CN108247284B - A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin - Google Patents

A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin Download PDF

Info

Publication number
CN108247284B
CN108247284B CN201711260445.3A CN201711260445A CN108247284B CN 108247284 B CN108247284 B CN 108247284B CN 201711260445 A CN201711260445 A CN 201711260445A CN 108247284 B CN108247284 B CN 108247284B
Authority
CN
China
Prior art keywords
semi
finished product
temperature
alloy billet
locking pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711260445.3A
Other languages
Chinese (zh)
Other versions
CN108247284A (en
Inventor
吕明柯
邓达纮
陆军
许正中
李光远
吴平平
王冬石
陈�峰
杨清峡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jing Indium Marine Engineering Innovation Research Co Ltd
Guangdong Jing Yin Ocean Engineering Co Ltd
Original Assignee
Guangdong Jing Indium Marine Engineering Innovation Research Co Ltd
Guangdong Jing Yin Ocean Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jing Indium Marine Engineering Innovation Research Co Ltd, Guangdong Jing Yin Ocean Engineering Co Ltd filed Critical Guangdong Jing Indium Marine Engineering Innovation Research Co Ltd
Priority to CN201711260445.3A priority Critical patent/CN108247284B/en
Publication of CN108247284A publication Critical patent/CN108247284A/en
Application granted granted Critical
Publication of CN108247284B publication Critical patent/CN108247284B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/005Modifying the physical properties by deformation combined with, or followed by, heat treatment of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Steel (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a kind of manufacturing method of low temperature heavy duty high-performance safe locking pin, step A intercepts alloy billet, and forges to the alloy billet of interception;Step B carries out copying to the alloy billet being cooled to room temperature, i.e., carries out rough turning to alloy billet and rough mill tooth copying, to obtain the semi-finished product of safe locking pin;Step C, is heat-treated semi-finished product;Step D carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, to obtain low temperature heavy duty high-performance safe locking pin.The alloy billet of interception is forged, alloy billet consistency height, good toughness and the steel fibre composition that the mode of forging obtains centainly uniformly flow to form;It after copying is at the semi-finished product, is heat-treated, so that the mechanical property of semi-finished product is excellent in, the advantages that intensity is high, elongation percentage is big and impact flexibility is high is still maintained under low temperature environment (- 40 DEG C).

Description

A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin
Technical field
The present invention relates to ocean platform safe locking pin manufacturing field more particularly to a kind of low temperature heavy duty high-performance safety locks The manufacturing method tightly sold.
Background technique
Lifting device is the key component of self-lifting type marine drilling platform, act on for allow spud leg and hull make it is opposite up and down Movement, so that main platform body can move up and down and be fixed in some position of spud leg.Due to maritime environment complexity Changeable, offshore work platform usually increases in jacking system and pacifies at any time by distinguished and admirable, ocean current impact and load effect of drifting along Full locking pin locks spud leg, to prevent under non-lift operating condition spud leg because being impacted by distinguished and admirable, ocean current and load of drifting along Lotus acts on and occurs significantly to shake, and improves operational security.Safe locking pin will not only bear the substantial load of spud leg, also want It is chronically at severe maritime environment, therefore critical component of the safe locking pin as lifting device, manufacturing process requires high.
But existing safe locking pin manufacturing method is easy to appear that density is loose or a large amount of contractings first is that using rolled steel The bad phenomenon in hole;Two are a lack of heat treatment process, under -10~-30 DEG C of low temperature environment, existing safe locking pin mechanics Performance just substantially reduces, and generates brittleness, cracky, and replacement safe locking pin needs high maintenance cost;Third is that existing safety Locking pin is easily broken off under the environment of low temperature heavy duty, and there are great security risks.
Summary of the invention
It is an object of the invention to propose a kind of manufacturing method of low temperature heavy duty high-performance safe locking pin, so that producing The safe locking pin come still maintains excellent mechanical performance, not easy to break, wear-resistant, service life under low temperature heavy duty environment It is long.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin, comprising the following steps:
Step A intercepts alloy billet, and forges to the alloy billet of interception:
Step A1 is heated to 1200~1300 DEG C to the alloy billet, and keeps the temperature 14~15h;
Step A2 carries out rough forge to the alloy billet after heating and thermal insulation, wherein the starting forging temperature of the rough forge It is 1100~1200 DEG C, the final forging temperature of the rough forge is >=1000 DEG C;
Step A3 is diffused annealing to the alloy billet after rough forge, wherein the diffusion annealing Heating temperature is 1100~1200 DEG C, and keeps the temperature 14~15h;
Step A4 carries out finish forge to the alloy billet after diffusion annealing, wherein the starting forging temperature of the finish forge It is 1000~1100 DEG C, the final forging temperature of the finish forge is >=900 DEG C;
Step A5 is heated to 880 DEG C to the alloy billet normalizing after finish forge, keeps the temperature 14~15h;, then it is air-cooled Tempering is carried out after being cooled to 200 DEG C or less, the tempering temperature is 680 DEG C, keeps the temperature 14h, then comes out of the stove and be air-cooled to room temperature;
Step B carries out copying to the alloy billet that is cooled to room temperature, i.e., to the alloy billet carry out rough turning and Rough milling, to obtain the semi-finished product of safe locking pin;
Step C is heat-treated the semi-finished product;
Step D carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, to obtain low temperature heavy duty High-performance safe locking pin.
Preferably, further include step E, the parameters of the low temperature heavy duty high-performance safe locking pin are examined, if every Parameter is qualified can be then packed and stored.
Preferably, the step C includes following sub-step:
Step C1 carries out heating and thermal insulation to the semi-finished product;
Step C2 quenches the semi-finished product after heating in water base quenching cycles pond, controls water base quenching and follows Liquid temperature in cisterna ambiens is 30~55 DEG C, and the cool time is 25~30min, cooling temperature≤150 DEG C of the semi-finished product;
The quenched semi-finished product are put into tempering furnace and are tempered by step C3, and tempering temperature is 590~610 DEG C, are protected The warm time is 14h;
Step C4 quenches the semi-finished product that tempering is come out of the stove again in water base quenching cycles pond, controls water base 30~55 DEG C of liquid temperature in quenching cycles pond, cool time are 25~30min, cooling temperature≤150 DEG C of the semi-finished product;So Cycle temper tempering is secondary afterwards, and tempering temperature is 590~610 DEG C, soaking time 14h.Alloy billet is in copying at described half It after finished product, is heat-treated, passes through quenching --- the Tempering and Quenching process of tempering --- quenching --- double tempering, so that half The mechanical property of finished product is excellent in, such as tensile strength, yield strength, elongation after fracture, the contraction percentage of area and ballistic work ginseng Number increases.
Preferably, the heating and thermal insulation of the step C1 includes:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 430~470 DEG C, and keeps the temperature 2h; Being then heated to furnace temperature is 630~670 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 840~880 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time≤60s.
Preferably, further include step C5:
Surface hardness detection first is carried out to the semi-finished product, examines the surface of surface at least three point of the semi-finished product hard Degree, verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection.Default tension is strong Degree, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection acceptance value, then to semi-finished product carry out with Upper detection detects the mechanical property of semi-finished product in time, can optimize heat treatment process parameter in time according to testing result, avoid finished product Quality is irregular.Also it can increase some heat treatment procedures by subsequent in time to underproof semi-finished product are detected come to its mechanics Performance optimizes.
Preferably, according to mass percent, the alloy billet includes following components:
C:0.32~0.38%,
Si:0.17~0.37%,
Mn:0.45~0.70%,
P :≤0.025%,
S :≤0.035%,
V:0.07~0.12%,
Cu :≤0.20%,
Cr:1.45~1.70%,
Mo:0.22~0.32%,
Ni:1.50~1.70%,
Nb:0.01~0.1%,
Surplus is Fe and inevitable impurity;
In its metal structure, ferritic volume fraction is 30~45%, and the volume fraction of bainite is 10~25%, is returned The volume fraction of fiery martensite is 30~45%, and the volume fraction of austenite is 5~15% and the volume fraction of martensite is 5 ~8%.
Using above-mentioned alloy billet, avoid density loose or the appearance of a large amount of shrinkage cavities, forge for the later period, be heat-treated obtain it is excellent The opposite sex can provide basis;Existing safe locking pin uses rolled steel, and Post isothermal treatment is difficult to promote its mechanical property again.
Element of the C as stable austenite at room temperature in the alloy billet, is to ensure that the remaining necessity of austenite Element;The content of C has decisive role for the volume fraction of remaining martensite, therefore the content of C is arranged (according to quality percentage Than) it is 0.32~0.38%, stability of the retained austenite in processing can be improved, while ensuring the content of remaining martensite, And avoid the excessively high damage caused to machining of C content and the reduction of solderability.
Mn is equally used as austenite stabilizer element, while cementite can be prevented to generate, and facilitates C in austenite Enrichment;Therefore the content (according to mass percent) of setting Mn is 0.45~0.70%, and it is too low caused to can be avoided Mn resultant Hardening caused by the volume fraction of remaining martensite is less and Mn too high levels to ferrite or bainite, and then avoid pair The reduction of machinability and the reduction of toughness.
P does not dissolve in cementite in 350~600 DEG C of isothermals, so as to inhibit cementite to be precipitated within this temperature range; Extremely strong solution strengthening ability is played simultaneously, improves solution strengthening effect.Therefore the content (according to mass percent) of setting P is ≤ 0.025%, the solid solution strengthening effect for not only improving P plays, and does not also have a negative impact, and steel body is avoided to generate cold brittleness.
The content (according to mass percent) of S is arranged in the range of≤0.035%, can improve the machining of steel body Property, it does not also have a negative impact, steel body is avoided to generate red brittleness.
The content (according to mass percent) of Cu is arranged in the range of≤0.20%, and the intensity of steel body and tough can be improved Property, it does not also have a negative impact, steel body is avoided to generate red brittleness.
The content (according to mass percent) of V is arranged in the range of 0.07~0.12%, can thinning microstructure crystal grain, improve The intensity and toughness of steel body, V and C form carbide, improve the hydrogen attack resistance of steel body at high temperature under high pressure.
Si helps to increase ferritic volume fraction, improves the machinability of steel body as ferrite stabilizer. In addition, Si can prevent the formation of cementite, so that it is enriched in C effectively in austenite, therefore the addition of Si combination C element, it is right It is required at room temperature stablizing austenite in a volume fraction appropriate.
The content (according to mass percent) of Cr is arranged in the range of 1.45~1.70%, and Cr and C form a variety of carbonizations Object slows down the decomposition rate of austenite, the intensity and the harden ability in heat treatment for significantly improving steel body.
Mo is solid-solution in ferrite, austenite and carbide, and the element of austenite phase field, therefore the content of Mo are reduced (according to mass percent) is arranged in the range of 0.22~0.32%, and other element institutes are reduced or inhibited when coexisting with Cr, Mn Caused temper brittleness.
The content (according to mass percent) of Ni is arranged in the range of 1.50~1.70%, and Ni significantly improves the strong of steel body Degree, and steel body is made to keep good plasticity and toughness.
The content (according to mass percent) of Nb is arranged in the range of 0.01~0.1%, in the partial saturation stage, Nb element gives full play to the inhibition to austenite grain growth, avoids a large amount of precipitates to remaining horse while refining crystal grain The influence of family name's body stability reduces the superheated susceptivity and temper brittleness of steel body.
Preferably, further include step A6:
To treated that the alloy billet carries out metallographic examination by step A5, the segregation group of the alloy billet is checked Knit vestiges and grain size: if the alloy billet does not have a mixed crystal presence, and most coarse-grain granularity is at 7 grades or more, then the alloy Steel billet is by metallographic examination, if the alloy billet does not pass through metallographic examination, which not can enter subsequent processing Process.The grain size of the alloy billet is controlled at 7 grades or more, fine and closely woven uniform crystal grain, so that the alloy billet is shown The mechanical property come significantly improves.And common iron, grain size control is hardly done, grain size is usually in lower 9,10 Grade or even worse, and coarse grain size can reduce the mechanical property of steel.
Preferably, further include following checkout procedure in the copying of the step B:
Step B1 carries out ultrasonic examination inspection to the alloy billet behind the rough turn outside of the alloy billet;Step B2 controls each portion's scale error of the semi-finished product during rough turning and rough milling.To steel alloy in copying Base carries out ultrasonic examination inspection, avoids the alloy billet of existing defects from entering subsequent processing link, improves final product quality.In advance If each portion's dimensional tolerance of semi-finished product, control each portion's scale error of semi-finished product in its correspondingly-sized margin of tolerance, improve at Quality.The acceptance criteria of the ultrasonic examination inspection is " 3 grades of GB/T6402-2008 ".
Preferably, the step D further include:
Step D1 carries out ultrasonic examination inspection to the semi-finished product after semifinishing;
Step D2 controls each portion's scale error of the semi-finished product in finishing passes;
Step D3 carries out magnetic particle testing to the semi-finished product after finishing.
It avoids the semi-finished product of existing defects from entering following process, presets each portion's dimensional tolerance of semi-finished product, control semi-finished product Each portion's scale error in its correspondingly-sized margin of tolerance, the acceptance criteria of the ultrasonic examination inspection is " GB/T6402- 2008 3 grades ".The acceptance criteria of the magnetic particle testing is " GB/T15822.1-2005 ".
Preferably, in the step A, chemical component spectrum analysis first is carried out to the alloy billet of interception, then forged. By carrying out chemical component spectrum analysis to the alloy billet of interception, whether the various composition for detecting alloy billet is up to standard, avoids Underproof alloy billet enters following process link, improves final product quality.
Preferably, front and back temperature rise≤10 DEG C of the quenching.It avoids the front and back temperature rise of quenching too fast and influences releasing for stress It puts and alloy billet is made to generate larger brittleness.
The manufacturing method of the low temperature heavy duty high-performance safe locking pin forges the alloy billet of interception, the side of forging Alloy billet consistency height, good toughness and the steel fibre composition that formula obtains centainly uniformly flow to form, than rolled steel performance It is more excellent, such as the comparison of rope and line.Increase diffusion annealing processing during forging, makes all kinds of alloys member in alloy billet Plain sufficiently fusion, is effectively improved structural homogenity.The low temperature heavy duty high-performance safe locking pin obtained can be -10~-30 DEG C low temperature environment under 3000~8000 tons of load, the low temperature heavy duty high-performance safe locking pin excellent in mechanical performance is not easy Fracture, effectively latching ship, long service life.
The alloy billet is kept the temperature at 1200~1300 DEG C, guarantees that all alloying elements are outstanding in the alloy billet It is the abundant solid solution of Nb, and there are certain relationship in soaking time and morphology volume (mainly maximum cross section), heat preservation 14~ 15h is conducive to the abundant diffusion of alloying element, promotes the homogenization of alloying element, ultimately facilitates the homogenization of tissue.It is described It forges and is pulled out for multiple pier, the number that forges is not particularly limited, forge effect with can obtain predetermined deformation quantity.
Control pretreatment temperature opens forging, final forging temperature, can prevent due to forging front and back excessive temperature differentials, bring stress greatly, The ill effects such as micro-crack.The starting forging temperature of the rough forge is 1100~1200 DEG C, and the final forging temperature of the rough forge is >=1000 ℃;The temperature requirement for advantageously ensuring that subsequent finish forge avoids the weight for leading to the alloy billet due to temperature is too low after rough forge Newly melt down heating.The heating temperature of the diffusion annealing is 1100~1200 DEG C, and keeps the temperature 14~15h;In the diffusion annealing Heating temperature condition under, martensitic traoformation occurs for the alloy billet, while effectively improving the uniformity for forging steel billet tissue, Keep the crystal grain for forging steel billet fine and smooth uniformly, so as to improve banded structure is forged, and then reduces the crystallite dimension for forging recrystallization, make It is more uniform tissue must to be forged.The diffusion annealing is completed by way of heating;There is no special want to the mode of the heating It asks, using heating method well-known to those skilled in the art.The starting forging temperature of the finish forge is 1000~1100 DEG C, institute The final forging temperature for stating finish forge is >=900 DEG C;Pro-eutectoid ferrite caused by avoiding final forging temperature too low and austenite are along processing Direction elongation forms ferrite and the alternatively distributed banded structure pattern of pearlite after completing transformation, and otherwise banded structure has Heredity, if forging, banded structure is serious, and austenite is preferentially in banded structure grain boundaries shape when forging rear continuous annealing heating At, and quickly grow up to pearlite, band-like martensite is formed in subsequent cooling procedure, leads to the elongation of the alloy billet Rate decline.
Normalizing and tempering are increased to the alloy billet after finish forge, is released effectively and forges stress, and make Steel fibre after forging uniformly, chemical component element sufficiently fuse, the intensity of the alloy billet is improved, so that manufacture is low For warm heavy duty high-performance safe locking pin under low temperature high-impact, uniform force avoids moment overload impact from being broken ,- Also there is preferable mechanical property under 10~-30 DEG C of low temperature environment, not cracky, improve the use reliability of safe locking pin, Ship is effectively lockked, is prolonged the service life.
Detailed description of the invention
The present invention will be further described for attached drawing, but the content in attached drawing does not constitute any limitation of the invention.
Fig. 1 is the low temperature heavy duty high-performance safe locking pin preparation technology flow chart of the one of embodiment of the present invention.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
The each component and its mass percentage content of embodiment A1~A4 alloy billet, as shown in table 1, surplus is for Fe and not Evitable impurity;
In the metal structure of embodiment A1~A4 alloy billet, ferritic volume fraction is 40%, the volume of bainite Score is 15%, and the volume fraction of tempered martensite is 35%, and the volume fraction of austenite is 5% and the volume point of martensite Number is 5%.
Table 1
As shown in Figure 1, embodiment A1~A4 prepares low temperature heavy duty high-performance safe locking pin according to following steps:
Step 1: interception ingredient alloy billet as shown in Table 1, first carries out chemical component spectrum to the alloy billet of interception Analysis, then forged:
(1.1) 1250 DEG C are heated to the alloy billet, and keep the temperature 14.5h;
(1.2) rough forge is carried out to the alloy billet, wherein the starting forging temperature of the rough forge is 1150 DEG C, the rough forge Final forging temperature is 1100 DEG C;
(1.3) annealing is diffused to the alloy billet, wherein the heating temperature of the diffusion annealing is 1150 DEG C, and keep the temperature 14.5h;
(1.4) finish forge is carried out to the alloy billet, wherein the starting forging temperature of the finish forge is 1050 DEG C, the finish forge Final forging temperature is 1000 DEG C;
(1.5) 880 DEG C are heated to the alloy billet normalizing after finish forge, keep the temperature 14.5h;, then wind cooling temperature lowering Tempering is carried out after to 200 DEG C or less, the tempering temperature is 680 DEG C, keeps the temperature 14h, then comes out of the stove and be air-cooled to room temperature;
(1.6) metallographic examination is carried out to the alloy billet, checks the segregation tissue vestiges and crystal grain of the alloy billet Degree: if the alloy billet does not have mixed crystal presence, and most coarse-grain granularity at 7 grades or more, then the alloy billet passes through metallographic It checks;
Step 2: carrying out copying to the alloy billet being cooled to room temperature, i.e., rough turning is carried out to the alloy billet And rough milling carries out ultrasonic examination inspection to the alloy billet, described in control behind the rough turn outside of the alloy billet Each portion's scale error of semi-finished product, to obtain the semi-finished product of safe locking pin;
Step 3 is heat-treated the semi-finished product:
(3.1) heating and thermal insulation is carried out to the semi-finished product:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 450 DEG C, and keeps the temperature 2h;Then plus Heat to furnace temperature is 650 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 860 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time 50s;
(3.2) semi-finished product after heating are quenched in water base quenching cycles pond, controls water base quenching cycles Liquid temperature in pond is 40 DEG C, cool time 25min, controls front and back temperature rise≤10 DEG C of quenching, the cooling temperature of the semi-finished product ≤ 150 DEG C of degree;
(3.3) the quenched semi-finished product are put into tempering furnace to be tempered, tempering temperature is 600 DEG C, soaking time For 14h;
(3.4) semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, controls water base quench 40 DEG C, cool time 25min of liquid temperature in fiery circulatory pool, control front and back temperature rise≤10 DEG C of quenching, the semi-finished product it is cold But temperature≤150 DEG C;Then cycle temper tempering is secondary, and tempering temperature is 600 DEG C, soaking time 14h;
(3.5) surface hardness detection first is carried out to the semi-finished product, examines the table of surface at least three point of the semi-finished product Surface hardness verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection;
Step 4 carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, after semifinishing The semi-finished product carry out ultrasonic examination inspection, each portion's scale error of the semi-finished product are controlled in finishing passes, to essence The semi-finished product after processing carry out magnetic particle testing, to obtain low temperature heavy duty high-performance safe locking pin, detection data As shown in table 2.
Table 2
As shown in Table 2, the manufacturing method of the low temperature heavy duty high-performance safe locking pin is reliable and stable, the low temperature produced Heavily loaded high-performance safe locking pin intensity is high, and be hit good toughness, still maintains superiority in storm, severe cold adverse circumstances Can, the advantages that intensity is high, elongation percentage is big and impact flexibility is high is still maintained under low temperature environment (- 40 DEG C), tensile strength reaches 1000MPa or more, elongation after fracture is between 12~20%, AKV (- 40 DEG C) >=40J, meets and has heavy duty and impact flexibility The process components requirement of product.
Embodiment B1~B4 alloy billet is composed of the following components: C:0.34%, Si:0.28%, Mn:0.54%, P: 0.007%, S:0.004%, V:0.09%, Cu:0.03%, Cr:1.55%, Mo:0.28%, Ni:1.58%, Nb:0.02%, Surplus is Fe and inevitable impurity;
In the metal structure of embodiment B1~B4 alloy billet, ferritic volume fraction is 40%, the volume of bainite Score is 15%, and the volume fraction of tempered martensite is 35%, and the volume fraction of austenite is 5% and the volume point of martensite Number is 5%.
Embodiment B1 prepares safe locking pin according to following steps:
Step 1: intercepting above-mentioned alloy billet, chemical component spectrum analysis is carried out to the alloy billet of interception, and to described Alloy billet carries out metallographic examination, checks the segregation tissue vestiges and grain size of the alloy billet: if the alloy billet does not have With the presence of mixed crystal, and most coarse-grain granularity at 7 grades or more, then the alloy billet passes through metallographic examination;
Step 2: carrying out copying to alloy billet, i.e., rough turning and rough milling are carried out to the alloy billet, Behind the rough turn outside of alloy billet, ultrasonic examination inspection is carried out to the alloy billet, controls each portion of the semi-finished product Scale error, to obtain the semi-finished product of safe locking pin;
Step 3 is heat-treated the semi-finished product:
(3.1) heating and thermal insulation is carried out to the semi-finished product:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 450 DEG C, and keeps the temperature 2h;Then plus Heat to furnace temperature is 650 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 860 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time 50s;
(3.2) semi-finished product after heating are quenched in water base quenching cycles pond, controls water base quenching cycles Liquid temperature in pond is 40 DEG C, cool time 25min, controls front and back temperature rise≤10 DEG C of quenching, the cooling temperature of the semi-finished product ≤ 150 DEG C of degree;
(3.3) the quenched semi-finished product are put into tempering furnace to be tempered, tempering temperature is 600 DEG C, soaking time For 14h;
(3.4) semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, controls water base quench 40 DEG C, cool time 25min of liquid temperature in fiery circulatory pool, control front and back temperature rise≤10 DEG C of quenching, the semi-finished product it is cold But temperature≤150 DEG C;Then cycle temper tempering is secondary, and tempering temperature is 600 DEG C, soaking time 14h;
(3.5) surface hardness detection first is carried out to the semi-finished product, examines the table of surface at least three point of the semi-finished product Surface hardness verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection;
Step 4 carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, after semifinishing The semi-finished product carry out ultrasonic examination inspection, each portion's scale error of the semi-finished product are controlled in finishing passes, to essence The semi-finished product after processing carry out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Embodiment B2 prepares safe locking pin according to following steps:
Step 1: intercepting above-mentioned alloy billet, chemical component spectrum analysis first is carried out to the alloy billet of interception, then carry out It forges:
(1.1) 1250 DEG C are heated to the alloy billet, and keep the temperature 14.5h;
(1.2) rough forge is carried out to the alloy billet, wherein the starting forging temperature of the rough forge is 1150 DEG C, the rough forge Final forging temperature is 1100 DEG C;
(1.3) annealing is diffused to the alloy billet, wherein the heating temperature of the diffusion annealing is 1150 DEG C, and keep the temperature 14.5h;
(1.4) finish forge is carried out to the alloy billet, wherein the starting forging temperature of the finish forge is 1050 DEG C, the finish forge Final forging temperature is 1000 DEG C;
(1.5) metallographic examination is carried out to the alloy billet, checks the segregation tissue vestiges and crystal grain of the alloy billet Degree: if the alloy billet does not have mixed crystal presence, and most coarse-grain granularity at 7 grades or more, then the alloy billet passes through metallographic It checks;
Step 2: carrying out copying to the alloy billet being cooled to room temperature, i.e., rough turning is carried out to the alloy billet And rough milling carries out ultrasonic examination inspection to the alloy billet, described in control behind the rough turn outside of the alloy billet Each portion's scale error of semi-finished product, to obtain the semi-finished product of safe locking pin;
Step 3 is heat-treated the semi-finished product:
(3.1) heating and thermal insulation is carried out to the semi-finished product:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 450 DEG C, and keeps the temperature 2h;Then plus Heat to furnace temperature is 650 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 860 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time 50s;
(3.2) semi-finished product after heating are quenched in water base quenching cycles pond, controls water base quenching cycles Liquid temperature in pond is 40 DEG C, cool time 25min, controls front and back temperature rise≤10 DEG C of quenching, the cooling temperature of the semi-finished product ≤ 150 DEG C of degree;
(3.3) the quenched semi-finished product are put into tempering furnace to be tempered, tempering temperature is 600 DEG C, soaking time For 14h;
(3.4) semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, controls water base quench 40 DEG C, cool time 25min of liquid temperature in fiery circulatory pool, control front and back temperature rise≤10 DEG C of quenching, the semi-finished product it is cold But temperature≤150 DEG C;Then cycle temper tempering is secondary, and tempering temperature is 600 DEG C, soaking time 14h;
(3.5) surface hardness detection first is carried out to the semi-finished product, examines the table of surface at least three point of the semi-finished product Surface hardness verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection;
Step 4 carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, after semifinishing The semi-finished product carry out ultrasonic examination inspection, each portion's scale error of the semi-finished product are controlled in finishing passes, to essence The semi-finished product after processing carry out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Embodiment B3 prepares safe locking pin according to following steps:
Step 1: intercepting above-mentioned alloy billet, chemical component spectrum analysis first is carried out to the alloy billet of interception, then carry out It forges:
(1.1) 1250 DEG C are heated to the alloy billet, and keep the temperature 14.5h;
(1.2) rough forge is carried out to the alloy billet, wherein the starting forging temperature of the rough forge is 1150 DEG C, the rough forge Final forging temperature is 1100 DEG C;
(1.3) annealing is diffused to the alloy billet, wherein the heating temperature of the diffusion annealing is 1150 DEG C, and keep the temperature 14.5h;
(1.4) finish forge is carried out to the alloy billet, wherein the starting forging temperature of the finish forge is 1050 DEG C, the finish forge Final forging temperature is 1000 DEG C;
(1.5) 880 DEG C are heated to the alloy billet normalizing after finish forge, keep the temperature 14.5h;, then wind cooling temperature lowering Tempering is carried out after to 200 DEG C or less, the tempering temperature is 680 DEG C, keeps the temperature 14h, then comes out of the stove and be air-cooled to room temperature;
(1.6) metallographic examination is carried out to the alloy billet, checks the segregation tissue vestiges and crystal grain of the alloy billet Degree: if the alloy billet does not have mixed crystal presence, and most coarse-grain granularity at 7 grades or more, then the alloy billet passes through metallographic It checks;
Step 2: carrying out copying to the alloy billet being cooled to room temperature, i.e., rough turning is carried out to the alloy billet And rough milling carries out ultrasonic examination inspection to the alloy billet, described in control behind the rough turn outside of the alloy billet Each portion's scale error of semi-finished product, to obtain the semi-finished product of safe locking pin;
Step 3 carries out semifinishing and finishing to the semi-finished product, carries out to the semi-finished product after semifinishing Ultrasonic examination inspection controls each portion's scale error of the semi-finished product in finishing passes, to described half after finishing Finished product carries out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Embodiment B4 prepares safe locking pin according to following steps:
Step 1: intercepting above-mentioned alloy billet, chemical component spectrum analysis first is carried out to the alloy billet of interception, then carry out It forges:
(1.1) 1250 DEG C are heated to the alloy billet, and keep the temperature 14.5h;
(1.2) rough forge is carried out to the alloy billet, wherein the starting forging temperature of the rough forge is 1150 DEG C, the rough forge Final forging temperature is 1100 DEG C;
(1.3) annealing is diffused to the alloy billet, wherein the heating temperature of the diffusion annealing is 1150 DEG C, and keep the temperature 14.5h;
(1.4) finish forge is carried out to the alloy billet, wherein the starting forging temperature of the finish forge is 1050 DEG C, the finish forge Final forging temperature is 1000 DEG C;
(1.5) 880 DEG C are heated to the alloy billet normalizing after finish forge, keep the temperature 14.5h;, then wind cooling temperature lowering Tempering is carried out after to 200 DEG C or less, the tempering temperature is 680 DEG C, keeps the temperature 14h, then comes out of the stove and be air-cooled to room temperature;
Step 2: carrying out copying to the alloy billet being cooled to room temperature, i.e., rough turning is carried out to the alloy billet And rough milling carries out ultrasonic examination inspection to the alloy billet, described in control behind the rough turn outside of the alloy billet Each portion's scale error of semi-finished product, to obtain the semi-finished product of safe locking pin;
Step 3 is heat-treated the semi-finished product:
(3.1) heating and thermal insulation is carried out to the semi-finished product:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 450 DEG C, and keeps the temperature 2h;Then plus Heat to furnace temperature is 650 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 860 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time 50s;
(3.2) semi-finished product after heating are quenched in water base quenching cycles pond, controls water base quenching cycles Liquid temperature in pond is 40 DEG C, cool time 25min, controls front and back temperature rise≤10 DEG C of quenching, the cooling temperature of the semi-finished product ≤ 150 DEG C of degree;
(3.3) the quenched semi-finished product are put into tempering furnace to be tempered, tempering temperature is 600 DEG C, soaking time For 14h;
(3.4) semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, controls water base quench 40 DEG C, cool time 25min of liquid temperature in fiery circulatory pool, control front and back temperature rise≤10 DEG C of quenching, the semi-finished product it is cold But temperature≤150 DEG C;Then cycle temper tempering is secondary, and tempering temperature is 600 DEG C, soaking time 14h;
(3.5) surface hardness detection first is carried out to the semi-finished product, examines the table of surface at least three point of the semi-finished product Surface hardness verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection;
Step 4 carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, after semifinishing The semi-finished product carry out ultrasonic examination inspection, each portion's scale error of the semi-finished product are controlled in finishing passes, to essence The semi-finished product after processing carry out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Embodiment C1 prepares safe locking pin according to following steps:
Step 1: intercepting existing rolling steel billet, copying is carried out, i.e., rough turning is carried out to existing rolling steel billet and is rough milled Processing carries out ultrasonic examination inspection to existing rolling steel billet, controls the semi-finished product behind the rough turn outside of existing rolling steel billet Each portion's scale error, to obtain the semi-finished product of safe locking pin;
Step 2 carries out semifinishing and finishing to the semi-finished product, carries out to the semi-finished product after semifinishing Ultrasonic examination inspection controls each portion's scale error of the semi-finished product in finishing passes, to described half after finishing Finished product carries out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Embodiment C2 prepares safe locking pin according to following steps:
Step 1: intercepting existing rolling steel billet, chemical component spectrum analysis first is carried out to the existing rolling steel billet of interception;
Step 2: carrying out copying to existing rolling steel billet, i.e., existing rolling steel billet is carried out rough turning and rough milled to add Work carries out ultrasonic examination inspection to existing rolling steel billet, controls the semi-finished product behind the rough turn outside of existing rolling steel billet Each portion's scale error, to obtain the semi-finished product of safe locking pin;
Step 3 is heat-treated the semi-finished product:
(3.1) heating and thermal insulation is carried out to the semi-finished product:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 450 DEG C, and keeps the temperature 2h;Then plus Heat to furnace temperature is 650 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 860 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time 50s;
(3.2) semi-finished product after heating are quenched in water base quenching cycles pond, controls water base quenching cycles Liquid temperature in pond is 40 DEG C, cool time 25min, controls front and back temperature rise≤10 DEG C of quenching, the cooling temperature of the semi-finished product ≤ 150 DEG C of degree;
(3.3) the quenched semi-finished product are put into tempering furnace to be tempered, tempering temperature is 600 DEG C, soaking time For 14h;
(3.4) semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, controls water base quench 40 DEG C, cool time 25min of liquid temperature in fiery circulatory pool, control front and back temperature rise≤10 DEG C of quenching, the semi-finished product it is cold But temperature≤150 DEG C;Then cycle temper tempering is secondary, and tempering temperature is 600 DEG C, soaking time 14h;
(3.5) surface hardness detection first is carried out to the semi-finished product, examines the table of surface at least three point of the semi-finished product Surface hardness verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection;
Step 4 carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, after semifinishing The semi-finished product carry out ultrasonic examination inspection, each portion's scale error of the semi-finished product are controlled in finishing passes, to essence The semi-finished product after processing carry out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Embodiment C3 prepares safe locking pin according to following steps:
Step 1: intercepting existing rolling steel billet, chemical component spectrum analysis first is carried out to the existing rolling steel billet of interception, then It is forged:
(1.1) 1250 DEG C are heated to existing rolling steel billet, and keep the temperature 14.5h;
(1.2) rough forge is carried out to existing rolling steel billet, wherein the starting forging temperature of the rough forge is 1150 DEG C, the rough forge Final forging temperature is 1100 DEG C;
(1.3) annealing is diffused to existing rolling steel billet, wherein the heating temperature of the diffusion annealing is 1150 DEG C, and keep the temperature 14.5h;
(1.4) finish forge is carried out to existing rolling steel billet, wherein the starting forging temperature of the finish forge is 1050 DEG C, the finish forge Final forging temperature is 1000 DEG C;
(1.5) 880 DEG C are heated to the existing rolling steel billet normalizing after finish forge, keep the temperature 14.5h;, then wind cooling temperature lowering Tempering is carried out after to 200 DEG C or less, the tempering temperature is 680 DEG C, keeps the temperature 14.5h, then comes out of the stove and be air-cooled to room temperature;
(1.6) metallographic examination is carried out to existing rolling steel billet, checks the segregation tissue vestiges and crystal grain of the alloy billet Degree: if the alloy billet does not have mixed crystal presence, and most coarse-grain granularity at 7 grades or more, then existing rolling steel billet passes through metallographic It checks;
Step 2: carrying out copying to the existing rolling steel billet being cooled to room temperature, i.e., existing rolling steel billet is carried out thick Turning and rough milling carry out ultrasonic examination inspection, control to existing rolling steel billet behind the rough turn outside of existing rolling steel billet Each portion's scale error of the semi-finished product, to obtain the semi-finished product of safe locking pin;
Step 3 is heat-treated the semi-finished product:
(3.1) heating and thermal insulation is carried out to the semi-finished product:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 450 DEG C, and keeps the temperature 2h;Then plus Heat to furnace temperature is 650 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 860 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base Above quenching bath, traveling time 50s;
(3.2) semi-finished product after heating are quenched in water base quenching cycles pond, controls water base quenching cycles Liquid temperature in pond is 40 DEG C, cool time 25min, controls front and back temperature rise≤10 DEG C of quenching, the cooling temperature of the semi-finished product ≤ 150 DEG C of degree;
(3.3) the quenched semi-finished product are put into tempering furnace to be tempered, tempering temperature is 600 DEG C, soaking time For 14h;
(3.4) semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, controls water base quench 40 DEG C, cool time 25min of liquid temperature in fiery circulatory pool, control front and back temperature rise≤10 DEG C of quenching, the semi-finished product it is cold But temperature≤150 DEG C;Then cycle temper tempering is secondary, and tempering temperature is 600 DEG C, soaking time 14h;
(3.5) surface hardness detection first is carried out to the semi-finished product, examines the table of surface at least three point of the semi-finished product Surface hardness verifies the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and impact examination after part of materialsing processing It tests on machine and carries out tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection;
Step 4 carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, after semifinishing The semi-finished product carry out ultrasonic examination inspection, each portion's scale error of the semi-finished product are controlled in finishing passes, to essence The semi-finished product after processing carry out magnetic particle testing, to obtain safe locking pin, detection data is as shown in table 3.
Table 3
As shown in Table 3, by embodiment A1~A4 and embodiment B1 comparison it is found that the alloy billet consistency by forging High, good toughness and steel fibre, which form, centainly uniformly flows to form, avoids moment overload impact from being broken, at -10~-30 DEG C Low temperature environment under also have preferable mechanical property, not cracky improves the intensity of safe locking pin;
By embodiment A1~A4 and embodiment B2 comparison it is found that increasing normalizing to the alloy billet after finish forge And tempering, be released effectively and forge stress, and make the steel fibre after forging uniformly, chemical component element sufficiently fuse, Improve the intensity of the alloy billet so that manufacture low temperature heavy duty high-performance safe locking pin under low temperature high-impact, by Power is uniform;
By embodiment A1~A4 and embodiment B3 comparison it is found that alloy billet is after copying is at the semi-finished product, It is heat-treated, passes through quenching --- the Tempering and Quenching process of tempering --- quenching --- double tempering, so that semi-finished product Mechanical property is excellent in, such as tensile strength, yield strength, elongation after fracture, the contraction percentage of area and ballistic work parameter have It is improved;
By embodiment A1~A4 and embodiment B4 comparison it is found that controlling the grain size of the alloy billet at 7 grades or more, Fine and closely woven uniform crystal grain, so that the mechanical property that the alloy billet shows significantly improves, coarse grain size can be reduced The mechanical property of steel;
By embodiment A1~A4 and embodiment C1~C3 comparison it is found that existing rolling steel billet density is loose, exist a large amount of Shrinkage cavity, even if the later period, by forging and being heat-treated, every mechanical property is also not highly desirable, in low temperature environment -10~30 DEG C, The mechanical property of existing rolling steel billet just substantially reduces, and generates brittleness, cracky.
The technical principle of the invention is described above in combination with a specific embodiment.These descriptions are intended merely to explain of the invention Principle, and shall not be construed in any way as a limitation of the scope of protection of the invention.Based on the explanation herein, the technology of this field Personnel can associate with other specific embodiments of the invention without creative labor, these modes are fallen within Within protection scope of the present invention.

Claims (10)

1. a kind of manufacturing method of low temperature heavy duty high-performance safe locking pin, which comprises the following steps:
Step A intercepts alloy billet, and forges to the alloy billet of interception:
Step A1 is heated to 1200~1300 DEG C to the alloy billet, and keeps the temperature 14~15h;
Step A2 carries out rough forge to the alloy billet after heating and thermal insulation, wherein the starting forging temperature of the rough forge is 1100~1200 DEG C, the final forging temperature of the rough forge is >=1000 DEG C;
Step A3 is diffused annealing to the alloy billet after rough forge, wherein the heating of the diffusion annealing Temperature is 1100~1200 DEG C, and keeps the temperature 14~15h;
Step A4 carries out finish forge to the alloy billet after diffusion annealing, wherein the starting forging temperature of the finish forge is 1000~1100 DEG C, the final forging temperature of the finish forge is >=900 DEG C;
Step A5 is heated to 880 DEG C to the alloy billet normalizing after finish forge, keeps the temperature 14~15h, then wind cooling temperature lowering is extremely Tempering is carried out after 200 DEG C or less, the tempering temperature is 680 DEG C, keeps the temperature 14h, then comes out of the stove and be air-cooled to room temperature;
Step B carries out copying to the alloy billet being cooled to room temperature, i.e., carries out rough turning to the alloy billet and rough mill Processing, to obtain the semi-finished product of safe locking pin;
Step C is heat-treated the semi-finished product;
Step D carries out semifinishing and finishing to the semi-finished product after Overheating Treatment, to obtain the high property of low temperature heavy duty It can safe locking pin;
According to mass percent, the alloy billet includes following components:
C:0.32~0.38%,
Si:0.17~0.37%,
Mn:0.45~0.70%,
P :≤0.025%,
S :≤0.035%,
V:0.07~0.12%,
Cu :≤0.20%,
Cr:1.45~1.70%,
Mo:0.22~0.32%,
Ni:1.50~1.70%,
Nb:0.01~0.1%,
Surplus is Fe and inevitable impurity.
2. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 1, which is characterized in that the step Rapid C includes following sub-step:
Step C1 carries out heating and thermal insulation to the semi-finished product;
The semi-finished product after heating are quenched in water base quenching cycles pond, control water base quenching cycles pond by step C2 In liquid temperature be 30~55 DEG C, the cool time be 25~30min, cooling temperature≤150 DEG C of the semi-finished product;
The quenched semi-finished product are put into tempering furnace and are tempered by step C3, and tempering temperature is 590~610 DEG C, when heat preservation Between be 14h;
The semi-finished product that tempering is come out of the stove are quenched again in water base quenching cycles pond, control water base quenching by step C4 30~55 DEG C of liquid temperature in circulatory pool, cool time are 25~30min, cooling temperature≤150 DEG C of the semi-finished product;Then it follows Loopback fire is secondary, and tempering temperature is 590~610 DEG C, soaking time 14h.
3. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 2, which is characterized in that the step Suddenly the heating and thermal insulation of C1 includes:
The semi-finished product are put into well-type electric furnace by preheating step, and being first heated to furnace temperature is 430~470 DEG C, and keeps the temperature 2h;Then Being heated to furnace temperature is 630~670 DEG C, and keeps the temperature 1h;
Incubation step, after the preheating step, being heated to furnace temperature is 840~880 DEG C, and keeps the temperature 14h;
It comes out of the stove step, the semi-finished product after the incubation step is come out of the stove, and the semi-finished product are rapidly moved to water base quenching Above pond, traveling time≤60s.
4. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 2, which is characterized in that further include Step C5:
Surface hardness detection first is carried out to the semi-finished product, the surface hardness of surface at least three point of the semi-finished product is examined, tests Demonstrate,prove the surface hardness of the semi-finished product;
Mechanics properties testing is carried out to the semi-finished product again, in universal tensile testing machine and shock machine after part of materialsing processing Upper progress tensile strength, yield strength, elongation after fracture, the contraction percentage of area and Charpy-V impact power detection.
5. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 1, it is characterised in that: the conjunction In the metal structure of golden steel billet, ferritic volume fraction is 30~45%, and the volume fraction of bainite is 10~25%, tempering The volume fraction of martensite is 30~45%, the volume fraction of austenite be 5~15% and the volume fraction of martensite be 5~ 8%.
6. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 1, which is characterized in that further include Step A6:
To treated that the alloy billet carries out metallographic examination by step A5, check that the segregation tissue of the alloy billet is residual Mark and grain size: if the alloy billet does not have a mixed crystal presence, and most coarse-grain granularity is at 7 grades or more, then the alloy billet Pass through metallographic examination.
7. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 1, which is characterized in that the step Further include following checkout procedure in the copying of rapid B:
Step B1 carries out ultrasonic examination inspection to the alloy billet behind the rough turn outside of the alloy billet;
Step B2 controls each portion's scale error of the semi-finished product in rough turning and during rough mill tooth copying.
8. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 1, which is characterized in that the step Rapid D further include:
Step D1 carries out ultrasonic examination inspection to the semi-finished product after semifinishing;
Step D2 controls each portion's scale error of the semi-finished product in finishing passes;
Step D3 carries out magnetic particle testing to the semi-finished product after finishing.
9. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 1, it is characterised in that: the step In rapid A, chemical component spectrum analysis first is carried out to the alloy billet of interception, then forged.
10. the manufacturing method of low temperature heavy duty high-performance safe locking pin according to claim 2, it is characterised in that: described Front and back temperature rise≤10 DEG C of quenching.
CN201711260445.3A 2017-12-04 2017-12-04 A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin Active CN108247284B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711260445.3A CN108247284B (en) 2017-12-04 2017-12-04 A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711260445.3A CN108247284B (en) 2017-12-04 2017-12-04 A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin

Publications (2)

Publication Number Publication Date
CN108247284A CN108247284A (en) 2018-07-06
CN108247284B true CN108247284B (en) 2019-01-29

Family

ID=62720838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711260445.3A Active CN108247284B (en) 2017-12-04 2017-12-04 A kind of manufacturing method of low temperature heavy duty high-performance safe locking pin

Country Status (1)

Country Link
CN (1) CN108247284B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115283945B (en) * 2022-07-19 2024-04-09 陕西法士特齿轮有限责任公司 High-hardness synchronizer riveting locking pin and processing method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008015260A1 (en) * 2006-08-03 2008-02-07 Aubert & Duval Method for transforming steel blanks
CN103409699A (en) * 2013-09-06 2013-11-27 陕西华威锻压有限公司 Steel forging with ultra-high strength and ultra-high low-temperature impact on box body of fracturing pump valve and manufacturing method of steel forging
CN104233101A (en) * 2014-09-17 2014-12-24 泰尔重工股份有限公司 Rolling-cut type bilateral scissors and manufacturing method thereof
CN105506457A (en) * 2015-12-28 2016-04-20 二重集团(德阳)重型装备股份有限公司 Low-temperature forged steel manufacturing method and product thereof
CN105648161A (en) * 2016-04-08 2016-06-08 中国第重型机械股份公司 Preheat treatment method for large-size forged steel supporting roller
CN105671431A (en) * 2016-01-27 2016-06-15 南京工程学院 Manufacturing method of steel and forge piece thereof for valve seat of deep sea oil extraction equipment
CN105755365A (en) * 2015-12-30 2016-07-13 宝鼎科技股份有限公司 Low-temperature-resistant large propeller shaft and manufacturing process thereof
CN106917032A (en) * 2015-12-25 2017-07-04 上海电气上重铸锻有限公司 The method that reactor pressure vessel steels large thick-wall forging lifts low-temperature impact work

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6581782B2 (en) * 2015-03-09 2019-09-25 山陽特殊製鋼株式会社 High toughness hot work tool steel with excellent machinability and softening resistance
CN106086691A (en) * 2016-05-13 2016-11-09 如皋市宏茂重型锻压有限公司 A kind of boron micro-alloyed mould steel and preparation technology thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008015260A1 (en) * 2006-08-03 2008-02-07 Aubert & Duval Method for transforming steel blanks
CN103409699A (en) * 2013-09-06 2013-11-27 陕西华威锻压有限公司 Steel forging with ultra-high strength and ultra-high low-temperature impact on box body of fracturing pump valve and manufacturing method of steel forging
CN104233101A (en) * 2014-09-17 2014-12-24 泰尔重工股份有限公司 Rolling-cut type bilateral scissors and manufacturing method thereof
CN106917032A (en) * 2015-12-25 2017-07-04 上海电气上重铸锻有限公司 The method that reactor pressure vessel steels large thick-wall forging lifts low-temperature impact work
CN105506457A (en) * 2015-12-28 2016-04-20 二重集团(德阳)重型装备股份有限公司 Low-temperature forged steel manufacturing method and product thereof
CN105755365A (en) * 2015-12-30 2016-07-13 宝鼎科技股份有限公司 Low-temperature-resistant large propeller shaft and manufacturing process thereof
CN105671431A (en) * 2016-01-27 2016-06-15 南京工程学院 Manufacturing method of steel and forge piece thereof for valve seat of deep sea oil extraction equipment
CN105648161A (en) * 2016-04-08 2016-06-08 中国第重型机械股份公司 Preheat treatment method for large-size forged steel supporting roller

Also Published As

Publication number Publication date
CN108247284A (en) 2018-07-06

Similar Documents

Publication Publication Date Title
CN105525226B (en) A kind of martensitic stain less steel wire rod and its manufacture method
CN100455692C (en) High-strength weathering steel and method of manufacturing same
CN105039865B (en) High-strength high-toughness steel plate and manufacturing method thereof
CN109082591A (en) The high-strength oil annular tube steel of 125ksi anti-H 2 S stress corrosion and its preparation process
CN108728743B (en) Ocean engineering steel with good low-temperature fracture toughness and manufacturing method thereof
CN106636961A (en) Cu-containing nanophase strengthened easy-to-weld steel and preparation method
CN109023119A (en) Wear-resistant steel with excellent ductility and toughness and manufacturing method thereof
CN106319389B (en) The steel for engineering machinery and its manufacturing method of inexpensive, high machining property
CN108914006A (en) A kind of superhigh intensity hardened and tempered steel plate that thickness directional properties are excellent and its manufacturing method
CN106319388B (en) The low preheating type high-strength steel sheet of 80 feather weight of one kind and its manufacturing method
CN102477518A (en) Steel used for steam turbine blades and manufacturing method thereof
CN106756567B (en) A kind of preparation method of the hot rolling low density steel of strength and ductility product >=40GPa%
CN104911503A (en) Extra-thick tempering EH40 steel for ocean engineering and preparation method thereof
Vervynckt et al. Effect of niobium on the microstructure and mechanical properties of hot rolled microalloyed steels after recrystallization-controlled rolling
CN107287500A (en) Steel for pressurized water reactor nuclear power station safety injection tank base plate and manufacturing method thereof
CN104364405B (en) Welding super high tensile steel plate
WO2023165614A1 (en) Long-service-life high-toughness corrosion-resistant steel for subsea christmas tree valve and heat treatment method and production method for long-service-life high-toughness corrosion-resistant steel for subsea christmas tree valve
CN102691005A (en) Low alloy die steel
CN110205565A (en) A kind of 690 steel of disperse nano reinforcement and its manufacturing method
CN105925895B (en) Strain resistant initial aging stage is with eliminating the special thick 600MPa levels hardened and tempered steel plate of residual stress Annealing Embrittlement and its manufacture method
WO2023165617A1 (en) High-strength and high-toughness steel with long service life and wall thickness of ≥ 600 mm for valve body of subsea christmas tree, and heat treatment method and production method therefor
CN108385023A (en) High-strength high-toughness steel for nuclear power voltage stabilizer and manufacturing method thereof
CN104073731B (en) Method for producing ultrahigh-strength ship plate by adopting direct quenching process
CN105970099A (en) Cu-containing crack arrest steel and preparation method thereof
CN103981459A (en) High-strength refractory anti-seismic structure steel and production method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20180706

Assignee: Guangdong Yaoda Financial Leasing Co.,Ltd.

Assignor: KEEN OFFSHORE ENGINEERING Co.,Ltd.

Contract record no.: X2020980005507

Denomination of invention: A manufacturing method of low temperature heavy load high performance safety locking pin

Granted publication date: 20190129

License type: Exclusive License

Record date: 20200828

EE01 Entry into force of recordation of patent licensing contract
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A manufacturing method of low temperature heavy load high performance safety locking pin

Effective date of registration: 20200904

Granted publication date: 20190129

Pledgee: Guangdong Yaoda Financial Leasing Co.,Ltd.

Pledgor: KEEN OFFSHORE ENGINEERING Co.,Ltd.

Registration number: Y2020980005706

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20190129

Pledgee: Guangdong Yaoda Financial Leasing Co.,Ltd.

Pledgor: KEEN OFFSHORE ENGINEERING Co.,Ltd.

Registration number: Y2020980005706

EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract