CN108247262A - Profile steel bracket welding bracing frame and its welding method - Google Patents

Profile steel bracket welding bracing frame and its welding method Download PDF

Info

Publication number
CN108247262A
CN108247262A CN201611232503.7A CN201611232503A CN108247262A CN 108247262 A CN108247262 A CN 108247262A CN 201611232503 A CN201611232503 A CN 201611232503A CN 108247262 A CN108247262 A CN 108247262A
Authority
CN
China
Prior art keywords
profile steel
steel bracket
adjusting
bolt
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611232503.7A
Other languages
Chinese (zh)
Other versions
CN108247262B (en
Inventor
金辽东
宋赛中
陈雷
王弘力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201611232503.7A priority Critical patent/CN108247262B/en
Publication of CN108247262A publication Critical patent/CN108247262A/en
Application granted granted Critical
Publication of CN108247262B publication Critical patent/CN108247262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs

Abstract

The present invention relates to the welding methods of pipeline bracket more particularly to profile steel bracket.Profile steel bracket welding bracing frame, it includes trolley, and the trolley includes vehicle frame, and vehicle frame side is equipped with vehicle handrail, and bottom four corners set idler wheel, it further includes the adjusting post and height adjustment device being placed in car frame, it is located on the inside of adjusting post.Profile steel bracket welding method, it includes:A profile steel bracket is taken to be placed between two adjusting posts, while profile steel bracket bottom end is placed in jacking apparatus Z-shaped frame upper;Z-shaped stent is driven to jack by the regulation handle rotation on jacking apparatus, profile steel bracket is adjusted to required height of constructing;Coordinated using line pendant with the bolt on adjusting post, by the bolt left and right adjusting on two adjusting posts, profile steel bracket is fixed on plumbness;It is welded, until by profile steel bracket firm welding, completes construction task.

Description

Profile steel bracket welding bracing frame and its welding method
Technical field
The present invention relates to the welding methods of pipeline bracket more particularly to profile steel bracket.
Background technology
It is built in pipeline profile steel bracket work progress in industry, municipal administration, room, since most profile steel bracket is heavier, especially It is under the narrow environment of construction, a large amount of manpower and materials is expended from transporting to installing, construction is cumbersome, inefficient, applies simultaneously Work can not also ensure safely.
Conventional construction method is passed through frequently with manpower or is transported using cart into profile steel bracket is about to construction location.Installation When, using more people coordinate, from manually lift and meanwhile with welder.It is too near due to lifting worker and welder's distance, it is welding During work welding, it may appear that welding slag burns people's phenomenon, such phenomenon construct it is commonplace.Due to manually lifting, when profile steel bracket tune During whole verticality, governing speed is slow or because welder's spot welding is insecure, when adjusting, bracket is caused to fall and injures construction personnel by a crashing object, passes Construction technology disadvantage of uniting is excessive.
Invention content
Present invention seek to address that drawbacks described above, provides a kind of profile steel bracket welding bracing frame and its welding method.The present invention Without manually lifting, avoid hurting sb.'s feelings, while adjust verticality fast and easy.
To solve the above problems, profile steel bracket welding bracing frame of the present invention, it includes trolley, and the trolley includes vehicle frame, Vehicle frame side is equipped with vehicle handrail, and bottom four corners set idler wheel, which is characterized in that it, which is further included, is placed in car frame:
Adjusting post, it is located at a side end of car frame, and including a pair of upright shaped steel, shaped steel spacing is more than profile steel bracket Width is respectively equipped with bolt and nut in each shaped steel upper and lower ends, and nut is welded with shaped steel;
Height adjustment device, it is located on the inside of adjusting post, and an adjusting bolt is uprightly welded including pedestal, on pedestal, adjusts A regulation handle is set on bolt, covers a casing at the top of adjusting bolt, cannula tip is welded on the top of a Z-shaped stent On lower surface.
The profile steel bracket welding bracing frame, the vehicle frame right side is profile steel bracket placement region.
A kind of profile steel bracket welding method using the profile steel bracket welding bracing frame, it includes:
Multiple profile steel brackets are placed on the right side of car frame, transport construction point position by step 1;
Step 2 takes a profile steel bracket to be placed between two adjusting posts, while profile steel bracket bottom end is placed in jacking dress Put Z-shaped frame upper;
Step 3 drives Z-shaped stent to jack, profile steel bracket is adjusted to construct by the regulation handle rotation on jacking apparatus Required height;
Step 4 is coordinated using line pendant with the bolt on adjusting post, will by the bolt left and right adjusting on two adjusting posts Profile steel bracket is fixed on plumbness;
Step 5 is welded, until by profile steel bracket firm welding, completes construction task.
The supporting rack of the present invention makes simple, install convenient.Profile steel bracket installation is fixed not by the shadow of other external factors It rings, greatly improves construction efficiency, and ensure that construction quality;The present invention makes profile steel bracket installation more convenient, simultaneously Greatly construction safety is ensured.
Description of the drawings
In the following, with reference to attached drawing, the present invention is further illustrated:
Fig. 1 is the profile steel bracket welding bracing frame schematic diagram of the present invention;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is height adjustment device schematic diagram of the present invention.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, profile steel bracket welding bracing frame of the present invention, it includes trolley 3, and the trolley includes Vehicle frame, vehicle frame side are equipped with vehicle handrail 31, and bottom four corners set idler wheel 32, it, which is further included, is placed in car frame:
Adjusting post, it is located at a side end of car frame, and including a pair of upright shaped steel 1, shaped steel spacing is more than shaped steel support Frame width is respectively equipped with bolt 11 and nut in each shaped steel upper and lower ends, and nut is welded with shaped steel;
Height adjustment device, it is located on the inside of adjusting post, and an adjusting bolt 21 is uprightly welded including pedestal 2, on pedestal, adjusts It saves and a regulation handle 22 is set on bolt, cover a casing 23 at the top of adjusting bolt, cannula tip is welded on a Z-shaped branch On the top lower surface of frame 24.
The profile steel bracket welding bracing frame, the vehicle frame right side is profile steel bracket placement region.
The production method of profile steel bracket welding bracing frame of the present invention is
Using length and two similar shaped steel of 4 length of profile steel bracket, one M12 bolt is respectively installed in each shaped steel upper and lower ends And nut, nut are welded with shaped steel, form adjusting post 1.
Z-shaped stent is fabricated to using steel plate, Z-shaped pedestal upper end welds a casing, and casing inner diameter is slightly larger than jacking Bolt outer diameter.Adjusting bolt is inserted the cannula into, the installation and adjustment handle in adjusting bolt is steady when constructing for guarantee jacking apparatus It is fixed, pedestal is welded into bolt lower end and one block of steel plate, forms jacking apparatus 2.
A trolley is made, two adjusting posts are mounted on trolley one end(According to construction requirement, such as construction area both ends Need mounting bracket, then trolley both ends can weld two " 1 " adjusting posts simultaneously), two " 1 " adjusting posts gap between it It is more bigger than profile steel bracket.
Jacking apparatus is placed on trolley, since jacking apparatus is equipped with pedestal, without being welded on trolley, can arbitrarily be moved It is dynamic.
When profile steel bracket is constructed, multiple profile steel brackets are placed on trolley, bracket is reduced and transports one by one.Transport construction Point position, between profile steel bracket is placed on two adjusting posts, at the same profile steel bracket bottom end be placed in jacking apparatus Z-shaped it is curved on Portion.The curved jacking of Z-shaped is driven by the regulation handle rotation on jacking apparatus, profile steel bracket is adjusted to required height of constructing Degree.Then coordinated using line pendant with the bolt on adjusting post, by the bolt left and right adjusting on two adjusting posts, by shaped steel Bracket is fixed on plumbness.Then it is welded, until by profile steel bracket firm welding, completes construction task.

Claims (3)

1. profile steel bracket welding bracing frame, it includes trolley, and the trolley includes vehicle frame, and vehicle frame side is equipped with vehicle handrail, bottom Quadrangle sets idler wheel, which is characterized in that it, which is further included, is placed in car frame:
Adjusting post, it is located at a side end of car frame, and including a pair of upright shaped steel, shaped steel spacing is more than profile steel bracket Width is respectively equipped with bolt and nut in each shaped steel upper and lower ends, and nut is welded with shaped steel;
Height adjustment device, it is located on the inside of adjusting post, and an adjusting bolt is uprightly welded including pedestal, on pedestal, adjusts A regulation handle is set on bolt, covers a casing at the top of adjusting bolt, cannula tip is welded on the top of a Z-shaped stent On lower surface.
2. profile steel bracket welding bracing frame according to claim 1, which is characterized in that be profile steel bracket on the right side of the vehicle frame Placement region.
3. a kind of profile steel bracket welding method using profile steel bracket welding bracing frame according to claim 1 or 2, special Sign is that it includes:
Multiple profile steel brackets are placed on the right side of car frame, transport construction point position by step 1;
Step 2 takes a profile steel bracket to be placed between two adjusting posts, while profile steel bracket bottom end is placed in jacking dress Put Z-shaped frame upper;
Step 3 drives Z-shaped stent to jack, profile steel bracket is adjusted to construct by the regulation handle rotation on jacking apparatus Required height;
Step 4 is coordinated using line pendant with the bolt on adjusting post, will by the bolt left and right adjusting on two adjusting posts Profile steel bracket is fixed on plumbness;
Step 5 is welded, until by profile steel bracket firm welding, completes construction task.
CN201611232503.7A 2016-12-28 2016-12-28 Section steel bracket welding support frame and welding method thereof Active CN108247262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611232503.7A CN108247262B (en) 2016-12-28 2016-12-28 Section steel bracket welding support frame and welding method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611232503.7A CN108247262B (en) 2016-12-28 2016-12-28 Section steel bracket welding support frame and welding method thereof

Publications (2)

Publication Number Publication Date
CN108247262A true CN108247262A (en) 2018-07-06
CN108247262B CN108247262B (en) 2019-12-17

Family

ID=62720188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611232503.7A Active CN108247262B (en) 2016-12-28 2016-12-28 Section steel bracket welding support frame and welding method thereof

Country Status (1)

Country Link
CN (1) CN108247262B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132862A (en) * 2018-10-25 2019-01-04 上海宝冶集团有限公司 A kind of carriage device and method being segmented steel mast for just falling to mix lifting movement
CN110405327A (en) * 2019-07-29 2019-11-05 哈尔滨锅炉厂有限责任公司 The novel adjustable top wheel apparatus of one kind and adjusting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202046430U (en) * 2010-12-07 2011-11-23 上海江南长兴造船有限责任公司 Dock pier trailer
CN202400195U (en) * 2011-12-28 2012-08-29 力帆实业(集团)股份有限公司 Rear bracket supporting device
CN203233270U (en) * 2013-05-29 2013-10-09 杨红涛 Rapid lifting device of pumping-unit motor
CN204893260U (en) * 2015-07-31 2015-12-23 上海宝冶集团有限公司 Weld device of high -strength steel structure roof beam, H shaped steel in batches
KR20160095503A (en) * 2015-02-03 2016-08-11 윤효성 Welded pipe support fixture

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202046430U (en) * 2010-12-07 2011-11-23 上海江南长兴造船有限责任公司 Dock pier trailer
CN202400195U (en) * 2011-12-28 2012-08-29 力帆实业(集团)股份有限公司 Rear bracket supporting device
CN203233270U (en) * 2013-05-29 2013-10-09 杨红涛 Rapid lifting device of pumping-unit motor
KR20160095503A (en) * 2015-02-03 2016-08-11 윤효성 Welded pipe support fixture
CN204893260U (en) * 2015-07-31 2015-12-23 上海宝冶集团有限公司 Weld device of high -strength steel structure roof beam, H shaped steel in batches

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132862A (en) * 2018-10-25 2019-01-04 上海宝冶集团有限公司 A kind of carriage device and method being segmented steel mast for just falling to mix lifting movement
CN109132862B (en) * 2018-10-25 2020-07-07 上海宝冶集团有限公司 Method for forward-backward hybrid hoisting of mobile segmented steel mast
CN110405327A (en) * 2019-07-29 2019-11-05 哈尔滨锅炉厂有限责任公司 The novel adjustable top wheel apparatus of one kind and adjusting method
CN110405327B (en) * 2019-07-29 2021-05-14 哈尔滨锅炉厂有限责任公司 Novel adjustable top wheel device and adjusting method

Also Published As

Publication number Publication date
CN108247262B (en) 2019-12-17

Similar Documents

Publication Publication Date Title
CN207282017U (en) A kind of traffic lights easy to repair
CN106078030B (en) One kind is used for penstock stiffening ring automatic welding device and method
CN107458973A (en) A kind of hanging lifting device of surface structures steel pipe
CN104493370A (en) Automatic welding process for small-diameter pipe
CN108247262A (en) Profile steel bracket welding bracing frame and its welding method
US3409334A (en) Tubular column for conveying concrete or the like
JP6533673B2 (en) Continuous belt conveyor height adjustment mechanism
CN204454064U (en) A kind of aluminium wire take-up stand
JP2019210109A (en) Lifting device of heavy load and lifting and conveying method
KR102075319B1 (en) Pointing part formation method of drawing pipe including the automatic welding step and plasma hole formation step and apparatus thereof
CN114700668A (en) Automatic processing equipment for I-steel of underground continuous wall reinforcement cage joint
CN211110746U (en) Slope moving platform hoisting device
CN210882183U (en) Height-adjustable support trolley
CN107237498A (en) A kind of steel pipe triangular truss structure roof slide installation method
CN208772803U (en) A kind of large capacity liner is dedicated to exempt from clamping angle adjustable girth welding machine
CN208166421U (en) A kind of hanging apparatus of metal plate
CN207847254U (en) A kind of construction guard fender
CN210825164U (en) Box girder prestressed jack installation device
JP2906471B2 (en) Idler propeller mounting device
CN206970160U (en) Pipe riser
CN209242382U (en) A kind of Cable holder for distribution
CN105565190B (en) A kind of derrick crane
CN218262263U (en) Glass kiln arch top tire piece lifting steel pipe supporting and colliding device
CN210341746U (en) Installation adjusting device of steel crash barrier
CN207465154U (en) A kind of movable type top plate perforating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant