CN108259821A - Electric network operation monitoring system and method - Google Patents
Electric network operation monitoring system and method Download PDFInfo
- Publication number
- CN108259821A CN108259821A CN201711396106.8A CN201711396106A CN108259821A CN 108259821 A CN108259821 A CN 108259821A CN 201711396106 A CN201711396106 A CN 201711396106A CN 108259821 A CN108259821 A CN 108259821A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- data
- connect
- monitoring device
- remote
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/04—Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks
- H04L63/0428—Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks wherein the data content is protected, e.g. by encrypting or encapsulating the payload
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/14—Systems for two-way working
- H04N7/141—Systems for two-way working between two video terminals, e.g. videophone
- H04N7/147—Communication arrangements, e.g. identifying the communication as a video-communication, intermediate storage of the signals
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Multimedia (AREA)
- Computer Security & Cryptography (AREA)
- Computer Hardware Design (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Selective Calling Equipment (AREA)
- Telephonic Communication Services (AREA)
Abstract
The present invention relates to a kind of electric network operation monitoring system and methods.The system includes the wearable monitoring device for being arranged on the remote monitoring terminal of main website and being dressed by operating personnel, and remote monitoring terminal is communicated to connect with wearable monitoring device, and wearable monitoring device includes:Apparatus body and the monitoring device being connect with apparatus body, monitoring device include:Acquire the audio and video acquisition devices of the monitoring data at electric network operation scene;It is connect with audio and video acquisition devices, for monitoring data to be encrypted to obtain the central processing unit of encryption data, encryption key is corresponded with monitoring device;And it is connect respectively with central processing unit and remote monitoring terminal, for receiving the encryption data of central processing unit output and encryption data is sent to the communication device of remote monitoring terminal.Real time monitoring to electric power field work is realized by the system, greatly improves personnel's utilization rate, and ensure that reliability and the safety of data transmission.
Description
Technical field
The present invention relates to monitoring field, more particularly to a kind of electric network operation monitoring system and method.
Background technology
In the operating process of traditional electric system, typically assign care provider and perform monitoring at the scene, to avoid
Operating personnel's maloperation and cause the accident, for example, during grid switching operation, need to be equipped with an at least operating personnel and perform
Lock operates, while is equipped with an at least care provider and carries out live monitoring.It is however, quick with power industry substation quantity
Development, substation accelerate to promote from single station administration pattern to fibrillar center management mode is patrolled so that substation's quantity mostly with O&M people
Member's contradiction in short supply is increasingly prominent.Therefore, how power system operation process to be supervised in real time using limited human resources
Control, to prevent staff's maloperation from becoming urgent problem to be solved.
Invention content
Based on this, it is necessary to for substation's quantity contradiction in short supply mostly with operation maintenance personnel it is increasingly prominent the problem of, provide
A kind of electric network operation monitoring system and method.
A kind of electric network operation monitoring system, including being arranged on the remote monitoring terminal of main website and being worn by what operating personnel dressed
Formula monitoring device is worn, the remote monitoring terminal is communicated to connect with the wearable monitoring device, the wearable monitoring device
Including:Apparatus body and the monitoring device being connect with the apparatus body, the monitoring device include:
Acquire the audio and video acquisition devices of the monitoring data at electric network operation scene;
It is connect with the audio and video acquisition devices, for the monitoring data to be encrypted to obtain the center of encryption data
Processor, the encryption key are corresponded with the monitoring device;And
It connect with the central processing unit and the remote monitoring terminal, exported for receiving the central processing unit respectively
Encryption data and the encryption data is sent to the communication device of remote monitoring terminal.
It further includes in one of the embodiments,:The relay that is connect with the communication device and with the relaying
The server unit that device is connected with the remote monitoring terminal.
The server unit includes in one of the embodiments,:
The number of the wearable monitoring device and the data of remote monitoring terminal transmission is connect, stored with the relay
According to library server;And
The network server being connect respectively with the database server and the remote monitoring terminal.
The remote monitoring terminal includes in one of the embodiments,:It is connect with the communication device, for acquiring master
The first audio data for standing and the audio collecting device that first audio data is transmitted to the monitoring device.
The wearable monitoring device further includes in one of the embodiments,:It connect with the communication device, pass through institute
It states communication device and receives the first audio data that the audio collecting device is sent and the first audio output device exported.
The remote monitoring terminal further includes in one of the embodiments,:
It is connect with the communication device, the display device for receiving the video data in the monitoring data and showing;
It is connect with the communication device, the second audio for receiving the second audio data of the monitoring data and exporting
Output device.
The monitoring device further includes in one of the embodiments,:Connect with the central processing unit, for receive simultaneously
Store the memory of the encryption data of the central processing unit output.
It is whole to include at least two remote monitorings being connect with the wearable monitoring device in one of the embodiments,
End.
The apparatus body is provided with buckle slot in one of the embodiments, the monitoring device be provided with it is described
The corresponding fastener of buckle slot, the monitoring device are fixed on the equipment sheet by the fastener and buckle slot cooperation
Body.
A kind of electric network operation monitoring method, including:
Obtain remote monitoring terminal send verification information, the verification information include monitoring device identify and with it is described
Identify corresponding password;
The encryption data for obtaining corresponding monitoring device is identified according to the monitoring device;
The encryption data is decrypted according to the password, obtains monitoring data, the monitoring data is wearable
The collected monitoring data of monitoring device;
The monitoring data is sent to the remote monitoring terminal.
Above-mentioned electric network operation monitoring system and method using wearable monitoring device collection site monitoring data, will acquire
Monitoring data be sent to remote monitoring terminal, realize the real time monitoring to execute-in-place using remote monitoring terminal, without
Assign staff and carry out monitoring operation to scene, greatly improve personnel's utilization rate.Secondly, by monitoring device to acquisition
To monitoring data be encrypted after send, ensure that the reliability of data transmission, further define the retrievable power of data
Limit, has ensured the safety of electric power data.
Description of the drawings
Fig. 1 is the structure diagram of electric network operation monitoring system in an embodiment;
Fig. 2 is the structure diagram of electric network operation monitoring system in another embodiment;
Fig. 3 is the front view and side view of wearable monitoring device in another embodiment;
Fig. 4 is the flow diagram of electric network operation monitoring method in an embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the object, technical solution and advantage for making the application are more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, and
It is not used in restriction the application.
As shown in Figure 1, Figure 3, in one embodiment, a kind of electric network operation monitoring system, electric network operation monitoring system are provided
System includes the wearable monitoring device 200 for being arranged on the remote monitoring terminal 100 of main website and being dressed by operating personnel, remote monitoring
Terminal 100 is communicated to connect with wearable monitoring device 200, and wearable monitoring device 200 includes:Apparatus body 210 and with setting
The monitoring device 220 that standby ontology 210 connects, monitoring device 220 include:Audio and video acquisition devices 221,222 and of central processing unit
Communication device 223.
Audio and video acquisition devices 221 are used to acquire the monitoring data at electric network operation scene.Specifically, audio and video acquisition devices
221 acquisition monitoring datas include audio data, video data and image data, are regarded by the live sound during recording operation
Frequency information takes pictures to scene, so as to carry out complete monitoring to operating process, understands showing in operating process in time
Field situation.Specifically, monitoring data may include the audio, video data of the power transformation operation scene of the accident, grid switching operation process audio and video
Audio, video data of operation field etc. in data and tour maintenance process.
Central processing unit 222 is connect with audio and video acquisition devices 221, for monitoring data to be encrypted to obtain encryption number
According to encryption key is corresponded with monitoring device.
In the present embodiment, the encryption key of one, each monitoring device and encryption each monitoring device is configured in advance
Key corresponds, and when the audio and video acquisition devices of the monitoring device collect monitoring data, central processing unit utilizes correspondence
Encryption key the monitoring data acquired is encrypted so that only with counterpart keys related side's ability
Corresponding monitoring data is enough got, effectively prevent the leakage of electric power data.
Communication device 223 is connect respectively with central processing unit 222 and remote monitoring terminal 100, for receiving central processing
The encryption data of 222 outputs, and encryption data is sent to remote monitoring terminal 100.
Communication device 223 can realize the communication of wearable monitoring device and remote monitoring terminal, both can be by wearable monitoring
The monitoring data of the acquisition of equipment is sent to remote monitoring terminal, but can receive remote monitoring terminal be sent to it is wearable monitoring set
Standby related data realizes the interaction of data.
Above-mentioned electric network operation monitoring system, using wearable monitoring device collection site monitoring data, by the monitoring of acquisition
Data are sent to remote monitoring terminal, the real time monitoring to execute-in-place are realized using remote monitoring terminal, without assigning people
Member is monitored and instructs to electric field, greatly improves personnel's utilization rate.Secondly, by monitoring device to collected
Monitoring data is sent after being encrypted, and ensure that the reliability of data transmission, also, based on adding to each monitoring device setting
Key further defines the retrievable permission of data, has ensured the safety of electric power data.
In one embodiment, communication device 223 is the wireless communications such as WiFi communication device, Bluetooth communication device dress
It puts.Further, communication device 223 includes hotspot sending module, for passing through the hot spot signal of transmission and remote monitoring
Terminal is direct-connected.By taking WiFi communication device as an example, WiFi communication device with external wireless link terminal by connecting, then pass through outside
Wireless relay terminal is connect with remote supervisory and control(ling) equipment, realizes the data interaction of wearable monitoring device and remote supervisory and control(ling) equipment.This
Outside, under init state, WiFi communication device also serves as hot spot and emits WiFi signal, and and remote monitoring terminal outward in itself
It is directly connected to, for completing WiFi accounts when WiFi communication device is connect with external wireless link terminal by remote monitoring terminal
Number and password setting.
In another embodiment, as shown in Fig. 2, electric network operation monitoring system further includes:In being connect with communication device 223
After device 300 and the server unit 400 being connect with relay 300 and remote monitoring terminal 100.
In one embodiment, communication device 223 carries out pairing company by account and password authentification with relay 300
It connects.Specifically, communication device 223 itself can emit wireless signal outward as hot spot, under init state, open communication dress
223 hot spot is put, remote monitoring terminal 100 is directly connect by the hot spot with communication device 223, and utilizes remote monitoring terminal
The setting of account and password when 100 completion communication devices 223 are connect with relay 300, realizes communication device 223 and relaying
The pairing connection of device 300.After communication device 223 and 300 successful connection of relay, the hot spot of communication close device 223,
Wearable monitoring device can carry out data friendship by relay 300 and server unit 400 and remote monitoring terminal 100
Mutually.
Specifically, relay 300 can be 3G/4G hotspot terminal or wireless router etc..
Further, with continued reference to Fig. 2, server unit 400 includes:It connect with relay 300, store wearable prison
Control the data that equipment 200 and remote monitoring terminal 100 transmit database server 410 and respectively with database server
410 and remote monitoring terminal 100 connect network server 420.
Database server 410 is used to store the various information datas from communication device 223 and network server 420,
Namely the data that wearable monitoring device 200 and remote monitoring terminal 100 transmit.Network server 420 is the number of internet
According to terminal is exchanged, it is connected respectively with database server 410 and remote monitoring terminal 100 by communication network, network service
Information and the remote monitoring terminal 100 that device 420 is responsible for transmitting in database server 410 carry out data exchange, and by database
Server 410 is relatively isolated with internet, avoid remote monitoring terminal 100 for database server 410 it is direct access and
The direct destruction of internet hacker and virus to database server 410.
It is appreciated that database server 410 is stored with encrypted monitoring data, remote monitoring terminal 100 can both lead to
It crosses database server 410 and network server 420 obtains the real time data that wearable monitoring device 200 is sent, can also pass through
Stored data in database server 410 are obtained, monitor video, audio and image frame are played back.
Network server 420 is additionally operable to be obtained according to the identification information that remote monitoring terminal 100 is sent corresponding with the mark
Monitoring device 220 transmit encryption data, and according to remote monitoring terminal 100 send encrypted message to encryption data carry out
The monitoring data of gained after decryption is sent to remote monitoring terminal 100 by decryption.Wherein, identification information for it is pre-set, with
Monitoring device 220 corresponds to identification information.It is appreciated that different personnel have different supervision authorities, and different monitoring is weighed
Limit, which corresponds to, obtains the data that different monitoring device is monitored, and corresponding monitoring number only can be just checked with corresponding permission
According to further also having ensured the safety of electric power data.
In another embodiment, remote monitoring terminal 100 includes:Connect with communication device 223, for acquire main website
One audio data and the audio collecting device that the first audio data is transmitted to monitoring device 220.It can by remote monitoring terminal
Phonetic entry is carried out, and by transmitting voice signal to wearable monitoring device, so as to fulfill remote guide.
Further, wearable monitoring device 200 further includes:It connect with communication device 223, connect by communication device 223
Receive the first audio data that audio collecting device is sent and the first audio output device 230 exported.Pass through the first audio output
Device 230 plays the voice signal that remote monitoring terminal is sent, and work is carried out to field personnel to receive remote worker
Coach and task publication etc..Specifically, the first audio output device can be wire/wireless earphone, loud speaker etc..
In the present embodiment, communication device 223 is additionally operable to receive the first audio data that remote monitoring terminal is sent, and will
The audio data is sent to the first audio output device 230.That is, the wearable monitoring device that the present embodiment is provided also has
The function of intercommunication is carried out with remote monitoring terminal, and then can realize that remote guide and task are sent out by the wearable monitoring device
Cloth.
In another embodiment, remote monitoring terminal 100 further includes:It connect with communication device 223, monitor number for receiving
It video data in and the display device that shows and is connect with communication device 223, the second sound for receiving monitoring data
Frequency evidence and the second audio output device exported.Specifically, the second audio output device can be wire/wireless earphone, raise
Sound device etc..
Remote monitoring terminal can show acquired video information, play collected field speech information, can also obtain
The voice signal of main website staff played out with being sent to monitoring device, it is real with remote monitoring terminal to pass through monitoring device
Real-time intercommunication inside and outside scene, at the same can real-time display electric field situation, monitoring personnel into electric field without being supervised
It examines, related personnel also can carry out task publication and task instruction etc. by electric network operation monitoring system, and for electric power, personnel provide
It is greatly convenient.
Further, remote monitoring terminal 100 by send include monitoring device identify and with the corresponding password of mark
Verification information carry out Authority Verification, when the authentication succeeds, you can corresponding monitoring data is obtained, at this time it is believed that remote monitoring
The monitoring device 220 corresponding with the mark of terminal 100 completes pairing, and then can be sent to the voice data of the main website of acquisition
Monitoring device 220 realizes remote guide to carry out intercommunication.Wherein, remote monitoring terminal can be for one or multiple, real
Monitoring and management of the existing multiterminal personnel to scene.
Further, remote monitoring terminal 100 is additionally operable to the communication by inputting initial password and wearable monitoring device
Device 223 connects, which is connection password corresponding with the wireless signal that communication device 223 is sent out, and remote monitoring is whole
After end 100 and communication device 223 are direct-connected, it is configured when communication device 223 is connect with relay 300 by remote monitoring terminal
Account and password, to realize that communication device 223 and the pairing of relay 300 are connect.
In addition, remote monitoring terminal 100 be additionally operable to monitoring device 220 it is direct-connected after, to 222 configuration monitoring of central processing unit
There are correspondences for the mark of the encryption secret key of data and scrambled mode, the encryption secret key and monitoring device 220 so that
Central processing unit 222 is getting monitoring data, is carried out using the scrambled mode and encryption secret key pair monitoring data of configuration
Encryption.Further, password of the remote monitoring terminal 100 into the verification information that network server 420 is sent is and machine
The corresponding decryption secret key of key, that is, when remote monitoring terminal 100 needs to obtain certain corresponding monitoring data of mark, only
Have when the encryption secret key pairing corresponding with the mark of the decryption secret key of its transmission, it can be to the corresponding encryption data of the mark
It is decrypted, and the monitoring data after being decrypted.It is appreciated that different personnel have different supervision authorities, and it is different
Supervision authority correspond to and obtain the data that are monitored of different monitoring device, only can just check correspondence with corresponding permission
Monitoring data, further also ensured the safety of monitoring data.
Specifically, remote monitoring terminal 100 realizes that any of the above-described embodiment medium-long range monitors by dedicated monitoring APP
The function that terminal 100 is realized.
Above-mentioned monitoring system obtains on-site supervision data by wearable monitoring device and is uploaded to server, long-range to supervise
Control terminal obtains monitoring data by server or sends voice data to wearable monitoring device, realizes and scene is grasped
The real time monitoring and remote guide of work without carrying out on-site supervision and guidance by assigning professional, greatly improve
Personnel's utilization rate, while support the playback function of monitoring data, convenient for analyzing field data.Also, to each monitoring
Device carries out priority assignation, and the monitoring data of monitoring device could be obtained simultaneously by remote monitoring terminal by only possessing corresponding authority
Intercommunication is carried out, further improves the safety of monitoring data.
With continued reference to Fig. 2, monitoring device 220 further includes:It is connect with central processing unit 222, for receiving and storing center
The memory 224 for the encryption data that processor 222 exports.
It is appreciated that central processing unit 222 is encrypted monitoring data after monitoring data is got, and will
Encryption data is sent to memory 224 and is locally stored, when the wearable monitoring device and remote monitoring terminal or other set
During standby connection, playback that can be by reading the data being locally stored realization monitored picture and audio data etc..
Further, wearable monitoring device 200 further includes the supply unit 240 being connect with monitoring device 220.Specifically
Ground, supply unit 240 respectively in monitoring device 220 audio and video acquisition devices 221, central processing unit 222, communication device
223 and memory 224, provide operating voltage for each device in monitoring device 220.In addition, supply unit 240 can also be with
One audio output device 230 connects, and operating voltage is provided for the first audio output device 230.
In another embodiment, the apparatus body 210 of wearable monitoring device 200 is provided with buckle slot, monitoring device 220
Fastener corresponding with buckle slot is provided with, monitoring device 220 is fixed on apparatus body by fastener and buckle slot cooperation
210。
Specifically, in electric operating scene, operating personnel usually requires safe wearing cap to protect head safe, because
This, in the case where not influencing safety work, can realize monitoring number using safety cap as the apparatus body of wearable monitoring device
According to acquisition.Further, as shown in figure 3, for the main view using safety cap as the wearable monitoring device 200 of apparatus body 210
Figure and side view are set in the front end of safety cap with buckle slot, are coordinated by the fastener and the buckle slot of monitoring device 220
The front end of safety cap is fixed on, under the premise of neither wear comfort and the security function of safety cap is influenced, is easily acquired
To on-site supervision data.
Further, monitoring device 220 is fixed on the positive front end of safety cap, realizes that the First look of operating personnel is found a view.
The size of monitoring device 220 is 4.5cm*4.5cm*1.4cm, net weight 20g, and each device is highly integrated in monitoring device 220, makes this
220 small volume and less weight of monitoring device, reduces the influence to safety work.Monitoring device 220 is also using the material with water protection standards
As sheathing material, to avoid damage of the moisture in operating environment to each device in monitoring device 220.
In other embodiments, apparatus body can also be that spectacle frame, head-wearing device etc. not influence safety work and be convenient for wearing again
The device worn, being used cooperatively based on apparatus body and monitoring device realize the function of on-site supervision data acquisition.
In electric system, by electric network operation monitoring system can implement power transformation operation accident treatment remote guide,
Remote support and operation field remote supervisory etc. are safeguarded in grid switching operation long distance monitoring, tour.Specifically, wearable prison is first turned on
It controls equipment and Initialize installation is carried out to wearable monitoring device, open the hot spot of the communication device of wearable monitoring device, far
Range monitoring terminal is connect by inputting initial password with communication device, after direct-connected success, is configured and communicated by remote monitoring terminal
Account and password when device is connect with relay, to realize that the pairing of communication device and relay connects, remote monitoring
Terminal is by communication device to the encryption secret key of central processing unit configuration monitoring data and scrambled mode, thus completion pair
The Initialize installation of wearable monitoring device.The wearable monitoring device is then worn by staff and enters operation field, is supervised
After control device acquires audio and video or image data and is encrypted in real time, encryption data is uploaded to by service by relay
Device end, remote monitoring terminal obtains the corresponding audio and video of server end or image data by validation information, so as to real
Now to the monitoring at scene.In addition, over-the-counter staff can also be by remote monitoring terminal input speech signal, and by remote monitoring
Voice signal is sent to server end, then be sent to wearable monitoring device by server end by terminal, with to work on the spot people
Member carries out job guide and task publication etc..
The monitoring system supports audio and video or image data to play and play back in real time, can be by playing in real time in time
Field condition is solved, live data analysis is carried out using playback function, can also outside guidance etc. be sought by real-time intercommunication, is electric power
Operation provides a degree of facility, and without carrying out on-site supervision by assigning professional, improves personnel's utilization rate.
Simultaneously can also in remote monitoring field operating personnel operation process, construction personnel is promoted to be performed in strict accordance with job specification, is improved
Operation quality further also can not be prevented or be given in time at that time remedial measure there is operation, be reduced because operation is improper
Caused by accident rate.
In another embodiment, as shown in figure 4, also providing a kind of electric network operation monitoring method, which includes step
Rapid S110 to step S140:
S110, obtain remote monitoring terminal send verification information, verification information include monitoring device identify and with mark
Know corresponding password.
S120 identifies the encryption data for obtaining corresponding monitoring device according to monitoring device.
S130 is decrypted encryption data according to password, obtains monitoring data, and monitoring data is wearable monitoring device
Collected monitoring data.Specifically, monitoring data includes video data and second audio data.
Monitoring data is sent to remote monitoring terminal by S140.
Above-mentioned monitoring method obtains the wearable collected monitoring data of monitoring device using remote monitoring terminal, so as to
The real time monitoring to execute-in-place can be achieved, without carrying out on-site supervision by assigning professional, greatly improve personnel
Utilization rate.Also, by being verified to remote monitoring terminal, corresponding monitoring data could be obtained after being proved to be successful, into one
Step has ensured the safety of power monitoring data.
In another embodiment, before the step of obtaining the verification information that remote monitoring terminal is sent, step is further included:It obtains
Take the encryption data that wearable monitoring device is sent and storage.The encryption data is wearable monitoring device to collected monitoring
Data obtain data after being encrypted.
Monitoring data is acquired by wearable monitoring device, can realize live number in the case where not influencing safety work
According to acquisition, provide condition for remote monitoring.
In another embodiment, step is further included:The first audio data that remote monitoring terminal is sent is obtained, and by first
Audio data is sent to wearable monitoring device.
In the present embodiment, by the audio data of the also transmittable main website of remote monitoring terminal, and then remote monitoring is realized
The intercommunication function of terminal and wearable monitoring device can realize outside guidance, task publication etc. by intercommunication function, further carry
High working efficiency.
Remote monitoring end is sent to by obtaining the collected monitoring data of wearable monitoring device, and by monitoring data
End so as to realize the real time monitoring to execute-in-place, without carrying out on-site supervision by assigning professional, improves personnel
Utilization rate, and by being verified to remote monitoring terminal, corresponding monitoring data could be obtained after being proved to be successful, is further carried
The high safety of monitoring data.In addition, can also be achieved the intercommunication function inside and outside field, issued with carrying out job guide and task
Deng providing a degree of facility for electric operating etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that those of ordinary skill in the art are come
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of electric network operation monitoring system, which is characterized in that including being arranged on the remote monitoring terminal of main website and by operation people
The wearable monitoring device of member's wearing, the remote monitoring terminal are communicated to connect with the wearable monitoring device, the wearing
Formula monitoring device includes:Apparatus body and the monitoring device being connect with the apparatus body, the monitoring device include:
Acquire the audio and video acquisition devices of the monitoring data at electric network operation scene;
It is connect with the audio and video acquisition devices, for the monitoring data to be encrypted to obtain the central processing of encryption data
Device, the encryption key are corresponded with the monitoring device;And
Connect respectively with the central processing unit and the remote monitoring terminal, for receive central processing unit output plus
Ciphertext data and the communication device that the encryption data is sent to remote monitoring terminal.
2. electric network operation monitoring system according to claim 1, which is characterized in that further include:Connect with the communication device
The relay connect and the server unit being connect with the relay and the remote monitoring terminal.
3. electric network operation monitoring system according to claim 2, which is characterized in that the server unit includes:
The database of the wearable monitoring device and the data of remote monitoring terminal transmission is connect, stored with the relay
Server;And
The network server being connect respectively with the database server and the remote monitoring terminal.
4. electric network operation monitoring system according to claim 1, which is characterized in that the remote monitoring terminal includes:With
First audio data for the first audio data for acquiring main website and is transmitted to the prison by communication device connection
Control the audio collecting device of device.
5. electric network operation monitoring system according to claim 4, which is characterized in that the wearable monitoring device is also wrapped
It includes:It is connect with the communication device, the first audio data that the audio collecting device is sent is received by the communication device
And the first audio output device exported.
6. electric network operation monitoring system according to claim 1, which is characterized in that the remote monitoring terminal further includes:
It is connect with the communication device, the display device for receiving the video data in the monitoring data and showing;
It is connect with the communication device, the second audio output for receiving the second audio data of the monitoring data and exporting
Device.
7. electric network operation monitoring system according to claim 1, which is characterized in that the monitoring device further includes:With institute
State central processing unit connection, the memory for receiving and storing the encryption data of the central processing unit output.
8. electric network operation monitoring system according to claim 1, which is characterized in that including at least two with it is described wearable
The remote monitoring terminal of monitoring device connection.
9. according to claim 1 to 8 any one of them electric network operation monitoring system, which is characterized in that the apparatus body is set
Buckle slot is equipped with, the monitoring device is provided with fastener corresponding with the buckle slot, and the monitoring device passes through the card
Fastener is fixed on the apparatus body with buckle slot cooperation.
10. a kind of electric network operation monitoring method, which is characterized in that including:
Obtain remote monitoring terminal send verification information, the verification information include monitoring device identify and with the mark
Corresponding password;
The encryption data for obtaining corresponding monitoring device is identified according to the monitoring device;
The encryption data is decrypted according to the password, obtains monitoring data, the monitoring data is wearable monitoring
The collected monitoring data of equipment;
The monitoring data is sent to the remote monitoring terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711396106.8A CN108259821A (en) | 2017-12-21 | 2017-12-21 | Electric network operation monitoring system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711396106.8A CN108259821A (en) | 2017-12-21 | 2017-12-21 | Electric network operation monitoring system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108259821A true CN108259821A (en) | 2018-07-06 |
Family
ID=62723738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711396106.8A Pending CN108259821A (en) | 2017-12-21 | 2017-12-21 | Electric network operation monitoring system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108259821A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110545401A (en) * | 2019-08-02 | 2019-12-06 | 国网浙江省电力有限公司金华供电公司 | Safety monitoring system and safety monitoring method for live working process |
CN111193906A (en) * | 2019-12-26 | 2020-05-22 | 深圳供电局有限公司 | Visual monitoring management method and device, computer equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202488210U (en) * | 2011-07-15 | 2012-10-10 | 山东电力集团公司莱芜供电公司 | Electric power remote operation monitoring device |
CN102724563A (en) * | 2012-06-15 | 2012-10-10 | 深圳市汇海威视科技有限公司 | Monitoring front end and terminal, monitoring system as well as audio/video signal encryption and decryption methods |
CN202679517U (en) * | 2011-12-26 | 2013-01-16 | 武汉珞珈天铭电气科技有限公司 | Outdoor operation safety monitoring system |
CN203136056U (en) * | 2013-01-29 | 2013-08-14 | 刘闻 | Bidirectional visual voice intercommunication system for operations conducted high aboveground |
-
2017
- 2017-12-21 CN CN201711396106.8A patent/CN108259821A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202488210U (en) * | 2011-07-15 | 2012-10-10 | 山东电力集团公司莱芜供电公司 | Electric power remote operation monitoring device |
CN202679517U (en) * | 2011-12-26 | 2013-01-16 | 武汉珞珈天铭电气科技有限公司 | Outdoor operation safety monitoring system |
CN102724563A (en) * | 2012-06-15 | 2012-10-10 | 深圳市汇海威视科技有限公司 | Monitoring front end and terminal, monitoring system as well as audio/video signal encryption and decryption methods |
CN203136056U (en) * | 2013-01-29 | 2013-08-14 | 刘闻 | Bidirectional visual voice intercommunication system for operations conducted high aboveground |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110545401A (en) * | 2019-08-02 | 2019-12-06 | 国网浙江省电力有限公司金华供电公司 | Safety monitoring system and safety monitoring method for live working process |
CN111193906A (en) * | 2019-12-26 | 2020-05-22 | 深圳供电局有限公司 | Visual monitoring management method and device, computer equipment and storage medium |
CN111193906B (en) * | 2019-12-26 | 2022-03-22 | 深圳供电局有限公司 | Visual monitoring management method and device, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103186850B (en) | For obtaining the method for evidence for payment, equipment and system | |
CN109286932A (en) | Networking authentication method, apparatus and system | |
CN104636777B (en) | ID card information obtains system | |
CN106059757A (en) | Audio and video monitoring device, data encryption and decryption method, and audio and video display device | |
CN101853533B (en) | Password setting method and device used for building gate control system | |
CN105261100A (en) | Entrance guard unlocking method and system | |
CN102638578A (en) | Data synchronization method and data synchronization system based on mobile devices | |
CN109714360A (en) | A kind of intelligent gateway and gateway communication processing method | |
CN108684040A (en) | A kind of connection method of wireless network and system | |
CN104102863B (en) | A kind of ID authentication device and the apparatus control method | |
CN108259821A (en) | Electric network operation monitoring system and method | |
CN104035408A (en) | RTU (Remote Terminal Unit) controller and communication method with SCADA (Supervisory Control And Data Acquisition) system | |
WO2022166775A1 (en) | Elevator accessory authentication method and system, and server and storage medium | |
CN105262653A (en) | Safety access platform | |
CN110635894B (en) | Quantum key output method and system based on frame protocol format | |
CN207589051U (en) | Electric network operation monitoring system | |
CN111770588B (en) | Method and system for quickly establishing wireless connection with wireless router | |
CN109474426A (en) | A kind of safe quantum communication system and communication means for multimedia data stream | |
CN108616543A (en) | A kind of short haul connection based on Quick Response Code, transmission method, apparatus | |
CN210605460U (en) | Safe type intelligence house control system | |
CN110312253A (en) | A kind of method for network access, apparatus and system | |
CN103745511A (en) | Intelligent door control system based on set top box | |
CN103702080A (en) | Intelligent security and protection system | |
CN106372557B (en) | Certificate card information acquisition method, device and system | |
CN208207999U (en) | Communal space management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200921 Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd. |
|
TA01 | Transfer of patent application right |