CN108319991A - A kind of node engineering wiring diagram determines method and device - Google Patents
A kind of node engineering wiring diagram determines method and device Download PDFInfo
- Publication number
- CN108319991A CN108319991A CN201710032563.2A CN201710032563A CN108319991A CN 108319991 A CN108319991 A CN 108319991A CN 201710032563 A CN201710032563 A CN 201710032563A CN 108319991 A CN108319991 A CN 108319991A
- Authority
- CN
- China
- Prior art keywords
- node
- tree
- logic chart
- relative position
- position relation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Design And Manufacture Of Integrated Circuits (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of node engineering wiring diagrams to determine method and device, to draw egress engineering cloth line chart according to the tag number of each node.Method is:According to the tag number of each leaf node, determine that each leaf node respectively to the structure title of each node on the path of root node and the relative position relation of each node and adjacent node, establishes tree-shaped logic chart respectively;According to the relative position relation of each node and adjacent node in the structure title of each node in the first preset rules, the tree-shaped logic chart and the tree-shaped logic chart, the coordinate information of each node in the tree-shaped logic chart is determined;According to each structure title of node in the tree-shaped logic chart, the relative position relation of the coordinate information of each node and each node and adjacent node, the drafting information of each node is determined according to the second preset rules;Node engineering wiring diagram is drawn according to the drafting information of each node.
Description
Technical field
The present invention relates to field of computer technology more particularly to a kind of node engineering wiring diagram to determine method and device.
Background technology
Under normal circumstances, various engineering wirings are all disposed within the inside of building, or are arranged and are building hidden place.When
Engineering wiring some node generation problem after, need one by one node investigated and detected, the difficulty investigated and detected is very
Greatly, efficiency is low.
Currently, can be in each node setting radio frequency identification (Radio Frequency that engineering connects up
Identification, RFID) label, the state of representative node is provided by RFID tag, which is used to indicate this
Whether node breaks down.
But lack effective management to the position of the node representated by RFID tag and the RFID tag at present, still
Cannot quickly positioning failure RFID tag representated by node position.
If egress engineering cloth line chart can be drawn according to the tag number of each node, the node engineering can be based on
The position of node representated by the RFID tag of the quick positioning failure of wiring diagram, and how according to the RFID tag number of each node
Egress engineering cloth line chart is drawn, is problem to be solved.
Invention content
A kind of node engineering wiring diagram of offer of the embodiment of the present invention determines method and device, to be compiled according to the label of node
Number draw egress engineering cloth line chart.
Specific technical solution provided in an embodiment of the present invention is as follows:
In a first aspect, an embodiment of the present invention provides a kind of node engineering wiring diagrams to determine method, including:
Obtain the respective tag number of each leaf node;
According to the tag number of each leaf node, determine each leaf node respectively on the path of root node respectively
Each structure title of node and the relative position relation of each node and an adjacent upper node, establish tree-shaped logic chart;
According to the structure title and the tree-shaped logic of each node in the first preset rules, the tree-shaped logic chart
The relative position relation of each node and an adjacent upper node, determines the coordinate of each node in the tree-shaped logic chart in figure
Information;
According to each structure title of node, the coordinate information of each node and each section in the tree-shaped logic chart
The relative position relation of point and an adjacent upper node, the drafting information of each node is determined according to the second preset rules;
Node engineering wiring diagram is drawn according to the drafting information of each node.
In possible embodiment, the tag number of the leaf node includes every on the leaf node to root node path
The designations of the structure title of a node, and including on the leaf node to root node path each node with it is adjacent on
The designations of the relative position relation of one node.
In possible embodiment, according to the structure title of each node in the first preset rules, the tree-shaped logic chart,
And in the tree-shaped logic chart each node and an adjacent upper node relative position relation, determine in the tree-shaped logic chart
Each node coordinate information, including:
According to the structure title for the node for including in first preset rules, the structure of the adjacent next node of the node
Relative position relation between title, the node and adjacent next node and pair between the coordinate information of the node
It should be related to, determine the coordinate information of each node in the tree-shaped logic chart.
In possible embodiment, according to the structure title of each node in the tree-shaped logic chart, the seat of each node
The relative position relation for marking information and each node and an adjacent upper node, each node is determined according to the second preset rules
Drafting information, including:
According to include in second preset rules the structure title of node, the coordinate information of each node, Mei Gejie
Point and the relative position relation of adjacent next node, the correspondence of the drafting information of each node to adjacent next node,
Determine the drafting information of each node in the tree-shaped logic chart.
It is described to draw information to include the node walk to the connecting line of adjacent next node in possible embodiment
To and the connecting line drafting color.
Second aspect, an embodiment of the present invention provides a kind of node engineering wiring diagram determining devices, including:
First processing module, for obtaining the respective tag number of each leaf node;
Second processing module determines each leaf node respectively respectively for the tag number according to each leaf node
The relative position relation of the structure title of each node on to the path of root node and each node and an adjacent upper node,
Establish tree-shaped logic chart;
Third processing module, for according to the structure title of each node in the first preset rules, the tree-shaped logic chart,
And in the tree-shaped logic chart each node and an adjacent upper node relative position relation, determine in the tree-shaped logic chart
Each node coordinate information;
Fourth processing module, for the seat according to the structure title of each node in the tree-shaped logic chart, each node
The relative position relation for marking information and each node and an adjacent upper node, each node is determined according to the second preset rules
Drafting information;
5th processing module, for drawing node engineering wiring diagram according to the drafting information of each node.
In possible embodiment, the tag number of the leaf node includes every on the leaf node to root node path
The designations of the structure title of a node, and including on the leaf node to root node path each node with it is adjacent on
The designations of the relative position relation of one node.
In possible embodiment, the third processing module is used for:
According to the structure title for the node for including in first preset rules, the structure of the adjacent next node of the node
Relative position relation between title, the node and adjacent next node and pair between the coordinate information of the node
It should be related to, determine the coordinate information of each node in the tree-shaped logic chart.
In possible embodiment, the fourth processing module is used for:
According to include in second preset rules the structure title of node, the coordinate information of each node, Mei Gejie
Point and the relative position relation of adjacent next node, the correspondence of the drafting information of each node to adjacent next node,
Determine the drafting information of each node in the tree-shaped logic chart.
It is described to draw information to include the node walk to the connecting line of adjacent next node in possible embodiment
To and the connecting line drafting color.
Based on the above-mentioned technical proposal, it in the embodiment of the present invention, according to the tag number of each leaf node, determines respectively each
The leaf node is respectively to the structure title of each node on the path of root node and the phase of each node and adjacent node
To position relationship, tree-shaped logic chart is established, the seat of each node in the tree-shaped logic chart is determined according to the first preset rules
Information is marked, according to each structure title of node, the coordinate information of each node and each node in the tree-shaped logic chart
With the relative position relation of adjacent node, the drafting information of each node is determined according to the second preset rules, according to described each
The drafting information of node draws node engineering wiring diagram, and the tag number to realize according to node draws node engineering automatically
The function of wiring diagram provides possibility for the automatic detection of line fault and investigation, saves cost of labor, reduce construction
Difficulty.
Description of the drawings
Fig. 1 is the method flow schematic diagram that node engineering wiring diagram is determined in the embodiment of the present invention;
Fig. 2 is tree schematic diagram in the embodiment of the present invention;
Fig. 3 is binary tree structure schematic diagram in the embodiment of the present invention;
Fig. 4 is interior joint engineering wiring diagram schematic diagram of the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of interior joint engineering wiring diagram determining device of the embodiment of the present invention.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into
It is described in detail to one step, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole implementation
Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts
All other embodiment, shall fall within the protection scope of the present invention.
The embodiment of the present invention is described in detail below in conjunction with attached drawing.
In the embodiment of the present invention, as shown in Figure 1, determining that the method detailed flow of node engineering wiring diagram is as follows:
Step 101:Obtain the respective tag number of each leaf node.
Wherein, the tag number of each leaf node is RFID tag number.
In one specific implementation mode, the tag number of the leaf node includes on the leaf node to root node path
The designations of the structure title of each node, and including on the leaf node to root node path each node with it is adjacent
The designations of the relative position relation of a upper node, wherein the knot of each node on the leaf node to root node path
The designations of structure title are arranged according to the precedence that each node occurs on the path, equally, the leaf node to root
The designations of each node and the relative position relation of an adjacent upper node on node path, according to each node on the road
The precedence arrangement occurred on diameter.
In specific implementation, the correspondence between being referred to as according to the designations of preset structure title and structure name determines
The designations of the structure title of each node on the leaf node to root node path are carried in the tag number of leaf node
The structure title referred to.For example, referring to router using designations A, power splitter is referred to using designations B.
In specific implementation, according to the corresponding pass between the designations of preset relative position relation and relative position relation
System determines each node on the leaf node to root node path carried in the tag number of leaf node and an adjacent upper section
The relative position relation that the designations of the relative position relation of point are referred to.For example, number 1 is used to refer to the node as upper one
First child node of node, number 2 indicate that the node is the 2nd child node of a upper node.
It is every on the leaf node to root node path in the tag number of a leaf node in one specific implementation mode
The information of a node occupies two characters, the first character in two characters represent the node on behalf physical meaning or
Rank residing for the node, second character in two characters represent the relative position relation of the node and adjacent node.
Step 102:According to the tag number of each leaf node, determine that each leaf node respectively arrives root node respectively
The relative position relation of the structure title of each node on path and each node and an adjacent upper node, establishes tree-shaped and patrols
Collect figure.
In one specific implementation mode, it is directed to the tag number of each leaf node respectively, executes following procedure:
According to the structure title of each node on the leaf node to root node path in the tag number of leaf node
Designations and the path on each node structure title designations ordering, determine the leaf node extremely
The structure title and precedence of each node on root node;
According to each node and adjacent upper one on the leaf node to root node path in the tag number of leaf node
The relative position of each node and an adjacent upper node on the designations of the relative position relation of node and the path is closed
The ordering of the designations of system determines the relative position of each node and an adjacent upper node on the leaf node to root node
Relationship.
After the tag number to each leaf node executes the process, you can obtain logic chart.
For example, by taking tree shown in Fig. 2 as an example, it is assumed that root node is node 0, it is assumed that the volume of one of leaf node
Number it is A1B1C1, the information of each node occupies two characters in the number, and the first character refers to structure title, and the second character refers to
For the relative position relation of the node and a upper node.The number indicates that there are three sections on the leaf node to the path of root node
Point, respectively node A, B and C, then be followed successively by node A, B, C from root node to leaf node, wherein A, B, C are respectively each section
The designations of point are respectively referred to according to agreement A, B, C for different structure titles.A1 indicates that node A is root node in the number
First child node, B1 indicates that node B is first child node of node A, and C1 indicates that node C is first son of node B
Node then can determine that A1B1C1 is the node 7 of tree, then is 0-1-3-7 according to the determining path of the number of node 7.Together
Reason, it is assumed that the number of one of node is A1B1C2, then A1 indicates that first son that node A is root node saves in the number
Point, B1 indicate that node B is first child node of node A, and C2 indicates that node C is second child node of node B, then can determine
A1B1C2 is the node 8 of tree, then is 0-1-3-8 according to the determining path of the number of node 8.Similarly determine that A2B1C2 is
The node 12 of tree is then 0-2-5-12 according to the determining path of the number of node 12.
Step 103:According to the structure title of each node in the first preset rules, the tree-shaped logic chart and described
The relative position relation of each node and an adjacent upper node, determines each section in the tree-shaped logic chart in tree-shaped logic chart
The coordinate information of point.
In one specific implementation mode, according to the structure title for the node for including in first preset rules, the section
Put the relative position relation between structure title, the node and the adjacent next node of adjacent next node and the section
Correspondence between the coordinate information of point, determines the coordinate information of each node in the tree-shaped logic chart.
Wherein, the coordinate information of node is for reflecting position of the node in node engineering wiring diagram.
For example, it is assumed that S indicates that root node, A indicate that a kind of node, bis- class nodes of B, C indicate three classes node (i.e. leaf node).
Tree-shaped logic chart is traversed according to the first preset rules, if the next node that root node S encounters is A, it is determined that the coordinate information of the A
For (Ax, Bx), state SA1, wherein when state refers to from S nodes to A nodes, the drafting information corresponding to A nodes (such as connects
Trend, color of wiring etc.) and attribute, when which is used to determine that node A encounters next node, the next node
Draw information and attribute;If the next node that root node S encounters is other structures, no operation;If state is SA1, and is met
To next node be structure A, it is determined that the coordinate information of node A be (A2x, B2x), state SA2,;If state is SA1,
And the next node encountered be B, then the coordinate information of node B be (B1x, B2x), state SB1, and so on, Fig. 3 can be obtained
Shown in binary tree, the node C of the rightmost side in binary tree shown in Fig. 3 is the leaf node for providing tag number.
Step 104:According to the structure title of each node in the tree-shaped logic chart, each node coordinate information, with
And the relative position relation of each node and an adjacent upper node, determine that the drafting of each node is believed according to the second preset rules
Breath.
In one specific implementation mode, according to the structure title for the node for including in second preset rules, Mei Gejie
The coordinate information of point, relative position relation, each node to adjacent next node of each node and adjacent next node
The correspondence for drawing information, determines the drafting information of each node in the tree-shaped logic chart.
In one specific implementation mode, the drafting information includes connecting line of the node to adjacent next node
The drafting color of trend and the connecting line.The drafting color of connecting line can be the color of paintbrush or paintbrush.
Step 105:Node engineering wiring diagram is drawn according to the drafting information of each node.
Specifically, it according to the drafting information of the coordinate information of each node and each node, can draw to obtain node work
Journey wiring diagram.
For example, traversing tree-shaped logic chart, if the next node of node encounters A nodes, A nodes according to the second preset rules
Coordinate information is fa (x, y), and the states of A nodes is SA1 states, then the trend of connecting line be downward, and the color of connecting line is the
One color;If next node encounters B node, the coordinate information of B node is fb (x, y), and the state of B node is SB1, then connecting line
Trend be that the right, the color of connecting line is the second color, and so on, node engineering wiring diagram shown in Fig. 4 can be obtained.
In the embodiment of the present invention, it is pre-configured with the attribute of root node, root node is included at least in the attribute of the root node
Coordinate information.
In specific implementation, after drawing node engineering wiring diagram, the node that state is failure is marked, i.e., is intuitively shown
Malfunctioning node, and then the malfunctioning node is positioned, improve the location efficiency of malfunctioning node.
In the embodiment of the present invention, according to the tag number of each leaf node, determine that each leaf node respectively arrives respectively
The structure title of each node on the path of root node and the relative position relation of each node and adjacent node establish tree
Type logic chart determines the coordinate information of each node in the tree-shaped logic chart according to the first preset rules, according to the tree
The structure title of each node in type logic chart, the coordinate information of each node and each node and adjacent node it is opposite
Position relationship determines the drafting information of each node according to the second preset rules, is painted according to the drafting information of each node
Node engineering wiring diagram processed is to realize the function of drawing node engineering wiring diagram automatically according to the tag number of node
The automatic detection of line fault and investigation provide possibility, save cost of labor, reduce difficulty of construction.
Based on same inventive concept, an embodiment of the present invention provides a kind of node engineering wiring diagram determining device, the devices
Specific implementation can be found in embodiment of the method part description, overlaps will not be repeated, as shown in figure 5, the device mainly wraps
It includes:
First processing module 501, for obtaining the respective tag number of each leaf node;
Second processing module 502 determines that each leaf node is each respectively for the tag number according to each leaf node
It is closed from the relative position of the structure title of each node on the path to root node and each node and an adjacent upper node
System, establishes tree-shaped logic chart;
Third processing module 503, for the structure name according to each node in the first preset rules, the tree-shaped logic chart
The relative position relation of each node and an adjacent upper node, determines the tree-shaped logic in title and the tree-shaped logic chart
The coordinate information of each node in figure;
Fourth processing module 504, for according to the structure title of each node in the tree-shaped logic chart, each node
The relative position relation of coordinate information and each node and an adjacent upper node determines each section according to the second preset rules
The drafting information of point;
5th processing module 505, for drawing node engineering wiring diagram according to the drafting information of each node.
In possible embodiment, the tag number of the leaf node includes every on the leaf node to root node path
The designations of the structure title of a node, and including on the leaf node to root node path each node with it is adjacent on
The designations of the relative position relation of one node.
In possible embodiment, the third processing module is used for:
According to the structure title for the node for including in first preset rules, the structure of the adjacent next node of the node
Relative position relation between title, the node and adjacent next node and pair between the coordinate information of the node
It should be related to, determine the coordinate information of each node in the tree-shaped logic chart.
In possible embodiment, the fourth processing module is used for:
According to include in second preset rules the structure title of node, the coordinate information of each node, Mei Gejie
Point and the relative position relation of adjacent next node, the correspondence of the drafting information of each node to adjacent next node,
Determine the drafting information of each node in the tree-shaped logic chart.
It is described to draw information to include the node walk to the connecting line of adjacent next node in possible embodiment
To and the connecting line drafting color.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention
Apply the form of example.Moreover, the present invention can be used in one or more wherein include computer usable program code computer
The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.)
Formula.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram
The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided
Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real
The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to
Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or
The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
God and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (10)
1. a kind of node engineering wiring diagram determines method, which is characterized in that including:
Obtain the respective tag number of each leaf node;
According to the tag number of each leaf node, determine each leaf node respectively to each of on the path of root node respectively
The relative position relation of the structure title of node and each node and an adjacent upper node, establishes tree-shaped logic chart;
According in the structure title of each node in the first preset rules, the tree-shaped logic chart and the tree-shaped logic chart
The relative position relation of each node and an adjacent upper node determines the coordinate letter of each node in the tree-shaped logic chart
Breath;
According to each structure title of node in the tree-shaped logic chart, the coordinate information of each node and each node with
The relative position relation of an adjacent upper node, the drafting information of each node is determined according to the second preset rules;
Node engineering wiring diagram is drawn according to the drafting information of each node.
2. the method as described in claim 1, which is characterized in that the tag number of the leaf node includes the leaf node to root
The designations of the structure title of each node on node path, and including every on the leaf node to root node path
The designations of a node and the relative position relation of an adjacent upper node.
3. method as claimed in claim 1 or 2, which is characterized in that according to every in the first preset rules, the tree-shaped logic chart
The relative position relation of each node and an adjacent upper node in the structure title of a node and the tree-shaped logic chart, really
The coordinate information of each node in the fixed tree-shaped logic chart, including:
According to the structure name of the structure title for the node for including in first preset rules, the adjacent next node of the node
Claim, is between the coordinate information of the relative position relation between the node and adjacent next node and the node corresponding
Relationship determines the coordinate information of each node in the tree-shaped logic chart.
4. method as claimed in claim 1 or 2, which is characterized in that according to the structure of each node in the tree-shaped logic chart
The relative position relation of title, the coordinate information of each node and each node and an adjacent upper node, it is default according to second
Rule determines the drafting information of each node, including:
According to the structure title for the node for including in second preset rules, the coordinate information of each node, each node with
The correspondence of the drafting information of the relative position relation of adjacent next node, each node to adjacent next node determines
The drafting information of each node in the tree-shaped logic chart.
5. method as claimed in claim 4, which is characterized in that the drafting information includes the node to adjacent next section
The trend of the connecting line of point and the drafting color of the connecting line.
6. a kind of node engineering wiring diagram determining device, which is characterized in that including:
First processing module, for obtaining the respective tag number of each leaf node;
Second processing module determines that each leaf node respectively arrives root respectively for the tag number according to each leaf node
The relative position relation of the structure title of each node on the path of node and each node and an adjacent upper node is established
Tree-shaped logic chart;
Third processing module, for according to the structure title of each node in the first preset rules, the tree-shaped logic chart and
The relative position relation of each node and an adjacent upper node, determines every in the tree-shaped logic chart in the tree-shaped logic chart
The coordinate information of a node;
Fourth processing module, for the coordinate letter according to the structure title of each node in the tree-shaped logic chart, each node
The relative position relation of breath and each node and an adjacent upper node, painting for each node is determined according to the second preset rules
Information processed;
5th processing module, for drawing node engineering wiring diagram according to the drafting information of each node.
7. device as claimed in claim 6, which is characterized in that the tag number of the leaf node includes the leaf node to root
The designations of the structure title of each node on node path, and including every on the leaf node to root node path
The designations of a node and the relative position relation of an adjacent upper node.
8. device as claimed in claims 6 or 7, which is characterized in that the third processing module is used for:
According to the structure name of the structure title for the node for including in first preset rules, the adjacent next node of the node
Claim, is between the coordinate information of the relative position relation between the node and adjacent next node and the node corresponding
Relationship determines the coordinate information of each node in the tree-shaped logic chart.
9. device as claimed in claims 6 or 7, which is characterized in that the fourth processing module is used for:
According to the structure title for the node for including in second preset rules, the coordinate information of each node, each node with
The correspondence of the drafting information of the relative position relation of adjacent next node, each node to adjacent next node determines
The drafting information of each node in the tree-shaped logic chart.
10. device as claimed in claim 9, which is characterized in that the drafting information includes the node to adjacent next
The drafting color of the trend of the connecting line of node and the connecting line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710032563.2A CN108319991B (en) | 2017-01-16 | 2017-01-16 | Node engineering wiring diagram determining method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710032563.2A CN108319991B (en) | 2017-01-16 | 2017-01-16 | Node engineering wiring diagram determining method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108319991A true CN108319991A (en) | 2018-07-24 |
CN108319991B CN108319991B (en) | 2021-02-09 |
Family
ID=62891149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710032563.2A Active CN108319991B (en) | 2017-01-16 | 2017-01-16 | Node engineering wiring diagram determining method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108319991B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109190326A (en) * | 2018-11-22 | 2019-01-11 | 南京新联电能云服务有限公司 | Generate the method and device of process flow chart |
CN111967114A (en) * | 2020-08-17 | 2020-11-20 | 深圳市安冠科技有限公司 | Drawing method of equipment wiring diagram |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1964284A (en) * | 2006-12-04 | 2007-05-16 | 中国科学院计算技术研究所 | A method to realize visual wireless sensor network |
KR20110068037A (en) * | 2009-12-15 | 2011-06-22 | 동국대학교 산학협력단 | Method and apparatus for allocating address in tree structured network |
CN102148703A (en) * | 2011-01-19 | 2011-08-10 | 武汉迈威光电技术有限公司 | Network management topology realizing algorithm of switchboard |
CN102467535A (en) * | 2010-11-12 | 2012-05-23 | 金蝶软件(中国)有限公司 | Method, device and system for acquiring tree data output coordinate |
CN102566849A (en) * | 2010-12-10 | 2012-07-11 | 金蝶软件(中国)有限公司 | Method and device for acquiring tree-form data drawing output positions and ERP (enterprise resource planning) system |
CN102819533A (en) * | 2011-09-20 | 2012-12-12 | 金蝶软件(中国)有限公司 | Method and device for processing location information of visualized warehouse |
CN103440521A (en) * | 2013-08-21 | 2013-12-11 | 南昌大学 | Coding and genetic algorithm suitable for power distribution network and application in distribution network reconfiguration |
CN103577164A (en) * | 2012-07-20 | 2014-02-12 | 腾讯科技(深圳)有限公司 | Flow diagram generating method and device |
CN103699598A (en) * | 2013-12-12 | 2014-04-02 | 福建榕基软件股份有限公司 | Method for displaying data reference process in graphical manner and device thereof |
CN103838889A (en) * | 2012-11-23 | 2014-06-04 | 中国北车集团大同电力机车有限责任公司 | Method and device for generating report form of locomotive electrical principle and wiring diagram |
CN104461496A (en) * | 2014-10-30 | 2015-03-25 | 华中科技大学 | And-or graph layering displaying method |
CN105024929A (en) * | 2015-07-22 | 2015-11-04 | 上海交通大学 | Application awareness resource management method in software defined network |
CN105426499A (en) * | 2015-11-25 | 2016-03-23 | 成都数联铭品科技有限公司 | Implementation method of data visualization |
CN105488130A (en) * | 2015-11-25 | 2016-04-13 | 成都数联铭品科技有限公司 | Associated data visualization display method |
CN105490830A (en) * | 2015-05-12 | 2016-04-13 | 哈尔滨安天科技股份有限公司 | Method and system for finding ring structure in network topological graph |
CN105488088A (en) * | 2014-12-31 | 2016-04-13 | 哈尔滨安天科技股份有限公司 | Two-dimensional network angle distribution layout method based on tree structure |
CN106133721A (en) * | 2014-03-17 | 2016-11-16 | 微软技术许可有限责任公司 | Parallel decision tree processor architecture |
CN106250129A (en) * | 2016-07-26 | 2016-12-21 | 南京航空航天大学 | The vector quantization dynamic drawing method of symbol based on meta graph recognition model |
-
2017
- 2017-01-16 CN CN201710032563.2A patent/CN108319991B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1964284A (en) * | 2006-12-04 | 2007-05-16 | 中国科学院计算技术研究所 | A method to realize visual wireless sensor network |
KR20110068037A (en) * | 2009-12-15 | 2011-06-22 | 동국대학교 산학협력단 | Method and apparatus for allocating address in tree structured network |
CN102467535A (en) * | 2010-11-12 | 2012-05-23 | 金蝶软件(中国)有限公司 | Method, device and system for acquiring tree data output coordinate |
CN102566849A (en) * | 2010-12-10 | 2012-07-11 | 金蝶软件(中国)有限公司 | Method and device for acquiring tree-form data drawing output positions and ERP (enterprise resource planning) system |
CN102148703A (en) * | 2011-01-19 | 2011-08-10 | 武汉迈威光电技术有限公司 | Network management topology realizing algorithm of switchboard |
CN102819533A (en) * | 2011-09-20 | 2012-12-12 | 金蝶软件(中国)有限公司 | Method and device for processing location information of visualized warehouse |
CN103577164A (en) * | 2012-07-20 | 2014-02-12 | 腾讯科技(深圳)有限公司 | Flow diagram generating method and device |
CN103838889A (en) * | 2012-11-23 | 2014-06-04 | 中国北车集团大同电力机车有限责任公司 | Method and device for generating report form of locomotive electrical principle and wiring diagram |
CN103440521A (en) * | 2013-08-21 | 2013-12-11 | 南昌大学 | Coding and genetic algorithm suitable for power distribution network and application in distribution network reconfiguration |
CN103699598A (en) * | 2013-12-12 | 2014-04-02 | 福建榕基软件股份有限公司 | Method for displaying data reference process in graphical manner and device thereof |
CN106133721A (en) * | 2014-03-17 | 2016-11-16 | 微软技术许可有限责任公司 | Parallel decision tree processor architecture |
CN104461496A (en) * | 2014-10-30 | 2015-03-25 | 华中科技大学 | And-or graph layering displaying method |
CN105488088A (en) * | 2014-12-31 | 2016-04-13 | 哈尔滨安天科技股份有限公司 | Two-dimensional network angle distribution layout method based on tree structure |
CN105490830A (en) * | 2015-05-12 | 2016-04-13 | 哈尔滨安天科技股份有限公司 | Method and system for finding ring structure in network topological graph |
CN105024929A (en) * | 2015-07-22 | 2015-11-04 | 上海交通大学 | Application awareness resource management method in software defined network |
CN105426499A (en) * | 2015-11-25 | 2016-03-23 | 成都数联铭品科技有限公司 | Implementation method of data visualization |
CN105488130A (en) * | 2015-11-25 | 2016-04-13 | 成都数联铭品科技有限公司 | Associated data visualization display method |
CN106250129A (en) * | 2016-07-26 | 2016-12-21 | 南京航空航天大学 | The vector quantization dynamic drawing method of symbol based on meta graph recognition model |
Non-Patent Citations (1)
Title |
---|
刘潇等: "基于改进 RRT 算法的线缆自动布线技术", 《机械工程学报》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109190326A (en) * | 2018-11-22 | 2019-01-11 | 南京新联电能云服务有限公司 | Generate the method and device of process flow chart |
CN109190326B (en) * | 2018-11-22 | 2024-01-30 | 南京新联电能云服务有限公司 | Method and device for generating process flow chart |
CN111967114A (en) * | 2020-08-17 | 2020-11-20 | 深圳市安冠科技有限公司 | Drawing method of equipment wiring diagram |
CN111967114B (en) * | 2020-08-17 | 2024-02-02 | 深圳市安冠科技有限公司 | Drawing method of equipment wiring diagram |
Also Published As
Publication number | Publication date |
---|---|
CN108319991B (en) | 2021-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8473889B2 (en) | Routing storage structure based on directional grid points and routing method thereof | |
EP2680175B1 (en) | Design assistance system | |
CN108712286A (en) | The determination method, apparatus and storage medium of network topology structure | |
CN102611568B (en) | A kind of failure service path diagnostic method and device | |
US20040155899A1 (en) | Method and system for presenting an arrangement of management devices operable in a managed network | |
CN103701633B (en) | Setup and maintenance system of visual cluster application for distributed search SolrCloud | |
CN110932981B (en) | Data exchange system supporting automatic routing | |
CN108319991A (en) | A kind of node engineering wiring diagram determines method and device | |
US7836402B2 (en) | Multiple link connector list | |
CN107395594A (en) | A kind of automatic identifying method for pulling identifying code | |
CN112464497B (en) | Fault drilling method, device, equipment and medium based on distributed system | |
US8423948B2 (en) | Wiring design support device and wiring design supporting method | |
CN110442755A (en) | Based on the topological diagram methods of exhibiting being connected to the network between nuclear power plant's DCS platform station | |
CN107204866A (en) | The implementation method of multi-tenant service chaining transmission is solved based on VXLAN technologies | |
US8045474B2 (en) | Method and apparatus for tracking layer-2 (L2) resource of a switch | |
US20160294981A1 (en) | Display method and device | |
CN108038584A (en) | A kind of flow method of adjustment, device and equipment as the occasion requires | |
US9978162B1 (en) | Rules-based causality visualization framework | |
US11080939B1 (en) | Generating test cases for augmented reality (AR) application testing | |
CN106789407A (en) | A kind of method that cloud platform checks virtual machine connection status | |
CN110489686A (en) | A kind of data analysing method, device and terminal | |
CN109617724A (en) | A kind of monitoring of transport network traffic and restorative procedure, device, storage medium | |
CN111045757A (en) | Visual display system and method for IT resource operation state and storage medium | |
CN108647069A (en) | interface display method and device, storage medium and electronic device | |
CN109547252A (en) | The method, apparatus and server of instantiated nodes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |