CN108321852A - Distributed photovoltaic air conditioning system and control method thereof - Google Patents

Distributed photovoltaic air conditioning system and control method thereof Download PDF

Info

Publication number
CN108321852A
CN108321852A CN201810136785.3A CN201810136785A CN108321852A CN 108321852 A CN108321852 A CN 108321852A CN 201810136785 A CN201810136785 A CN 201810136785A CN 108321852 A CN108321852 A CN 108321852A
Authority
CN
China
Prior art keywords
air
energy
power grid
conditioner
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810136785.3A
Other languages
Chinese (zh)
Other versions
CN108321852B (en
Inventor
董明珠
赵志刚
罗晓
王灵军
任鹏
刘洪明
文武
蒋世用
李伟进
黄猛
曾云洪
张雪芬
张智伟
卢扬渐
吴妙瑜
邵世卓
佘国聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201810136785.3A priority Critical patent/CN108321852B/en
Publication of CN108321852A publication Critical patent/CN108321852A/en
Application granted granted Critical
Publication of CN108321852B publication Critical patent/CN108321852B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The application discloses a distributed photovoltaic air conditioning system and a control method thereof. This distributed photovoltaic air conditioning system includes: the photovoltaic air conditioning systems are distributed in a target area; an energy dispatch center comprising: the power grid processing unit is in communication connection with a power grid and is used for receiving a scheduling instruction; the energy scheduling unit is in communication connection with the power grid processing unit and the plurality of sets of photovoltaic air conditioning systems and is used for identifying the energy state of the power grid under the condition of receiving the scheduling instruction; determining control information according to the energy state of the power grid; and controlling the operation of a plurality of sets of photovoltaic air conditioning systems according to the control information, and adjusting the energy supply of the power grid. Through the application, the problem that the photovoltaic air conditioning system in the prior art is low in regional performance source utilization efficiency and difficult to realize energy sharing is solved.

Description

Distributed photovoltaic air-conditioning system and its control method
Technical field
This application involves distributed photovoltaic air-conditioning technical fields, in particular to a kind of distributed photovoltaic air-conditioning system And its control method.
Background technology
Now, air conditioner has become one of electric appliance indispensable in people's daily life, but due to the consumption of air conditioner Electricity is big, therefore PV air-conditioner system occurs.In existing PV air-conditioner system, when the generated output of photovoltaic generating system fills When sufficient, powered to air-conditioning system by the photovoltaic generating system;If when the generated output deficiency of photovoltaic generating system, pass through Grid generation system is powered to air-conditioning system.However, PV air-conditioner system in the prior art is in regional efficiency of energy utilization It is relatively low, it is difficult to realize that the energy is shared.In view of the above-mentioned problems, currently no effective solution has been proposed.
Invention content
The main purpose of the application is to provide a kind of distributed photovoltaic air-conditioning system and its control method, existing to solve PV air-conditioner system in technology is relatively low in regional efficiency of energy utilization, it is difficult to realize that the energy is shared.
To achieve the goals above, according to the one side of the application, a kind of distributed photovoltaic air-conditioning system is provided Control method.The control method of the distributed photovoltaic air-conditioning system includes:It detects whether to receive dispatch command;Receiving In the case of stating dispatch command, the energy state of power grid is identified;Control information is determined according to the energy state of the power grid, In, the control information is distributed in target area more set PV air-conditioner systems for controlling;It is controlled according to the control information The operation of more set PV air-conditioner systems, adjusts the energy supply of the power grid.
Further, the energy state of the power grid is first order energy state, second level energy state or third level energy Source state, wherein the first order energy state indicates that the power grid is in energy supply peak state, the second level energy State indicates that the power grid is in the state of energy supply anxiety, and the third level energy state indicates that the power grid is in the energy Abundant state.
Further, after determining control information according to the energy state of the power grid, according to the control information The operation of more set PV air-conditioner systems is controlled, before the energy supply for adjusting the power grid, the control method further includes: Identify the energy scheduling mark of PV air-conditioner system in more set PV air-conditioner systems, wherein in the energy of PV air-conditioner system In the case that source scheduling identification is first identifier, the PV air-conditioner system can participate in adjusting to the energy supply of the power grid, In the case where the energy scheduling of PV air-conditioner system is identified as second identifier, the PV air-conditioner system cannot be participated in described The energy supply of power grid is adjusted.
Further, determine that control information includes according to the energy state of the power grid:In the energy state of the power grid In the case of for first order energy state, the first control information is determined, wherein the first control information is described more for controlling Set PV air-conditioner system in energy scheduling be identified as first identifier PV air-conditioner system will it is remaining electricity to the power grid feed;According to The control information controls the operation of more set PV air-conditioner systems, and the energy supply for adjusting the power grid includes:According to institute It states the first control information and controls the PV air-conditioner system that energy scheduling in more set PV air-conditioner systems is identified as first identifier Remaining electricity is fed to the power grid.
Further, the control method further includes:Monitor the energy state of the power grid and more set PV air-conditioners The energy scheduling mark of PV air-conditioner system in system;All PV air-conditioner systems in monitoring more set PV air-conditioner systems The energy scheduling mark of system is control in the case that the energy state of second identifier and the power grid is still first order energy state System closes the electricity consumption of the PV air-conditioner system in more set PV air-conditioner systems, is fed to the power grid.
Further, determine that control information includes according to the energy state of the power grid:In the energy state of the power grid In the case of for second level energy state, the second control information is determined, wherein the second control information is described more for controlling Energy scheduling is identified as the remaining electric to more set PV air-conditioners of the PV air-conditioner system of first identifier in set PV air-conditioner system Energy scheduling is identified as the PV air-conditioner system feed of second identifier in system;According to control information control more set light The operation of air-conditioning system is lied prostrate, the energy supply for adjusting the power grid includes:Information control more sets are controlled according to described second Energy scheduling is identified as the remaining electric to more set PV air-conditioner systems of the PV air-conditioner system of first identifier in PV air-conditioner system Energy scheduling is identified as the PV air-conditioner system feed of second identifier in system.
Further, the control method further includes:Monitor PV air-conditioner system in more set PV air-conditioner systems Energy scheduling identifies;Monitoring that the energy scheduling mark of all PV air-conditioner systems in more set PV air-conditioner systems is equal In the case of for second identifier, PV air-conditioner system power supply of the power grid into more set PV air-conditioner systems is controlled.
Further, determine that control information includes according to the energy state of the power grid:In the energy state of the power grid In the case of for third level energy state, determine that third controls information, wherein the third control information is described more for controlling Energy scheduling is identified as the remaining electric to power grid feed of the PV air-conditioner system of first identifier in set PV air-conditioner system;And it controls Make the PV air-conditioner system power supply that power grid energy scheduling into more set PV air-conditioner systems is identified as second identifier;Root The operation of more set PV air-conditioner systems is controlled according to the control information, the energy supply for adjusting the power grid includes:According to The third control information controls the PV air-conditioner system that energy scheduling in more set PV air-conditioner systems is identified as first identifier The remaining electricity of system is fed to the power grid;And it controls power grid energy scheduling into more set PV air-conditioner systems and is identified as the The PV air-conditioner system power supply of two marks.
To achieve the goals above, according to the one side of the application, a kind of distributed photovoltaic air-conditioning system is provided.It should Distributed photovoltaic air-conditioning system includes:More set PV air-conditioner systems, are distributed in target area;Energy scheduling center, including:Electricity Net processing unit and energy scheduling unit, wherein the power grid processing unit is connect with the communication system of power grids, is referred to for receiving scheduling It enables;The energy scheduling unit is connect with the power grid processing unit and more set PV air-conditioner system communications, for connecing In the case of receiving the dispatch command, the energy state of power grid is identified;Control letter is determined according to the energy state of the power grid Breath;The operation that more set PV air-conditioner systems are controlled according to the control information, adjusts the energy supply of the power grid.
Further, the energy scheduling center further includes:System monitoring unit, with the power grid and more set photovoltaics Air-conditioning system communicates to connect, the energy information of energy information and more set PV air-conditioner systems for monitoring the power grid, Wherein, the energy information of the power grid includes at least the energy state of the power grid, the energy of more set PV air-conditioner systems The energy scheduling that information includes at least PV air-conditioner system identifies, and first identifier is identified as in the energy scheduling of PV air-conditioner system In the case of, the PV air-conditioner system can participate in adjusting to the energy supply of the power grid, in the energy of PV air-conditioner system In the case that scheduling identification is second identifier, the PV air-conditioner system cannot participate in adjusting to the energy supply of the power grid.
Further, the energy state of the power grid is first order energy state, second level energy state or third level energy Source state, wherein the first order energy state indicates that the power grid is in energy supply peak state, the second level energy State indicates that the power grid is in the state of energy supply anxiety, and the third level energy state indicates that the power grid is in the energy Abundant state.
Further, the energy scheduling unit is additionally operable in the energy state of the power grid be first order energy state In the case of, it determines the first control information, energy tune in information control more set PV air-conditioner systems is controlled according to described first The PV air-conditioner system that degree is identified as first identifier feeds remaining electricity to the power grid.
Further, all PV air-conditioner systems in the system monitoring unit monitors more set PV air-conditioner systems The energy scheduling of system be identified as second identifier and the power grid energy state be still first order energy state in the case of, it is described Energy scheduling unit is additionally operable to the electricity consumption for the PV air-conditioner system that control is closed in more set PV air-conditioner systems, to the electricity Net feed.
Further, the energy scheduling unit is additionally operable in the energy state of the power grid be second level energy state In the case of, it determines the second control information, energy tune in information control more set PV air-conditioner systems is controlled according to described second Degree is identified as the remaining electricity of the PV air-conditioner system of the first identifier energy scheduling into more set PV air-conditioner systems and is identified as the The PV air-conditioner system feed of two marks.
Further, all PV air-conditioners in more set PV air-conditioner systems are monitored in the system monitoring unit In the case that the energy scheduling mark of system is all second identifier, the energy scheduling unit is additionally operable to control the power grid to institute State the PV air-conditioner system power supply in more set PV air-conditioner systems.
Further, the energy scheduling unit is additionally operable in the energy state of the power grid be third level energy state In the case of, it determines that third controls information, energy tune in information control more set PV air-conditioner systems is controlled according to the third The remaining electricity for spending the PV air-conditioner system for being identified as first identifier feeds to the power grid and controls the power grid to more set light Energy scheduling in volt air-conditioning system is identified as the PV air-conditioner system power supply of second identifier.
Further, the distributed photovoltaic air-conditioning system further includes:Alternating current unit, with the power grid and more set light Air-conditioning system communication connection is lied prostrate, the energy for controlling between more set PV air-conditioner systems and the power grid flows to.
By the distributed photovoltaic air-conditioning system of the application, including:More set PV air-conditioner systems, are distributed in target area It is interior;Energy scheduling center, including:Power grid processing unit and energy scheduling unit, wherein power grid processing unit, with the communication system of power grids Connection, for receiving dispatch command;Energy scheduling unit is connect with power grid processing unit and more set PV air-conditioner system communications, Energy state in the case where receiving dispatch command, identifying power grid;Control letter is determined according to the energy state of power grid Breath;The operation of the more set PV air-conditioner systems of control according to the control information, adjusts the energy supply of power grid, solves in the prior art PV air-conditioner system it is relatively low in regional efficiency of energy utilization, it is difficult to realize that the energy is shared.Pass through the energy shape according to power grid The operation of the more set PV air-conditioner systems of state control ensures the energy supply of power grid to adjust the energy supply of power grid, and then reaches The effect efficiently utilized of PV air-conditioner system energy.
Description of the drawings
The attached drawing constituted part of this application is used for providing further understanding of the present application, the schematic reality of the application Example and its explanation are applied for explaining the application, does not constitute the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the flow chart according to the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application;
Fig. 2 is the schematic diagram according to distributed photovoltaic air-conditioning system provided by the embodiments of the present application;And
Fig. 3 is the schematic diagram according to optional distributed photovoltaic air-conditioning system provided by the embodiments of the present application.
Specific implementation mode
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, technical solutions in the embodiments of the present application are clearly and completely described, it is clear that described embodiment is only The embodiment of the application part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people The every other embodiment that member is obtained without making creative work should all belong to the model of the application protection It encloses.
It should be noted that term " first " in the description and claims of this application and above-mentioned attached drawing, " Two " etc. be for distinguishing similar object, without being used to describe specific sequence or precedence.It should be appreciated that using in this way Data can be interchanged in the appropriate case, so as to embodiments herein described herein.In addition, term " comprising " and " tool Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing series of steps or unit Process, method, system, product or equipment those of are not necessarily limited to clearly to list step or unit, but may include without clear It is listing to Chu or for these processes, method, product or equipment intrinsic other steps or unit.
With reference to preferred implementation steps, the present invention will be described, and Fig. 1 is according to provided by the embodiments of the present application point The flow chart of the control method of cloth PV air-conditioner system, as shown in Figure 1, the control method includes the following steps:
Step S101 detects whether to receive dispatch command.
Above-mentioned dispatch command is grid side dispatch command.
Step S102 identifies the energy state of power grid in the case where receiving dispatch command.
After receiving grid side dispatch command, the dispatch command is responded, identifies the energy state of power grid.
Step S103 determines control information, wherein control information is distributed in mesh for controlling according to the energy state of power grid Mark more set PV air-conditioner systems in region.
Step S104, the operation of the more set PV air-conditioner systems of control, adjusts the energy supply of power grid according to the control information.
It should be noted that above-mentioned more set PV air-conditioner systems can be used as virtual plant, virtual energy storage system.
The control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application receives scheduling by detecting whether Instruction;In the case where receiving dispatch command, the energy state of power grid is identified;Control letter is determined according to the energy state of power grid Breath, wherein control information covers PV air-conditioner system more for controlling to be distributed in target area;The more sets of control according to the control information The operation of PV air-conditioner system adjusts the energy supply of power grid, solves PV air-conditioner system in the prior art in regionality Efficiency of energy utilization is relatively low, it is difficult to realize that the energy is shared.By controlling more set PV air-conditioner systems according to the energy state of power grid Operation ensure the energy supply of power grid to adjust the energy supply of power grid, and then reached the height of PV air-conditioner system energy Imitate the effect utilized.
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, the energy of power grid State is first order energy state, second level energy state or third level energy state, wherein first order energy state indicates electricity Net is in energy supply peak state, and second level energy state indicates that power grid is in the state of energy supply anxiety, third level energy Source state indicates that power grid is in the abundant state of the energy.
In the above scheme, for example, energy supply peak, electricity consumption side (in this application for more cover PV air-conditioner system) is needed Peak load shifting instruction is responded, it is then above-mentioned first order energy state that the power generation of electricity consumption side is fed to greatest extent;Energy supply is nervous, It needs voluntarily to share adjusting between electricity consumption side system, it is then above-mentioned second level energy state to reduce power grid power supply pressure;Grid side energy It is then above-mentioned third level energy state that source, which is supplied abundant,.
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, according to power grid Energy state determine control information after, in the operations of the more set PV air-conditioner systems of control according to the control information, adjust power grid Energy supply before, which further includes:The energy scheduling of PV air-conditioner system in the more set PV air-conditioner systems of identification Mark, wherein in the case where the energy scheduling of PV air-conditioner system is identified as first identifier, PV air-conditioner system can participate in The energy supply of power grid is adjusted, in the case where the energy scheduling of PV air-conditioner system is identified as second identifier, PV air-conditioner system System cannot participate in the energy supply to power grid and adjust.
In the above scheme, for example, according to whether itself power load can be reduced, in determining more set PV air-conditioner systems The energy scheduling of PV air-conditioner system identifies.If energy scheduling is identified as true (corresponding above-mentioned first identifier), expression can be joined With energy scheduling;If energy scheduling is identified as false (corresponding above-mentioned second identifier), expression cannot participate in energy scheduling.It needs What is illustrated is, if may participate in energy scheduling mark by itself real-time judge of PV air-conditioner system, for example, being set according to air-conditioning equipment It sets and judges that e.g., in cooling mode, temperature setting cannot be below 20 DEG C no more than limit value;Alternatively, in a heating mode, temperature Degree is arranged not above 18 DEG C etc..
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, according to power grid Energy state determines that control information includes:In the case where the energy state of power grid is first order energy state, the first control is determined Information processed, wherein the first control information is used to control the light that energy scheduling in more set PV air-conditioner systems is identified as first identifier Air-conditioning system is lied prostrate to feed remaining electricity to power grid;The operation of the more set PV air-conditioner systems of control according to the control information, adjusts power grid Energy supply includes:The light of first identifier is identified as according to energy scheduling in the first more set PV air-conditioner systems of control information control Air-conditioning system is lied prostrate to feed remaining electricity to power grid.
In the above scheme, it needs to control more set PV air-conditioner systems to greatest extent to grid side feed.For example, certain region Distributed photovoltaic air-conditioning system has been built, has been made of 5 sets of PV air-conditioner systems, wherein has had may participate in for 3 sets of PV air-conditioner systems Energy scheduling is identified as true (corresponding above-mentioned first identifier), has the energy scheduling that may participate in of 2 sets of PV air-conditioner systems to be identified as False (corresponding above-mentioned second identifier).In the case where the energy state of power grid is first order energy state, energy scheduling is controlled Genuine 3 sets of PV air-conditioner systems are identified as to feed remaining electricity to grid side.
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, the control method Further include:Monitor the energy state of power grid and the energy scheduling mark for covering PV air-conditioner system in PV air-conditioner system more;It is supervising The energy scheduling mark for measuring all PV air-conditioner systems in more set PV air-conditioner systems is the energy of second identifier and power grid In the case that state is still first order energy state, the use of the PV air-conditioner system in more set PV air-conditioner systems is closed in control Electricity is fed to power grid.
In the above scheme, in the case where the energy state of power grid is first order energy state, energy scheduling mark is controlled When knowledge is that genuine 3 sets of PV air-conditioner systems are fed remaining electricity to grid side, the energy scheduling mark of PV air-conditioner system is monitored The energy state with power grid is known, until the energy scheduling mark of 5 sets of PV air-conditioner systems is all false, if grid side energy state is still For first order energy state, the electricity consumption of PV air-conditioner system is closed successively, is fed at capacity toward power grid.
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, according to power grid Energy state determines that control information includes:In the case where the energy state of power grid is second level energy state, the second control is determined Information processed, wherein the second control information is used to control the light that energy scheduling in more set PV air-conditioner systems is identified as first identifier The remaining electricity of volt air-conditioning system energy scheduling into more set PV air-conditioner systems is identified as the PV air-conditioner system feed of second identifier; Control covers the operations of PV air-conditioner systems more according to the control information, and the energy supply for adjusting power grid includes:Believed according to the second control Energy scheduling is identified as the remaining electric to more set photovoltaics of the PV air-conditioner system of first identifier in the more set PV air-conditioner systems of breath control Energy scheduling is identified as the PV air-conditioner system feed of second identifier in air-conditioning system.
In the above scheme, the shared adjusting of preferential electricity consumption side distributed photovoltaic air-conditioning system internal power source is controlled, for example, certain Regional construction distributed photovoltaic air-conditioning system, is made of 5 sets of PV air-conditioner systems, wherein have 3 sets of PV air-conditioner systems can It participates in energy scheduling and is identified as true (corresponding above-mentioned first identifier), have 2 sets of PV air-conditioner systems may participate in energy scheduling mark Knowledge is false (corresponding above-mentioned second identifier).In the case where the energy state of power grid is second level energy state, energy scheduling It is identified as itself adjustment equipment setting of genuine 3 sets of PV air-conditioner systems, reduces itself power load, it will be remaining electric to energy scheduling mark Knowledge is that 2 sets of false PV air-conditioner systems are fed, if still there is extra electricity to be fed to power grid.
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, the control method Further include:The energy scheduling mark of PV air-conditioner system in the more set PV air-conditioner systems of monitoring;It is monitoring in mostly set photovoltaic sky In the case that the energy scheduling mark of all PV air-conditioner systems is second identifier in adjusting system, control power grid covers photovoltaics more to PV air-conditioner system power supply in air-conditioning system.
In the above scheme, in the case where the energy state of power grid is second level energy state, energy scheduling mark is controlled When knowledge is that remaining electricity is identified as false 2 sets of PV air-conditioner systems feed by genuine 3 sets of PV air-conditioner systems toward energy scheduling, light is monitored The energy scheduling mark for lying prostrate air-conditioning system controls power grid to 5 sets of PV air-conditioners in the case where 5 sets of energy schedulings are identified as vacation System power supply.
Optionally, in the control method of distributed photovoltaic air-conditioning system provided by the embodiments of the present application, according to power grid Energy state determines that control information includes:In the case where the energy state of power grid is third level energy state, third control is determined Information processed, wherein third control information is used to control the light that energy scheduling in more set PV air-conditioner systems is identified as first identifier The remaining electricity for lying prostrate air-conditioning system is fed to power grid;And it controls power grid energy scheduling into more set PV air-conditioner systems and is identified as the second mark The PV air-conditioner system power supply of knowledge;The operation of the more set PV air-conditioner systems of control, the energy for adjusting power grid supply according to the control information Should include:The PV air-conditioner that energy scheduling in the more set PV air-conditioner systems of information control is identified as first identifier is controlled according to third The remaining electricity of system is fed to power grid;And control the light that power grid energy scheduling into more set PV air-conditioner systems is identified as second identifier Lie prostrate air-conditioning system power supply.
In the above scheme, for example, certain regional construction distributed photovoltaic air-conditioning system, by 5 sets of PV air-conditioner system groups At, wherein there is the energy scheduling that may participate in of 3 sets of PV air-conditioner systems to be identified as true (corresponding above-mentioned first identifier), there are 2 sets of light The energy scheduling that may participate in of volt air-conditioning system is identified as false (corresponding above-mentioned second identifier).It is second in the energy state of power grid In the case of grade energy state, energy scheduling is identified as genuine 3 sets of PV air-conditioner systems and feeds extra electricity to power grid, control Power grid processed is identified as 2 sets of false PV air-conditioner system power supplies to energy scheduling.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not The sequence being same as herein executes shown or described step.
The embodiment of the present application also provides a kind of distributed photovoltaic air-conditioning systems, it should be noted that the embodiment of the present application Distributed photovoltaic air-conditioning system can be used for executing that the embodiment of the present application provided for distributed photovoltaic air-conditioning system Control method.Distributed photovoltaic air-conditioning system provided by the embodiments of the present application is introduced below.
Fig. 2 is the schematic diagram according to the distributed photovoltaic air-conditioning system of the embodiment of the present application.As shown in Fig. 2, the device packet It includes:More set PV air-conditioner systems, are distributed in target area;Energy scheduling center, including:Power grid processing unit and energy scheduling Unit, wherein power grid processing unit is connect with the communication system of power grids, for receiving dispatch command;Energy scheduling unit, at power grid Reason unit is connected with more set PV air-conditioner system communications, the energy in the case where receiving dispatch command, identifying power grid State;Control information is determined according to the energy state of power grid;The operation of the more set PV air-conditioner systems of control according to the control information, is adjusted The energy supply of economize on electricity net.
For example, mostly set PV air-conditioner system is the PV air-conditioner system 1 in Fig. 2, PV air-conditioner system 2, PV air-conditioner system PV air-conditioner system n, above-mentioned PV air-conditioner system are both considered as virtual plant to system 3 ..., are also considered as only electric discharge Virtual energy storage, while being also power unit.Above-mentioned power grid processing unit receives the device of grid side dispatch command, above-mentioned Energy scheduling unit, i.e., in real time analysis current system energy supply and demand state, with decision virtual plant, virtual energy storage, electricity consumption, electricity The device of net associated components action.Above-mentioned connection A can directly receive grid side scheduling for energy management control centre and refer to It enables.
Distributed photovoltaic air-conditioning system provided by the embodiments of the present application solves PV air-conditioner system in the prior art and exists Regional efficiency of energy utilization is relatively low, it is difficult to realize that the energy is shared.It is empty by controlling more set photovoltaics according to the energy state of power grid The operation of adjusting system ensures the energy supply of power grid to adjust the energy supply of power grid, and then has reached PV air-conditioner system energy The effect efficiently utilized in source.
Optionally, in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, energy scheduling center further includes:System System monitoring unit is connect with power grid and more set PV air-conditioner system communications, and the energy information for monitoring power grid covers photovoltaics more with The energy information of air-conditioning system, wherein the energy information of power grid includes at least the energy state of power grid, cover PV air-conditioner system more Energy information include at least the energy scheduling of PV air-conditioner system and identify, be identified as the in the energy scheduling of PV air-conditioner system In the case of one mark, PV air-conditioner system can participate in the adjusting of the energy supply to power grid, in the energy tune of PV air-conditioner system In the case that degree is identified as second identifier, PV air-conditioner system cannot participate in the adjusting of the energy supply to power grid.
Whether above-mentioned system monitoring unit acquires power generation, electricity consumption, the voltage of power grid, electric current, power, electricity, may be used in real time Participate in the energy informations such as energy scheduling mark.For example, system monitoring unit is according to whether the determination of itself power load can be reduced The energy scheduling mark of PV air-conditioner system in more set PV air-conditioner systems.If energy scheduling is identified as true (corresponding above-mentioned the One mark), expression can participate in energy scheduling;If energy scheduling is identified as false (corresponding above-mentioned second identifier), expression can not To participate in energy scheduling.It is identified by itself real-time judge of PV air-conditioner system it should be noted that whether may participate in energy scheduling, For example, being no more than limit value according to air-conditioning equipment setting judges that e.g., in cooling mode, temperature setting cannot be below 20 DEG C;Or Person, in a heating mode, temperature setting is not above 18 DEG C etc..
Optionally, distributed photovoltaic air-conditioning system further includes:Alternating current unit, with power grid and more set PV air-conditioner system communications Connection is flowed to for controlling the energy between more set PV air-conditioner systems and power grid.
As shown in figure 3, the distributed photovoltaic air-conditioning system includes for controlling between more set PV air-conditioner systems and power grid The alternating current unit of energy flow direction and the energy information for monitoring power grid and the energy informations of more set PV air-conditioner systems be System monitoring unit.
Optionally, in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, the energy state of power grid is first Grade energy state, second level energy state or third level energy state, wherein first order energy state indicates that power grid is in the energy Peak state is supplied, second level energy state indicates that power grid is in the state of energy supply anxiety, and third level energy state indicates Power grid is in the abundant state of the energy.
In the above scheme, for example, energy supply peak, electricity consumption side (in this application for more cover PV air-conditioner system) is needed Peak load shifting instruction is responded, it is then above-mentioned first order energy state that the power generation of electricity consumption side is fed to greatest extent;Energy supply is nervous, It needs voluntarily to share adjusting between electricity consumption side system, it is then above-mentioned second level energy state to reduce power grid power supply pressure;Grid side energy It is then above-mentioned third level energy state that source, which is supplied abundant,.
Optionally, in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, energy scheduling unit is additionally operable to In the case that the energy state of power grid is first order energy state, the first control information is determined, according to the first control information control Energy scheduling is identified as the PV air-conditioner system of first identifier and feeds remaining electricity to power grid in more set PV air-conditioner systems.
In the above scheme, energy scheduling unit needs to control more set PV air-conditioner systems to greatest extent to grid side feedback Electricity.For example, certain regional construction distributed photovoltaic air-conditioning system, is made of 5 sets of PV air-conditioner systems, wherein there is 3 sets of photovoltaics empty The energy scheduling that may participate in of adjusting system is identified as true (corresponding above-mentioned first identifier), there is may participate in for 2 sets of PV air-conditioner systems Energy scheduling is identified as false (corresponding above-mentioned second identifier).The case where the energy state of power grid is first order energy state Under, energy scheduling unit control energy scheduling is identified as genuine 3 sets of PV air-conditioner systems and feeds remaining electricity to grid side.
Optionally, it in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, is monitored in system monitoring unit The energy schedulings of all PV air-conditioner systems are identified as the energy state of second identifier and power grid still in more set PV air-conditioner systems In the case of first order energy state, it is empty that energy scheduling unit is additionally operable to the photovoltaic that control is closed in more set PV air-conditioner systems The electricity consumption of adjusting system is fed to power grid.
In the above scheme, in the case where the energy state of power grid is first order energy state, energy scheduling mark is controlled When knowledge is that genuine 3 sets of PV air-conditioner systems are fed remaining electricity to grid side, system monitoring unit monitors PV air-conditioner system Energy scheduling mark and power grid energy state, until the energy scheduling mark of 5 sets PV air-conditioner systems is all fictitious time, if electric Net side energy state is still first order energy state, and energy scheduling unit closes the electricity consumption of PV air-conditioner system successively, at full capacity Ground is fed toward power grid.
Optionally, in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, energy scheduling unit is additionally operable to In the case that the energy state of power grid is second level energy state, the second control information is determined, according to the second control information control Energy scheduling is identified as the remaining electric to more set PV air-conditioner systems of the PV air-conditioner system of first identifier in more set PV air-conditioner systems Energy scheduling is identified as the PV air-conditioner system feed of second identifier in system.
In the above scheme, it is shared to control preferential electricity consumption side distributed photovoltaic air-conditioning system internal power source for energy scheduling unit It adjusts, for example, certain regional construction distributed photovoltaic air-conditioning system, is made of, wherein have 3 sets of photovoltaics 5 sets of PV air-conditioner systems The energy scheduling that may participate in of air-conditioning system is identified as true (corresponding above-mentioned first identifier), there is joining for 2 sets of PV air-conditioner systems It is identified as false (corresponding above-mentioned second identifier) with energy scheduling.The case where the energy state of power grid is second level energy state Under, energy scheduling unit control energy scheduling is identified as itself adjustment equipment setting of genuine 3 sets of PV air-conditioner systems, reduces itself Remaining electricity is identified as 2 sets of false PV air-conditioner systems to energy scheduling and fed by power load, if still there is extra electricity to be presented to power grid Electricity.
Optionally, it in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, is monitored in system monitoring unit In the case that the energy scheduling mark of all PV air-conditioner systems is all second identifier in mostly set PV air-conditioner system, energy tune Degree unit is additionally operable to PV air-conditioner system power supply of the control power grid into more set PV air-conditioner systems.
In the above scheme, in the case where the energy state of power grid is second level energy state, energy scheduling unit control Energy scheduling processed is identified as genuine 3 sets of PV air-conditioner systems and remaining electricity is identified as 2 sets of false PV air-conditioner systems toward energy scheduling When feed, system monitoring unit monitors the energy scheduling mark of PV air-conditioner system, and false situation is identified as in 5 sets of energy schedulings Under, energy scheduling unit controls power grid to 5 sets of PV air-conditioner system power supplies.
Optionally, in distributed photovoltaic air-conditioning system provided by the embodiments of the present application, energy scheduling unit is additionally operable to It in the case that the energy state of power grid is third level energy state, determines that third controls information, information control is controlled according to third The remaining electricity for the PV air-conditioner system that energy scheduling is identified as first identifier in more set PV air-conditioner systems feeds and controls to power grid Energy scheduling of the power grid into more set PV air-conditioner systems is identified as the PV air-conditioner system power supply of second identifier.
In the above scheme, for example, certain regional construction distributed photovoltaic air-conditioning system, by 5 sets of PV air-conditioner system groups At, wherein there is the energy scheduling that may participate in of 3 sets of PV air-conditioner systems to be identified as true (corresponding above-mentioned first identifier), there are 2 sets of light The energy scheduling that may participate in of volt air-conditioning system is identified as false (corresponding above-mentioned second identifier).It is second in the energy state of power grid In the case of grade energy state, energy scheduling unit control energy scheduling is identified as genuine 3 sets of PV air-conditioner systems will be extra Electricity is fed to power grid, and control power grid is identified as 2 sets of false PV air-conditioner system power supplies to energy scheduling.
Through the above scheme, in distributed photovoltaic air-conditioning system, application message technology is built in energy management scheduling The heart is linked with supply and demand and is realized from electricity consumption side Demand-side angle:In grid side power shortage, each virtual plant, each virtual storage Can be self-sufficient, the energy is shared between system, reduces power grid power supply.When grid side sends peak load shifting instruction, PV air-conditioner system System timely responds to, and each virtual plant, each virtual energy storage are concentrated to be fed to power grid, reduces system itself electricity consumption.In PV air-conditioner system When system power generation is more than electricity consumption, fed in real time toward power grid.When the power generation of PV air-conditioner system is less than electricity consumption, hair inside priority system Electricity is adjusted, the energy is shared, and when scarce capacity takes electricity from power grid again.By the distributed photovoltaic air-conditioning system of the embodiment of the present application, Under different scenes, it can all realize that using energy source maximizes.
It will be understood by those skilled in the art that embodiments herein can be provided as method, system or computer program product. Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application Form.It is deposited moreover, the application can be used to can be used in the computer that one or more wherein includes computer usable program code The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
It these are only embodiments herein, be not intended to limit this application.To those skilled in the art, The application can have various modifications and variations.It is all within spirit herein and principle made by any modification, equivalent replacement, Improve etc., it should be included within the scope of claims hereof.

Claims (17)

1. a kind of control method of distributed photovoltaic air-conditioning system, which is characterized in that including:
It detects whether to receive dispatch command;
In the case where receiving the dispatch command, the energy state of power grid is identified;
Control information is determined according to the energy state of the power grid, wherein the control information is distributed in target area for controlling It is in domain to cover PV air-conditioner system more;
The operation that more set PV air-conditioner systems are controlled according to the control information, adjusts the energy supply of the power grid.
2. control method according to claim 1, which is characterized in that the energy state of the power grid is first order energy shape State, second level energy state or third level energy state, wherein the first order energy state indicates that the power grid is in the energy Peak state is supplied, the second level energy state indicates that the power grid is in the state of energy supply anxiety, the third level Energy state indicates that the power grid is in the abundant state of the energy.
3. control method according to claim 2, which is characterized in that controlled being determined according to the energy state of the power grid After information, in the operation for controlling more set PV air-conditioner systems according to the control information, the energy of the power grid is adjusted Before supply, the control method further includes:
Identify the energy scheduling mark of PV air-conditioner system in more set PV air-conditioner systems, wherein in PV air-conditioner system Energy scheduling be identified as first identifier in the case of, the PV air-conditioner system can participate in the energy supply tune to the power grid Section, in the case where the energy scheduling of PV air-conditioner system is identified as second identifier, the PV air-conditioner system cannot participate in The energy supply of the power grid is adjusted.
4. wanting the control method described in 3 according to right, which is characterized in that
Determine that control information includes according to the energy state of the power grid:It is first order energy shape in the energy state of the power grid In the case of state, the first control information is determined, wherein the first control information is for controlling more set PV air-conditioner systems The PV air-conditioner system that middle energy scheduling is identified as first identifier feeds remaining electricity to the power grid;
The operation that more set PV air-conditioner systems are controlled according to the control information, adjusts the energy supply packet of the power grid It includes:Information, which is controlled, according to described first controls the photovoltaic that energy scheduling in more set PV air-conditioner systems is identified as first identifier Air-conditioning system feeds remaining electricity to the power grid.
5. control method according to claim 4, which is characterized in that the control method further includes:
Monitor the energy state of the power grid and the energy scheduling mark for covering PV air-conditioner system in PV air-conditioner system more;
The energy scheduling mark of all PV air-conditioner systems is second identifier in monitoring more set PV air-conditioner systems And in the case that the energy state of the power grid is still first order energy state, control is closed in more set PV air-conditioner systems PV air-conditioner system electricity consumption, to the power grid feed.
6. wanting the control method described in 3 according to right, which is characterized in that
Determine that control information includes according to the energy state of the power grid:It is second level energy shape in the energy state of the power grid In the case of state, the second control information is determined, wherein the second control information is for controlling more set PV air-conditioner systems The remaining electricity that middle energy scheduling is identified as the PV air-conditioner system of first identifier covers energy scheduling in PV air-conditioner systems more to described It is identified as the PV air-conditioner system feed of second identifier;
The operation that more set PV air-conditioner systems are controlled according to the control information, adjusts the energy supply packet of the power grid It includes:Information, which is controlled, according to described second controls the photovoltaic that energy scheduling in more set PV air-conditioner systems is identified as first identifier The remaining electricity of air-conditioning system energy scheduling into more set PV air-conditioner systems is identified as the PV air-conditioner system feedback of second identifier Electricity.
7. control method according to claim 6, which is characterized in that the control method further includes:
Monitor the energy scheduling mark of PV air-conditioner system in more set PV air-conditioner systems;
Monitoring that the energy scheduling mark of all PV air-conditioner systems in more set PV air-conditioner systems is the second mark In the case of knowledge, PV air-conditioner system power supply of the power grid into more set PV air-conditioner systems is controlled.
8. wanting the control method described in 3 according to right, which is characterized in that
Determine that control information includes according to the energy state of the power grid:It is third level energy shape in the energy state of the power grid In the case of state, determine that third controls information, wherein the third control information is for controlling more set PV air-conditioner systems The remaining electricity that middle energy scheduling is identified as the PV air-conditioner system of first identifier is fed to the power grid;And the power grid is controlled to institute State the PV air-conditioner system power supply that energy scheduling in more set PV air-conditioner systems is identified as second identifier;
The operation that more set PV air-conditioner systems are controlled according to the control information, adjusts the energy supply packet of the power grid It includes:Information, which is controlled, according to the third controls the photovoltaic that energy scheduling in more set PV air-conditioner systems is identified as first identifier The remaining electricity of air-conditioning system is fed to the power grid;And control power grid energy scheduling mark into more set PV air-conditioner systems Know the PV air-conditioner system power supply for second identifier.
9. a kind of distributed photovoltaic air-conditioning system, which is characterized in that including:
More set PV air-conditioner systems, are distributed in target area;
Energy scheduling center, including:Power grid processing unit and energy scheduling unit,
Wherein, the power grid processing unit, connect with the communication system of power grids, for receiving dispatch command;
The energy scheduling unit connect with the power grid processing unit and more set PV air-conditioner system communications, is used for In the case of receiving the dispatch command, the energy state of power grid is identified;It is determined and is controlled according to the energy state of the power grid Information;The operation that more set PV air-conditioner systems are controlled according to the control information, adjusts the energy supply of the power grid.
10. distributed photovoltaic air-conditioning system according to claim 9, which is characterized in that also wrap at the energy scheduling center It includes:
System monitoring unit is connect with the power grid and more set PV air-conditioner system communications, for monitoring the power grid The energy information of energy information and more set PV air-conditioner systems, wherein the energy information of the power grid includes at least described The energy information of the energy state of power grid, more set PV air-conditioner systems includes at least the energy scheduling mark of PV air-conditioner system Know, in the case where the energy scheduling of PV air-conditioner system is identified as first identifier, the PV air-conditioner system can be participated in institute The energy supply for stating power grid is adjusted, in the case where the energy scheduling of PV air-conditioner system is identified as second identifier, the photovoltaic Air-conditioning system cannot participate in adjusting to the energy supply of the power grid.
11. distributed photovoltaic air-conditioning system according to claim 10, which is characterized in that the energy state of the power grid is First order energy state, second level energy state or third level energy state, wherein described in the first order energy state indicates Power grid is in energy supply peak state, and the second level energy state indicates that the power grid is in the shape of energy supply anxiety State, the third level energy state indicate that the power grid is in the abundant state of the energy.
12. wanting the distributed photovoltaic air-conditioning system described in 11 according to right, which is characterized in that the energy scheduling unit is additionally operable to In the case where the energy state of the power grid is first order energy state, the first control information is determined, controlled according to described first Information processed controls energy scheduling in more set PV air-conditioner system and is identified as the PV air-conditioner system of first identifier by Yu electricity Xiang The power grid feed.
13. distributed photovoltaic air-conditioning system according to claim 12, which is characterized in that
The energy scheduling of all PV air-conditioner systems in more set PV air-conditioner systems is monitored in the system monitoring unit Be identified as second identifier and the power grid energy state be still first order energy state in the case of, the energy scheduling unit It is additionally operable to the electricity consumption for the PV air-conditioner system that control is closed in more set PV air-conditioner systems, is fed to the power grid.
14. wanting the distributed photovoltaic air-conditioning system described in 11 according to right, which is characterized in that
The energy scheduling unit is additionally operable to, in the case where the energy state of the power grid is second level energy state, determine the Two control information control energy scheduling in information control more set PV air-conditioner systems according to described second and are identified as the first mark The photovoltaic that the remaining electricity of the PV air-conditioner system of knowledge energy scheduling into more set PV air-conditioner systems is identified as second identifier is empty Adjusting system is fed.
15. distributed photovoltaic air-conditioning system according to claim 14, which is characterized in that
The energy tune of all PV air-conditioner systems in more set PV air-conditioner systems is monitored in the system monitoring unit In the case that scale knowledge is all second identifier, the energy scheduling unit is additionally operable to control the power grid to more set photovoltaics skies PV air-conditioner system power supply in adjusting system.
16. wanting the distributed photovoltaic air-conditioning system described in 11 according to right, which is characterized in that
The energy scheduling unit is additionally operable to, in the case where the energy state of the power grid is third level energy state, determine the Three control information control energy scheduling in information control more set PV air-conditioner systems according to the third and are identified as the first mark The remaining electricity of the PV air-conditioner system of knowledge feeds to the power grid and controls the power grid into more set PV air-conditioner systems Energy scheduling is identified as the PV air-conditioner system power supply of second identifier.
17. distributed photovoltaic air-conditioning system according to claim 9, which is characterized in that distributed photovoltaic air-conditioning system System further includes:Alternating current unit is connect with the power grid and more set PV air-conditioner system communications, for controlling more set light The energy lied prostrate between air-conditioning system and the power grid flows to.
CN201810136785.3A 2018-02-09 2018-02-09 Distributed photovoltaic air conditioning system and control method thereof Active CN108321852B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810136785.3A CN108321852B (en) 2018-02-09 2018-02-09 Distributed photovoltaic air conditioning system and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810136785.3A CN108321852B (en) 2018-02-09 2018-02-09 Distributed photovoltaic air conditioning system and control method thereof

Publications (2)

Publication Number Publication Date
CN108321852A true CN108321852A (en) 2018-07-24
CN108321852B CN108321852B (en) 2020-01-07

Family

ID=62903944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810136785.3A Active CN108321852B (en) 2018-02-09 2018-02-09 Distributed photovoltaic air conditioning system and control method thereof

Country Status (1)

Country Link
CN (1) CN108321852B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106385051A (en) * 2016-10-20 2017-02-08 中国电力科学研究院 Distributed photovoltaic interactive terminal and method
CN106707778A (en) * 2016-12-06 2017-05-24 长沙理工大学 Model predictive control-based home integrated energy intelligent optimization and management system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106385051A (en) * 2016-10-20 2017-02-08 中国电力科学研究院 Distributed photovoltaic interactive terminal and method
CN106707778A (en) * 2016-12-06 2017-05-24 长沙理工大学 Model predictive control-based home integrated energy intelligent optimization and management system

Also Published As

Publication number Publication date
CN108321852B (en) 2020-01-07

Similar Documents

Publication Publication Date Title
Özkan A new real time home power management system
CN103620902B (en) The control apparatus and method of the power consumption in the system controlling power consumers
CN102377182A (en) Load shed system for demand response without AMI/AMR system
CN104633869A (en) Control method and system for air conditioner outdoor unit
CN110848895B (en) Non-industrial air conditioner flexible load control method and system
CN109787262A (en) A kind of resident's building system active response micro-capacitance sensor Optimization Scheduling
CN106953340B (en) It is a kind of based on multiclass temperature control load weighted state queue control distribution interconnection tie power fluctuation stabilize method
Rahman et al. An intelligent approach of achieving demand response by fuzzy logic based domestic load management
CN113839423A (en) Control management method, device, equipment and storage medium
CN109274088A (en) Energy control method, energy control device, energy management system and storage medium
CN106712087A (en) Micro-energy grid switching mode
CN106685313B (en) Power generation control method and device for photovoltaic power station and photovoltaic power station
CN111277007A (en) Thermal power generating unit frequency modulation system considering demand side response
CN105243445A (en) Peak clipping method based on power consumption utility grading on electric apparatus and identification on power consumption behavior of user
CN106839082B (en) Wind power heating regulator control system and regulation method
CN110429712A (en) DC load response control method and device based on voltage change and DC electrical appliance
CN206370695U (en) A kind of photovoltaic plant
Fan et al. An optimization management strategy for energy efficiency of air conditioning loads in smart building
CN108321852A (en) Distributed photovoltaic air conditioning system and control method thereof
CN114142479B (en) User side energy scheduling method and system considering multi-type adjustable load resources
CN110535143A (en) Energy management method and device towards the response of intelligent dwelling dynamic need
CN112736950B (en) Public energy storage power station configuration method and system for micro-grid group
CN113869775A (en) Park operation strategy generation method for multi-type user comprehensive demand response
Saxena et al. Demand Response Management of Residential Loads with Integrated Temperature Dependent Appliances
CN113437748A (en) Load regulation and control method and system for power system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant