CN108320125A - A kind of project process management system - Google Patents
A kind of project process management system Download PDFInfo
- Publication number
- CN108320125A CN108320125A CN201711364585.5A CN201711364585A CN108320125A CN 108320125 A CN108320125 A CN 108320125A CN 201711364585 A CN201711364585 A CN 201711364585A CN 108320125 A CN108320125 A CN 108320125A
- Authority
- CN
- China
- Prior art keywords
- user
- module
- project
- information
- management module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to computer systems technology fields, more particularly, to a kind of project process management system, including user management module, flow processing module and data memory module;User management module includes user log-in block, information processing module of user's, subscriber information management module, user log-in block is for providing user login operation, information processing module of user's judges user in flow processing mould operating right in the block according to user information and carries out setting operation, and subscriber information management module carries out statistical management to the workflow of user and operation note;Flow processing module to the action in each stage in project flow for being managed operation;Data memory module is used for system data.The present invention manages system by Establishing process, is managed collectively to the flow processing in project construction process, both improved work efficiency, ensure that the timely reception and registration of project work information, and also simplified project process flow.
Description
Technical field
The present invention relates to computer systems technology fields, more particularly, to a kind of project process management system.
Background technology
In power industry, construction project is of great significance to the development of electric system, and project construction also receives state
The great attention of family.But since construction project has the characteristics that project work amount is big, the type of skill is various, in flying for business
In fast evolution, there are some problems in the technical support of project and implementation process in Utilities Electric Co., such as:Involved by project
And item types are various, the present situations such as project work amount is big, Project Technical is complicated, cause personnel amount that cannot meet the number of entry
With the rapid growth of scale, employee often works extra shifts or extra hours;Personnel go on business number increase, management level and employee's face-to-face exchange when
Between and chance it is less, management level obtain project information and execute decision accuracy and promptness be affected.This several respect is asked
It is more and more to inscribe the contradiction generated over time, forms management fast knot, or even as the management bottleneck of entire company, such as
Information management in what effective coordination project flow, promotes the efficiency and quality of project information management, there are no solved well
Certainly.
Invention content
The present invention is at least one defect overcome described in the above-mentioned prior art, provides a kind of project process management system,
Unified effective management is carried out to project flow, effectively improves the efficiency and quality of project information management.
In order to solve the above technical problems, present invention employs following technical solutions:
A kind of project process management system, including user management module, flow processing module and data memory module;
User management module includes user log-in block, information processing module of user's, subscriber information management module, and user logs in mould
For block for providing user login operation, information processing module of user's judges that user is in the block in flow processing mould according to user information
Operating right simultaneously carries out setting operation, and subscriber information management module carries out statistics pipe to the workflow of user and operation note
Reason;
Flow processing module to the action in each stage in project flow for being managed operation;
Data memory module is used for system data.
The present invention is used for Enterprise Project information and workflow management, and project participant creates account by user log-in block
It is logged in, information processing module of user's determines the operating right of user according to the information of user, and sets user at flow
Mould operating right in the block is managed, user can be handled the work in project process by flow processing module, in work
Appearance is reported, is examined and issue handling, carries out project flow processing.The setting of operating right facilitates the processing of project flow, no
The processing that corresponding work can be carried out with staff's login system in post, for other posies, content such as declares at the operations, does not have
There is processing authority, Each performs its own functions by the personnel that ensure that in project flow, keeps project flow more orderly.
Further, subscriber information management module includes user's workflow management module and user's operation management module, described
User's workflow management module is used to be arranged user's relevant item and is carried out to the workflow of user according to the respective settings of user
Management.User's operation management counts the operation of user, the historical operation for recording user, and user's workflow management mould
Block is managed the project flow action of user, including key link information reminds, finds potential risk in time in time
And problem;According to workflow, being automatically reminded to action includes:Need the document audited, problem to be solved etc..
Further, flow processing module includes several operational modules and management module, and the operational module includes statistics
Analysis module, Basic Information Management module, procurement contract management module, construction information management module;
Statistical analysis module counts for realizing project returned money, project support situation counts, the operation of engineering construction statistics;
The opening post of this module includes pre-sales personnel, project manager, company leader.
Basic Information Management module is used for the correlation circumstance to item base information, scheduling information, super bid information
It is managed;The opening post of this module includes pre-sales personnel, project manager, company leader.
Procurement contract management module is for realizing the management to Project contract, purchase of goods and materials and procurement contract;This module
Open post includes pre-sales personnel, inventory managers, project manager, company leader.
Construction information management module is used for the construction information of management project, including construction speed, construction personnel, construction cost
With;The opening post of this module includes construction personnel, project manager, company leader.
Management module is associated with each operational module, and synchronizing information is carried out to each operational module according to project flow.This mould
Block is used for the information interchange between each operational module, and such as a certain project carries out declaration form submission and examined, by management mould
Block carries out unified change to the state in relation to the project in other operational modules, to ensure the synchronization of project flow.
Further, data memory module includes User Information Database and item information database, the user information
Database uses data, the item information database to believe for stored items for storing user account information and user's operation
Breath, project flow and project associated documents.
Compared with prior art, advantageous effect is:The present invention manages system by Establishing process, in project construction process
Flow processing be managed collectively, both improved work efficiency, ensure that the timely reception and registration of project work information, also simplified
Project process flow.
Description of the drawings
Fig. 1 is the structural schematic diagram in one embodiment of the invention.
Specific implementation mode
Invention is further explained below in conjunction with the accompanying drawings, it should be noted that attached drawing only for illustration,
It should not be understood as the limitation to this patent.
As shown in Figure 1, a kind of project process management system, including user management module, flow processing module and data are deposited
Store up module;
User management module includes user log-in block, information processing module of user's, subscriber information management module, and user logs in mould
Block is for providing user login operation;Information processing module of user's judges that user is in the block in flow processing mould according to user information
Operating right simultaneously carries out setting operation;Subscriber information management module carries out statistics pipe to the workflow of user and operation note
Reason, including user's workflow management module and user's operation management module, user's workflow management module is for being arranged user's continuous item
Mesh is simultaneously managed the workflow of user according to the respective settings of user.User's operation management unites to the operation of user
Meter, the historical operation for recording user, and user's workflow management module is managed the project flow action of user,
It reminded in time including key link information, find potential risk and problem in time;According to workflow, it is automatically reminded to action
Including:Need the document audited, problem to be solved etc..
Flow processing module to the action in each stage in project flow for being managed operation;If specifically including
Module of working and management module, operational module include statistical analysis module, Basic Information Management module, procurement contract management mould
Block, construction information management module;
Statistical analysis module counts for realizing project returned money, project support situation counts, the operation of engineering construction statistics;
The opening post of this module includes pre-sales personnel, project manager, company leader.
Basic Information Management module is used for the correlation circumstance to item base information, scheduling information, super bid information
It is managed;The opening post of this module includes pre-sales personnel, project manager, company leader.
Procurement contract management module is for realizing the management to Project contract, purchase of goods and materials and procurement contract;This module
Open post includes pre-sales personnel, inventory managers, project manager, company leader.
Construction information management module is used for the construction information of management project, including construction speed, construction personnel, construction cost
With;The opening post of this module includes construction personnel, project manager, company leader.
Management module is associated with each operational module, and synchronizing information is carried out to each operational module according to project flow.This mould
Block is used for the information interchange between each operational module, and such as a certain project carries out declaration form submission and examined, by management mould
Block carries out unified change to the state in relation to the project in other operational modules, to ensure the synchronization of project flow.
Data memory module is used for system data, including User Information Database and item information database, user information
Database uses data for storing user account information and user's operation, item information database for stored items information,
Project flow and project associated documents.
The present invention is used for Enterprise Project information and workflow management, and project participant creates account by user log-in block
It is logged in, information processing module of user's determines the operating right of user according to the information of user, and sets user at flow
Mould operating right in the block is managed, user can be handled the work in project process by flow processing module, in work
Appearance is reported, is examined and issue handling, carries out project flow processing.The setting of operating right facilitates the processing of project flow, no
The processing that corresponding work can be carried out with staff's login system in post, for other posies, content such as declares at the operations, does not have
There is processing authority, Each performs its own functions by the personnel that ensure that in project flow, keeps project flow more orderly.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair
The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description
To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this
All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention
Protection domain within.
Claims (4)
1. a kind of project process management system, which is characterized in that stored including user management module, flow processing module and data
Module;
The user management module includes user log-in block, information processing module of user's, subscriber information management module, the use
For family login module for providing user login operation, the information processing module of user's judges user in flow according to user information
Operating right in processing module simultaneously carries out setting operation, workflow and operation of the subscriber information management module to user
Record carries out statistical management;
The flow processing module to the action in each stage in project flow for being managed operation;
The data memory module is used for system data.
2. a kind of project process management system according to claim 1, which is characterized in that the subscriber information management module
Including user's workflow management module and user's operation management module, user's workflow management module is for being arranged user's continuous item
Mesh is simultaneously managed the workflow of user according to the respective settings of user.
3. a kind of project process management system according to claim 1, which is characterized in that the flow processing module includes
Several operational modules and management module, the operational module include statistical analysis module, Basic Information Management module, procurement contract
Management module, construction information management module;
The statistical analysis module counts for realizing project returned money, project support situation statistics, engineering construction statistics
Operation;
The Basic Information Management module is used for the correlation circumstance to item base information, scheduling information, super bid information
It is managed;
The procurement contract management module is for realizing the management to Project contract, purchase of goods and materials and procurement contract;
The construction information management module is used for the construction information of management project, including construction speed, construction personnel, construction cost
With;
The management module is associated with each operational module, and synchronizing information is carried out to each operational module according to project flow.
4. a kind of project process management system according to claim 3, which is characterized in that the data memory module includes
User Information Database and item information database, the User Information Database is for storing user account information and user behaviour
Make that data, the item information database is used to be used for stored items information, project flow and project associated documents.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711364585.5A CN108320125A (en) | 2017-12-18 | 2017-12-18 | A kind of project process management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711364585.5A CN108320125A (en) | 2017-12-18 | 2017-12-18 | A kind of project process management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108320125A true CN108320125A (en) | 2018-07-24 |
Family
ID=62892396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711364585.5A Pending CN108320125A (en) | 2017-12-18 | 2017-12-18 | A kind of project process management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108320125A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109784852A (en) * | 2019-01-12 | 2019-05-21 | 重庆洪峰工业设备安装有限公司 | A kind of electronic system and working method of Engineering Oriented debit |
CN110223032A (en) * | 2019-05-17 | 2019-09-10 | 国网安徽省电力有限公司 | A kind of fortune inspection public service project management control system and method |
CN110751452A (en) * | 2019-09-18 | 2020-02-04 | 九江明阳电路科技有限公司 | Workflow management system, method and storage medium |
CN113065123A (en) * | 2021-04-12 | 2021-07-02 | 山东壹典专业设计有限公司 | Data information flow management system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040044673A1 (en) * | 2002-09-04 | 2004-03-04 | Jeffrey Brady | System and method for a planner and a deduplicating planner |
CN102855546A (en) * | 2012-08-31 | 2013-01-02 | 天津博信汽车零部件有限公司 | Integrated project management system |
CN107292592A (en) * | 2017-07-19 | 2017-10-24 | 中诚工程建设管理(苏州)股份有限公司 | Construction-engineering project data automatic classification orients supplying system |
-
2017
- 2017-12-18 CN CN201711364585.5A patent/CN108320125A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040044673A1 (en) * | 2002-09-04 | 2004-03-04 | Jeffrey Brady | System and method for a planner and a deduplicating planner |
CN102855546A (en) * | 2012-08-31 | 2013-01-02 | 天津博信汽车零部件有限公司 | Integrated project management system |
CN107292592A (en) * | 2017-07-19 | 2017-10-24 | 中诚工程建设管理(苏州)股份有限公司 | Construction-engineering project data automatic classification orients supplying system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109784852A (en) * | 2019-01-12 | 2019-05-21 | 重庆洪峰工业设备安装有限公司 | A kind of electronic system and working method of Engineering Oriented debit |
CN110223032A (en) * | 2019-05-17 | 2019-09-10 | 国网安徽省电力有限公司 | A kind of fortune inspection public service project management control system and method |
CN110751452A (en) * | 2019-09-18 | 2020-02-04 | 九江明阳电路科技有限公司 | Workflow management system, method and storage medium |
CN110751452B (en) * | 2019-09-18 | 2023-11-10 | 九江明阳电路科技有限公司 | Workflow management system, method and storage medium |
CN113065123A (en) * | 2021-04-12 | 2021-07-02 | 山东壹典专业设计有限公司 | Data information flow management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108320125A (en) | A kind of project process management system | |
Pyon et al. | Service improvement by business process management using customer complaints in financial service industry | |
CN102663557B (en) | MOT management system and its implementation | |
CN102663645A (en) | Integrated management system of investment bank and realization method thereof | |
US20190026672A1 (en) | System and computer program for implementing an improved blockchain for use a value chain | |
CN111222955A (en) | Supplier supervision method and system based on block chain | |
CN109523211A (en) | A kind of intelligent classification displaying order production management billboard based on wechat small routine | |
Yin et al. | Utilizing blockchain technology to manage the dark and bright sides of supply network complexity to enhance supply chain sustainability | |
McCoy et al. | Accounting for human capital: Implications of automation and operational performance | |
Grudzińska-Kuna | Supporting knowledge workers: case management model and notation (CMMN) | |
US20030046193A1 (en) | Method and system for decentralized logistic management of supply chain networks | |
CN107247715A (en) | The synchronous method of WMS systems and ERP system | |
Jović et al. | SWOT analysis of selected digital technologies in transport economics | |
CN109409650A (en) | A kind of ERP management system of corporate resources | |
CN104778520A (en) | Cloud enterprise information portal application system | |
US20110307401A1 (en) | People relationship management system | |
Zhao | Blockchain Technology Improves Supply Chain: A Literature Review | |
Lee et al. | Redefining organizational information technology-based capabilities with an integrative framework for multiple levels of analysis | |
CN110533295A (en) | A kind of wire examination method and system | |
Yan | Smart Financial Real-Time Control System Implementation based on Artificial Intelligence and Data Mining | |
Sun et al. | Design of an enterprise financial risk management system based on big data mining | |
Jerab | The Effect of Organizational Structure on Corporate Governance | |
Kristandl | Technologies underpinning accounting information systems | |
Yaacob et al. | A systematic literature review of industry 4.0: bridging between the information asymmetry and corporate governance | |
Wan et al. | Linking top management team’s internal social capital and project performance in a mega construction project: The mediating role of behavioral integration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180724 |
|
RJ01 | Rejection of invention patent application after publication |