CN108269447A - A kind of reactor protection tube assembly bourdon tube replaces simulation training platform - Google Patents
A kind of reactor protection tube assembly bourdon tube replaces simulation training platform Download PDFInfo
- Publication number
- CN108269447A CN108269447A CN201611251476.8A CN201611251476A CN108269447A CN 108269447 A CN108269447 A CN 108269447A CN 201611251476 A CN201611251476 A CN 201611251476A CN 108269447 A CN108269447 A CN 108269447A
- Authority
- CN
- China
- Prior art keywords
- bourdon tube
- backing plate
- bourdon
- gasket
- tube assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012549 training Methods 0.000 title claims abstract description 34
- 238000004088 simulation Methods 0.000 title claims abstract description 25
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 235000014676 Phragmites communis Nutrition 0.000 claims description 2
- 241001310793 Podium Species 0.000 claims description 2
- 125000003003 spiro group Chemical group 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 2
- 230000002285 radioactive effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- CWQXQMHSOZUFJS-UHFFFAOYSA-N molybdenum disulfide Chemical compound S=[Mo]=S CWQXQMHSOZUFJS-UHFFFAOYSA-N 0.000 description 1
- 229910052982 molybdenum disulfide Inorganic materials 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
The invention belongs to nuclear power plant reactor service technique fields, and in particular to a kind of reactor protection tube assembly bourdon tube replaces simulation training platform.The present invention includes a bourdon tube, bourdon tube fastener, backing plate and support element; bourdon tube is fixed on by bourdon tube fastener above backing plate; support element is connected to below backing plate; wherein; backing plate is the tablet with certain radian, and radian protection tube assembly convex shoulder radian corresponding with single clarinet is identical;Backing plate is equipped with several threaded holes, and position is corresponding with the bolt hole position of the bourdon tube above backing plate;Threaded hole internal thread is identical with protection tube assembly convex shoulder screw thread.The present invention solves protection tube assembly bourdon tube and replaces the technical issues of operation difficulty is big, the consuming time is long, collective dose is high; it can be in overhaul early period to service personnel's intense session; the level of skill of service personnel is improved, reduces the time used in this work, reduces personnel's radioactive dose.
Description
Technical field
The invention belongs to nuclear power plant reactor service technique fields, and in particular to a kind of reactor protection tube assembly bourdon tube
Replace simulation training platform.
Background technology
Field gulf nuclear power station uses Russia VVER-1000 type presurized water reactor units, and type of reactor is B-428 types.Reactor
Tube assembly bourdon tube is protected to be mounted on protection tube assembly convex shoulder, is coordinated with concave station in upper element, in upper element and protection
Elastic connection is established between tube assembly.When implementing to seal to reactor primary sealing area using kingbolt, bourdon tube flexible deformation
The reaction force of generation makes the sealing of primary sealing area relatively reliable.When main pump is run, bourdon tube is additionally operable to prevent core barrel
Floating and vibrations.Therefore, correct, the reliable installation of bourdon tube plays to pass normal reactor operation, power station normal power generation
Important role.
As shown in Figure 1, protection tube assembly bourdon tube shares three, each bourdon tube is the cylinder with certain radian
Shape, three bourdon tubes are evenly distributed on the convex shoulder of protection tube assembly, are spliced into a circle, the structure of three bourdon tubes and tight
Gu mode is consistent.The replacement of protection tube assembly bourdon tube is operated in protection tube assembly time and installs into rear progress, is as follows:
(1) lock washer is moved toward straightening with screwdriver and fitter's hammer can be pounded;
(2) bolt is backed out, bolt and lock washer, gasket are put into fastener pallet;
(3) old bourdon tube is removed, is hung out with crane, be put into designated position;
(4) the new effective crane of compressed spring is hung near protection tube assembly;
(5) bourdon tube is installed on the convex shoulder of protection tube assembly, by the bolt hole of bourdon tube and protection tube assembly convex shoulder
Upper screwed hole is to good;
(6) four gaskets and four check washers are installed, pad hole is aligned with the threaded hole on protection tube assembly convex shoulder;
(7) screw thread of four bolts is coated into molybdenum disulfide 232, bolt is inserted into threaded hole and with torque Mkp=80+
5N.M is tightened;
(8) lock washer dovetail shaped lock point is bent on the adjacent stupefied side of bolt two, while will lock vertically upward with screwdriver
The tight gasket other end is bent on gasket vertically downward, prevents bolt looseness;
(9) more changing jobs for other two bourdon tubes is completed according to above-mentioned steps.
Protection tube assembly bourdon tube in more changing jobs step more difficult, that the used time is longer be:Lock pad in step (1)
Piece is not easy to move toward straightening, and time-consuming;New bourdon tube is being installed to protection tube assembly convex shoulder due to accuracy of manufacture error in step (5)
Installation site takes longer, there is a situation where to need bourdon tube hole " reaming ";Step (7) and step (8) are in practical operation
When need operating personnel have rich experience, while torque adjust lock washer position, with ensure after complete torque
Lock washer dovetail shaped lock point is located on the adjacent stupefied side of bolt two, and the lock washer other end is located at any one stupefied side of gasket
On.
Since protection tube assembly bourdon tube is replaced, operation difficulty is big, it is long to expend the time, collective dose is high, and there is an urgent need for exploitations
A kind of reactor protection tube assembly bourdon tube replaces simulation training platform in overhaul early period to service personnel's intense session.
Invention content
The technical problem to be solved in the invention is:In view of protection tube assembly bourdon tube is replaced, operation difficulty is big, consumes
Time-consuming length, collective dose are high, propose that a kind of reactor protection tube assembly bourdon tube replaces simulation training platform, in overhaul early period
To service personnel's intense session, the level of skill of service personnel is improved, reduces the time used in this work, reduction personnel are shone
Dosage.
It is described that technical scheme is as follows:
A kind of reactor protection tube assembly bourdon tube replaces simulation training platform, is fastened including a bourdon tube, bourdon tube
Part, backing plate and support element, bourdon tube are fixed on by bourdon tube fastener above backing plate, and support element is connected to below backing plate.
The bourdon tube is equipped with several penetrating bolts hole.
The backing structure is the tablet with certain radian, and radian protection tube assembly corresponding with single clarinet is convex
Shoulder radian is identical;Backing plate is equipped with several threaded holes, and position is corresponding with the bolt hole position of the bourdon tube above backing plate;
Threaded hole internal thread is identical with protection tube assembly convex shoulder screw thread.
The bourdon tube fastener includes gasket I, gasket II and bolt, when being installed to bourdon tube, makes bourdon tube
The screw thread hole site of bolt hole and backing plate corresponds, and for each bolt hole, places successively be put into gasket II inside it
With gasket I, the pad hole of gasket II and the pad hole of gasket I are corresponding with backing plate screw thread hole site, and bolt is passed through bourdon tube
It is placed with the bolt hole of gasket II and gasket I and backing plate threaded hole and tightens.
Preferably:Bourdon tube is set there are four penetrating equally distributed bolt hole:Bourdon tube initial and end end respectively sets one
A bolt hole respectively sets a bolt hole at 1/3 radian of bourdon tube and at 2/3 radian.
Preferably:For the supports support below backing plate, height makes protection tube assembly bourdon tube more change the mold
It is identical with device height during field operation to intend training platform height.
Beneficial effects of the present invention are:
(1) reactor protection tube assembly bourdon tube of the invention replaces simulation training platform, according to actual size 1:1
Ratio makes, and simulation works well:Service personnel is giveed training with the simulation training platform of the present invention before overhaul, hence it is evident that carry
The high level of skill of personnel, significantly reduces the activity duration, so as to significantly reduce personnel's radioactive dose.
(2) protection tube assembly bourdon tube of the invention replace simulation training platform in field gulf nuclear power station T108, T208 and
It is applied successfully in the work of T109 overhauls ex-period training, is mainly used for carrying out bourdon tube dismounting, bullet to participating in reactor service personnel
The trainings such as reed pipe installation, fastener adjustment and bourdon tube position measurement.The result of training of the simulation training platform of the present invention is
Through being embodied in overhaul three times.According to statistics, it is 0.27-0.47mSv/h that bourdon tube, which replaces working environment dosage rate, during overhaul, average
Dosage rate 0.37mSv/h.The above-mentioned bourdon tube of overhaul three times replaces average used time 1.5h, and than before, more unused training platform is to overhauling people
The 0.5h when overhaul of member's training is economized on.By theoretical calculation:More being changed jobs by bourdon tube needs in terms of 3 service personnel, shortens working hour
0.5h can reduce collective dose:0.37mSv/h × 3 people × 0.5h=0.555man.mSv.Actual effect:Above-mentioned overhaul three times
Protection tube assembly bourdon tube more change jobs generate collective dose be respectively 1.751man.mSv, 1.673man.mSv,
1.617man.mSv, and this work averagely generates collective dose in the overhaul that unused training platform trains service personnel before
2.25man.mSv.Therefore, service personnel being giveed training with training platform can at least make bourdon tube replace team's agent
Amount reduces 0.5man.mSv.
Description of the drawings
Fig. 1 is three protection tube assembly bourdon tube vertical views fastened;
The protection tube assembly bourdon tube that Fig. 2 is the present invention replaces simulation training platform backing plate schematic diagram;
The protection tube assembly bourdon tube that Fig. 3 is the present invention replaces simulation training platform spring pipe assembling section.
In figure, 1- bourdon tubes, 2- bolts, 3- gaskets I, 4- gasket II, 5- backing plate.
Specific embodiment
Simulation training platform is replaced to the protection tube assembly bourdon tube of the present invention with reference to the accompanying drawings and examples to carry out in detail
It describes in detail bright.
Since three 1 shape and structures of bourdon tube are identical with fastening means, the protection tube assembly spring in the present embodiment
Pipe replaces simulation training platform and carries out simulation training for single bourdon tube 1 is replaced.
The protection tube assembly bourdon tube of the present embodiment is replaced simulation training platform and is fastened including a bourdon tube 1, bourdon tube 1
Part, backing plate 5 and support element:Bourdon tube 1 is fixed on 5 top of backing plate by 1 fastener of bourdon tube, and support element is connected under backing plate 5
Side.
The bourdon tube 1 is unit actual installation bourdon tube 1, and bourdon tube 1 is set there are four penetrating equally distributed spiral shell
Keyhole:1 initial and end end of bourdon tube respectively sets a bolt hole, and a bolt hole is respectively set at 11/3 radian of bourdon tube and at 2/3 radian.
As shown in Fig. 2, the backing plate 5, as protection tube assembly convex shoulder simulating piece, structure has certain radian for one
Tablet, radian protection tube assembly convex shoulder radian corresponding with single clarinet are identical.It is set on backing plate 5 there are four threaded hole,
Position is corresponding with 1 four bolt hole positions of bourdon tube of 5 top of backing plate, threaded hole internal thread and protection tube assembly convex shoulder screw thread
It is identical, for installing 1 fastener of bourdon tube.
The support element is welded in 5 lower section of backing plate, is used to support backing plate 5 and bourdon tube 1, and ensures to protect tube assembly spring
Pipe replacement simulation training podium level is identical with device height during field operation, and protection tube assembly bourdon tube is made to replace simulation training
Platform is worth with more simulation training.
As shown in figure 3, the bourdon tube fastener includes gasket I3, gasket II4 and bolt 2, gasket I3 has anti-uncage
Tight effect.When being installed to bourdon tube 1, the bolt hole of bourdon tube 1 is made to be corresponded with the screw thread hole site of backing plate 5, for
Each bolt hole is placed successively be put into gasket II4 and gasket I3, the pad hole of gasket II4 and the pad of gasket I3 inside it
Film perforation is corresponding with 5 screw thread hole site of backing plate, and bolt 2 is placed with to the bolt hole and pad of gasket II4 and gasket I3 across bourdon tube 1
5 threaded hole of plate is simultaneously tightened.
Claims (3)
1. a kind of reactor protection tube assembly bourdon tube replaces simulation training platform, including a bourdon tube (1), bourdon tube (1)
Fastener, backing plate (5) and support element, bourdon tube (1) are fixed on by bourdon tube (1) fastener above backing plate (5), and support element connects
It is connected to below backing plate (5), it is characterised in that:
The bourdon tube (1) is equipped with several penetrating bolts hole;
Backing plate (5) structure is the tablet with certain radian, and radian protection tube assembly corresponding with single clarinet is convex
Shoulder radian is identical;Backing plate (5) is equipped with several threaded holes, position and the spiro keyhole position of the bourdon tube (1) above backing plate (5)
It puts corresponding;Threaded hole internal thread is identical with protection tube assembly convex shoulder screw thread;
Bourdon tube (1) fastener includes gasket I (3), gasket II (4) and bolt (2), when being installed to bourdon tube (1),
The bolt hole of bourdon tube (1) is made to be corresponded with the screw thread hole site of backing plate (5), for each bolt hole, is put inside it
It puts and is successively put into gasket II (4) and gasket I (3), the pad hole of gasket II (4) and the pad hole of gasket I (3) and backing plate (5) spiral shell
Pit position is corresponding, and bolt (2) is placed with the bolt hole of gasket II (4) and gasket I (3) and backing plate (5) across bourdon tube (1)
Threaded hole is simultaneously tightened.
2. reactor protection tube assembly bourdon tube according to claim 1 replaces simulation training platform, it is characterised in that:Bullet
Reed pipe (1) is set there are four penetrating equally distributed bolt hole:Bourdon tube (1) initial and end end respectively sets a bolt hole, bourdon tube
A bolt hole is respectively set at (1) 1/3 radian and at 2/3 radian.
3. reactor protection tube assembly bourdon tube according to claim 1 or 2 replaces simulation training platform, feature exists
In:The supports support below the backing plate (5), height make protection tube assembly bourdon tube replace simulation training podium level with
Device height is identical during field operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611251476.8A CN108269447A (en) | 2016-12-30 | 2016-12-30 | A kind of reactor protection tube assembly bourdon tube replaces simulation training platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611251476.8A CN108269447A (en) | 2016-12-30 | 2016-12-30 | A kind of reactor protection tube assembly bourdon tube replaces simulation training platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108269447A true CN108269447A (en) | 2018-07-10 |
Family
ID=62753672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611251476.8A Pending CN108269447A (en) | 2016-12-30 | 2016-12-30 | A kind of reactor protection tube assembly bourdon tube replaces simulation training platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108269447A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109916255A (en) * | 2019-03-28 | 2019-06-21 | 江苏核电有限公司 | A kind of reactor upper element surveyors' staff clamping device and its clamp method |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200950318Y (en) * | 2006-09-18 | 2007-09-19 | 湖南科技大学 | Device for simulating dam seepage and detection based on distributed fiber sensing |
CN200979769Y (en) * | 2006-11-06 | 2007-11-21 | 比亚迪股份有限公司 | A simulated battery device |
CN201145967Y (en) * | 2007-11-13 | 2008-11-05 | 上海宝冶建设有限公司 | Support for training soldering completely-station round tube |
CN201732028U (en) * | 2010-07-30 | 2011-02-02 | 中国科学院金属研究所 | Sample holder for high temperature and high pressure water corrosion fatigue test |
CN202012002U (en) * | 2011-02-14 | 2011-10-19 | 松下家电研究开发(杭州)有限公司 | Fixing device for water containing barrel of washing machine |
CN103164997A (en) * | 2011-12-13 | 2013-06-19 | 南京梅山冶金发展有限公司 | Bolt fastening practical training device |
CN203179384U (en) * | 2013-03-28 | 2013-09-04 | 国家电网公司 | Linear rod live working training apparatus |
CN203297293U (en) * | 2013-06-04 | 2013-11-20 | 中联重科股份有限公司渭南分公司 | Anti-loosening gasket for threaded connection structure and threaded connection structure |
CN103962945A (en) * | 2014-04-24 | 2014-08-06 | 洛阳市格林滚动体有限公司 | Roller material sending device |
CN204229672U (en) * | 2014-01-15 | 2015-03-25 | 奇瑞重工股份有限公司 | A kind of hydraulic excavator pipeline assembling training frock |
CN204299912U (en) * | 2014-05-14 | 2015-04-29 | 江苏核电有限公司 | Big machinery sealing assembling training and on-line checkingi platform |
CN105090079A (en) * | 2014-05-14 | 2015-11-25 | 江苏核电有限公司 | Large-sized mechanical seal assembly training and online detection platform |
CN206524030U (en) * | 2016-12-30 | 2017-09-26 | 江苏核电有限公司 | A kind of reactor protection tube assembly bourdon tube changes simulation training platform |
-
2016
- 2016-12-30 CN CN201611251476.8A patent/CN108269447A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200950318Y (en) * | 2006-09-18 | 2007-09-19 | 湖南科技大学 | Device for simulating dam seepage and detection based on distributed fiber sensing |
CN200979769Y (en) * | 2006-11-06 | 2007-11-21 | 比亚迪股份有限公司 | A simulated battery device |
CN201145967Y (en) * | 2007-11-13 | 2008-11-05 | 上海宝冶建设有限公司 | Support for training soldering completely-station round tube |
CN201732028U (en) * | 2010-07-30 | 2011-02-02 | 中国科学院金属研究所 | Sample holder for high temperature and high pressure water corrosion fatigue test |
CN202012002U (en) * | 2011-02-14 | 2011-10-19 | 松下家电研究开发(杭州)有限公司 | Fixing device for water containing barrel of washing machine |
CN103164997A (en) * | 2011-12-13 | 2013-06-19 | 南京梅山冶金发展有限公司 | Bolt fastening practical training device |
CN203179384U (en) * | 2013-03-28 | 2013-09-04 | 国家电网公司 | Linear rod live working training apparatus |
CN203297293U (en) * | 2013-06-04 | 2013-11-20 | 中联重科股份有限公司渭南分公司 | Anti-loosening gasket for threaded connection structure and threaded connection structure |
CN204229672U (en) * | 2014-01-15 | 2015-03-25 | 奇瑞重工股份有限公司 | A kind of hydraulic excavator pipeline assembling training frock |
CN103962945A (en) * | 2014-04-24 | 2014-08-06 | 洛阳市格林滚动体有限公司 | Roller material sending device |
CN204299912U (en) * | 2014-05-14 | 2015-04-29 | 江苏核电有限公司 | Big machinery sealing assembling training and on-line checkingi platform |
CN105090079A (en) * | 2014-05-14 | 2015-11-25 | 江苏核电有限公司 | Large-sized mechanical seal assembly training and online detection platform |
CN206524030U (en) * | 2016-12-30 | 2017-09-26 | 江苏核电有限公司 | A kind of reactor protection tube assembly bourdon tube changes simulation training platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109916255A (en) * | 2019-03-28 | 2019-06-21 | 江苏核电有限公司 | A kind of reactor upper element surveyors' staff clamping device and its clamp method |
CN109916255B (en) * | 2019-03-28 | 2024-03-19 | 江苏核电有限公司 | Clamping device and clamping method for measuring scale of upper assembly of reactor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202534370U (en) | Adjustable penetrating piece in radioactive environment | |
CN108269447A (en) | A kind of reactor protection tube assembly bourdon tube replaces simulation training platform | |
CN206524030U (en) | A kind of reactor protection tube assembly bourdon tube changes simulation training platform | |
CN101892672A (en) | Integral fixed installation method of embedded steel pipe on roof of coal furnace foundation | |
CN203433733U (en) | Simulation apparatus for chemical disaster accident | |
CN105155407B (en) | Mounting and connection device of large flexible collision avoidance fender and used for pier bearing platform and construction method of replaceable mounting and connection device | |
US20230272634A1 (en) | Bolt-bearing circumferential device for reinforcing and correcting angle irons of transmission tower | |
CN203104232U (en) | Air-leakage maintenance apparatus for under-pressure plugging generator end cover | |
CN201891074U (en) | Bridge-falling resisting device for bridge | |
CN108730668A (en) | Reactor fluid power gate leakage monitoring nozzle plug and its tool specially for attaching and detaching | |
CN208735101U (en) | Reactor fluid power gate leakage monitor | |
CN206271436U (en) | Primary side of steam generator of nuclear power plant adapter blind structure | |
CN210250951U (en) | Power plant fire extinguishing system | |
CN214566052U (en) | Semicircular pipe assembling device | |
CN207471031U (en) | Equipment leveling fixture | |
CN206361287U (en) | A kind of steel flange | |
CN207285352U (en) | A kind of steel construction climbs special iron shoe | |
CN103794334B (en) | A kind of encapsulating method of transformer rectangle mouth of pipe closure plate | |
CN109027504A (en) | A kind of gas pipeline flow regulator | |
CN114252579A (en) | Simulation device and method for purifying mine water in underground reservoir rock mass | |
CN206279844U (en) | A kind of antidetonation formed steel construction | |
CN220956583U (en) | Shock absorber device with convenient mounting and dismounting protection component | |
CN220978821U (en) | Pre-buried bolt positioner | |
CN217811165U (en) | Arrangement structure of anchor bolt cage on basis of wind turbine generator | |
CN219755648U (en) | Flow monitoring device for underground pipeline state detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |