- CN108304569A CN108304569A CN201810149825.8A CN201810149825A CN108304569A CN 108304569 A CN108304569 A CN 108304569A CN 201810149825 A CN201810149825 A CN 201810149825A CN 108304569 A CN108304569 A CN 108304569A
- Authority
- CN
- China
- Prior art keywords
- test data
- data
- version
- database table
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/22—Indexing; Data structures therefor; Storage structures
- G06F16/2282—Tablespace storage structures; Management thereof
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Software Systems (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Debugging And Monitoring (AREA)
Abstract
The present invention provides a kind of test data accumulation methods and device, this method to include:In the case where system testing process is not opened, test data is extracted from test data pond, and pre-processed to test data according to default test order;In the case where system testing process executes the pretreated test data of completion, reversible data and new test data are chosen from the test data after execution;Recovery operation carried out to reversible data, and according to after recovery reversible data and new test data update test data pond.Based on method disclosed by the invention, it can ensure that business operation can be executed correctly under newest system testing environment always, realize the continuous accumulation of test data, gradually establish the test data pond of a high quality, to avoid setup test data again, reduces human cost and time cost, further solves the problems, such as financial institution's test data not easy care.
Description
Technical field
The present invention relates to system testing technical fields, more specifically to a kind of test data accumulation method and device.
Background technology
As economic situation continues to develop, financial field business is increasingly complicated and changeable, and large scale business bank can not be compared with it
Quasi- complicated business occupy the first.Business bank is related to numerous analysis classes application systems, and the test quality of such system by force according to
Rely the quality in test data.
At this stage, after test data is performed, the business scenario that the possible test data " will be expressed " has lost
The meaning of script, leads in system testing environment that there are a large amount of dirty datas or the invalid datas having no value for use.Therefore, it is being
After unified test tries, tester is the system testing environment prepared next time, can directly remove all test datas, this
It will result in human cost and the significant wastage of time cost.
Invention content
In view of this, a kind of test data accumulation method of present invention offer and device, to solve after system testing,
Tester is the system testing environment prepared next time, the problem of directly removing all test datas.Technical solution
It is as follows:
A kind of test data accumulation method, including:
In the case where system testing process is not opened, test data is extracted from test data pond, and according to default survey
Examination rule pre-processes the test data;
In the case where the system testing process executes the pretreated test data of completion, from the institute after execution
It states and chooses reversible data and new test data in test data;
To the reversible data carry out recovery operation, and according to after recovery the reversible data and the new test data
Update the test data pond.
Preferably, described that the test data is pre-processed according to default test order, including:
Judge that the system version of the system testing process whether there is first database table structure to be changed;
If there are the first database table structures for the system version, according to the first database table structure to described
The structure of test data changes operation;
Judge change structure after the test data whether and meanwhile meet pre-set business scene coverage and pre-set business
The scene order of magnitude;
If it is not, obtaining new test data.
Preferably, further include:
During the system testing process executes the pretreated test data, the system testing is judged
Whether the system version of process is system mend version;
If the system version is the system mend version, judge the system mend version with the presence or absence of to be changed
Second database table structure;
If there are second database table structures for the system mend version, according to second database table structure pair
The structure of the test data changes operation.
Preferably, it is described the test data is pre-processed according to default test order after, further include:
Generate the corresponding test data baseline of the pretreated test data.
A kind of test data accumulation device, including:Preprocessing module chooses module and recovery module;
The preprocessing module, in the case where system testing process is not opened, extracting and surveying from test data pond
Data are tried, and the test data is pre-processed according to default test order;
The selection module, for executing the feelings for completing the pretreated test data in the system testing process
Under condition, reversible data and new test data are chosen from the test data after execution;
The recovery module, for carrying out recovery operation to the reversible data, and according to can inverse number described in after recovery
The test data pond is updated according to the new test data.
Preferably, the preprocessing module, is specifically used for:
Judge that the system version of the system testing process whether there is first database table structure to be changed;If described
There are the first database table structures for system version, according to the first database table structure to the structure of the test data
Change operation;Judge change structure after the test data whether simultaneously meet pre-set business scene coverage and preset
The business scenario order of magnitude;If it is not, obtaining new test data.
Preferably, further include:Reprocess module;
The reprocessing module, the process for executing the pretreated test data in the system testing process
In, judge whether the system version of the system testing process is system mend version;If the system version is the system
Patch release judges that the system mend version whether there is the second database table structure to be changed;If the system mend
There are second database table structures for version, are carried out to the structure of the test data according to second database table structure
Change operation.
Preferably, further include:Baseline generation module;
The baseline generation module, for generating the corresponding test data baseline of the pretreated test data.
Compared to the prior art, what the present invention realized has the beneficial effect that:
A kind of test data accumulation method provided by the invention and device, this method are based oneself upon for system testing ring above
Border, by pre-processing the test data in test data pond, to ensure that business operation always can be in newest system testing ring
It is executed correctly under border, realizes the continuous accumulation of test data, the test data pond of a high quality is gradually established, to avoid
Again setup test data reduce human cost and time cost, further solve financial institution's test data not easy care
Problem.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
Fig. 1 is the method flow diagram of test data accumulation method provided in an embodiment of the present invention;
Fig. 2 is the Part Methods flow chart of test data accumulation method provided in an embodiment of the present invention;
Fig. 3 is another part method flow diagram of test data accumulation method provided in an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of test data accumulation device provided in an embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
System testing:It is the test carried out for entire product systems, it is therefore an objective to which verifying system, whether meet demand is regular
Definition, find out and be not inconsistent with requirement rules or contradictory place therewith, it is more perfect to deduct a percentage
Baseline:The one or more configuration items of description and the related entities for constituting configuration item, generally in project or product
The end point of various stages is formed, and it is that one or more software configuration items are recognized by verification and validation to form mark
Can, provide stable basis for lasting evaluation configuration item.
Version:One group of configuration item is at a time or the set of a certain specified point.
The embodiment of the present invention provides a kind of test data accumulation method, and the method flow diagram of this method is as shown in Figure 1, include
Following steps:
S10 extracts test data, and according to pre- in the case where system testing process is not opened from test data pond
If test order pre-processes test data;
In the present embodiment, it can determine system testing not for characterizing the flag bit of system testing process progress by detecting
The time point opened, have turned on and terminated, for example, when system testing is not opened, flag bit 000, and the mark having turned on
Position 001, the flag bit 111 of end.
When the flag bit for detecting system testing process is 001, i.e., extract test data from test data pond.Herein
In the process, it is extracted if first time, then the test data extracted is to pre-set original test data.
Specifically, multiple operation windows can be all arranged in business bank according to actual conditions every year, each operation window can
There are a large amount of application system, a large amount of tester that can also participate in system testing.In view of tester passes through end-to-end side
Formula setup test data, essence are exactly to simulate true business scenario.Therefore, to a certain extent it is considered that original survey
It is " true creation data " to try data, and tester has reached hundreds of people, the required test data quantity prepared
Grade disclosure satisfy that test Minimum requirements substantially, while numerous application systems participates in test, the original test data being prepared
Involved business scenario coverage can also reach certain requirement, therefore, can be directly using original test data as test data
Test data in pond.
If not in addition, extracting for the first time, then the test data extracted is the result of last data accumulation.
Further, after extracting test data, to ensure that business operation always can be in newest system testing ring
It is executed correctly under border, needs to pre-process test data process according to prediction test order, specifically to the structure of test data
It is handled with quantity.
It should be noted that before being pre-processed to test data process, it, can to realize " orderly " arrangement of test data
Angle based on business formulates test data specification rule, such as customer name Naming conventions, using the rule to test data
Carry out specification handles.
It should also be noted that, to identify pretreated test data, corresponding test data baseline is produced, such as
Test data baseline V1.0, test data baseline V2.0 distinguish the test data for executing different operation to realize.
During specific implementation, the process " test data pre-processed according to default test order " in step S10,
It can specifically use following steps, method flow diagram as shown in Figure 2:
S101 judges that the system version of system testing process whether there is first database table structure to be changed;If being
Version unite there are first database table structure, thens follow the steps S102;
In the present embodiment, by checking that system version whether there is first database table structure to be changed, it is to determine
Whether system edition upgrading is related to database table structure change, if being related to, needs to test according to first database table structure updating
The structure of data, conversely, not executing any operation then.
S102 changes operation according to first database table structure to the structure of test data;
During executing step S102, the structures of changed test data include at least it is a kind of in following several situations or
It is a variety of:
(1) database table newly increases certain field;
(2) database table two of which field A and B merges into a newer field C;
(3) database table removes certain field;
(4) database table field upgrading:For example, ID card No. upgrades to 18 from 15;
(5) database table field data types change:For example, being changed to string types from char types;
S103, judge change structure after test data whether and meanwhile meet pre-set business scene coverage and pre-set business
The scene order of magnitude;If it is not, thening follow the steps S104;
S104 obtains new test data.
During executing step S104, change structure test data be unsatisfactory for pre-set business scene coverage or
In the case of person's pre-set business scene order of magnitude, prompt message is produced, to remind tester according to setup test data
Specification criterion prepare new test data.
S20, in the case where system testing process executes the pretreated test data of completion, from the test number after execution
According to middle selection reversible data and new test data;
During executing step S20, when the flag bit for detecting system testing process is 111, i.e., after execution
Test data in choose generated new test data in recoverable reversible data and implementation procedure.Certainly, it is executing
Be also possible to generate in the process it is non-response can not reverse data, at this point, can delete reverse data or can not execute any operation.
Since the transaction data of financial field has its specific attribute, executes different operation according to different business scene and exist
Three kinds of situations below:
(1) increase several transaction records while reversible data is reversed in system testing environment, lifted with account balance
Example, scene description are as follows:
To restore test data, the positive transaction of punching is executed, then test data variation is as follows:
(2) increase several transaction records while reversible data is reversed in system testing environment, lifted with account balance
Example, scene description are as follows:
To restore test data, money transfer transactions are executed again, then test data variation is as follows:
(3) transaction data that can not be reversed closes the citing of family state with account, and scene description is as follows:
Under this scene, which kind of transaction no matter is executed, the state of account A can not all return back to normal condition again, therefore, for not
Reversible data.
First two situation depending on specific business scenario, test purpose difference and take different recovery measures;For most
The irreversible data of latter can not then be restored, and this kind of test data belongs to disposable test data, be similar to " consumption
Product " can not be used again once being used.
S30, to reversible data carry out recovery operation, and according to after recovery reversible data and new test data update test
Data pool;
In the present embodiment, recovery operation, such as above-mentioned institute can be executed according to business scenario for selected reversible data
What is referred to rushes positive transaction, i.e. the positive operation of punching or money transfer transactions, i.e. transfer operation.
In some other embodiment, to ensure that test data timely updates during system testing, shown in Fig. 1
Further include following steps on the basis of test data accumulation method, Part Methods flow chart is as shown in Figure 3:
S40, during system testing process executes pretreated test data, judge system testing process is
Whether version of uniting is system mend version;If system version is system mend version, S50 is thened follow the steps;
S50 judges that system mend version whether there is the second database table structure to be changed;If system mend version is deposited
In the second database table structure, S60 is thened follow the steps;
In the present embodiment, by checking that system mend version whether there is the second database table structure to be changed, come true
Determine whether system mend edition upgrading is related to database table structure change, if being related to, needs according to the second database table structure
The structure of upgrading test data, conversely, not executing any operation then.
S60 changes operation according to the second database table structure to the structure of test data.
During executing step S60, the structures of changed test data include at least it is a kind of in following several situations or
It is a variety of:
(1) database table newly increases certain field;
(2) database table two of which field A and B merges into a newer field C;
(3) database table removes certain field;
(4) database table field upgrading:For example, ID card No. upgrades to 18 from 15;
(5) database table field data types change:For example, being changed to string types from char types;
Above step S101~step S104 is only in the embodiment of the present application step S10 " according to default test order pair
Test data is pre-processed " process a kind of preferred realization method, the specific implementation in relation to this process can basis
The demand of oneself is arbitrarily arranged, and does not limit herein.
Test data accumulation method provided in an embodiment of the present invention is based oneself upon for system testing environment, is surveyed by pre-processing
The test data in data pool is tried, to ensure that business operation can be executed correctly under newest system testing environment always,
The continuous accumulation for realizing test data, gradually establishes the test data pond of a high quality, to avoid setup test number again
According to reduction human cost and time cost further solve the problems, such as financial institution's test data not easy care.
Based on the test data accumulation method that above-described embodiment provides, then corresponding provide executes above-mentioned survey to the embodiment of the present invention
The device of data accumulation method is tried, the structural schematic diagram of the device is as shown in figure 4, include:Preprocessing module 10 chooses module 20
With recovery module 30;
Preprocessing module 10, in the case where system testing process is not opened, test to be extracted from test data pond
Data, and test data is pre-processed according to default test order;
Choose module 20, for system testing process execute complete pretreated test data in the case of, from holding
Reversible data and new test data are chosen in test data after row;
Recovery module 30 for carrying out recovery operation to reversible data, and is tested according to the reversible data after recovery with new
Data update test data pond.
In some other embodiment, preprocessing module is specifically used for:
Judge that the system version of system testing process whether there is first database table structure to be changed;If system version
There are first database table structures, and operation is changed to the structure of test data according to first database table structure;Judge to become
Whether the test data after more structure meets pre-set business scene coverage and the pre-set business scene order of magnitude simultaneously;If it is not, obtaining
Take new test data.
In some other embodiment, to ensure that test data timely updates during system testing, shown in Fig. 4
Further include following module on the basis of test data accumulation device:
Module is reprocessed, for during system testing process executes pretreated test data, judging system
Whether the system version of test process is system mend version;If system version is system mend version, system mend version is judged
This whether there is the second database table structure to be changed;If there are the second database table structures for system mend version, according to
Two database table structures change operation to the structure of test data.
In some other embodiment, to identify pretreated test data, dress is accumulated in the test data shown in Fig. 4
Further include following module on the basis of setting:
Baseline generation module, for generating the corresponding test data baseline of pretreated test data.
Test data provided in an embodiment of the present invention accumulates device, bases oneself upon for system testing environment, is tested by pre-processing
Test data in data pool, it is real to ensure that business operation can be executed correctly under newest system testing environment always
The continuous accumulation of existing test data, gradually establishes the test data pond of a high quality, to avoid setup test data again,
It reduces human cost and time cost, further solve the problems, such as financial institution's test data not easy care.
A kind of test data accumulation method provided by the present invention and device are described in detail above, answered herein
With specific case, principle and implementation of the present invention are described, and the explanation of above example is only intended to help to manage
Solve the method and its core concept of the present invention;Meanwhile for those of ordinary skill in the art, according to the thought of the present invention,
There will be changes in specific implementation mode and application range, in conclusion the content of the present specification should not be construed as to this hair
Bright limitation.
It should be noted that each embodiment in this specification is described in a progressive manner, each embodiment weight
Point explanation is all difference from other examples, and the same or similar parts between the embodiments can be referred to each other.
For the device disclosed in the embodiment, since it is corresponded to the methods disclosed in the examples, so fairly simple, the phase of description
Place is closed referring to method part illustration.
It should also be noted that, herein, relational terms such as first and second and the like are used merely to one
Entity or operation are distinguished with another entity or operation, without necessarily requiring or implying between these entities or operation
There are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to contain
Lid non-exclusive inclusion, so that the element that the process, method, article or equipment including a series of elements is intrinsic,
Further include either the element intrinsic for these process, method, article or equipments.In the absence of more restrictions,
The element limited by sentence "including a ...", it is not excluded that in the process, method, article or equipment for including the element
In there is also other identical elements.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest range caused.
Claims (8)
1. a kind of test data accumulation method, which is characterized in that including:
In the case where system testing process is not opened, test data is extracted from test data pond, and advise according to default test
Then the test data is pre-processed;
In the case where the system testing process executes the pretreated test data of completion, from the survey after execution
It tries to choose reversible data and new test data in data;
Recovery operation carried out to the reversible data, and according to after recovery the reversible data and the new test data update
The test data pond.
2. according to the method described in claim 1, it is characterized in that, it is described according to default test order to the test data into
Row pretreatment, including:
Judge that the system version of the system testing process whether there is first database table structure to be changed;
If there are the first database table structures for the system version, according to the first database table structure to the test
The structure of data changes operation;
Judge change structure after the test data whether and meanwhile meet pre-set business scene coverage and pre-set business scene
The order of magnitude;
If it is not, obtaining new test data.
3. according to the method described in claim 1, it is characterized in that, further including:
During the system testing process executes the pretreated test data, the system testing process is judged
System version whether be system mend version;
If the system version is the system mend version, judge that the system mend version whether there is to be changed second
Database table structure;
If there are second database table structures for the system mend version, according to second database table structure to described
The structure of test data changes operation.
4. according to the method described in claim 1, it is characterized in that, it is described according to default test order to the test data into
After row pretreatment, further include:
Generate the corresponding test data baseline of the pretreated test data.
5. a kind of test data accumulation device, which is characterized in that including:Preprocessing module chooses module and recovery module;
The preprocessing module, in the case where system testing process is not opened, test number to be extracted from test data pond
According to, and the test data is pre-processed according to default test order;
The selection module, for executing the case where completing the pretreated test data in the system testing process
Under, reversible data and new test data are chosen from the test data after execution;
The recovery module, for the reversible data carry out recovery operation, and according to after recovery the reversible data and
The new test data updates the test data pond.
6. device according to claim 5, which is characterized in that the preprocessing module is specifically used for:
Judge that the system version of the system testing process whether there is first database table structure to be changed;If the system
There are the first database table structures for version, are carried out to the structure of the test data according to the first database table structure
Change operation;Judge change structure after the test data whether and meanwhile meet pre-set business scene coverage and pre-set business
The scene order of magnitude;If it is not, obtaining new test data.
7. device according to claim 5, which is characterized in that further include:Reprocess module;
The reprocessing module is used for during the system testing process executes the pretreated test data,
Judge whether the system version of the system testing process is system mend version;If the system version is the system mend
Version judges that the system mend version whether there is the second database table structure to be changed;If the system mend version
There are second database table structures, are changed to the structure of the test data according to second database table structure
Operation.
8. device according to claim 5, which is characterized in that further include:Baseline generation module;
The baseline generation module, for generating the corresponding test data baseline of the pretreated test data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810149825.8A CN108304569B (en) | 2018-02-13 | 2018-02-13 | Test data accumulation method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810149825.8A CN108304569B (en) | 2018-02-13 | 2018-02-13 | Test data accumulation method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108304569A true CN108304569A (en) | 2018-07-20 |
CN108304569B CN108304569B (en) | 2021-10-29 |
Family
ID=62865417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810149825.8A Active CN108304569B (en) | 2018-02-13 | 2018-02-13 | Test data accumulation method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108304569B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109240926A (en) * | 2018-09-06 | 2019-01-18 | 郑州云海信息技术有限公司 | A kind of software compatibility system safety testing device and method |
CN111858387A (en) * | 2020-08-05 | 2020-10-30 | 中国工商银行股份有限公司 | Data preparation method and device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101063950A (en) * | 2006-04-27 | 2007-10-31 | 宇达电脑(上海)有限公司 | Testing and updating system and method |
CN102567204A (en) * | 2011-12-28 | 2012-07-11 | 云海创想信息技术(无锡)有限公司 | Method for managing automatic testing data |
CN103699479A (en) * | 2012-09-27 | 2014-04-02 | 百度在线网络技术(北京)有限公司 | Sandbox testing environment constitution system and sandbox testing environment constitution method |
US20160140032A1 (en) * | 2014-11-19 | 2016-05-19 | International Business Machines Corporation | Correlating test results variations with business requirements |
CN105975390A (en) * | 2016-04-28 | 2016-09-28 | 浪潮电子信息产业股份有限公司 | Test data recovery method based on complex test scene |
CN106649082A (en) * | 2016-09-05 | 2017-05-10 | 中国银行股份有限公司 | Test data generation method and apparatus |
CN107276842A (en) * | 2017-05-10 | 2017-10-20 | 北京金山安全软件有限公司 | Interface test method and device and electronic equipment |
-
2018
- 2018-02-13 CN CN201810149825.8A patent/CN108304569B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101063950A (en) * | 2006-04-27 | 2007-10-31 | 宇达电脑(上海)有限公司 | Testing and updating system and method |
CN102567204A (en) * | 2011-12-28 | 2012-07-11 | 云海创想信息技术(无锡)有限公司 | Method for managing automatic testing data |
CN103699479A (en) * | 2012-09-27 | 2014-04-02 | 百度在线网络技术(北京)有限公司 | Sandbox testing environment constitution system and sandbox testing environment constitution method |
US20160140032A1 (en) * | 2014-11-19 | 2016-05-19 | International Business Machines Corporation | Correlating test results variations with business requirements |
CN105975390A (en) * | 2016-04-28 | 2016-09-28 | 浪潮电子信息产业股份有限公司 | Test data recovery method based on complex test scene |
CN106649082A (en) * | 2016-09-05 | 2017-05-10 | 中国银行股份有限公司 | Test data generation method and apparatus |
CN107276842A (en) * | 2017-05-10 | 2017-10-20 | 北京金山安全软件有限公司 | Interface test method and device and electronic equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109240926A (en) * | 2018-09-06 | 2019-01-18 | 郑州云海信息技术有限公司 | A kind of software compatibility system safety testing device and method |
CN111858387A (en) * | 2020-08-05 | 2020-10-30 | 中国工商银行股份有限公司 | Data preparation method and device |
CN111858387B (en) * | 2020-08-05 | 2023-08-15 | 中国工商银行股份有限公司 | Data preparation method and device |
Also Published As
Publication number | Publication date |
---|---|
CN108304569B (en) | 2021-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ter Hofstede et al. | YAWL: yet another workflow language | |
CN103345487B (en) | A kind of multi-platform between the method and system of consistency verification of data | |
CN106408410A (en) | Automatic account checking method and device | |
US9098630B2 (en) | Data selection | |
CN109615015A (en) | A kind of data preprocessing method based on block chain intelligence contract and machine learning | |
van der Aalst et al. | YAWL: Yet another workflow language (revised version) | |
US8781869B2 (en) | Determining estimation variance associated with project planning | |
CN108304569A (en) | A kind of test data accumulation method and device | |
CN104281523B (en) | A kind of demand Testability Analysis method and system | |
CN113538137A (en) | Capital flow monitoring method and device based on double-spectrum fusion calculation | |
CN111680023B (en) | Migration data checking method and device | |
CN110362481A (en) | Automatic test approach and terminal device | |
US20170032707A1 (en) | Method for determining a fruition score in relation to a poverty alleviation program | |
CN107038607A (en) | A kind of pricing method and system | |
CN110262961A (en) | Test method, device, storage medium and the terminal device of Workflow Management System | |
JP2003281326A (en) | Method and program of skill analysis | |
CN116452007B (en) | Enterprise tax compliance risk assessment method based on capsule network | |
CN111932310A (en) | Method and device for mining potential public customers of bank products | |
Kicsi et al. | Information retrieval based feature analysis for product line adoption in 4gl systems | |
CN109508203A (en) | Version consistency determines method, apparatus and system | |
CN109902196A (en) | A kind of trademark class recommended method, device, computer equipment and storage medium | |
CN112419052B (en) | Transaction testing method, device, electronic equipment and readable storage medium | |
CN114356781A (en) | Software function testing method and device | |
CN109558153A (en) | Version consistency determines method, apparatus and system | |
CN105760406B (en) | Method for extracting characteristic in data mining technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |