CN108306286A - A kind of power distribution network active forewarning workform management method and device - Google Patents
A kind of power distribution network active forewarning workform management method and device Download PDFInfo
- Publication number
- CN108306286A CN108306286A CN201810061789.XA CN201810061789A CN108306286A CN 108306286 A CN108306286 A CN 108306286A CN 201810061789 A CN201810061789 A CN 201810061789A CN 108306286 A CN108306286 A CN 108306286A
- Authority
- CN
- China
- Prior art keywords
- work order
- active forewarning
- forewarning
- operating parameter
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 108
- 238000007726 management method Methods 0.000 title claims abstract description 46
- 238000012545 processing Methods 0.000 claims abstract description 29
- 238000011065 in-situ storage Methods 0.000 claims abstract description 26
- 238000012544 monitoring process Methods 0.000 claims abstract description 23
- 230000008859 change Effects 0.000 claims description 15
- 230000005540 biological transmission Effects 0.000 claims description 14
- 238000004891 communication Methods 0.000 claims description 10
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 13
- 230000005611 electricity Effects 0.000 abstract description 8
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000012958 reprocessing Methods 0.000 abstract description 3
- 230000015654 memory Effects 0.000 description 12
- 238000010586 diagram Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 238000003860 storage Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000013522 software testing Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H02J13/0013—
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
A kind of power distribution network active forewarning workform management method and device provided in an embodiment of the present invention is related to electric system regulation and control running technology field.This method and device generate active forewarning work order when distribution operating parameter meets presetting condition, and send active forewarning work order to the user terminal of any one and the type matching of the active forewarning work order, so that user terminal is sent and the associated in-situ processing information of active forewarning work order, and monitoring is tracked to active forewarning work order according to the distribution operating parameter for receiving the time of in-situ processing information and receiving again;To by generating active forewarning work order, it is tracked monitoring to the performance to active forewarning work order, it realizes to data exception work order closed loop management and control, avoid the reprocessing of work order, treatment effeciency is improved, human cost has been saved, enhances distribution network systems data validity, the stability for improving power distribution network operation level enhances electricity consumption reliability level.
Description
Technical field
The present invention relates to electric system regulation and control running technology fields, in particular to a kind of power distribution network active forewarning work
Menu manager method and device.
Background technology
With being constantly progressive for technology, the life of social continuous development, the mankind increasingly be unable to do without electricity.And every family
Power supply be to have power distribution network unified management, configuration, thus power distribution network safe and stable operation counts for much, the operation feelings of power distribution network
Condition has been increasingly becoming emphasis of people's attention.
Conventionally, as power distribution network framework is complicated, equipment is numerous, it is always that a difficult point is asked effectively to run management and control
Topic.More preferably to realize that distribution network operation management and control, all kinds of advanced monitoring system of distribution network are come into being, it can realize that distribution network operation is real
When monitor.But at present, the management and control of distribution network operation is still mainly using the pattern for O&M repairing of meeting an urgent need, i.e. passive processing afterwards,
It is difficult to meet that power distribution network is highly reliable, low complaint service requirement.
Invention content
In view of this, the purpose of the present invention is to provide a kind of power distribution network active forewarning workform management method and device, with
It solves the above problems.
To achieve the goals above, technical solution used in the embodiment of the present invention is as follows:
In a first aspect, an embodiment of the present invention provides a kind of power distribution network active forewarning workform management method, it is applied to one and supplies
Electricity service maneuvering platform, the electric service maneuvering platform are connect at least one user terminal communication, and the power distribution network is actively
Early warning workform management method includes:
Receive the distribution operating parameter of public system transmission;
Active forewarning work order is generated when the distribution operating parameter meets presetting condition;
Active forewarning work order is sent to any one and the matched user terminal of the active forewarning work order;
According to receive that the user terminal sends with the associated in-situ processing information of the active forewarning work order when
Between and the distribution operating parameter that receives again monitoring is tracked to the active forewarning work order.
Second aspect, the embodiment of the present invention additionally provide a kind of power distribution network active forewarning workform management device, are applied to one
Electric service maneuvering platform, the electric service maneuvering platform are connect at least one user terminal communication, the distribution host
Moving early warning workform management device includes:
Data receipt unit, the distribution operating parameter for receiving public system transmission;
Work order generation unit, for generating active forewarning work when the distribution operating parameter meets presetting condition
It is single;
Transmission unit, it is actively pre- for being sent to any one with the matched user terminal of the active forewarning work order
Alert work order;
Tracing monitoring unit receives the associated with the active forewarning work order of the user terminal transmission for foundation
The time of in-situ processing information and the distribution operating parameter received again are tracked monitoring to the active forewarning work order.
Power distribution network active forewarning workform management method and device provided in an embodiment of the present invention matches network operation what is received
Generate active forewarning work order when parameter meets presetting condition, and to the type matching of any one and the active forewarning work order
User terminal send active forewarning work order so that user terminal send with the associated in-situ processing information of active forewarning work order,
And active forewarning work order is carried out according to the distribution operating parameter for receiving the time of in-situ processing information and receiving again
Tracing monitoring;To by generating active forewarning work order, be tracked monitoring to the performance to active forewarning work order, realize
To data exception work order closed loop management and control, the reprocessing of work order is avoided, treatment effeciency is improved, has saved human cost,
Distribution network systems data validity is enhanced, the stability of power distribution network operation level is improved, enhances electricity consumption reliability level.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows the functional block diagram that can be applied to the maneuvering platform of the electric service in the embodiment of the present invention.
Fig. 2 shows the flow charts of power distribution network active forewarning workform management method provided in an embodiment of the present invention.
Fig. 3 shows the particular flow sheet of step S205 in Fig. 2.
Fig. 4 shows the functional block diagram of power distribution network active forewarning workform management device provided in an embodiment of the present invention.
Icon:100- electric service maneuvering platforms;111- memories;112- processors;113- communication units;200- distribution
Net active forewarning workform management device;210- data receipt units;220- judging units;230- work order generation units;240- is sent out
Send unit;250- tracing monitoring units.
Specific implementation mode
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete
Ground describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed
The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment of the present invention, people in the art
The every other embodiment that member is obtained without making creative work, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
It should be noted that the relational terms of term " first " and " second " or the like be used merely to an entity or
Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any
This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive
Property include so that including a series of elements process, method, article or equipment not only include those elements, but also
Further include other elements that are not explicitly listed, or further include for this process, method, article or equipment it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described
There is also other identical elements in the process, method, article or equipment of element.
The present invention provides a kind of electric service maneuvering platform 100, for realizing to the active management and control of power distribution network, O&M,
And realization is to the real-time oversight of distribution problem.Referring to Fig. 1, Fig. 1 shows a kind of confession that can be applied in the embodiment of the present invention
The functional block diagram of electricity service maneuvering platform 100.The electric service maneuvering platform 100 is filled including power distribution network active forewarning workform management
Set 200, memory 111, storage control, one or more (one is only shown in figure) processors 112, communication unit 113.This
A little components are mutually communicated by one or more communication bus/signal wire.The power distribution network active forewarning workform management device 200
It can be stored in the memory 111 or be solidificated in the confession in the form of software or firmware (firmware) including at least one
SFU software functional unit in the operating system (operating S4stem, OS) of electricity service maneuvering platform 100.
Memory 111 can be used for storing software program and unit, as in the embodiment of the present invention software testing device and
Program instruction/unit corresponding to method, processor 112 are stored in the power distribution network active forewarning in memory 111 by operation
Workform management device 200, the software program of method and unit, to perform various functions application and data processing, such as originally
The power distribution network active forewarning workform management method that inventive embodiments provide.Wherein, the memory 111 may be, but not limited to,
Random access memory (Random Access Memory, RAM), read-only memory (Read OnlyMemory, ROM), can compile
Journey read-only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable
Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable
Programmable Read-OnlyMemory, EEPROM) etc..Processor 112 and other possible components are to memory 111
Access can be carried out under the control of storage control.
The communication unit 113 is used to establish the electric service maneuvering platform 100 and other communications by the network
Communication connection between terminal, and for passing through the network transceiving data.
It should be understood that structure shown in FIG. 1 is only to illustrate, electric service maneuvering platform 100 may also include than in Fig. 1
Shown more either less components or with the configuration different from shown in Fig. 1.Each component shown in Fig. 1 may be used
Hardware, software, or its combination is realized.
First embodiment
An embodiment of the present invention provides a kind of power distribution network active forewarning workform management methods, and it is flat to be applied to electric service commander
Platform 100 for realizing to the active management and control of power distribution network, O&M, and realizes the real-time oversight to distribution problem.Referring to Fig. 2, figure
2 show a kind of flow chart of power distribution network active forewarning workform management method provided in an embodiment of the present invention.The power distribution network is actively
Early warning workform management method includes:
Step S201:Receive the distribution operating parameter of public system transmission.
Specifically, public system is for acquiring power dispatching data, and power dispatching data is transmitted to electric service maneuvering platform
100.The public system includes but are not limited to electrical power distribution automatization system, Energy Management System (EMS), power production management system
(PMS), power information acquisition system, marketing system etc..
Distribution operating parameter is used to indicate the operating condition of line related appearance in distribution, includes but are not limited to busbar electricity
Pressure, line load rate, electric current, public varying load rate, public change low-voltage and public affairs become overvoltage etc..
Step S202:Judge whether distribution operating parameter meets presetting condition, if so, thening follow the steps S203;
If not, thening follow the steps S201.
It should be noted that the concrete type according to distribution operating parameter, it is default to judge whether distribution operating parameter meets
The method of fixed condition includes but are not limited to following six kinds, respectively:
The first:When distribution operating parameter is busbar voltage, whether within a preset range busbar voltage is judged, specifically
Ground, judges whether busbar voltage is more than first threshold or is less than second threshold.It should be noted that under normal circumstances, busbar
Voltage should be 10KV;In a kind of preferred embodiment, first threshold 10.7KV, second threshold 10KV.
It should also be noted that, in other embodiments, first threshold and second threshold can be according to the reality of power distribution network
Parameter and the demand of user are modified.
Second:When distribution operating parameter is line load rate, judge whether line load rate is greater than or equal to first
Preset value and maintain the state time be more than the first preset time.
Line load rate is the ratio of line current and safe operation electric current.In a kind of preferred embodiment, first is pre-
If value is 100%, the first preset time is 1 hour, i.e., when line load rate is more than 100% and the duration is more than 1 small, then
Showing distribution network line, there are problems.
The third:When distribution operating parameter is electric current, judge whether current three-phase degree of unbalancedness is greater than or equal to second
Whether preset value, line load rate are greater than or equal to third preset value and maintain line load rate default more than or equal to third
Whether the time of the state of value is more than the second preset time.
It should be noted that current three-phase degree of unbalancedness is by Current calculation.Specifically,
Current three-phase degree of unbalancedness=(maximum phase current-minimum phase current)/maximum phase current * 100%
In a kind of preferred embodiment, the second preset value is 25%, and third preset value is 60%, and the second preset time is
2 hours.
4th kind:When distribution operating parameter is public varying load rate, judge whether public varying load rate is greater than or equal to the 4th
Preset value and maintain the state time whether be more than third preset time.
Wherein, the public active general power of varying load rate=three-phase/rated capacity * 100%.
In a kind of preferred embodiment, the 4th preset value is 100%, and third preset time is 2 hours.
5th kind:When distribution operating parameter is public change low-voltage, judge whether public change low-voltage is less than or equal to the 5th
Preset value and maintain the state time be more than the 4th preset time.
In a kind of preferred embodiment, the 5th preset value is 198V, and the 4th preset time is 1 hour.But it needs to illustrate
, in other embodiments, the 5th preset value can at any time change with current voltage, and specifically, the 5th preset value meets following
Formula:
5th preset value=(normal voltage-current voltage)/normal voltage * 90%
Wherein, normal voltage 220V.
6th kind:When distribution operating parameter is public change overvoltage, judge whether public change low-voltage is greater than or equal to the 6th
Preset value and maintain the state time be more than the 5th preset time.
In a kind of preferred embodiment, the 6th preset value is 247V.But it should be recognized that in other embodiments,
6th preset value can at any time change with current voltage, and specifically, the 6th preset value meets following formula:
6th preset value=(current voltage-normal voltage)/normal voltage * 112%
Wherein, normal voltage 220V.
Step S203:Generate active forewarning work order.
Specifically, when busbar voltage within a preset range when;It is preset when current three-phase degree of unbalancedness is greater than or equal to second
Value, line load rate are greater than or equal to third preset value and maintain line load rate more than or equal to the state of third preset value
When time is more than the second preset time;When public varying load rate is greater than or equal to the 4th preset value and the time of the state is maintained to be more than
When third preset time;It is preset when public change low-voltage is less than or equal to the 5th preset value and the time of the state is maintained to be more than the 4th
When the time;When public change overvoltage is greater than or equal to the 6th preset value and the time of the state is maintained to be more than five preset times,
Generate active forewarning work order.
It is to be appreciated that when distribution operating parameter meets any one above-mentioned condition, indicate that there are different for distribution circuit
Often, security risk, but circuit is not stopped transport also at this time, therefore active forewarning work order is generated, exist to remind in maintenance personal's circuit
Security risk is likely to cause stoppage in transit event if do not repaired.
Step S204:Active forewarning work order is sent to any one and the matched user terminal of active forewarning work order.
It should be noted that each user terminal is stored with the identity of the line teams and groups using the user terminal,
The identity shows the business of the line teams and groups.For example, a line teams and groups can be but be not limited only to processing active forewarning
Work order, active forewarning work order, active forewarning work order and work order etc. of taking the initiative in offering a hand.
Thus, the user terminal with the type matching of active forewarning work order refers to the identity mark stored in the user terminal
Know the type matching with active forewarning work order, i.e. the identity shows that a line teams and groups can handle active forewarning work order.
Step S205:According to receive user terminal transmission with the associated in-situ processing information of active forewarning work order when
Between and the distribution operating parameter that receives again monitoring is tracked to active forewarning work order.
In a kind of preferred embodiment, referring to Fig. 3, step S205 includes:
Sub-step S2051:Judge whether the time for receiving in-situ processing information is more than the second preset time, if so,
Then execute sub-step S2052;If it is not, then executing sub-step S2053.
By judging whether the time of in-situ processing information is more than the second preset time, electric service maneuvering platform 100 can
Learn whether a line teams and groups are handled active forewarning work order within the time limit, to realize that the tracking to active forewarning work order is supervised
Control.
Sub-step S2052:Generate the first prompt message.
When the time for receiving in-situ processing information being more than the second preset time, show that a line teams and groups are right not within the time limit
Active forewarning work order is handled, thus is generated the first prompt message pair line teams and groups and reminded.
Sub-step S2053:Judge whether the distribution operating parameter received again meets presetting condition, if so,
Then execute sub-step S2054;If it is not, then executing sub-step S2055.
When the time for receiving in-situ processing information being less than or equal to the second preset time, show that a line teams and groups exist
Active forewarning work order is handled in time limit, it is presetting to judge whether the distribution operating parameter received again meets at this time
Condition, to realize tracking to a line teams and groups handling result.
It should be noted that judging whether the distribution operating parameter received again meets the method for presetting condition such as
Described in step S202.In addition, whether the related data of judgement and last time generation active forewarning work order is this time only needed to meet presetting
Condition.
Sub-step S2054:Generate the second prompt message.
When the distribution fortune that the time for receiving in-situ processing information is less than or equal to the second preset time and receives again
When row parameter meets presetting condition, show that the handling result of a line teams and groups is undesirable, is asked there are still identical in circuit
Topic, generates the second prompt message at this time, to remind a line teams and groups to continue to handle active forewarning work order.
Sub-step S2055:Archive information is generated according to in-situ processing information and active forewarning work order.
When the distribution fortune that the time for receiving in-situ processing information is less than or equal to the second preset time and receives again
When row parameter is unsatisfactory for presetting condition, indicate to be solved the problem of including in the active forewarning work order, at this time foundation
In-situ processing information and active forewarning work order generate archive information, can be used for carrying out the operations such as performance appraisal to the line teams and groups.
Second embodiment
Referring to Fig. 4, Fig. 4 is a kind of power distribution network active forewarning workform management device that present pre-ferred embodiments provide
200 functional block diagram.It should be noted that the power distribution network active forewarning workform management device 200 that the present embodiment is provided,
Basic principle and the technique effect of generation are identical with above-described embodiment, and to briefly describe, the present embodiment part does not refer to place, can
With reference to corresponding contents in the above embodiments.The power distribution network active forewarning workform management device 200 includes data receipt unit
210, judging unit 220, work order generation unit 230, transmission unit 240 and tracing monitoring unit 250.
Wherein, data receipt unit 210 is used to receive the distribution operating parameter of public system transmission.
It is to be appreciated that in a kind of preferred embodiment, data receipt unit 210 can be used for executing step S201.
Judging unit 220 is for judging whether distribution operating parameter meets presetting condition.
Specifically, within a preset range whether judging unit 220 for judging busbar voltage;Whether judge line load rate
More than or equal to the first preset value and the time of the state is maintained to be more than the first preset time;Judging current three-phase degree of unbalancedness is
It is no to be greater than or equal to whether the second preset value, line load rate are greater than or equal to third preset value and maintain line load rate big
In or equal to third preset value state time whether be more than the second preset time;Judge whether public varying load rate is more than or waits
In the 4th preset value and maintain whether the time of the state is more than third preset time;Judge whether public change low-voltage is less than or waits
In the 5th preset value and the time of the state is maintained to be more than the 4th preset time;Judge public to become whether low-voltage is greater than or equal to the
Six preset values and maintain the state time be more than the 5th preset time..
It is to be appreciated that in a kind of preferred embodiment, judging unit 220 can be used for executing step S202.
Work order generation unit 230 is used for when distribution operating parameter meets presetting condition, generates active forewarning work order.
Specifically, when busbar voltage within a preset range when;It is preset when current three-phase degree of unbalancedness is greater than or equal to second
Value, line load rate are greater than or equal to third preset value and maintain line load rate more than or equal to the state of third preset value
When time is more than the second preset time;When public varying load rate is greater than or equal to the 4th preset value and the time of the state is maintained to be more than
When third preset time;It is preset when public change low-voltage is less than or equal to the 5th preset value and the time of the state is maintained to be more than the 4th
When the time;When public change overvoltage is greater than or equal to the 6th preset value and the time of the state is maintained to be more than five preset times,
Generate active forewarning work order.
It is to be appreciated that in a kind of preferred embodiment, work order generation unit 230 can be used for executing step S203.
Transmission unit 240 is used to send active forewarning work to any one and the matched user terminal of active forewarning work order
It is single.
It is to be appreciated that in a kind of preferred embodiment, transmission unit 240 can be used for executing step S204.
Tracing monitoring unit 250 be used for according to receive user terminal transmission with active forewarning work order it is associated scene at
The distribution operating parameter managed the time of information and received again is tracked monitoring to active forewarning work order.
Specifically, tracing monitoring unit 250 is used to be more than the second preset time when the time for receiving in-situ processing information
When, generate the first prompt message;When the time for receiving in-situ processing information is less than or equal to the second preset time and connects again
When the power dispatching data received meets presetting condition, the second prompt message is generated and when receiving in-situ processing information
Between be less than or equal to the second preset time and when the power dispatching data that receives again is unsatisfactory for presetting condition, at scene
It manages information and active forewarning work order generates archive information.
It is to be appreciated that in a kind of preferred embodiment, tracing monitoring unit 250 can be used for executing step S205, son
Step S2051, sub-step S2052, sub-step S2053, sub-step S2054 and sub-step S2055.
In conclusion power distribution network active forewarning workform management method and device provided in an embodiment of the present invention, is receiving
Distribution operating parameter generate active forewarning work order when meeting presetting condition, and to any one and the active forewarning work order
Type matching user terminal send active forewarning work order so that user terminal send with the associated scene of active forewarning work order
Information is handled, and according to the distribution operating parameter for receiving the time of in-situ processing information and receiving again to active forewarning
Work order is tracked monitoring;To by generating active forewarning work order, be tracked to the performance to active forewarning work order
Monitoring, realizes to data exception work order closed loop management and control, avoids the reprocessing of work order, improve treatment effeciency, saves
Human cost enhances distribution network systems data validity, improves the stability of power distribution network operation level, it is reliable to enhance electricity consumption
Property it is horizontal.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exist
Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing
It is further defined and is explained.
Claims (10)
1. a kind of power distribution network active forewarning workform management method, which is characterized in that it is applied to an electric service maneuvering platform, it is described
Electric service maneuvering platform is connect at least one user terminal communication, the power distribution network active forewarning workform management method packet
It includes:
Receive the distribution operating parameter of public system transmission;
Active forewarning work order is generated when the distribution operating parameter meets presetting condition;
Active forewarning work order is sent to any one and the matched user terminal of the active forewarning work order;
According to receive it is that the user terminal sends with the associated in-situ processing information of the active forewarning work order time with
And the distribution operating parameter received again is tracked monitoring to the active forewarning work order.
2. power distribution network active forewarning workform management method according to claim 1, which is characterized in that described to join with network operation
Number includes busbar voltage, described the step of active forewarning work order is generated when the distribution operating parameter meets presetting condition
Including:
When the busbar voltage within a preset range when, generate the generation active forewarning work order.
3. power distribution network active forewarning workform management method according to claim 1, which is characterized in that described to join with network operation
Number includes line load rate, the step that active forewarning work order is generated when the distribution operating parameter meets presetting condition
Suddenly include:
When the line load rate is greater than or equal to the first preset value and the time of the state is maintained to be more than the first preset time
When, generate the generation active forewarning work order.
4. power distribution network active forewarning workform management method according to claim 3, which is characterized in that described to join with network operation
Number includes electric current, and described the step of active forewarning work order is generated when the distribution operating parameter meets presetting condition wraps
It includes:
According to the Current calculation current three-phase degree of unbalancedness;
When the current three-phase degree of unbalancedness is pre- more than or equal to third more than or equal to the second preset value, the line load rate
It is raw if value and when the time for the state that the line load rate is greater than or equal to third preset value being maintained to be more than the second preset time
At the generation active forewarning work order.
5. power distribution network active forewarning workform management method according to claim 1, which is characterized in that described to join with network operation
Number includes public varying load rate, the step that active forewarning work order is generated when the distribution operating parameter meets presetting condition
Suddenly include:
When the public varying load rate is greater than or equal to the 4th preset value and the time of the state is maintained to be more than third preset time
When, generate the generation active forewarning work order.
6. power distribution network active forewarning workform management method according to claim 1, which is characterized in that described to join with network operation
Number includes public change low-voltage, the step that active forewarning work order is generated when the distribution operating parameter meets presetting condition
Suddenly include:
When the public low-voltage that becomes is less than or equal to the time of the 5th preset value and the maintenance state more than the 4th preset time
When, generate the generation active forewarning work order.
7. power distribution network active forewarning workform management method according to claim 1, which is characterized in that described to join with network operation
Number includes public change overvoltage, the step that active forewarning work order is generated when the distribution operating parameter meets presetting condition
Suddenly include:
When the public overvoltage that becomes is greater than or equal to the time of the 6th preset value and the maintenance state more than the 5th preset time
When, generate the generation active forewarning work order.
8. the power distribution network active forewarning workform management method according to claim 1-7 any one, which is characterized in that described
According to receive it is that the user terminal sends with the associated in-situ processing information of the active forewarning work order time and again
The step of distribution operating parameter newly received is tracked monitoring to the active forewarning work order include:
When the time for receiving in-situ processing information is more than six preset times, the first prompt message is generated;
When the time for receiving in-situ processing information being less than or equal to six preset times, received again according to described in
Distribution operating parameter monitoring is tracked to the active forewarning work order.
9. power distribution network active forewarning workform management method according to claim 8, which is characterized in that the foundation connects again
The step of distribution operating parameter received is tracked monitoring to the active forewarning work order include:
When the time for receiving in-situ processing information be less than or equal to the 6th preset time and it is described receive again match
When network operation parameter meets the presetting condition, the second prompt message is generated;
When the time for receiving in-situ processing information be less than or equal to the 6th preset time and it is described receive again match
When network operation parameter is unsatisfactory for the presetting condition, generated according to the in-situ processing information and the active forewarning work order
Archive information.
10. a kind of power distribution network active forewarning workform management device, which is characterized in that be applied to an electric service maneuvering platform, institute
It states electric service maneuvering platform to connect at least one user terminal communication, the power distribution network active forewarning workform management device packet
It includes:
Data receipt unit, the distribution operating parameter for receiving public system transmission;
Work order generation unit, for generating active forewarning work order when the distribution operating parameter meets presetting condition;
Transmission unit, for sending active forewarning work to any one and the matched user terminal of the active forewarning work order
It is single;
Tracing monitoring unit, for sending with the associated scene of active forewarning work order according to the user terminal is received
The distribution operating parameter for handling the time of information and receiving again is tracked monitoring to the active forewarning work order.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810061789.XA CN108306286A (en) | 2018-01-23 | 2018-01-23 | A kind of power distribution network active forewarning workform management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810061789.XA CN108306286A (en) | 2018-01-23 | 2018-01-23 | A kind of power distribution network active forewarning workform management method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108306286A true CN108306286A (en) | 2018-07-20 |
Family
ID=62866362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810061789.XA Pending CN108306286A (en) | 2018-01-23 | 2018-01-23 | A kind of power distribution network active forewarning workform management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108306286A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109583790A (en) * | 2018-12-21 | 2019-04-05 | 广东电网有限责任公司 | Power distribution network active O&M method and system based on real-time monitoring |
CN110474420A (en) * | 2019-07-22 | 2019-11-19 | 漳州科华技术有限责任公司 | Control method, control device and the controlling terminal of multi-standard uninterruptible power supply |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104914837A (en) * | 2015-05-26 | 2015-09-16 | 国家电网公司 | Intelligent dispatching visualization early warning system |
CN106875114A (en) * | 2017-02-10 | 2017-06-20 | 国家电网公司 | The SMS platform optimization system and method for distribution repairing maneuvering platform |
-
2018
- 2018-01-23 CN CN201810061789.XA patent/CN108306286A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104914837A (en) * | 2015-05-26 | 2015-09-16 | 国家电网公司 | Intelligent dispatching visualization early warning system |
CN106875114A (en) * | 2017-02-10 | 2017-06-20 | 国家电网公司 | The SMS platform optimization system and method for distribution repairing maneuvering platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109583790A (en) * | 2018-12-21 | 2019-04-05 | 广东电网有限责任公司 | Power distribution network active O&M method and system based on real-time monitoring |
CN110474420A (en) * | 2019-07-22 | 2019-11-19 | 漳州科华技术有限责任公司 | Control method, control device and the controlling terminal of multi-standard uninterruptible power supply |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108229841A (en) | A kind of data exception processing method and processing device | |
CN108320086A (en) | A kind of power distribution network risk management method and device | |
CN111585352B (en) | Power monitoring system, equipment and readable storage medium based on PMS2.0 system | |
CN109521702A (en) | A kind of method and server monitoring dcs operating status | |
CN108306286A (en) | A kind of power distribution network active forewarning workform management method and device | |
CN106787182A (en) | Distribution fault processing method and system | |
Rafferty et al. | Frequency support using multi‐terminal HVDC systems based on DC voltage manipulation | |
CN111835083B (en) | Power supply information monitoring system, method and device, computer equipment and storage medium | |
CN108460517A (en) | A kind of power distribution network management-control method and device | |
CN108287290A (en) | A kind of power grid cascading fault pre-alarming analysis system based on the operation of big regional power grid | |
CN115085371A (en) | Intelligent power distribution network engineering auxiliary management system | |
CN103854230A (en) | Electric power security risk management and control system and method | |
CN109193947A (en) | Power distribution room monitoring method, device, server and computer readable storage medium | |
CN105354769A (en) | Data processing method and device used for power distribution network equipment | |
CN104836329A (en) | Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation | |
US9379532B2 (en) | Protecting electronic devices from electrical supply disturbances | |
CN115115133B (en) | Parallel operation control method and device of generator and computer program product | |
CN108460468A (en) | It is a kind of public to become failure event management method and device | |
CN109450092A (en) | Power distribution network overload early-warning monitoring system | |
CN112787863B (en) | Remote operation and maintenance secure communication method and device and computer readable storage medium | |
CN108879954A (en) | Controller switching equipment management method, device and power distribution server | |
CN110738392B (en) | Single-terminal multi-user wind control modeling method based on Bayesian network model | |
Ma et al. | An initial study on computational intelligence for smart grid | |
Cho et al. | Distributed and autonomous control system for voltage regulation in low-voltage DC distribution systems | |
CN103869216A (en) | Fault processing method and fault processing device for power grid system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180720 |