CN108268358A - The monitoring method of task, apparatus and system - Google Patents
The monitoring method of task, apparatus and system Download PDFInfo
- Publication number
- CN108268358A CN108268358A CN201711480723.6A CN201711480723A CN108268358A CN 108268358 A CN108268358 A CN 108268358A CN 201711480723 A CN201711480723 A CN 201711480723A CN 108268358 A CN108268358 A CN 108268358A
- Authority
- CN
- China
- Prior art keywords
- target timing
- timing task
- task
- run time
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3003—Monitoring arrangements specially adapted to the computing system or computing system component being monitored
- G06F11/3017—Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system is implementing multitasking
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/0703—Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
- G06F11/0766—Error or fault reporting or storing
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computing Systems (AREA)
- Mathematical Physics (AREA)
- Debugging And Monitoring (AREA)
Abstract
The invention discloses a kind of monitoring method of task, apparatus and systems, it is related to field of computer technology, main purpose is to solve comprehensively, timely be monitored each timed task in the prior art, realizes the monitoring comprehensively, timely completed to each timed task.The main technical schemes of the present invention include:The run time of target timing task is configured in management end, and the run time of the target timing task is sent to monitoring control, so that the monitoring control monitors whether the target timing task is run according to the run time;Receive the monitored results to the target timing task that the monitoring control is sent.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of monitoring method of task, apparatus and system.
Background technology
With the fast development of computer technology, computer can be all used in all trades and professions and carries out practical operation and control
System.For the ease of managing and saving computer resource, it will usually set timed task in a computer.
At present, it after timed task is set successfully, is run according to run time, running frequency set etc., to subtract
The management resource overhead of few computer resource;After timed task is set, manually go to monitor whether those tasks run on time.But
It is that, when the timed task of setting is more, timed task operating status that the mode that manually monitors monitors is not comprehensive enough, promptness
Difference.
Invention content
In view of this, a kind of monitoring method of task provided by the invention, apparatus and system, main purpose are to solve existing
Having in technology comprehensively, to be timely monitored each timed task, realize and comprehensively, timely complete to appoint each timing
The monitoring of business.
According to the present invention on one side, the present invention provides a kind of monitoring method of task, including:
The run time of target timing task is configured in management end, and the run time of the target timing task is sent to
Control is monitored, so that the monitoring control monitors whether the target timing task is run according to the run time;
Receive the monitored results to the target timing task that the monitoring control is sent.
Optionally, the method further includes:
Determine the first quantity of the monitoring target timing task included in the monitored results, the mesh with configuration
Whether the second quantity for marking timed task is consistent;
If first quantity and second quantity are inconsistent, it is determined that go out first quantity and second quantity
Difference, and determine difference quantities target timing task not running.
Optionally, the method further includes:
Alarm path when setting the target timing task appearance abnormal.
Optionally, the run time of the target timing task includes:Target timing task when operation starts between and transport
The row end time;
After the monitored results that the monitoring control is sent are received, the method further includes:
The first time with the second time is compared, determines the target timing task whether normal operation,
In, the first time be monitored results in monitor target timing task when operation starts between and the end of run time,
Second time be configuration setting target timing task when operation starts between and the end of run time;
If the first time and second Time Inconsistency, it is determined that it is different that operation occurs for the target timing task
Often.
Optionally, the method further includes:
The target timing task of operation exception and the target timing task of not running are carried out according to the alarm approach
Alarm.
Optionally, the method further includes:
The target timing task of the target timing task of the operation exception and not running is visualized.
Second aspect, the present invention also provides a kind of monitoring device of task, including:
Dispensing unit, for being configured the run time of target timing task, and during by the operation of the target timing task
Between be sent to monitoring control, so that the monitoring control monitors whether the target timing task carries out according to the run time
Operation;
Receiving unit, for receiving the monitored results to the target timing task that the monitoring control is sent.
Optionally, described device further includes:
First determination unit, for determining the first number of the monitoring target timing task included in the monitored results
Amount, it is whether consistent with the second quantity of the target timing task of configuration;
Second determination unit determines that first quantity differs with second quantity for working as first determination unit
During cause, the difference of first quantity and second quantity is determined, and determine that the target timing task of difference quantities is not transported
Row.
Optionally, described device further includes:
Setting unit, for setting the alarm path when target timing task occurs abnormal.
Optionally, the run time of the target timing task includes:Target timing task when operation starts between and transport
The row end time;
Described device further includes:
Comparing unit, for receive that the monitoring control is sent in the receiving unit monitored results after, by described the
One time was compared with the second time, wherein, the first time is the target timing task monitored in monitored results
Between when operation starts and the end of run time, the second time be the target timing task of configuration setting when operation starts between and transport
The row end time;
Third determination unit, for the comparing unit compare first time in second time course,
Determine the target timing task whether normal operation
4th determination unit determines that the first time differs with second time for working as the third determination unit
During cause, determine that operation exception occurs for the target timing task.
Optionally, described device further includes:
Alarm unit, for the target timing task and described for the operation exception for determining the 4th determination unit
The target timing task for the not running that two determination units determine is alarmed according to the alarm approach.
Optionally, described device further includes:
Display unit, for the target timing task of the target timing task of the operation exception and not running to be carried out
It visualizes.
The third aspect, the present invention also provides a kind of monitoring system of task, including management end and client, wherein,
The management end for the run time of target timing task in the client to be configured, and the target is determined
When task run time be sent to client, appoint so that the monitoring control in the client monitors the target timing
Whether business is run according to the run time;
The client, for receiving the run time of the target timing task of the management end configuration, and based on described
Monitoring control monitors whether the target timing task is run according to the run time, by the target timing task
Monitored results are sent to the management end;
The management end is additionally operable to receive the monitored results that control transmission is monitored in the client.
By above-mentioned technical proposal, the monitoring method of task provided by the invention, apparatus and system, management end configuration target
The run time of timed task, and the run time of the target timing task is sent to monitoring control, so as to the monitoring
Control monitors whether the target timing task is run according to the run time, receives pair that the monitoring control is sent
The monitored results of the target timing task;Compared with prior art, the present invention realizes pair by using the mode of monitoring control
The monitoring of timed task, this kind of automatically-monitored mode can realize comprehensively, timely each timed task is monitored.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects of the present invention, feature and advantage can
It is clearer and more comprehensible, below the special specific embodiment for lifting the present invention.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field
Technical staff will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 shows a kind of flow chart of the monitoring method of task provided in an embodiment of the present invention;
Fig. 2 shows the flow charts of the monitoring method of another task provided in an embodiment of the present invention;
Fig. 3 shows a kind of schematic diagram of monitored results provided in an embodiment of the present invention;
Fig. 4 shows a kind of composition frame chart of the monitoring device of task provided in an embodiment of the present invention;
Fig. 5 shows the composition frame chart of the monitoring device of another task provided in an embodiment of the present invention;
Fig. 6 shows a kind of composition frame chart of the monitoring system of task provided in an embodiment of the present invention.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.
The embodiment of the present invention provides a kind of monitoring method of task, as shown in Figure 1, the method includes:101st, management end
The run time of target timing task is configured, and the run time of the target timing task is sent to monitoring control, so as to
The monitoring control monitors whether the target timing task is run according to the run time.
Target timing task described in the embodiment of the present invention is generally timing script, can be timing antivirus script, timing
More new script, timing upgrade script, timing acquisition specify the script of data, the script periodically issued the documents etc., and the present invention is real
Example is applied not limit the concrete type of target timing task.
When management end sets the target timing task run in client, in addition to the class of target timing task to be determined
Outside type, the run time (between when operation starts, end of run time) of target timing task there is provision of, each target timing is appointed
Basic setup information comprising run time is sent to client, so as to client by the basic setups information such as operation duration of business
End carries out operational objective timed task according to the basic setup information.
After client receives the target timing task of management end setting, under normal operation, target timing task meeting
It is run according to fixed run time, the situation of operation exception occurs in target timing task in order to prevent, in the client
Monitoring control is additionally provided with, which runs shape for supervising and being reported to management end the operating status of target timing task
State include target timing task when operation starts between, end of run time and whether abnormal.
In order not to block the normal operation of other scripts in client, control target timing in client is got is monitored
Task when operation starts between, end of run time and whether after exception, can the monitored results monitored be sent to pipe at once
End is managed, and is not to perform the arrangement of monitored results in the client in monitoring control or keep in, to waste the place of client
Manage resource.In the embodiment of the present invention, the monitoring control can be that the monitoring software introduced in target timing task is opened
Kit (Software Development Kit, SDK) is sent out, which carries out the interaction of data by the interface of management end.
There is no proper restriction in specific implementation process, between management end and client, it is assumed that work as management end
After target timing task is set on equipment of itself, then management end can also be used as client, when target timing task setting
In other equipment, other equipment is as client.
102nd, management end receives the monitored results to the target timing task that the monitoring control is sent.
After monitoring control in the client gets the operation result of target timing task, monitored results are transmitted in real time
To management end, so that management end analyzes the operation conditions of each target timing task.
The run time of target timing task is configured in the monitoring method of task provided in an embodiment of the present invention, management end, and
The run time of the target timing task is sent to monitoring control, is appointed so that the monitoring control monitors the target timing
Whether business is run according to the run time, receives the monitoring to the target timing task that the monitoring control is sent
As a result;Compared with prior art, the embodiment of the present invention realizes monitoring to timed task by using the mode of monitoring control, should
Kind automatically-monitored mode can be realized comprehensively, timely each timed task is monitored.
Further, the purpose monitored in real time to target timing task is, when target timing task breaks down
When, failure statistics and early warning in time are carried out, the failure due to target timing task is avoided irremediable loss occur.Based on upper
Purpose is stated, the embodiment of the present invention also provides the monitoring method of another task, as shown in Fig. 2, the method includes:
201st, the run time of target timing task is configured, and the run time of the target timing task is sent to prison
Control is controlled, (is synchronized so that whether the monitoring control monitoring target timing task is run according to the run time
It is rapid 101).
Wherein, the run time of the target timing task includes:Target timing task when operation starts between and run
End time;
Alarm path when the 202nd, setting the target timing task appearance abnormal.
The purpose in setting alarm path is to monitor the failure of target timing task when the monitoring control in client
When, can alert process be carried out by the alarm path of setting in time, so that staff appoints the target timing of failure
Business is debugged.
In actual application, alarm path can include but is not limited to the following contents, such as:It is mailbox, phone, short
Letter, the pop-up of client display interface, short message etc..The embodiment of the present invention does not make the sequence of step 201 and step 202
It limits.
203rd, the monitored results to the target timing task of the monitoring control transmission are received (with step 102).
In order to make it easy to understand, illustrate the monitored results that management end receives in the form shown.As shown in figure 3, Fig. 3 is shown
A kind of schematic diagram of monitored results provided in an embodiment of the present invention, it should be noted that the exemplary only explanations of Fig. 3, this
Inventive embodiments report form to be not construed as limiting to monitored results, can also be chained list etc..
204th, the first quantity of the monitoring target timing task included in the monitored results, the institute with configuration are determined
Whether the second quantity for stating target timing task is consistent.
After monitored results are received, first have to determine the first quantity of the monitoring target timing task, with configuration
Whether the second quantity of the target timing task is consistent, if unanimously, illustrating that the target timing task in client has been turned on
Operation, and step 205 is continued to execute, if first quantity and second quantity are inconsistent, illustrate the mesh in client
It marks in timed task there may be the not actuated operation of target timing task, the reason of needs to the not actuated operation of target timing task
It is investigated, in troubleshooting procedure, first determines the difference of first quantity and second quantity, which is target timing
The quantity of task not running after quantification, is investigated according to the ID of target timing task, until determining that target timing is appointed
The reason of business not running.
205th, the first time with the second time is compared, determines whether the target timing task normally transports
Row, wherein, the first time be monitored results in monitor target timing task when operation starts between and end of run
Time, the second time be configuration setting target timing task when operation starts between and the end of run time.
Seen from the above description, monitoring control can only obtain target timing task in the client when operation starts between,
End of run time and with the presence or absence of exception, the analysis of monitored results can't be performed.Accordingly, it is determined that the first quantity and second
After quantity is consistent, by the comparison to first time and the second time, determine target timing task whether timing, run on time.
Illustratively, it is assumed that at the first time record be target timing task when operation starts between 10:10 and operation knot
The beam time 10:10, the second time configuration mark timed task when operation starts between 10:100 and the end of run time 10:10,
The two is identical, illustrates the target timing task normal operation.If the second time configuration mark timed task when operation starts between
10:10 and the end of run time 10:12, although the success of target timing task, is a time out, illustrates that target timing task run is different
Often.
If the 206th, the first time and second Time Inconsistency, it is determined that the target timing task is run
It is abnormal.
Operation exception described in the embodiment of the present invention includes a variety of situations, such as:Operation failure, operation failure and time-out,
Run successfully but time-out, should not running, unknown error etc..It should be noted that operation exception for should not running shape
State is when target timing task process is configured under this kind of state, is configured with lock function, i.e., do not support to run simultaneously it is multiple into
Under the premise of journey, when upper target timing task not running is completed, next target timing task is not carried out.
207th, by the target timing task of operation exception and the target timing task of not running according to the alarm approach
It alarms.
The purpose alarmed is, notifies that the operation maintenance personnel of target timing task adjusts the exception in time in time
Examination, avoids the occurrence of adverse consequences.
In actual application, when occurring repeatedly abnormal in a client, repeatedly abnormal will can disposably it carry out
Alarm, can also carry out abnormal alarm, specifically, the embodiment of the present invention does not limit the mode of alarm in a manner of alarming one by one
It is fixed.
208th, the target timing task of the target timing task of the operation exception and not running is subjected to visualization exhibition
Show.
The target timing task of the target timing task of misoperation and not running is visualized, purpose exists
In all target timing tasks under macroscopically being monitored to management end carry out same management, determine which target timing task
For often occur the timed task of exception/not running or, where the period occur exception/not running quantity it is relatively more,
With according to visual displaying, the quantity of less exception/not running target timing task.
When performing visual presentation, the modes such as block diagram, cake chart, line chart can be used and be shown, the present invention is real
Example is applied not limit this.
Further, as the realization to method shown in above-mentioned Fig. 1 and Fig. 2, another embodiment of the present invention additionally provides one
The monitoring device of kind task.The device embodiment is corresponding with preceding method embodiment, and for ease of reading, present apparatus embodiment is no longer
Detail content in preceding method embodiment is repeated one by one, it should be understood that the device in the present embodiment can correspond to
Realize the full content in preceding method embodiment.
The embodiment of the present invention also provides a kind of monitoring device of task, as shown in figure 4, including:
Dispensing unit 31, for being configured the run time of target timing task, and by the operation of the target timing task
Time is sent to monitoring control, so as to the monitoring control monitor the target timing task whether according to the run time into
Row operation;
Receiving unit 32, for receiving the monitored results to the target timing task that the monitoring control is sent.
Further, as shown in figure 5, described device further includes:
First determination unit 33, for determining included in the monitored results the first of the monitoring target timing task
Quantity, it is whether consistent with the second quantity of the target timing task of configuration;
Second determination unit 34 determines first quantity and second quantity for working as first determination unit 33
When inconsistent, the difference of first quantity and second quantity is determined, and determine the target timing task of difference quantities
Not running.
Further, as shown in figure 5, described device further includes:
Setting unit 35, for setting the alarm path when target timing task occurs abnormal.
Further, as shown in figure 5, the run time of the target timing task includes:The operation of target timing task
Time started and end of run time;
Described device further includes:
Comparing unit 36, described in after the receiving unit receives the monitored results for monitoring control and sending, inciting somebody to action
It is compared at the first time with the second time, wherein, the first time is the target timing task monitored in monitored results
When operation starts between and the end of run time, the second time be configuration setting target timing task when operation starts between and
The end of run time;
Third determination unit 37, for comparing the first time and second time course in the comparing unit 36
In, determine the target timing task whether normal operation
4th determination unit 38 determines the first time and second time for working as the third determination unit 37
When inconsistent, determine that operation exception occurs for the target timing task.
Further, as shown in figure 5, described device further includes:
Alarm unit 39, for by the 4th determination unit 38 determine operation exception target timing task and institute
The target timing task for stating the determining not running of the second determination unit 34 is alarmed according to the alarm approach.
Further, as shown in figure 5, described device further includes:
Display unit 310, for by the target timing task of the target timing task of the operation exception and not running
It is visualized.
Further, the embodiment of the present invention also provides a kind of monitoring system of task, as shown in fig. 6, including management end 41
And client 42, wherein,
The management end 41, for being configured the run time of target timing task in the client 42, and by the mesh
The run time of mark timed task is sent to client 42, so that the monitoring control in the client 42 monitors the mesh
Whether mark timed task is run according to the run time;
The client 42, for receiving the run time of the target timing task of the management end configuration, and based on institute
It states monitoring control and monitors whether the target timing task is run according to the run time, by the target timing task
Monitored results be sent to the management end 41;
The management end 41 is additionally operable to receive the monitored results that control transmission is monitored in the client 42.
The run time of target timing task is configured in the monitoring device and system of task provided by the invention, management end, and
The run time of the target timing task is sent to monitoring control, is appointed so that the monitoring control monitors the target timing
Whether business is run according to the run time, receives the monitoring to the target timing task that the monitoring control is sent
As a result;Compared with prior art, the mode of the invention by using monitoring control realizes the monitoring to timed task, this kind automatic
Change monitoring mode can realize comprehensively, timely each timed task is monitored.
Following technical solution is also disclosed in the embodiment of the present invention:
A1, a kind of monitoring method of task, including:
The run time of target timing task is configured in management end, and the run time of the target timing task is sent to
Control is monitored, so that the monitoring control monitors whether the target timing task is run according to the run time;
Receive the monitored results to the target timing task that the monitoring control is sent.
A2, the method according to A1, the method further include:
Determine the first quantity of the monitoring target timing task included in the monitored results, the mesh with configuration
Whether the second quantity for marking timed task is consistent;
If first quantity and second quantity are inconsistent, it is determined that go out first quantity and second quantity
Difference, and determine difference quantities target timing task not running.
A3, the method according to A2, the method further include:
Alarm path when setting the target timing task appearance abnormal.
A4, the method according to A3, the run time of the target timing task include:The operation of target timing task
Time started and end of run time;
After the monitored results that the monitoring control is sent are received, the method further includes:
The first time with the second time is compared, determines the target timing task whether normal operation,
In, the first time be monitored results in monitor target timing task when operation starts between and the end of run time,
Second time be configuration setting target timing task when operation starts between and the end of run time;
If the first time and second Time Inconsistency, it is determined that it is different that operation occurs for the target timing task
Often.
A5, the method according to A4, the method further include:
The target timing task of operation exception and the target timing task of not running are carried out according to the alarm approach
Alarm.
A6, the method according to A5, the method further include:
The target timing task of the target timing task of the operation exception and not running is visualized.
B7, a kind of monitoring device of task, including:
Dispensing unit, for being configured the run time of target timing task, and during by the operation of the target timing task
Between be sent to monitoring control, so that the monitoring control monitors whether the target timing task carries out according to the run time
Operation;
Receiving unit, for receiving the monitored results to the target timing task that the monitoring control is sent.
B8, the device according to B7, described device further include:
First determination unit, for determining the first number of the monitoring target timing task included in the monitored results
Amount, it is whether consistent with the second quantity of the target timing task of configuration;
Second determination unit determines that first quantity differs with second quantity for working as first determination unit
During cause, the difference of first quantity and second quantity is determined, and determine that the target timing task of difference quantities is not transported
Row.
B9, the device according to B8, described device further include:
Setting unit, for setting the alarm path when target timing task occurs abnormal.
B10, the device according to B9, the run time of the target timing task include:The fortune of target timing task
Row time started and end of run time;
Described device further includes:
Comparing unit, for receive that the monitoring control is sent in the receiving unit monitored results after, by described the
One time was compared with the second time, wherein, the first time is the target timing task monitored in monitored results
Between when operation starts and the end of run time, the second time be the target timing task of configuration setting when operation starts between and transport
The row end time;
Third determination unit, for the comparing unit compare first time in second time course,
Determine the target timing task whether normal operation
4th determination unit determines that the first time differs with second time for working as the third determination unit
During cause, determine that operation exception occurs for the target timing task.
B11, the device according to B10, described device further include:
Alarm unit, for the target timing task and described for the operation exception for determining the 4th determination unit
The target timing task for the not running that two determination units determine is alarmed according to the alarm approach.
B12, the device according to B11, described device further include:
Display unit, for the target timing task of the target timing task of the operation exception and not running to be carried out
It visualizes.
C13, a kind of monitoring system of task, including management end and client, wherein,
The management end for the run time of target timing task in the client to be configured, and the target is determined
When task run time be sent to client, appoint so that the monitoring control in the client monitors the target timing
Whether business is run according to the run time;
The client, for receiving the run time of the target timing task of the management end configuration, and based on described
Monitoring control monitors whether the target timing task is run according to the run time, by the target timing task
Monitored results are sent to the management end;
The management end is additionally operable to receive the monitored results that control transmission is monitored in the client.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment
Point, it may refer to the associated description of other embodiment.
It is understood that the correlated characteristic in the above method and device can be referred to mutually.In addition, in above-described embodiment
" first ", " second " etc. be for distinguishing each embodiment, and do not represent the quality of each embodiment.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit can refer to the corresponding process in preceding method embodiment, and details are not described herein.
Algorithm and display be not inherently related to any certain computer, virtual system or miscellaneous equipment provided herein.
Various general-purpose systems can also be used together with teaching based on this.As described above, required by constructing this kind of system
Structure be obvious.In addition, the present invention is not also directed to any certain programmed language.It should be understood that it can utilize various
Programming language realizes the content of invention described herein, and the description done above to language-specific is to disclose this hair
Bright preferred forms.
In the specification provided in this place, numerous specific details are set forth.It is to be appreciated, however, that the implementation of the present invention
Example can be put into practice without these specific details.In some instances, well known method, structure is not been shown in detail
And technology, so as not to obscure the understanding of this description.
Similarly, it should be understood that in order to simplify the disclosure and help to understand one or more of each inventive aspect,
Above in the description of exemplary embodiment of the present invention, each feature of the invention is grouped together into single implementation sometimes
In example, figure or descriptions thereof.However, the method for the disclosure should be construed to reflect following intention:I.e. required guarantor
Shield the present invention claims the more features of feature than being expressly recited in each claim.More precisely, as following
Claims reflect as, inventive aspect is all features less than single embodiment disclosed above.Therefore,
Thus the claims for following specific embodiment are expressly incorporated in the specific embodiment, wherein each claim is in itself
Separate embodiments all as the present invention.
Those skilled in the art, which are appreciated that, to carry out adaptively the module in the equipment in embodiment
Change and they are arranged in one or more equipment different from the embodiment.It can be the module or list in embodiment
Member or component be combined into a module or unit or component and can be divided into addition multiple submodule or subelement or
Sub-component.Other than such feature and/or at least some of process or unit exclude each other, it may be used any
Combination is disclosed to all features disclosed in this specification (including adjoint claim, abstract and attached drawing) and so to appoint
Where all processes or unit of method or equipment are combined.Unless expressly stated otherwise, this specification is (including adjoint power
Profit requirement, abstract and attached drawing) disclosed in each feature can be by providing the alternative features of identical, equivalent or similar purpose come generation
It replaces.
In addition, it will be appreciated by those of skill in the art that although some embodiments described herein include other embodiments
In included certain features rather than other feature, but the combination of the feature of different embodiments means in of the invention
Within the scope of and form different embodiments.For example, in the following claims, embodiment claimed is appointed
One of meaning mode can use in any combination.
The all parts embodiment of the present invention can be with hardware realization or to be run on one or more processor
Software module realize or realized with combination thereof.It will be understood by those of skill in the art that it can use in practice
Microprocessor or digital signal processor (DSP) come realize the monitoring method of task according to embodiments of the present invention, device and
The some or all functions of some or all components in system.The present invention is also implemented as being retouched here for performing
The some or all equipment or program of device (for example, computer program and computer program product) for the method stated.
Such program for realizing the present invention can may be stored on the computer-readable medium or can have one or more signal
Form.Such signal can be downloaded from internet website obtain either providing on carrier signal or with it is any its
He provides form.
It should be noted that the present invention will be described rather than limits the invention, and ability for above-described embodiment
Field technique personnel can design alternative embodiment without departing from the scope of the appended claims.In the claims,
Any reference mark between bracket should not be configured to limitations on claims.Word "comprising" does not exclude the presence of not
Element or step listed in the claims.Word "a" or "an" before element does not exclude the presence of multiple such
Element.The present invention can be by means of including the hardware of several different elements and being come by means of properly programmed computer real
It is existing.If in the unit claim for listing equipment for drying, several in these devices can be by same hardware branch
To embody.The use of word first, second, and third does not indicate that any sequence.These words can be explained and run after fame
Claim.
Claims (10)
1. a kind of monitoring method of task, which is characterized in that including:
The run time of target timing task is configured in management end, and the run time of the target timing task is sent to monitoring
Control, so that the monitoring control monitors whether the target timing task is run according to the run time;
Receive the monitored results to the target timing task that the monitoring control is sent.
2. according to the method described in claim 1, it is characterized in that, the method further includes:
It determines the first quantity of the monitoring target timing task included in the monitored results, determines with the target of configuration
When task the second quantity it is whether consistent;
If first quantity and second quantity are inconsistent, it is determined that go out the difference of first quantity and second quantity
Value, and determine the target timing task not running of difference quantities.
3. according to the method described in claim 2, it is characterized in that, the method further includes:
Alarm path when setting the target timing task appearance abnormal.
4. according to the method described in claim 3, it is characterized in that, the run time of the target timing task includes:Target
Timed task when operation starts between and the end of run time;
After the monitored results that the monitoring control is sent are received, the method further includes:
The first time with the second time is compared, determines the target timing task whether normal operation, wherein, institute
State at the first time for the target timing task that monitors in monitored results when operation starts between and the end of run time, when second
Between for configuration setting target timing task when operation starts between and the end of run time;
If the first time and second Time Inconsistency, it is determined that operation exception occurs for the target timing task.
5. according to the method described in claim 4, it is characterized in that, the method further includes:
The target timing task of operation exception and the target timing task of not running are alarmed according to the alarm approach.
6. according to the method described in claim 5, it is characterized in that, the method further includes:
The target timing task of the target timing task of the operation exception and not running is visualized.
7. a kind of monitoring device of task, which is characterized in that including:
Dispensing unit for the run time of target timing task to be configured, and the run time of the target timing task is sent out
It send to monitoring control, so that the monitoring control monitors whether the target timing task is transported according to the run time
Row;
Receiving unit, for receiving the monitored results to the target timing task that the monitoring control is sent.
8. device according to claim 7, which is characterized in that described device further includes:
First determination unit, for determining the first quantity of the monitoring target timing task included in the monitored results,
It is whether consistent with the second quantity of the target timing task of configuration;
Second determination unit determines that first quantity and second quantity are inconsistent for working as first determination unit
When, determine the difference of first quantity and second quantity, and determine the target timing task not running of difference quantities.
9. device according to claim 8, which is characterized in that described device further includes:
Setting unit, for setting the alarm path when target timing task occurs abnormal.
10. a kind of monitoring system of task, which is characterized in that including management end and client, wherein,
The management end for the run time of target timing task in the client to be configured, and the target timing is appointed
The run time of business is sent to client, is so that the monitoring control in the client monitors the target timing task
It is no to be run according to the run time;
The client, for receiving the run time of the target timing task of the management end configuration, and based on the monitoring
Control monitors whether the target timing task is run according to the run time, by the monitoring of the target timing task
As a result it is sent to the management end;
The management end is additionally operable to receive the monitored results that control transmission is monitored in the client.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711480723.6A CN108268358A (en) | 2017-12-29 | 2017-12-29 | The monitoring method of task, apparatus and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711480723.6A CN108268358A (en) | 2017-12-29 | 2017-12-29 | The monitoring method of task, apparatus and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108268358A true CN108268358A (en) | 2018-07-10 |
Family
ID=62772833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711480723.6A Pending CN108268358A (en) | 2017-12-29 | 2017-12-29 | The monitoring method of task, apparatus and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108268358A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110262878A (en) * | 2019-05-06 | 2019-09-20 | 平安科技(深圳)有限公司 | Timed task processing method, device, equipment and computer readable storage medium |
CN113395307A (en) * | 2020-03-13 | 2021-09-14 | 华为技术有限公司 | Task synchronization method and device and computer equipment |
CN115168137A (en) * | 2022-06-17 | 2022-10-11 | 北京结慧科技有限公司 | Monitoring method and system for timing task, computer equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1783804A (en) * | 2004-12-01 | 2006-06-07 | 华为技术有限公司 | Realtime updating method for net page data |
US20080052351A1 (en) * | 2002-04-19 | 2008-02-28 | International Business Machines Corporation | System and method for preventing timeout of a client |
CN101677278A (en) * | 2008-09-17 | 2010-03-24 | 中兴通讯股份有限公司 | Method and system for monitoring availability of network information system |
CN105656659A (en) * | 2014-12-02 | 2016-06-08 | 中兴通讯股份有限公司 | Management method and device for network element upgrade |
-
2017
- 2017-12-29 CN CN201711480723.6A patent/CN108268358A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080052351A1 (en) * | 2002-04-19 | 2008-02-28 | International Business Machines Corporation | System and method for preventing timeout of a client |
CN1783804A (en) * | 2004-12-01 | 2006-06-07 | 华为技术有限公司 | Realtime updating method for net page data |
CN101677278A (en) * | 2008-09-17 | 2010-03-24 | 中兴通讯股份有限公司 | Method and system for monitoring availability of network information system |
CN105656659A (en) * | 2014-12-02 | 2016-06-08 | 中兴通讯股份有限公司 | Management method and device for network element upgrade |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110262878A (en) * | 2019-05-06 | 2019-09-20 | 平安科技(深圳)有限公司 | Timed task processing method, device, equipment and computer readable storage medium |
CN110262878B (en) * | 2019-05-06 | 2024-03-08 | 平安科技(深圳)有限公司 | Timed task processing method, device, equipment and computer readable storage medium |
CN113395307A (en) * | 2020-03-13 | 2021-09-14 | 华为技术有限公司 | Task synchronization method and device and computer equipment |
CN115168137A (en) * | 2022-06-17 | 2022-10-11 | 北京结慧科技有限公司 | Monitoring method and system for timing task, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10824521B2 (en) | Generating predictive diagnostics via package update manager | |
CN109683899B (en) | Software integration method and device | |
US7840841B2 (en) | Automatic detection of functional defects and performance bottlenecks in network devices | |
DE102005028926B4 (en) | Fault tolerant module type of services | |
CN108268358A (en) | The monitoring method of task, apparatus and system | |
US20210194773A1 (en) | Automated Remediation and Repair for Networked Environments | |
CN110990289A (en) | Method and device for automatically submitting bug, electronic equipment and storage medium | |
JP2017016507A (en) | Test management system and program | |
CN114338363A (en) | Continuous integration method, device, equipment and storage medium | |
CN112202613B (en) | Optical cable fault processing method, device, equipment and computer readable storage medium | |
CN111767218B (en) | Automatic test method, equipment and storage medium for continuous integration | |
US20160170395A1 (en) | Case management linkage of updates, evidence, and triggers | |
US9542250B2 (en) | Distributed maintenance mode control | |
EP3511835A1 (en) | Management of software bugs in a data processing system | |
CN115904846A (en) | Method, device and system for testing system emergency fault | |
US20220100594A1 (en) | Infrastructure monitoring system | |
KR101239804B1 (en) | Apparatus and method for diagnosing control rod control system | |
CA2131717C (en) | Method and system for automatic graphic display modification based on control program modification | |
CN108021407A (en) | Method for processing business and device based on the network equipment | |
JP3223872B2 (en) | Server group display monitoring device | |
KR102419119B1 (en) | Test device for generating graphic user interface according to interface control document and operation mehtod of the same | |
CN116452141A (en) | Task management system | |
CN110795347A (en) | Application test platform building method and system | |
CN114095957A (en) | Dial testing diagnostic method, device and system based on 5G double dialing and storage medium | |
CN114116468A (en) | Application testing method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |