CN108320125A - A kind of project process management system - Google Patents

A kind of project process management system Download PDF

Info

Publication number
CN108320125A
CN108320125A CN201711364585.5A CN201711364585A CN108320125A CN 108320125 A CN108320125 A CN 108320125A CN 201711364585 A CN201711364585 A CN 201711364585A CN 108320125 A CN108320125 A CN 108320125A
Authority
CN
China
Prior art keywords
user
module
project
information
management module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711364585.5A
Other languages
Chinese (zh)
Inventor
江映燕
陈业钊
卢乐书
罗文�
罗一文
徐晓东
陈素敏
王远丰
杨志花
罗崇立
陈燕
秦凤枝
张铭予
林少锐
马腾腾
姜文婷
刘健峰
陈飞鹏
刘紫健
潘伟文
廖颖茜
陈洪钦
饶冠佳
尹震超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority to CN201711364585.5A priority Critical patent/CN108320125A/en
Publication of CN108320125A publication Critical patent/CN108320125A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to computer systems technology fields, more particularly, to a kind of project process management system, including user management module, flow processing module and data memory module;User management module includes user log-in block, information processing module of user's, subscriber information management module, user log-in block is for providing user login operation, information processing module of user's judges user in flow processing mould operating right in the block according to user information and carries out setting operation, and subscriber information management module carries out statistical management to the workflow of user and operation note;Flow processing module to the action in each stage in project flow for being managed operation;Data memory module is used for system data.The present invention manages system by Establishing process, is managed collectively to the flow processing in project construction process, both improved work efficiency, ensure that the timely reception and registration of project work information, and also simplified project process flow.

Description

A kind of project process management system
Technical field
The present invention relates to computer systems technology fields, more particularly, to a kind of project process management system.
Background technology
In power industry, construction project is of great significance to the development of electric system, and project construction also receives state The great attention of family.But since construction project has the characteristics that project work amount is big, the type of skill is various, in flying for business In fast evolution, there are some problems in the technical support of project and implementation process in Utilities Electric Co., such as:Involved by project And item types are various, the present situations such as project work amount is big, Project Technical is complicated, cause personnel amount that cannot meet the number of entry With the rapid growth of scale, employee often works extra shifts or extra hours;Personnel go on business number increase, management level and employee's face-to-face exchange when Between and chance it is less, management level obtain project information and execute decision accuracy and promptness be affected.This several respect is asked It is more and more to inscribe the contradiction generated over time, forms management fast knot, or even as the management bottleneck of entire company, such as Information management in what effective coordination project flow, promotes the efficiency and quality of project information management, there are no solved well Certainly.
Invention content
The present invention is at least one defect overcome described in the above-mentioned prior art, provides a kind of project process management system, Unified effective management is carried out to project flow, effectively improves the efficiency and quality of project information management.
In order to solve the above technical problems, present invention employs following technical solutions:
A kind of project process management system, including user management module, flow processing module and data memory module;
User management module includes user log-in block, information processing module of user's, subscriber information management module, and user logs in mould For block for providing user login operation, information processing module of user's judges that user is in the block in flow processing mould according to user information Operating right simultaneously carries out setting operation, and subscriber information management module carries out statistics pipe to the workflow of user and operation note Reason;
Flow processing module to the action in each stage in project flow for being managed operation;
Data memory module is used for system data.
The present invention is used for Enterprise Project information and workflow management, and project participant creates account by user log-in block It is logged in, information processing module of user's determines the operating right of user according to the information of user, and sets user at flow Mould operating right in the block is managed, user can be handled the work in project process by flow processing module, in work Appearance is reported, is examined and issue handling, carries out project flow processing.The setting of operating right facilitates the processing of project flow, no The processing that corresponding work can be carried out with staff's login system in post, for other posies, content such as declares at the operations, does not have There is processing authority, Each performs its own functions by the personnel that ensure that in project flow, keeps project flow more orderly.
Further, subscriber information management module includes user's workflow management module and user's operation management module, described User's workflow management module is used to be arranged user's relevant item and is carried out to the workflow of user according to the respective settings of user Management.User's operation management counts the operation of user, the historical operation for recording user, and user's workflow management mould Block is managed the project flow action of user, including key link information reminds, finds potential risk in time in time And problem;According to workflow, being automatically reminded to action includes:Need the document audited, problem to be solved etc..
Further, flow processing module includes several operational modules and management module, and the operational module includes statistics Analysis module, Basic Information Management module, procurement contract management module, construction information management module;
Statistical analysis module counts for realizing project returned money, project support situation counts, the operation of engineering construction statistics; The opening post of this module includes pre-sales personnel, project manager, company leader.
Basic Information Management module is used for the correlation circumstance to item base information, scheduling information, super bid information It is managed;The opening post of this module includes pre-sales personnel, project manager, company leader.
Procurement contract management module is for realizing the management to Project contract, purchase of goods and materials and procurement contract;This module Open post includes pre-sales personnel, inventory managers, project manager, company leader.
Construction information management module is used for the construction information of management project, including construction speed, construction personnel, construction cost With;The opening post of this module includes construction personnel, project manager, company leader.
Management module is associated with each operational module, and synchronizing information is carried out to each operational module according to project flow.This mould Block is used for the information interchange between each operational module, and such as a certain project carries out declaration form submission and examined, by management mould Block carries out unified change to the state in relation to the project in other operational modules, to ensure the synchronization of project flow.
Further, data memory module includes User Information Database and item information database, the user information Database uses data, the item information database to believe for stored items for storing user account information and user's operation Breath, project flow and project associated documents.
Compared with prior art, advantageous effect is:The present invention manages system by Establishing process, in project construction process Flow processing be managed collectively, both improved work efficiency, ensure that the timely reception and registration of project work information, also simplified Project process flow.
Description of the drawings
Fig. 1 is the structural schematic diagram in one embodiment of the invention.
Specific implementation mode
Invention is further explained below in conjunction with the accompanying drawings, it should be noted that attached drawing only for illustration, It should not be understood as the limitation to this patent.
As shown in Figure 1, a kind of project process management system, including user management module, flow processing module and data are deposited Store up module;
User management module includes user log-in block, information processing module of user's, subscriber information management module, and user logs in mould Block is for providing user login operation;Information processing module of user's judges that user is in the block in flow processing mould according to user information Operating right simultaneously carries out setting operation;Subscriber information management module carries out statistics pipe to the workflow of user and operation note Reason, including user's workflow management module and user's operation management module, user's workflow management module is for being arranged user's continuous item Mesh is simultaneously managed the workflow of user according to the respective settings of user.User's operation management unites to the operation of user Meter, the historical operation for recording user, and user's workflow management module is managed the project flow action of user, It reminded in time including key link information, find potential risk and problem in time;According to workflow, it is automatically reminded to action Including:Need the document audited, problem to be solved etc..
Flow processing module to the action in each stage in project flow for being managed operation;If specifically including Module of working and management module, operational module include statistical analysis module, Basic Information Management module, procurement contract management mould Block, construction information management module;
Statistical analysis module counts for realizing project returned money, project support situation counts, the operation of engineering construction statistics; The opening post of this module includes pre-sales personnel, project manager, company leader.
Basic Information Management module is used for the correlation circumstance to item base information, scheduling information, super bid information It is managed;The opening post of this module includes pre-sales personnel, project manager, company leader.
Procurement contract management module is for realizing the management to Project contract, purchase of goods and materials and procurement contract;This module Open post includes pre-sales personnel, inventory managers, project manager, company leader.
Construction information management module is used for the construction information of management project, including construction speed, construction personnel, construction cost With;The opening post of this module includes construction personnel, project manager, company leader.
Management module is associated with each operational module, and synchronizing information is carried out to each operational module according to project flow.This mould Block is used for the information interchange between each operational module, and such as a certain project carries out declaration form submission and examined, by management mould Block carries out unified change to the state in relation to the project in other operational modules, to ensure the synchronization of project flow.
Data memory module is used for system data, including User Information Database and item information database, user information Database uses data for storing user account information and user's operation, item information database for stored items information, Project flow and project associated documents.
The present invention is used for Enterprise Project information and workflow management, and project participant creates account by user log-in block It is logged in, information processing module of user's determines the operating right of user according to the information of user, and sets user at flow Mould operating right in the block is managed, user can be handled the work in project process by flow processing module, in work Appearance is reported, is examined and issue handling, carries out project flow processing.The setting of operating right facilitates the processing of project flow, no The processing that corresponding work can be carried out with staff's login system in post, for other posies, content such as declares at the operations, does not have There is processing authority, Each performs its own functions by the personnel that ensure that in project flow, keeps project flow more orderly.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention Protection domain within.

Claims (4)

1. a kind of project process management system, which is characterized in that stored including user management module, flow processing module and data Module;
The user management module includes user log-in block, information processing module of user's, subscriber information management module, the use For family login module for providing user login operation, the information processing module of user's judges user in flow according to user information Operating right in processing module simultaneously carries out setting operation, workflow and operation of the subscriber information management module to user Record carries out statistical management;
The flow processing module to the action in each stage in project flow for being managed operation;
The data memory module is used for system data.
2. a kind of project process management system according to claim 1, which is characterized in that the subscriber information management module Including user's workflow management module and user's operation management module, user's workflow management module is for being arranged user's continuous item Mesh is simultaneously managed the workflow of user according to the respective settings of user.
3. a kind of project process management system according to claim 1, which is characterized in that the flow processing module includes Several operational modules and management module, the operational module include statistical analysis module, Basic Information Management module, procurement contract Management module, construction information management module;
The statistical analysis module counts for realizing project returned money, project support situation statistics, engineering construction statistics Operation;
The Basic Information Management module is used for the correlation circumstance to item base information, scheduling information, super bid information It is managed;
The procurement contract management module is for realizing the management to Project contract, purchase of goods and materials and procurement contract;
The construction information management module is used for the construction information of management project, including construction speed, construction personnel, construction cost With;
The management module is associated with each operational module, and synchronizing information is carried out to each operational module according to project flow.
4. a kind of project process management system according to claim 3, which is characterized in that the data memory module includes User Information Database and item information database, the User Information Database is for storing user account information and user behaviour Make that data, the item information database is used to be used for stored items information, project flow and project associated documents.
CN201711364585.5A 2017-12-18 2017-12-18 A kind of project process management system Pending CN108320125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711364585.5A CN108320125A (en) 2017-12-18 2017-12-18 A kind of project process management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711364585.5A CN108320125A (en) 2017-12-18 2017-12-18 A kind of project process management system

Publications (1)

Publication Number Publication Date
CN108320125A true CN108320125A (en) 2018-07-24

Family

ID=62892396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711364585.5A Pending CN108320125A (en) 2017-12-18 2017-12-18 A kind of project process management system

Country Status (1)

Country Link
CN (1) CN108320125A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109784852A (en) * 2019-01-12 2019-05-21 重庆洪峰工业设备安装有限公司 A kind of electronic system and working method of Engineering Oriented debit
CN110223032A (en) * 2019-05-17 2019-09-10 国网安徽省电力有限公司 A kind of fortune inspection public service project management control system and method
CN110751452A (en) * 2019-09-18 2020-02-04 九江明阳电路科技有限公司 Workflow management system, method and storage medium
CN113065123A (en) * 2021-04-12 2021-07-02 山东壹典专业设计有限公司 Data information flow management system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040044673A1 (en) * 2002-09-04 2004-03-04 Jeffrey Brady System and method for a planner and a deduplicating planner
CN102855546A (en) * 2012-08-31 2013-01-02 天津博信汽车零部件有限公司 Integrated project management system
CN107292592A (en) * 2017-07-19 2017-10-24 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data automatic classification orients supplying system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040044673A1 (en) * 2002-09-04 2004-03-04 Jeffrey Brady System and method for a planner and a deduplicating planner
CN102855546A (en) * 2012-08-31 2013-01-02 天津博信汽车零部件有限公司 Integrated project management system
CN107292592A (en) * 2017-07-19 2017-10-24 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data automatic classification orients supplying system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109784852A (en) * 2019-01-12 2019-05-21 重庆洪峰工业设备安装有限公司 A kind of electronic system and working method of Engineering Oriented debit
CN110223032A (en) * 2019-05-17 2019-09-10 国网安徽省电力有限公司 A kind of fortune inspection public service project management control system and method
CN110751452A (en) * 2019-09-18 2020-02-04 九江明阳电路科技有限公司 Workflow management system, method and storage medium
CN110751452B (en) * 2019-09-18 2023-11-10 九江明阳电路科技有限公司 Workflow management system, method and storage medium
CN113065123A (en) * 2021-04-12 2021-07-02 山东壹典专业设计有限公司 Data information flow management system

Similar Documents

Publication Publication Date Title
CN108320125A (en) A kind of project process management system
Pyon et al. Service improvement by business process management using customer complaints in financial service industry
CN102663557B (en) MOT management system and its implementation
CN102663645A (en) Integrated management system of investment bank and realization method thereof
US20190026672A1 (en) System and computer program for implementing an improved blockchain for use a value chain
CN111222955A (en) Supplier supervision method and system based on block chain
CN109523211A (en) A kind of intelligent classification displaying order production management billboard based on wechat small routine
Yin et al. Utilizing blockchain technology to manage the dark and bright sides of supply network complexity to enhance supply chain sustainability
McCoy et al. Accounting for human capital: Implications of automation and operational performance
Grudzińska-Kuna Supporting knowledge workers: case management model and notation (CMMN)
US20030046193A1 (en) Method and system for decentralized logistic management of supply chain networks
CN107247715A (en) The synchronous method of WMS systems and ERP system
Jović et al. SWOT analysis of selected digital technologies in transport economics
CN109409650A (en) A kind of ERP management system of corporate resources
CN104778520A (en) Cloud enterprise information portal application system
US20110307401A1 (en) People relationship management system
Zhao Blockchain Technology Improves Supply Chain: A Literature Review
Lee et al. Redefining organizational information technology-based capabilities with an integrative framework for multiple levels of analysis
CN110533295A (en) A kind of wire examination method and system
Yan Smart Financial Real-Time Control System Implementation based on Artificial Intelligence and Data Mining
Sun et al. Design of an enterprise financial risk management system based on big data mining
Jerab The Effect of Organizational Structure on Corporate Governance
Kristandl Technologies underpinning accounting information systems
Yaacob et al. A systematic literature review of industry 4.0: bridging between the information asymmetry and corporate governance
Wan et al. Linking top management team’s internal social capital and project performance in a mega construction project: The mediating role of behavioral integration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180724

RJ01 Rejection of invention patent application after publication