CN108301506A - A kind of square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method - Google Patents

A kind of square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method Download PDF

Info

Publication number
CN108301506A
CN108301506A CN201711456092.4A CN201711456092A CN108301506A CN 108301506 A CN108301506 A CN 108301506A CN 201711456092 A CN201711456092 A CN 201711456092A CN 108301506 A CN108301506 A CN 108301506A
Authority
CN
China
Prior art keywords
steel plate
surface steel
web
top surface
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711456092.4A
Other languages
Chinese (zh)
Other versions
CN108301506B (en
Inventor
安百平
郭玉顺
冯尚攀
丁晓
赵新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianyuan Construction Group Co Ltd
Veterans Shandong Construction Group Co Ltd
Original Assignee
Tianyuan Construction Group Co Ltd
Shandong Hongda Real Estate Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianyuan Construction Group Co Ltd, Shandong Hongda Real Estate Co Ltd filed Critical Tianyuan Construction Group Co Ltd
Priority to CN201711456092.4A priority Critical patent/CN108301506B/en
Publication of CN108301506A publication Critical patent/CN108301506A/en
Application granted granted Critical
Publication of CN108301506B publication Critical patent/CN108301506B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material

Abstract

The present invention relates to a kind of square tubular column beams of concrete bracket Joint's connection fabrication and its construction methods, including:Top surface steel plate, bottom surface steel plate, middle pectoral plate, left web, right web and reinforced bar sleeve, the forward edge of the left web and right web is equipped with groove, convenient for binding node stirrup, by being welded to connect between top surface steel plate, bottom surface steel plate, middle pectoral plate, left web, right web and reinforced bar sleeve.The purpose of the present invention is to provide a kind of square tubular column beams of concrete bracket Joint's connection fabrication and its construction methods, to solve the problems, such as that existing construction complexity, poor reliability, difficulty of construction are big between steel column and beams of concrete in current architecture configuration, the vertical muscle for effectively preventing beams of concrete crosses damage of the steel column section to square tubular column, the invention joint structure is simple, convenient for construction, connection is reliable, not only can guarantee quality but also can substantially shorten the construction period, and reduces construction cost.

Description

A kind of square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method
Technical field
The present invention relates to building structure bean column node technical fields, more particularly to a kind of square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method.
Background technology
In building structure field, part megastore, hotel and exhibition center use steel construction, and underground garage level by It is then generally deposited between the steel column and beams of concrete of agent structure in current industry using reinforced concrete structure in power system Big in connecting structure complexity, poor reliability, difficulty of construction, quality is difficult to ensure and the problem of long construction period.
In view of the foregoing, there is an urgent need for a kind of new square tubular column-beams of concrete bracket Joint's connection fabrications, to solve to work as front-axle beam The problems such as existing construction of Column border node connection is complicated, and difficulty of construction is greatly and the period is long, to simplify construction method, accelerate to construct into Degree.
Invention content
The purpose of the present invention is to provide a kind of square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method, Generally existing connecting structure complexity, poor reliability, construction between square tubular column and beams of concrete in current industry can effectively be solved The big problem of difficulty, simplifies joint structure and construction method, not only can guarantee construction quality but also can accelerate construction progress, shortening is built If the period.
Technical solution is used by the present invention realizes its function:A kind of square tubular column-beams of concrete bracket node connection structure It makes, including:Top surface steel plate, bottom surface steel plate, middle pectoral plate, left web, right web and reinforced bar sleeve, the left web It is equipped with groove with the forward edge of right web, convenient for binding node stirrup.
Further, the top surface steel plate is located at the top of structure, and bottom surface steel plate is located at the lower part of structure, top surface steel plate and The mutual horizontal parallel alignment of bottom surface steel plate;Between top surface steel plate and bottom surface steel plate be equipped with middle pectoral plate, left web and Right web, three are mutually vertically arranged in parallel, wherein middle pectoral plate is located at the centre of left web and right web, left side Web is located on the left of structure, and concordant with the left side edge of top surface steel plate and bottom surface steel plate, and right web is located at the right side of structure, And it is concordant with the right side edge of top plate steel plate and bottom surface steel plate;Left web, middle pectoral plate and right web pass through welding and top Face steel plate is connected with bottom surface steel plate.
Further, the top surface steel plate, bottom surface steel plate are identical with the thickness of middle pectoral plate, and muscle more vertical than the maximum of beam is straight The big 3-5mm of diameter;Left web is identical with the thickness of right web, and bigger 2-4mm than the waist muscle diameter of beam, and along bracket height 20mm wide, the groove of 40mm depths is arranged every 80mm in direction.
Further, the reinforced bar sleeve is evenly arranged in the downside of top surface steel plate and bottom surface steel plate, and passes through welding point Not connected with top surface steel plate with bottom surface steel plate.
A kind of above-mentioned square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method, including following construction Step:
A. the prefabricated processing of bracket joint structure is carried out.The ruler of top surface steel plate, bottom surface steel plate and web is determined according to design drawing It is very little, it is ensured that the downside that top surface steel plate indulges muscle with back portion is tangent, and the top side that bottom surface steel plate indulges muscle with beam bottom portion is tangent;Left web It is tangent with the right side of waist muscle on the left of beam, and the concordant left side edge for being welded in top surface steel plate and bottom surface steel plate;Right web and beam The left side of right side waist muscle is tangent, and the concordant right side edge for being welded in top surface steel plate and bottom surface steel plate;Middle pectoral plate is set to a left side The centre of coxostermum and right web is held out against with top surface steel plate and bottom surface steel plate, is welded to connect in top surface steel plate and bottom surface slab Plate;The deep groove of 20mm wide, 40mm is set every 80mm along bracket short transverse in left web and right web, at node Column tie-bar passes through;Reinforced bar sleeve determines model sum number amount according to the vertical muscle radical and diameter of beam, and difference uniform welding is in top surface The downside of steel plate and bottom surface steel plate;
B. the prefabricated bracket joint structure processed is welded in square tubular column;
C. it is required according to design drawing and construction requirement carries out construction site installation to square tubular column;
D. following sequence constructions are pressed in the installation between square steel bracket node and concrete beam reinforcing successively:1)It installs at beam-ends bracket Encryption stirrup, 2)Bean column node column tie-bar is installed, and column tie-bar is snapped into the groove of bracket left web and right web, 3)The lower layer in beam bottom portion is indulged into muscle by straight screw sleeve connection to bottom surface steel plate lower part, the upper layer in beam bottom portion indulges muscle and passes through the company of welding It is connected to bottom surface steel plate top, 3)Beam top lower layer is indulged into muscle by straight screw sleeve connection to the lower part of top surface steel plate, beam top Upper layer indulges muscle and is welded to top surface steel plate top, and 5)The waist muscle of beam is connected by welding to the outside of left web and right web; E. after bean column node installs, casting concrete simultaneously conserves, and completes construction.
The advantages of the present invention are:
The present invention can be solved effectively by a kind of square tubular column-beams of concrete bracket Joint's connection fabrication of offer and its construction method Generally existing connecting structure complexity, poor reliability, difficulty of construction are big between square tubular column and beams of concrete in certainly current industry asks Topic, simplifies joint structure and construction method, not only can guarantee construction quality but also can accelerate construction progress, has shortened the construction period, from And construction cost is reduced, generate preferable economic benefit.
Description of the drawings
Fig. 1 is the organigram of the present invention;
Fig. 2 is the construction vertical view of the present invention;
Fig. 3 is the structural side view of the present invention;
Fig. 4 is square tubular column of the present invention-beams of concrete bracket Joint's connection fabrication installation effect diagram;
1, top surface steel plate, 2, bottom surface steel plate, 3, middle pectoral plate, 4, left web, 5, right web, 6, groove, 7, reinforced bar sleeve.
Specific implementation mode
Illustrate specific embodiments of the present invention below in conjunction with the accompanying drawings:
As shown in Figure 1, in the present invention:A kind of square tubular column-beams of concrete bracket Joint's connection fabrication, including:Top surface steel plate 1, bottom Face steel plate 2, middle pectoral plate 3, left web 4, right web 5 and reinforced bar sleeve 7, the left web 4 and right web 5 Forward edge is equipped with groove 6, convenient for binding node stirrup.
A kind of Specific construction step of square tubular column-beams of concrete bracket Joint's connection fabrication is:A. bracket node structure is carried out Make prefabricated processing.The size of top surface steel plate 1, bottom surface steel plate 2 and web is determined according to design drawing, it is ensured that top surface steel plate 1 and beam The downside that muscle is indulged at top is tangent, and the top side that bottom surface steel plate 2 indulges muscle with beam bottom portion is tangent;The right side of left web 4 and waist muscle on the left of beam Side is tangent, and the concordant left side edge for being welded in top surface steel plate 1 and bottom surface steel plate 2;The left side of right web 5 and waist muscle on the right side of beam It is tangent, and the concordant right side edge for being welded in top surface steel plate 1 and bottom surface steel plate 2;Middle pectoral plate 3 is set to left web 4 and the right side The centre of coxostermum 5 is held out against with top surface steel plate 1 and bottom surface steel plate 2, is welded to connect in top surface steel plate 1 and bottom panel steel plate 2; The deep groove 6 of 20mm wide, 40mm is arranged every 80mm along bracket short transverse in left web 4 and right web 5, for column at node Stirrup passes through;Reinforced bar sleeve 7 determines model sum number amount according to the vertical muscle radical and diameter of beam, and difference uniform welding is in top surface steel The downside of plate 1 and bottom surface steel plate 2;B. the prefabricated bracket joint structure processed is welded in square tubular column;C. according to design drawing Paper requires and construction requirement carries out construction site installation to square tubular column;D. the peace between square steel bracket node and concrete beam reinforcing Dress presses following sequence constructions successively:1)It installs and encrypts stirrup at beam-ends bracket, 2)Bean column node column tie-bar is installed, and by tie Muscle snaps into the groove of bracket left web 4 and right web 5, and 3)The lower layer in beam bottom portion is indulged muscle to connect by reinforced bar sleeve 7 To 2 lower part of bottom surface steel plate, the upper layer in beam bottom portion indulges muscle and is connected by welding to 2 top of bottom surface steel plate, and 3)Beam top lower layer is indulged Muscle is connected to the lower part of top surface steel plate 1 by reinforced bar sleeve 7, and the upper layer on beam top indulges muscle and is welded to 1 top of top surface steel plate, and 5) The waist muscle of beam is connected by welding to the outside of left web 4 and right web 5;E. it after bean column node installs, pours mixed Solidifying soil simultaneously conserves, and completes construction.

Claims (5)

1. a kind of square tubular column-beams of concrete bracket Joint's connection fabrication, which is characterized in that including:Top surface steel plate, bottom surface steel plate, The forward edge of middle pectoral plate, left web, right web and reinforced bar sleeve, the left web and right web is equipped with recessed Slot, convenient for binding node stirrup.
2. a kind of square tubular column according to claim 1-beams of concrete bracket Joint's connection fabrication, which is characterized in that top surface Steel plate is located at the top of structure, and bottom surface steel plate is located at the lower part of structure, top surface steel plate and the mutual horizontal parallel alignment of bottom surface steel plate Arrangement;Middle pectoral plate, left web and right web are equipped between top surface steel plate and bottom surface steel plate, three is mutually vertical parallel Arrangement, wherein middle pectoral plate is located at the centre of left web and right web, and left web is located on the left of structure, and and top surface Steel plate is concordant with the left side edge of bottom surface steel plate, and right web is located at the right side of structure, and with top plate steel plate and bottom surface steel plate Right side edge is concordant;Left web, middle pectoral plate and right web are connect by welding with top surface steel plate and bottom surface steel plate.
3. a kind of square tubular column according to claim 1-beams of concrete bracket Joint's connection fabrication, which is characterized in that top surface Steel plate, bottom surface steel plate are identical with the thickness of middle pectoral plate, and muscle diameter more vertical than the maximum of beam is big 3-5mm;Left web and right side The thickness of web is identical, and bigger 2-4mm than the waist muscle diameter of beam, and 20mm wide is being arranged every 80mm along bracket short transverse, The groove of 40mm depths.
4. a kind of square tubular column according to claim 1-beams of concrete bracket Joint's connection fabrication, which is characterized in that described Reinforced bar sleeve be evenly arranged in the downside of top surface steel plate and bottom surface steel plate, and by weld respectively with top surface steel plate and bottom surface steel Plate connects.
5. a kind of construction party of square tubular column-beams of concrete bracket Joint's connection fabrication according to one of claim 1 to 4 Method, it is characterised in that including following construction procedure:Carry out the prefabricated processing of bracket joint structure:Top surface steel is determined according to design drawing The size of plate, bottom surface steel plate and web, it is ensured that the downside that top surface steel plate indulges muscle with back portion is tangent, and bottom surface steel plate is vertical with beam bottom portion The top side of muscle is tangent;The right side of waist muscle is tangent on the left of left web and beam, and concordant top surface steel plate and the bottom surface steel plate of being welded in Left side edge;Right web and the left side of waist muscle on the right side of beam are tangent, and the concordant right side for being welded in top surface steel plate and bottom surface steel plate Edge;Middle pectoral plate is set to the centre of left web and right web, holds out against, is welded to connect with top surface steel plate and bottom surface steel plate In top surface steel plate and bottom panel steel plate;Left web and right web along bracket short transverse every 80mm be arranged 20mm wide, The groove of 40mm depths, passes through for column tie-bar at node;Reinforced bar sleeve determines model sum number amount according to the vertical muscle radical and diameter of beam, And difference uniform welding is in the downside of top surface steel plate and bottom surface steel plate;B. by the prefabricated bracket joint structure side of being welded to processed On steel column;C. construction site installation is carried out to square tubular column according to design drawing and construction requirement;D. steel column bracket node and coagulation Following sequence constructions are pressed in installation between native beam steel successively:1)It installs and encrypts stirrup at beam-ends bracket, 2)Bean column node column is installed Stirrup, and column tie-bar is snapped into the groove of bracket left web and right web, 3)The lower layer in beam bottom portion is indulged into muscle and passes through steel Muscle sleeve connection to bottom surface steel plate lower part, indulge muscle and be connected by welding to bottom surface steel plate top by the upper layer in beam bottom portion, and 3)It will be on beam The vertical muscle of subordinate's layer is indulged muscle and is welded on the steel plate of top surface by straight screw sleeve connection to the lower part of top surface steel plate, the upper layer on beam top Portion, 5)The waist muscle of beam is connected by welding to the outside of left web and right web;E. it after bean column node installs, pours It builds concrete and conserves, complete construction.
CN201711456092.4A 2017-12-28 2017-12-28 Square steel column-concrete beam bracket node connection structure and construction method thereof Active CN108301506B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711456092.4A CN108301506B (en) 2017-12-28 2017-12-28 Square steel column-concrete beam bracket node connection structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711456092.4A CN108301506B (en) 2017-12-28 2017-12-28 Square steel column-concrete beam bracket node connection structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN108301506A true CN108301506A (en) 2018-07-20
CN108301506B CN108301506B (en) 2023-08-11

Family

ID=62867688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711456092.4A Active CN108301506B (en) 2017-12-28 2017-12-28 Square steel column-concrete beam bracket node connection structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN108301506B (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07127130A (en) * 1993-10-29 1995-05-16 Maeda Corp Joint structure of column and beam
JPH11210077A (en) * 1998-01-28 1999-08-03 Shimizu Corp Joint construction between cft column and rc beam
CN2495711Y (en) * 2001-08-22 2002-06-19 徐州市建筑设计研究院 Vertical and cross-linking reinforcing steel bar type concrete joint
JP2007211449A (en) * 2006-02-08 2007-08-23 Shimizu Corp Structure and construction method for joining steel-frame beam and concrete body together
CN201339250Y (en) * 2008-12-25 2009-11-04 中建三局第三建设工程有限责任公司 Stiffness structure framework beam preformed steel reinforcement framework structure
CN201991083U (en) * 2011-01-19 2011-09-28 天津市建筑设计院 Beam column node of composite structural system of steel and concrete
JP2011231509A (en) * 2010-04-27 2011-11-17 Daiwa House Industry Co Ltd Mixed structural beam of concrete and steel construction
CN102322101A (en) * 2011-06-30 2012-01-18 湖北弘毅建筑装饰工程有限公司 Construction method for formed steel reinforced concrete beam-column nodes
CN202658804U (en) * 2012-05-22 2013-01-09 山西四建集团有限公司 Stirrup positioning structure
CN203213409U (en) * 2013-02-26 2013-09-25 中国十七冶集团有限公司 Special-purpose cushion block for reinforcement positioning and protecting layer of concrete wall and column
CN203782890U (en) * 2014-02-27 2014-08-20 南京工业大学 Steel-reinforced concrete T-shaped column-steel beam connecting node
CN203977587U (en) * 2014-07-11 2014-12-03 河北杭萧钢构有限公司 The joint pin of a kind of girder steel and composite steel concrete column
CN204772988U (en) * 2015-07-09 2015-11-18 江西诺金建设工程有限公司 A auxiliary device for trussing up concrete support column embedded bar
CN105201071A (en) * 2015-09-10 2015-12-30 陈涛 Totally-prefabricated concrete structure
CN105863046A (en) * 2016-05-05 2016-08-17 四川省第四建筑工程公司 Prefabricated assembly type beam column joint connecting process
CN106638989A (en) * 2017-02-16 2017-05-10 中国建筑设计院有限公司 Steel pipe column and reinforced concrete column reinforced beam switching node and building comprising same
CN207959493U (en) * 2017-12-28 2018-10-12 天元建设集团有限公司 A kind of square tubular column beams of concrete bracket Joint's connection fabrication

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07127130A (en) * 1993-10-29 1995-05-16 Maeda Corp Joint structure of column and beam
JPH11210077A (en) * 1998-01-28 1999-08-03 Shimizu Corp Joint construction between cft column and rc beam
CN2495711Y (en) * 2001-08-22 2002-06-19 徐州市建筑设计研究院 Vertical and cross-linking reinforcing steel bar type concrete joint
JP2007211449A (en) * 2006-02-08 2007-08-23 Shimizu Corp Structure and construction method for joining steel-frame beam and concrete body together
CN201339250Y (en) * 2008-12-25 2009-11-04 中建三局第三建设工程有限责任公司 Stiffness structure framework beam preformed steel reinforcement framework structure
JP2011231509A (en) * 2010-04-27 2011-11-17 Daiwa House Industry Co Ltd Mixed structural beam of concrete and steel construction
CN201991083U (en) * 2011-01-19 2011-09-28 天津市建筑设计院 Beam column node of composite structural system of steel and concrete
CN102322101A (en) * 2011-06-30 2012-01-18 湖北弘毅建筑装饰工程有限公司 Construction method for formed steel reinforced concrete beam-column nodes
CN202658804U (en) * 2012-05-22 2013-01-09 山西四建集团有限公司 Stirrup positioning structure
CN203213409U (en) * 2013-02-26 2013-09-25 中国十七冶集团有限公司 Special-purpose cushion block for reinforcement positioning and protecting layer of concrete wall and column
CN203782890U (en) * 2014-02-27 2014-08-20 南京工业大学 Steel-reinforced concrete T-shaped column-steel beam connecting node
CN203977587U (en) * 2014-07-11 2014-12-03 河北杭萧钢构有限公司 The joint pin of a kind of girder steel and composite steel concrete column
CN204772988U (en) * 2015-07-09 2015-11-18 江西诺金建设工程有限公司 A auxiliary device for trussing up concrete support column embedded bar
CN105201071A (en) * 2015-09-10 2015-12-30 陈涛 Totally-prefabricated concrete structure
CN105863046A (en) * 2016-05-05 2016-08-17 四川省第四建筑工程公司 Prefabricated assembly type beam column joint connecting process
CN106638989A (en) * 2017-02-16 2017-05-10 中国建筑设计院有限公司 Steel pipe column and reinforced concrete column reinforced beam switching node and building comprising same
CN207959493U (en) * 2017-12-28 2018-10-12 天元建设集团有限公司 A kind of square tubular column beams of concrete bracket Joint's connection fabrication

Also Published As

Publication number Publication date
CN108301506B (en) 2023-08-11

Similar Documents

Publication Publication Date Title
CN108331158A (en) A kind of joint connection in site method of precast reinforced concrete beam column
CN106522381A (en) Joint connection of regeneration cubage concrete combination beam-column and construction method thereof
CN106351445B (en) A kind of strengthening concrete sloping core form assembly bracing reinforcement system and construction method of installation
CN106978909A (en) A kind of method that beams of concrete is connected with profile steel concrete column joint reinforcing bar
CN205314589U (en) Overhanging type discharging platform
CN204804057U (en) Beam column connecting device of prefabricated frame
CN108818890A (en) A kind of I-steel T girder prefabricated pedestal and preparation method thereof
CN104805960B (en) One kind exempts from form removal beams of concrete and its construction method
CN107083804A (en) A kind of wall structure post joint bar construction method
CN210316020U (en) Section steel concrete composite structure
CN207959493U (en) A kind of square tubular column beams of concrete bracket Joint's connection fabrication
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN207079910U (en) A kind of steel concrete shuttering for being easy to quick form removal
CN211850272U (en) Assembled superimposed sheet bearing structure
CN108301506A (en) A kind of square tubular column-beams of concrete bracket Joint's connection fabrication and its construction method
CN204825945U (en) A fixture for fixing buried bolt in advance
CN103835434A (en) H-shaped steel with rib and concrete structure of H-shaped steel with rib
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN207919358U (en) A kind of bottom web reinforcement binding positioning moulding bed
CN206667035U (en) A kind of well formula steel plate shear force construction of assembled composite beam bridge
CN103741857A (en) Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates
CN206233578U (en) Inner corner trim reinforcing template and its formwork system
CN203867059U (en) Ribbed H-section steel and ribbed H-section steel concrete structure
CN207700064U (en) A kind of Precast T-Beam reinforcing steel bar-binding bench

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province

Patentee after: TIANYUAN CONSTRUCTION GROUP Co.,Ltd.

Country or region after: China

Patentee after: Veterans (Shandong) Construction Group Co.,Ltd.

Address before: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province

Patentee before: TIANYUAN CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

Patentee before: SHANDONG HONGDA REAL ESTATE Co.,Ltd.