CN108267616A - A kind of insulation support plate for electromagnetic compatibility test - Google Patents
A kind of insulation support plate for electromagnetic compatibility test Download PDFInfo
- Publication number
- CN108267616A CN108267616A CN201611263264.1A CN201611263264A CN108267616A CN 108267616 A CN108267616 A CN 108267616A CN 201611263264 A CN201611263264 A CN 201611263264A CN 108267616 A CN108267616 A CN 108267616A
- Authority
- CN
- China
- Prior art keywords
- support plates
- plate
- insulation
- support plate
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
Abstract
The present invention relates to the radiation disturbance of electromagnetic compatibility and immunity to interference testing fields, and in particular to a kind of with length is adjustable, meets to flexibility the insulation support plate required in each standard probe positions.This insulation support plate mainly includes, insulation main supporting plate, length 50cm support plates, length 30cm support plates, length 20cm support plates, spill fixing fitting.Wherein insulation main supporting plate is made of two parts, the probe support plate of 50cm Slidable supports plate and 5 10cm.For placing Slidable support plate and probe support plate, spill fixing fitting can be linked together insulation main supporting plate and other support plates the Main shoe plate groove that insulate.Each independent module of this insulation support plate is equipped with scale as a result, for test site build really realize it is convenient, fast.All support plate modules can be combined freely, be dismantled, and to meet requirement of the different testing standards for test harness, injection pincers to be used and monitoring be needed to clamp in simple positioned conductive immunity to interference test.The test error for avoiding artificial measurement and generating, is accurately performed test.
Description
Technical field
The present invention relates to the automotive electronics in EMC test technology and national military standard field, are a kind of test backmans
Dress.Can be according to the different length for changing tooling for harness length in testing standard, the note being accurately positioned in immunity to interference test
Enter, monitoring probe.Single test fixture is integrated, meets the requirement of each international standard and depot's standard.
Background technology
Radiation disturbance is primarily referred to as that energy is emitted to space by source in the form of an electromagnetic wave or energy is existed with electromagnetic wave
The phenomenon that spatial, the exceeded product of radiation disturbance may cause peripheral devices, equipment or system performance to reduce, interference information
The normal work of technical equipment or other electronic products, and human body is caused centainly to endanger.Sample surfaces, cable connectivity port,
Power cord and signal wire are all radiation disturbance sources, at the same also be subject to interference must survey position and test be most easily detected by
And the project of rectification is most difficult to, so the radiation disturbance of electronic product and the testing precision of immunity to interference require also more and more strictly.
Electromagnetic compatibility test harness and injection probe, the method for arranging of monitoring probe are defined in national military standard GJB-151B:
With the 2m line segments of every interconnection cable of sample termination(Unless the cable length in actual installation is shorter than 2m)Configuration should be parallel to
Front border wiring, all cables are all supported with non-conductive support object, and the 5cm above ground connection tablet, the dielectric of supporter are normal
Number should be low as possible;Monitoring probe is placed in away from sample port 5cm in the injection conducted susceptibility test of CS114 bunchs of cables, and injection is visited
Head is placed in away from detection probe 5cm.
In automotive electronics electromagnetic compatibility test International Organization for standardization ISO and International Radio Interference Committee CISPR with
And major depot(Masses, Ford etc.)Standard in have respectively for radiation-emitting and radiation, the harness length of conducted immunity
The requirement of 100cm, 150cm and 170cm;BCI Bulk current injections have to the position of injection probe and monitoring probe 5cm, 15cm,
The requirement of 45cm, 75cm, 90cm.
Summary, traditional test fixture can only meet single testing standard, can not realize to harness length and anti-
That pops one's head in degree of disturbing test is accurately positioned.
Invention content
The present invention is to provide a kind of with length is adjustable, meets to flexibility the work required in each standard probe positions
Dress.Test fixture with positioning function can split into several parts, convenient for storing and carrying, after simply assembling, fill
Divide and meet in various criterion for the length of insulation stent requirement.It is straight on clamp device and tooling by movably injecting
Injection pincers are precisely located in ruler, and the place for conveniently completing electromagnetic compatibility test is built, and are saving laboratory's manpower, are carrying
The research and development testing cost of consigner is also saved while high testing efficiency.
In order to solve the technical issues of above-mentioned, the technical solution adopted by the present invention is:It is a kind of for electromagnetic compatibility test
Insulation support plate(All unit modules are all that ε r≤1.4 are made by the material of low relative dielectric constant), the long 2m of insulation support plate,
Wide 20cm is highly 5cm.Including:Insulate main supporting plate, length 50cm support plates, length 30cm support plates, length 20cm
Support plate, spill fixing fitting five are most of.Each support plate module facilitates combination different length respectively with scale.
The main supporting plate length that insulate is 1m, is made of two parts, the probe support of 50cm Slidable supports plate and 5 10cm
Plate.It is concave shape slot among insulation main supporting plate, to place the probe support plate of 50cm Slidable supports plate and 5 10cm.
Length 50cm Slidable supports plate and other 5 probe support plates can be with spiral-locks on main supporting plate and can be on main supporting plate
It slides, to meet in various criterion for the requirement of probe positions.Such as:5cm, 15cm, 45cm, 75cm, 90cm etc..
Insulation main supporting plate card with length 50cm support plates can be coupled together using spill fixing fitting, can met
Radiation emission test as defined in CISPR25 and some auto vendor's standards.Length 20cm support plates are also to join in the same way
It is connected on main supporting plate, the length of 170cm is primarily to meet the radiated immunity test harness requirement of some auto vendors.
Equally, the connection of all parts can be met to the requirement of national military standard together.
Advantage is compared with traditional insulation support plate:The present invention, each independent support plate module is equipped with scale, right
In test site build really realize it is convenient, fast.All support plate modules can be combined freely, be dismantled, to meet difference
Requirement of the testing standard for test harness needs injection pincers to be used and monitoring to clamp in simple positioned conductive immunity to interference test.
The test error for avoiding artificial measurement and generating, is accurately performed test request.
Description of the drawings
Fig. 1 is a kind of typical conducted immunity test schematic diagram defined in ISO11452-4;
Fig. 2 is the overall structure diagram of the present invention;
Fig. 3 is present invention insulation main supporting plate structure diagram;
Fig. 4 is 10cm probe supports plate structure schematic diagram of the present invention;
Fig. 5 is 50cm Slidable supports plate structure schematic diagram of the present invention;
Fig. 6 is 50cm, 30cm, 20cm supporting plate structure schematic diagram of the present invention;
Fig. 7 is spill fixing fitting structure diagram of the present invention.
Specific embodiment
As shown in Fig. 2 to 7, for the insulating carriage of electromagnetic compatibility test, each independent support plate module is equipped with
Scale.Wherein, including:Insulate main supporting plate 1,10cm probe supports plate 2,50cm Slidable supports plate 3,50cm support plates 4,
30cm support plates 5,20cm support plates 6, spill fixing fitting 7.
Wherein 10cm probe supports plate 2 and 50cm Slidable supports plate 3 are placed on insulation main supporting plate 1, and spill is fixed
50cm support plates 4 can be fixed on 1 on main supporting plate by attachment 7 respectively.Same mode, by 30cm support plates 5,20cm branch
Fagging 6 is fixed on 1 on main supporting plate.
The above is only the exemplary embodiment of the present invention, it is noted that those skilled in the art are come
It says, under the premise of not departing from the present invention, the improvement of several suitable actual conditions can be done to technical scheme of the present invention.Cause
This, protection scope of the present invention is without being limited thereto, and those skilled in the art are any based on non-reality in technical solution of the present invention
Matter change is included within the scope of the present invention.
Claims (7)
1. a kind of insulation support plate for electromagnetic compatibility test, for test site build really realize it is convenient, fast, it is full
Foot difference testing standard is for test harness and injection pincers, the requirement of monitoring clamp position.
2. it is characterized in that, each independent support plate module is equipped with scale, including:Insulate main supporting plate(1), 10cm probe
Support plate(2), 50cm Slidable support plates(3), 50cm support plates(4), 30cm support plates(5), 20cm support plates(6), spill
Fixing fitting(7).
3. wherein 10cm probe supports plate(2)With 50cm Slidable support plates(3)It is placed on insulation main supporting plate(1)On, spill
Fixing fitting(7)It can be respectively by 50cm support plates(4)It is fixed on main supporting plate(1)On.
4. same mode, by 30cm support plates(5), 20cm support plates(6)It is fixed on main supporting plate(1)On.
5. insulation support plate according to claim 1, it is characterised in that:Insulate main supporting plate(1)Equipped with scale and it is recessed
Shape, for installing 10cm probe support plates(2), 50cm Slidable support plates(3).
6. insulation support plate according to claim 1, it is characterised in that:Use spill fixing fitting(7)It can will insulate
Main supporting plate(1)With 50cm support plates(4), 30cm support plates(5), 20cm support plates(6)Couple respectively, and can be free group
Close different length.
7. according to any insulation support plate of claim 1-3, it is characterised in that:The insulation support plate can be torn open
Into insulation main supporting plate(1), 10cm probe support plates(2), 50cm Slidable support plates(3), 50cm support plates(4), 30cm branch
Fagging(5), 20cm support plates(6), spill fixing fitting(7), each independent module is with scale, so that this insulate
Support plate can be convenient for combination and installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611263264.1A CN108267616A (en) | 2016-12-30 | 2016-12-30 | A kind of insulation support plate for electromagnetic compatibility test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611263264.1A CN108267616A (en) | 2016-12-30 | 2016-12-30 | A kind of insulation support plate for electromagnetic compatibility test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108267616A true CN108267616A (en) | 2018-07-10 |
Family
ID=62755309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611263264.1A Withdrawn CN108267616A (en) | 2016-12-30 | 2016-12-30 | A kind of insulation support plate for electromagnetic compatibility test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108267616A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110514919A (en) * | 2019-07-08 | 2019-11-29 | 上海市计量测试技术研究院(中国上海测试中心、华东国家计量测试中心、上海市计量器具强制检定中心) | Harness coupling test device |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201697984U (en) * | 2010-06-09 | 2011-01-05 | 英业达股份有限公司 | Electromagnetic immunity testing device |
CN102368088A (en) * | 2011-10-21 | 2012-03-07 | 中国北方车辆研究所 | Arrangement device of tested device and current clamp |
CN202171604U (en) * | 2011-08-19 | 2012-03-21 | 云南电力试验研究院(集团)有限公司 | Device for supporting connecting wire in electromagnetic compatibility conduction immunity test |
CN102621415A (en) * | 2012-03-23 | 2012-08-01 | 上海市电力公司 | Electrical fast transient (EFT) disturbance experimental system |
CN102914713A (en) * | 2012-10-23 | 2013-02-06 | 上海市电力公司 | Electromagnetic compatibility test method and device for electric power online monitoring equipment |
CN202720248U (en) * | 2012-07-27 | 2013-02-06 | 河南省电力公司商丘供电公司 | Insulating bracket for high voltage test |
CN103698560A (en) * | 2013-12-31 | 2014-04-02 | 深圳市思达仪表有限公司 | High-frequency electromagnetic field anti-interference testing tool |
CN203932875U (en) * | 2014-06-10 | 2014-11-05 | 周毅 | A kind of wire harness fixing device for experiment |
CN204008883U (en) * | 2014-06-12 | 2014-12-10 | 北京汽车研究总院有限公司 | A kind of test fixture of electromagnetic compatibility |
CN204832375U (en) * | 2015-07-09 | 2015-12-02 | 广东中认华南检测技术有限公司 | A guide rail auxiliary assembly for disturbance power test among electro magnetic compatibility test |
CN204882615U (en) * | 2015-06-19 | 2015-12-16 | 东莞市越铧电子科技有限公司 | General conductor tester with adjustable distance |
CN205580877U (en) * | 2016-04-20 | 2016-09-14 | 广东省建筑科学研究院集团股份有限公司 | Multi -functional transverse strength test device |
-
2016
- 2016-12-30 CN CN201611263264.1A patent/CN108267616A/en not_active Withdrawn
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201697984U (en) * | 2010-06-09 | 2011-01-05 | 英业达股份有限公司 | Electromagnetic immunity testing device |
CN202171604U (en) * | 2011-08-19 | 2012-03-21 | 云南电力试验研究院(集团)有限公司 | Device for supporting connecting wire in electromagnetic compatibility conduction immunity test |
CN102368088A (en) * | 2011-10-21 | 2012-03-07 | 中国北方车辆研究所 | Arrangement device of tested device and current clamp |
CN102621415A (en) * | 2012-03-23 | 2012-08-01 | 上海市电力公司 | Electrical fast transient (EFT) disturbance experimental system |
CN202720248U (en) * | 2012-07-27 | 2013-02-06 | 河南省电力公司商丘供电公司 | Insulating bracket for high voltage test |
CN102914713A (en) * | 2012-10-23 | 2013-02-06 | 上海市电力公司 | Electromagnetic compatibility test method and device for electric power online monitoring equipment |
CN103698560A (en) * | 2013-12-31 | 2014-04-02 | 深圳市思达仪表有限公司 | High-frequency electromagnetic field anti-interference testing tool |
CN203932875U (en) * | 2014-06-10 | 2014-11-05 | 周毅 | A kind of wire harness fixing device for experiment |
CN204008883U (en) * | 2014-06-12 | 2014-12-10 | 北京汽车研究总院有限公司 | A kind of test fixture of electromagnetic compatibility |
CN204882615U (en) * | 2015-06-19 | 2015-12-16 | 东莞市越铧电子科技有限公司 | General conductor tester with adjustable distance |
CN204832375U (en) * | 2015-07-09 | 2015-12-02 | 广东中认华南检测技术有限公司 | A guide rail auxiliary assembly for disturbance power test among electro magnetic compatibility test |
CN205580877U (en) * | 2016-04-20 | 2016-09-14 | 广东省建筑科学研究院集团股份有限公司 | Multi -functional transverse strength test device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110514919A (en) * | 2019-07-08 | 2019-11-29 | 上海市计量测试技术研究院(中国上海测试中心、华东国家计量测试中心、上海市计量器具强制检定中心) | Harness coupling test device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102981086A (en) | Analysis and measurement method for electromagnetic radiation of voltage driven radiation source | |
EP2944969B1 (en) | Antenna and cable connection status verification device and verification method | |
CN109962629A (en) | Electrical equipment and its casing member | |
US10989748B2 (en) | Apparatus and methods for testing devices | |
US10649010B2 (en) | Current sensing | |
KR20140131481A (en) | Test socket providing mechanical stabilization for pogo pin connections | |
CN108267616A (en) | A kind of insulation support plate for electromagnetic compatibility test | |
CN104155548B (en) | Electromagnetic interference detection device in rack of bus type apparatus | |
CN110161401A (en) | A kind of superconduction chip low temperature test device | |
CN109901055A (en) | A kind of OBD equipment performance test macro | |
JP2020034285A (en) | Magnetic field spatial distribution detection device | |
CN103698560A (en) | High-frequency electromagnetic field anti-interference testing tool | |
CN107741511B (en) | Convenient joint for resistance measurement by four-lead method | |
CN211785828U (en) | Setting device of conductive plane | |
CN112578253B (en) | Multi-channel chip aging system and method | |
CN106896242B (en) | Probe test connecting device | |
Dienot et al. | Thermal-electromagnetic susceptibility behaviors of PWM patterns used in control electronic circuit | |
Wang et al. | An equivalent circuit model for the wire-to-surface junction based on method of moments | |
CN110879322A (en) | Method and device for arranging conductive plane | |
CN206832861U (en) | Test probe and printed circuit board test fixture | |
CN207689575U (en) | A kind of surface resistivity measuring device of GIS disc insulators | |
CN206945852U (en) | Microwave monolithic circuit immunity to interference test fixture | |
CN204296598U (en) | A kind of data acquisition module fixture | |
CN106872755B (en) | For measuring the monitoring device of low-frequency current in inductive load | |
JP6052355B1 (en) | Test equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180710 |