment is at least 5 ;

所述第一螺栓穿过第一孔及第一固定段上的一个上通孔,第一螺栓压紧第一基座,第一螺母压紧第一固定段,第二螺栓穿过第二孔及第二固定段上的一个上通孔,第二螺栓压紧第二基座,第二螺母压紧第二固定段;The first bolt passes through the first hole and an upper through hole on the first fixing section, the first bolt presses the first base, the first nut presses the first fixing section, and the second bolt passes through the second hole and an upper through hole on the second fixed section, the second bolt presses the second base, and the second nut presses the second fixed section;

所述紧固螺栓穿过第一基座及第二基座,紧固螺栓压紧第一基座,紧固螺母压紧第二基座,第二基座上设有安装板7,安装板上设有若干连接孔。The tightening bolts pass through the first base and the second base, the tightening bolts press the first base, the tightening nuts press the second base, and a mounting plate 7 is provided on the second base. There are several connecting holes on it.

使用本发明时,抱紧带一开始是一条平铺展开的条形带。根据需要抱持的杆塔(或其它结构)的尺寸,现场对抱紧带进行折弯,抱紧带弯曲成三段(第一固定段、环带段及第二固定段),然后用环带段抱住杆塔,利用第一固定结构将第一固定段与第一基座进行连接(第一螺栓穿过第一孔及第一固定段上的一个上通孔,第一螺栓压紧第一基座,第一螺母压紧第一固定段),利用第二固定结构将第二固定段与第二基座进行连接(第二螺栓穿过第二孔及第二固定段上的一个上通孔,第二螺栓压紧第二基座,第二螺母压紧第二固定段)。最后用紧固螺栓及紧固螺栓母将第一基座与第二基座进行连接(紧固螺栓穿过第一基座及第二基座,紧固螺栓压紧第一基座,紧固螺母压紧第二基座),实现抱持连接。安装板及其上的连接孔可用于连接、焊接各需要安装的配件、结构、设备等。When using the present invention, the gripping strap starts out as a flat strip. According to the size of the tower (or other structure) that needs to be held, the holding belt is bent on site, and the holding belt is bent into three sections (the first fixed section, the ring belt section and the second fixed section), and then the ring belt is bent into three sections. The segment hugs the tower, and uses the first fixing structure to connect the first fixing segment and the first base (the first bolt passes through the first hole and an upper through hole on the first fixing segment, and the first bolt presses the first base, the first nut is pressed against the first fixing section), and the second fixing section is connected with the second base by the second fixing structure (the second bolt passes through the second hole and an upper pass on the second fixing section) hole, the second bolt is pressed against the second base, and the second nut is pressed against the second fixed segment). Finally, connect the first base and the second base with the tightening bolts and the tightening bolt nut (the tightening bolts pass through the first base and the second base, the tightening bolts press the first base, and tighten the The nut presses the second base) to realize the holding connection. The mounting plate and the connection holes on it can be used to connect and weld accessories, structures, and equipment that need to be installed.

所述第一基座上设有第三固定结构,第三固定结构包括第三螺栓及与第三螺栓螺纹连接的第三螺母,第一基座上设有第三孔,第二基座上设有第四固定结构,第四固定结构包括第四螺栓及与第四螺栓螺纹连接的第四螺母,第二基座上设有第四孔,抱紧带上设有多个与上通孔一一对应的下通孔32,下通孔处在对应上通孔的正下方,第三螺栓穿过第三孔及第一固定段上的一个下通孔,第三螺栓压紧第一基座,第三螺母压紧第一固定段,第四螺栓穿过第四孔及第二固定段上的一个下上通孔,第四螺栓压紧第二基座,第四螺母压紧第二固定段。第三结构的使用及作用原理同第一结构,第四结构的使用及作用原理同第二结构。The first base is provided with a third fixing structure, the third fixing structure includes a third bolt and a third nut threadedly connected with the third bolt, the first base is provided with a third hole, and the second base is provided with a third hole. A fourth fixing structure is provided, the fourth fixing structure includes a fourth bolt and a fourth nut threadedly connected with the fourth bolt, a fourth hole is arranged on the second base, and a plurality of through holes are arranged on the holding belt One-to-one corresponding lower through holes 32, the lower through holes are located just below the corresponding upper through holes, the third bolt passes through the third hole and a lower through hole on the first fixing section, and the third bolt presses the first base seat, the third nut presses the first fixing section, the fourth bolt passes through the fourth hole and a lower and upper through hole on the second fixing section, the fourth bolt presses the second base, and the fourth nut presses the second Fixed segment. The use and action principle of the third structure are the same as those of the first structure, and the use and action principle of the fourth structure are the same as those of the second structure.

第三螺栓处在第一螺栓下方,第四螺栓处在第二螺栓下方。The third bolt is below the first bolt and the fourth bolt is below the second bolt.

所述上通孔轴线水平,所有上通孔轴线均处在同一水平面内,所述下通孔轴线水平,所有下通孔轴线均处在同一水平面内。The axes of the upper through holes are horizontal, the axes of all the upper through holes are in the same horizontal plane, the axes of the lower through holes are horizontal, and the axes of all the lower through holes are in the same horizontal plane.

所述紧固螺栓通过垫片8压紧第一基座,紧固螺母通过垫片压紧第二基座,第一螺母通过垫片压紧第一固定段,第二螺母通过垫片压紧第二固定段。所述第三螺母通过垫片压紧第一固定段,第四螺母通过垫片压紧第二固定段。垫片可以增大接触面积,提高固定和压紧的效果,从而可提升整体结构的稳定性和牢靠性。The fastening bolts are pressed against the first base through the gasket 8, the fastening nut is pressed against the second base by the gasket, the first nut is pressed against the first fixed section by the gasket, and the second nut is pressed by the gasket Second fixed segment. The third nut presses the first fixing segment through the washer, and the fourth nut presses the second fixing segment through the washer. The gasket can increase the contact area and improve the effect of fixing and pressing, thereby improving the stability and reliability of the overall structure.

所述抱紧带由不锈钢或铁或钢或铝制成。根据不同的需求,抱紧带可由各类金属或合金制成。当由不锈钢制成时,具备一定的防锈抗蚀能力。The gripping straps are made of stainless steel or iron or steel or aluminum. According to different needs, the holding belt can be made of various metals or alloys. When made of stainless steel, it has certain rust and corrosion resistance.

所述抱紧带还包括第一覆盖段3d及第二覆盖段3e,第一覆盖段、第一固定段、环带段、第二固定段及第二覆盖段依次连接,第一覆盖段、第一固定段、环带段、第二固定段及第二覆盖段为一体成型结构,第一覆盖段接触第一螺栓及第三螺栓,第二覆盖段接触第二螺栓及第四螺栓。第一覆盖段可以盖住第一螺栓和第三螺栓,既能提高美观性,又可利用摩擦力来防松,还可以对第一螺栓和第三螺栓进行保护;第二覆盖段可以盖住第二螺栓和第四螺栓,既能提高美观性,又可利用摩擦力来防松,还可以对第二螺栓和第四螺栓进行保护。The holding belt also includes a first covering section 3d and a second covering section 3e. The first covering section, the first fixing section, the annular belt section, the second fixing section and the second covering section are connected in sequence. The first covering section, The first fixing segment, the annular band segment, the second fixing segment and the second covering segment are integrally formed, the first covering segment contacts the first bolt and the third bolt, and the second covering segment contacts the second bolt and the fourth bolt. The first cover section can cover the first bolt and the third bolt, which can not only improve the aesthetics, but also use friction to prevent loosening, and can also protect the first bolt and the third bolt; the second cover section can cover the The second bolt and the fourth bolt can not only improve the aesthetics, but also use friction to prevent loosening, and can also protect the second bolt and the fourth bolt.

在第一螺栓轴向上:第一覆盖段、第一固定段、第一孔及第一螺母依次布置,第一螺栓投影落在第一覆盖段投影范围内;在第二螺栓轴向上:第一覆盖段、第一固定段、第一孔及第二螺母依次布置,第二螺栓投影落在第一覆盖段投影范围内;在第三螺栓轴向上:第一覆盖段、第一固定段、第三孔及第三螺母依次布置,第三螺栓投影落在第一覆盖段投影范围内;在第四螺栓轴向上:第一覆盖段、第一固定段、第四孔及第四螺母依次布置,第四螺栓投影落在第一覆盖段投影范围内。In the axial direction of the first bolt: the first covering section, the first fixing section, the first hole and the first nut are arranged in sequence, and the projection of the first bolt falls within the projection range of the first covering section; in the axial direction of the second bolt: The first covering section, the first fixing section, the first hole and the second nut are arranged in sequence, and the projection of the second bolt falls within the projection range of the first covering section; on the axial direction of the third bolt: the first covering section, the first fixing section The segment, the third hole and the third nut are arranged in sequence, and the projection of the third bolt falls within the projection range of the first covering segment; on the axial direction of the fourth bolt: the first covering segment, the first fixing segment, the fourth hole and the fourth The nuts are arranged in sequence, and the projection of the fourth bolt falls within the projection range of the first covering segment.

所述第一基座上设有加强板,第二基座上设有加强板。加强板可以强化第一基座和第二基座的强度,提升本发明工作过程中整体结构的稳定性。The first base is provided with a reinforcing plate, and the second base is provided with a reinforcing plate. The reinforcing plate can strengthen the strength of the first base and the second base, and improve the stability of the overall structure during the working process of the present invention.

Claims (6)

1.一种杆塔抱箍,其特征是,包括1. a pole tower hoop, is characterized in that, comprises 第一基座、第二基座、抱紧带、紧固螺栓及与紧固螺栓螺纹连接的紧固螺母;a first base, a second base, a holding belt, a fastening bolt and a fastening nut threadedly connected with the fastening bolt; 所述第一基座上设有第一固定结构,第一固定结构包括第一螺栓及与第一螺栓螺纹连接的第一螺母,第一基座上设有第一孔,第二基座上设有第二固定结构,第二固定结构包括第二螺栓及与第二螺栓螺纹连接的第二螺母,第二基座上设有第二孔;The first base is provided with a first fixing structure, the first fixing structure includes a first bolt and a first nut threadedly connected with the first bolt, the first base is provided with a first hole, and the second base is provided with a first hole. a second fixing structure is provided, the second fixing structure comprises a second bolt and a second nut threadedly connected with the second bolt, and a second hole is arranged on the second base; 所述抱紧带上设有多个上通孔,抱紧带包括第一固定段、环带段、第二固定段、第一覆盖段及第二覆盖段,第一覆盖段、第一固定段、环带段、第二固定段及第二覆盖段依次连接,第一覆盖段、第一固定段、环带段、第二固定段及第二覆盖段为一体成型结构,第一固定段上的上通孔数目至少为1个,第二固定段上的上通孔数目至少为1个,环带段上的上通孔数目至少为5个;The holding belt is provided with a plurality of upper through holes, and the holding belt includes a first fixing section, an annular belt section, a second fixing section, a first covering section and a second covering section. The first covering section, the first fixing section, the annular belt section, the second fixing section and the second covering section are integrally formed, and the first fixing section The number of upper through holes on the upper part is at least 1, the number of upper through holes on the second fixed segment is at least 1, and the number of upper through holes on the annular band segment is at least 5; 所述第一螺栓穿过第一孔及第一固定段上的一个上通孔,第一螺栓压紧第一基座,第一螺母压紧第一固定段,第二螺栓穿过第二孔及第二固定段上的一个上通孔,第二螺栓压紧第二基座,第二螺母压紧第二固定段;The first bolt passes through the first hole and an upper through hole on the first fixing section, the first bolt presses the first base, the first nut presses the first fixing section, and the second bolt passes through the second hole and an upper through hole on the second fixed section, the second bolt presses the second base, and the second nut presses the second fixed section; 所述紧固螺栓穿过第一基座及第二基座,紧固螺栓压紧第一基座,紧固螺母压紧第二基座,第二基座上设有安装板,安装板上设有若干连接孔;The tightening bolts pass through the first base and the second base, the tightening bolts press the first base, the tightening nuts press the second base, the second base is provided with a mounting plate, and the mounting plate There are several connection holes; 所述第一基座上设有第三固定结构,第三固定结构包括第三螺栓及与第三螺栓螺纹连接的第三螺母,第一基座上设有第三孔,第二基座上设有第四固定结构,第四固定结构包括第四螺栓及与第四螺栓螺纹连接的第四螺母,第二基座上设有第四孔,抱紧带上设有多个与上通孔一一对应的下通孔,下通孔处在对应上通孔的正下方,第三螺栓穿过第三孔及第一固定段上的一个下通孔,第三螺栓压紧第一基座,第三螺母压紧第一固定段,第四螺栓穿过第四孔及第二固定段上的一个下通孔,第四螺栓压紧第二基座,第四螺母压紧第二固定段;The first base is provided with a third fixing structure, the third fixing structure includes a third bolt and a third nut threadedly connected with the third bolt, the first base is provided with a third hole, and the second base is provided with a third hole. A fourth fixing structure is provided, the fourth fixing structure includes a fourth bolt and a fourth nut threadedly connected with the fourth bolt, a fourth hole is arranged on the second base, and a plurality of through holes are arranged on the holding belt One-to-one corresponding lower through holes, the lower through holes are located just below the corresponding upper through holes, the third bolt passes through the third hole and a lower through hole on the first fixing section, and the third bolt presses the first base , the third nut presses the first fixing segment, the fourth bolt passes through the fourth hole and a lower through hole on the second fixing segment, the fourth bolt presses the second base, and the fourth nut presses the second fixing segment ; 所述第一覆盖段接触第一螺栓及第三螺栓,第二覆盖段接触第二螺栓及第四螺栓;the first cover section contacts the first bolt and the third bolt, and the second cover section contacts the second bolt and the fourth bolt; 所述第一基座上设有加强板,第二基座上设有加强板。The first base is provided with a reinforcing plate, and the second base is provided with a reinforcing plate. 2.根据权利要求1所述的一种杆塔抱箍,其特征是,所述上通孔轴线水平,所有上通孔轴线均处在同一水平面内,所述下通孔轴线水平,所有下通孔轴线均处在同一水平面内。2. A kind of pole tower hoop according to claim 1, is characterized in that, the axis of described upper through hole is horizontal, all upper through hole axes are all in the same horizontal plane, the described lower through hole axis is horizontal, and all lower through hole axes are horizontal. The axes of the holes are all in the same horizontal plane. 3.根据权利要求1所述的一种杆塔抱箍,其特征是,所述紧固螺栓通过第一垫片压紧第一基座,紧固螺母通过第二垫片压紧第二基座,第一螺母通过第三垫片压紧第一固定段,第二螺母通过第四垫片压紧第二固定段。3. A kind of pole tower hoop according to claim 1, is characterized in that, described fastening bolt presses the first base by the first gasket, and the fastening nut presses the second base by the second washer , the first nut is pressed against the first fixed segment by the third washer, and the second nut is pressed against the second fixed segment by the fourth washer. 4.根据权利要求1所述的一种杆塔抱箍,其特征是,所述第三螺母通过第五垫片压紧第一固定段,第四螺母通过第六垫片压紧第二固定段。4. A pole tower hoop according to claim 1, wherein the third nut compresses the first fixed section through the fifth washer, and the fourth nut compresses the second fixed section through the sixth gasket . 5.根据权利要求1或2或3或4所述的一种杆塔抱箍,其特征是,所述抱紧带由不锈钢或铁或铝制成。5. A kind of pole tower hoop according to claim 1 or 2 or 3 or 4, is characterized in that, described clamping band is made of stainless steel or iron or aluminum. 6.根据权利要求1所述的一种杆塔抱箍,其特征是,6. a kind of pole tower hoop according to claim 1 is characterized in that, 在第一螺栓轴向上:第一覆盖段、第一固定段、第一孔及第一螺母依次布置,第一螺栓投影落在第一覆盖段投影范围内;In the axial direction of the first bolt: the first covering section, the first fixing section, the first hole and the first nut are arranged in sequence, and the projection of the first bolt falls within the projection range of the first covering section; 在第二螺栓轴向上:第二覆盖段、第二固定段、第二孔及第二螺母依次布置,第二螺栓投影落在第二覆盖段投影范围内;In the axial direction of the second bolt: the second covering section, the second fixing section, the second hole and the second nut are arranged in sequence, and the projection of the second bolt falls within the projection range of the second covering section; 在第三螺栓轴向上:第一覆盖段、第一固定段、第三孔及第三螺母依次布置,第三螺栓投影落在第一覆盖段投影范围内;In the axial direction of the third bolt: the first covering section, the first fixing section, the third hole and the third nut are arranged in sequence, and the projection of the third bolt falls within the projection range of the first covering section; 在第四螺栓轴向上:第二覆盖段、第二固定段、第四孔及第四螺母依次布置,第四螺栓投影落在第二覆盖段投影范围内。In the axial direction of the fourth bolt: the second covering section, the second fixing section, the fourth hole and the fourth nut are arranged in sequence, and the projection of the fourth bolt falls within the projection range of the second covering section.
CN201711480353.6A 2017-12-29 2017-12-29 A pole tower hoop Active CN108331810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711480353.6A CN108331810B (en) 2017-12-29 2017-12-29 A pole tower hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711480353.6A CN108331810B (en) 2017-12-29 2017-12-29 A pole tower hoop

Publications (2)

Publication Number Publication Date
CN108331810A CN108331810A (en) 2018-07-27
CN108331810B true CN108331810B (en) 2020-06-05

Family

ID=62924630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711480353.6A Active CN108331810B (en) 2017-12-29 2017-12-29 A pole tower hoop

Country Status (1)

Country Link
CN (1) CN108331810B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200382039Y1 (en) * 2005-02-04 2005-04-18 노건상 Connecting band for pipes
FR2884563B1 (en) * 2005-04-13 2011-03-18 Caillau Ets CLAMPING DEVICE WITH REINFORCED CLAMPING EARS
CN201246372Y (en) * 2008-08-25 2009-05-27 江苏武进液压启闭机有限公司 Anchor ear
KR20110035161A (en) * 2009-09-30 2011-04-06 (주)삼일강업 Hose couplings
FR2989436B1 (en) * 2012-04-13 2015-02-13 Caillau Ets TIGHTENING NECK
CN205977930U (en) * 2016-08-04 2017-02-22 力帆实业(集团)股份有限公司 Fastening staple bolt structure
CN206274607U (en) * 2016-12-28 2017-06-23 国网浙江省电力公司湖州供电公司 A kind of Novel lightning arrester external leakage shields anchor ear device
CN207848110U (en) * 2017-12-29 2018-09-11 国网浙江省电力公司衢州供电公司 Shaft tower anchor ear

Also Published As

Publication number Publication date
CN108331810A (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN207829577U (en) A kind of mounting structure of communication equipment platform
CN108331810B (en) A pole tower hoop
CN204928025U (en) Intelligence generating line bearing structure
CN207848110U (en) Shaft tower anchor ear
CN204216234U (en) A kind of earth terminal of earth connection
CN107061468B (en) Waterproof pressure riveting nut
CN106122229A (en) A kind of flange nut washer combination
CN204418775U (en) A kind of steel tower fixture
CN205879450U (en) Connecting seat work piece air -tight test frock
CN212706436U (en) Butt joint fixing device for mounting gas pipeline
CN206054926U (en) A kind of angle steel tower ventilation duct clamp device
CN201407264Y (en) Detachable expansion bolt
CN207218201U (en) A kind of graphite ground wire fixing device
CN203260715U (en) Top antenna pedestal of automobile
CN202737116U (en) Detachable cover plate grounding soldering lug
CN205842040U (en) Flange
CN207527170U (en) A kind of groove pipeline connecting parts pipe clamp
CN207045252U (en) A kind of automobile-used radio positioner being easily installed
CN208997101U (en) A kind of Novel pipe clamp
CN210829055U (en) An adjustable aluminum alloy cabin ladder climbing system
CN215600935U (en) A fixed clip for new energy vehicle wiring harness
CN221762417U (en) A waterproof riveted nut
CN211738562U (en) Solar monitoring embracing type column support
CN201674007U (en) Distribution transformer area grounding clamp
CN204793956U (en) Insulating strain clamp clamping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant