CN108252411A - A kind of girder steel hinged joint - Google Patents
A kind of girder steel hinged joint Download PDFInfo
- Publication number
- CN108252411A CN108252411A CN201711469331.XA CN201711469331A CN108252411A CN 108252411 A CN108252411 A CN 108252411A CN 201711469331 A CN201711469331 A CN 201711469331A CN 108252411 A CN108252411 A CN 108252411A
- Authority
- CN
- China
- Prior art keywords
- girder steel
- plate body
- wing
- hole
- edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2406—Connection nodes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2418—Details of bolting
Abstract
The invention discloses a kind of girder steel hinged joints, belong to field of steel structure.The girder steel hinged joint is by the way that fixation kit and fixed bracket are fixed on steel column, first plate body and the second plate body are symmetricly set on the both sides of the web close to first edge of a wing of girder steel, the web of girder steel is fixed between the first plate body and the second plate body so that girder steel can not achieve to be rotated around using the direction parallel with first edge of a wing, second edge of a wing and web as axis;Since second edge of a wing of girder steel is fixed on top plate, the aperture of first through hole, third through-hole and the second through-hole is all higher than the bar diameter of the screw rod of first bolt, so that girder steel is when by extraneous power, it can be to fix bracket as supporting point, realize that girder steel is rotated around direction parallel with first edge of a wing and second edge of a wing, vertical with web for axis, structure more meets the structure of hinged joint ideally, improves the safety of structure, eliminates the security risk in structure.
Description
Technical field
The present invention relates to field of steel structure, more particularly to a kind of girder steel hinged joint.
Background technology
Simply supported beam is that a kind of common girder construction, girder steel are connect by the hinged joint at both ends with steel column in engineering.It is preferable
The structure diagram of hinged joint under state on the face of steel column as shown in Figure 1, by being provided with horizontally-supported seat a and two
Body of rod b so that one end of girder steel can be erected on support base a, and is passed through body of rod b and fixed, and girder steel can be realized:(1) around
Direction parallel and vertical with web is freely rotated for axis with two edges of a wing, such as the x-axis in Fig. 1;(2) cannot around with
Two edges of a wing direction parallel with web is freely rotated for axis, such as the z-axis in Fig. 1.
The structure diagram of hinged joint is commonly used in Practical Project, as shown in Figures 2 and 3, hinged joint includes first jiao
Steel c, the second angle steel d and at least two row bolt e, by by a side pair of a side of the first angle steel c and the second angle steel d
Claim in the both sides of steel beam web plate, another side of another side of the first angle steel c and the second angle steel d pass through bolt e respectively
It is fixed on beam column, realizes node connection.
In the implementation of the present invention, the inventors discovered that having at least the following problems in the prior art:
Although the hinged joint in Practical Project can realize the connection between girder steel and steel column, so set, steel
Beam cannot be rotated around the direction parallel and vertical with web with two edges of a wing for axis, is not inconsistent with theoretical model, structure
There is definitely difference in the stress of system, cause definitely security risk with calculating in setting.
Invention content
In consideration of it, the present invention provides a kind of girder steel hinged joint, girder steel can be realized around and and abdomen parallel with two edges of a wing
The vertical direction of plate is rotated for axis, improves the safety of structure.
Specifically, including following technical solution:
A kind of girder steel hinged joint, the node include:Fixation kit and fixed bracket, wherein,
The fixation kit includes:First plate body and the second plate body, first plate body and second plate body are arranged on
Close to the both sides of the web on first edge of a wing of girder steel, and the side end face of first plate body and the side end face of second plate body are divided
It is not connect with steel column;
The fixed bracket includes:It top plate and is connected to the outside plate face stiffener of the top plate and at least two puts more energy into
Plate, the side end face of at least two stiffener and the side end face of top plate are connect with the steel column, second edge of a wing of the girder steel
It is connected to the top plate;
First plate body offers first through hole, and second plate body offers the second through-hole, the web of the girder steel
On offer third through-hole, the screw rod of the first bolt passes through the first through hole, the third through-hole and second through-hole, and
The aperture of the first through hole, the third through-hole and second through-hole is all higher than the bar diameter of the screw rod of first bolt.
Further, the node further includes:Third plate body, the third plate body are clamped in the top plate and the steel
Between the lateral surface on second edge of a wing of beam.
Further, the third plate body is connected with second edge of a wing of the girder steel, and the size of the third plate body is small
In the size of the top plate.
Further, the node further includes:First nut is provided with outer spiral shell on the outer wall of the screw rod of first bolt
Line is provided with the internal thread coordinated with the external screw thread on the inner wall of first nut.
Further, the node further includes:First elastic buffer piece, the first elastic buffer piece are set in first spiral shell
On the screw rod of bolt, and between first nut and second plate body.
Further, the node further includes:First gasket, first gasket are set in the screw rod of first bolt
On, and between first nut and the first elastic buffer piece.
Further, the node further includes:At least a pair of second bolt, each pair of second bolt is with the girder steel
Face where web is the plane of symmetry symmetrically through second edge of a wing of the top plate and the girder steel.
Further, the node further includes:Second nut is provided with outer spiral shell on the outer wall of the screw rod of second bolt
Line is provided with the internal thread coordinated with the external screw thread on the inner wall of second nut.
Further, the node further includes:Second gasket, second gasket are set in the screw rod of second bolt
On, and between the medial surface on second nut and second edge of a wing of the girder steel.
Further, the node further includes:Second elastic buffer piece, the second elastic buffer piece are set in described
On the screw rod of two bolts, and between the medial surface on second gasket and second edge of a wing of the girder steel.
The advantageous effect of technical solution provided in an embodiment of the present invention:
The girder steel hinged joint of the embodiment of the present invention passes through the side of the first plate body using fixation kit and fixed bracket
Face, the second plate body side end face connect with steel column, the first bolt can be fixed to pass through first through hole, third through-hole and the second through-hole
First plate body, the web of girder steel and the second plate body so that fixation kit can be fixed on steel column;Pass through the side end face of stiffener
It is connected with the side end face of top plate with steel column so that fixed bracket is fixed on steel column;Then the first plate body and the setting of the second plate body
In the both sides of the web close to first edge of a wing of girder steel, the web of the first plate body and the second plate body clamping girder steel so that girder steel is not
It can realize and be rotated around using the direction parallel with first edge of a wing, second edge of a wing and web as axis;Due to the of girder steel
Two edges of a wing are connected to top plate, and the aperture of first through hole, third through-hole and the second through-hole is all higher than the bar diameter of the screw rod of the first bolt,
So that girder steel is when by external force, can to fix bracket as supporting point, realize girder steel around with first edge of a wing and second edge of a wing
Direction parallel, vertical with web is rotated for axis, and structure more meets the structure of hinged joint ideally, is improved
The safety of structure, eliminates the security risk in structure.
Description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment
Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the present invention, for
For those of ordinary skill in the art, without creative efforts, other are can also be obtained according to these attached drawings
Attached drawing.
Fig. 1 is the structure diagram of ideally hinged joint;
Fig. 2 is the positive structure diagram that hinged joint is commonly used in Practical Project;
Fig. 3 is the overlooking the structure diagram that hinged joint is commonly used in Practical Project;
Fig. 4 is that the structure of the first girder steel hinged joint provided in an embodiment of the present invention splits schematic diagram;
Fig. 5 is the first structure diagram of girder steel hinged joint after mounting provided in an embodiment of the present invention;
Fig. 6 is that the structure of second of girder steel hinged joint provided in an embodiment of the present invention splits schematic diagram;
Fig. 7 is the structure diagram of second of girder steel hinged joint provided in an embodiment of the present invention after mounting;
Fig. 8 is that the structure of the third girder steel hinged joint provided in an embodiment of the present invention splits schematic diagram;
Fig. 9 is the third structure diagram of girder steel hinged joint after mounting provided in an embodiment of the present invention.
Reference numeral is expressed as:
1st, fixation kit;
101st, the first plate body;
1011st, first through hole;
102nd, the second plate body;
1021st, the second through-hole;
2nd, fixed bracket;
201st, stiffener;
202nd, top plate;
3rd, girder steel;
301st, first edge of a wing;
302nd, web;
3021st, third through-hole;
303rd, second edge of a wing;
4th, steel column;
5th, the first bolt;
501st, screw rod;
502nd, nut;
6th, third plate body;
7th, the first nut;
8th, the first elastic buffer piece;
9th, the first gasket;
10th, the second bolt;
1001st, screw rod;
11st, the second nut;
12nd, the second gasket;
13rd, the second elastic buffer piece;
14th, third gasket;
A, support base;
B, the body of rod;
C, the first angle steel;
D, the second angle steel;
E, bolt.
Specific embodiment
To make technical scheme of the present invention and advantage clearer, embodiment of the present invention is made below in conjunction with attached drawing into
One step it is described in detail.
An embodiment of the present invention provides a kind of girder steel hinged joint, structure broken away view as shown in figure 4, its after mounting
Structure diagram as shown in figure 5, including:Fixation kit 1 and fixed bracket 2.
Wherein, fixation kit 1 includes:First plate body 101 and the second plate body 102, the first plate body 101 and the second plate body 102
It is positioned close to the both sides of the web 302 on first edge of a wing 301 of girder steel 3, and the side end face of the first plate body 101 and the second plate body
102 side end face is connect respectively with steel column 4;
Fixed bracket 2 includes:Top plate 202 and at least two stiffeners 201 of outside plate face for being connected to top plate 202, until
The side end face of few two stiffeners 201 is connect with steel column 4, and second edge of a wing 303 of girder steel 3 is connected to top plate 202;
First plate body 101 offers first through hole 1011, and the second plate body 102 offers the second through-hole 1021, the abdomen of girder steel 3
Offer third through-hole 3021 on plate 302, the screw rod 501 of the first bolt 5 passes through first through hole 1011, third through-hole 3021 and the
Two through-holes 1021, and first through hole 1011, the aperture of 3021 and second through-hole 1021 of third through-hole are all higher than the spiral shell of the first bolt 5
The bar diameter of bar 501.
It should be noted that in embodiments of the present invention, to be interior close to the center of girder steel 3, with the center far from girder steel 3
It is outer.
Therefore, the girder steel hinged joint of the embodiment of the present invention passes through the first plate body using fixation kit 1 and fixed bracket 2
101 side end face, the second plate body 102 side end face connect with steel column 4, the first bolt 5 can be to pass through first through hole 1011, third
3021 and second through-hole 1021 of through-hole fixes 302 and second plate body 102 of web of the first plate body 101, girder steel 3 so that fixed group
Part 1 can be fixed on steel column 4;It is connected by the side end face of stiffener 201 and the side end face of top plate 202 with steel column 4 so that Gu
Determine bracket 2 to be fixed on steel column 4;Then the first plate body 101 and the second plate body 102 are positioned close to first edge of a wing 301 of girder steel 3
Web 302 both sides, the first plate body 101 and the second plate body 102 clamping girder steel 3 web 302 so that girder steel 3 can not achieve
It is rotated around using the direction parallel with first edge of a wing 301, second edge of a wing 303 and web 302 as axis;Due to girder steel 3
Second edge of a wing 303 be connected to top plate 202, first through hole 1011, the aperture of 3021 and second through-hole 1021 of third through-hole are big
In the bar diameter of the screw rod 501 of the first bolt 5 so that girder steel 3 can be realized when by external force with fixing bracket 2 as supporting point
Girder steel 3 is rotated around with first edge of a wing 301 and second edge of a wing, 303 direction parallel, vertical with web 302 for axis, is tied
Structure more meets the structure of hinged joint ideally, improves the safety of structure, eliminates the security risk in structure.
It should be noted that in order to ensure the stable connection between fixation kit 1 and fixed bracket 2 and steel column 4, the first plate
The side end face of body 101 is welded on steel column 4, and the side end face of the second plate body 102 is welded on steel column 4 so that fixation kit 1 can be with
It is fixedly secured on steel column 4;The side end face of stiffener 201 and the side end face of top plate 202 are weldingly fixed on steel column 4 so that Gu
Determining bracket 2 can be fixedly secured on steel column 4.
Based on above device, the structure of the girder steel hinged joint of the embodiment of the present invention is further described through below
It is bright:
It will be appreciated by persons skilled in the art that due to first through hole 1011,3021 and second through-hole of third through-hole
1021 aperture is all higher than the bar diameter of the screw rod 501 of the first bolt 5, therefore, even if by the first plate body 101, the web of girder steel 3
302 and second fixed close between plate body 102, when the external world exerts a force to first edge of a wing 301 of girder steel 3, the web of girder steel 3
302 can also realize around being that axis carries out with first edge of a wing 301 and second edge of a wing, 303 direction parallel, vertical with web 302
Rotation.
There are many can for first through hole 1011, the structure of 3021 and second through-hole 1021 of third through-hole in embodiments of the present invention
The realization method of energy.
In the first possible implementation, as shown in Fig. 4 or Fig. 5,1011 and second through-hole 1021 of first through hole is
Extend elongated elliptical aperture in the horizontal direction, third through-hole 3021 is to extend elongated elliptical aperture, the first bolt 5 in vertical direction
Screw rod 501 can successively pass through first through hole 1011,3021 and second through-hole 1021 of third through-hole.
So set, when the power that first edge of a wing 301 of girder steel 3 is applied by the external world, the first bolt 5 is without limitation on girder steel
Relative movement between 3 302 and first plate body 101 of web, the second plate body 102, with realize girder steel 3 around with first edge of a wing
301 and second edge of a wing, 303 direction parallel, vertical with web 302 be the purpose that is rotated of axis.
It should be noted that the size of first through hole 1011, the second through-hole 1021 and third through-hole 3021 can be identical,
Can be different, it is not especially limited in embodiments of the present invention.
In second of possible realization method, as is seen in fig. 6 or fig. 7, first through hole 1011, the second through-hole 1021 and
Three through-holes 3021 are circular hole, and the size of three is identical, the area much larger than the cross section of the screw rod 501 of the first bolt 5,
The screw rod 501 of first bolt 5 can successively pass through first through hole 1011,3021 and second through-hole 1021 of third through-hole.
So set, since first through hole 1011, the second through-hole 1021 and third through-hole 3021 are circular hole, and long-range
Area in the cross section of the screw rod 501 of the first bolt 5, therefore, when the power that first edge of a wing 301 of girder steel 3 is applied by the external world
When, the first bolt 5 without limitation on the relative movement between 302 and first plate body 101 of web of girder steel 3, the second plate body 102, with
Realize that girder steel 3 is rotated around with first edge of a wing 301 and second edge of a wing, 303 direction parallel, vertical with web 302 for axis
Purpose.
In the third possible realization method, as shown in Fig. 8 or Fig. 9, first through hole 1011, the second through-hole 1021 and
Three through-holes 3021 are square hole, and the size of three is identical, the area much larger than the cross section of the screw rod 501 of the first bolt 5,
The screw rod 501 of first bolt 5 can successively pass through first through hole 1011,3021 and second through-hole 1021 of third through-hole.
So set, since first through hole 1011, the second through-hole 1021 and third through-hole 3021 are square hole, and long-range
Area in the cross section of the screw rod 501 of the first bolt 5, therefore, when the power that first edge of a wing 301 of girder steel 3 is applied by the external world
When, the first bolt 5 without limitation on the relative movement between 302 and first plate body 101 of web of girder steel 3, the second plate body 102, with
Realize that girder steel 3 is rotated around with first edge of a wing 301 and second edge of a wing, 303 direction parallel, vertical with web 302 for axis
Purpose.
Further, in order to enable the structure of the girder steel hinged joint of the embodiment of the present invention more meets hinge ideally
The structure of node is connect, node further includes:Third plate body 6, as shown in Fig. 4 or Fig. 5 or Fig. 6 or Fig. 7 or Fig. 8 or Fig. 9, third plate body
6 are clamped between the lateral surface on second edge of a wing 303 of top plate 202 and girder steel 3.
So set, girder steel 3 of being more convenient for is around parallel, vertical with web 302 with first edge of a wing 301 and second edge of a wing 303
Direction rotated for axis, more meet the structure of hinged joint ideally.
For third plate body 6, third plate body 6 is connected with second edge of a wing 303 of girder steel 3, to ensure third plate body 6
Fixing-stable is firm, and in embodiments of the present invention, third plate body 6 is welded on second edge of a wing 303 of girder steel 3.
Meanwhile the size of third plate body 6 is less than the size of top plate 202, since contact area is small, further convenient for girder steel 3
It is rotated around with first edge of a wing 301 and second edge of a wing, 303 direction parallel, vertical with web 302 for axis.
For fixation kit 1, in order to fix the first bolt 5, node further includes:First nut 7, the screw rod of the first bolt 5
External screw thread is provided on 501 outer wall, the internal thread coordinated with external screw thread is provided on the inner wall of the first nut 7, passes through first
7 and first bolt 5 of nut realizes the fastening between the first plate body 101,302 and second plate body 102 of web.
Corresponding, in order to coordinate with the first nut 7, node further includes:First gasket 9, such as Fig. 4 or Fig. 5 or Fig. 6 or figure
Shown in 7 or Fig. 8 or Fig. 9, the first gasket 9 is set on the screw rod 501 of the first bolt 5, and positioned at the first nut 7 and the first elasticity
Between buffer substrate tablet 8, in order to removing and installing for the first nut 7, avoid taking excessive time in installation or removal and tear open
It unloads and installs on the first nut 7.
Meanwhile node further includes:Third gasket 14, third gasket 14 is set on the screw rod 501 of the first bolt 5, and position
Between 502 and first plate body 101 of nut of the first bolt 5, as shown in Fig. 6 or Fig. 8, in order to the first nut 7 dismounting with
Installation avoids taking excessive time on the first nut 7 is disassembled and installed in installation or removal.
Further, in order to avoid the first nut 7 twist tension, influence girder steel 3 around with first edge of a wing 301 and second wing
Parallel, vertical with web 302 direction of edge 303 is rotated for axis, and node further includes:First elastic buffer piece 8, the first bullet
Property buffer substrate tablet 8 is set on the screw rod 501 of the first bolt 5, and between the first nut 7 and the second plate body 102.
For fixed bracket 2, in order to enable second edge of a wing 303 of girder steel 3 is fixed on top plate 202, node also wraps
It includes:At least a pair of second bolt 10, each pair of second bolt 10 are that the plane of symmetry symmetrically runs through top using the 302 place face of web of steel plate 3
Second edge of a wing 303 of plate 202 and girder steel 3.
For example, a pair of second bolt 10 can be utilized so that two second bolts 10 using 302 place face of web as pair
Title face is symmetrical arranged.
It will be appreciated by persons skilled in the art that the quantity of the second bolt 10 can be according to the girder steel 3 of actual use
The length on second edge of a wing 303 determines that all second bolt, 10 Parallel Symmetrics are arranged on the both sides of web 302, and all second
Bolt 10 is on the same line, to ensure that girder steel 3 can be fixed on fixed bracket 2.
In embodiments of the present invention, the first bolt 5 and the second bolt 10 all can be a diameter of 30mm M30 bolts, just
In installation and dismounting.
Further, in order to coordinate with bolt 7, node further includes:Second nut 11, the quantity and second of the second nut 11
The quantity of bolt 10 is identical, is provided with external screw thread on the outer wall of the screw rod 1001 of the second bolt 10, on the inner wall of the second nut 11
The internal thread coordinated with external screw thread is provided with, every second bolt 10 can run through between stiffener 201 two-by-two from bottom to top
Behind second edge of a wing 303 of top plate 202 and girder steel 3, realized by the thread fitting between the second nut 11 and the second bolt 10 solid
It is fixed, as shown in Fig. 5 or Fig. 7 or Fig. 9.
Corresponding, in order to coordinate with the second nut 11, node further includes:Second gasket 12, the quantity of the second gasket 12
Identical with the quantity of the second bolt 10 and the second nut 11, the second gasket 12 is set on the screw rod 1001 of the second bolt 10, and
Between the medial surface on the second nut 11 and second edge of a wing 303 of girder steel 3.
So set, removing and installing convenient for the second nut 11, avoids taking excessive time in installation or removal
On the second nut 11 is disassembled and installed.
In embodiments of the present invention, the thickness of the second gasket 12 can be between 10mm~35mm, preferably 30mm.
Further, in order to avoid the second nut 11 twist tension, influence girder steel 3 around with first edge of a wing 301 and second
Parallel, vertical with web 302 direction in the edge of a wing 303 is rotated for axis, and node further includes:Second elastic buffer piece 13, the
Two elastic buffer pieces 13 are set on the screw rod 1001 of the second bolt 10, and positioned at second edge of a wing of the second gasket 12 and girder steel 3
Between 303 medial surface.
Meanwhile first elastic buffer piece 8 and the second elastic buffer piece 13 material all can be flexible sheet rubber,
Thickness all can be 6~30mm, preferably 10mm.
In overall structure, each component part of the girder steel hinged joint of the embodiment of the present invention will ensure fastness, steady
Qualitative and resistance to pressure, therefore, each building block are both preferably steel material.
In actual use, by taking the structure in Fig. 4 and Fig. 5 as an example, installation process is as follows:
First, the side end face of the side end face of stiffener 201 and top plate 202 is welded on steel column 4;
Secondly, second edge of a wing 303 of girder steel 3 is placed on top plate 202, with a pair of second bolt 10 from bottom to top through top
Plate 202, second edge of a wing 303 of girder steel 3, the first elastic buffer piece 8 and the first gasket 9;
Then, the second nut 11 is tightened;
Again, the side end face of the side end face of the first plate body 101 and the second plate body 102 is welded on steel column 4, with the first spiral shell
Bolt 5 passes through the first plate body 101, the web 302 of girder steel 3, the second plate body 102, the second elastic buffer piece 13 and the second gasket 12;
Finally, the first nut 7 is tightened, completes installation.
The above is for only for ease of it will be understood by those skilled in the art that technical scheme of the present invention, not limiting
The present invention.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection domain of invention.
Claims (10)
1. a kind of girder steel hinged joint, which is characterized in that the node includes:Fixation kit (1) and fixed bracket (2), wherein,
The fixation kit (1) includes:First plate body (101) and the second plate body (102), first plate body (101) and described
Second plate body (102) is positioned close to the both sides of the web (302) on first edge of a wing (301) of girder steel (3), and first plate body
(101) side end face and the side end face of second plate body (102) is connect respectively with steel column (4);
The fixed bracket (2) includes:Top plate (202) and be connected to the top plate (202) outside plate face at least two plus
Strength plate (201), the side end face of at least two stiffener (201) and the side end face of the top plate (202) and the steel column (4)
Connection, second edge of a wing (303) of the girder steel (3) is connected to the top plate (202);
First plate body (101) offers first through hole (1011), and second plate body (102) offers the second through-hole
(1021), third through-hole (3021) is offered on the web (302) of the girder steel (3), the screw rod (501) of the first bolt (5) is worn
Cross the first through hole (1011), the third through-hole (3021) and second through-hole (1021), and the first through hole
(1011), the aperture of the third through-hole (3021) and second through-hole (1021) is all higher than the spiral shell of first bolt (5)
The bar diameter of bar (501).
2. girder steel hinged joint according to claim 1, which is characterized in that the node further includes:Third plate body (6),
The third plate body (6) is clamped between the lateral surface on second edge of a wing (303) of the top plate (202) and the girder steel (3).
3. girder steel hinged joint according to claim 2, which is characterized in that the third plate body (6) and the girder steel (3)
Second edge of a wing (303) be connected, and the size of the third plate body (6) be less than the top plate (202) size.
4. girder steel hinged joint according to claim 1, which is characterized in that the node further includes:First nut (7),
External screw thread is provided on the outer wall of the screw rod (501) of first bolt (5), is provided on the inner wall of first nut (7)
With the internal thread of external screw thread cooperation.
5. girder steel hinged joint according to claim 4, which is characterized in that the node further includes:First elastic buffer
Piece (8), the first elastic buffer piece (8) are set on the screw rod (501) of first bolt (5), and positioned at described first
Between nut (7) and second plate body (102).
6. girder steel hinged joint according to claim 5, which is characterized in that the node further includes:First gasket (9),
First gasket (9) is set on the screw rod (501) of first bolt (5), and positioned at first nut (7) with it is described
Between first elastic buffer piece (8).
7. girder steel hinged joint according to claim 1, which is characterized in that the node further includes:At least a pair second
Bolt (10), each pair of second bolt (10) symmetrically run through institute using face where the web (302) of the girder steel (3) as the plane of symmetry
State second edge of a wing (303) of top plate (202) and the girder steel (3).
8. girder steel hinged joint according to claim 7, which is characterized in that the node further includes:Second nut (11),
External screw thread is provided on screw rod (1001) outer wall of second bolt (10), is provided on the inner wall of second nut (11)
With the internal thread of external screw thread cooperation.
9. girder steel hinged joint according to claim 8, which is characterized in that the node further includes:Second gasket (12),
Second gasket (12) is set on the screw rod (1001) of second bolt (10), and positioned at second nut (11) with
Between the medial surface on second edge of a wing (303) of the girder steel (3).
10. girder steel hinged joint according to claim 9, which is characterized in that the node further includes:Second elastic buffer
Piece (13), the second elastic buffer piece (13) are set on the screw rod (1001) of second bolt (10), and positioned at described
Between the medial surface on second edge of a wing (303) of the second gasket (12) and the girder steel (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711469331.XA CN108252411B (en) | 2017-12-29 | 2017-12-29 | Steel beam hinged joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711469331.XA CN108252411B (en) | 2017-12-29 | 2017-12-29 | Steel beam hinged joint |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108252411A true CN108252411A (en) | 2018-07-06 |
CN108252411B CN108252411B (en) | 2020-08-04 |
Family
ID=62724479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711469331.XA Active CN108252411B (en) | 2017-12-29 | 2017-12-29 | Steel beam hinged joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108252411B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU949101A1 (en) * | 1981-01-05 | 1982-08-07 | Государственный Проектный Институт "Днепрпроектсталь" Госстроя Ссср | Pivotal joint for fastening roof truss to pillar |
CN201883543U (en) * | 2010-12-23 | 2011-06-29 | 贵阳铝镁设计研究院 | Hinged structure of steel girder and steel column |
CN203755461U (en) * | 2014-02-14 | 2014-08-06 | 湖南金海钢结构股份有限公司 | Steel beam and steel column sliding support joint device |
CN107514057A (en) * | 2017-07-10 | 2017-12-26 | 湖南大学 | A kind of angle steel channel-section steel connects energy-dissipation beam column node |
-
2017
- 2017-12-29 CN CN201711469331.XA patent/CN108252411B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU949101A1 (en) * | 1981-01-05 | 1982-08-07 | Государственный Проектный Институт "Днепрпроектсталь" Госстроя Ссср | Pivotal joint for fastening roof truss to pillar |
CN201883543U (en) * | 2010-12-23 | 2011-06-29 | 贵阳铝镁设计研究院 | Hinged structure of steel girder and steel column |
CN203755461U (en) * | 2014-02-14 | 2014-08-06 | 湖南金海钢结构股份有限公司 | Steel beam and steel column sliding support joint device |
CN107514057A (en) * | 2017-07-10 | 2017-12-26 | 湖南大学 | A kind of angle steel channel-section steel connects energy-dissipation beam column node |
Also Published As
Publication number | Publication date |
---|---|
CN108252411B (en) | 2020-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9458974B2 (en) | Flexible moment connection device for mast arm signal mounting | |
CN104315255B (en) | Anti-seismic connecting support combined structure | |
CN108316471B (en) | A kind of beam-column hinged connecting node | |
CN108548012A (en) | A kind of universal antidetonation suspension and support of novel single rod | |
US8985535B1 (en) | Wind resilient mast arm mounting assembly | |
CN108252411A (en) | A kind of girder steel hinged joint | |
CN207964459U (en) | A kind of fixture for repeated bend test | |
CN108222252A (en) | A kind of beam-column hinged node | |
CN206377128U (en) | Keyhole connector, shock-resistant slant bar assembly and the antidetonation suspension bracket of brace are shaken for bilateral monoclonal antibody | |
CN216112547U (en) | Mounting structure for air pipe support and hanger of suspended ceiling | |
CN212957096U (en) | Antidetonation heat preservation wall | |
CN212986257U (en) | Split type anti-seismic bidirectional fixing support and pipeline anti-seismic supporting and hanging structure | |
CN209398939U (en) | A kind of heavy caliber air-conditioning water pipe para-seismic support | |
CN207947578U (en) | A kind of cable testing bridge antidetonation suspension and support | |
JP6073116B2 (en) | Telescopic device and water stop method for road bridge joints | |
CN207215415U (en) | A kind of pipeline clamping device and pipeline support | |
CN219164124U (en) | Spool fixing device for steel structure part | |
CN206903331U (en) | The bearing pin girder steel folder and its component taken root for antidetonation brace | |
CN219992751U (en) | Reinforcing and connecting device for building structure | |
CN206888312U (en) | Assembled open-type builds the general erection support and mounting assembly of bottom plate | |
CN216952016U (en) | Assembled comprehensive support and hanger | |
CN206458910U (en) | A kind of Rotatable hanging support | |
US20160145888A1 (en) | Flexible Moment Connection Device for Mast Arm Signal Mounting | |
CN213268532U (en) | Mechanical connection ceiling system for assembly type steel structure factory building | |
CN218657464U (en) | Solid web welding H-shaped steel component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |