CN108278772A - A kind of boiler plant of efficient thermal cycle - Google Patents

A kind of boiler plant of efficient thermal cycle Download PDF

Info

Publication number
CN108278772A
CN108278772A CN201711409594.1A CN201711409594A CN108278772A CN 108278772 A CN108278772 A CN 108278772A CN 201711409594 A CN201711409594 A CN 201711409594A CN 108278772 A CN108278772 A CN 108278772A
Authority
CN
China
Prior art keywords
boiler
smoke
pipe
water inlet
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711409594.1A
Other languages
Chinese (zh)
Inventor
罗海兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711409594.1A priority Critical patent/CN108278772A/en
Publication of CN108278772A publication Critical patent/CN108278772A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/24Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water mantle surrounding the combustion chamber or chambers
    • F24H1/26Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water mantle surrounding the combustion chamber or chambers the water mantle forming an integral body
    • F24H1/28Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water mantle surrounding the combustion chamber or chambers the water mantle forming an integral body including one or more furnace or fire tubes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/0005Details for water heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The invention discloses a kind of boiler plants of efficient thermal cycle, including boiler, the boiler bottom is fixed in support base, support base is internally provided with smoke evacuation room, smoke evacuation is indoor to be equipped with smoke guide pipe, combustion chamber is arranged in boiler internal, water inlet pipe is fixed on the two bottom sides of boiler, economizer bank is equipped in water inlet pipe, current divider box is arranged in the bottom of heating chamber, in the inner wall that heating chamber is arranged between boiler and combustion chamber, the top of heating chamber is equipped with header box, multiple heat exchanger tubes are fixedly connected between header box and current divider box, the outer surface of heat exchanger tube is equipped with propeller, it is connected to outlet pipe at the top of header box, the top center of boiler is reverse mounted combustor, the firn-jet head of combustor is located at the inner top of combustion chamber;The present invention utilizes rotatable heat exchanger tube, improves heat exchanger effectiveness, and preheated to the water in water inlet pipe inside water body, substantially increases pre-warmed effect, reduces energy consumption, very energy conservation and environmental protection.

Description

A kind of boiler plant of efficient thermal cycle
Technical field
The present invention relates to a kind of power economized boiler field, the boiler plant of specifically a kind of efficient thermal cycle.
Background technology
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy, electric energy in fuel, boiler output Steam, high-temperature water with certain thermal energy or organic heat carrier, the original meaning of pot refer to the water container heated on fire, and stove refers to burning The place of fuel, boiler include pot and stove two large divisions, and the hot water or steam generated in boiler can directly be industrial production and people The people's livelihood, which is lived, provides required thermal energy, mechanical energy can be also converted to by Steam Power Equipment, or again turn mechanical energy by generator It is changed to electric energy, the boiler for providing hot water is known as hot-water boiler, is mainly used for living, and also has a small amount of application in industrial production, generates The boiler of steam is known as steam boiler, is often simply called boiler, is chiefly used in thermal power station, ship, locomotive and industrial and mining enterprises.
The shorter exchange process of switching path of boiler plant heat in combustion is not thorough fully at present, in order to ensure It exchanges heat and reaches requirement, it is generally restricted to the water inlet flow velocity that needs swap, and also many boiler combustion heating generate Flue gas fail to make full use of, the heat that a large amount of flue gases carry is discharged with smoke exhaust pipe, causes prodigious thermal loss, causes The waste of heat resources so that boiler heat loss is excessive, cannot be satisfied energy-efficient demand.
Invention content
The purpose of the present invention is to provide a kind of boiler plants of efficient thermal cycle, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the present invention provides the following technical solutions:
A kind of boiler plant of efficient thermal cycle, including support base, smoke evacuation room, smoke guide pipe, water inlet pipe, smoke exhaust pipe, smoke evacuation it is close Seal ring, economizer bank, boiler, combustion chamber, heating chamber, heat exchanger tube, propeller, confluence room, outlet pipe, water blockoff plug, swivel bearing, combustion Burning machine, firn-jet head, diffluence room, smoke outlet, the boiler bottom are fixed in support base, and the support base is fixed on ground On, the support base is internally provided with smoke evacuation room, and the smoke evacuation is indoor to be equipped with smoke guide pipe, and the inner end of the smoke guide pipe passes through row Mouth is connected with combustion chamber, and the joint in smoke evacuation room and combustion chamber is arranged in the smoke outlet, and the combustion chamber is arranged in pot The outboard end of furnace interior, the smoke guide pipe is pierced by the inside bottom that smoke evacuation room is connected in water inlet pipe, and the water inlet pipe is fixed on boiler Two bottom sides, economizer bank is equipped in the water inlet pipe, the bottom of the economizer bank is connected with smoke guide pipe, the economizer bank bottom Portion is connected with smoke exhaust pipe, and the smoke exhaust pipe and the junction of smoke guide pipe and water inlet pipe are equipped with smoke evacuation sealing ring, the water inlet Pipe is connected with current divider box, and the current divider box is arranged in the bottom of heating chamber, the heating chamber setting boiler and combustion chamber it Between inner wall in, the top of the heating chamber is equipped with header box, and multiple change is fixedly connected between the header box and current divider box Heat pipe, the outer surface of the heat exchanger tube are equipped with propeller, and the heat exchanger tube is connected to current divider box and header box, the heat exchanger tube with The top of current divider box and it is equipped with swivel bearing with the bottom junctions of header box, outlet pipe is connected at the top of the header box, The junction for being discharged bottom of the tube and header box is equipped with blocking plug, and the top of the outlet pipe is located at the top of boiler, the boiler Top center reverse mounted there is combustor, the firn-jet head of the combustor to be located at the inner top of combustion chamber.
As a further solution of the present invention:Heat medium water is filled in the heating chamber.
As further scheme of the invention:The heating chamber, current divider box and header box are all that circular ring metal seals Babinet.
As further scheme of the invention:The heat exchanger tube is circumferentially distributed around boiler central shaft to be set up.
As further scheme of the invention:The propeller is the upward metal blade of rotation.
As further scheme of the invention:The junction of the swivel bearing and heat exchanger tube is equipped with rubber gasket.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention utilizes the even generation pair of uneven heating in heating chamber The heat medium water of stream drives propeller rotational, on the one hand heat medium water is allow to exchange heat pipe and is evenly heated, on the other hand, spiral shell Rotation paddle rotation can also drive heat to change pipe to rotate in heat medium water, can improve the efficiency of heat exchange, wherein by flue gas be introduced directly into In the closed economizer bank placed in water pipe, the water in water inlet pipe is preheated inside water body, substantially increases preheating Effect so that the heat of flue gas is able to using saving the consumption of the energy, very energy conservation and environmental protection.
Description of the drawings
Fig. 1 is the structural schematic diagram of the boiler plant of efficient thermal cycle.
Fig. 2 be efficient thermal cycle boiler plant in A structural schematic diagram.
Fig. 3 be efficient thermal cycle boiler plant in water inlet pipe left view structural schematic diagram.
Fig. 4 be efficient thermal cycle boiler plant in header box structural schematic diagram.
In figure:Support base 1, smoke evacuation room 2, smoke guide pipe 3, water inlet pipe 4, smoke exhaust pipe 5, smoke evacuation sealing ring 6, economizer bank 7, pot Stove 8, combustion chamber 9, heating chamber 10, heat exchanger tube 11, propeller 12, confluence room 13, outlet pipe 14, water blockoff plug 15, swivel bearing 16, Combustor 17, firn-jet head 18, diffluence room 19, smoke outlet 20.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig.1~4, in the embodiment of the present invention, a kind of boiler plant of efficient thermal cycle, including support base 1, row Smoke-box 2, smoke guide pipe 3, water inlet pipe 4, smoke exhaust pipe 5, smoke evacuation sealing ring 6, economizer bank 7, boiler 8, combustion chamber 9, heating chamber 10, heat exchange Pipe 11, propeller 12, confluence room 13, outlet pipe 14, water blockoff plug 15, swivel bearing 16, combustor 17, firn-jet head 18, diffluence room 19, smoke outlet 20,8 bottom of the boiler are fixed in support base 1, and the support base 1 fixes on the ground, the support Pedestal 1 is internally provided with smoke evacuation room 2, is equipped with smoke guide pipe 3 in the smoke evacuation room 2, the inner end of the smoke guide pipe 3 passes through smoke outlet 20 It is connected with combustion chamber 9, the joint in smoke evacuation room 2 and combustion chamber 9 is arranged in the smoke outlet 20, and the setting of the combustion chamber 9 exists Inside boiler 8, the outboard end of the smoke guide pipe 3 is pierced by the inside bottom that smoke evacuation room 2 is connected in water inlet pipe 4, and the water inlet pipe 4 is fixed Economizer bank 7 is equipped in the two bottom sides of boiler 4, the water inlet pipe 4, the bottom of the economizer bank 7 is connected with smoke guide pipe 3, 7 bottom of the economizer bank is connected with smoke exhaust pipe 5, and the smoke exhaust pipe 5 and smoke guide pipe 3 and the junction of water inlet pipe 4 are equipped with row Cigarette sealing ring 6, the smoke evacuation sealing ring 6 is the rubber ring being glued on water inlet pipe 4, and the water inlet pipe 4 is connected with current divider box 19 Logical, the current divider box 19, which is arranged in the bottom of heating chamber 10, the heating chamber 10, is filled with heat medium water, and the heating chamber 10 is set It sets in the inner wall between boiler 8 and combustion chamber 9, the top of the heating chamber 10 is equipped with header box 13, and the heating chamber 10 is divided It is circular ring metal seal case to flow case 19 and header box 13 all, is fixedly connected between the header box 13 and current divider box 19 more A heat exchanger tube 11, the heat exchanger tube 11 is circumferentially distributed around 8 central shaft of boiler to be set up, and the outer surface of the heat exchanger tube 11 is set It is the upward metal blade of rotation to have propeller 12, the propeller 12, and the heat exchanger tube 11 is connected to current divider box 19 and confluence Case 13, the top of the heat exchanger tube 11 and current divider box 19 and is equipped with swivel bearing 16, institute with the bottom junctions of header box 13 The junction for stating swivel bearing 16 and heat exchanger tube 11 is equipped with rubber gasket, and 13 top of the header box is connected to outlet pipe 14, 14 bottom of outlet pipe and the junction of header box 13 are equipped with and block plug 15, and the top of the outlet pipe 14 is located at the top of boiler 8, The top center of the boiler 8 is reverse mounted to have combustor 17, the firn-jet head 18 of the combustor 17 to be located at combustion chamber 9 Inner top.
The present invention operation principle be:When work, jetted out flames in combustion chamber 9 by firn-jet head 18 between combustor 17 The heating chamber 10 on periphery is heated, heat medium water heats the heat exchanger tube 11 being arranged in heating chamber 10 in heating chamber 10, is changing In thermal process, since the heated very fast top in heat medium water bottom is heated relatively slow, the heat medium water of upper and lower different temperatures can heat Chamber 10 generates convection current, and the heat medium water of convection current can drive propeller 12 to rotate, and propeller 12 is rotated the hotter heat medium water of bottom It is sent to top, this aspect heat medium water to exchange heat pipe 11 to be evenly heated, and on the other hand, the rotation of propeller 12 is also Heat can be driven to change pipe 11 to rotate in heat medium water, the efficiency of heat exchange can be improved, wherein the flue gas generated in combustion chamber 9 can lead to It crosses smoke guide pipe 3 to enter inside water inlet pipe 4, heat is changed to be discharged by smoke exhaust pipe 5 again, wherein flue gas containing a large amount of heat can intake Economizer bank 7 inside pipe 4 is by discharge, and by giving economizer bank 7 to heat, economizer bank 7 is heated by self heat to entering flue gas Cold water in chamber 10 is preheated, and while improving heating above speed, and is reduced the loss of heat in flue gas, is saved The consumption of the energy substantially increases the efficiency that recycle heat utilizes.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (7)

1. a kind of boiler plant of efficient thermal cycle, including support base (1), smoke evacuation room (2), smoke guide pipe (3), water inlet pipe (4), Smoke exhaust pipe (5), smoke evacuation sealing ring (6), economizer bank (7), boiler (8), combustion chamber (9), heating chamber (10), heat exchanger tube (11), spiral shell Revolve paddle (12), confluence room (13), outlet pipe (14), water blockoff plug (15), swivel bearing (16), combustor (17), firn-jet head (18), Diffluence room (19), smoke outlet (20), which is characterized in that boiler (8) bottom is fixed in support base (1), the support Pedestal (1) fixes on the ground, and the support base (1) is internally provided with smoke evacuation room (2), is equipped in the smoke evacuation room (2) and leads cigarette It manages (3), the inner end of the smoke guide pipe (3) is connected by smoke outlet (20) with combustion chamber (9), smoke outlet (20) setting Joint in smoke evacuation room (2) and combustion chamber (9), combustion chamber (9) setting is internal in boiler (8), the smoke guide pipe (3) Outboard end is pierced by the inside bottom that smoke evacuation room (2) is connected in water inlet pipe (4), and the water inlet pipe (4) is fixed on the bottom two of boiler (4) Side, the water inlet pipe (4) is interior to be equipped with economizer bank (7), and the bottom of the economizer bank (7) is connected with smoke guide pipe (3), the preheating Pipe (7) bottom is connected with smoke exhaust pipe (5), and the smoke exhaust pipe (5) and smoke guide pipe (3) and the junction of water inlet pipe (4) are equipped with Smoke evacuation sealing ring (6), the water inlet pipe (4) are connected with current divider box (19), and the current divider box (19) is arranged in heating chamber (10) Bottom, in the inner wall that the heating chamber (10) is arranged between boiler (8) and combustion chamber (9), the top of the heating chamber (10) Portion is equipped with header box (13), and multiple heat exchanger tubes (11) are fixedly connected between the header box (13) and current divider box (19), described The outer surface of heat exchanger tube (11) is equipped with propeller (12), and the heat exchanger tube (11) is connected to current divider box (19) and header box (13), The top of the heat exchanger tube (11) and current divider box (19) and it is equipped with swivel bearing (16) with the bottom junctions of header box (13), Outlet pipe (14) is connected at the top of the header box (13), outlet pipe (14) bottom and the junction of header box (13) are equipped with blocking It fills in (15), the top of the outlet pipe (14) is located at the top of boiler (8), and the top center of the boiler (8) is inverted peace Equipped with combustor (17), the firn-jet head (18) of the combustor (17) is located at the inner top of combustion chamber (9).
2. the boiler plant of efficient thermal cycle according to claim 1, which is characterized in that the smoke evacuation sealing ring (6) is The rubber ring being glued on water inlet pipe (4).
3. the boiler plant of efficient thermal cycle according to claim 1, which is characterized in that filling in the heating chamber (10) There is heat medium water.
4. the boiler plant of efficient thermal cycle according to claim 1, which is characterized in that the heating chamber (10), shunting Case (19) and header box (13) are all circular ring metal seal case.
5. the boiler plant of efficient thermal cycle according to claim 1, which is characterized in that the heat exchanger tube (11) around Boiler (8) central shaft, which is circumferentially distributed, to be set up.
6. wanting the boiler plant of the efficient thermal cycle described in 1 according to right, which is characterized in that the propeller (12) be rotation to On metal blade.
7. the boiler plant of efficient thermal cycle according to claim 1, which is characterized in that the swivel bearing (16) with change The junction of heat pipe (11) is equipped with rubber gasket.
CN201711409594.1A 2017-12-23 2017-12-23 A kind of boiler plant of efficient thermal cycle Pending CN108278772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711409594.1A CN108278772A (en) 2017-12-23 2017-12-23 A kind of boiler plant of efficient thermal cycle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711409594.1A CN108278772A (en) 2017-12-23 2017-12-23 A kind of boiler plant of efficient thermal cycle

Publications (1)

Publication Number Publication Date
CN108278772A true CN108278772A (en) 2018-07-13

Family

ID=62801994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711409594.1A Pending CN108278772A (en) 2017-12-23 2017-12-23 A kind of boiler plant of efficient thermal cycle

Country Status (1)

Country Link
CN (1) CN108278772A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179541A (en) * 2018-11-09 2019-01-11 董雪露 boiler

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203404966U (en) * 2013-07-22 2014-01-22 湖北金威新能源科技有限公司 Biomass boiler
CN203687366U (en) * 2014-02-21 2014-07-02 暖尔特热力设备(德清)有限公司 Phase-inversion heat exchanging water heating boiler
CN203744818U (en) * 2014-01-24 2014-07-30 潍柴动力股份有限公司 Tubular heat exchanger and turbulence device thereof
CN207865705U (en) * 2017-12-23 2018-09-14 董许亮 A kind of boiler plant of efficient thermal cycle

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203404966U (en) * 2013-07-22 2014-01-22 湖北金威新能源科技有限公司 Biomass boiler
CN203744818U (en) * 2014-01-24 2014-07-30 潍柴动力股份有限公司 Tubular heat exchanger and turbulence device thereof
CN203687366U (en) * 2014-02-21 2014-07-02 暖尔特热力设备(德清)有限公司 Phase-inversion heat exchanging water heating boiler
CN207865705U (en) * 2017-12-23 2018-09-14 董许亮 A kind of boiler plant of efficient thermal cycle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179541A (en) * 2018-11-09 2019-01-11 董雪露 boiler
CN109179541B (en) * 2018-11-09 2022-07-29 浙江尚厨家居科技股份有限公司 Boiler

Similar Documents

Publication Publication Date Title
CN207865705U (en) A kind of boiler plant of efficient thermal cycle
CN108106000A (en) A kind of gear-linked double rod cleaning type energy-saving, environmental protection boiler
CN205477921U (en) Marsh gas natural gas combined drive supply of cooling, heating and electrical powers system
CN108278772A (en) A kind of boiler plant of efficient thermal cycle
CN108613384A (en) A kind of vertical bottom of connection in series-parallel mixing combusts oily gas organic heat carrier boiler
CN104848233B (en) A kind of extremely low concentration coal mine gas boiler and its operation method
CN207317236U (en) A kind of telescopic wall-mounted stove of built-in internal circulation apparatus
CN207907484U (en) A kind of boiler plant of multiloop heat exchange
CN207333049U (en) A kind of hot gas fused salt low temperature Stirling electricity generation system
CN208042506U (en) A kind of boiler plant of burner hearth heat convolution heating
CN209295433U (en) A kind of fuel wind furnace
CN207797384U (en) A kind of new and effective hot-water boiler
CN204240396U (en) Residual heat from boiler fume utilizes system
CN105526705B (en) A kind of energy-conserving steam boiler for dual purpose
CN206847093U (en) Flame condensing boiler is returned at a kind of two return center
CN207649086U (en) Energy conservation and environmental protection Fuel Furnace
CN207849339U (en) A kind of three backhaul list ontology heat exchange structures of steam boiler
CN207378790U (en) A kind of gas steam generator
CN108266712B (en) A kind of boiler plant of multiloop heat exchange
CN207514873U (en) A kind of hot air type solid-vapor stove
CN207455895U (en) A kind of water heating and energy saving type boiler
CN206113338U (en) Novel hot water hot wind boiler
CN108120018A (en) A kind of boiler plant of burner hearth heat convolution heating
CN110486935A (en) A kind of biomass power generation Waste-heat boiler device
CN205919291U (en) Water pipe steam boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180713