CN108330752A - A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail - Google Patents

A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail Download PDF

Info

Publication number
CN108330752A
CN108330752A CN201810399830.4A CN201810399830A CN108330752A CN 108330752 A CN108330752 A CN 108330752A CN 201810399830 A CN201810399830 A CN 201810399830A CN 108330752 A CN108330752 A CN 108330752A
Authority
CN
China
Prior art keywords
hpc
prefabricated
plates
steel
steel case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810399830.4A
Other languages
Chinese (zh)
Inventor
周帅
方聪
李水生
谭立新
凡林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201810399830.4A priority Critical patent/CN108330752A/en
Publication of CN108330752A publication Critical patent/CN108330752A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/08Tracks for mono-rails with centre of gravity of vehicle above the load-bearing rail
    • E01B25/10Mono-rails; Auxiliary balancing rails; Supports or connections for rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the construction methods of the prefabricated assembled steel HPC combined track beams of straddle-type monorail, include the following steps A steel casees made by beam making field, prefabricated HPC plates;Connecting component is arranged in the wet seam section in each of B steel box top;Prefabricated HPC plates are arranged and are positioned on steel case by C, are corresponding wet seam section between two neighboring prefabricated HPC plates;D pours all wet seams, and all prefabricated HPC plates are connected to steel box-shaped into beam body;Beam body is transported to installation site and is installed on pier stud by E.With the construction method, steel boxboard part, that batch production standard can be used in prefabricated HPC plates is quick prefabricated, greatly reduce the risk for pouring and generating a large amount of contraction fissures, the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case is eliminated, steel case web is not extend to back, and HPC plates not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, this process simplify construction technologies, shorten the construction period, reduce influence of the situ wet operation to environment.

Description

A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail
Technical field
The present invention relates to field of track traffic, more particularly to a kind of prefabricated assembled steel-HPC (High of straddle-type monorail Performance Concrete, high performance concrete) combined track beam construction method.
Background technology
Cross-saddle single-track traffic is different from traditional rail traffic, is shuttled among city in the form of by overpass, is one Kind relatively new system of rail traffic, track girder are supported on pier stud, and train encircles traveling in track girder above, directive wheel with Steady wheel is respectively acting on the top and the bottom of track girder two sides.Cross-saddle single-track traffic is high, right due to city space utilization rate Along thread environment influence it is small, construction cost is relatively low, adapts to abrupt slope sharp turn, in Construction of Urban Rail Traffic have it is very strong Adaptability is a kind of resource-effective, environmental-friendly system of rail traffic, will become the important side of future track transport development To.
Traditional straddle-type monorail steel-mixes combined track beam top and casting concrete, two coxostermum of steel case is used to extend to Back wraps up concrete, in concrete coagulation hardening process and there are problems that contraction under effect of environmental temperature, for increasing outside The HPC (high performance concrete) of water-reducing agent is imitated, contraction problem is more serious, since casting concrete is in package about pencil State, can not free shrink, the stress that blockage effect generates crosses senior general and leads to concrete cracking, influences the durability of structure and complete Property, meanwhile, lower part uses steel box structure, and due to material sex differernce, expanding with heat and contract with cold for steel is asynchronous in concrete, causes to pour The joint face of concrete and steel generates additional stress, keeps inherently weaker joint face stress more complicated, makes coagulation Soil easy tos produce crack, or even comes to nothing, meanwhile, poured in place concrete, construction technology is complicated, influences the construction period, matter of constructing Amount is also difficult to be protected.
Invention content
It is an object of the invention to overcome the existing straddle-type monorail steel-in the presence of the prior art to mix combined track beam In concrete coagulation hardening process and there is contraction in structure, under effect of environmental temperature since casting concrete is in packet Wrap up in restrained condition, can not free shrink, the stress that blockage effect generates crosses senior general and leads to concrete cracking, influences the durable of structure Property and integrality, lower part use steel box structure, due to material sex differernce, expanding with heat and contract with cold for steel is asynchronous in concrete, causes The joint face of casting concrete and steel generates additional stress, keeps inherently weaker joint face stress more complicated, makes Concrete easy tos produce crack, or even the above-mentioned deficiency come to nothing, and provides a kind of prefabricated assembled steel-HPC combinations of straddle-type monorail The construction method of track girder.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail, includes the following steps:
A, the steel case made by beam making field, prefabricated HPC plates;
B, connecting component is arranged in the wet seam section in each of described steel box top;
C, the prefabricated HPC plates are arranged and are positioned on the steel case, be pair between the two neighboring prefabricated HPC plates The wet seam section answered;
D, all wet seams are poured, all prefabricated HPC plates are connected to the steel box-shaped into beam body;
E, the beam body is transported to installation site and is installed on pier stud.
Using a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, steel Boxboard part, prefabricated HPC plates can be used that batch production standard is quick prefabricated, greatly reduce the wind for pouring and generating a large amount of contraction fissures Danger, eliminates the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case, and steel case web is not extend to beam Top, HPC plates not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, pour wet seam, pre- by adjacent two While HPC plates connection processed, wet seam wraps up connecting component, and prefabricated HPC plates are connected to steel case, construction method step letter It is single, it is easy to operate, construction technology is simplified, construction period, prefabrication are shortened, in-site installation reduces situ wet operation Influence to environment.
Preferably, bearing is equipped between the steel case and the pier stud.
Preferably, several extension lengthways main steel bars are equipped at each prefabricated HPC plate end faces, after executing the step C, The extension lengthways main steel bar between the two neighboring prefabricated HPC plates is corresponded into overlap joint setting, then executes the step D.
Preferably, each connecting component includes several shearing pegs, and each connecting component includes all The shearing peg is arranged along the corresponding wet seam length direction.
Preferably, all shearing pegs are welded on the steel box top.
Using this structure setting, shearing peg only is set in wet seam crossing and is welded on steel box top, is greatly reduced The dosage of shearing peg and welding job amount, reduce the welding damage to steel box top, reduce the duration.
Preferably, the steel case includes web and top plate, and the top plate is equipped with opening, and the top plate is made to form two phases To the structural slab of setting, each structural slab is connected on the corresponding web.
It, can only be outside top plate and web when top plate is welded to connect web since existing steel box structure is that a sealing is whole Welding procedure on the connecting line of side, top plate are difficult to securely connect with web inner side connection wire, this using opening is equipped on top plate Structure setting can construct to the interior outside connecting line full penetration of top plate and web, ensure welding quality, increase steel box structure Stability, while rolled steel dosage has been saved, the dead weight of steel box structure is alleviated, cost has been saved.
Preferably, after executing the step D, all prefabricated HPC plates are sealedly attached to the top plate, then execute described Step E.
Since top plate is equipped with opening, the track girder of outdoor layout in operation, rainwater can from the prefabricated HPC plates with Gap between top plate enters opening, inside steel case, although and anti-corrosion structure is equipped with outside steel case, due to Cost control, steel case inside usually lack anti-corrosion structure, and rainwater causes brokenly the generation corrosion of steel case internal structure into membership It is bad, this structure setting of top plate is sealedly attached to using prefabricated HPC plates, steel case is with prefabricated HPC board groups at a confined space, energy Enough it effectively prevent erosion of the external environmental factor to steel case internal structure.
Preferably, structural silicone adhesive sealed connection is filled between all prefabricated HPC plates and the top plate.
Preferably, after executing the step D, by the steel case end part seal, confined space in steel case is formed, at bridge operation The maintenance outside steel case and maintenance need to be only carried out afterwards.
Preferably, each wet seam crossing is correspondingly provided with a connecting plate, and the both ends of each connecting plate connect respectively It is connected on two structural slabs, each connecting component is set along structural slab described in the corresponding connecting plate and its both ends It sets.
Using this structure setting, the bonding strength between each connecting component and steel case is increased, it is pre- to increase Bonding strength between HPC plates and steel case processed.
Preferably, each connecting component includes several shearing pegs, the shearing peg on the connecting plate Spaced set.
Preferably, further include drip, the width of the prefabricated HPC plates is more than the width of the top plate, the prefabricated HPC Plate two bottom sides stretch out the top plate, and the prefabricated HPC plates base projection is respectively set the drip, prevents Rainwater flows to bottom along the prefabricated HPC plates side wall, then flows to the top plate of the steel case and the web again, and opening It is piled up in the intersection of the prefabricated HPC plates and the steel case under the action of power, the steel case is caused to corrode.
The present invention also provides a kind of construction methods of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail, including Following steps:
A, several vertical through holes are arranged on the prefabricated HPC plates in the steel case made by beam making field, prefabricated HPC plates;
B, connecting component is arranged in the corresponding steel box top of each through-hole;
C, the prefabricated HPC plates are arranged and are positioned on the steel case, keep each connecting component adaptation corresponding The through-hole;
D, all through-holes are poured, all prefabricated HPC plates are connected to the steel box-shaped into beam body;
E, the beam body is transported to installation site and is installed on pier stud.
Using a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, steel Boxboard part, prefabricated HPC plates can be used that batch production standard is quick prefabricated, greatly reduce the wind for pouring and generating a large amount of contraction fissures Danger, eliminates the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case, and steel case web is not extend to beam Top, HPC plates not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, pour through-hole, and inner concrete package connects Prefabricated HPC plates are connected to steel case by relay part, and the construction method step is simple, easy to operate, simplifies construction technology, are shortened Construction period, prefabrication, in-site installation reduce influence of the situ wet operation to environment.
Preferably, each through-hole is less than the port of the other side close to the port of steel box top side.
Using this structure setting, through-hole has upper and lower position-limiting action after pouring to prefabricated HPC plates.
Preferably, the steel case includes web and top plate, and the top plate is equipped with opening, and the top plate is made to form two phases To the structural slab of setting, each structural slab is connected on the corresponding web, and each prefabricated HPC plates are along track girder Several through-holes are respectively set in longitudinal both sides, the setting connection corresponding with the through-hole on each structural slab Component.
In conclusion by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, Steel boxboard part, prefabricated HPC plates can be used that batch production standard is quick prefabricated, greatly reduce to pour and generate a large amount of contraction fissures Risk, eliminates the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case, and steel case web is not extend to Back, HPC plates not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, wet seam are poured, by adjacent two While prefabricated HPC plates connection, wet seam wraps up connecting component, and prefabricated HPC plates are connected to steel case, construction method step letter It is single, it is easy to operate, construction technology is simplified, construction period, prefabrication are shortened, in-site installation reduces situ wet operation Influence to environment;
2, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, Each connecting component includes several shearing pegs, and all shearing pegs that each connecting component includes are along right The wet seam length direction setting answered, all shearing pegs are welded on the steel box top, using this structure Setting is only arranged shearing peg in wet seam crossing and is welded on steel box top, considerably reduces dosage and the weldering of shearing peg Workload is connect, the welding damage to steel box top is reduced, reduces the duration;
3, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, Using this structure setting that is open is equipped on top plate, can construct to the interior outside connecting line full penetration of top plate and web, Ensure welding quality, increase steel box structure stability, while having saved rolled steel dosage, alleviates the dead weight of steel box structure, save Cost;
4, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, This structure setting of top plate is sealedly attached to using prefabricated HPC plates, steel case and prefabricated HPC board groups, can at a confined space It effectively prevent erosion of the external environmental factor to steel case internal structure;
5, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, Each wet seam crossing is correspondingly provided with a connecting plate, and the both ends of each connecting plate are connected to two structures On plate, each connecting component is arranged along structural slab described in the corresponding connecting plate and its both ends, is set using this structure It sets, increases the bonding strength between each connecting component and steel case, to increase the connection between prefabricated HPC plates and steel case Intensity;
6, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, Steel boxboard part, prefabricated HPC plates can be used that batch production standard is quick prefabricated, greatly reduce to pour and generate a large amount of contraction fissures Risk, eliminates the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case, and steel case web is not extend to Back, HPC plates not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, pour through-hole, inner concrete package Prefabricated HPC plates are connected to steel case by connecting component, and the construction method step is simple, easy to operate, simplifies construction technology, contracting Short construction period, prefabrication, in-site installation reduce influence of the situ wet operation to environment;
7, with a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, Each through-hole is less than the port of the other side close to the port of steel box top side, using this structure setting, through-hole There is upper and lower position-limiting action to prefabricated HPC plates after pouring.
Description of the drawings
Fig. 1 is the schematic diagram that steel case is made in embodiment 1;
Fig. 2 is the schematic diagram that connecting component is arranged in the wet seam section in each of steel box top in embodiment 1;
Fig. 3 is hoisting prefabricated HPC plates and to be positioned at the schematic diagram of steel case in embodiment 1;
Fig. 4 is that the schematic diagram that wet seam connects steel case and prefabricated HPC plates form beam body is poured in embodiment 1;
Fig. 5 is that beam body transports to installation site and is lifted into the schematic diagram of pier stud in embodiment 1;
Fig. 6 is a kind of partial schematic sectional view of structure of combined track beam described in embodiment 1;
Fig. 7 is the partial schematic sectional view of another structure of combined track beam described in embodiment 1;
Fig. 8 is the schematic side view for the combined track beam that Fig. 6 or Fig. 7 is used;
Fig. 9 is a kind of partial schematic sectional view of structure of combined track beam described in embodiment 2;
Figure 10 is the schematic side view for the combined track beam that Fig. 9 is used;
Figure 11 is that the right side for the combined track beam that Fig. 8 or Figure 10 is used regards schematic diagram;
Figure 12 is the schematic diagram for the combined track beam that drip is equipped in Figure 11.
It is marked in figure:1- steel casees, 11- webs, 12- top plates, 13- openings, the prefabricated HPC plates of 2-, 21- extension lengthways main steel bars, 22- through-holes, the wet seams of 3-, 4- connecting components, 5- connecting plates, 6- pier studs, 7- drips.
Specific implementation mode
With reference to test example and specific implementation mode, the present invention is described in further detail.But this should not be understood It is only limitted to embodiment below for the range of the above-mentioned theme of the present invention, it is all that this is belonged to based on the technology that the content of present invention is realized The range of invention.
Embodiment 1
As shown in Fig. 1-8,11 and 12, a kind of prefabricated assembled steel-HPC combined tracks of straddle-type monorail of the present invention The construction method of beam, includes the following steps:
A, as shown in Figure 1, the steel case 1 made by beam making field, prefabricated HPC plates 2;
B, as shown in Fig. 2, connecting component 4 is arranged in each of 1 top of the steel case 3 section of wet seam;
C, as shown in figure 3, hoisting prefabricated HPC plates 2 and being positioned on the steel case 1, the two neighboring prefabricated HPC plates 2 Between be corresponding 3 section of wet seam, wherein to be equipped with several extensions longitudinally main for each prefabricated 2 endface of HPC plates Muscle 21;
D, the extension lengthways main steel bar 21 between the two neighboring prefabricated HPC plates 2 is corresponded into overlap joint setting;
E, as shown in figure 4, pouring all wet seams 3, all prefabricated HPC plates 2 are connected to 1 shape of steel case At beam body;
F, structural silicone adhesive sealed connection is filled between 1 top of all prefabricated HPC plates 2 and the steel case;
G, by 1 end part seal of steel case, confined space in steel case 1 is formed;
H, as shown in figure 5, the beam body is transported to installation site and is lifted on pier stud 6.
Wherein, the length of each prefabricated HPC plates 2 is less than or equal to 8 meters, between the steel case 1 and the pier stud 6 Equipped with bearing.
As a preferred embodiment of the present embodiment, as shown in Figures 6 and 7, each connecting component 4 is cut including several Power peg, all shearing pegs that each connecting component 4 includes are set along corresponding 3 length direction of wet seam It sets, all shearing pegs are welded on 1 top of the steel case, using this structure setting, are only arranged at wet seam 3 and are cut Power peg is simultaneously welded on 1 top of steel case, considerably reduces the dosage and welding job amount of shearing peg, reduces to steel case 1 The welding damage at top, reduces the duration.
As a preferred embodiment of the present embodiment, as shown in Figures 6 and 7, the steel case 1 includes web 11 and top plate 12, The top plate 12 is equipped with opening 13, and the top plate 12 is made to form two structural slabs being oppositely arranged, and each structural slab connects It is connected on the corresponding web 11, since existing steel box structure is that a sealing is whole, when top plate 12 is welded to connect web 11, It can only be difficult to securely connect with 11 inner side connection wire of web in top plate 12 and welding procedure on 11 outside connecting line of web, top plate 12 It connects, it, can be to the interior outside connecting line fine melt of top plate 12 and web 11 using 13 this structure settings of opening are equipped on top plate 12 Saturating welding procedure ensures welding quality, increases by 1 structural stability of steel case, while having saved rolled steel dosage, alleviates 1 knot of steel case Structure is conducted oneself with dignity, and cost has been saved.
As a preferred embodiment of the present embodiment, all prefabricated HPC plates 2 are sealedly attached to the top plate 12, by It is equipped with opening 13 in top plate 12, for the track girder of outdoor layout in operation, rainwater can be from the prefabricated HPC plates 2 and top plate Gap between 12 enters opening 13, inside steel case 1, although and the outside of steel case 1 is equipped with anti-corrosion structure, by In cost control, 1 inside of steel case usually lacks anti-corrosion structure, and rainwater makes the generation corrosion of 1 internal structure of steel case into membership At destruction, 12 this structure setting of top plate is sealedly attached to using prefabricated HPC plates 2, steel case 1 and prefabricated HPC plates 2 composition one are close Space is closed, erosion of the external environmental factor to 1 internal structure of steel case can be effectively prevent.
As a preferred embodiment of the present embodiment, as shown in fig. 7, being correspondingly provided with a company at each wet seam 3 The both ends of fishplate bar 5, each connecting plate 5 are connected on two structural slabs, and each connecting component 4 is along correspondence The connecting plate 5 and its both ends described in structural slab setting, using this structure setting, increase each connecting component 4 and steel Bonding strength between case 1, to increase the bonding strength between prefabricated HPC plates 2 and steel case 1;Each connecting component 4 Including several shearing pegs, the shearing peg spaced set on the connecting plate 5.
Further include drip 7 as shown in figure 12 as a preferred embodiment of the present embodiment, the prefabricated HPC plates 2 Width is more than the width of the top plate 12, and prefabricated 2 two bottom sides of HPC plates stretch out the top plate 12, described prefabricated The drip 7 is respectively set in 2 base projection of HPC plates, prevents rainwater from flowing to bottom along prefabricated 2 side wall of HPC plates, and The top plate 12 and the web 11 of the steel case 1 are flowed to again afterwards, and is piled up in the prefabricated HPC plates under tension 2 and the steel case 1 intersection, the steel case 1 is caused to corrode.
With a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, steel 1 plate of case, prefabricated HPC plates 2 can be used that batch production standard is quick prefabricated, greatly reduce to pour and generate a large amount of contraction fissures Risk, eliminates the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case 1, and 1 web of steel case does not extend To back, HPC plates 2 not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, pour wet seam 3, will be adjacent While two prefabricated HPC plates 2 connect, wet seam 3 wraps up connecting component 4, prefabricated HPC plates 2 is connected to steel case 1, the construction Method and step is simple, easy to operate, simplifies construction technology, shortens construction period, prefabrication, and in-site installation reduces Influence of the situ wet operation to environment.
Embodiment 2
As shown in figs9-12, the prefabricated assembled steel-HPC combined tracks beam of a kind of straddle-type monorail of the present invention is applied Work method, includes the following steps:
A, several vertical through holes are arranged on the prefabricated HPC plates 2 in the steel case 1 made by beam making field, prefabricated HPC plates 2 22;
B, connecting component 4 is arranged in corresponding 1 top of the steel case of each through-hole 22;
C, it hoisting prefabricated HPC plates 2 and is positioned on the steel case 1, each connecting component 4 is made to be adapted to the corresponding through-hole 22, it is corresponding 3 section of wet seam between the two neighboring prefabricated HPC plates 2, wherein each prefabricated 2 end of HPC plates Several extension lengthways main steel bars 21 are equipped at face;
D, the extension lengthways main steel bar 21 on two neighboring prefabricated 2 end face of HPC plates corresponds to overlap joint setting;
E, all through-holes 22 and all wet seams 3 are poured, all prefabricated HPC plates 2 are connected to described Steel case 1 forms beam body;
F, structural silicone adhesive sealed connection is filled between 1 top of all prefabricated HPC plates 2 and the steel case;
G, by 1 end part seal of steel case, confined space in steel case 1 is formed;
H, the beam body is transported to installation site and is lifted on pier stud 6.
Wherein, the length of each prefabricated HPC plates 2 is more than 8 meters, and branch is equipped between the steel case 1 and the pier stud 6 Seat.
As a preferred embodiment of the present embodiment, each through-hole 22 is close to the port of 1 top side of steel case Less than the port of the other side, using this structure setting, through-hole 22 has upper and lower position-limiting action after pouring to prefabricated HPC plates 2.
As a preferred embodiment of the present embodiment, as shown in Figures 9 and 10, the steel case 1 includes web 11 and top plate 12, The top plate 12 is equipped with opening 13, and the top plate 12 is made to form two structural slabs being oppositely arranged, and each structural slab connects It is connected on the corresponding web 11, each prefabricated HPC plates 2 are respectively set along the both sides of track girder longitudinal direction described in several Each the connecting component corresponding with the through-hole 22 4 is arranged on the structural slab in through-hole 22;Since existing steel box structure is One sealing is whole, when top plate 12 is welded to connect web 11, can only the welding procedure on top plate 12 and 11 outside connecting line of web, Top plate 12 is difficult to securely connect with 11 inner side connection wire of web, can using 13 this structure settings of opening are equipped on top plate 12 It constructs to the interior outside connecting line full penetration of top plate 12 and web 11, ensures welding quality, increase by 1 stable structure of steel case Property, while rolled steel dosage has been saved, 1 dead load of steel case is alleviated, cost has been saved.
As a preferred embodiment of the present embodiment, all prefabricated HPC plates 2 are sealedly attached to the top plate 12, by It is equipped with opening 13 in top plate 12, for the track girder of outdoor layout in operation, rainwater can be from the prefabricated HPC plates 2 and top plate Gap between 12 enters opening 13, inside steel case 1, although and the outside of steel case 1 is equipped with anti-corrosion structure, by In cost control, 1 inside of steel case usually lacks anti-corrosion structure, and rainwater makes the generation corrosion of 1 internal structure of steel case into membership At destruction, 12 this structure setting of top plate is sealedly attached to using prefabricated HPC plates 2, steel case 1 and prefabricated HPC plates 2 composition one are close Space is closed, erosion of the external environmental factor to 1 internal structure of steel case can be effectively prevent.
As a preferred embodiment of the present embodiment, it is provided on the corresponding top plate 12 at each wet seam 3 Connecting component 4, the connecting component 4 connect the corresponding wet seam 3, and a company is correspondingly provided at each wet seam 3 The both ends of fishplate bar, each connecting plate are connected on two structural slabs, and each connecting component 4 is along corresponding Structural slab described in the connecting plate and its both ends is arranged.
Further include drip 7 as shown in figure 12 as a preferred embodiment of the present embodiment, the prefabricated HPC plates 2 Width is more than the width of the top plate 12, and prefabricated 2 two bottom sides of HPC plates stretch out the top plate 12, the prefabricated HPC plates The drip 7 is respectively set in 2 base projections, prevents rainwater from flowing to bottom along prefabricated 2 side wall of HPC plates, then again The top plate 12 and the web 11 of the steel case 1 are flowed to, and is piled up in prefabricated 2 He of HPC plates under tension The intersection of the steel case 1 causes to corrode to the steel case 1.
With a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail of the present invention, steel 1 plate of case, prefabricated HPC plates 2 can be used that batch production standard is quick prefabricated, greatly reduce to pour and generate a large amount of contraction fissures Risk, eliminates the additional stress of the generation of systolic dyssynchrony between top concrete and lower part steel case 1, and 1 web of steel case does not extend To back, HPC plates 2 not prefabricated to top generate package effect of contraction, ensure that it shrinks freely, pour through-hole 22, interior coagulation Soil package connecting component 4, is connected to steel case 1, the construction method step is simple, easy to operate, simplifies and applies by prefabricated HPC plates 2 Work technique, shortens construction period, prefabrication, and in-site installation reduces influence of the situ wet operation to environment.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (10)

1. a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail, which is characterized in that including following Step:
A, steel case (1), prefabricated HPC plates (2) made by beam making field;
B, wet seam (3) section setting connecting component (4) each of at the top of the steel case (1);
C, the prefabricated HPC plates (2) are arranged and are positioned on the steel case (1), the two neighboring prefabricated HPC plates (2) it Between be corresponding wet seam (3) section;
D, all wet seams (3) are poured, all prefabricated HPC plates (2), which are connected to the steel case (1), forms beam body;
E, the beam body is transported to installation site and is installed on pier stud (6).
2. the construction method of track girder according to claim 1, which is characterized in that each prefabricated HPC plates (2) end face Place will be between the two neighboring prefabricated HPC plates (2) after executing the step C equipped with several extension lengthways main steel bars (21) The corresponding overlap joint setting of the extension lengthways main steel bar (21), then execute the step D.
3. the construction method of track girder according to claim 1, which is characterized in that each the connecting component (4) includes Several shearing pegs, all shearing pegs that each connecting component (4) includes are along the corresponding wet seam (3) Length direction is arranged.
4. the construction method of track girder according to claim 3, which is characterized in that all shearing pegs are welded in institute It states on steel case (1) top.
5. according to the construction method of claim 1-4 any one of them track girders, which is characterized in that the steel case (1) includes Web (11) and top plate (12), the top plate (12) are equipped with opening (13), so that the top plate (12) is formed two and are oppositely arranged Structural slab, each structural slab is connected on the corresponding web (11).
6. the construction method of track girder according to claim 5, which is characterized in that all described after executing the step D Prefabricated HPC plates (2) are sealedly attached to the top plate (12), then execute the step E.
7. the construction method of track girder according to claim 6, which is characterized in that all prefabricated HPC plates (2) and institute It states and fills in structural silicone adhesive sealed connection between top plate (12).
8. the construction method of track girder according to claim 5, which is characterized in that corresponded at each wet seam (3) If there are one connecting plate (5), the both ends of each connecting plate (5) are connected on two structural slabs, each described Connecting component (4) is arranged along structural slab described in the corresponding connecting plate (5) and its both ends.
9. a kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail, which is characterized in that including following Step:
A, several vertical through holes are arranged on the prefabricated HPC plates (2) in steel case (1), prefabricated HPC plates (2) made by beam making field (22);
B, setting connecting component (4) at the top of the corresponding steel case (1) of each through-hole (22);
C, the prefabricated HPC plates (2) are arranged and are positioned on the steel case (1), make each connecting component (4) adaptation pair The through-hole (22) answered;
D, all through-holes (22) are poured, all prefabricated HPC plates (2), which are connected to the steel case (1), forms beam body;
E, the beam body is transported to installation site and is installed on pier stud (6).
10. the construction method of track girder according to claim 9, which is characterized in that the steel case (1) includes web (11) With top plate (12), the top plate (12) is equipped with opening (13), and the top plate (12) is made to form two structural slabs being oppositely arranged, Each structural slab is connected on the corresponding web (11), each prefabricated HPC plates (2) along track girder it is longitudinal two Several through-holes (22) are respectively set in side, the setting connection corresponding with the through-hole (22) on each structural slab Component (4).
CN201810399830.4A 2018-04-28 2018-04-28 A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail Pending CN108330752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810399830.4A CN108330752A (en) 2018-04-28 2018-04-28 A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810399830.4A CN108330752A (en) 2018-04-28 2018-04-28 A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail

Publications (1)

Publication Number Publication Date
CN108330752A true CN108330752A (en) 2018-07-27

Family

ID=62934866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810399830.4A Pending CN108330752A (en) 2018-04-28 2018-04-28 A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail

Country Status (1)

Country Link
CN (1) CN108330752A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9267242B2 (en) * 2008-03-12 2016-02-23 Hilltrac, Inc. Elevated rail system
CN105887655A (en) * 2016-05-18 2016-08-24 同济大学 Combined beam containing perforated plate connectors and construction method of combined beam
CN106638260A (en) * 2016-11-17 2017-05-10 西南交通大学 Combined box beam structure and manufacturing method thereof
KR20170072454A (en) * 2015-12-17 2017-06-27 재단법인한국조선해양기자재연구원 Floating rail apparatus for moving floating structure and floating structure moving system with the same
CN107109804A (en) * 2015-01-09 2017-08-29 动力结构有限公司 V-shaped track supporting structure part
CN107245934A (en) * 2017-07-31 2017-10-13 哈尔滨工业大学 A kind of assembled steel profiled sheet concrete combined board small box girder
CN207259883U (en) * 2017-01-24 2018-04-20 北京交通大学 A kind of suspension type monorail traffic steel reinforced concrete combined track beam based on assembled technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9267242B2 (en) * 2008-03-12 2016-02-23 Hilltrac, Inc. Elevated rail system
CN107109804A (en) * 2015-01-09 2017-08-29 动力结构有限公司 V-shaped track supporting structure part
KR20170072454A (en) * 2015-12-17 2017-06-27 재단법인한국조선해양기자재연구원 Floating rail apparatus for moving floating structure and floating structure moving system with the same
CN105887655A (en) * 2016-05-18 2016-08-24 同济大学 Combined beam containing perforated plate connectors and construction method of combined beam
CN106638260A (en) * 2016-11-17 2017-05-10 西南交通大学 Combined box beam structure and manufacturing method thereof
CN207259883U (en) * 2017-01-24 2018-04-20 北京交通大学 A kind of suspension type monorail traffic steel reinforced concrete combined track beam based on assembled technology
CN107245934A (en) * 2017-07-31 2017-10-13 哈尔滨工业大学 A kind of assembled steel profiled sheet concrete combined board small box girder

Similar Documents

Publication Publication Date Title
CN103758023B (en) Prestressed concrete and steel truss mixed continuous rigid frame bridge and construction method thereof
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN107100065B (en) A kind of compound section steel box girder and its method of construction for high-speed railway
CN106223183B (en) Assembled concrete-filled rectangular steel tube combines truss bridge and construction method
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN106948489A (en) Assembled reinforced concrete column-shaped steel concrete beam node
CN105544373B (en) A kind of steel case Combined concrete girder and construction method for long-span cablestayed bridges
CN108221634A (en) The Wavelike steel webplate I-shaped composite beam bridge of maximum assembling
CN108824162A (en) A kind of steel_concrete composite beam and its construction method using plain plate and corrugated sheet steel mixing web
CN207176475U (en) The K shapes support combination column on the arch of CFST Arch Bridge
CN109083003A (en) A kind of precast pier pier top connection structure and its construction method
CN103938549A (en) Construction method for fabricated type corrugated steel inclined web combined beam
CN208685437U (en) A kind of wet seam construction of prefabricated assembled concrete floorings
CN110258289A (en) Prestressed concrete continuous box girder bridge laterally spells wide structure
CN206328669U (en) The narrow composite beam of steel box of new concrete
CN108708274A (en) A kind of wet seam construction of prefabricated assembled concrete floorings
CN108842530B (en) A kind of straddle-type monorail two-wire combined track girder construction
CN108252222B (en) Steel-concrete combined structure formula simple supported-to-continuous girder bridge method
CN208250887U (en) Prefabricated assembled steel-HPC combined track the beam of straddle-type monorail
CN208104916U (en) A kind of prefabricated assembled steel-HPC combined track beam of straddle-type monorail
CN108301261A (en) A kind of prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail
CN108342974A (en) Prefabricated assembled steel-HPC combined tracks the beam of straddle-type monorail
CN108330752A (en) A kind of construction method of the prefabricated assembled steel-HPC combined tracks beam of straddle-type monorail
CN208346566U (en) A kind of straddle type monorail rail tracks and monorail system
CN109183615B (en) Multi-main-beam type steel-concrete combined continuous beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180727

RJ01 Rejection of invention patent application after publication