CN108311868A - The special press mounting die of bottle gouard moved by hands wallboard and supporting rod - Google Patents

The special press mounting die of bottle gouard moved by hands wallboard and supporting rod Download PDF

Info

Publication number
CN108311868A
CN108311868A CN201810340749.9A CN201810340749A CN108311868A CN 108311868 A CN108311868 A CN 108311868A CN 201810340749 A CN201810340749 A CN 201810340749A CN 108311868 A CN108311868 A CN 108311868A
Authority
CN
China
Prior art keywords
wallboard
positioning
hole
supporting rod
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810340749.9A
Other languages
Chinese (zh)
Inventor
盛嘉庆
邓伟林
张奎
单伟军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHUANGNIAO MACHINERY CO Ltd ZHEJIANG
Original Assignee
SHUANGNIAO MACHINERY CO Ltd ZHEJIANG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHUANGNIAO MACHINERY CO Ltd ZHEJIANG filed Critical SHUANGNIAO MACHINERY CO Ltd ZHEJIANG
Priority to CN201810340749.9A priority Critical patent/CN108311868A/en
Publication of CN108311868A publication Critical patent/CN108311868A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/18Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for positioning only

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention discloses the special press mounting dies of a kind of bottle gouard moved by hands wallboard and supporting rod,It includes bottom plate,Positioning mould holder,There are three the upper die holders of riveting head for close-fitting,Die shank,Wallboard support plate,Wallboard positioning plate and three positioning sleeves being tight on positioning mould holder,Two fixed guide posts that positioning mould holder is equipped with are arranged compression spring,Wallboard support plate and wallboard positioning plate are by guide column sleeve slide fit on fixed guide post,The wallboard positioning plate and wallboard support plate being fixed together have the cavity of accommodating wallboard between the two,Wallboard is opened there are three press mounting hole,Each positioning sleeve is provided with the mounting hole assigned for supporting rod in its center,And it is provided with stepped hole in the lower end of each positioning sleeve,Close-fitting has a positioning block in each stepped hole,The location hole that locating piece is provided in its center,Supporting rod its underpart shoulder can sequentially enter corresponding press mounting hole in location hole at the top of upper part shoulder and bar,In riveting head through-hole.Three supporting rods of this mold toward synchronous press mounting on wallboard have the characteristics that verticality is good.

Description

The special press mounting die of bottle gouard moved by hands wallboard and supporting rod
【Technical field】
The present invention relates to the special press mounting dies of a kind of bottle gouard moved by hands wallboard and supporting rod, belong to bottle gouard moved by hands component assembly Technical field.
【Background technology】
Bottle gouard moved by hands part assembles time-consuming and laborious deficiency there are assembly parts since loose mail is numerous, for example right wallboard needs It is fixedly connected with three supporting rods, then left wallboard could be worn on supporting rod and be fixed again.Wherein, right wallboard and three When supporting rod is fixedly connected, typically supporting rod is pressed into one by one on right wallboard, has often been pressed a supporting rod and has been both needed to To right wallboard and to continue supporting rod to be pressed respectively and position, it is low to be not only pressed work efficiency, and is pressed quality and differs, Even if wherein deflection occurs in a supporting rod after press fitting, the supporting rod of this deflection can not be with respective perforations pair on left wallboard Position, this just influences whether that left wallboard is worn on supporting rod, and to hinder the assembling work of left wallboard, the supporting rod after deflection is then It needs to do over again again and be pressed, in view of this, existing bottle gouard moved by hands wallboard has improvement necessary in fact with supporting rod press mounting structure.
【Invention content】
The purpose of the present invention is to provide it is a kind of can be toward the bottle gouard moved by hands wallboard of three supporting rods of synchronous press mounting on wallboard With the special press mounting die of supporting rod, the supporting rod verticality after press fitting is good, parallel to each other.
For this purpose, the present invention provides the following technical solutions:
The special press mounting die of bottle gouard moved by hands wallboard and supporting rod, including one piece of bottom plate, be fixed on bottom plate one piece it is fixed One piece of upper die holder above positioning mould holder of position die holder, arranged for interval and a die shank for being fixed on its top surface of upper die holder, positioning Die holder is left and right along its length to be symmetrically arranged two fixed guide posts, and two fixed guide column sleeves are equipped with compression spring, and upper die holder is fixed Two guide sleeves and the fixed sleeve column it is corresponding respectively, improvement is:Further include one piece of wallboard support plate, be fixed on this One piece of wallboard positioning plate of its top surface of wallboard support plate and three positioning sleeves being tight on the positioning mould holder, wallboard support plate With wallboard positioning plate by two guide column sleeve slide fits on two fixed guide posts, the lower end of each compression spring is supported on positioning mould holder, The upper end of each compression spring is nested with corresponding guide column sleeve and conflict wallboard support plate, is formed between wallboard positioning plate and wallboard support plate A cavity of wallboard can be housed, which opens there are three press mounting hole, and there are three riveting heads for upper die holder close-fitting, in each riveting head The heart has riveting head through-hole, and each positioning sleeve is provided with mounting hole in its center, and offers stepped hole in the lower end of each positioning sleeve, Close-fitting has a positioning block, locating piece to be provided with location hole in its center in each stepped hole, and each mounting hole supplies to assign a supporting rod, and Supporting rod its underpart shoulder is located in location hole, and can be according at the top of the bar of supporting rod its top shoulder and supporting rod that Gong press In the corresponding press mounting hole of secondary entrance, riveting head through-hole, fixed with being pressed with wallboard.
The hole heart line of above-mentioned mounting hole and the hole heart line of location hole are total to vertical line.
Three positioning sleeves are arranged between two fixed guide posts with being centrosymmetric, and the position of three riveting heads is fixed with three Position set corresponds.
The invention has the advantages that and good effect:
Upper die holder can be along fixed guide post sliding by guide sleeve, it is ensured that the stationarity that upper die holder moves above and below;Wallboard is fixed Position plate and wallboard support plate is by guide column sleeve slide fit on fixed guide post, and being formed between wallboard positioning plate and wallboard support plate will The cavity that wallboard is positioned so then can guarantee that wallboard is smoothly pressed with supporting rod with the pressing action of riveting head Operation;Each supporting rod is constrained in positioning sleeve before press fitting, and the lower part shoulder of each supporting rod is subject to effective position by locating piece, Press fitting overall process it is effectively guaranteed that the verticality of each supporting rod is remained the same from beginning to end, until the top shoulder of each supporting rod be pressed to On wallboard, since each supporting rod verticality attains full and complete satisfaction after press fitting, is conducive to other one block of wallboard and is not obstructed smoothly It wears each supporting rod with hindering, not only increases press fitting work efficiency, avoid press fitting and do over again the generation of phenomenon, and after improving Continue the packaging efficiency of another block of wallboard.
【Description of the drawings】
Fig. 1 is the outline drawing of the present invention;
Fig. 2 is the vertical view of the present invention;
Fig. 3 is the sectional view of the Z-Z along Fig. 2;
Fig. 4 is the plan view of wallboard;
Fig. 5 is the sectional view of the A-A along Fig. 4;
Fig. 6 is the schematic diagram that the wallboard after the press fitting of this mold is fixed together with supporting rod.
【Specific implementation mode】
It refers to shown in Fig. 1,2,3,4,5,6, the special press mounting die of bottle gouard moved by hands wallboard and supporting rod, including one piece of bottom It one piece of upper die holder 3 above positioning mould holder 2 of plate 1, one piece of positioning mould holder 2 being fixed on bottom plate 1, arranged for interval and is fixed on One die shank 4 of 3 its top surface of upper die holder, positioning mould holder 2 is left and right along its length to be symmetrically arranged two fixed guide posts 21, Two fixed guide posts 21 are arranged with compression spring K, and two fixed guide sleeves 31 of upper die holder 3 divide in position with the fixed sleeve column 21 Not Dui Ying, improvement is:Further include one piece of wallboard support plate 5, be fixed on one block of wallboard of 5 its top surface of wallboard support plate Positioning plate 6 and three positioning sleeves 7 being tight on the positioning mould holder 2, wallboard support plate 5 and wallboard positioning plate 6 pass through two 51 slide fit of guide column sleeve is on two fixed guide posts 21, and the lower end of each compression spring K is supported on positioning mould holder 2, the upper end cap of each compression spring K It sets corresponding guide column sleeve 51 and contradicts wallboard support plate 5, wall can be housed by being formed between wallboard support plate 5 and wallboard positioning plate 6 A cavity C of plate M, wallboard M are opened there are three press mounting hole M0, and there are three riveting heads 30 for 3 close-fitting of upper die holder, in each riveting head 30 Center has riveting head through-hole 300, and each positioning sleeve 7 is provided with mounting hole 70 in its center, and is opened up in the lower end of each positioning sleeve 7 There is a stepped hole (not indicating), close-fitting has a positioning block 8, locating piece 8 to be provided with location hole 80 in its center in each stepped hole, each to install Hole 70 is for assigning a supporting rod 9, and 9 its underpart shoulder 91 of supporting rod is located in location hole 80, and supporting rod 9 its confession presses Corresponding press mounting hole M0 can be sequentially entered at the top of the bar of top shoulder 90 and supporting rod 9, in riveting head through-hole 300, and make Supporting rod 9 is fixed with wallboard M press fittings.
Locating piece 8 uses hard material, the present embodiment to use Cr12.
Its outer profile of bottom plate 1 is square, and bottom plate 1 is in flatly to be positioned on the workbench of forcing press, positioning mould holder 2, wall The outer profile of plate positioning plate 6 and upper die holder 3 is substantially in flat hexagon, and positioning mould holder 2 is fixed on bottom by corner bolt in two pieces On plate 1, upper die holder 3 and positioning mould holder 2 are parallel to each other;Upper die holder 3 is fixed on by corner bolt in three pieces in its chassis portion of die shank 4 The die shank portion of top surface, die shank 4 is connected on the forcing press of existing structure, drives upper die holder 3 along fixed guide post 21 by forcing press Upper and lower movement.
For wallboard support plate 5 between upper die holder 3 and positioning mould holder 2, wallboard positioning plate 6 also is located at upper die holder 3 and positioning Between die holder 2.
Two compression spring K specifications are identical;Two 31 specifications of guide sleeve are identical;Two 21 specifications of fixed guide post are identical and contour, Two fixed guide posts 21 are vertical and parallel to each other;Three positioning sleeves 7 are below two fixed guide posts 21, and three positioning sleeves 7 In the lower section of wallboard support plate 5.
Two 51 specifications of guide column sleeve are identical, and each guide column sleeve 51 with wallboard support plate 5,6 close-fitting of wallboard positioning plate.
Wallboard positioning plate 6 is fixedly connected by four pieces of sunk screws (not shown) with wallboard support plate 5;Wallboard M is held on When on wallboard support plate 5, the outer peripheral edge of wallboard M is positioned by the inner peripheral of wallboard positioning plate 6.
The aperture of riveting head through-hole 300 is slightly larger than the supporting rod 9 of position its bar top diameter of being corresponding to it.
Supporting rod 9 is existing structure, it includes rod body part, at the top of bar (being formed with screw thread) and bar bottom (being formed with screw thread), Transition forms top shoulder 90 between rod body part at the top of bar, and transition forms lower part shoulder 91 between bar bottom and rod body part.
The hole heart line of mounting hole 70 is total to vertical line with the hole heart line of location hole 80
Three positioning sleeves 7 are arranged with being centrosymmetric, and three positioning sleeves 7 are located between two fixed guide posts 21, three The position of riveting head 30 is corresponded with three positioning sleeves 7.
When specific press fitting, three supporting rods 9 are inserted in three positioning sleeves 7 in advance, make lower part shoulder 91 and location hole 80 Positioning, then places one piece of wallboard M to be pressed (industry is commonly referred to as right wallboard), wallboard M is fallen on wallboard support plate 5 After cavity C, the outer peripheral edge of wallboard M is positioned by the inner peripheral of wallboard positioning plate 6, can be started after completing above-mentioned preparation Forcing press is pressed, until forcing press unloads power reset after pushing in place, is unloaded upward with the return action of compression spring while power It pushes wallboard support plate 5 and drives three supporting rods 9, taken off so that the lower part shoulder 91 of each supporting rod is realized out of location hole 80 From then the press fitting part by supporting rod 9 together with wallboard M is taken together from riveting head 30, and is screwed on fixing nut i.e. toward bar top Can, often carrying out primary press fitting operation can simultaneously be pressed into three supporting rods 9 on wallboard M.
At this point it is possible to parts on shaft is installed on three supporting rods 9, it can be easily toward three supporting rods 9 after installing The left wallboard of upper sleeve through finally screws in stop nut in bar bottom and tightens until the perforation of left wallboard moves on at lower part shoulder 91, To complete the assembling operation of a whole set of (two pieces) wallboard.
The diameter of three supporting rods can be different from, or the diameter of wherein one supporting rod and other two supporting rods Diameter differ, and the diameter of other two supporting rods is then identical, it is only necessary to which making the diameter at 9 each position of supporting rod, (rod body part is straight Diameter at the top of diameter, 91 diameter of lower part shoulder, 90 diameter of top shoulder and bar) respectively with corresponding mounting hole 70, location hole 80, Press mounting hole M0 and riveting head through-hole 300 are adapted.In the present embodiment, as shown in figure 3, the supporting rod and the right hand of left-hand side The supporting rod on side etc. is thick, and slightly thicker than the supporting rod of the supporting rod of left-hand side and right-hand side positioned at an intermediate supporting rod, for another example Shown in Fig. 2, the aperture of its two press mounting hole M0 being located above of wallboard M is identical, and the hole of a underlying press mounting hole M0 Diameter is slightly larger than two apertures press mounting hole M0 of top, so, when three supporting rod workpiece diameter and wallboard workpiece its When the aperture of press mounting hole changes, it is only necessary to need only adaptively replace positioning sleeve, the locating piece of adaptation on the basis of same mold With riveting head, i.e. single mold can realize the press fitting needs of the wallboard and different size supporting rod in different press fitting apertures, In addition, when supporting rod quantity increases with wallboard press fitting hole number, the positioning of installation respective numbers can be increased on same mold Set, locating piece and riveting head, to realize the needs of more multi-work piece press fitting.

Claims (3)

1. the special press mounting die of a kind of bottle gouard moved by hands wallboard and supporting rod, including one piece of bottom plate, be fixed on bottom plate one piece One piece of upper die holder above positioning mould holder of positioning mould holder, arranged for interval and a die shank for being fixed on its top surface of upper die holder, it is fixed Position die holder is left and right along its length to be symmetrically arranged two fixed guide posts, and two fixed guide column sleeves are equipped with compression spring, and upper die holder is solid If two guide sleeves and the fixed sleeve column it is corresponding respectively, it is characterised in that:Further include one piece of wallboard support plate, be fixed on this One piece of wallboard positioning plate of its top surface of wallboard support plate and three positioning sleeves being tight on the positioning mould holder,
By two guide column sleeve slide fits on two fixed guide posts, the lower end of each compression spring supports for wallboard support plate and wallboard positioning plate In on positioning mould holder, the upper end of each compression spring is nested with corresponding guide column sleeve and conflict wallboard support plate, wallboard positioning plate and wallboard branch A cavity of wallboard can be housed by being formed between board, which opens there are three press mounting hole,
There are three riveting heads for upper die holder close-fitting, have riveting head through-hole at the center of each riveting head,
Each positioning sleeve is provided with mounting hole in its center, and offers stepped hole in the lower end of each positioning sleeve, tight in each stepped hole Equipped with a positioning block, locating piece is provided with location hole in its center, and each mounting hole is for assigning a supporting rod, and supporting rod its underpart Shoulder is located in location hole, and can be sequentially entered at the top of the bar of supporting rod its top shoulder and supporting rod that Gong press corresponding In press mounting hole, riveting head through-hole, fixed with being pressed with wallboard.
2. special press mounting die according to claim 1, it is characterised in that:The hole heart line of the mounting hole and location hole Hole heart line is total to vertical line.
3. special press mounting die according to claim 1 or 2, it is characterized in that three positioning sleeves are arranged in being centrosymmetric Between two fixed guide posts, the position of three riveting heads is corresponded with three positioning sleeves.
CN201810340749.9A 2018-04-14 2018-04-14 The special press mounting die of bottle gouard moved by hands wallboard and supporting rod Pending CN108311868A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810340749.9A CN108311868A (en) 2018-04-14 2018-04-14 The special press mounting die of bottle gouard moved by hands wallboard and supporting rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810340749.9A CN108311868A (en) 2018-04-14 2018-04-14 The special press mounting die of bottle gouard moved by hands wallboard and supporting rod

Publications (1)

Publication Number Publication Date
CN108311868A true CN108311868A (en) 2018-07-24

Family

ID=62898082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810340749.9A Pending CN108311868A (en) 2018-04-14 2018-04-14 The special press mounting die of bottle gouard moved by hands wallboard and supporting rod

Country Status (1)

Country Link
CN (1) CN108311868A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109318209A (en) * 2018-11-20 2019-02-12 西安智强科技有限公司 A kind of round building mold robot for disassembling work
CN109807599A (en) * 2018-12-24 2019-05-28 河南平高电气股份有限公司 Connecting lever riveting positioning tool
CN111195686A (en) * 2019-12-28 2020-05-26 河北成华机械制造有限公司 Riveting method of inner plate of lever block wrench and brake cover

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2331145A1 (en) * 2000-01-18 2001-07-18 Helmut Meyerdierks Winch
CN202861742U (en) * 2012-08-20 2013-04-10 成都华川电装有限责任公司 Pressing installation tool for hole shaft interference fit
CN103223433A (en) * 2013-04-01 2013-07-31 江阴市东顺机械有限公司 Stamping mechanism of grid of lead-acid storage battery
CN203635784U (en) * 2013-12-11 2014-06-11 重庆美和机电有限公司 Riveting tool of supporting rods and wallboard
CN203875266U (en) * 2014-06-04 2014-10-15 温州奔龙自动化科技有限公司 Riveting die
CN204035960U (en) * 2014-06-09 2014-12-24 杭州维多利机械有限公司 A kind of chain block steel bushing assembly tool
CN104289894A (en) * 2014-10-28 2015-01-21 重庆长兴工业有限公司 Riveting tooling for shoe seat and shoe connecting pole of shoe type clutch
CN204294746U (en) * 2014-10-28 2015-04-29 重庆长兴工业有限公司 The shoe block base of shoe block clutch and the riveting tool of hoof block joint pin
JP2016165734A (en) * 2015-03-09 2016-09-15 Jfeスチール株式会社 Roll frame slewing gear
CN208117165U (en) * 2018-04-14 2018-11-20 浙江双鸟机械有限公司 The dedicated press mounting die of bottle gouard moved by hands wallboard and support rod

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2331145A1 (en) * 2000-01-18 2001-07-18 Helmut Meyerdierks Winch
CN202861742U (en) * 2012-08-20 2013-04-10 成都华川电装有限责任公司 Pressing installation tool for hole shaft interference fit
CN103223433A (en) * 2013-04-01 2013-07-31 江阴市东顺机械有限公司 Stamping mechanism of grid of lead-acid storage battery
CN203635784U (en) * 2013-12-11 2014-06-11 重庆美和机电有限公司 Riveting tool of supporting rods and wallboard
CN203875266U (en) * 2014-06-04 2014-10-15 温州奔龙自动化科技有限公司 Riveting die
CN204035960U (en) * 2014-06-09 2014-12-24 杭州维多利机械有限公司 A kind of chain block steel bushing assembly tool
CN104289894A (en) * 2014-10-28 2015-01-21 重庆长兴工业有限公司 Riveting tooling for shoe seat and shoe connecting pole of shoe type clutch
CN204294746U (en) * 2014-10-28 2015-04-29 重庆长兴工业有限公司 The shoe block base of shoe block clutch and the riveting tool of hoof block joint pin
JP2016165734A (en) * 2015-03-09 2016-09-15 Jfeスチール株式会社 Roll frame slewing gear
CN208117165U (en) * 2018-04-14 2018-11-20 浙江双鸟机械有限公司 The dedicated press mounting die of bottle gouard moved by hands wallboard and support rod

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109318209A (en) * 2018-11-20 2019-02-12 西安智强科技有限公司 A kind of round building mold robot for disassembling work
CN109807599A (en) * 2018-12-24 2019-05-28 河南平高电气股份有限公司 Connecting lever riveting positioning tool
CN109807599B (en) * 2018-12-24 2020-07-28 河南平高电气股份有限公司 Crank arm riveting positioning tool
CN111195686A (en) * 2019-12-28 2020-05-26 河北成华机械制造有限公司 Riveting method of inner plate of lever block wrench and brake cover
CN111195686B (en) * 2019-12-28 2021-07-13 河北成华机械制造有限公司 Riveting method of inner plate of lever block wrench and brake cover

Similar Documents

Publication Publication Date Title
CN207872851U (en) A kind of multi-hole position synchronous punching mold
CN1733384A (en) Punching-pressing composite mould
CN108311868A (en) The special press mounting die of bottle gouard moved by hands wallboard and supporting rod
CN208117165U (en) The dedicated press mounting die of bottle gouard moved by hands wallboard and support rod
CN107671173A (en) A kind of multinomial compound diel
CN207414156U (en) A kind of multinomial compound stamping die
CN209063592U (en) A kind of plane riveting die
CN206445161U (en) Electric machine assembly and cover plate riveting tool
CN213945003U (en) Drilling machine for furniture board
CN212021646U (en) Stamping die of ABS draw-bar box
CN207386287U (en) A kind of punching machine tool for processing trimming lower die fixed board
CN107214243A (en) A kind of U-shaped part assembling die and U-shaped part processing technology
CN208866274U (en) A kind of positioning device of lamp stamping mold
CN207839817U (en) Process the bulging die of isolation board
CN210816996U (en) In-mold tapping mold
CN208067229U (en) A kind of squeeze riveter that use scope is wide in range
CN202097978U (en) Punch with large control box
CN209006601U (en) A kind of three-dimensional forging mold
CN206163362U (en) Inserted sheet frock is riveted to rocker switch base
CN208977014U (en) A kind of positioning fixture for being exclusively used in line and cutting rectangle part
CN110653324A (en) Multifunctional device for nut assembly
CN202097993U (en) Punching machine convenient for installing punching die
CN104525759B (en) Riveting die
CN210788925U (en) Die device for riveting nut on thick aluminum alloy plate
CN210936779U (en) Quick die holder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180724