CN108253217B - A kind of architectural engineering PPR water pipe Automatic Link Establishment - Google Patents

A kind of architectural engineering PPR water pipe Automatic Link Establishment Download PDF

Info

Publication number
CN108253217B
CN108253217B CN201810053982.9A CN201810053982A CN108253217B CN 108253217 B CN108253217 B CN 108253217B CN 201810053982 A CN201810053982 A CN 201810053982A CN 108253217 B CN108253217 B CN 108253217B
Authority
CN
China
Prior art keywords
hydraulic cylinder
bracket
pedestal
water pipe
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810053982.9A
Other languages
Chinese (zh)
Other versions
CN108253217A (en
Inventor
李春丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GAOTANG Rongzhi Rongzhi Technology Service Co.,Ltd.
Original Assignee
Jingmen Better Mechanical And Electrical Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingmen Better Mechanical And Electrical Technology Service Co Ltd filed Critical Jingmen Better Mechanical And Electrical Technology Service Co Ltd
Priority to CN201810053982.9A priority Critical patent/CN108253217B/en
Publication of CN108253217A publication Critical patent/CN108253217A/en
Application granted granted Critical
Publication of CN108253217B publication Critical patent/CN108253217B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L47/00Connecting arrangements or other fittings specially adapted to be made of plastics or to be used with pipes made of plastics
    • F16L47/02Welded joints; Adhesive joints
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes

Abstract

A kind of architectural engineering PPR water pipe Automatic Link Establishment, belong to industrial building production field, the first hydraulic cylinder is mounted on downwards below first hydraulic cylinder pedestal, the first pressure sensor is mounted on the main shaft of first hydraulic cylinder, the second hydraulic cylinder is fixed on the right end of workbench, on the main shaft of the fixed second hydraulic cylinder of the second pressure sensor, the heating device is mounted on third bracket, the third hydraulic cylinder is mounted on the top left end of workbench, the controller is mounted on the left side of third hydraulic cylinder, 4th pressure sensor is fixed between the 4th hydraulic cylinder and the first cover board, 4th hydraulic cylinder is mounted on the lower section of the 4th hydraulic cylinder pedestal, the 4th hydraulic cylinder pedestal is fixed on the top of the 5th bracket.The invention blocks water pipe by cover board and pedestal, drives it to move to heating device and its port of heating and melting by hydraulic cylinder, connects water pipe automatically, reduce hand labor, improves the quality and efficiency of water pipe connection.

Description

A kind of architectural engineering PPR water pipe Automatic Link Establishment
Technical field
The present invention relates to a kind of architectural engineering PPR water pipe Automatic Link Establishments, specifically a kind of to pass through hydraulic cylinder band Dynamic cover board card jail water pipe, and the device for connecting thickness water pipe by heating device thawing water pipe port belong to industrial building production Field.
Background technique
With the rapid development of our country's economy, the quantity in house is more and more, to PPR water pipe in building construction and finishing Demand it is also more and more.It due to PPR water pipe material, can not curve it in actual use, so at turning Place must be handled it, and two water pipes are connected with thicker adapter to realize the trend for changing hose;Actually make When with middle connection PPR water pipe, it is also desirable to one section of thicker hose be selected to connect two water pipes.
Traditional connection type is that finishing master worker is melted with fiery bake thin PPR water pipe port extexine, thick PPR water pipe The inside of port is roasting to melt, and then firmly rapidly thickness water pipe is docking together, after water pipe cooling.It does so not The time is only expended, physical strength is extremely wasted when docking, and will be baked unless you give your whole attention to it when roasting PPR water pipe Change, waste material, also or without roasting does not connect at all thoroughly, there is also the risks for causing fire incident.
Summary of the invention
In view of the above deficiencies, the present invention provides a kind of architectural engineering PPR water pipe Automatic Link Establishments.
The present invention is achieved by the following technical solutions: a kind of architectural engineering PPR water pipe Automatic Link Establishment, including the One hydraulic cylinder pedestal, first hydraulic cylinder, first support, first pressure sensor, second hydraulic cylinder, second pressure sensor, One pedestal, second support, workbench, heating device, third bracket, the second pedestal, the 4th bracket, third hydraulic cylinder, third pressure Force snesor, controller, the 5th bracket, the 4th pressure sensor, the 4th hydraulic cylinder, the 4th hydraulic cylinder pedestal, the first cover board, Two cover boards, supporting leg, baffle, electromagnet and the 6th bracket, the first hydraulic cylinder pedestal is mounted on the top of first support, described First hydraulic cylinder is mounted on downwards below first hydraulic cylinder pedestal, and the first support is fixed on the secondary support bracket, shape Shape is L shape, and the first pressure sensor is mounted on the main shaft of first hydraulic cylinder, and the second hydraulic cylinder is fixed on workbench Right end, direction is towards a left side, and on the main shaft of the fixed second hydraulic cylinder of the second pressure sensor, first pedestal is half Circle, circle internal diameter is identical as water pipe outer diameter, is mounted on above second support, and the second support is mounted on second hydraulic cylinder master On axis, the workbench is a rectangle iron plate, and the heating device is mounted on third bracket, and the third bracket is a L Shape bracket is fixed on the central location above workbench, and second pedestal is a semicircular structure, justifies internal diameter and water pipe Outer diameter is identical, and above the 4th bracket of installation, the 4th bracket is fixed on the front of third hydraulic cylinder, the third hydraulic cylinder It is mounted on the top left end of workbench, the third pressure sensor is mounted between third hydraulic cylinder and the 4th bracket, described Controller is mounted on the left side of third hydraulic cylinder, and the 5th bracket is a L bracket, is mounted on the left side of third bracket Face, the 4th pressure sensor are fixed between the 4th hydraulic cylinder and the first cover board, and the 4th hydraulic cylinder is mounted on the 4th The lower section of hydraulic cylinder pedestal, straight down, the 4th hydraulic cylinder pedestal is fixed on the top of the 5th bracket, institute to major axes orientation Stating the first cover board is structure semicircle identical with the second pedestal, and Open Side Down is fixed on the main shaft of the 4th hydraulic cylinder, With the second pedestal on same plane of structure, second covering plate structure is identical as the first base construction, and Open Side Down is fixed on On the main shaft of one hydraulic cylinder, for the two on same plane of structure, there are two the supporting legs is separately fixed at the left and right sides below workbench, The baffle is so vertical that be mounted on the top of electromagnet, and the electromagnet is fixed on above the 6th bracket, the 6th bracket peace Mounted in the right side of controller.
The heating device includes the 5th hydraulic cylinder, heater, heat-conductive bracket, heating female and heating male connector, and described the Five hydraulic cylinders are connected with third bracket, and the heater is fixed on the lower section of the 5th hydraulic cylinder, and the heat-conductive bracket is by thermally conductive Property fabulous copper at the upper end is connected with heater, and lower end is one round, and the heating female is mounted on heat-conductive bracket Right side, internal diameter is identical as the outer diameter of thin PPR water pipe, and the heating male connector is mounted on the left side of heat-conductive bracket, outer diameter with The internal diameter of thick PPR water pipe is identical.
The third hydraulic cylinder and the opposite left and right side that must be mounted on workbench of second hydraulic cylinder, the two main shaft is same On one horizontal line.
The usefulness of the invention is that the invention drives cover board upper and lower displacement by first hydraulic cylinder and the 4th hydraulic cylinder, Make to place PPR water pipe card jail on the base, and cover board and water are detected by first pressure sensor and the 4th pressure sensor Pressure between pipe, sending a signal to controller behind the two card jail makes hydraulic cylinder stop applying pressure, prevents water pipe pressure break;It is logical It crosses second hydraulic cylinder and third hydraulic cylinder drives second support and the 4th bracket to move forward, due to the 5th bracket and first support It is fixed in second support and the 4th bracket, ensure that base and cover plate while following advance, the water pipe clamped in it is driven Advance;The pressure between water pipe and heating device is detected by second pressure sensor and third pressure sensor, ensure that water Manage accurate be docked in heating male connector and heating female and will not be due to the excessive damage equipment of pressure and water pipe;It is female by heating The outside of head heating thin conduit, heating male connector heat the inside of thick water pipe, ensure that water pipe port is melted just right;Pass through Electromagnet drives baffle to advance, and the water pipe connected is released.By the use of the present apparatus, ensure that water pipe connection efficiency and Quality saves manpower and material.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the right front structural schematic diagram of Fig. 1 of the present invention.
Fig. 3 is the bottom substance schematic diagram of Fig. 1 of the present invention.
Fig. 4 is the rear structure schematic diagram of Fig. 1 of the present invention.
Fig. 5 is schematic diagram of heating device in Fig. 1 of the present invention.
Fig. 6 is heating device right side structure schematic diagram in Fig. 1 of the present invention.
Fig. 7 is the axis geodesic structure schematic diagram of Fig. 1 of the present invention.
Fig. 8 is the apex structure schematic diagram of Fig. 1 of the present invention.
In figure, 1, first hydraulic cylinder pedestal, 2, first hydraulic cylinder, 3, first support, 4, first pressure sensor, 5, second Hydraulic cylinder, 6, second pressure sensor, the 7, first pedestal, 8, second support, 9, workbench, 10, heating device, the 1001, the 5th Hydraulic cylinder, 1002, heater, 1003, heat-conductive bracket, 1004, heating female, 1005, heating male connector, 11, third bracket, 12, Second pedestal, the 13, the 4th bracket, 14, third hydraulic cylinder, 15, third pressure sensor, 16, controller, the 17, the 5th bracket, 18, the 4th pressure sensor, the 19, the 4th hydraulic cylinder, the 20, the 4th hydraulic cylinder pedestal, the 21, first cover board, the 22, second cover board, 23, Supporting leg, 24, baffle, 25, electromagnet, the 26, the 6th bracket.
Specific embodiment
What the invention is realized by the following technical scheme: a kind of architectural engineering PPR water pipe Automatic Link Establishment, including first Hydraulic cylinder pedestal 1, first hydraulic cylinder 2, first support 3, first pressure sensor 4, second hydraulic cylinder 5, second pressure sensor 6, the first pedestal 7, second support 8, workbench 9, heating device 10, third bracket 11, the second pedestal 12, the 4th bracket 13, Three hydraulic cylinders 14, third pressure sensor 15, controller 16, the 5th bracket 17, the 4th pressure sensor 18, the 4th hydraulic cylinder base Seat 20,20 pedestal of the 4th hydraulic cylinder pedestal, the first cover board 21, the second cover board 22, supporting leg 23, baffle 24, electromagnet 25 and the 6th Bracket 26, the first hydraulic cylinder pedestal 1 are mounted on the top of first support 3, and the first hydraulic cylinder 2 is mounted on downwards 1 lower section of first hydraulic cylinder pedestal, the first support 3 are fixed in second support 8, and shape is L shape, and the first pressure passes Sensor 4 is mounted on the main shaft of first hydraulic cylinder 2, for detecting whether water pipe is strictly buckled by the first pedestal 7 and the second cover board 22 Firmly, the second hydraulic cylinder 5 is fixed on the right end of workbench 9, and direction is towards a left side, for driving second support 8 and dress thereon It sets with water pipe to left dislocation, the second pressure sensor 6 is fixed on the main shaft of second hydraulic cylinder 5, for whether detecting water pipe So tight that be in contact with heating female 1004, first pedestal 7 is a semicircle, and circle internal diameter is identical as water pipe outer diameter, peace Above second support 8, the second support 8 is mounted on 5 main shaft of second hydraulic cylinder, and the workbench 9 is a rectangle Iron plate, the heating device 10 are mounted on third bracket 11, for heating heating female 1004 and heating male connector 1005, are made thick Thin conduit head melts, and is conducive to connection, and the third bracket 11 is a L bracket, is fixed on the central position of 9 top of workbench It sets, second pedestal 12 is a semicircular structure, and circle internal diameter is identical as water pipe outer diameter, 13 top of the 4th bracket of installation, 4th bracket 13 is fixed on the front of third hydraulic cylinder 14, and the top that the third hydraulic cylinder 14 is mounted on workbench 9 is left End, the third pressure sensor 15 are mounted between third hydraulic cylinder 14 and the 4th bracket 13, and the controller 16 is mounted on The left side of third hydraulic cylinder 14, the 5th bracket 17 are a L bracket, are mounted on the left side of third bracket 11, described 4th pressure sensor 18 is fixed between the 4th hydraulic cylinder pedestal 20 and the first cover board 21, the 4th hydraulic cylinder pedestal 20 peace Mounted in the lower section of 20 pedestal of the 4th hydraulic cylinder pedestal, straight down, 20 pedestal of the 4th hydraulic cylinder pedestal is solid for major axes orientation It is scheduled on the top of the 5th bracket 17, first cover board 21 is structure semicircle identical with the second pedestal 12, and Open Side Down It is fixed on the main shaft of the 4th hydraulic cylinder pedestal 20, with the second pedestal 12 on same plane of structure, 22 structure of the second cover board Identical as 7 structure of the first pedestal, Open Side Down is fixed on the main shaft of first hydraulic cylinder 2, and the two is described on same plane of structure For supporting leg 23 there are two being separately fixed at the lower section of workbench 9 left and right sides, the baffle 24 is so vertical that be mounted on the top of electromagnet 25 End, the electromagnet 25 are fixed on 26 top of the 6th bracket, and the 6th bracket 26 is mounted on the right side of controller 16.
The heating device 10 includes the 5th hydraulic cylinder 1001, heater 1002, heat-conductive bracket 1003, heating female 1004 With heating male connector 1005, the 5th hydraulic cylinder 1001 is connected with third bracket 11, and the heater 1002 is fixed on the 5th The lower section of hydraulic cylinder 1001, the heat-conductive bracket 1003 is by the fabulous copper of thermal conductivity at the upper end is connected with heater 1002 It connects, lower end is one round, and the heating female 1004 is mounted on the right side of heat-conductive bracket 1003, internal diameter and thin PPR water pipe Outer diameter it is identical, the heating male connector 1005 is mounted on the left side of heat-conductive bracket 1003, the internal diameter phase of outer diameter and thick PPR water pipe Together.
The third hydraulic cylinder 14 and the opposite left and right side that must be mounted on workbench 9 of second hydraulic cylinder 5, the two main shaft In the same horizontal line, it ensure that the accuracy of docking.
Working principle: in use, thick water pipe is placed on the second pedestal 12, thin conduit is placed on the first pedestal 7, and first Hydraulic cylinder 2 and the 4th hydraulic cylinder 19 drive the second cover board 22 and the first cover board 21 to fall, and water pipe are clasped, by first pressure sensor 4 and the 4th pressure sensor 18 detect the pressure between cover board and water pipe and data be sent into controller 16, when pressure reaches one Indicate that water pipe is buckled after definite value, controller 16, which issues signal, makes first hydraulic cylinder 2 and the 4th hydraulic cylinder 19 stop working, and prevents Pressure break water pipe, second hydraulic cylinder 5 and third hydraulic cylinder 14 work at this time, and second support 8 and third bracket 13 is driven to move forward, Since first support 3 and the 5th bracket 17 are fixed in second support 8 and third bracket 13, it ensure that base and cover plate is total With advancing, so that the water pipe in card jail be driven to advance, make thick water pipe port to heating male connector 1005, thin conduit port is to heating In female 1004, pressure between the two is detected by second pressure sensor 6 and third pressure sensor 15, after reaching desired value Hydraulic cylinder stops working, and heater 1002 makes to heat male connector 1005 and heat female 1004 to heat, to keep water pipe port appropriate Melt, second hydraulic cylinder 5 and third hydraulic cylinder 14 work later, separate water pipe with heating device 10, and the 5th hydraulic cylinder drives 1001 drive heat-conductive bracket 1003 to rise, and feed pipe connects leaving space, and second hydraulic cylinder 5 and third hydraulic cylinder 14 work, make Thickness water pipe is docking together, and first hydraulic cylinder 2 and the lifting of the 4th hydraulic cylinder 19, electromagnet 25 drive baffle 24 to move forward later Make, pop up the water pipe connected, to its cooling, completes arresting stop after all water pipe connections.
For the ordinary skill in the art, introduction according to the present invention, do not depart from the principle of the present invention with In the case where spirit, changes, modifications that embodiment is carried out, replacement and variant still fall within protection scope of the present invention it It is interior.

Claims (2)

1. a kind of architectural engineering PPR water pipe Automatic Link Establishment, including first hydraulic cylinder pedestal, first hydraulic cylinder, first support, First pressure sensor, second hydraulic cylinder, second pressure sensor, the first pedestal, second support, workbench, heating device, Three brackets, the second pedestal, the 4th bracket, third hydraulic cylinder, third pressure sensor, controller, the 5th bracket, the 4th pressure pass Sensor, the 4th hydraulic cylinder, the 4th hydraulic cylinder pedestal, the first cover board, the second cover board, supporting leg, baffle, electromagnet and the 6th bracket, It is characterized by: the first hydraulic cylinder pedestal is mounted on the top of first support, the first hydraulic cylinder is installed downwards Below first hydraulic cylinder pedestal, the first support is fixed on the secondary support bracket, and shape is L shape, and the first pressure passes Sensor is mounted on the main shaft of first hydraulic cylinder, and the second hydraulic cylinder is fixed on the right end of workbench, and direction is described towards a left side On the main shaft of the fixed second hydraulic cylinder of second pressure sensor, first pedestal is a semicircle, circle internal diameter and water pipe outer diameter It is identical, it is mounted on above second support, the second support is mounted on second hydraulic cylinder main shaft, and the workbench is one long Rectangular iron plate, the heating device are mounted on third bracket, and the third bracket is a L bracket, are fixed on workbench The central location of top, second pedestal are a semicircular structure, and circle internal diameter is identical as water pipe outer diameter, installs the 4th Above frame, the 4th bracket is fixed on the front of third hydraulic cylinder, and the top that the third hydraulic cylinder is mounted on workbench is left End, the third pressure sensor are mounted between third hydraulic cylinder and the 4th bracket, and it is hydraulic that the controller is mounted on third The left side of cylinder, the 5th bracket are a L bracket, are mounted on the left side of third bracket, the 4th pressure sensor It is fixed between the 4th hydraulic cylinder and the first cover board, the 4th hydraulic cylinder is mounted on the lower section of the 4th hydraulic cylinder pedestal, master Straight down, the 4th hydraulic cylinder pedestal is fixed on the top of the 5th bracket to axis direction, first cover board be a structure with The identical semicircle of second pedestal, Open Side Down is fixed on the main shaft of the 4th hydraulic cylinder, with the second pedestal in same plane of structure On, second covering plate structure is identical as the first base construction, and Open Side Down is fixed on the main shaft of first hydraulic cylinder, the two On same plane of structure, the supporting leg is so vertical that be mounted on there are two the left and right sides, the baffle below workbench is separately fixed at The top of electromagnet, the electromagnet are fixed on above the 6th bracket, and the 6th bracket is mounted on the right side of controller;
The heating device includes the 5th hydraulic cylinder, heater, heat-conductive bracket, heating female and heating male connector, the 5th liquid Cylinder pressure is connected with third bracket, and the heater is fixed on the lower section of the 5th hydraulic cylinder, and the heat-conductive bracket is by thermal conductivity pole Good copper is at the upper end is connected with heater, and lower end is one round, and the heating female is mounted on the right side of heat-conductive bracket Side, internal diameter is identical as the outer diameter of thin PPR water pipe, and the heating male connector is mounted on the left side of heat-conductive bracket, outer diameter and thick The internal diameter of PPR water pipe is identical.
2. a kind of architectural engineering PPR water pipe Automatic Link Establishment according to claim 1, it is characterised in that: the third Hydraulic cylinder and second hydraulic cylinder are relatively mounted on the left and right side of workbench, and the two main shaft is in the same horizontal line.
CN201810053982.9A 2018-01-19 2018-01-19 A kind of architectural engineering PPR water pipe Automatic Link Establishment Active CN108253217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810053982.9A CN108253217B (en) 2018-01-19 2018-01-19 A kind of architectural engineering PPR water pipe Automatic Link Establishment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810053982.9A CN108253217B (en) 2018-01-19 2018-01-19 A kind of architectural engineering PPR water pipe Automatic Link Establishment

Publications (2)

Publication Number Publication Date
CN108253217A CN108253217A (en) 2018-07-06
CN108253217B true CN108253217B (en) 2019-05-03

Family

ID=62741552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810053982.9A Active CN108253217B (en) 2018-01-19 2018-01-19 A kind of architectural engineering PPR water pipe Automatic Link Establishment

Country Status (1)

Country Link
CN (1) CN108253217B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5527406A (en) * 1990-11-29 1996-06-18 Brath Aps Method, a heating device and an apparatus for fusing separate thermoplastic bodies
CN2851792Y (en) * 2004-01-26 2006-12-27 株式会社Acorn Hot-melt assembling connector for pipeline
CN203052075U (en) * 2013-01-11 2013-07-10 李忠诚 Combination water-proof type electric melting sleeve for electric melting pipelines
CN103470913A (en) * 2013-07-05 2013-12-25 周立超 Connecting structure and manufacturing and connecting method of metal glass steel FRP (Fiber-glass Reinforced Plastics) lining rubber and plastic subsea pipeline
CN204512761U (en) * 2015-04-13 2015-07-29 黑龙江大千环保科技有限公司 A kind of PE plastic tube draining Special connecting pipe hoop
CN206635371U (en) * 2017-04-20 2017-11-14 南京扬子石油化工工程有限责任公司 A kind of pipeline fixture for heat treatment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5527406A (en) * 1990-11-29 1996-06-18 Brath Aps Method, a heating device and an apparatus for fusing separate thermoplastic bodies
CN2851792Y (en) * 2004-01-26 2006-12-27 株式会社Acorn Hot-melt assembling connector for pipeline
CN203052075U (en) * 2013-01-11 2013-07-10 李忠诚 Combination water-proof type electric melting sleeve for electric melting pipelines
CN103470913A (en) * 2013-07-05 2013-12-25 周立超 Connecting structure and manufacturing and connecting method of metal glass steel FRP (Fiber-glass Reinforced Plastics) lining rubber and plastic subsea pipeline
CN204512761U (en) * 2015-04-13 2015-07-29 黑龙江大千环保科技有限公司 A kind of PE plastic tube draining Special connecting pipe hoop
CN206635371U (en) * 2017-04-20 2017-11-14 南京扬子石油化工工程有限责任公司 A kind of pipeline fixture for heat treatment

Also Published As

Publication number Publication date
CN108253217A (en) 2018-07-06

Similar Documents

Publication Publication Date Title
CN109668317A (en) A kind of continous way gas-heating apparatus
CN108253217B (en) A kind of architectural engineering PPR water pipe Automatic Link Establishment
CN204460992U (en) A kind of drying unit for plaster tablet
CN210772728U (en) Domestic gas water heater
CN207439106U (en) Screw elevator far-infrared ray drying equipment
CN207394951U (en) A kind of wall electric heating
CN201653098U (en) Drying device
CN202074602U (en) The Book of Changes dry type paving floor heating system
CN205289358U (en) Copper pipe bender
CN205289360U (en) Automatic copper pipe bender of material loading
CN208372207U (en) A kind of B liquid heating device of central liquid supply system
CN207438900U (en) A kind of Oil Guide heating unit of plasthetics processing
CN208410735U (en) A kind of expanding device convenient for PVC pipe connection
CN202747774U (en) Inclinable rotary furnace
CN206254513U (en) One kind insulation heat melting device
CN202826395U (en) Electricity and steam dual-purpose polyvinyl chloride (PVC) plastic plate local heating device
CN203771941U (en) Novel continuous sheet drying machine for adhesive stickers
CN208832587U (en) A kind of central heating supply system for families separately
CN202707692U (en) Intelligent temperature control device of cooler
CN104122293A (en) Heating consistency detection device for super-thermal conductance floor heating pipes
CN204842948U (en) Steel / iron package baking equipment's pivot assembly
CN206094594U (en) Heat collector vertical setting of types integral type water tank heat pump water heating system
CN207335427U (en) Semiconductor heating furnace
CN204757380U (en) Coating thick liquids are with removing heating device
CN212565987U (en) Heating and ventilation energy-saving device for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211216

Address after: 252000 No. 2, Huixin South Road, Gaotang Economic Development Zone, Liaocheng City, Shandong Province (Development Zone Management Committee)

Patentee after: GAOTANG Rongzhi Rongzhi Technology Service Co.,Ltd.

Address before: 448001 open source lane, Dongbao District, Jingmen, Hubei Province, No. 10

Patentee before: JINGMEN NINGJIE ELECTROMECHANICAL TECHNOLOGY SERVICE Co.,Ltd.

TR01 Transfer of patent right