CN108252276B - A kind of plant without storage's automatic optimization method adjusted based on power output - Google Patents

A kind of plant without storage's automatic optimization method adjusted based on power output Download PDF

Info

Publication number
CN108252276B
CN108252276B CN201810133948.2A CN201810133948A CN108252276B CN 108252276 B CN108252276 B CN 108252276B CN 201810133948 A CN201810133948 A CN 201810133948A CN 108252276 B CN108252276 B CN 108252276B
Authority
CN
China
Prior art keywords
unit
units
power output
water level
forebay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810133948.2A
Other languages
Chinese (zh)
Other versions
CN108252276A (en
Inventor
王朋
王鹏波
连源财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Jiejing Technology Co ltd
Original Assignee
Henan Chuang Hui Water Conservancy And Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Chuang Hui Water Conservancy And Hydropower Engineering Co Ltd filed Critical Henan Chuang Hui Water Conservancy And Hydropower Engineering Co Ltd
Priority to CN201810133948.2A priority Critical patent/CN108252276B/en
Publication of CN108252276A publication Critical patent/CN108252276A/en
Application granted granted Critical
Publication of CN108252276B publication Critical patent/CN108252276B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B15/00Controlling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Control Of Eletrric Generators (AREA)
  • Control Of Water Turbines (AREA)

Abstract

A kind of plant without storage's automatic optimization method adjusted based on power output provided by the invention, for the plant without storage of 2 units, by to carrying out power output adjusting between unit, on the basis of guaranteeing that power station goes out dynamic balance, by adjusting, total water consumption rate in power station is reduced, the water consumption of reduction is averagely allocated to unit later, the increase for realizing unit output improves the on-road efficiency and water resource utilization efficiency in power station.

Description

A kind of plant without storage's automatic optimization method adjusted based on power output
Technical field
The present invention relates to power station optimizations, and in particular to a kind of Automatic Optimal side, plant without storage adjusted based on power output Method.
Background technique
Important energy source component part of the waterpower resourses as China, with the irreplaceable superiority of other energy, rationally Develop and using waterpower resourses be the good approach of the inevitable choice readjusted the energy structure and the Implement of sustainable development strategy. As deepening continuously for research theory is constantly improve with scientific and technological level, the utilization efficiency of water resource is increased dramatically, especially It is in large hydropower station, optimization operation and the research of scheduling theory reach its maturity, and pass through the actual motion mistake in power station Implement Optimized Operation in journey, achieves preferable operational effect.Large hydropower station common engineering scale and installed capacity are larger, single A power station proportion in power grid is larger, generally by power grid United Dispatching and allotment, therefore, attention degree, throwing in research All comparatively sufficiently, research achievement is relatively more for the manpower and material resources entered, all opposite in terms of theoretical basis and practical application Comparative maturity.And small hydropower station is for a long time, less input for attention degree, the research funding being subject to due to it, to miniature water The research of the optimization operation in power station be also only limitted to it is some sporadicly and limited research, corresponding research achievement more zero It dissipates, and is difficult to be applied in the actual motion in power station.
Data shows that power station is carried out optimization operation and compared with optimization operation is not carried out, and generated energy 2 usually can be improved ~10%, the ratio that small hydropower station increases generated energy wants some higher relatively, small hydropower station total installation of generating capacity and average annual power generation Amount occupies larger specific gravity in HYDROELECTRIC ENERGY structure, and small power station is constrained by objective condition at present, and operational efficiency is generally lower.Cause The basic theory for small hydropower station optimization operation is improved in the economical operation in this research power station, small-sized what is satisfied the requirements Optimization operation is realized in power station as far as possible, increases the generated energy of water power, seriously polluted traditional energy is substituted with clean energy resource, With significant ecological benefits and social benefit.
Plant without storage is the common form of small hydropower station, and shared large percentage, this in China power station Power station does not often have regulation performance, is generated electricity using natural runoff.Due to lacking the management of science, often lead to Power station is difficult to effectively be adjusted, to cannot achieve optimization operation.Especially once booting operation, does not often consider further that Optimization, and due to the difference of unit assignment of traffic, there is also certain optimization spaces, this is for Rational Decision and improves water money Source utilization efficiency plays a significant role.
Summary of the invention
The present invention is directed to problem of the prior art, provides a kind of Automatic Optimal side, plant without storage adjusted based on power output Method.
The present invention provides a kind of plant without storage's automatic optimization method adjusted based on power output, and the plant without storage is extremely Less include forebay, conduit pipe, turbine-generator units and governor, is provided with detection forebay on the forebay The water-level gauge of water level, the governor are used to control the power output of turbine-generator units, and the number of units of the turbine-generator units is 2 Platform, number is No. 1 unit, No. 2 units respectively, and when 2, power station, unit is run simultaneously, and when the water level of the frontal pool is constant, power station Power generation reference flow is equal to the practical incoming flow in power station, executes following optimization method at this time:
S1: increase the power output of No. 1 unit by the governor of No. 1 unit, and reduced out using the governor of No. 2 units Power, the increased power output of No. 1 unit is equal with the power output that No. 2 units reduce, and utilizes water-level gauge detection pressure at this time The water level of power forebay;
S2: the step S2 includes the following steps S21, S22, S23;
S21: if the water level for the forebay that step S1 is detected goes up, illustrate that power station reference flow is less than power station Practical incoming flow, at this point, continue growing the power output of No. 1 unit by the governor of No. 1 unit, and utilize the speed regulation of No. 2 units Device reduces power output, and the increased power output of No. 1 unit is equal with the power output that No. 2 units reduce, and executes adjustment until described Forebay water level decreasing, at this time by No. 1 unit and No. 2 unit allocations the water level of the frontal pool decline it is corresponding it is upper once adjust go out Force value;
S22: if the water level decreasing for the forebay that step S1 is detected, illustrate that power station reference flow is greater than power station Practical incoming flow, at this point, reducing the power output of No. 1 unit by the governor of No. 1 unit, and increased using the governor of No. 2 units Add power output, the power output that No. 1 unit reduces is equal with the increased power output of No. 2 units, if the water level of the frontal pool increases, executes Adjustment until the forebay water level decreasing, at this time by No. 1 unit with No. 2 unit allocations on the water level of the frontal pool decline is corresponding The power generating value once adjusted;
S23: it if the water level for the forebay that step S1 is detected is constant, does not continue to execute adjustment;
S3: after executing step S2, forebay water level increases, and obtains the increased water level of forebay, and utilize pressure The water level storage-capacity curve of forebay calculates increased water value, forebay water level increased average time is obtained, before pressure Pond increase carrys out water and obtains the average increase flow of forebay divided by the average time;
S4: by the average increase flow in step S3 according to being averagely allocated to No. 1 unit and No. 2 units calculate No. 1 units With No. 2 increased power generating values of unit, No. 1 unit and No. 2 increased power generating values of unit are distributed to respectively by governor No. 1 unit and No. 2 units, complete the optimal control in power station.
Preferably, the power generating value increasedd or decreased that No. 1 unit, No. 2 units adjust every time is identical.
Preferably, the power generating value increasedd or decreased that No. 1 unit, No. 2 units adjust every time is hydrogenerator The 2% of group nominal output.
The present invention has the advantages that
A kind of plant without storage's automatic optimization method adjusted based on power output provided by the invention, for 2 units Plant without storage, by the basis of guaranteeing that power station goes out dynamic balance, passing through tune to power output adjusting is carried out between unit Section, reduces total water consumption rate in power station, the water consumption of reduction is averagely allocated to unit later, realize the increase of unit output, Improve the on-road efficiency and water resource utilization efficiency in power station.
Specific embodiment: below to the present invention specifically illustrated, and to its theoretical basis and how Operation is carried out in power station carries out necessary explanation.
The present invention provides a kind of plant without storage's automatic optimization method adjusted based on power output, and the plant without storage is extremely Less include forebay, conduit pipe, turbine-generator units and governor, is provided with detection forebay on the forebay The water-level gauge of water level, the governor are used to control the power output of turbine-generator units, and the number of units of the turbine-generator units is 2 Platform, number is No. 1 unit, No. 2 units respectively, and when 2, power station, unit is run simultaneously, and when the water level of the frontal pool is constant, power station Power generation reference flow is equal to the practical incoming flow in power station, executes following optimization method at this time:
S1: increase the power output of No. 1 unit by the governor of No. 1 unit, and reduced out using the governor of No. 2 units Power, the increased power output of No. 1 unit is equal with the power output that No. 2 units reduce, and utilizes water-level gauge detection pressure at this time The water level of power forebay;
S2: the step S2 includes the following steps S21, S22, S23;
S21: if the water level for the forebay that step S1 is detected goes up, illustrate that power station reference flow is less than power station Practical incoming flow, at this point, continue growing the power output of No. 1 unit by the governor of No. 1 unit, and utilize the speed regulation of No. 2 units Device reduces power output, and the increased power output of No. 1 unit is equal with the power output that No. 2 units reduce, and executes adjustment until described Forebay water level decreasing, at this time by No. 1 unit and No. 2 unit allocations the water level of the frontal pool decline it is corresponding it is upper once adjust go out Force value;
S22: if the water level decreasing for the forebay that step S1 is detected, illustrate that power station reference flow is greater than power station Practical incoming flow, at this point, reducing the power output of No. 1 unit by the governor of No. 1 unit, and increased using the governor of No. 2 units Add power output, the power output that No. 1 unit reduces is equal with the increased power output of No. 2 units, if the water level of the frontal pool increases, executes Adjustment until the forebay water level decreasing, at this time by No. 1 unit with No. 2 unit allocations on the water level of the frontal pool decline is corresponding The power generating value once adjusted;
S23: it if the water level for the forebay that step S1 is detected is constant, does not continue to execute adjustment;
S3: after executing step S2, forebay water level increases, and obtains the increased water level of forebay, and utilize pressure The water level storage-capacity curve of forebay calculates increased water value, forebay water level increased average time is obtained, before pressure Pond increase carrys out water and obtains the average increase flow of forebay divided by the average time;
S4: by the average increase flow in step S3 according to being averagely allocated to No. 1 unit and No. 2 units calculate No. 1 units With No. 2 increased power generating values of unit, No. 1 unit and No. 2 increased power generating values of unit are distributed to respectively by governor No. 1 unit and No. 2 units, complete the optimal control in power station.
Preferably, the power generating value increasedd or decreased that No. 1 unit, No. 2 units adjust every time is identical.
Preferably, the power generating value increasedd or decreased that No. 1 unit, No. 2 units adjust every time is hydrogenerator The 2% of group nominal output.
When wherein step S3 is realized, water-level gauge has clocking capability, when executing step S1, acquisition time point t1, and water level H1, at the end of step S2, acquisition time point t2, water level h2 inquire the water level storage-capacity curve of the forebay, utilize water level H1, h2 obtain storage capacity V1, the V2 of forebay, then averagely increasing flow described in step S3 is (V1-V2)/(t2-t1)
In step S4, it will averagely increase flow described in step S3 and be divided into 2 units, then according to forebay water Position, the efficiency curve of the hydraulic turbine, tail water pool water level according to power station pipe arrangement form, generator efficiency etc. calculate step S1 it Before preceding adjustment power output, then the corresponding reference flow of corresponding two units of power generating value utilizes the reference stream of two units Amount plus it is described averagely increase flow divide equally flow rate calculation power output, and by the power output of be calculated No. 1 unit, No. 2 units It is adjusted by governor;
Preferably, turbine-generator units have current surveying device, actually drawing for 2, power station unit is detected before step S1 With flow, step S2 obtains the practical reference flow of 2, power station unit later, then obtains the practical reduction stream in power station Amount, is averagely allocated to 2 units for the reduction flow, utilizes forebay water level, the efficiency curve of the hydraulic turbine, tail water pool water level Calculate the additional issue power output of two units according to power station pipe arrangement form, generator efficiency etc., and by be calculated No. 1 machine Group, the power output of No. 2 units are adjusted by governor.
Theoretical basis of the invention are as follows:
Optimize operating energy loss in factory to have ignored usually in accordance with water turbine set and the theoretical characteristics of power station flow channels The influence of error causes theoretical optimal case not to be consistent with actual motion.The error mainly has the constant error of machine unit characteristic, number Choose error according to acquisition and parameter and calculate error etc..
For turbine-generator units, operating point is different, then the efficiency of the hydraulic turbine can differ larger, optimize in Hydroelectric Plant When operation calculates, although each individual error can not be obtained accurately, each individual error forms comprehensive miss by transmitting, superposition Difference.Composition error can not only make the actual efficiency curved surface of the hydraulic turbine in vertical direction deviation, relative to theoretical operating point, practical work Condition point can also be subjected to displacement (i.e. the efficiency surface of the hydraulic turbine) in the horizontal direction.
Meanwhile when an only unit operation, even only operating point changes due to error, and the efficiency of the hydraulic turbine is bent Face can also translate, and making actual efficiency value and theoretical efficiency value, there are deviations, eventually lead to theoretially optimum value not necessarily Actual optimal value;Operation is simultaneously participated in for more units, power station participates in existing in the climatic conditioning main plot of operating unit Theoretical curved surface, due to the presence of composition error when actual motion, the vertical and water of the overall efficiencies of more units in theoretical curved surface Square to can also generate displacement, eventually leading to theoretical optimization result and actual motion, there are deviations, and this deviation is also larger sometimes.
The present invention proposes to establish based on the Automatic Optimal mechanism controlled of contributing, and unit is adjusted in real time when running, and realizes The feedback closed loop of optimization controls, to reduce deviation existing for theoretical calculation and actual motion.Its basic thought is that it is flat to meet power output Under the conditions of weighing apparatus, disturbance appropriate is given to the optimal operating condition point of unit theory scheme, faces at it and searches actual optimum operating condition in domain Point (facing domain range can require to set according to available accuracy).
For 2 units, the gross capability of 2 units and the reference flow of 2 units have functional relation, to wherein 1 unit increases certain power output, reduces certain power output for another 1 unit, and gross capability is constant, but due to going out between unit Power changes, and head loss, turbine efficiency also can therefore change, and at this moment inevitably results in unit reference stream quantitative change Change, due to 2 units, optimal power output (i.e. maximum output) is that the monotonic function of wherein some unit reference flow is (another Platform unit can subtract the flow of known unit with total flow), i.e., if adjustment direction is correct, the power output meeting one of 2 units Directly be in monotonic relationshi, this be for those skilled in the art it is available, theoretical basis is power station optimum theory, error point Analysis is theoretical and monotonic function is theoretical.
Illustrate if water consumption rate reduces there is also certain optimization space if executing primary adjustment, if water consumption rate increases Add, then illustrate adjustment direction mistake, adjustment direction should be changed at this time, water consumption rate then reduces.
Optimal way provided by the invention can under monitoring and control of hydropower station platform automatic implementation, dynamic adjust, solve due to Offset issue caused by theoretical characteristics and actual conditions are not inconsistent, be to the in-plant economical operation model based on power output control must It supplements and corrects, further excavated power generation potentiality.
The above embodiment is only the preferred embodiment of the present invention, and protection scope of the present invention is not construed as only limiting In the concrete form that embodiment is stated, protection scope of the present invention also includes that those skilled in the art conceive institute according to the present invention It is conceivable that equivalent technologies mean.

Claims (3)

1. a kind of plant without storage's automatic optimization method adjusted based on power output, before which includes at least pressure Pond, conduit pipe, turbine-generator units and governor are provided with the water level of detection forebay water level on the forebay Meter, the governor are used to control the power output of turbine-generator units, and the number of units of the turbine-generator units is 2, number respectively For No. 1 unit, No. 2 units, when 2, power station, unit is run simultaneously, and when the water level of the frontal pool is constant, and hydropower station quotes flow Equal to the practical incoming flow in power station, following optimization method is executed at this time:
S1: increase the power output of No. 1 unit by the governor of No. 1 unit, and reduce power output, institute using the governor of No. 2 units It is equal with the power output that No. 2 units reduce to state the increased power output of No. 1 unit, detects forebay using the water-level gauge at this time Water level;
S2: the step S2 includes the following steps S21, S22, S23;
S21: if the water level for the forebay that step S1 is detected goes up, illustrate that power station reference flow is less than the reality in power station Border incoming flow at this point, continuing growing the power output of No. 1 unit by the governor of No. 1 unit, and is subtracted using the governor of No. 2 units Small power output, the increased power output of No. 1 unit is equal with the power output that No. 2 units reduce, and executes adjustment until the pressure The water level of the frontal pool decline, declines the corresponding upper power output once adjusted in the water level of the frontal pool with No. 2 unit allocations for No. 1 unit at this time Value;
S22: if the water level decreasing for the forebay that step S1 is detected, illustrate that power station reference flow is greater than the reality in power station Border incoming flow at this point, reducing the power output of No. 1 unit by the governor of No. 1 unit, and is increased out using the governor of No. 2 units Power, the power output that No. 1 unit reduces is equal with the increased power output of No. 2 units, if the water level of the frontal pool increases, executes adjustment Until the forebay water level decreasing, corresponding primary in the water level of the frontal pool decline with No. 2 unit allocations by No. 1 unit at this time The power generating value of adjustment;
S23: it if the water level for the forebay that step S1 is detected is constant, does not continue to execute adjustment;
S3: after executing step S2, forebay water level increases, and obtains the increased water level of forebay, and utilize forebay Water level storage-capacity curve calculate increased water value, obtain forebay water level increased average time, increased using forebay Calais's water obtains the average increase flow of forebay divided by the average time;
S4: by the average increase flow in step S3 according to No. 1 unit and No. 2 units is averagely allocated to, No. 1 unit and 2 are calculated Number increased power generating value of unit is respectively distributed to No. 1 unit and No. 2 increased power generating values of unit by governor described No. 1 unit and No. 2 units, complete the optimal control in power station.
2. a kind of plant without storage's automatic optimization method adjusted based on power output as described in claim 1, it is characterised in that: The power generating value increasedd or decreased that No. 1 unit, No. 2 units adjust every time is identical.
3. a kind of plant without storage's automatic optimization method adjusted based on power output as described in claim 1, it is characterised in that: The power generating value increasedd or decreased that No. 1 unit, No. 2 units adjust every time is the 2% of turbine-generator units nominal output.
CN201810133948.2A 2018-02-09 2018-02-09 A kind of plant without storage's automatic optimization method adjusted based on power output Expired - Fee Related CN108252276B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810133948.2A CN108252276B (en) 2018-02-09 2018-02-09 A kind of plant without storage's automatic optimization method adjusted based on power output

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810133948.2A CN108252276B (en) 2018-02-09 2018-02-09 A kind of plant without storage's automatic optimization method adjusted based on power output

Publications (2)

Publication Number Publication Date
CN108252276A CN108252276A (en) 2018-07-06
CN108252276B true CN108252276B (en) 2019-10-29

Family

ID=62745024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810133948.2A Expired - Fee Related CN108252276B (en) 2018-02-09 2018-02-09 A kind of plant without storage's automatic optimization method adjusted based on power output

Country Status (1)

Country Link
CN (1) CN108252276B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321713B (en) * 2019-06-19 2021-05-11 河南郑大水利科技有限公司 Hydropower station unit operation method based on ecological flow
CN110705784B (en) * 2019-09-29 2023-04-07 河南郑大水利科技有限公司 Optimized operation evaluation method for radial flow type hydropower station
CN111832830B (en) * 2020-07-21 2022-12-16 河南郑大水利科技有限公司 Tail water level-based big data optimization operation method for radial flow type hydropower station
CN111738625B (en) * 2020-07-21 2024-02-20 河南郑大水利科技有限公司 High water level operation method for front pool of radial hydropower station
CN111832829B (en) * 2020-07-21 2023-06-02 黑龙江省水利水电集团有限公司 Reservoir hydropower station optimal operation method based on big data
CN111738626B (en) * 2020-07-22 2023-07-14 云南大唐国际李仙江流域水电开发有限公司 Starting method and system for radial hydropower station
CN111859823B (en) * 2020-07-22 2023-10-17 河南郑大水利科技有限公司 Method and system for determining starting-up of radial hydropower station according to incoming flow

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162697A (en) * 1997-02-04 1997-10-22 “列宁格勒金属工厂”股份公司 Combined hydro-generators of hydroelectric stations
JP4649876B2 (en) * 2004-05-31 2011-03-16 株式会社日立製作所 Support method for hydropower plant operation management
CN103545817A (en) * 2013-09-24 2014-01-29 许继集团有限公司 Automatic power generation control method for cascade hydropower stations

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162697A (en) * 1997-02-04 1997-10-22 “列宁格勒金属工厂”股份公司 Combined hydro-generators of hydroelectric stations
JP4649876B2 (en) * 2004-05-31 2011-03-16 株式会社日立製作所 Support method for hydropower plant operation management
CN103545817A (en) * 2013-09-24 2014-01-29 许继集团有限公司 Automatic power generation control method for cascade hydropower stations

Also Published As

Publication number Publication date
CN108252276A (en) 2018-07-06

Similar Documents

Publication Publication Date Title
CN108252276B (en) A kind of plant without storage's automatic optimization method adjusted based on power output
CN103306886B (en) A kind of population parameter adjustment control method of turbine-generator units
CN108193653B (en) Automatic optimizing system of radial-flow hydropower station
CN104795846A (en) Optimized operation method of pumped-storage power station and wind power combined system
CN104636830A (en) Water power and thermal power generation real-time load adjusting method of provincial grid under inflow change
CN103216827B (en) A kind of CFBB fast and stable duty control method
CN116667395B (en) Capacity allocation method for water-wind-solar-energy-storage complementary pump station based on cascade hydropower transformation
CN102684189A (en) Automatic gain control (AGC) method for hydroelectric power station surge shaft
CN103208086B (en) A kind of balance of electric power and ener method accurately taking into account wind-powered electricity generation contribution
CN101655063B (en) On-line adjustment method for KAPLAN unit
CN105427017A (en) Water power concentration power grid extra large scale power station group short period plan compiling method
CN104392284A (en) Situational analysis based large, medium and small hydropower station short-period largest consumable electric quantity coordination optimization scheduling method
CN108335045B (en) Automatic optimization method for radial flow type hydropower station based on opening degree adjustment
CN109915216A (en) A kind of thermal power plant unit control steam extraction frequency modulation system and adjusting method in short-term
CN108053083A (en) A kind of hydro plant with reservoir non-flood period combined optimization power generation dispatching method
CN103545817B (en) A kind of cascaded hydropower stations automatic power generation control method
CN109802445A (en) A kind of multicomputer coordinated scheduling method considering transmission of electricity section capacity limit
CN104299054A (en) Power generation schedule optimization method taking hydroelectric generating set vibration area into account
CN112906929B (en) Coupling scheduling method and device based on macroscopic regulation and microscopic correction
Yao et al. Optimal sizing of variable-speed seawater pumped storage based on maximum efficiency tracking
Corujo et al. Operation of small isolated power system with large non-controllable RES penetration–System Operator’s experience in El Hierro Island
Nibbi et al. Improving Pumped Hydro Storage (PHS) Flexibility in China
CN110852901B (en) Method for making current generation plan of provincial power grid hydropower station group through simple-detailed calculation interaction
CN103401264A (en) Overload adjusting method of power transmission network
CN102354331B (en) Method for calculating downstream unsteady flow

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201222

Address after: 224300 Xinxing Industrial Park, CHANGDANG Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: YANCHENG JIEJING TECHNOLOGY Co.,Ltd.

Address before: 450002 6025, Huakai building, 21 Jingqi Road, Jinshui District, Zhengzhou City, Henan Province

Patentee before: HENAN CHUANGHUI WATER RESOURCES AND HYDROPOWER ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029