CN108263877A - A kind of method of work of landing platform - Google Patents

A kind of method of work of landing platform Download PDF

Info

Publication number
CN108263877A
CN108263877A CN201810086266.0A CN201810086266A CN108263877A CN 108263877 A CN108263877 A CN 108263877A CN 201810086266 A CN201810086266 A CN 201810086266A CN 108263877 A CN108263877 A CN 108263877A
Authority
CN
China
Prior art keywords
mobile jib
slide bar
parcel shelf
pedestal
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810086266.0A
Other languages
Chinese (zh)
Other versions
CN108263877B (en
Inventor
缪雪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Fuqi Internet Technology Co., Ltd
Original Assignee
缪雪峰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 缪雪峰 filed Critical 缪雪峰
Priority to CN201810086266.0A priority Critical patent/CN108263877B/en
Publication of CN108263877A publication Critical patent/CN108263877A/en
Application granted granted Critical
Publication of CN108263877B publication Critical patent/CN108263877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/22Horizontal loading or unloading platforms
    • B65G69/24Horizontal loading or unloading platforms having platform level adjusting means

Abstract

The invention discloses a kind of method of works of landing platform, platform includes pedestal, the first articulated stand, the first hinge bar, the first mobile jib, the first slide bar, parcel shelf, the second articulated stand, the second hinge bar, the second slide bar, the second mobile jib and spring, U-shaped structure is made in the pedestal, and pedestal includes bottom plate and two side plates;Several the second locating pieces on the bottom plate of the pedestal are installed, several first articulated stands are installed on the side plate of pedestal;First articulated stand connects the first hinge bar by the first pin, and the first hinge bar is connected with the first mobile jib;Second articulated stand connects the second hinge bar by the second pin, and the second hinge bar is connected with the first slide bar;Second locating piece is connected with the second mobile jib.Cargo quickly can be transported to lower position by the present invention as container and the halfpace of conveyer belt from higher position, and good buffer effect is simple in structure, easy to use, highly practical, and rate of discharging is high, operates steadily.

Description

A kind of method of work of landing platform
The application is that application No. is a kind of entitled divisional applications of novel landing platform of 201610042220.X.
【Technical field】
The present invention relates to logistics equipment manufacturing technology field, particularly a kind of technical field of landing platform.
【Background technology】
Logistics capacity is more and more, after logistics transportation arrives at, needs quickly to unload cargo, link of unloading is shadow A key factor of working efficiency is rung, current unloading mode, which mainly directly topples over the cargo in container, is discharged at ground On or move down by manually bringing up to cargo.When the container where cargo has certain difference in height apart from ground, people is needed Cargo is removed placement or using unloading plate by work, and cargo is slided along unloading plate.This mode working efficiency of manpower unloading is low Under, time-consuming and laborious, the expense unloaded is also higher, increases transportation cost.When needing a large amount of unloadings, cargo is typically placed in On conveyer belt, fast transfer is realized.At this moment from container to conveyer belt process, the masterplate of formula is taken in use letter to cargo, plastic blister plate is formed Unloading platform.
Easy unloading platform can complete the unloading of bulky goods, and existing deficiency is a lack of buffering, easily cargo is made Into damage, particularly frangible perishable cargo.Loading/unloading platform be for hydraulic pressure, pneumatic or mechanical device.It can help to use The lorry of various height and size is loaded and unloaded safe efficiently in family.In use, loading/unloading platform is overlapped on truck tail, it is divided into fixation Formula loading/unloading platform, mobile two kinds of loading/unloading platform.Existing delivering device can realize function when independently unloading, but with container, Conveyer belt is with closing, and there are still deficiencies.
【Invention content】
The purpose of the present invention is exactly to solve the problems of the prior art, proposes a kind of novel landing platform, can be used as goods Cargo is quickly transported to lower position by the halfpace of case and conveyer belt from higher position, and good buffer effect is simple in structure, makes With conveniently, highly practical, rate of discharging is high, operates steadily.
To achieve the above object, the present invention proposes a kind of novel landing platform, including pedestal, the first articulated stand, One hinge bar, the first mobile jib, the first slide bar, parcel shelf, the second articulated stand, the second hinge bar, the second slide bar, the second mobile jib and U-shaped structure is made in spring, the pedestal, and pedestal includes bottom plate and two side plates;Several are installed on the bottom plate of the pedestal Second locating piece is equipped with several the first articulated stands on the side plate of pedestal;First articulated stand passes through the first pin The first hinge bar is connected, the first hinge bar is connected with the first mobile jib;Second articulated stand connects second by the second pin Hinge bar, the second hinge bar are connected with the first slide bar;Second locating piece is connected with the second mobile jib;It opens the parcel shelf side Fluted, bottom portion of groove is connected several second articulated stands;The pedestal is placed between conveyer belt and container.
Preferably, first mobile jib is connected with the first slide bar, there is movement between the first mobile jib and the first slide bar It is secondary.
Preferably, several the first locating pieces, the first locating piece bottom and the second slide bar are installed in the parcel shelf bottom It is connected.
Preferably, second slide bar is connected with the second mobile jib, the second mobile jib and the second slide bar have prismatic pair.
Preferably, the second slide bar bottom is equipped with spring, spring is arranged in the second mobile jib, spring connection second Mobile jib bottom.
Preferably, the container discharge location is higher than the position of conveyer belt, it is flat that unloading is placed between container and conveyer belt Platform, the transfer position of cargo are followed successively by container, parcel shelf, on conveyer belt.
Beneficial effects of the present invention:The present invention realizes cargo in landing platform by more rod structures and spring connecting structure On vertically move, impact force is small, and rate of discharging is fast;Can as container and the halfpace of conveyer belt, quickly by cargo from compared with High position is transported to lower position, and cargo moves on to landing platform again to conveyer belt, landing platform solution container and conveying from container Between band the problem of quick and stable transfer cargo.Simple in structure, easy to use, highly practical, rate of discharging is high, operates steadily, It unloads suitable for eminence compartment, reduces the damage of fragile goods.
The feature and advantage of the present invention will be described in detail by embodiment combination attached drawing.
【Description of the drawings】
Fig. 1 is a kind of stereoscopic schematic diagram of novel landing platform of the present invention;
Fig. 2 is a kind of schematic diagram of mechanism of novel landing platform of the present invention;
Fig. 3 is a kind of overall workflow schematic diagram of novel landing platform of the present invention.
In figure:1- pedestals, the first articulated stands of 2-, the first pins of 3-, the first hinge bars of 4-, the first mobile jibs of 5-, 6- first Slide bar, 7-, which put goods plate, the second articulated stands of 8-, the second pins of 9-, the second hinge bars of 10-, the first locating pieces of 11-, 12- second, to be slided Bar, the second mobile jibs of 13-, the second locating pieces of 14-, 15- springs, 16- cargos, 17- conveyer belts, 18- containers.
【Specific embodiment】
Refering to Fig. 1, Fig. 2 and Fig. 3, a kind of novel landing platform of the present invention, including pedestal 1, the first articulated stand 2, first Hinge bar 4, the first mobile jib 5, the first slide bar 6, parcel shelf 7, the second articulated stand 8, the second hinge bar 10, the second slide bar 12, U-shaped structure is made in two mobile jibs 13 and spring 15, the pedestal 1, and pedestal 1 includes bottom plate and two side plates;The bottom plate of the pedestal 1 On several the second locating pieces 14 are installed, several first articulated stands 2 are installed on the side plate of pedestal 1;First hinge It connects stent 2 and first hinge bar 4 is connected by the first pin 3, the first hinge bar 4 and the first mobile jib 5 are connected;Described second hinged branch Frame 8 connects the second hinge bar 10 by the second pin 9, and the second hinge bar 10 and the first slide bar 6 are connected;Second locating piece 14 It is connected with the second mobile jib 13;7 side of parcel shelf is provided with groove, and bottom portion of groove is connected several second articulated stands 8;It is described Pedestal 1 is placed between conveyer belt 17 and container 18.First mobile jib 5 is connected with the first slide bar 6, the first mobile jib 5 and There is prismatic pair between one slide bar 6.7 bottom of parcel shelf is installed by several the first locating pieces 11,11 bottom of the first locating piece It is connected with the second slide bar 12.Second slide bar 12 is connected with the second mobile jib 13, and the second mobile jib 13 has with the second slide bar 12 Prismatic pair.Second slide bar, 12 bottom is equipped with spring 15, and spring 15 is arranged in the second mobile jib 13, the connection of spring 15 second 13 bottom of mobile jib.18 discharge location of container is higher than the position of conveyer belt 17, and unloading is placed between container 18 and conveyer belt 17 Platform, the transfer position of cargo 16 are followed successively by container 18, parcel shelf 7, on conveyer belt 17.
The course of work of the present invention:
Landing platform during the work time, is first moved to container 18 by a kind of novel landing platform of the present invention by operating personnel Between conveyer belt 17.When on parcel shelf 7 without weight, the spring 15 in the second mobile jib 13 is in original state, and first is slided Bar 6 is propped up, and parcel shelf 7 is moved to extreme higher position.At this point, the first slide bar 6 is stretched out from the first mobile jib 5, the two keeps connection, not It is detached from.Cargo 16 in container 18 is placed on parcel shelf 7 by unloading personnel, and parcel shelf 7 vertically moves down rapidly.With parcel shelf 7 decline, and spring 15 is in compressive state, and reaction force increase is moved down and slowed, impact force suffered by cargo 16 is smaller.This In stage, in first mobile jib of the first retraction of the first slide bar 65, then stretch out, until parcel shelf 7 reaches bottommost, the elastic force of spring 15 with The weight of cargo 16 is in equilibrium state.Unloading personnel take out cargo 16 on parcel shelf 7, are put into conveyer belt 17.On parcel shelf 7 Without weight, parcel shelf 7 is pushed back original state by the power of spring 15.
The present invention by 15 connection structure of more rod structures and spring, realizes that cargo 16 vertically moves on landing platform, rushes It is small to hit power, rate of discharging is fast;Quickly cargo can be transported to from higher position low as container and the halfpace of conveyer belt Position, cargo 16 move on to landing platform again to conveyer belt 17 from container 18, landing platform solve container 18 and conveyer belt 17 it Between quick and stable transfer cargo 16 the problem of.Simple in structure, easy to use, highly practical, rate of discharging is high, operates steadily, and fits
It unloads for eminence compartment, reduces the damage of fragile goods.
Above-described embodiment is the description of the invention, is not limitation of the invention, it is any to simple transformation of the present invention after Scheme all belong to the scope of protection of the present invention.

Claims (2)

1. a kind of method of work of landing platform, includes the following steps:Landing platform is first moved to container by operating personnel (18) between conveyer belt (17).When on parcel shelf (7) without weight, the spring (15) in the second mobile jib (13) is in initial shape State props up the first slide bar (6), and parcel shelf (7) is moved to extreme higher position;At this point, the first slide bar (6) is from the first mobile jib (5) It stretches out, the two keeps connection, without departing from;The inner cargo (16) of container (18) is placed on parcel shelf (7) by unloading personnel, glove Plate (7) vertically moves down rapidly.As parcel shelf (7) declines, spring (15) moves down speed in compressive state, reaction force increase Spend slack-off, impact force suffered by cargo (16) is smaller;In this stage, in the first slide bar (6) elder generation's the first mobile jib of retraction (5), then stretch Go out, until parcel shelf (7) reaches bottommost, the elastic force of spring (15) is in equilibrium state with the weight of cargo (16);Discharger Member takes out cargo (16) on parcel shelf (7), is put into conveyer belt (17);It will be put without weight, the power of spring (15) on parcel shelf (7) Object plate (7) pushes back original state.
2. method of work according to claim 1, which is characterized in that the landing platform is hinged including pedestal (1), first Stent (2), the first hinge bar (4), the first mobile jib (5), the first slide bar (6), parcel shelf (7), the second articulated stand (8), second U-shaped structure, pedestal (1) is made in hinge bar (10), the second slide bar (12), the second mobile jib (13) and spring (15), the pedestal (1) Including bottom plate and two side plates;Several second locating pieces (14), the side of pedestal (1) are installed on the bottom plate of the pedestal (1) Several the first articulated stands (2) are installed on plate;First articulated stand (2) passes through the first hinge of the first pin (3) connection Extension bar (4), the first hinge bar (4) are connected with the first mobile jib (5);Second articulated stand (8) is connected by the second pin (9) Second hinge bar (10), the second hinge bar (10) are connected with the first slide bar (6);Second locating piece (14) and the second mobile jib (13) it is connected;Parcel shelf (7) side is provided with groove, and bottom portion of groove is connected several second articulated stands (8);The pedestal (1) it is placed between conveyer belt (17) and container (18);
First mobile jib (5) is connected with the first slide bar (6), has movement between the first mobile jib (5) and the first slide bar (6) It is secondary;
Parcel shelf (7) bottom is installed by several the first locating pieces (11), the first locating piece (11) bottom and the second slide bar (12) it is connected;
Second slide bar (12) is connected with the second mobile jib (13), and the second mobile jib (13) has movement with the second slide bar (12) It is secondary;
Second slide bar (12) bottom is equipped with spring (15), and spring (15) is arranged in the second mobile jib (13), spring (15) Connect the second mobile jib (13) bottom;
Container (18) discharge location is higher than the position of conveyer belt (17), and unloading is placed between container (18) and conveyer belt (17) Platform, the transfer position of cargo (16) are followed successively by container (18), parcel shelf (7), on conveyer belt (17).
CN201810086266.0A 2016-01-22 2016-01-22 Working method of unloading platform Active CN108263877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810086266.0A CN108263877B (en) 2016-01-22 2016-01-22 Working method of unloading platform

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610042220.XA CN105502031B (en) 2016-01-22 2016-01-22 A kind of landing platform
CN201810086266.0A CN108263877B (en) 2016-01-22 2016-01-22 Working method of unloading platform

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610042220.XA Division CN105502031B (en) 2016-01-22 2016-01-22 A kind of landing platform

Publications (2)

Publication Number Publication Date
CN108263877A true CN108263877A (en) 2018-07-10
CN108263877B CN108263877B (en) 2020-02-18

Family

ID=55710426

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810086266.0A Active CN108263877B (en) 2016-01-22 2016-01-22 Working method of unloading platform
CN201610042220.XA Active CN105502031B (en) 2016-01-22 2016-01-22 A kind of landing platform

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610042220.XA Active CN105502031B (en) 2016-01-22 2016-01-22 A kind of landing platform

Country Status (1)

Country Link
CN (2) CN108263877B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106494912B (en) * 2016-12-30 2018-12-11 上海电信工程有限公司 A kind of discharge mechanism
CN107601011A (en) * 2017-10-30 2018-01-19 湖南新食康农业发展有限公司 One kind processing dried sweet potato automatic charging device
CN108313767B (en) * 2018-04-25 2020-03-13 重庆市互茂劳务派遣有限公司 Unloading device for road cargo
CN112875335A (en) * 2021-02-02 2021-06-01 陈啸林 Movable unloading platform
CN112875334A (en) * 2021-02-02 2021-06-01 陈啸林 Automatic change discharge devices

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3997932A (en) * 1974-12-13 1976-12-21 Kelley Company, Inc. Dockboard having improved lip lifting mechanism
US5774920A (en) * 1996-05-20 1998-07-07 United Dominion Industries, Inc. Electrically actuated dock leveler
CN203998217U (en) * 2014-06-04 2014-12-10 东莞职业技术学院 A kind of landing platform

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT396096B (en) * 1990-02-22 1993-05-25 Sgp Verkehrstechnik SECONDARY SPRING FOR A ROTATION OF A RAIL VEHICLE
CN2499317Y (en) * 2001-10-30 2002-07-10 陈绪跃 Inverted tricycle motorcycle
CN201447008U (en) * 2009-05-20 2010-05-05 彭国荣 Bicycle
CN205312701U (en) * 2016-01-22 2016-06-15 缪雪峰 Novel landing platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3997932A (en) * 1974-12-13 1976-12-21 Kelley Company, Inc. Dockboard having improved lip lifting mechanism
US5774920A (en) * 1996-05-20 1998-07-07 United Dominion Industries, Inc. Electrically actuated dock leveler
CN203998217U (en) * 2014-06-04 2014-12-10 东莞职业技术学院 A kind of landing platform

Also Published As

Publication number Publication date
CN108263877B (en) 2020-02-18
CN105502031B (en) 2018-04-06
CN105502031A (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN108263877A (en) A kind of method of work of landing platform
US9731917B2 (en) Vehicle goods bracket and vehicle goods bracket set
CN105540297B (en) A kind of mechanical buffer lift easing gear
CN105060184B (en) A kind of ceramic tile transportation fork-truck accessory
CN205634268U (en) Discharge helping hand dolly
CN205312701U (en) Novel landing platform
CN208086858U (en) A kind of handling conveyer
CN208915975U (en) A kind of logistic storage transfer robot based on the narrowband Nb-lot Internet of Things
CN205294350U (en) Mechanical type buffering lift discharge devices
CN211870472U (en) Intelligent integrated conveyor belt
CN111216919A (en) Aerospace material conveying device based on artificial intelligence
CN103935535B (en) A kind of solid waste compression package system
CN209143220U (en) A kind of pallet conveying device
CN209427784U (en) A kind of logistics express mail Quick-unloading platform
CN207759738U (en) Express delivery goods sorting handler
CN209601455U (en) A kind of counter quick despatch belt system
CN105501487A (en) Methods for loading product into cases
CN109051826A (en) A kind of express mail handling device
CN201849852U (en) Split mobile storage rack
CN105109523A (en) Trolley capable of lowering labor intensity of waist and using method thereof
CN214494981U (en) Portable commodity circulation unloader
CN220300326U (en) Cloth roll carrying machine
CN220033428U (en) Cargo handling auxiliary device
CN220702228U (en) Prevent express delivery conveyer that express delivery piece dropped
CN207861808U (en) Easing gear and fork truck

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200115

Address after: 215400 room 407, building 1, No. 309, Zhenghe Middle Road, Chengxiang Town, Taicang City, Suzhou City, Jiangsu Province

Applicant after: Suzhou Fuqi Internet Technology Co., Ltd

Address before: 317503, Zhejiang, Taizhou province Wenling Binhai Town, Village No. 275

Applicant before: Miao Xuefeng

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant