CN108269447A - A kind of reactor protection tube assembly bourdon tube replaces simulation training platform - Google Patents

A kind of reactor protection tube assembly bourdon tube replaces simulation training platform Download PDF

Info

Publication number
CN108269447A
CN108269447A CN201611251476.8A CN201611251476A CN108269447A CN 108269447 A CN108269447 A CN 108269447A CN 201611251476 A CN201611251476 A CN 201611251476A CN 108269447 A CN108269447 A CN 108269447A
Authority
CN
China
Prior art keywords
bourdon tube
backing plate
bourdon
gasket
tube assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611251476.8A
Other languages
Chinese (zh)
Inventor
尤晓波
赵亚明
兰晓伟
曾振华
曹晔
胡宇
刘勇
李高超
易良川
胡彬
吴磊
张建军
隋震
高生华
张宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nuclear Power Corp
Original Assignee
Jiangsu Nuclear Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nuclear Power Corp filed Critical Jiangsu Nuclear Power Corp
Priority to CN201611251476.8A priority Critical patent/CN108269447A/en
Publication of CN108269447A publication Critical patent/CN108269447A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

The invention belongs to nuclear power plant reactor service technique fields, and in particular to a kind of reactor protection tube assembly bourdon tube replaces simulation training platform.The present invention includes a bourdon tube, bourdon tube fastener, backing plate and support element; bourdon tube is fixed on by bourdon tube fastener above backing plate; support element is connected to below backing plate; wherein; backing plate is the tablet with certain radian, and radian protection tube assembly convex shoulder radian corresponding with single clarinet is identical;Backing plate is equipped with several threaded holes, and position is corresponding with the bolt hole position of the bourdon tube above backing plate;Threaded hole internal thread is identical with protection tube assembly convex shoulder screw thread.The present invention solves protection tube assembly bourdon tube and replaces the technical issues of operation difficulty is big, the consuming time is long, collective dose is high; it can be in overhaul early period to service personnel's intense session; the level of skill of service personnel is improved, reduces the time used in this work, reduces personnel's radioactive dose.

Description

A kind of reactor protection tube assembly bourdon tube replaces simulation training platform
Technical field
The invention belongs to nuclear power plant reactor service technique fields, and in particular to a kind of reactor protection tube assembly bourdon tube Replace simulation training platform.
Background technology
Field gulf nuclear power station uses Russia VVER-1000 type presurized water reactor units, and type of reactor is B-428 types.Reactor Tube assembly bourdon tube is protected to be mounted on protection tube assembly convex shoulder, is coordinated with concave station in upper element, in upper element and protection Elastic connection is established between tube assembly.When implementing to seal to reactor primary sealing area using kingbolt, bourdon tube flexible deformation The reaction force of generation makes the sealing of primary sealing area relatively reliable.When main pump is run, bourdon tube is additionally operable to prevent core barrel Floating and vibrations.Therefore, correct, the reliable installation of bourdon tube plays to pass normal reactor operation, power station normal power generation Important role.
As shown in Figure 1, protection tube assembly bourdon tube shares three, each bourdon tube is the cylinder with certain radian Shape, three bourdon tubes are evenly distributed on the convex shoulder of protection tube assembly, are spliced into a circle, the structure of three bourdon tubes and tight Gu mode is consistent.The replacement of protection tube assembly bourdon tube is operated in protection tube assembly time and installs into rear progress, is as follows:
(1) lock washer is moved toward straightening with screwdriver and fitter's hammer can be pounded;
(2) bolt is backed out, bolt and lock washer, gasket are put into fastener pallet;
(3) old bourdon tube is removed, is hung out with crane, be put into designated position;
(4) the new effective crane of compressed spring is hung near protection tube assembly;
(5) bourdon tube is installed on the convex shoulder of protection tube assembly, by the bolt hole of bourdon tube and protection tube assembly convex shoulder Upper screwed hole is to good;
(6) four gaskets and four check washers are installed, pad hole is aligned with the threaded hole on protection tube assembly convex shoulder;
(7) screw thread of four bolts is coated into molybdenum disulfide 232, bolt is inserted into threaded hole and with torque Mkp=80+ 5N.M is tightened;
(8) lock washer dovetail shaped lock point is bent on the adjacent stupefied side of bolt two, while will lock vertically upward with screwdriver The tight gasket other end is bent on gasket vertically downward, prevents bolt looseness;
(9) more changing jobs for other two bourdon tubes is completed according to above-mentioned steps.
Protection tube assembly bourdon tube in more changing jobs step more difficult, that the used time is longer be:Lock pad in step (1) Piece is not easy to move toward straightening, and time-consuming;New bourdon tube is being installed to protection tube assembly convex shoulder due to accuracy of manufacture error in step (5) Installation site takes longer, there is a situation where to need bourdon tube hole " reaming ";Step (7) and step (8) are in practical operation When need operating personnel have rich experience, while torque adjust lock washer position, with ensure after complete torque Lock washer dovetail shaped lock point is located on the adjacent stupefied side of bolt two, and the lock washer other end is located at any one stupefied side of gasket On.
Since protection tube assembly bourdon tube is replaced, operation difficulty is big, it is long to expend the time, collective dose is high, and there is an urgent need for exploitations A kind of reactor protection tube assembly bourdon tube replaces simulation training platform in overhaul early period to service personnel's intense session.
Invention content
The technical problem to be solved in the invention is:In view of protection tube assembly bourdon tube is replaced, operation difficulty is big, consumes Time-consuming length, collective dose are high, propose that a kind of reactor protection tube assembly bourdon tube replaces simulation training platform, in overhaul early period To service personnel's intense session, the level of skill of service personnel is improved, reduces the time used in this work, reduction personnel are shone Dosage.
It is described that technical scheme is as follows:
A kind of reactor protection tube assembly bourdon tube replaces simulation training platform, is fastened including a bourdon tube, bourdon tube Part, backing plate and support element, bourdon tube are fixed on by bourdon tube fastener above backing plate, and support element is connected to below backing plate.
The bourdon tube is equipped with several penetrating bolts hole.
The backing structure is the tablet with certain radian, and radian protection tube assembly corresponding with single clarinet is convex Shoulder radian is identical;Backing plate is equipped with several threaded holes, and position is corresponding with the bolt hole position of the bourdon tube above backing plate; Threaded hole internal thread is identical with protection tube assembly convex shoulder screw thread.
The bourdon tube fastener includes gasket I, gasket II and bolt, when being installed to bourdon tube, makes bourdon tube The screw thread hole site of bolt hole and backing plate corresponds, and for each bolt hole, places successively be put into gasket II inside it With gasket I, the pad hole of gasket II and the pad hole of gasket I are corresponding with backing plate screw thread hole site, and bolt is passed through bourdon tube It is placed with the bolt hole of gasket II and gasket I and backing plate threaded hole and tightens.
Preferably:Bourdon tube is set there are four penetrating equally distributed bolt hole:Bourdon tube initial and end end respectively sets one A bolt hole respectively sets a bolt hole at 1/3 radian of bourdon tube and at 2/3 radian.
Preferably:For the supports support below backing plate, height makes protection tube assembly bourdon tube more change the mold It is identical with device height during field operation to intend training platform height.
Beneficial effects of the present invention are:
(1) reactor protection tube assembly bourdon tube of the invention replaces simulation training platform, according to actual size 1:1 Ratio makes, and simulation works well:Service personnel is giveed training with the simulation training platform of the present invention before overhaul, hence it is evident that carry The high level of skill of personnel, significantly reduces the activity duration, so as to significantly reduce personnel's radioactive dose.
(2) protection tube assembly bourdon tube of the invention replace simulation training platform in field gulf nuclear power station T108, T208 and It is applied successfully in the work of T109 overhauls ex-period training, is mainly used for carrying out bourdon tube dismounting, bullet to participating in reactor service personnel The trainings such as reed pipe installation, fastener adjustment and bourdon tube position measurement.The result of training of the simulation training platform of the present invention is Through being embodied in overhaul three times.According to statistics, it is 0.27-0.47mSv/h that bourdon tube, which replaces working environment dosage rate, during overhaul, average Dosage rate 0.37mSv/h.The above-mentioned bourdon tube of overhaul three times replaces average used time 1.5h, and than before, more unused training platform is to overhauling people The 0.5h when overhaul of member's training is economized on.By theoretical calculation:More being changed jobs by bourdon tube needs in terms of 3 service personnel, shortens working hour 0.5h can reduce collective dose:0.37mSv/h × 3 people × 0.5h=0.555man.mSv.Actual effect:Above-mentioned overhaul three times Protection tube assembly bourdon tube more change jobs generate collective dose be respectively 1.751man.mSv, 1.673man.mSv, 1.617man.mSv, and this work averagely generates collective dose in the overhaul that unused training platform trains service personnel before 2.25man.mSv.Therefore, service personnel being giveed training with training platform can at least make bourdon tube replace team's agent Amount reduces 0.5man.mSv.
Description of the drawings
Fig. 1 is three protection tube assembly bourdon tube vertical views fastened;
The protection tube assembly bourdon tube that Fig. 2 is the present invention replaces simulation training platform backing plate schematic diagram;
The protection tube assembly bourdon tube that Fig. 3 is the present invention replaces simulation training platform spring pipe assembling section.
In figure, 1- bourdon tubes, 2- bolts, 3- gaskets I, 4- gasket II, 5- backing plate.
Specific embodiment
Simulation training platform is replaced to the protection tube assembly bourdon tube of the present invention with reference to the accompanying drawings and examples to carry out in detail It describes in detail bright.
Since three 1 shape and structures of bourdon tube are identical with fastening means, the protection tube assembly spring in the present embodiment Pipe replaces simulation training platform and carries out simulation training for single bourdon tube 1 is replaced.
The protection tube assembly bourdon tube of the present embodiment is replaced simulation training platform and is fastened including a bourdon tube 1, bourdon tube 1 Part, backing plate 5 and support element:Bourdon tube 1 is fixed on 5 top of backing plate by 1 fastener of bourdon tube, and support element is connected under backing plate 5 Side.
The bourdon tube 1 is unit actual installation bourdon tube 1, and bourdon tube 1 is set there are four penetrating equally distributed spiral shell Keyhole:1 initial and end end of bourdon tube respectively sets a bolt hole, and a bolt hole is respectively set at 11/3 radian of bourdon tube and at 2/3 radian.
As shown in Fig. 2, the backing plate 5, as protection tube assembly convex shoulder simulating piece, structure has certain radian for one Tablet, radian protection tube assembly convex shoulder radian corresponding with single clarinet are identical.It is set on backing plate 5 there are four threaded hole, Position is corresponding with 1 four bolt hole positions of bourdon tube of 5 top of backing plate, threaded hole internal thread and protection tube assembly convex shoulder screw thread It is identical, for installing 1 fastener of bourdon tube.
The support element is welded in 5 lower section of backing plate, is used to support backing plate 5 and bourdon tube 1, and ensures to protect tube assembly spring Pipe replacement simulation training podium level is identical with device height during field operation, and protection tube assembly bourdon tube is made to replace simulation training Platform is worth with more simulation training.
As shown in figure 3, the bourdon tube fastener includes gasket I3, gasket II4 and bolt 2, gasket I3 has anti-uncage Tight effect.When being installed to bourdon tube 1, the bolt hole of bourdon tube 1 is made to be corresponded with the screw thread hole site of backing plate 5, for Each bolt hole is placed successively be put into gasket II4 and gasket I3, the pad hole of gasket II4 and the pad of gasket I3 inside it Film perforation is corresponding with 5 screw thread hole site of backing plate, and bolt 2 is placed with to the bolt hole and pad of gasket II4 and gasket I3 across bourdon tube 1 5 threaded hole of plate is simultaneously tightened.

Claims (3)

1. a kind of reactor protection tube assembly bourdon tube replaces simulation training platform, including a bourdon tube (1), bourdon tube (1) Fastener, backing plate (5) and support element, bourdon tube (1) are fixed on by bourdon tube (1) fastener above backing plate (5), and support element connects It is connected to below backing plate (5), it is characterised in that:
The bourdon tube (1) is equipped with several penetrating bolts hole;
Backing plate (5) structure is the tablet with certain radian, and radian protection tube assembly corresponding with single clarinet is convex Shoulder radian is identical;Backing plate (5) is equipped with several threaded holes, position and the spiro keyhole position of the bourdon tube (1) above backing plate (5) It puts corresponding;Threaded hole internal thread is identical with protection tube assembly convex shoulder screw thread;
Bourdon tube (1) fastener includes gasket I (3), gasket II (4) and bolt (2), when being installed to bourdon tube (1), The bolt hole of bourdon tube (1) is made to be corresponded with the screw thread hole site of backing plate (5), for each bolt hole, is put inside it It puts and is successively put into gasket II (4) and gasket I (3), the pad hole of gasket II (4) and the pad hole of gasket I (3) and backing plate (5) spiral shell Pit position is corresponding, and bolt (2) is placed with the bolt hole of gasket II (4) and gasket I (3) and backing plate (5) across bourdon tube (1) Threaded hole is simultaneously tightened.
2. reactor protection tube assembly bourdon tube according to claim 1 replaces simulation training platform, it is characterised in that:Bullet Reed pipe (1) is set there are four penetrating equally distributed bolt hole:Bourdon tube (1) initial and end end respectively sets a bolt hole, bourdon tube A bolt hole is respectively set at (1) 1/3 radian and at 2/3 radian.
3. reactor protection tube assembly bourdon tube according to claim 1 or 2 replaces simulation training platform, feature exists In:The supports support below the backing plate (5), height make protection tube assembly bourdon tube replace simulation training podium level with Device height is identical during field operation.
CN201611251476.8A 2016-12-30 2016-12-30 A kind of reactor protection tube assembly bourdon tube replaces simulation training platform Pending CN108269447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611251476.8A CN108269447A (en) 2016-12-30 2016-12-30 A kind of reactor protection tube assembly bourdon tube replaces simulation training platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611251476.8A CN108269447A (en) 2016-12-30 2016-12-30 A kind of reactor protection tube assembly bourdon tube replaces simulation training platform

Publications (1)

Publication Number Publication Date
CN108269447A true CN108269447A (en) 2018-07-10

Family

ID=62753672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611251476.8A Pending CN108269447A (en) 2016-12-30 2016-12-30 A kind of reactor protection tube assembly bourdon tube replaces simulation training platform

Country Status (1)

Country Link
CN (1) CN108269447A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109916255A (en) * 2019-03-28 2019-06-21 江苏核电有限公司 A kind of reactor upper element surveyors' staff clamping device and its clamp method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200950318Y (en) * 2006-09-18 2007-09-19 湖南科技大学 Device for simulating dam seepage and detection based on distributed fiber sensing
CN200979769Y (en) * 2006-11-06 2007-11-21 比亚迪股份有限公司 A simulated battery device
CN201145967Y (en) * 2007-11-13 2008-11-05 上海宝冶建设有限公司 Support for training soldering completely-station round tube
CN201732028U (en) * 2010-07-30 2011-02-02 中国科学院金属研究所 Sample holder for high temperature and high pressure water corrosion fatigue test
CN202012002U (en) * 2011-02-14 2011-10-19 松下家电研究开发(杭州)有限公司 Fixing device for water containing barrel of washing machine
CN103164997A (en) * 2011-12-13 2013-06-19 南京梅山冶金发展有限公司 Bolt fastening practical training device
CN203179384U (en) * 2013-03-28 2013-09-04 国家电网公司 Linear rod live working training apparatus
CN203297293U (en) * 2013-06-04 2013-11-20 中联重科股份有限公司渭南分公司 Anti-loosening gasket for threaded connection structure and threaded connection structure
CN103962945A (en) * 2014-04-24 2014-08-06 洛阳市格林滚动体有限公司 Roller material sending device
CN204229672U (en) * 2014-01-15 2015-03-25 奇瑞重工股份有限公司 A kind of hydraulic excavator pipeline assembling training frock
CN204299912U (en) * 2014-05-14 2015-04-29 江苏核电有限公司 Big machinery sealing assembling training and on-line checkingi platform
CN105090079A (en) * 2014-05-14 2015-11-25 江苏核电有限公司 Large-sized mechanical seal assembly training and online detection platform
CN206524030U (en) * 2016-12-30 2017-09-26 江苏核电有限公司 A kind of reactor protection tube assembly bourdon tube changes simulation training platform

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200950318Y (en) * 2006-09-18 2007-09-19 湖南科技大学 Device for simulating dam seepage and detection based on distributed fiber sensing
CN200979769Y (en) * 2006-11-06 2007-11-21 比亚迪股份有限公司 A simulated battery device
CN201145967Y (en) * 2007-11-13 2008-11-05 上海宝冶建设有限公司 Support for training soldering completely-station round tube
CN201732028U (en) * 2010-07-30 2011-02-02 中国科学院金属研究所 Sample holder for high temperature and high pressure water corrosion fatigue test
CN202012002U (en) * 2011-02-14 2011-10-19 松下家电研究开发(杭州)有限公司 Fixing device for water containing barrel of washing machine
CN103164997A (en) * 2011-12-13 2013-06-19 南京梅山冶金发展有限公司 Bolt fastening practical training device
CN203179384U (en) * 2013-03-28 2013-09-04 国家电网公司 Linear rod live working training apparatus
CN203297293U (en) * 2013-06-04 2013-11-20 中联重科股份有限公司渭南分公司 Anti-loosening gasket for threaded connection structure and threaded connection structure
CN204229672U (en) * 2014-01-15 2015-03-25 奇瑞重工股份有限公司 A kind of hydraulic excavator pipeline assembling training frock
CN103962945A (en) * 2014-04-24 2014-08-06 洛阳市格林滚动体有限公司 Roller material sending device
CN204299912U (en) * 2014-05-14 2015-04-29 江苏核电有限公司 Big machinery sealing assembling training and on-line checkingi platform
CN105090079A (en) * 2014-05-14 2015-11-25 江苏核电有限公司 Large-sized mechanical seal assembly training and online detection platform
CN206524030U (en) * 2016-12-30 2017-09-26 江苏核电有限公司 A kind of reactor protection tube assembly bourdon tube changes simulation training platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109916255A (en) * 2019-03-28 2019-06-21 江苏核电有限公司 A kind of reactor upper element surveyors' staff clamping device and its clamp method
CN109916255B (en) * 2019-03-28 2024-03-19 江苏核电有限公司 Clamping device and clamping method for measuring scale of upper assembly of reactor

Similar Documents

Publication Publication Date Title
CN202534370U (en) Adjustable penetrating piece in radioactive environment
CN108269447A (en) A kind of reactor protection tube assembly bourdon tube replaces simulation training platform
CN206524030U (en) A kind of reactor protection tube assembly bourdon tube changes simulation training platform
CN101892672A (en) Integral fixed installation method of embedded steel pipe on roof of coal furnace foundation
CN203433733U (en) Simulation apparatus for chemical disaster accident
CN105155407B (en) Mounting and connection device of large flexible collision avoidance fender and used for pier bearing platform and construction method of replaceable mounting and connection device
US20230272634A1 (en) Bolt-bearing circumferential device for reinforcing and correcting angle irons of transmission tower
CN203104232U (en) Air-leakage maintenance apparatus for under-pressure plugging generator end cover
CN201891074U (en) Bridge-falling resisting device for bridge
CN108730668A (en) Reactor fluid power gate leakage monitoring nozzle plug and its tool specially for attaching and detaching
CN208735101U (en) Reactor fluid power gate leakage monitor
CN206271436U (en) Primary side of steam generator of nuclear power plant adapter blind structure
CN210250951U (en) Power plant fire extinguishing system
CN214566052U (en) Semicircular pipe assembling device
CN207471031U (en) Equipment leveling fixture
CN206361287U (en) A kind of steel flange
CN207285352U (en) A kind of steel construction climbs special iron shoe
CN103794334B (en) A kind of encapsulating method of transformer rectangle mouth of pipe closure plate
CN109027504A (en) A kind of gas pipeline flow regulator
CN114252579A (en) Simulation device and method for purifying mine water in underground reservoir rock mass
CN206279844U (en) A kind of antidetonation formed steel construction
CN220956583U (en) Shock absorber device with convenient mounting and dismounting protection component
CN220978821U (en) Pre-buried bolt positioner
CN217811165U (en) Arrangement structure of anchor bolt cage on basis of wind turbine generator
CN219755648U (en) Flow monitoring device for underground pipeline state detection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710