CN108275178A - A kind of hydraulic engineering pile foundation handling device - Google Patents
A kind of hydraulic engineering pile foundation handling device Download PDFInfo
- Publication number
- CN108275178A CN108275178A CN201810222021.6A CN201810222021A CN108275178A CN 108275178 A CN108275178 A CN 108275178A CN 201810222021 A CN201810222021 A CN 201810222021A CN 108275178 A CN108275178 A CN 108275178A
- Authority
- CN
- China
- Prior art keywords
- fixed
- mounting plate
- plate
- baffle
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B3/00—Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor
- B62B3/02—Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor involving parts being adjustable, collapsible, attachable, detachable or convertible
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B5/00—Accessories or details specially adapted for hand carts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B5/00—Accessories or details specially adapted for hand carts
- B62B5/0006—Bumpers; Safety devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B5/00—Accessories or details specially adapted for hand carts
- B62B5/04—Braking mechanisms; Locking devices against movement
- B62B5/049—Braking mechanisms; Locking devices against movement locking against movement by contacting the floor or a wall
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B2202/00—Indexing codes relating to type or characteristics of transported articles
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The present invention relates to a kind of handling device more particularly to a kind of hydraulic engineering pile foundation handling devices.It takes up space small, and the hydraulic engineering pile foundation handling device that applicability is high the technical problem to be solved in the present invention is to provide one kind.In order to solve the above technical problem, the present invention provides such a hydraulic engineering pile foundation handling devices, include wheel, mounting plate, braking mechanism, protection mechanism, fixed mechanism, mobile mechanism and push rod;Wheel is fixed in mounting plate bottom, and protection mechanism, push rod are fixed in along mounting plate length direction at the top of mounting plate successively, and one side of mounting plate is provided with the first groove;Fixed mechanism is fixed in one side of mounting plate, and braking mechanism is fixed in mounting plate the other side;Mobile mechanism is fixed in mounting plate.The present invention completes the work of fixed handling device by braking mechanism, has reached small, and the effect that applicability is high that takes up space.
Description
Technical field
The present invention relates to a kind of handling device more particularly to a kind of hydraulic engineering pile foundation handling devices.
Background technology
Water conservancy pile foundation varies, and has with short, and the demand of hydraulic engineering pile foundation is bigger, existing method
It is that small pile foundation is solved by artificial mode of transport, the pile foundation of big length is all carried by crane.Artificial carry not only is imitated
Rate is low, and might have danger, and crane not only occupies that place is larger, but also expense is more expensive, impracticable.
The existing hydraulic engineering pile foundation handling device larger and applicability that haves the shortcomings that take up space is low, therefore urgently
One kind need to be researched and developed to take up space small, and the hydraulic engineering pile foundation handling device that applicability is high.
Invention content
(1)Technical problems to be solved
The present invention in order to overcome the larger and low applicability disadvantage that takes up space, the technical problem to be solved in the present invention is to provide
One kind takes up space small, and the hydraulic engineering pile foundation handling device that applicability is high.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a hydraulic engineering pile foundation handling devices, include vehicle
Wheel, mounting plate, braking mechanism, protection mechanism, fixed mechanism, mobile mechanism and push rod;Wheel is fixed in mounting plate bottom, protection
Mechanism, push rod are fixed in along mounting plate length direction at the top of mounting plate successively, and one side of mounting plate is provided with the first groove;Fixed machine
Structure is fixed in one side of mounting plate, and braking mechanism is fixed in mounting plate the other side;Mobile mechanism is fixed in mounting plate, and is located at
In first groove;
Braking mechanism includes the first guide pad, the first elastic component, guide rod, guide plate, connecting rod, fixed plate, the first connection
Block, the second elastic component, the second link block, third elastic component and friction plate;First guide pad is fixed at the top of mounting plate, and first leads
It is provided with the second groove to one side of block;Guide rod is affixed by the first elastic component and the first guide pad, and in the second groove;
Guide plate is fixed in one side of mounting plate, and guide plate is provided with pilot hole, and connecting rod runs through pilot hole, and fixed plate is fixed in connecting rod
Top, friction plate are fixed at the top of connecting rod, and the first link block is fixed in one side of connecting rod, and second elastic component one end is fixed in
Guide plate bottom, the other end are fixed at the top of the first link block;Second link block is fixed in connecting rod the other side, third elasticity
Part one end is fixed in guide plate bottom, and the other end is fixed at the top of the second link block.
Preferably, protection mechanism includes first baffle, third link block, the first wing bolt, second baffle, the 4th company
Connect block and the second wing bolt;Multiple equidistant thread grooves are provided on mounting plate, first baffle is positioned at the top of mounting plate, the
Three link blocks are fixed on rear side of first baffle, and the first threaded hole is provided on third link block, and the first wing bolt runs through the first spiral shell
Pit is spirally connected with thread groove;Second baffle is positioned at the top of mounting plate, and in front of first baffle;4th link block is fixed in
On front side of second baffle, the second threaded hole is provided on the 4th link block, the second wing bolt is through the second threaded hole and thread groove spiral shell
It connects.
Preferably, fixed mechanism includes third baffle and bolt;Third baffle one end is hinged with one side of mounting plate, the
It is provided with the first cotter way at the top of three baffles, the second cotter way is provided at the top of mounting plate;Bolt one end is located in the first cotter way, other end position
In in the second cotter way.
Preferably, mobile mechanism includes the first sliding rail, the first sliding block, the second sliding block, the second sliding rail, third sliding block,
Four-slider and the first placement plate;First sliding rail is fixed in antetheca in the first groove on mounting plate, the first sliding block, the second sliding block with
First sliding rail is slidably connected, and the second sliding rail is fixed in rear wall in the first groove on mounting plate, third sliding block, Four-slider and
Two sliding rails are slidably connected, and one side of the first placement plate and the first sliding block, the second sliding block are affixed, the other side and third sliding block, the
Four-slider is affixed.
Preferably, which further includes having the 4th elastic component and the second placement plate;Second puts
Plate is set to be fixed at the top of mounting plate by multiple 4th elastic components.
Preferably, which further includes having the first foam-rubber cushion and the second foam-rubber cushion;First sea
Silk floss pad is fixed in first baffle front, and the second foam-rubber cushion is fixed in second baffle rear portion.
Preferably, non-slip mat is fixed in friction plate bottom.
Preferably, wheel is universal wheel.
Operation principle:When needing using this handling device onto, handling device is shifted to the place for needing to carry pile foundation first,
Operate braking mechanism so that braking mechanism output end is contacted with ground, and to fix device, when pile foundation is excessive, operating is protected
Protecting mechanism so that two output end of protection mechanism is located remotely from each other, when the spacing of two output end of protection mechanism is bigger than the diameter of pile foundation, fortune
Rotation protection mechanism, when the length of pile foundation is long, operates fixed mechanism to fixed protection mechanism output end so that fixed machine
Structure output end is opened, and reruns mobile mechanism so that mobile mechanism's output end is displaced outwardly, and removes pile foundation at this point, can place
Onto device, operate braking mechanism so that braking mechanism output end, no longer fixing device, in this way, reached take up space it is small,
And the effect that applicability is high.
Because braking mechanism include the first guide pad, the first elastic component, guide rod, guide plate, connecting rod, fixed plate,
First link block, the second elastic component, the second link block, third elastic component and friction plate;First guide pad is fixed in mounting plate top
Portion, one side of the first guide pad are provided with the second groove;Guide rod is affixed by the first elastic component and the first guide pad, and positioned at the
In two grooves;Guide plate is fixed in one side of mounting plate, and guide plate is provided with pilot hole, and connecting rod runs through pilot hole, and fixed plate is solid
It is connected at the top of connecting rod, friction plate is fixed at the top of connecting rod, and the first link block is fixed in one side of connecting rod, the second elastic component
One end is fixed in guide plate bottom, and the other end is fixed at the top of the first link block;Second link block is fixed in the connecting rod other side
Portion, third elastic component one end are fixed in guide plate bottom, and the other end is fixed at the top of the second link block;It is filled when needing fixed carry
When setting, control fixed plate declines, and fixed plate squeezes guide rod and is moved to the left, and fixed plate drives connecting rod and friction plate to moving down
It is dynamic, after friction plate and ground contact;Fixed plate no longer squeezes guide rod, and below guide rod;Guide rod is by first
The effect of elastic component elastic force moves right, and returns to initial position, and the first link block is moved up by the effect of the second elastic component elastic force,
Second link block is moved up by the effect of third elastic component elastic force, and to drive connecting rod to move up, connecting rod drives solid
Fixed board and friction plate move up, and fixed plate is stopped by guide rod, cannot move up, when needing mobile handling device,
Control guide rod is moved to the left so that guide rod no longer stops that fixed plate, the first link block are acted on by the second elastic component elastic force
It moving up, the second link block is moved up by the effect of third elastic component elastic force, to drive connecting rod to move up, connection
Bar drives fixed plate and friction plate to move up, and returns to initial position, when fixed plate is left, guide rod is by the first elastic component
Elastic force effect moves right, and is contacted with one side of connecting rod, so so that when loading onto pile foundation, handling device moves, and causes
It is dangerous.
Because protection mechanism includes first baffle, third link block, the first wing bolt, second baffle, the 4th connection
Block and the second wing bolt;Multiple equidistant thread grooves are provided on mounting plate, first baffle is positioned at the top of mounting plate, third
Link block is fixed on rear side of first baffle, and the first threaded hole is provided on third link block, and the first wing bolt runs through the first screw thread
Hole is spirally connected with thread groove;Second baffle is positioned at the top of mounting plate, and in front of first baffle;4th link block is fixed in
On front side of two baffles, it is provided with the second threaded hole on the 4th link block, the second wing bolt is spirally connected through the second threaded hole with thread groove;
When Pile Diameter is excessive, the first wing bolt of control rotates clockwise, and moves it up, and leaves thread groove, control first
Baffle is moved to the left, and to drive third link block to be moved to the left, the first wing bolt of control rotates counterclockwise, and makes it to moving down
It is dynamic, it is spirally connected with thread groove through the first threaded hole, then control the second wing bolt and rotate clockwise, moves it up, leave
Thread groove, control second baffle moves right, and to drive the 4th link block to move right, the second wing bolt of control is counterclockwise
Rotation, makes it move down, is spirally connected with thread groove through the second threaded hole, in this way, protection transportational process, pile foundation move,
It damages, is also applicable in and different size of pile foundation.
Because fixed mechanism includes third baffle and bolt;Third baffle one end is hinged with one side of mounting plate, third
It is provided with the first cotter way at the top of baffle, the second cotter way is provided at the top of mounting plate;Bolt one end is located in the first cotter way, and the other end is located at
In second cotter way;When pile foundation is long, when needing mobile mechanism's output end overhanging, by bolt from the first cotter way, the second cotter way
When extraction so that the no longer fixed third baffle of bolt can rotate counterclockwise third baffle, it is made no longer to stop that mobile mechanism is defeated
Outlet, in this way, playing the role of stopping mobile mechanism's output end.
Because mobile mechanism includes the first sliding rail, the first sliding block, the second sliding block, the second sliding rail, third sliding block, the 4th cunning
Block and the first placement plate;First sliding rail is fixed in antetheca in the first groove on mounting plate, the first sliding block, the second sliding block and first
Sliding rail is slidably connected, and the second sliding rail is fixed in rear wall in the first groove on mounting plate, and third sliding block, Four-slider and second are slided
Rail is slidably connected, and one side of the first placement plate and the first sliding block, the second sliding block are affixed, and the other side is slided with third sliding block, the 4th
Block is affixed;When third baffle no longer stops the first placement plate, control the first placement plate be moved to the left, can according to pile foundation length,
The first placement plate extension is adjusted, in this way, improving the practicability of handling device.
Because the hydraulic engineering pile foundation handling device further includes having the 4th elastic component and the second placement plate;Second placement plate
It is fixed at the top of mounting plate by multiple 4th elastic components;By the cooperation of the 4th elastic component and the second placement plate, reach damping
Effect, prevents in transportational process, because vibrations damage pile foundation.
Because the hydraulic engineering pile foundation handling device further includes having the first foam-rubber cushion and the second foam-rubber cushion;First foam-rubber cushion
It is fixed in first baffle front, the second foam-rubber cushion is fixed in second baffle rear portion;Pass through the first foam-rubber cushion and the second foam-rubber cushion
Cooperation prevents pile foundation from being collided with first baffle, second baffle, is damaged to pile foundation.
Preferably, non-slip mat is fixed in friction plate bottom;The frictional force between friction plate and ground can be increased, improve and carry
The stability of device.
(3)Advantageous effect
The work of fixed handling device is completed in this practicality by braking mechanism, has reached small, and the effect that applicability is high that takes up space
Fruit, the work for completing to prevent pile foundation from moving by protection mechanism protect transportational process, pile foundation to move, damage, also suitable
Passed through mobile mechanism by the work of fixed mechanism completion the first placement plate of blocking with different size of pile foundation and complete to move
The work of first placement plate improves the practicability of handling device, this and handling device are also put by the 4th elastic component and second
The cooperation for setting plate, reaches cushioning effect, prevents in transportational process, because vibrations damage pile foundation, by the first foam-rubber cushion and
The cooperation of second foam-rubber cushion prevents pile foundation from being collided with first baffle, second baffle, is damaged to pile foundation, can by non-slip mat
Increase the frictional force between friction plate and ground, improve the stability of handling device, has reached and taken up space small, and applicability is high
Effect.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the left view structural representation of the present invention.
Fig. 3 is the first main structure diagram of braking mechanism of the present invention.
Fig. 4 is the first left view structural scheme of mechanism of protection mechanism of the present invention.
Fig. 5 is the main structure diagram of guard mechanism of the present invention.
Fig. 6 is the overlooking structure diagram of mobile mechanism of the present invention.
Fig. 7 is second of main structure diagram of the present invention.
Fig. 8 is second of main structure diagram of braking mechanism of the present invention.
Fig. 9 is second of left view structural scheme of mechanism of protection mechanism of the present invention.
Label in attached drawing be:1- wheels, 2- mounting plates, 3- braking mechanisms, the first guide pads of 31-, the second grooves of 32-,
The first elastic components of 33-, 34- guide rods, 35- guide plates, 36- pilot holes, 37- connecting rods, 38- fixed plates, the connections of 39- first
Block, the second elastic components of 310-, the second link blocks of 311-, 312- third elastic components, 313- friction plates, 4- protection mechanisms, 41- screw threads
Slot, 42- first baffles, 43- third link blocks, the first threaded holes of 44-, the first wing bolts of 45-, 46- second baffles, 47-
Four link blocks, the second threaded holes of 48-, the second wing bolts of 49-, the first grooves of 5-, 6- fixed mechanisms, 61- third baffles, 62-
First cotter way, the second cotter ways of 63-, 64- bolts, 7- mobile mechanisms, the first sliding rails of 71-, the first sliding blocks of 72-, the second sliding blocks of 73-,
The second sliding rails of 74-, 75- third sliding blocks, 76- Four-sliders, the first placement plates of 77-, 8- push rods, the 4th elastic components of 9-, 10- second
Placement plate, 11- non-slip mats, the first foam-rubber cushions of 12-, the second foam-rubber cushions of 13-.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of hydraulic engineering pile foundation handling device includes as shown in figs 1-9 wheel 1, mounting plate 2, braking mechanism 3, protection
Mechanism 4, fixed mechanism 6, mobile mechanism 7 and push rod 8;Wheel 1 is fixed in 2 bottom of mounting plate, and protection mechanism 4, push rod 8 are along installation
2 length direction of plate is fixed in 2 top of mounting plate successively, and 2 one side of mounting plate is provided with the first groove 5;Fixed mechanism 6 is fixed in peace
2 one side of loading board, braking mechanism 3 are fixed in 2 the other side of mounting plate;Mobile mechanism 7 is fixed in mounting plate 2, and is located at first
In groove 5;
Braking mechanism 3 includes the first guide pad 31, the first elastic component 33, guide rod 34, guide plate 35, connecting rod 37, fixes
Plate 38, the first link block 39, the second elastic component 310, the second link block 311, third elastic component 312 and friction plate 313;First leads
It is fixed in 2 top of mounting plate to block 31,31 1 side of the first guide pad is provided with the second groove 32;Guide rod 34 passes through the first elasticity
Part 33 and the first guide pad 31 are affixed, and in the second groove 32;Guide plate 35 is fixed in 2 one side of mounting plate, guide plate
35 are provided with pilot hole 36, and connecting rod 37 runs through pilot hole 36, and fixed plate 38 is fixed in 37 top of connecting rod, and friction plate 313 is affixed
In 37 top of connecting rod, the first link block 39 is fixed in 37 1 side of connecting rod, and 310 one end of the second elastic component is fixed in guide plate
35 bottoms, the other end are fixed in 39 top of the first link block;Second link block 311 is fixed in 37 the other side of connecting rod, third
312 one end of elastic component is fixed in 35 bottom of guide plate, and the other end is fixed in 311 top of the second link block.
Protection mechanism 4 includes first baffle 42, third link block 43, the first wing bolt 45, second baffle the 46, the 4th
Link block 47 and the second wing bolt 49;Multiple equidistant thread grooves 41 are provided on mounting plate 2, first baffle 42 is positioned over peace
2 top of loading board, third link block 43 are fixed in 42 rear side of first baffle, the first threaded hole 44 are provided on third link block 43, the
One wing bolt 45 is spirally connected through the first threaded hole 44 with thread groove 41;Second baffle 46 is positioned over 2 top of mounting plate, and is located at
42 front of first baffle;4th link block 47 is fixed in 46 front side of second baffle, and the second threaded hole is provided on the 4th link block 47
48, the second wing bolt 49 is spirally connected through the second threaded hole 48 with thread groove 41.
Fixed mechanism 6 includes third baffle 61 and bolt 64;61 one end of third baffle is hinged with 2 one side of mounting plate,
61 top of third baffle is provided with the first cotter way 62, and 2 top of mounting plate is provided with the second cotter way 63;64 one end of bolt is located at the first cotter way
In 62, the other end is located in the second cotter way 63.
Mobile mechanism 7 includes the first sliding rail 71, the first sliding block 72, the second sliding block 73, the second sliding rail 74, third sliding block
75, Four-slider 76 and the first placement plate 77;First sliding rail 71 is fixed in antetheca in the first groove 5 on mounting plate 2, and first slides
Block 72, the second sliding block 73 and the first sliding rail 71 are slidably connected, after the second sliding rail 74 is fixed in the first groove 5 on mounting plate 2
Wall, third sliding block 75, Four-slider 76 and the second sliding rail 74 are slidably connected, 77 1 side of the first placement plate and the first sliding block 72,
Second sliding block 73 is affixed, and the other side and third sliding block 75, Four-slider 76 are affixed.
The hydraulic engineering pile foundation handling device further includes having the 4th elastic component 9 and the second placement plate 10;Second placement plate
10 are fixed in 2 top of mounting plate by multiple 4th elastic components 9.
The hydraulic engineering pile foundation handling device further includes having the first foam-rubber cushion 12 and the second foam-rubber cushion 13;First foam-rubber cushion
12 are fixed in 42 front of first baffle, and the second foam-rubber cushion 13 is fixed in 46 rear portion of second baffle.
Non-slip mat 11 is fixed in 313 bottom of friction plate.
Wheel 1 is universal wheel.
Operation principle:When needing using this handling device onto, handling device is shifted to the place for needing to carry pile foundation first,
Operating braking mechanism 3 so that 3 output end of braking mechanism is contacted with ground, to which device be fixed, when pile foundation is excessive, operating
Protection mechanism 4 so that 4 liang of output ends of protection mechanism are located remotely from each other, and the spacing of 4 liang of output ends of protection mechanism is bigger than the diameter of pile foundation
When, running protection mechanism 4, when the length of pile foundation is long, operates fixed mechanism 6, makes to 4 output end of fixed protection mechanism
It obtains 6 output end of fixed mechanism to open, reruns mobile mechanism 7 so that 7 output end of mobile mechanism is displaced outwardly, at this point, can put
It sets and move pile foundation on device to, operate braking mechanism 3 so that 3 output end of braking mechanism, no longer fixing device, in this way, reaching
It takes up space small, and the effect that applicability is high.
Because braking mechanism 3 includes the first guide pad 31, the first elastic component 33, guide rod 34, guide plate 35, connecting rod
37, fixed plate 38, the first link block 39, the second elastic component 310, the second link block 311, third elastic component 312 and friction plate
313;First guide pad 31 is fixed in 2 top of mounting plate, and 31 1 side of the first guide pad is provided with the second groove 32;Guide rod 34 is logical
It crosses the first elastic component 33 and the first guide pad 31 is affixed, and in the second groove 32;Guide plate 35 is fixed in 2 side of mounting plate
Portion, guide plate 35 are provided with pilot hole 36, and connecting rod 37 runs through pilot hole 36, and fixed plate 38 is fixed in 37 top of connecting rod, friction
Plate 313 is fixed in 37 top of connecting rod, and the first link block 39 is fixed in 37 1 side of connecting rod, and 310 one end of the second elastic component is solid
It is connected to 35 bottom of guide plate, the other end is fixed in 39 top of the first link block;It is another that second link block 311 is fixed in connecting rod 37
Side, 312 one end of third elastic component are fixed in 35 bottom of guide plate, and the other end is fixed in 311 top of the second link block;Work as needs
When fixed handling device, control fixed plate 38 declines, and fixed plate 38 squeezes guide rod 34 and is moved to the left, and fixed plate 38 drives connection
Bar 37 and friction plate 313 move down, after friction plate 313 and ground contact;Fixed plate 38 no longer squeezes guide rod 34, and position
In 34 lower section of guide rod;Guide rod 34 is moved right by the effect of 33 elastic force of the first elastic component, returns to initial position, the first connection
Block 39 is moved up by the effect of 310 elastic force of the second elastic component, and the second link block 311 is acted on by 312 elastic force of third elastic component
It moves up, to drive connecting rod 37 to move up, connecting rod 37 drives fixed plate 38 and friction plate 313 to move up, Gu
Fixed board 38 is stopped by guide rod 34, cannot move up, and when needing mobile handling device, control guide rod 34 is to moving to left
It is dynamic so that guide rod 34 no longer stops fixed plate 38, and the first link block 39 is acted on by 310 elastic force of the second elastic component to moving up
Dynamic, the second link block 311 is moved up by the effect of 312 elastic force of third elastic component, to drive connecting rod 37 to move up, even
Extension bar 37 drives fixed plate 38 and friction plate 313 to move up, and returns to initial position, when fixed plate 38 is left, guide rod 34
It is moved right, is contacted with 37 1 side of connecting rod, so so that when loading onto pile foundation, remove by the effect of 33 elastic force of the first elastic component
Shipping unit moves, and causes danger.
Because protection mechanism 4 include first baffle 42, third link block 43, the first wing bolt 45, second baffle 46,
4th link block 47 and the second wing bolt 49;Multiple equidistant thread grooves 41 are provided on mounting plate 2, first baffle 42 is placed
In 2 top of mounting plate, third link block 43 is fixed in 42 rear side of first baffle, and the first threaded hole is provided on third link block 43
44, the first wing bolt 45 is spirally connected through the first threaded hole 44 with thread groove 41;Second baffle 46 is positioned over 2 top of mounting plate,
And positioned at 42 front of first baffle;4th link block 47 is fixed in 46 front side of second baffle, and second is provided on the 4th link block 47
Threaded hole 48, the second wing bolt 49 are spirally connected through the second threaded hole 48 with thread groove 41;When Pile Diameter is excessive, control the
One wing bolt 45 rotates clockwise, and moves it up, and leaves thread groove 41, and control first baffle 42 is moved to the left, to
Third link block 43 is driven to be moved to the left, the first wing bolt 45 of control rotates counterclockwise, it is made to move down, and runs through the first spiral shell
Pit 44 is spirally connected with thread groove 41, then controls the second wing bolt 49 and rotate clockwise, and moves it up, leaves thread groove
41, control second baffle 46 moves right, and to drive the 4th link block 47 to move right, controls 49 inverse time of the second wing bolt
Needle rotates, and so that it is moved down, is spirally connected with thread groove 41 through the second threaded hole 48, in this way, protection transportational process, pile foundation occur
It is mobile, it damages, is also applicable in and different size of pile foundation.
Because fixed mechanism 6 includes third baffle 61 and bolt 64;It is cut with scissors with 2 one side of mounting plate 61 one end of third baffle
It connects, 61 top of third baffle is provided with the first cotter way 62, and 2 top of mounting plate is provided with the second cotter way 63;64 one end of bolt is located at first
In cotter way 62, the other end is located in the second cotter way 63;When pile foundation is long, when needing 7 output end of mobile mechanism overhanging, by bolt
64 from the first cotter way 62, the second cotter way 63 when extracting so that the no longer fixed third baffle 61 of bolt 64 can rotate counterclockwise
Third baffle 61 makes it no longer stop 7 output end of mobile mechanism, in this way, playing the role of stopping 7 output end of mobile mechanism.
Because mobile mechanism 7 includes the first sliding rail 71, the first sliding block 72, the second sliding block 73, the second sliding rail 74, third cunning
Block 75, Four-slider 76 and the first placement plate 77;First sliding rail 71 is fixed in antetheca in the first groove 5 on mounting plate 2, and first
Sliding block 72, the second sliding block 73 and the first sliding rail 71 are slidably connected, and the second sliding rail 74 is fixed in the first groove 5 on mounting plate 2
Rear wall, third sliding block 75, Four-slider 76 and the second sliding rail 74 are slidably connected, 77 1 side of the first placement plate and the first sliding block
72, the second sliding block 73 is affixed, and the other side and third sliding block 75, Four-slider 76 are affixed;When third baffle 61 no longer stops
When one placement plate 77, the first placement plate 77 of control is moved to the left, and can be adjusted and extended outside the first placement plate 77 according to pile foundation length
Degree, in this way, improving the practicability of handling device.
Because the hydraulic engineering pile foundation handling device further includes having the 4th elastic component 9 and the second placement plate 10;Second puts
It sets plate 10 and is fixed in 2 top of mounting plate by multiple 4th elastic components 9;Pass through matching for the 4th elastic component 9 and the second placement plate 10
It closes, reaches cushioning effect, prevent in transportational process, because vibrations damage pile foundation.
Because the hydraulic engineering pile foundation handling device further includes having the first foam-rubber cushion 12 and the second foam-rubber cushion 13;First sea
Continuous pad 12 is fixed in 42 front of first baffle, and the second foam-rubber cushion 13 is fixed in 46 rear portion of second baffle;Pass through the first foam-rubber cushion 12
With the cooperation of the second foam-rubber cushion 13, prevents pile foundation from being collided with first baffle 42, second baffle 46, pile foundation is damaged.
Non-slip mat 11 is fixed in 313 bottom of friction plate;The frictional force between friction plate 313 and ground can be increased, raising is removed
The stability of shipping unit.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of hydraulic engineering pile foundation handling device, which is characterized in that include wheel(1), mounting plate(2), braking mechanism
(3), protection mechanism(4), fixed mechanism(6), mobile mechanism(7)And push rod(8);Wheel(1)It is fixed in mounting plate(2)Bottom,
Protection mechanism(4), push rod(8)Along mounting plate(2)Length direction is fixed in mounting plate successively(2)Top, mounting plate(2)One side
It is provided with the first groove(5);Fixed mechanism(6)It is fixed in mounting plate(2)One side, braking mechanism(3)It is fixed in mounting plate(2)Separately
One side;Mobile mechanism(7)It is fixed in mounting plate(2), and it is located at the first groove(5)It is interior;
Braking mechanism(3)It include the first guide pad(31), the first elastic component(33), guide rod(34), guide plate(35), connection
Bar(37), fixed plate(38), the first link block(39), the second elastic component(310), the second link block(311), third elastic component
(312)And friction plate(313);First guide pad(31)It is fixed in mounting plate(2)Top, the first guide pad(31)One side is provided with
Second groove(32);Guide rod(34)Pass through the first elastic component(33)With the first guide pad(31)It is affixed, and it is located at the second groove
(32)It is interior;Guide plate(35)It is fixed in mounting plate(2)One side, guide plate(35)It is provided with pilot hole(36), connecting rod(37)It passes through
Wear pilot hole(36), fixed plate(38)It is fixed in connecting rod(37)Top, friction plate(313)It is fixed in connecting rod(37)Top,
First link block(39)It is fixed in connecting rod(37)One side, the second elastic component(310)One end is fixed in guide plate(35)Bottom,
The other end is fixed in the first link block(39)Top;Second link block(311)It is fixed in connecting rod(37)The other side, third bullet
Property part(312)One end is fixed in guide plate(35)Bottom, the other end are fixed in the second link block(311)Top.
2. a kind of hydraulic engineering pile foundation handling device according to claim 1, which is characterized in that protection mechanism(4)Packet
First baffle is included(42), third link block(43), the first wing bolt(45), second baffle(46), the 4th link block(47)
With the second wing bolt(49);Mounting plate(2)On be provided with multiple equidistant thread grooves(41), first baffle(42)It is positioned over peace
Loading board(2)Top, third link block(43)It is fixed in first baffle(42)Rear side, third link block(43)On be provided with the first screw thread
Hole(44), the first wing bolt(45)Through the first threaded hole(44)With thread groove(41)It is spirally connected;Second baffle(46)It is positioned over
Mounting plate(2)Top, and it is located at first baffle(42)Front;4th link block(47)It is fixed in second baffle(46)Front side, the
Four link blocks(47)On be provided with the second threaded hole(48), the second wing bolt(49)Through the second threaded hole(48)With thread groove
(41)It is spirally connected.
3. a kind of hydraulic engineering pile foundation handling device according to claim 2, which is characterized in that fixed mechanism(6)Packet
Third baffle is included(61)And bolt(64);Third baffle(61)One end and mounting plate(2)One side is hinged, third baffle(61)
Top is provided with the first cotter way(62), mounting plate(2)Top is provided with the second cotter way(63);Bolt(64)One end is located at the first cotter way
(62)Interior, the other end is located at the second cotter way(63)It is interior.
4. a kind of hydraulic engineering pile foundation handling device according to claim 3, which is characterized in that mobile mechanism(7)Packet
The first sliding rail is included(71), the first sliding block(72), the second sliding block(73), the second sliding rail(74), third sliding block(75), Four-slider
(76)With the first placement plate(77);First sliding rail(71)It is fixed in mounting plate(2)On the first groove(5)Interior antetheca, first slides
Block(72), the second sliding block(73)With the first sliding rail(71)It is slidably connected, the second sliding rail(74)It is fixed in mounting plate(2)On first
Groove(5)Interior rear wall, third sliding block(75), Four-slider(76)With the second sliding rail(74)It is slidably connected, the first placement plate(77)
One side and the first sliding block(72), the second sliding block(73)It is affixed, the other side and third sliding block(75), Four-slider(76)Gu
It connects.
5. a kind of hydraulic engineering pile foundation handling device according to claim 4, which is characterized in that the hydraulic engineering stake
Base handling device further includes having the 4th elastic component(9)With the second placement plate(10);Second placement plate(10)Pass through multiple 4th bullets
Property part(9)It is fixed in mounting plate(2)Top.
6. a kind of hydraulic engineering pile foundation handling device according to claim 5, which is characterized in that the hydraulic engineering stake
Base handling device further includes having the first foam-rubber cushion(12)With the second foam-rubber cushion(13);First foam-rubber cushion(12)It is fixed in first baffle
(42)Front, the second foam-rubber cushion(13)It is fixed in second baffle(46)Rear portion.
7. a kind of hydraulic engineering pile foundation handling device according to claim 6, which is characterized in that non-slip mat(11)It is affixed
In friction plate(313)Bottom.
8. a kind of hydraulic engineering pile foundation handling device according to claim 7, which is characterized in that wheel(1)It is universal
Wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810222021.6A CN108275178A (en) | 2018-03-18 | 2018-03-18 | A kind of hydraulic engineering pile foundation handling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810222021.6A CN108275178A (en) | 2018-03-18 | 2018-03-18 | A kind of hydraulic engineering pile foundation handling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108275178A true CN108275178A (en) | 2018-07-13 |
Family
ID=62809900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810222021.6A Pending CN108275178A (en) | 2018-03-18 | 2018-03-18 | A kind of hydraulic engineering pile foundation handling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108275178A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201545021U (en) * | 2010-01-11 | 2010-08-11 | 上海耐吉输配电设备有限公司 | Transporting vehicle |
CN205524379U (en) * | 2016-03-01 | 2016-08-31 | 陈昊 | Can extend friehgt handcart of widening |
CN205686446U (en) * | 2016-05-31 | 2016-11-16 | 广东南奥交通设备有限公司 | A kind of carrier for transporting arc part |
CN206202378U (en) * | 2016-08-25 | 2017-05-31 | 中国海洋石油总公司 | Adjustable type travelling bogie |
CN206719264U (en) * | 2017-04-05 | 2017-12-08 | 衢州福创工业设计有限公司 | A kind of handling device for being exclusively used in hydraulic engineering pile foundation |
CN207072368U (en) * | 2017-08-09 | 2018-03-06 | 蔡丹丹 | A kind of portable type transport vehicle for hydraulic engineering pipe culvert |
CN107776623A (en) * | 2017-10-29 | 2018-03-09 | 刘洋洋 | A kind of construction site Portable support pipe handling device |
CN107802916A (en) * | 2017-12-06 | 2018-03-16 | 姜舒旻 | A kind of obstetrics' outdoor activity Infusion support |
-
2018
- 2018-03-18 CN CN201810222021.6A patent/CN108275178A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201545021U (en) * | 2010-01-11 | 2010-08-11 | 上海耐吉输配电设备有限公司 | Transporting vehicle |
CN205524379U (en) * | 2016-03-01 | 2016-08-31 | 陈昊 | Can extend friehgt handcart of widening |
CN205686446U (en) * | 2016-05-31 | 2016-11-16 | 广东南奥交通设备有限公司 | A kind of carrier for transporting arc part |
CN206202378U (en) * | 2016-08-25 | 2017-05-31 | 中国海洋石油总公司 | Adjustable type travelling bogie |
CN206719264U (en) * | 2017-04-05 | 2017-12-08 | 衢州福创工业设计有限公司 | A kind of handling device for being exclusively used in hydraulic engineering pile foundation |
CN207072368U (en) * | 2017-08-09 | 2018-03-06 | 蔡丹丹 | A kind of portable type transport vehicle for hydraulic engineering pipe culvert |
CN107776623A (en) * | 2017-10-29 | 2018-03-09 | 刘洋洋 | A kind of construction site Portable support pipe handling device |
CN107802916A (en) * | 2017-12-06 | 2018-03-16 | 姜舒旻 | A kind of obstetrics' outdoor activity Infusion support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101936173B (en) | The anchor cable feeder apparatus of roll bolt supporting | |
US9085943B2 (en) | Pipe handling device | |
CN107790588A (en) | A kind of building bar rapid cutting device | |
CN107538066A (en) | A kind of plumbing heavy duty detergent water pipe cutting machine | |
CN108275178A (en) | A kind of hydraulic engineering pile foundation handling device | |
CN110255221A (en) | A kind of continuous dispensing vehicle of waveform protective fence | |
CN207141316U (en) | A kind of anchor chain machine fairleader | |
CN206464883U (en) | The contractile Digit Control Machine Tool of cutter | |
CN103801752B (en) | Pipeline cutting machine | |
CN106078637B (en) | A kind of carrying apparatus of position adjustable | |
CN204323649U (en) | A kind of mast wing drop device | |
CN204038314U (en) | Shuttle back and forth transport systems termination protection opening device fast | |
CN103183266A (en) | Speed limiter tension device for elevator | |
CN207846375U (en) | Device for dragging dregs | |
CN206187856U (en) | Rubber belt conveyor gravity tensioning safety arrangement | |
CN206596953U (en) | A kind of multifunctional drinking machine changes water installations | |
CN205274935U (en) | Elevator speed limiting device | |
CN108639711A (en) | A kind of block broken belt catcher | |
CN107555218A (en) | A kind of body paper automatic loading and unloading device and the cutting machine with the device | |
CN107244386A (en) | A kind of receipts anchor device of anchor winch | |
CN207876076U (en) | One kind tying up frame | |
CN206417007U (en) | Coal mine inclined shaft lace curtaining formula car arrester | |
CN205414724U (en) | A laser cutting machine for steel sheet | |
CN108996292B (en) | Separate winder is used in a kind of production of protective film | |
CN207030815U (en) | The anti-big rope job-hopping structure of a kind of overhead traveling crane and its pulley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180713 |
|
RJ01 | Rejection of invention patent application after publication |