CN108260075B - Addressing method and device for deployment position of base station - Google Patents

Addressing method and device for deployment position of base station Download PDF

Info

Publication number
CN108260075B
CN108260075B CN201611229481.9A CN201611229481A CN108260075B CN 108260075 B CN108260075 B CN 108260075B CN 201611229481 A CN201611229481 A CN 201611229481A CN 108260075 B CN108260075 B CN 108260075B
Authority
CN
China
Prior art keywords
grid
weak coverage
base station
grids
deployment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611229481.9A
Other languages
Chinese (zh)
Other versions
CN108260075A (en
Inventor
艾华
范永升
陈锋
孙春来
朱争
吴剑浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Zhejiang Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Zhejiang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Zhejiang Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201611229481.9A priority Critical patent/CN108260075B/en
Publication of CN108260075A publication Critical patent/CN108260075A/en
Application granted granted Critical
Publication of CN108260075B publication Critical patent/CN108260075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/021Services related to particular areas, e.g. point of interest [POI] services, venue services or geofences
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W64/00Locating users or terminals or network equipment for network management purposes, e.g. mobility management
    • H04W64/006Locating users or terminals or network equipment for network management purposes, e.g. mobility management with additional information processing, e.g. for direction or speed determination

Abstract

The invention relates to an addressing method and device for a base station deployment position, which comprises the following steps: acquiring test data comprising signal strength information and corresponding geographical location information; according to the geographical position information, converging the signal intensity information into a corresponding grid; the grid is obtained by dividing the area to be planned of the wireless network according to the geographical position; determining the position of the weak coverage grid according to the signal strength information corresponding to each grid; and according to the position of each weak coverage grid, taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed to form the deployment areas of a plurality of base stations to be deployed. The technical scheme provided by the embodiment of the invention realizes the addressing of the deployment position of the intelligent base station, solves the problems of blindness of manual point finding and unpredictability of results in the prior art, greatly improves the efficiency of site addressing, reduces the skill requirement on personnel and saves the resource investment in the aspects of manpower and material resources compared with the traditional site planning method.

Description

Addressing method and device for deployment position of base station
Technical Field
The present invention relates to the field of communications technologies, and in particular, to an addressing method and an addressing device for a base station deployment location.
Background
In the field of wireless communication, an operator needs to analyze a network coverage condition, evaluate the network coverage condition, and judge whether a site needs to be added, reduced or modified in a network according to an evaluation result.
The wireless network planning mainly comprises five stages, namely requirement analysis, network scale estimation, station address planning, network simulation, wireless parameter planning and the like. The existing planning means mainly comprises the steps of manually analyzing and processing problems in each stage through small tools, finally converging results of each stage together, and outputting related planning suggestions of each problem point through a large amount of manual participation.
The existing site planning can only depend on sporadic complaints and test feedback, and the obtained mode is relatively passive. Site survey requires a large amount of manpower and material resources to be spent on site testing and data acquisition. The site position needs to be searched in a large range manually and repeatedly calculated theoretically, so that whether the position is proper or not can be finally confirmed. Therefore, the planning mode of the position of the existing base station has low efficiency, large labor cost investment and long required time period.
Disclosure of Invention
The technical problem to be solved by the invention is to provide the addressing method of the base station deployment position, which has high efficiency and low labor cost investment.
To this end, the invention provides an addressing method for a base station deployment location, comprising:
acquiring test data comprising signal strength information and corresponding geographical location information;
according to the geographical position information, the signal intensity information is converged into a corresponding grid; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position;
determining the position of the weak coverage grid according to the signal strength information corresponding to each grid;
and according to the position of each weak coverage grid, taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed to form the deployment areas of a plurality of base stations to be deployed.
Optionally, the method further includes:
deploying base stations corresponding to the scene information in a deployment area according to the scene information of the deployment area of the base stations to be deployed
Optionally, the determining the position of the weak coverage grid according to the signal strength information corresponding to each grid includes:
according to the signal intensity information corresponding to each grid, determining the sampling times that the signal intensity acquired in the current grid is smaller than a first preset value;
and if the proportion of the sampling times to the total sampling times in the current grid is greater than a second preset value, determining that the current grid is a weak coverage grid.
Optionally, the forming a deployment area of a plurality of base stations to be deployed by using a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid specifically includes:
calculating the number of the weak coverage grids in a first preset range of each grid according to the positions of the weak coverage grids;
and if the number of the weak coverage grids is greater than a third preset value, determining that the current grid is a core grid.
Optionally, the forming a deployment area of a plurality of base stations to be deployed by using a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid specifically includes:
and for each core grid, if the number of the core grids in the second preset range of the current core grid is greater than a fourth preset value, determining the position of the grid to be added according to the position of the current core grid and the number of the core grids in the corresponding second preset range.
Optionally, the forming a deployment area of a plurality of base stations to be deployed by using a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid specifically includes:
and for each grid of the stations to be added, if the number of the grids of the stations to be added in the third preset range of the grid of the current stations to be added is greater than the fifth preset value, the position of the grid of the current stations to be added is the position of the base station deployment.
In another aspect, the present invention further provides an addressing apparatus for a base station deployment location, where the apparatus includes:
the data acquisition module is used for acquiring test data comprising signal strength information and corresponding geographical position information;
the rasterization module is used for converging the signal intensity information into a corresponding grid according to the geographical position information; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position;
the weak coverage determining module is used for determining the position of the weak coverage grids according to the signal strength information corresponding to each grid;
and the deployment position determining module is used for taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed according to the position of each weak coverage grid to form the deployment areas of a plurality of base stations to be deployed.
Optionally, the apparatus further comprises: a base station deployment module for deploying the base station corresponding to the scene information in the deployment area according to the scene information of the deployment area of the base station to be deployed
Optionally, the weak coverage determining module includes:
the sampling frequency counting module is used for determining the sampling frequency that the signal intensity acquired in the current grid is smaller than a first preset value according to the signal intensity information corresponding to each grid;
and the weak coverage determining unit is used for determining the current grid as a weak coverage grid when the proportion of the sampling times to the total sampling times in the current grid is greater than a second preset value.
Optionally, the deployment position determining module specifically includes:
the weak coverage quantity counting unit is used for calculating the quantity of the weak coverage grids in a first preset range of each grid according to the positions of the weak coverage grids;
the core grid determining unit is used for determining the current grid as the core grid when the number of the weak coverage grids is greater than a third preset value;
the station adding grid determining unit is used for determining the position of a grid to be added with stations according to the position of the current core grid and the number of the core grids in the corresponding second preset range when the number of the core grids in the second preset range of the current core grid is larger than a fourth preset value for each core grid;
and the deployment position determining unit is used for determining the position of the grid of the current station to be added as the deployment position of the base station when the number of the grids of the current station to be added in the third preset range of the grid of the current station to be added is larger than a fifth preset value.
According to the method and the device for addressing the deployment positions of the base stations, the network problem of the grids can be determined according to the signal strength information of each grid by acquiring the measurement data and rasterizing the area to be planned, so that a plurality of weak coverage grids can be combined to provide signals by the same base station, and the proper position of the base station to be deployed is determined according to the position of the weak coverage grids.
Drawings
The features and advantages of the present invention will be more clearly understood by reference to the accompanying drawings, which are illustrative and not to be construed as limiting the invention in any way, and in which:
fig. 1 is a schematic flowchart of an addressing method for a base station deployment location according to an embodiment of the present invention;
fig. 2 is a schematic diagram illustrating an addressing method for a base station deployment location according to an embodiment of the present invention;
fig. 3 is a flowchart illustrating a method for addressing a deployment location of a base station according to another embodiment of the present invention;
fig. 4 is a schematic diagram of a deployment location of a base station according to an embodiment of the present invention;
fig. 5 is a schematic frame diagram of an addressing apparatus for a base station deployment location according to an embodiment of the present invention;
fig. 6 is a schematic diagram of a framework of an apparatus for addressing base station deployment locations according to another embodiment of the present invention;
FIG. 7 is a block diagram of a deployment location determination module according to another embodiment of the present invention;
fig. 8 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1, an embodiment of the present invention provides an addressing method for a base station deployment location, including the following steps:
s1: acquiring test data comprising signal strength information and corresponding geographical location information;
specifically, the method provided in the embodiment of the present invention may use an addressing device at a base station deployment location as an execution subject, where a mobile terminal may report measurement data periodically, and the addressing device may obtain the measurement data reported by the mobile terminal, where the measurement data includes a location where the mobile terminal is located and signal strength information received by the location, that is, reference signal received power. In addition, the measurement data can also be acquired in a drive test frequency sweep mode.
S2: according to the geographical position information, the signal intensity information is converged into a corresponding grid; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position;
specifically, a digital map of an area to be planned of the wireless network may be rasterized, and each grid may have a size of 50 meters × 50 meters. The obtained signal strength information may be filled in a grid corresponding to the geographical location according to the measurement data obtained in step S1. I.e. each grid may comprise a plurality of sample points of signal strength information.
S3: determining the position of the weak coverage grid according to the signal strength information corresponding to each grid;
specifically, based on the signal strength information of the plurality of sampling points in each grid, it can be determined whether the grid is a weak coverage grid. For example, when the average value of the signal strength information of the plurality of sampling points in the grid is smaller than the low level threshold, the grid is determined to be a weak coverage grid. It should be noted that the weak coverage grid means that the base stations are too far apart, or the boundary area is poor in signal due to building obstruction. The weak coverage is typically less than-90 dBm at Rxlev (received signal level). The grid of weak coverage directly affects call quality.
S4: and according to the position of each weak coverage grid, taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed to form the deployment areas of a plurality of base stations to be deployed.
Specifically, for each grid in the area to be planned of the wireless network, each grid may be filtered first to remove the grid with obviously wrong measurement data, and according to the position of each weak coverage grid obtained in step S3, a plurality of weak coverage grids with a short distance may be merged to serve as the signal coverage area of the same base station to be deployed, so as to form a plurality of base station deployment areas, each base station deployment area is deployed with one base station, and the signal coverage area of the base station includes a plurality of weak coverage grids with a short distance. According to the radius (such as 200 meters) of the coverage area of the base station signals, weak coverage grids within a range of 200 meters apart can be combined, and the same base station to be deployed provides signals. The position of a weak coverage grid which can be provided by the same base station to be deployed can be determined through a density-like algorithm, then an envelope cluster containing the weak coverage grid is output through convex hull stacking, the base station to be deployed can be located in the envelope cluster, and the envelope cluster is located in the signal coverage area of the base station to be deployed. As shown in fig. 2, a gray grid 1 represents a weak coverage grid, a first area 3 represents that a short distance weak coverage grid is merged, and a second area 1 represents that a plurality of weak coverage grids form an envelope cluster.
According to the addressing method for the deployment position of the base station, provided by the embodiment of the invention, through acquiring the measurement data and rasterizing the area to be planned, the network problem of the grid can be determined according to the signal intensity information of each grid, so that a plurality of weak coverage grids can be combined to provide signals by the same base station, and the proper position of the base station to be deployed is determined according to the position of the weak coverage grid.
In order to simplify the complex site survey work, on the basis of the foregoing embodiment, as shown in fig. 3, the method for addressing the deployment location of the base station according to the embodiment of the present invention may further include:
step S5: and deploying the base station corresponding to the scene information in the deployment area according to the scene information of the deployment area of the base station to be deployed.
Specifically, the scene information of the deployment area of the base station may be determined in combination with the digital map, for example, the scene information may be indoor, outdoor or road, and for the deployment areas of different scene information, different types of base stations may be deployed. The scene information is an indoor deployment area, and an indoor distribution system can be deployed in the deployment area. For a deployment area with outdoor scene information, whether macro stations exist or not can be searched within 250 meters around the deployment area, and if so, base stations with signal coverage ranges between the macro stations and indoor stations can be built in the center or the periphery of the deployment area. Conversely, if not, the macro station is deployed within the deployment area according to the area of the deployment area, the coverage of the macro station, the overlapping coverage, and the like. Of course, if the scene information is a road, a base station having a signal coverage ranging between the macro station and the indoor station may be constructed in the center or the periphery of the deployment area.
On the basis of the foregoing embodiment, step S3 determines the position of the weak coverage grid according to the signal strength information corresponding to each grid, including:
according to the signal intensity information corresponding to each grid, determining the sampling times that the signal intensity acquired in the current grid is smaller than a first preset value;
and if the proportion of the sampling times to the total sampling times in the current grid is greater than a second preset value, determining that the current grid is a weak coverage grid.
Specifically, according to the signal strength information corresponding to the plurality of sampling points in each grid, it may be counted that the signal strength value acquired in each grid is less than the sampling frequency of a first preset value (e.g., -90dBm), and if the ratio of the sampling frequency of the signal strength value in a certain grid less than the first preset value to the total sampling frequency in the grid is greater than the first preset value (e.g., 20%), it may be determined that the grid is a weak coverage grid.
On the basis of the foregoing embodiment, step S4 specifically includes:
calculating the number of the weak coverage grids in a first preset range of each grid according to the positions of the weak coverage grids;
and if the number of the weak coverage grids is greater than a third preset value, determining that the current grid is a core grid.
Specifically, each grid G (i, j) is traversed, all weakly covered grids are labeled 1, others are labeled 0, and for distinction, each grid is labeled G (i, j)0The example is illustrated with a grid size of 50 meters × 50 meters and a base station coverage area radius of 200 meters0Within 200 meters (first predetermined range) of the core grid operation matrix
Figure BDA0001194262600000081
The matrix A comprises 81 elements and is provided with a standard vector S0=(1,1,1,1,1,1,1,1,1)TThen, if the binary value A (i, j) × S0>40, i.e. the current grid G (i, j)0Is greater than 40 (third predetermined value), grid G (i, j)0Is a core grid. All core grids are labeled 1 and the other grids are labeled 0, each grid being labeled G (i, j) for differentiation1And (4) showing.
Further, step S4 specifically includes:
for each core grid, if the number of the core grids in the second preset range of the current core grid is greater than the fourth preset value, determining the position of the grid to be added according to the position of the current core grid and the number of the core grids in the corresponding second preset range.
In particular, each grid G (i, j) is traversed1If the grid G (i, j)1Is a core grid marked as 1, and constructs a grid position operation matrix of the station adding
Figure BDA0001194262600000082
Figure BDA0001194262600000083
The matrix B comprises 25 elements and is provided with a standard vector S1=(1,1,1,1,1)TThen, if the binary value B (i, j) × S1>1, that is, the number of core grids within 100 meters of the current core grid (second preset range) is greater than 1 (fourth preset value), then
i + 3-log { (binary [ B (i, j) × S)1])/2}
j' ═ j + 3-log { (binary [ B (i, j)T*S1])/2}
G (i ', j') is used as the position of the grid of stations to be added. All grids to be added are marked with 1 and others with 0, each grid being used for G (i, j) for differentiation2And (4) showing.
Further, step S4 specifically includes:
and for each grid of the stations to be added, if the number of the grids of the stations to be added in the third preset range of the grid of the current stations to be added is greater than the fifth preset value, the position of the grid of the current stations to be added is the position of the base station deployment.
In particular, each grid G (i, j) is traversed2If the grid is G (i, j)2Is a grid marked as 1 for the station to be added, and constructs a base station deployment position operation matrix
Figure BDA0001194262600000091
Figure BDA0001194262600000092
The matrix C comprises 25 elements and is provided with a standard vector S2=(1,1,1,1,1)TThen, if the binary value C (i, j) × S2>1, that is, the number of grids to be added within a range of 100 meters of the grid to be added currently (third preset range) is greater than 1 (fifth preset value), the position of the grid to be added currently is the base station deployment position, as shown in fig. 4, and the black grid is the base station deployment position. And the grids of all the base station deployment positions can be marked as 1, and other grids can be marked as 0, so that the quick determination of the base station deployment positions can be realized.
In summary, the technical scheme provided by the embodiment of the invention firstly realizes accurate discovery of the weak coverage area and solves the problem of weak coverage omission possibly existing in the prior complaint information collection, drive test frequency sweep and other modes. And the corresponding base stations are deployed according to the scene information, so that the complex site survey work is greatly simplified. The intelligent addressing mode solves the problems of blindness of manual point finding and unpredictability of results. Compared with the traditional site planning method, the efficiency of site survey planning is greatly improved, the skill requirement of optimization personnel is reduced, and the resource investment in the aspects of manpower and material resources is saved.
On the other hand, as shown in fig. 5, an embodiment of the present invention further provides an addressing apparatus for a base station deployment location, where the apparatus may adopt the addressing method for a base station deployment location described in the foregoing embodiment, and the apparatus includes: a data acquisition module 51, a rasterization module 52, a weak coverage determination module 53 and a deployment position determination module 54 which are connected in sequence;
the data acquisition module 51 is configured to acquire test data including signal strength information and corresponding geographical location information;
the rasterizing module 52 is configured to converge the signal strength information into a corresponding grid according to the geographic location information; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position;
the weak coverage determining module 53 is configured to determine a position of a weak coverage grid according to the signal strength information corresponding to each grid;
the deployment position determining module 54 is configured to use a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid, so as to form deployment areas of a plurality of base stations to be deployed.
Specifically, the data obtaining module 51 obtains test data including signal strength information and corresponding geographical location information; the rasterizing module 52 converges the signal strength information into a corresponding grid according to the geographical location information; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position; the weak coverage determining module 53 determines the position of the weak coverage grid according to the signal strength information corresponding to each grid; the deployment position determining module 54 takes a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid, so as to form deployment areas of a plurality of base stations to be deployed.
According to the addressing device for the deployment position of the base station, provided by the embodiment of the invention, through acquiring the measurement data and rasterizing the area to be planned, the network problem of the grid can be determined according to the signal intensity information of each grid, so that a plurality of weak coverage grids can be combined to provide signals by the same base station, and the proper position of the base station to be deployed is determined according to the position of the weak coverage grid.
On the basis of the above embodiment, as shown in fig. 6, the apparatus further includes: a base station deployment module 55, configured to deploy, according to the scenario information of the deployment area of the base station to be deployed, the base station corresponding to the scenario information in the deployment area
On the basis of the above embodiment, the weak coverage determining module 53 includes:
the sampling frequency counting module is used for determining the sampling frequency that the signal intensity acquired in the current grid is smaller than a first preset value according to the signal intensity information corresponding to each grid;
and the weak coverage determining unit is used for determining the current grid as a weak coverage grid when the proportion of the sampling times to the total sampling times in the current grid is greater than a second preset value.
On the basis of the foregoing embodiment, as shown in fig. 7, the deployment position determining module 54 specifically includes:
a weak coverage quantity counting unit 541, configured to calculate, according to the position of the weak coverage grids, the quantity of the weak coverage grids within a first preset range of each grid;
a core grid determining unit 542, configured to determine that the current grid is a core grid when the number of the weak coverage grids is greater than a third preset value;
the station adding grid determining unit 543 is configured to determine, for each core grid, when the number of core grids in a second preset range of a current core grid is greater than a fourth preset value, a position of a grid to be added according to the position of the current core grid and the number of core grids in a corresponding second preset range;
a deployment position determining unit 544, configured to determine, for each grid of stations to be added, that the position of the grid of stations to be added currently is the base station deployment position when the number of grids of stations to be added within the third preset range of the grid of stations to be added currently is greater than the fifth preset value.
For the embodiment of the addressing device of the base station deployment location corresponding to the method, since the embodiment is basically similar to the embodiment of the method, and the achieved technical effect is also the same as the effect of the embodiment of the method, the description is relatively simple, and relevant points can be referred to the partial description of the embodiment of the method.
In another aspect, as shown in fig. 8, an embodiment of the present invention further provides an electronic device, which may be the apparatus in the foregoing embodiment, where the electronic device includes at least one processor (processor)81, a communication Interface (Communications Interface)82, at least one memory (memory)83, and a bus 84, where the processor 81, the communication Interface 82, and the memory 83 complete mutual communication through the bus 84. The communication interface 82 may be used for information transfer between the electronic device and a mobile terminal. Processor 81 may call logic instructions in memory 83 to perform the methods described in the above embodiments, including, for example: acquiring test data comprising signal strength information and corresponding geographical location information; according to the geographical position information, the signal intensity information is converged into a corresponding grid; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position; determining the position of the weak coverage grid according to the signal strength information corresponding to each grid; and according to the position of each weak coverage grid, taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed to form the deployment areas of a plurality of base stations to be deployed.
In addition, the logic instructions in the memory 83 may be implemented in the form of software functional units and stored in a computer readable storage medium when the logic instructions are sold or used as independent products. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
Embodiments of the present invention provide a computer program product comprising a computer program stored on a non-transitory computer-readable storage medium, the computer program comprising program instructions, which when executed by a computer, enable the computer to perform the methods provided by the above-mentioned method embodiments, for example, including: acquiring test data comprising signal strength information and corresponding geographical location information; according to the geographical position information, the signal intensity information is converged into a corresponding grid; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position; determining the position of the weak coverage grid according to the signal strength information corresponding to each grid; and according to the position of each weak coverage grid, taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed to form the deployment areas of a plurality of base stations to be deployed.
Embodiments of the present invention provide a non-transitory computer-readable storage medium, which stores computer instructions, where the computer instructions cause the computer to perform the methods provided by the above method embodiments, for example, the methods include: acquiring test data comprising signal strength information and corresponding geographical location information; according to the geographical position information, the signal intensity information is converged into a corresponding grid; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position; determining the position of the weak coverage grid according to the signal strength information corresponding to each grid; and according to the position of each weak coverage grid, taking a plurality of weak coverage grids as the signal coverage area of the same base station to be deployed to form the deployment areas of a plurality of base stations to be deployed.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. A method for addressing a base station deployment location, comprising:
acquiring test data comprising signal strength information and corresponding geographical location information;
according to the geographical position information, the signal intensity information is converged into a corresponding grid; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position;
determining the position of the weak coverage grid according to the signal strength information corresponding to each grid;
according to the position of each weak coverage grid, taking a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed to form deployment areas of a plurality of base stations to be deployed;
the forming a deployment area of a plurality of base stations to be deployed by using a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid specifically includes:
calculating the number of the weak coverage grids in a first preset range of each grid according to the positions of the weak coverage grids;
if the number of the weak coverage grids is larger than a third preset value, determining that the current grid is a core grid;
the forming a deployment area of a plurality of base stations to be deployed by using a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid specifically includes:
for each core grid, if the number of the core grids in a second preset range of the current core grid is greater than a fourth preset value, determining the position of the grid to be added according to the position of the current core grid and the number of the core grids in the corresponding second preset range;
the forming a deployment area of a plurality of base stations to be deployed by using a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid specifically includes:
and for each grid of the stations to be added, if the number of the grids of the stations to be added in the third preset range of the grid of the current stations to be added is greater than the fifth preset value, the position of the grid of the current stations to be added is the position of the base station deployment.
2. The method of claim 1, further comprising:
and deploying the base station corresponding to the scene information in the deployment area according to the scene information of the deployment area of the base station to be deployed.
3. The method of claim 1, wherein the determining the location of the weak coverage grids according to the signal strength information corresponding to each grid comprises:
according to the signal intensity information corresponding to each grid, determining the sampling times that the signal intensity acquired in the current grid is smaller than a first preset value;
and if the proportion of the sampling times to the total sampling times in the current grid is greater than a second preset value, determining that the current grid is a weak coverage grid.
4. An apparatus for addressing a deployment location of a base station, comprising:
the data acquisition module is used for acquiring test data comprising signal strength information and corresponding geographical position information;
the rasterization module is used for converging the signal intensity information into a corresponding grid according to the geographical position information; the grid is obtained by dividing an area to be planned of the wireless network according to the geographical position;
the weak coverage determining module is used for determining the position of the weak coverage grids according to the signal strength information corresponding to each grid;
the deployment position determining module is used for taking a plurality of weak coverage grids as signal coverage areas of the same base station to be deployed according to the position of each weak coverage grid to form deployment areas of a plurality of base stations to be deployed;
the deployment location determining module specifically includes:
the weak coverage quantity counting unit is used for calculating the quantity of the weak coverage grids in a first preset range of each grid according to the positions of the weak coverage grids;
the core grid determining unit is used for determining the current grid as the core grid when the number of the weak coverage grids is greater than a third preset value;
the station adding grid determining unit is used for determining the position of a grid to be added with stations according to the position of the current core grid and the number of the core grids in the corresponding second preset range when the number of the core grids in the second preset range of the current core grid is larger than a fourth preset value for each core grid;
and the deployment position determining unit is used for determining the position of the grid of the current station to be added as the deployment position of the base station when the number of the grids of the current station to be added in the third preset range of the grid of the current station to be added is larger than a fifth preset value.
5. The apparatus of claim 4, further comprising: and the base station deployment module is used for deploying the base station corresponding to the scene information in the deployment area according to the scene information of the deployment area of the base station to be deployed.
6. The apparatus of claim 4, wherein the weak coverage determination module comprises:
the sampling frequency counting module is used for determining the sampling frequency that the signal intensity acquired in the current grid is smaller than a first preset value according to the signal intensity information corresponding to each grid;
and the weak coverage determining unit is used for determining the current grid as a weak coverage grid when the proportion of the sampling times to the total sampling times in the current grid is greater than a second preset value.
CN201611229481.9A 2016-12-27 2016-12-27 Addressing method and device for deployment position of base station Active CN108260075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611229481.9A CN108260075B (en) 2016-12-27 2016-12-27 Addressing method and device for deployment position of base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611229481.9A CN108260075B (en) 2016-12-27 2016-12-27 Addressing method and device for deployment position of base station

Publications (2)

Publication Number Publication Date
CN108260075A CN108260075A (en) 2018-07-06
CN108260075B true CN108260075B (en) 2020-10-02

Family

ID=62718973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611229481.9A Active CN108260075B (en) 2016-12-27 2016-12-27 Addressing method and device for deployment position of base station

Country Status (1)

Country Link
CN (1) CN108260075B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020124356A1 (en) * 2018-12-18 2020-06-25 深圳市大疆创新科技有限公司 Coverage information determining method, signal coverage information determining device and unmanned aerial vehicle
CN109462855B (en) * 2019-01-09 2022-05-03 中国联合网络通信集团有限公司 Base station addressing method, device, equipment and storage medium
CN110113814A (en) * 2019-03-28 2019-08-09 普联技术有限公司 The signal access point of multi signal wireless location determines methods, devices and systems
CN111898787B (en) * 2019-05-06 2024-03-19 中国移动通信集团湖南有限公司 Base station planning method, base station planning device, terminal equipment and storage medium
CN110300413B (en) * 2019-06-25 2022-06-07 广州银禾网络通信有限公司 Communication station simulation planning method and system based on density algorithm
CN112243237B (en) * 2019-07-16 2022-07-01 中国移动通信集团浙江有限公司 Small micro station site selection method and device and electronic equipment
CN110493716B (en) * 2019-08-21 2020-12-11 科航(苏州)信息科技有限公司 Automatic deployment method and device for communication nodes
CN112566177A (en) * 2019-09-25 2021-03-26 中国电信股份有限公司 Weak coverage area identification method and device and computer-readable storage medium
CN113133007B (en) * 2019-12-31 2023-04-07 中国移动通信集团贵州有限公司 Method, device and equipment for selecting address of communication station
CN113068198B (en) * 2020-01-02 2022-10-18 中国移动通信集团设计院有限公司 Wireless network base station layering method and device
CN111148112B (en) * 2020-03-10 2023-06-27 京东方科技集团股份有限公司 Wireless network deployment method and device, electronic equipment and storage medium
CN113965270B (en) * 2020-07-20 2023-08-22 华为技术有限公司 EMF intensity control method and communication device
CN111800796B (en) * 2020-07-29 2023-04-28 广东睿住智能科技有限公司 Signal source position deployment method and device, readable storage medium and equipment
CN112004233B (en) * 2020-08-31 2022-08-02 南京邮电大学 Network planning method based on big data mining
CN112084280B (en) * 2020-09-04 2023-07-21 广州南方智能技术有限公司 Multi-scale terrain cutting and splicing method
CN113727359A (en) * 2021-09-01 2021-11-30 深圳市大洲智创科技有限公司 Method and device for surveying wireless AP (access point) distribution position in wireless local area network
CN114040420B (en) * 2021-12-17 2022-08-23 黑龙江龙廷信息技术有限公司 Base station design method and system for 5G network communication
CN115379464B (en) * 2022-08-22 2023-05-30 中国联合网络通信集团有限公司 Planning method, device and equipment of base station and computer readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014071616A1 (en) * 2012-11-09 2014-05-15 华为技术服务有限公司 Method and device for planning new base station
CN103906104A (en) * 2012-12-31 2014-07-02 中国移动通信集团内蒙古有限公司 Method and device for positioning and covering hole

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8630652B2 (en) * 2010-10-29 2014-01-14 Alcatel Lucent Method and apparatus for optimizing the location of heterogeneous underlaid evolved node-Bs
CN102547752B (en) * 2010-12-07 2015-08-19 中国移动通信集团广东有限公司 A kind of coverage evaluating method of wireless network and device
CN103118369B (en) * 2011-11-16 2016-04-06 华为技术有限公司 The system of selection of site and equipment and grid system of selection and equipment
CN103796227B (en) * 2012-10-31 2017-11-10 中国电信股份有限公司 Carry out the method and system of wireless signal covering analyzing
CN104602271B (en) * 2013-11-01 2018-11-02 中国移动通信集团设计院有限公司 The generation method and device of problem area in a kind of coverage optimization
CN106465142B (en) * 2014-05-21 2019-11-19 华为技术有限公司 Wireless network expansion method and equipment
CN105228242B (en) * 2014-05-26 2019-01-01 中国移动通信集团公司 The localization method and device of weak overlay area
CN104378769B (en) * 2014-11-14 2017-09-15 江苏省邮电规划设计院有限责任公司 TD SCDMA base station planning point automatic point selection methods based on coverage prediction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014071616A1 (en) * 2012-11-09 2014-05-15 华为技术服务有限公司 Method and device for planning new base station
CN103906104A (en) * 2012-12-31 2014-07-02 中国移动通信集团内蒙古有限公司 Method and device for positioning and covering hole

Also Published As

Publication number Publication date
CN108260075A (en) 2018-07-06

Similar Documents

Publication Publication Date Title
CN108260075B (en) Addressing method and device for deployment position of base station
CN104853379B (en) A kind of quality of wireless network appraisal procedure and device
EP2938115A1 (en) Network coverage planning method and device of evolution communication system
CN108124279B (en) Network coverage quality evaluation method and device
CN103067928B (en) A kind of analytical method of network coverage quality and system
CN106899985A (en) The appraisal procedure and device of a kind of network coverage
CN111901750A (en) Positioning method, positioning device, electronic equipment and storage medium
CN108540987B (en) LTE network coverage state evaluation method and device
CN105828393B (en) Method and device for configuring adjacent cells between systems
CN112469066B (en) 5G network coverage evaluation method and device
EP2160064B1 (en) Method and location device for locating at least one user in a mobile wireless network
CN114641015B (en) Network evaluation method, device, electronic equipment and storage medium
CN108632832B (en) Network coverage analysis method and system
CN106686611B (en) Method and device for evaluating indoor weak coverage area
CN114257957B (en) Network planning method and device, computing equipment and computer readable storage medium
CN106921978B (en) Position distribution determination method and device
CN102957572A (en) Method and device for evaluating performance of system
CN110913407A (en) Method and device for analyzing overlapping coverage
CN106941685B (en) Method and system for determining reverse connection of antenna
CN108513306B (en) Network coverage prediction method based on test big data
CN109982368B (en) Method, device, equipment and medium for checking cell azimuth
CN114025372B (en) MR data-based 5G RSRP calculation method and system
CN109996253A (en) A kind of rational appraisal procedure of cell signal coverage area and device
CN112243242B (en) Large-scale antenna beam configuration method and device
CN110839257B (en) Network quality evaluation method, device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant