CN108252222A - 钢—混凝土组合结构式先简支后连续梁桥方法 - Google Patents

钢—混凝土组合结构式先简支后连续梁桥方法 Download PDF

Info

Publication number
CN108252222A
CN108252222A CN201810065097.2A CN201810065097A CN108252222A CN 108252222 A CN108252222 A CN 108252222A CN 201810065097 A CN201810065097 A CN 201810065097A CN 108252222 A CN108252222 A CN 108252222A
Authority
CN
China
Prior art keywords
steel
beams
concrete
flange plate
continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810065097.2A
Other languages
English (en)
Other versions
CN108252222B (zh
Inventor
范亮
高燕梅
牛霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shilin Steel Structure Co ltd
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201810065097.2A priority Critical patent/CN108252222B/zh
Publication of CN108252222A publication Critical patent/CN108252222A/zh
Application granted granted Critical
Publication of CN108252222B publication Critical patent/CN108252222B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种钢—混凝土组合结构式先简支后连续梁桥方法,包括预制T梁、T梁就位、设置永久支座、设置连接段连接两T梁的首尾端以及拆除临时支座,桥面铺装等步骤。该方法改变了传统先简支后连续预应力混凝土T梁的结构形式,通过直接将T梁两端的翼缘板设置成钢结构,使转化后的连续梁桥桥面板上的受拉部分由钢结构翼缘板承担,避免了混凝土直接受拉,故无需在T梁中增加预应力束。与现有的先简支后连续梁桥体系相比,该方法简化了构造以及张拉预应力的过程,其T梁结构以及简支转连续施工工艺都更加简单,极大的缩短了施工工期。

Description

钢—混凝土组合结构式先简支后连续梁桥方法
技术领域
本发明属于桥梁领域,具体涉及一种钢—混凝土组合结构式先简支后连续梁桥方法。
背景技术
先简支后连续梁桥结合了连续梁和预制梁批量生产的优点,因此得到了广泛的应用和发展。目前的先简支后连续梁桥结构体系是采用后张法预应力梁形成简支梁,通过在连续墩上预置支座、浇筑混凝土,再张拉克服负弯矩的预应力束,将简支结构转换为连续梁;其中的预应力束是在预制梁时根据简支梁的布置形式设置在梁下部的跨中位置,梁端无需预应力。简支转连续梁后,跨中仍为正弯矩,墩顶由简支梁的零弯矩变为连续梁的负弯矩;在二期恒载和活载作用时,墩顶在负弯矩的作用下,桥面板受拉,由桥面板上的预应力束克服混凝土开裂问题。这类结构体系主要存在的问题是:(1)构造复杂,预制梁上设有孔道、齿板以及定位钢筋等;(2)工艺复杂,由于预制梁中设有预应力束,故制作预制梁时有穿束、接束、张拉、灌浆等步骤,步骤复杂,工艺繁琐;(3)受力复杂,桥面参数设计时,需确认有效预应力以及反拱情况等;(4)工期长。
发明内容
有鉴于此,本发明的目的在于提供一种钢—混凝土组合结构式先简支后连续梁桥方法,以解决现有先简支后连续梁桥所存在的缺陷。
为达到上述目的,本发明提供如下技术方案:一种钢—混凝土组合结构式先简支后连续梁桥方法,包括以下步骤:
(1)预制T梁:T梁两端的翼缘板为钢结构,固定在钢筋混凝土或预应力混凝土翼缘板与腹板中,形成中间段为钢筋混凝土或预应力混凝土截面、两端为钢—混凝土组合截面的结构;
(2)T梁就位:在桥墩上设置临时支座,各T梁的两端对应架设在两桥墩的临时支座上;
(3)简支梁转连续梁:桥墩上设置永久支座,设置连接段以连接两T梁的首尾端;两T梁的钢结构翼缘板间通过钢接头连接,腹板间通过现浇接头混凝土连接;
(4)拆除临时支座,完成桥面铺装。
进一步,所述步骤(1)前还包括计算确定T型梁的截面尺寸以及钢结构翼缘板的截面尺寸与长度。
进一步,两T梁的钢结构翼缘板间焊接连接。
进一步,两T梁的钢结构翼缘板间螺栓连接。
进一步,所述钢结构翼缘板为正交异性钢翼缘板。
本发明的有益效果在于:该先简支后连续梁桥方法中,改变了传统先简支后连续预应力混凝土T梁的结构形式,通过直接将T梁两端的翼缘板设置成钢结构,使转化后的连续梁桥桥面板上的受拉部分由钢结构翼缘板承担,避免了混凝土直接受拉,故无需在T梁中增加预应力束。与现有的先简支后连续梁桥体系相比,该方法简化了构造以及张拉预应力的过程,其T梁结构以及简支转连续施工工艺都更加简单,极大的缩短了施工工期。此外,钢结构的连接方式(焊接或螺栓连接)具有操作简、单快捷的优点,从装配化施工趋势而言,较常规技术更为先进。
附图说明
为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:
图1为T梁的结构示意图;
图2为本发明的连续梁桥结构示意图;
图3为图2中A-A的截面示意图;
图4为图2中B-B的截面示意图;。
具体实施方式
下面将结合附图,对本发明的优选实施例进行详细的描述。
如图所示,本实施例中的钢—混凝土组合结构式先简支后连续梁桥方法,具体包括以下步骤:
(1)预制T梁:T梁1两端的翼缘板11采用钢结构13,其余的翼缘与所有腹板均为钢筋混凝土或预应力混凝土结构;即该T梁的中间段为钢筋混凝土或预应力混凝土T型截面,两端为钢—混凝土组合T型截面;
(2)T梁就位:在桥墩2上设置临时支座3,各T梁的两端对应架设在两桥墩2的临时支座3上;
(3)桥墩2上设置永久支座4,设置连接段以连接两T梁1的首尾端;两T梁的钢结构翼缘板11间通过钢接头5连接,腹板12间通过现浇接头混凝土连接;
(4)拆除临时支座,桥面铺装。
本实施例中步骤(1)前还包括计算确定T型梁的截面尺寸及钢结构翼缘板的截面尺寸。此处的钢结构翼缘板为正交异性钢翼缘板,两钢结构翼缘板间通过焊接或是螺栓连接。
该先简支后连续梁桥方法中,改变了T梁的结构形式,通过直接将T梁1两端的翼缘板11设置成钢结构,使连续梁桥面板上的受拉部分由钢结构翼缘板11承担,避免了混凝土直接受拉,故无需在T梁中增加预应力束。与现有的先简支后连续梁桥体系相比,虽然都是连续梁桥的跨中为正弯矩,墩顶为负弯矩,但本体系的墩顶负弯矩区段由钢结构承担,即上部的钢结构翼缘板11受拉、下部的钢筋混凝土或预应力混凝土受压,简化了构造以及张拉预应力的过程,其T梁结构以及施工工艺都更加简单,极大的缩短了施工工期。
此外,钢结构的连接方式(焊接或螺栓连接)都是具有操作简、单快捷的优点,从装配化施工趋势而言,较常规技术更为先进。
最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。

Claims (5)

1.一种钢—混凝土组合结构式先简支后连续梁桥方法,其特征在于包括以下步骤:
(1)预制T梁:T梁两端的翼缘板为钢结构,其余的翼缘与所有腹板均为钢筋混凝土或预应力混凝土结构,形成中间段为钢筋混凝土或预应力混凝土截面、两端为钢—混凝土组合截面的结构;
(2)T梁就位:在桥墩上设置临时支座,各T梁的两端对应架设在两桥墩的临时支座上;
(3)简支梁转连续梁:桥墩上设置永久支座,设置连接段以连接两T梁的首尾端;两T梁的钢结构翼缘板间通过钢接头连接,腹板间通过现浇接头混凝土连接;
(4)拆除临时支座,完成桥面铺装。
2.根据权利要求1所述的钢—混凝土组合结构式先简支后连续梁桥方法,其特征在于:所述步骤(1)前还包括计算确定T型梁的截面尺寸以及钢结构翼缘板的截面尺寸与长度。
3.根据权利要求1所述的钢—混凝土组合结构式先简支后连续梁桥方法,其特征在于:两T梁的钢结构翼缘板间焊接连接。
4.根据权利要求1所述的钢—混凝土组合结构式先简支后连续梁桥方法,其特征在于:两T梁的钢结构翼缘板间螺栓连接。
5.根据权利要求1所述的钢—混凝土组合结构式先简支后连续梁桥方法,其特征在于:所述钢结构翼缘板为正交异性钢翼缘板。
CN201810065097.2A 2018-01-23 2018-01-23 钢—混凝土组合结构式先简支后连续梁桥方法 Active CN108252222B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810065097.2A CN108252222B (zh) 2018-01-23 2018-01-23 钢—混凝土组合结构式先简支后连续梁桥方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810065097.2A CN108252222B (zh) 2018-01-23 2018-01-23 钢—混凝土组合结构式先简支后连续梁桥方法

Publications (2)

Publication Number Publication Date
CN108252222A true CN108252222A (zh) 2018-07-06
CN108252222B CN108252222B (zh) 2019-08-06

Family

ID=62742171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810065097.2A Active CN108252222B (zh) 2018-01-23 2018-01-23 钢—混凝土组合结构式先简支后连续梁桥方法

Country Status (1)

Country Link
CN (1) CN108252222B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230268A (zh) * 2019-07-30 2019-09-13 郑州铁路职业技术学院 先连续后简支的钢桁组合梁桥施工方法
CN114351564A (zh) * 2022-01-24 2022-04-15 福州大学 无预应力波形钢腹板组合箱梁桥结构及施工方法
CN116607399A (zh) * 2023-07-18 2023-08-18 山东省交通规划设计院集团有限公司 一种适用于大跨径梁桥的叠层结合梁结构及施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2477701Y (zh) * 2001-05-24 2002-02-20 周志祥 桥梁由简支变连续的连结构造
KR20050025455A (ko) * 2003-09-08 2005-03-14 (주)스틸엔콘크리트 일정길이로 분할된 단위 프리스트레스트 합성보를프리케스트 연결이음장치로 연결하여 제작한프리스트레스트 합성보 및 이를 이용한 교량설치방법
JP4728453B1 (ja) * 2011-01-25 2011-07-20 朝日エンヂニヤリング株式会社 主桁の連続化構造
KR20130020497A (ko) * 2011-08-19 2013-02-27 삼표건설 주식회사 합성교량의 연속화 공법
KR20160019286A (ko) * 2014-08-11 2016-02-19 고재복 단부다이아프램을 구비한 psc거더 및 이를 이용한 반일체식 교량 시공방법
CN105839510A (zh) * 2016-05-23 2016-08-10 西安公路研究院 一种钢-超高性能混凝土组合连续梁桥结构及其施工方法
CN106758743A (zh) * 2017-02-28 2017-05-31 浙江大学 一种改善钢混组合多箱连续梁桥负弯矩区受力性能的方法
CN106930181A (zh) * 2017-04-18 2017-07-07 浙江省交通规划设计研究院 一种先简支后连续钢混组合桥梁负弯矩区结构
CN106958197A (zh) * 2017-02-24 2017-07-18 南京航空航天大学 桥面板纵向弹性不等的组合结构桥梁及其施工方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2477701Y (zh) * 2001-05-24 2002-02-20 周志祥 桥梁由简支变连续的连结构造
KR20050025455A (ko) * 2003-09-08 2005-03-14 (주)스틸엔콘크리트 일정길이로 분할된 단위 프리스트레스트 합성보를프리케스트 연결이음장치로 연결하여 제작한프리스트레스트 합성보 및 이를 이용한 교량설치방법
JP4728453B1 (ja) * 2011-01-25 2011-07-20 朝日エンヂニヤリング株式会社 主桁の連続化構造
KR20130020497A (ko) * 2011-08-19 2013-02-27 삼표건설 주식회사 합성교량의 연속화 공법
KR20160019286A (ko) * 2014-08-11 2016-02-19 고재복 단부다이아프램을 구비한 psc거더 및 이를 이용한 반일체식 교량 시공방법
CN105839510A (zh) * 2016-05-23 2016-08-10 西安公路研究院 一种钢-超高性能混凝土组合连续梁桥结构及其施工方法
CN106958197A (zh) * 2017-02-24 2017-07-18 南京航空航天大学 桥面板纵向弹性不等的组合结构桥梁及其施工方法
CN106758743A (zh) * 2017-02-28 2017-05-31 浙江大学 一种改善钢混组合多箱连续梁桥负弯矩区受力性能的方法
CN106930181A (zh) * 2017-04-18 2017-07-07 浙江省交通规划设计研究院 一种先简支后连续钢混组合桥梁负弯矩区结构

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230268A (zh) * 2019-07-30 2019-09-13 郑州铁路职业技术学院 先连续后简支的钢桁组合梁桥施工方法
CN114351564A (zh) * 2022-01-24 2022-04-15 福州大学 无预应力波形钢腹板组合箱梁桥结构及施工方法
CN116607399A (zh) * 2023-07-18 2023-08-18 山东省交通规划设计院集团有限公司 一种适用于大跨径梁桥的叠层结合梁结构及施工方法

Also Published As

Publication number Publication date
CN108252222B (zh) 2019-08-06

Similar Documents

Publication Publication Date Title
CN106677049B (zh) 装配式钢-混凝土组合结构桥梁及施工方法
CN101413247B (zh) 流线型钢-混凝土叠合箱梁
CN105839510B (zh) 一种钢‑超高性能混凝土组合连续梁桥结构及其施工方法
CN108978434B (zh) 一种钢-混组合连续箱梁桥的无支架工业化施工方法
CN105002816A (zh) 预制拼装的鱼腹工字型预应力钢混组合连续梁桥及施工方法
CN108824162A (zh) 一种采用平钢板与波形钢板混合腹板的钢-混凝土组合连续梁及其施工方法
CN101768916A (zh) 下翼缘改进型波形钢腹板组合箱梁及其施工方法
CN104762871A (zh) 一种预应力混凝土-钢槽梁结合梁连续梁桥
CN109082998A (zh) 整体预制钢板组合梁结构及施工方法
CN108252222B (zh) 钢—混凝土组合结构式先简支后连续梁桥方法
CN109958049A (zh) 一种模块化钢-混组合小箱梁简支连续桥及其施工方法
CN110331664B (zh) 钢-混凝土混合连续箱梁桥面板接头构造及其施工方法
CN110846996A (zh) 一种连续组合梁桥的施工方法及连续组合梁桥
CN108060636A (zh) 整体装配式组合梁桥的施工方法
CN108221636B (zh) 中跨采用无支架方案施工的钢混组合梁桥及成桥方法
CN103741577B (zh) 一种设置下平联的t型梁桥及其施工方法
CN108951399A (zh) 一种单箱多室箱梁桥及其施工方法
He et al. The development of composite bridges with corrugated steel webs in China
CN208121541U (zh) 中跨采用无支架方案施工的钢混组合梁桥
CN108265626A (zh) 钢筋-钢板骨架组合桥面板及其施工方法
CN106836028A (zh) 用钢桁梁顶升加固的混凝土连续刚构梁桥及施工方法
CN207878251U (zh) 预制装配uhpc组合梁
CN113774811A (zh) 一种组合梁斜拉桥上部结构建造方法
CN106192726B (zh) 一种v形腹板连续梁结构及其施工方法
CN117107623A (zh) 一种uhpc-波形钢腹板预制拼装变截面箱梁构造及施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 402260 No. 1 Fuxing Avenue, Shuangfu Town, Jiangjin District, Chongqing

Applicant after: CHONGQING JIAOTONG University

Address before: No. 66, Xuefu Avenue, Nanan District, Chongqing City, Chongqing

Applicant before: chongqing jiaotong university

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231023

Address after: 230000 b-1018, Woye Garden commercial office building, 81 Ganquan Road, Shushan District, Hefei City, Anhui Province

Patentee after: HEFEI WISDOM DRAGON MACHINERY DESIGN Co.,Ltd.

Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Dragon totem Technology (Hefei) Co.,Ltd.

Effective date of registration: 20231023

Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Dragon totem Technology (Hefei) Co.,Ltd.

Address before: 402260 No. 1 Fuxing Avenue, Shuangfu Town, Jiangjin District, Chongqing

Patentee before: CHONGQING JIAOTONG University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240520

Address after: No. 489 Hengtong Road, Zhongdian Town, Zoucheng City, Jining City, Shandong Province, 272000

Patentee after: Shilin Steel Structure Co.,Ltd.

Country or region after: China

Address before: 230000 b-1018, Woye Garden commercial office building, 81 Ganquan Road, Shushan District, Hefei City, Anhui Province

Patentee before: HEFEI WISDOM DRAGON MACHINERY DESIGN Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right