CN108319991A - A kind of node engineering wiring diagram determines method and device - Google Patents

A kind of node engineering wiring diagram determines method and device Download PDF

Info

Publication number
CN108319991A
CN108319991A CN201710032563.2A CN201710032563A CN108319991A CN 108319991 A CN108319991 A CN 108319991A CN 201710032563 A CN201710032563 A CN 201710032563A CN 108319991 A CN108319991 A CN 108319991A
Authority
CN
China
Prior art keywords
node
tree
logic chart
relative position
position relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710032563.2A
Other languages
Chinese (zh)
Other versions
CN108319991B (en
Inventor
耿静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aisino Corp
Original Assignee
Aisino Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aisino Corp filed Critical Aisino Corp
Priority to CN201710032563.2A priority Critical patent/CN108319991B/en
Publication of CN108319991A publication Critical patent/CN108319991A/en
Application granted granted Critical
Publication of CN108319991B publication Critical patent/CN108319991B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Design And Manufacture Of Integrated Circuits (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of node engineering wiring diagrams to determine method and device, to draw egress engineering cloth line chart according to the tag number of each node.Method is:According to the tag number of each leaf node, determine that each leaf node respectively to the structure title of each node on the path of root node and the relative position relation of each node and adjacent node, establishes tree-shaped logic chart respectively;According to the relative position relation of each node and adjacent node in the structure title of each node in the first preset rules, the tree-shaped logic chart and the tree-shaped logic chart, the coordinate information of each node in the tree-shaped logic chart is determined;According to each structure title of node in the tree-shaped logic chart, the relative position relation of the coordinate information of each node and each node and adjacent node, the drafting information of each node is determined according to the second preset rules;Node engineering wiring diagram is drawn according to the drafting information of each node.

Description

A kind of node engineering wiring diagram determines method and device
Technical field
The present invention relates to field of computer technology more particularly to a kind of node engineering wiring diagram to determine method and device.
Background technology
Under normal circumstances, various engineering wirings are all disposed within the inside of building, or are arranged and are building hidden place.When Engineering wiring some node generation problem after, need one by one node investigated and detected, the difficulty investigated and detected is very Greatly, efficiency is low.
Currently, can be in each node setting radio frequency identification (Radio Frequency that engineering connects up Identification, RFID) label, the state of representative node is provided by RFID tag, which is used to indicate this Whether node breaks down.
But lack effective management to the position of the node representated by RFID tag and the RFID tag at present, still Cannot quickly positioning failure RFID tag representated by node position.
If egress engineering cloth line chart can be drawn according to the tag number of each node, the node engineering can be based on The position of node representated by the RFID tag of the quick positioning failure of wiring diagram, and how according to the RFID tag number of each node Egress engineering cloth line chart is drawn, is problem to be solved.
Invention content
A kind of node engineering wiring diagram of offer of the embodiment of the present invention determines method and device, to be compiled according to the label of node Number draw egress engineering cloth line chart.
Specific technical solution provided in an embodiment of the present invention is as follows:
In a first aspect, an embodiment of the present invention provides a kind of node engineering wiring diagrams to determine method, including:
Obtain the respective tag number of each leaf node;
According to the tag number of each leaf node, determine each leaf node respectively on the path of root node respectively Each structure title of node and the relative position relation of each node and an adjacent upper node, establish tree-shaped logic chart;
According to the structure title and the tree-shaped logic of each node in the first preset rules, the tree-shaped logic chart The relative position relation of each node and an adjacent upper node, determines the coordinate of each node in the tree-shaped logic chart in figure Information;
According to each structure title of node, the coordinate information of each node and each section in the tree-shaped logic chart The relative position relation of point and an adjacent upper node, the drafting information of each node is determined according to the second preset rules;
Node engineering wiring diagram is drawn according to the drafting information of each node.
In possible embodiment, the tag number of the leaf node includes every on the leaf node to root node path The designations of the structure title of a node, and including on the leaf node to root node path each node with it is adjacent on The designations of the relative position relation of one node.
In possible embodiment, according to the structure title of each node in the first preset rules, the tree-shaped logic chart, And in the tree-shaped logic chart each node and an adjacent upper node relative position relation, determine in the tree-shaped logic chart Each node coordinate information, including:
According to the structure title for the node for including in first preset rules, the structure of the adjacent next node of the node Relative position relation between title, the node and adjacent next node and pair between the coordinate information of the node It should be related to, determine the coordinate information of each node in the tree-shaped logic chart.
In possible embodiment, according to the structure title of each node in the tree-shaped logic chart, the seat of each node The relative position relation for marking information and each node and an adjacent upper node, each node is determined according to the second preset rules Drafting information, including:
According to include in second preset rules the structure title of node, the coordinate information of each node, Mei Gejie Point and the relative position relation of adjacent next node, the correspondence of the drafting information of each node to adjacent next node, Determine the drafting information of each node in the tree-shaped logic chart.
It is described to draw information to include the node walk to the connecting line of adjacent next node in possible embodiment To and the connecting line drafting color.
Second aspect, an embodiment of the present invention provides a kind of node engineering wiring diagram determining devices, including:
First processing module, for obtaining the respective tag number of each leaf node;
Second processing module determines each leaf node respectively respectively for the tag number according to each leaf node The relative position relation of the structure title of each node on to the path of root node and each node and an adjacent upper node, Establish tree-shaped logic chart;
Third processing module, for according to the structure title of each node in the first preset rules, the tree-shaped logic chart, And in the tree-shaped logic chart each node and an adjacent upper node relative position relation, determine in the tree-shaped logic chart Each node coordinate information;
Fourth processing module, for the seat according to the structure title of each node in the tree-shaped logic chart, each node The relative position relation for marking information and each node and an adjacent upper node, each node is determined according to the second preset rules Drafting information;
5th processing module, for drawing node engineering wiring diagram according to the drafting information of each node.
In possible embodiment, the tag number of the leaf node includes every on the leaf node to root node path The designations of the structure title of a node, and including on the leaf node to root node path each node with it is adjacent on The designations of the relative position relation of one node.
In possible embodiment, the third processing module is used for:
According to the structure title for the node for including in first preset rules, the structure of the adjacent next node of the node Relative position relation between title, the node and adjacent next node and pair between the coordinate information of the node It should be related to, determine the coordinate information of each node in the tree-shaped logic chart.
In possible embodiment, the fourth processing module is used for:
According to include in second preset rules the structure title of node, the coordinate information of each node, Mei Gejie Point and the relative position relation of adjacent next node, the correspondence of the drafting information of each node to adjacent next node, Determine the drafting information of each node in the tree-shaped logic chart.
It is described to draw information to include the node walk to the connecting line of adjacent next node in possible embodiment To and the connecting line drafting color.
Based on the above-mentioned technical proposal, it in the embodiment of the present invention, according to the tag number of each leaf node, determines respectively each The leaf node is respectively to the structure title of each node on the path of root node and the phase of each node and adjacent node To position relationship, tree-shaped logic chart is established, the seat of each node in the tree-shaped logic chart is determined according to the first preset rules Information is marked, according to each structure title of node, the coordinate information of each node and each node in the tree-shaped logic chart With the relative position relation of adjacent node, the drafting information of each node is determined according to the second preset rules, according to described each The drafting information of node draws node engineering wiring diagram, and the tag number to realize according to node draws node engineering automatically The function of wiring diagram provides possibility for the automatic detection of line fault and investigation, saves cost of labor, reduce construction Difficulty.
Description of the drawings
Fig. 1 is the method flow schematic diagram that node engineering wiring diagram is determined in the embodiment of the present invention;
Fig. 2 is tree schematic diagram in the embodiment of the present invention;
Fig. 3 is binary tree structure schematic diagram in the embodiment of the present invention;
Fig. 4 is interior joint engineering wiring diagram schematic diagram of the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of interior joint engineering wiring diagram determining device of the embodiment of the present invention.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into It is described in detail to one step, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole implementation Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts All other embodiment, shall fall within the protection scope of the present invention.
The embodiment of the present invention is described in detail below in conjunction with attached drawing.
In the embodiment of the present invention, as shown in Figure 1, determining that the method detailed flow of node engineering wiring diagram is as follows:
Step 101:Obtain the respective tag number of each leaf node.
Wherein, the tag number of each leaf node is RFID tag number.
In one specific implementation mode, the tag number of the leaf node includes on the leaf node to root node path The designations of the structure title of each node, and including on the leaf node to root node path each node with it is adjacent The designations of the relative position relation of a upper node, wherein the knot of each node on the leaf node to root node path The designations of structure title are arranged according to the precedence that each node occurs on the path, equally, the leaf node to root The designations of each node and the relative position relation of an adjacent upper node on node path, according to each node on the road The precedence arrangement occurred on diameter.
In specific implementation, the correspondence between being referred to as according to the designations of preset structure title and structure name determines The designations of the structure title of each node on the leaf node to root node path are carried in the tag number of leaf node The structure title referred to.For example, referring to router using designations A, power splitter is referred to using designations B.
In specific implementation, according to the corresponding pass between the designations of preset relative position relation and relative position relation System determines each node on the leaf node to root node path carried in the tag number of leaf node and an adjacent upper section The relative position relation that the designations of the relative position relation of point are referred to.For example, number 1 is used to refer to the node as upper one First child node of node, number 2 indicate that the node is the 2nd child node of a upper node.
It is every on the leaf node to root node path in the tag number of a leaf node in one specific implementation mode The information of a node occupies two characters, the first character in two characters represent the node on behalf physical meaning or Rank residing for the node, second character in two characters represent the relative position relation of the node and adjacent node.
Step 102:According to the tag number of each leaf node, determine that each leaf node respectively arrives root node respectively The relative position relation of the structure title of each node on path and each node and an adjacent upper node, establishes tree-shaped and patrols Collect figure.
In one specific implementation mode, it is directed to the tag number of each leaf node respectively, executes following procedure:
According to the structure title of each node on the leaf node to root node path in the tag number of leaf node Designations and the path on each node structure title designations ordering, determine the leaf node extremely The structure title and precedence of each node on root node;
According to each node and adjacent upper one on the leaf node to root node path in the tag number of leaf node The relative position of each node and an adjacent upper node on the designations of the relative position relation of node and the path is closed The ordering of the designations of system determines the relative position of each node and an adjacent upper node on the leaf node to root node Relationship.
After the tag number to each leaf node executes the process, you can obtain logic chart.
For example, by taking tree shown in Fig. 2 as an example, it is assumed that root node is node 0, it is assumed that the volume of one of leaf node Number it is A1B1C1, the information of each node occupies two characters in the number, and the first character refers to structure title, and the second character refers to For the relative position relation of the node and a upper node.The number indicates that there are three sections on the leaf node to the path of root node Point, respectively node A, B and C, then be followed successively by node A, B, C from root node to leaf node, wherein A, B, C are respectively each section The designations of point are respectively referred to according to agreement A, B, C for different structure titles.A1 indicates that node A is root node in the number First child node, B1 indicates that node B is first child node of node A, and C1 indicates that node C is first son of node B Node then can determine that A1B1C1 is the node 7 of tree, then is 0-1-3-7 according to the determining path of the number of node 7.Together Reason, it is assumed that the number of one of node is A1B1C2, then A1 indicates that first son that node A is root node saves in the number Point, B1 indicate that node B is first child node of node A, and C2 indicates that node C is second child node of node B, then can determine A1B1C2 is the node 8 of tree, then is 0-1-3-8 according to the determining path of the number of node 8.Similarly determine that A2B1C2 is The node 12 of tree is then 0-2-5-12 according to the determining path of the number of node 12.
Step 103:According to the structure title of each node in the first preset rules, the tree-shaped logic chart and described The relative position relation of each node and an adjacent upper node, determines each section in the tree-shaped logic chart in tree-shaped logic chart The coordinate information of point.
In one specific implementation mode, according to the structure title for the node for including in first preset rules, the section Put the relative position relation between structure title, the node and the adjacent next node of adjacent next node and the section Correspondence between the coordinate information of point, determines the coordinate information of each node in the tree-shaped logic chart.
Wherein, the coordinate information of node is for reflecting position of the node in node engineering wiring diagram.
For example, it is assumed that S indicates that root node, A indicate that a kind of node, bis- class nodes of B, C indicate three classes node (i.e. leaf node). Tree-shaped logic chart is traversed according to the first preset rules, if the next node that root node S encounters is A, it is determined that the coordinate information of the A For (Ax, Bx), state SA1, wherein when state refers to from S nodes to A nodes, the drafting information corresponding to A nodes (such as connects Trend, color of wiring etc.) and attribute, when which is used to determine that node A encounters next node, the next node Draw information and attribute;If the next node that root node S encounters is other structures, no operation;If state is SA1, and is met To next node be structure A, it is determined that the coordinate information of node A be (A2x, B2x), state SA2,;If state is SA1, And the next node encountered be B, then the coordinate information of node B be (B1x, B2x), state SB1, and so on, Fig. 3 can be obtained Shown in binary tree, the node C of the rightmost side in binary tree shown in Fig. 3 is the leaf node for providing tag number.
Step 104:According to the structure title of each node in the tree-shaped logic chart, each node coordinate information, with And the relative position relation of each node and an adjacent upper node, determine that the drafting of each node is believed according to the second preset rules Breath.
In one specific implementation mode, according to the structure title for the node for including in second preset rules, Mei Gejie The coordinate information of point, relative position relation, each node to adjacent next node of each node and adjacent next node The correspondence for drawing information, determines the drafting information of each node in the tree-shaped logic chart.
In one specific implementation mode, the drafting information includes connecting line of the node to adjacent next node The drafting color of trend and the connecting line.The drafting color of connecting line can be the color of paintbrush or paintbrush.
Step 105:Node engineering wiring diagram is drawn according to the drafting information of each node.
Specifically, it according to the drafting information of the coordinate information of each node and each node, can draw to obtain node work Journey wiring diagram.
For example, traversing tree-shaped logic chart, if the next node of node encounters A nodes, A nodes according to the second preset rules Coordinate information is fa (x, y), and the states of A nodes is SA1 states, then the trend of connecting line be downward, and the color of connecting line is the One color;If next node encounters B node, the coordinate information of B node is fb (x, y), and the state of B node is SB1, then connecting line Trend be that the right, the color of connecting line is the second color, and so on, node engineering wiring diagram shown in Fig. 4 can be obtained.
In the embodiment of the present invention, it is pre-configured with the attribute of root node, root node is included at least in the attribute of the root node Coordinate information.
In specific implementation, after drawing node engineering wiring diagram, the node that state is failure is marked, i.e., is intuitively shown Malfunctioning node, and then the malfunctioning node is positioned, improve the location efficiency of malfunctioning node.
In the embodiment of the present invention, according to the tag number of each leaf node, determine that each leaf node respectively arrives respectively The structure title of each node on the path of root node and the relative position relation of each node and adjacent node establish tree Type logic chart determines the coordinate information of each node in the tree-shaped logic chart according to the first preset rules, according to the tree The structure title of each node in type logic chart, the coordinate information of each node and each node and adjacent node it is opposite Position relationship determines the drafting information of each node according to the second preset rules, is painted according to the drafting information of each node Node engineering wiring diagram processed is to realize the function of drawing node engineering wiring diagram automatically according to the tag number of node The automatic detection of line fault and investigation provide possibility, save cost of labor, reduce difficulty of construction.
Based on same inventive concept, an embodiment of the present invention provides a kind of node engineering wiring diagram determining device, the devices Specific implementation can be found in embodiment of the method part description, overlaps will not be repeated, as shown in figure 5, the device mainly wraps It includes:
First processing module 501, for obtaining the respective tag number of each leaf node;
Second processing module 502 determines that each leaf node is each respectively for the tag number according to each leaf node It is closed from the relative position of the structure title of each node on the path to root node and each node and an adjacent upper node System, establishes tree-shaped logic chart;
Third processing module 503, for the structure name according to each node in the first preset rules, the tree-shaped logic chart The relative position relation of each node and an adjacent upper node, determines the tree-shaped logic in title and the tree-shaped logic chart The coordinate information of each node in figure;
Fourth processing module 504, for according to the structure title of each node in the tree-shaped logic chart, each node The relative position relation of coordinate information and each node and an adjacent upper node determines each section according to the second preset rules The drafting information of point;
5th processing module 505, for drawing node engineering wiring diagram according to the drafting information of each node.
In possible embodiment, the tag number of the leaf node includes every on the leaf node to root node path The designations of the structure title of a node, and including on the leaf node to root node path each node with it is adjacent on The designations of the relative position relation of one node.
In possible embodiment, the third processing module is used for:
According to the structure title for the node for including in first preset rules, the structure of the adjacent next node of the node Relative position relation between title, the node and adjacent next node and pair between the coordinate information of the node It should be related to, determine the coordinate information of each node in the tree-shaped logic chart.
In possible embodiment, the fourth processing module is used for:
According to include in second preset rules the structure title of node, the coordinate information of each node, Mei Gejie Point and the relative position relation of adjacent next node, the correspondence of the drafting information of each node to adjacent next node, Determine the drafting information of each node in the tree-shaped logic chart.
It is described to draw information to include the node walk to the connecting line of adjacent next node in possible embodiment To and the connecting line drafting color.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, the present invention can be used in one or more wherein include computer usable program code computer The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. a kind of node engineering wiring diagram determines method, which is characterized in that including:
Obtain the respective tag number of each leaf node;
According to the tag number of each leaf node, determine each leaf node respectively to each of on the path of root node respectively The relative position relation of the structure title of node and each node and an adjacent upper node, establishes tree-shaped logic chart;
According in the structure title of each node in the first preset rules, the tree-shaped logic chart and the tree-shaped logic chart The relative position relation of each node and an adjacent upper node determines the coordinate letter of each node in the tree-shaped logic chart Breath;
According to each structure title of node in the tree-shaped logic chart, the coordinate information of each node and each node with The relative position relation of an adjacent upper node, the drafting information of each node is determined according to the second preset rules;
Node engineering wiring diagram is drawn according to the drafting information of each node.
2. the method as described in claim 1, which is characterized in that the tag number of the leaf node includes the leaf node to root The designations of the structure title of each node on node path, and including every on the leaf node to root node path The designations of a node and the relative position relation of an adjacent upper node.
3. method as claimed in claim 1 or 2, which is characterized in that according to every in the first preset rules, the tree-shaped logic chart The relative position relation of each node and an adjacent upper node in the structure title of a node and the tree-shaped logic chart, really The coordinate information of each node in the fixed tree-shaped logic chart, including:
According to the structure name of the structure title for the node for including in first preset rules, the adjacent next node of the node Claim, is between the coordinate information of the relative position relation between the node and adjacent next node and the node corresponding Relationship determines the coordinate information of each node in the tree-shaped logic chart.
4. method as claimed in claim 1 or 2, which is characterized in that according to the structure of each node in the tree-shaped logic chart The relative position relation of title, the coordinate information of each node and each node and an adjacent upper node, it is default according to second Rule determines the drafting information of each node, including:
According to the structure title for the node for including in second preset rules, the coordinate information of each node, each node with The correspondence of the drafting information of the relative position relation of adjacent next node, each node to adjacent next node determines The drafting information of each node in the tree-shaped logic chart.
5. method as claimed in claim 4, which is characterized in that the drafting information includes the node to adjacent next section The trend of the connecting line of point and the drafting color of the connecting line.
6. a kind of node engineering wiring diagram determining device, which is characterized in that including:
First processing module, for obtaining the respective tag number of each leaf node;
Second processing module determines that each leaf node respectively arrives root respectively for the tag number according to each leaf node The relative position relation of the structure title of each node on the path of node and each node and an adjacent upper node is established Tree-shaped logic chart;
Third processing module, for according to the structure title of each node in the first preset rules, the tree-shaped logic chart and The relative position relation of each node and an adjacent upper node, determines every in the tree-shaped logic chart in the tree-shaped logic chart The coordinate information of a node;
Fourth processing module, for the coordinate letter according to the structure title of each node in the tree-shaped logic chart, each node The relative position relation of breath and each node and an adjacent upper node, painting for each node is determined according to the second preset rules Information processed;
5th processing module, for drawing node engineering wiring diagram according to the drafting information of each node.
7. device as claimed in claim 6, which is characterized in that the tag number of the leaf node includes the leaf node to root The designations of the structure title of each node on node path, and including every on the leaf node to root node path The designations of a node and the relative position relation of an adjacent upper node.
8. device as claimed in claims 6 or 7, which is characterized in that the third processing module is used for:
According to the structure name of the structure title for the node for including in first preset rules, the adjacent next node of the node Claim, is between the coordinate information of the relative position relation between the node and adjacent next node and the node corresponding Relationship determines the coordinate information of each node in the tree-shaped logic chart.
9. device as claimed in claims 6 or 7, which is characterized in that the fourth processing module is used for:
According to the structure title for the node for including in second preset rules, the coordinate information of each node, each node with The correspondence of the drafting information of the relative position relation of adjacent next node, each node to adjacent next node determines The drafting information of each node in the tree-shaped logic chart.
10. device as claimed in claim 9, which is characterized in that the drafting information includes the node to adjacent next The drafting color of the trend of the connecting line of node and the connecting line.
CN201710032563.2A 2017-01-16 2017-01-16 Node engineering wiring diagram determining method and device Active CN108319991B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710032563.2A CN108319991B (en) 2017-01-16 2017-01-16 Node engineering wiring diagram determining method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710032563.2A CN108319991B (en) 2017-01-16 2017-01-16 Node engineering wiring diagram determining method and device

Publications (2)

Publication Number Publication Date
CN108319991A true CN108319991A (en) 2018-07-24
CN108319991B CN108319991B (en) 2021-02-09

Family

ID=62891149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710032563.2A Active CN108319991B (en) 2017-01-16 2017-01-16 Node engineering wiring diagram determining method and device

Country Status (1)

Country Link
CN (1) CN108319991B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109190326A (en) * 2018-11-22 2019-01-11 南京新联电能云服务有限公司 Generate the method and device of process flow chart
CN111967114A (en) * 2020-08-17 2020-11-20 深圳市安冠科技有限公司 Drawing method of equipment wiring diagram

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1964284A (en) * 2006-12-04 2007-05-16 中国科学院计算技术研究所 A method to realize visual wireless sensor network
KR20110068037A (en) * 2009-12-15 2011-06-22 동국대학교 산학협력단 Method and apparatus for allocating address in tree structured network
CN102148703A (en) * 2011-01-19 2011-08-10 武汉迈威光电技术有限公司 Network management topology realizing algorithm of switchboard
CN102467535A (en) * 2010-11-12 2012-05-23 金蝶软件(中国)有限公司 Method, device and system for acquiring tree data output coordinate
CN102566849A (en) * 2010-12-10 2012-07-11 金蝶软件(中国)有限公司 Method and device for acquiring tree-form data drawing output positions and ERP (enterprise resource planning) system
CN102819533A (en) * 2011-09-20 2012-12-12 金蝶软件(中国)有限公司 Method and device for processing location information of visualized warehouse
CN103440521A (en) * 2013-08-21 2013-12-11 南昌大学 Coding and genetic algorithm suitable for power distribution network and application in distribution network reconfiguration
CN103577164A (en) * 2012-07-20 2014-02-12 腾讯科技(深圳)有限公司 Flow diagram generating method and device
CN103699598A (en) * 2013-12-12 2014-04-02 福建榕基软件股份有限公司 Method for displaying data reference process in graphical manner and device thereof
CN103838889A (en) * 2012-11-23 2014-06-04 中国北车集团大同电力机车有限责任公司 Method and device for generating report form of locomotive electrical principle and wiring diagram
CN104461496A (en) * 2014-10-30 2015-03-25 华中科技大学 And-or graph layering displaying method
CN105024929A (en) * 2015-07-22 2015-11-04 上海交通大学 Application awareness resource management method in software defined network
CN105426499A (en) * 2015-11-25 2016-03-23 成都数联铭品科技有限公司 Implementation method of data visualization
CN105488130A (en) * 2015-11-25 2016-04-13 成都数联铭品科技有限公司 Associated data visualization display method
CN105490830A (en) * 2015-05-12 2016-04-13 哈尔滨安天科技股份有限公司 Method and system for finding ring structure in network topological graph
CN105488088A (en) * 2014-12-31 2016-04-13 哈尔滨安天科技股份有限公司 Two-dimensional network angle distribution layout method based on tree structure
CN106133721A (en) * 2014-03-17 2016-11-16 微软技术许可有限责任公司 Parallel decision tree processor architecture
CN106250129A (en) * 2016-07-26 2016-12-21 南京航空航天大学 The vector quantization dynamic drawing method of symbol based on meta graph recognition model

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1964284A (en) * 2006-12-04 2007-05-16 中国科学院计算技术研究所 A method to realize visual wireless sensor network
KR20110068037A (en) * 2009-12-15 2011-06-22 동국대학교 산학협력단 Method and apparatus for allocating address in tree structured network
CN102467535A (en) * 2010-11-12 2012-05-23 金蝶软件(中国)有限公司 Method, device and system for acquiring tree data output coordinate
CN102566849A (en) * 2010-12-10 2012-07-11 金蝶软件(中国)有限公司 Method and device for acquiring tree-form data drawing output positions and ERP (enterprise resource planning) system
CN102148703A (en) * 2011-01-19 2011-08-10 武汉迈威光电技术有限公司 Network management topology realizing algorithm of switchboard
CN102819533A (en) * 2011-09-20 2012-12-12 金蝶软件(中国)有限公司 Method and device for processing location information of visualized warehouse
CN103577164A (en) * 2012-07-20 2014-02-12 腾讯科技(深圳)有限公司 Flow diagram generating method and device
CN103838889A (en) * 2012-11-23 2014-06-04 中国北车集团大同电力机车有限责任公司 Method and device for generating report form of locomotive electrical principle and wiring diagram
CN103440521A (en) * 2013-08-21 2013-12-11 南昌大学 Coding and genetic algorithm suitable for power distribution network and application in distribution network reconfiguration
CN103699598A (en) * 2013-12-12 2014-04-02 福建榕基软件股份有限公司 Method for displaying data reference process in graphical manner and device thereof
CN106133721A (en) * 2014-03-17 2016-11-16 微软技术许可有限责任公司 Parallel decision tree processor architecture
CN104461496A (en) * 2014-10-30 2015-03-25 华中科技大学 And-or graph layering displaying method
CN105488088A (en) * 2014-12-31 2016-04-13 哈尔滨安天科技股份有限公司 Two-dimensional network angle distribution layout method based on tree structure
CN105490830A (en) * 2015-05-12 2016-04-13 哈尔滨安天科技股份有限公司 Method and system for finding ring structure in network topological graph
CN105024929A (en) * 2015-07-22 2015-11-04 上海交通大学 Application awareness resource management method in software defined network
CN105426499A (en) * 2015-11-25 2016-03-23 成都数联铭品科技有限公司 Implementation method of data visualization
CN105488130A (en) * 2015-11-25 2016-04-13 成都数联铭品科技有限公司 Associated data visualization display method
CN106250129A (en) * 2016-07-26 2016-12-21 南京航空航天大学 The vector quantization dynamic drawing method of symbol based on meta graph recognition model

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘潇等: "基于改进 RRT 算法的线缆自动布线技术", 《机械工程学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109190326A (en) * 2018-11-22 2019-01-11 南京新联电能云服务有限公司 Generate the method and device of process flow chart
CN109190326B (en) * 2018-11-22 2024-01-30 南京新联电能云服务有限公司 Method and device for generating process flow chart
CN111967114A (en) * 2020-08-17 2020-11-20 深圳市安冠科技有限公司 Drawing method of equipment wiring diagram
CN111967114B (en) * 2020-08-17 2024-02-02 深圳市安冠科技有限公司 Drawing method of equipment wiring diagram

Also Published As

Publication number Publication date
CN108319991B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
US8473889B2 (en) Routing storage structure based on directional grid points and routing method thereof
EP2680175B1 (en) Design assistance system
CN108712286A (en) The determination method, apparatus and storage medium of network topology structure
CN102611568B (en) A kind of failure service path diagnostic method and device
US20040155899A1 (en) Method and system for presenting an arrangement of management devices operable in a managed network
CN103701633B (en) Setup and maintenance system of visual cluster application for distributed search SolrCloud
CN110932981B (en) Data exchange system supporting automatic routing
CN108319991A (en) A kind of node engineering wiring diagram determines method and device
US7836402B2 (en) Multiple link connector list
CN107395594A (en) A kind of automatic identifying method for pulling identifying code
CN112464497B (en) Fault drilling method, device, equipment and medium based on distributed system
US8423948B2 (en) Wiring design support device and wiring design supporting method
CN110442755A (en) Based on the topological diagram methods of exhibiting being connected to the network between nuclear power plant's DCS platform station
CN107204866A (en) The implementation method of multi-tenant service chaining transmission is solved based on VXLAN technologies
US8045474B2 (en) Method and apparatus for tracking layer-2 (L2) resource of a switch
US20160294981A1 (en) Display method and device
CN108038584A (en) A kind of flow method of adjustment, device and equipment as the occasion requires
US9978162B1 (en) Rules-based causality visualization framework
US11080939B1 (en) Generating test cases for augmented reality (AR) application testing
CN106789407A (en) A kind of method that cloud platform checks virtual machine connection status
CN110489686A (en) A kind of data analysing method, device and terminal
CN109617724A (en) A kind of monitoring of transport network traffic and restorative procedure, device, storage medium
CN111045757A (en) Visual display system and method for IT resource operation state and storage medium
CN108647069A (en) interface display method and device, storage medium and electronic device
CN109547252A (en) The method, apparatus and server of instantiated nodes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant