CN108254650A - A kind of quick distinguishing method of substation busbars singlephase earth fault - Google Patents
A kind of quick distinguishing method of substation busbars singlephase earth fault Download PDFInfo
- Publication number
- CN108254650A CN108254650A CN201810336334.4A CN201810336334A CN108254650A CN 108254650 A CN108254650 A CN 108254650A CN 201810336334 A CN201810336334 A CN 201810336334A CN 108254650 A CN108254650 A CN 108254650A
- Authority
- CN
- China
- Prior art keywords
- zero
- sequence current
- feeder line
- maximum
- earth fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/088—Aspects of digital computing
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Theoretical Computer Science (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
- Locating Faults (AREA)
Abstract
The present invention is a kind of quick distinguishing method of substation busbars singlephase earth fault, and when singlephase earth fault occurs, I is measured by each feeder line zero sequence current mutual inductor10、I20…In0、Ij、IN,The feeder line of zero-sequence current maximum is found out than width method by zero-sequence current, if meeting Ijmax0=I10+I20+…+In0+Im0‑Inj0, i.e., the value of maximum zero sequence current is the sum of remaining feeder line zero-sequence current and busbar zero-sequence current in addition to itself in feeder line, then is judged as that singlephase earth fault occurs for the feeder line of zero-sequence current maximum;If Ijmax0≠I10+I20+…+In0+Im0‑Inj0I.e. the zero-sequence current of the feeder line is less than the circuit zero-sequence current value maximum in metallic earthing, then judges that singlephase earth fault occurs for substation busbars.
Description
Technical field
The present invention is one-phase earthing failure in electric distribution network process field, is mainly used for substation busbars and singlephase earth fault occurs
When failure quickly judge.
Background technology
When being handled using earth fault processing unit singlephase earth fault, since substation busbars can also be sent out sometimes
Raw singlephase earth fault needs to judge that singlephase earth fault is happened at the single-phase of the feeder line generation that is connect on busbar either busbar
Earth fault need to judge that singlephase earth fault is happened at substation bus bar or feeder line, could carry out accurately carrying out failure
Isolation processing.Because when singlephase earth fault occurs, the busbar being linked together is with feeder line in fault signature neutral-point displacement
The variation of voltage is all identical, it is difficult to the quick judgement of fault zone is carried out according to Fault feature of single phase earthing, it such as cannot be accurate
True judges fault zone, cannot carry out Fault Isolation processing, thus quickly judges when singlephase earth fault occurs
It is out of order and region and timely troubleshooting is taken to be very important.
Invention content
A kind of quick distinguishing method of substation busbars singlephase earth fault has been invented in view of the above problems, when detecting power transformation
Institute neutral point voltage UNWhen abnormal, each feeder line zero-sequence current I is measured by each feeder line zero sequence current mutual inductor first10、I20…In0、
Ij、IN,The feeder line of zero-sequence current maximum is found out than width method by zero-sequence current, if meeting Ijmax0=I10+I20+…+In0+Im0-
Inj0, i.e., the value of maximum zero sequence current is the sum of remaining feeder line zero-sequence current and busbar zero-sequence current in addition to itself in feeder line, then sentences
Break and singlephase earth fault occurs for the feeder line of zero-sequence current maximum;If Ijmax0≠I10+I20+…+In0+Im0-Inj0, and Ijmax0≤
Ijzmax0, Ijmax0≤Imax0, i.e. small or maximum in metallic earthing equal to the circuit zero-sequence current of the zero-sequence current of the feeder line
Value, at the same it is small or equal to zero-sequence current value of the capacitance current maximum feeder line in metallic earthing in all feeder lines of the busbar, then
Judge that singlephase earth fault occurs for substation busbars.
Im0For substation busbars zero-sequence current over the ground, field measurement can be passed through or the method for calculating obtains;Ijzmax0For feeder line
The zero-sequence current that circuit maximum during metallic earthing occurs for j can be obtained by field measurement or the method for calculating;Imax0For institute
There is zero-sequence current value of the capacitance current maximum feeder line in metallic earthing in feeder line, field measurement or the method for calculating can be passed through
It obtains.
Present invention tool has the advantage that:
1st, the invention solves the judgment technology problem of busbar singlephase earth fault and feeder line single-phase earthing, convenient for accurately carrying out
Isolated fault prevents from accidentally cutting feeder line in busbar singlephase earth fault.
2nd, the invention by comparing zero-sequence current correlation, method is simple, it is quick, convenient for judging the property speed of failure
Processing.
Specific embodiment
Calculating or measured data substation busbars capacitive earth current and the capacitive earth current of each feeder line are stored in
The computer control of earth fault processing unit.
When voltage transformer detects electric substation residual voltage UNWhen abnormal, when detecting electric substation neutral point voltage UNIt is different
Chang Shi measures each feeder line zero-sequence current I by each feeder line zero sequence current mutual inductor first10、I20…In0、Ij、IN,Pass through zero-sequence current
Than the feeder line that width method finds out zero-sequence current maximum, if meeting Ijmax0=I10+I20+…+In0+Im0-Inj0, i.e., maximum zero sequence in feeder line
The value of electric current is the sum of remaining feeder line zero-sequence current and busbar zero-sequence current in addition to itself, then is judged as the feedback of zero-sequence current maximum
Singlephase earth fault occurs for line, can carry out processing to feeder line earth fault at this time and further nature of trouble is judged,
If being judged as, permanent earth fault can cut off faulty line and failure is isolated.
If Ijmax0≠I10+I20+…+In0+Im0-Inj0, and Ijmax0≤Ijzmax0, Ijmax0≤Imax0, i.e. the zero sequence of the feeder line
Small or maximum in metallic earthing equal to the circuit zero-sequence current value of electric current, at the same it is small or equal in all feeder lines of the busbar
Zero-sequence current value of the capacitance current maximum feeder line in metallic earthing then judges that singlephase earth fault occurs for substation busbars,
Failure can be handled and nature of trouble is judged, be alarmed if permanent earth fault is judged as failure.
Im0For substation busbars zero-sequence current over the ground, field measurement can be passed through or the method for calculating obtains;Ijzmax0For feeder line
The zero-sequence current that circuit maximum during metallic earthing occurs for j can be obtained by field measurement or the method for calculating;Imax0For institute
There is zero-sequence current value of the capacitance current maximum feeder line in metallic earthing in feeder line, field measurement or the method for calculating can be passed through
It obtains.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention also should be regarded as the guarantor of the present invention
Protect range.
Claims (2)
1. a kind of quick distinguishing method of substation busbars singlephase earth fault, it is characterised in that:When detecting electric substation's neutral point
Voltage UNWhen abnormal, each feeder line zero-sequence current I is measured by each feeder line zero sequence current mutual inductor first10、I20…In0、Ij、IN,Pass through
Zero-sequence current finds out the feeder line of zero-sequence current maximum than width method, if meeting Ijmax0=I10+I20+…+In0+Im0-Inj0, i.e., in feeder line
The value of maximum zero sequence current is the sum of remaining feeder line zero-sequence current and busbar zero-sequence current in addition to itself, then is judged as zero-sequence current
Singlephase earth fault occurs for maximum feeder line;If Ijmax0≠I10+I20+…+In0+Im0-Inj0, and Ijmax0≤Ijzmax0, Ijmax0≤
Imax0, i.e. small or maximum in metallic earthing equal to the circuit zero-sequence current value of the zero-sequence current of the feeder line, at the same it is small or
Equal to zero-sequence current value of the capacitance current maximum feeder line in metallic earthing in all feeder lines of the busbar, then electric substation mother is judged
Singlephase earth fault occurs for line.
2. a kind of quick distinguishing method of substation busbars singlephase earth fault according to claim 1, it is characterised in that:Im0
For substation busbars zero-sequence current over the ground, field measurement can be passed through or the method for calculating obtains;Ijzmax0Metal occurs for feeder line j
Property ground connection when the circuit maximum zero-sequence current can pass through field measurement or the method for calculating acquisition;Imax0It is electric in all feeder lines
Zero-sequence current value of the capacitance current maximum feeder line in metallic earthing can be obtained by field measurement or the method for calculating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810336334.4A CN108254650B (en) | 2018-04-16 | 2018-04-16 | Quick judgment method for single-phase earth fault of substation bus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810336334.4A CN108254650B (en) | 2018-04-16 | 2018-04-16 | Quick judgment method for single-phase earth fault of substation bus |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108254650A true CN108254650A (en) | 2018-07-06 |
CN108254650B CN108254650B (en) | 2020-09-04 |
Family
ID=62748340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810336334.4A Active CN108254650B (en) | 2018-04-16 | 2018-04-16 | Quick judgment method for single-phase earth fault of substation bus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108254650B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110221115A (en) * | 2019-07-10 | 2019-09-10 | 山东钢铁股份有限公司 | The determination method, apparatus and equipment of unbalanced earth fault capacitance current |
CN113484687A (en) * | 2021-07-22 | 2021-10-08 | 李景禄 | Grounding fault judgment and grounding line selection method for complex power grid |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103728532A (en) * | 2013-12-26 | 2014-04-16 | 长园深瑞继保自动化有限公司 | Power distribution network single-phase grounding fault judging and locating method |
EP2476002B1 (en) * | 2009-09-09 | 2015-05-27 | Siemens Aktiengesellschaft | Fault detection in energy supply networks having an unearthed or resonant-earthed star point |
CN205246808U (en) * | 2015-12-11 | 2016-05-18 | 王炳国 | Power cable fault line selection device |
CN107561406A (en) * | 2017-08-16 | 2018-01-09 | 杭州零尔电力科技有限公司 | It is a kind of based on fault line selection method for single-phase-to-ground fault of the multiterminal than width phase comparing method |
-
2018
- 2018-04-16 CN CN201810336334.4A patent/CN108254650B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2476002B1 (en) * | 2009-09-09 | 2015-05-27 | Siemens Aktiengesellschaft | Fault detection in energy supply networks having an unearthed or resonant-earthed star point |
CN103728532A (en) * | 2013-12-26 | 2014-04-16 | 长园深瑞继保自动化有限公司 | Power distribution network single-phase grounding fault judging and locating method |
CN205246808U (en) * | 2015-12-11 | 2016-05-18 | 王炳国 | Power cable fault line selection device |
CN107561406A (en) * | 2017-08-16 | 2018-01-09 | 杭州零尔电力科技有限公司 | It is a kind of based on fault line selection method for single-phase-to-ground fault of the multiterminal than width phase comparing method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110221115A (en) * | 2019-07-10 | 2019-09-10 | 山东钢铁股份有限公司 | The determination method, apparatus and equipment of unbalanced earth fault capacitance current |
CN110221115B (en) * | 2019-07-10 | 2021-07-02 | 山东钢铁股份有限公司 | Method, device and equipment for determining single-phase grounding capacitance current |
CN113484687A (en) * | 2021-07-22 | 2021-10-08 | 李景禄 | Grounding fault judgment and grounding line selection method for complex power grid |
Also Published As
Publication number | Publication date |
---|---|
CN108254650B (en) | 2020-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104267311B (en) | Phase selection method for faults of double-circuit lines on same tower | |
US11435409B2 (en) | Temporary overvoltage and ground fault overvoltage protection based on arrester current measurement and analysis | |
CN104111403A (en) | Microcomputer integrated protection line-selection method for low-current earthed power system | |
CN105044560A (en) | Fault-adaptive-technology-based fault judgment method of power distribution network | |
CN106771804B (en) | A kind of transmission line of electricity broken string area judging method based on zero-sequence network | |
CN104577999B (en) | Bus bar protecting method and system based on transient zero-sequence current feature | |
Li et al. | A method of detecting commutation failure in multi-infeed HVDC systems based on critical failure impedance boundary | |
CN108287296A (en) | One kind being suitable for unbalance grid high resistance earthing fault reverse starting and route selection method | |
CN107315128A (en) | A kind of distributed earthing wire-selecting method and system based on GOOSE | |
CN108254650A (en) | A kind of quick distinguishing method of substation busbars singlephase earth fault | |
CN110320432B (en) | Single-phase line-breaking fault detection and protection method and system | |
CN106646123B (en) | A kind of transmission line of electricity broken string area judging method of relatively residual voltage | |
CN109031035A (en) | A kind of otherness one-phase earthing failure in electric distribution network property and fault recovery judgment method | |
CN107703423A (en) | A kind of singlephase earth fault determination methods for transient zero-sequence current | |
CN107144766B (en) | A kind of fast diagnosis method of the fault type for power distribution network transfer earthing or grounding means | |
CN109884436A (en) | Power capacitor complexes on-line monitoring method | |
CN107516878B (en) | Intermittent high resistance earthing protecting method and system | |
CN108008236A (en) | A kind of method for detecting electrical equipment fault | |
CN108718078B (en) | Alternating current micro-grid line protection algorithm based on impedance change measured at two ends of line | |
CN109038513B (en) | A kind of intelligent processing method of the broken string ground connection for failure phase transfer earthing or grounding means | |
CN105738751A (en) | Setting calculation method for bus differential protection current loop line disconnection alarm fixed value | |
CN108683157A (en) | A kind of busbar grounding intelligent decision method for shifting grounding device | |
CN107390076A (en) | The method that broken string transmission line of electricity is locked using negative sequence voltage | |
CN109782113B (en) | Single-phase disconnection line selection method and system for neutral point ungrounded system | |
CN107271855B (en) | A kind of quick judgement and processing method for one-phase earthing failure in electric distribution network region |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |